HomeMy WebLinkAboutIntermountain Gas 5-8 Aug Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Ulmer/Russo Date(s): 5-8 Aug 2019
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (4 day, 0.5 day) Total Inspection Days:1 8.5
Standard:F—] Construction: 8.5 Training: F__] (T)(D) Integrity Management: E] Incident: E]
M/M: F7 Follow-up: F-1 OQ: F-1 Damage Prevention: D&A: El
Inspection Summary
A construction inspection was performed on KV Utilities, a contractor for Intermountain Gas Company.
5-8 Aug 2019: (8.0 Construction)
Observed the crew potholing in preparation for the bore. They excavated the 2" PE they had split/pulled
prior to our inspection. Watched a "Missile/thumper" shot for a section of the 2" PE main installation.
Watched them bore on the main road to their tie-in location. They were stopped short due to the rocky
ground and had to trench the rest to the tie-in location. They pulled back the 2" main for they section of
bore the had completed.
Areas observed during this project were: Trenching, Boring, Squeezing, Mechanical coupling, Line Locating
9 Aug 2019: (.5 post Construction)
Type construction report.
Attachments:
IPUC Form 4 Construction Inspections
KV Utilities Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yesl I No X
Yes NoF X by (date):
Inspector (Lead): Date:
Darrin Ulmer of
Reviewer: Date:
IPUC Form 1