HomeMy WebLinkAboutIntermountain Gas 12 Sep Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Russo I Date(s): 12-Sep-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard:F-1 Construction: F-1-1 Training: F-] (T)(D) Integrity Management: Incident:
M/M: = Follow-up: Oct: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
12 Sept 2019: (1.0 Construction)
Observed a Dasco crew excavating for a new service. They used proper installation methods and
maintained seperation from other utilities in trench. Typed up report.
Areas observed during this project were: Excavating, Installation, Coupling, Backfilling, Purging
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by (date):
Inspector (Lead): Date:
Kyle Russo L a ► I
Reviewer: Date:
5z.1 a K &1
IPUC Form 1