Loading...
HomeMy WebLinkAboutIntermountain Gas 5-8 Aug Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Ulmer/Russo Date(s): 5-8 Aug 2019 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (4 day, 0.5 day) Total Inspection Days:1 8.5 Standard:F—] Construction: 8.5 Training: F__] (T)(D) Integrity Management: E] Incident: E] M/M: F7 Follow-up: F-1 OQ: F-1 Damage Prevention: D&A: El Inspection Summary A construction inspection was performed on KV Utilities, a contractor for Intermountain Gas Company. 5-8 Aug 2019: (8.0 Construction) Observed the crew potholing in preparation for the bore. They excavated the 2" PE they had split/pulled prior to our inspection. Watched a "Missile/thumper" shot for a section of the 2" PE main installation. Watched them bore on the main road to their tie-in location. They were stopped short due to the rocky ground and had to trench the rest to the tie-in location. They pulled back the 2" main for they section of bore the had completed. Areas observed during this project were: Trenching, Boring, Squeezing, Mechanical coupling, Line Locating 9 Aug 2019: (.5 post Construction) Type construction report. Attachments: IPUC Form 4 Construction Inspections KV Utilities Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yesl I No X Yes NoF X by (date): Inspector (Lead): Date: Darrin Ulmer of Reviewer: Date: IPUC Form 1