Loading...
HomeMy WebLinkAboutIntermountain Gas 12 Sep Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Russo I Date(s): 12-Sep-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:F-1 Construction: F-1-1 Training: F-] (T)(D) Integrity Management: Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 12 Sept 2019: (1.0 Construction) Observed a Dasco crew excavating for a new service. They used proper installation methods and maintained seperation from other utilities in trench. Typed up report. Areas observed during this project were: Excavating, Installation, Coupling, Backfilling, Purging Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by (date): Inspector (Lead): Date: Kyle Russo L a ► I Reviewer: Date: 5z.1 a K &1 IPUC Form 1