HomeMy WebLinkAboutIntermountain Gas 7 Oct Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins/Russo Date(s): 7-Oct-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days: 2.5 Standard:� Construction: 25 Training: (T)(D) Integrity Management: Incident: M/M: F-1 Follow-up: F7 oQ: F-1 Damage Prevention: El D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 7 Oct 2019: (2.0 Construction) Observed a Dasco crew excavating/torpedo for a new service. Used locating equipment/hand digging to locate utilities prior to using backhoe. Installed tee off of adjacent service 1/2"-3/4" and installed new riser, performed pressure test, bedded new line and used excavated materials as cover. Areas observed during this project were: Excavating, Line locating, material handling, bedding, pipe/tracer wire installation, pressure test, EFV installation and riser installation 8 Oct 2019: (.5 post Construction) Type construction report. Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes7l No X by(date): Inspector (Lead): Date: Bruce Perkinszd_9a�� Oc7 Reviewer: Date: IPUC Form 1