Inspector(s): Ulmer/Russo/Perkins I Date(s): 20-Aug-19
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type&Time (1 day) Total Inspection Days: 3
Standard:F7 Construction: 73 Training: F7 (T)(D) Integrity Management: 1= Incident: EJ
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
20 Aug 2019: (3.0 Construction)
Observed the crew performing a new service bore of a 3/4" PE to 935 W. Hubbard in Kuna to replace an
existing HPSS. The crew was excavating the existing serivice at the house upon arrival in preperation for
the bore. They bored in and pulled back the 3/4" PE to the HPSS bellhole. Did not witness the
completion of the project.
Areas observed during this project were: Excavating, Boring
20 Aug 2019: (.0 post Construction)
Type construction report.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by (date):
Inspector (lead): M Date: