Loading...
HomeMy WebLinkAboutIntermountain Gas 9 Oct Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Russo Date(s): 9-Oct-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days: 2.5 Standard:F] Construction: 2.5 Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 9 Oct 2019: (2.0 Construction) Observed a Dasco crew excavating/boring for a new service. Used locating equipment/hand digging/vac- truck to locate utilities prior to using backhoe. Installed tee off of adjacent service 3/4"-3/4" and installed new riser,bedded new line and used excavated materials as cover. Areas observed during this project were: Excavating, Line locating, material handling, bedding, pipe/tracer wire installation, boring and riser installation 10 Oct 2019: (.5 post Construction) Type construction report. Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X1 by(date): Inspector (Lead): r Date: Bruce Perkins ©47/� Reviewer: Date: IPUC Form 1