Inspector(s): I Perkins I Date(s): 16-19 Apr 2019
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type&Time (1 day, 0.5 day) I Total Inspection Days: 4
Standard:� Construction: 3.5 Training: (T)(D)Integrity Management: EJ Incident:
M/M: F-1 Follow-up: F-1 oQ: 0.5 Damage Prevention: F-1 D&A: EJ
Inspection Summary
A construction inspection was performed on DAS-CO, a contractor for Intermountain Gas Company.
16-18 April 2019: (2.5 Construction .5 OQ)
Crew was installing a 8" steel main as part of a road widening project and tying into an existing 10" main which
when completed will operate at 390 PSI. (Project# 191GC-2001).
Areas observed during this project were: Other utility location, Welding,Welding inspection by QCI, Excavation,
Pot holing, Abandoning, Main line installation (tracer wire),Tie-ins and Backfilling.
An operator qualification inspection was performed on Gordon Finlay of QCI (Subcontracted by IGC)that was
performing as the Certified Welding Inspector.
19 April 2019: (1 post Construction)
Type construction report.
Attachments:
IPUC Form 4 Construction Inspections
DAS-CO Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Photo's are located in file for the project.
PHMSA Form 15,OQ Field Inspection Form
Corrective Action Required: Follow-up Required: Yes No X
Yes No FX_1 by(date):
Inspector(Lead): Date:
Bruce Perkins 1?;4rl2
Reviewer: Date:
IPUC Form 1