HomeMy WebLinkAboutIntermountain Gas 18 Jul Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Russo Date(s): 18-Jul-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type&Time (1 day, 0.5 day) Total Inspection Days: 2.5 Standard:F-] Construction: 2.5 Training: F__] (T)(D)Integrity Management: Incident: M/M: F-1 Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on DAS-CO, a contractor for Intermountain Gas Company. 18 July 2019: (2.0 Construction) Crew was installing new 3/4" service line to a new home at 101 SW Locust Drive in Mountain home. Foreman was unable to determine exact location of sewer line so he called a plumbing company who ran a locator camera and marked location prior to boring/hand digging. Located existing main and hand dug until main was located. Used boring machine to run approximately 60' under a road to hand dug trench near residence. Installed new riser/meter and pressure tested. Areas observed during this project were: Line locations, boring, installing new service line and tracer wire, installing service T and EFV, pressure testing, bedding/backfiIling, 5 August 2019: (.5 post Construction) Type construction report. Attachments: IPUC Form 4 Construction Inspections DAS-CO Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes 71 No X by(date): Inspector (Lead): Date: Bruce Perkins Reviewer: Date: u 9 .Zvl/ IPUC Form 1