HomeMy WebLinkAboutIntermountain Gas 5 Sep Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Russo 11 Date(s): 5-Sep-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:F-] Construction: 71 Training: F__] (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. S Sept 2019: (1.0 Construction) Observed a Dasco crew excavating for a new service. They were exposing the stub and riser location but decided to come back with the right equipment at a later date due to a concrete driveway being poured before the gas was installed. Typed up report Areas observed during this project were: Excavating, Line locating Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector (Lead): Date: Kyle Russo 10 1 A Reviewer: Date: A Lac IPUC Form 1