HomeMy WebLinkAboutIntermountain Gas 5-6 Dec Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Russo I Date(s): 5-6 Dec 2019
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) Total Inspection Days: 3.5
Standard:F-] Construction: 2.5 Training: (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A: a
Inspection Summary
A construction inspection was performed on KV Utilities, a contractor for Intermountain Gas Company.
5 Dec 2019: (1.0 Construction)
Observed a KV Utilities crew excavating for a new service. They were using a backhoe but decided to
come back with the right equipment at a later date due to running into large rocks. They'll need to
bore it from the stub location under the road to the tie-in.
Areas observed during this project were: Excavating, Line Locating and OQ's
Observed a KV Utilities crew running service line from a stub. Crew was in the process of squeezing the stub to
attach new service line when I noticed that the squeeze tool did not have an attached grounding cable. I
stopped them from doing the squeeze and notified IGC personnel. KV Utilities leadership arrived and attached
a grounding cable. At that time I allowed the crew to complete the installation.
Areas observed during this project were: Excavating, Line locating, Bedding, Pressure testing, EFV installation,
Purging, and OQ's
6 Dec 2019: ( 1.0 Construction/1.0 Timp)
Observed a KV utilities crew excavating for a new service in a joint trench. Crew was very careful in hand digging
when within 2 feet of lines.
A compressor inspection was performed on IGC and contractor personnel on the Jerome compressor.
Observed IGC and contractor personnel troubleshooting, following O&M procedures and running up the
compressor station.
9 Dec 2019: (.5 Typed report)
Attachments:
IPUC Form 4 Construction Inspections
Track Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
IPUC Form 1
Idaho PUC Pipeline Safety Inspection Summary
Corrective Action Required: Follow-up Required: Yes No X
Yes No X I A by(date):
Inspector (Lead): ep Date:
Perkins 12/9/2019
Reviewer: Date:
IPUC Form 1