HomeMy WebLinkAboutIntermountain Gas 7 Oct Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Perkins/Russo Date(s): 7-Oct-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) Total Inspection Days: 2.5
Standard:� Construction: 25 Training: (T)(D) Integrity Management: Incident:
M/M: F-1 Follow-up: F7 oQ: F-1 Damage Prevention: El D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
7 Oct 2019: (2.0 Construction)
Observed a Dasco crew excavating/torpedo for a new service. Used locating equipment/hand digging to
locate utilities prior to using backhoe. Installed tee off of adjacent service 1/2"-3/4" and installed new
riser, performed pressure test, bedded new line and used excavated materials as cover.
Areas observed during this project were: Excavating, Line locating, material handling, bedding, pipe/tracer wire
installation, pressure test, EFV installation and riser installation
8 Oct 2019: (.5 post Construction)
Type construction report.
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes7l No X by(date):
Inspector (Lead): Date:
Bruce Perkinszd_9a�� Oc7
Reviewer: Date:
IPUC Form 1