HomeMy WebLinkAboutIntermountain Gas 8 Oct Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Russo Date(s): 8-Oct-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days:1 1
Standard:FI Construction: � Training: [7 (T)(D) Integrity Management: E] Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
8 Oct 2019: (1.0 Construction)
Observed a Dasco crew installing a branch service for two homes in Boise. Observed them excavating
for the services. They exposed the stub and laid the service in the trench to install. Pressure tested and
tied in. I had left before the gas was purged and backfilled. Typed up report
Areas observed during this project were: Excavating, Line locating, Coupling, Pressure testing
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
YesF71 No X by(date):
spector (Lead): Date:In
Kyle Russo
Reviewer: Date:
IPUC Form 1