Loading...
HomeMy WebLinkAboutIntermountain Gas 5-6 Dec Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Russo I Date(s): 5-6 Dec 2019 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days: 3.5 Standard:F-] Construction: 2.5 Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: a Inspection Summary A construction inspection was performed on KV Utilities, a contractor for Intermountain Gas Company. 5 Dec 2019: (1.0 Construction) Observed a KV Utilities crew excavating for a new service. They were using a backhoe but decided to come back with the right equipment at a later date due to running into large rocks. They'll need to bore it from the stub location under the road to the tie-in. Areas observed during this project were: Excavating, Line Locating and OQ's Observed a KV Utilities crew running service line from a stub. Crew was in the process of squeezing the stub to attach new service line when I noticed that the squeeze tool did not have an attached grounding cable. I stopped them from doing the squeeze and notified IGC personnel. KV Utilities leadership arrived and attached a grounding cable. At that time I allowed the crew to complete the installation. Areas observed during this project were: Excavating, Line locating, Bedding, Pressure testing, EFV installation, Purging, and OQ's 6 Dec 2019: ( 1.0 Construction/1.0 Timp) Observed a KV utilities crew excavating for a new service in a joint trench. Crew was very careful in hand digging when within 2 feet of lines. A compressor inspection was performed on IGC and contractor personnel on the Jerome compressor. Observed IGC and contractor personnel troubleshooting, following O&M procedures and running up the compressor station. 9 Dec 2019: (.5 Typed report) Attachments: IPUC Form 4 Construction Inspections Track Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Corrective Action Required: Follow-up Required: Yes No X Yes No X I A by(date): Inspector (Lead): ep Date: Perkins 12/9/2019 Reviewer: Date: IPUC Form 1