Loading...
HomeMy WebLinkAboutIntermountain Gas 10 Oct Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Russo Date(s): 10-Oct-19 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days:1 1 Standard:F-] Construction: FT] Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 10 Oct 2019: (1.0 Construction) Observed a Dasco crew excavating for a new service. They exposed the stub and prepared the service for installation. They put it on a pressure test and prepared the stub for tie in. Left a branch stub for the future lot next door. Typed up report Areas observed during this project were: Excavating, Line locating, Coupling, Pressure test Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yesi No X Yes No X by(date): Inspector (Lead): Date: Kyle Russo Reviewer: Date: IPUC Form 1