HomeMy WebLinkAboutIntermountain Gas 10 Oct Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Russo Date(s): 10-Oct-19
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 1
Standard:F-] Construction: FT] Training: (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
10 Oct 2019: (1.0 Construction)
Observed a Dasco crew excavating for a new service. They exposed the stub and prepared the service for
installation. They put it on a pressure test and prepared the stub for tie in. Left a branch stub for the
future lot next door. Typed up report
Areas observed during this project were: Excavating, Line locating, Coupling, Pressure test
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yesi No X
Yes No X by(date):
Inspector (Lead): Date:
Kyle Russo
Reviewer: Date:
IPUC Form 1