HomeMy WebLinkAboutIntermountain Gas 7-10 Oct Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Ulmer Date(s): 7-10 Oct 2019
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) Total Inspection Days: 5
Standard: Construction: F4 Training: r7 (T)(D) Integrity Management: El Incident:
M/M: 0.5 Follow-up: OQ: 0.5 Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on KV Utilities, a contractor for Intermountain Gas Company.
7-9 Oct 2019: (2 Construction, .5 MM, .5 OQ)
Observed a KV Utilities crew excavate/drive 6" steel casing under RR tracks. Crew drove in casing 20
feet, pot holed and was two feet short of the target depth. Torpedoed casing out, excavated deeper
and drove the casing back in.
Areas observed during this project were: Torpedoing, Excavating, material handling and driving
An operator qualification inspection was performed on Jacob Wesley a KV employee that was performing
Installation of Steel Pipe: Driving. Jacob performed the task in a satisfactory manner.
A master meter inspection was conducted on BYU campus in Rexburg. Checked campus apartments and
cafeteria/food court. No master meters found.
10 Oct 2019: (1 Construction)
Drove back to Boise.
11 Oct 2019: (1 Construction)
Typed report.
Attachments:
IPUC Form 4 Construction Inspections
KV Daily Itineraries
OQ's for all observed employees are located in file for the project.
PHMSA Form 15 OQ Field Inspection
Corrective Action Required: Follo -up Required: Yes No X
Yes Nor X by (date):