HomeMy WebLinkAboutIntermountain Gas 18 Jul Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Russo Date(s): 18-Jul-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 2.5
Standard:F-] Construction: 2.5 Training: F__] (T)(D)Integrity Management: Incident:
M/M: F-1 Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on DAS-CO, a contractor for Intermountain Gas Company.
18 July 2019: (2.0 Construction)
Crew was installing new 3/4" service line to a new home at 101 SW Locust Drive in Mountain home.
Foreman was unable to determine exact location of sewer line so he called a plumbing company who
ran a locator camera and marked location prior to boring/hand digging. Located existing main and hand
dug until main was located. Used boring machine to run approximately 60' under a road to hand dug
trench near residence. Installed new riser/meter and pressure tested.
Areas observed during this project were: Line locations, boring, installing new service line and tracer wire,
installing service T and EFV, pressure testing, bedding/backfiIling,
5 August 2019: (.5 post Construction)
Type construction report.
Attachments:
IPUC Form 4 Construction Inspections
DAS-CO Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes 71 No X by(date):
Inspector (Lead): Date:
Bruce Perkins
Reviewer: Date:
u 9 .Zvl/
IPUC Form 1