Loading...
HomeMy WebLinkAboutIntermountain Gas 16-17 May Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins, Russo I Date(s): 16-17 May 201 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 2 Standard: Construction: F2 Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on DAS-CO, a contractor for Intermountain Gas Company. 16-17 May 2019: (2 Construction) Observed the Dasco crew installing and tapping a new W service in the Neville Ranch subdivision at 3610 W. Miners Farm, Boise.Typed up report Areas observed during this inspection were: Locating, Excavating,Tie-ins,Tapping, Backfilling. Attachments: IPUC Form 4 Construction Inspections DAS-CO Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Photo's are located in file for the project. PHMSA Form 15, OQ Field Inspection Form Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector(Lead): Date: Bruce Perkins g I I Reviewer: Date: IPUC Form 1