HomeMy WebLinkAboutIntermountain Gas 5 Sep Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Russo 11 Date(s): 5-Sep-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard:F-] Construction: 71 Training: F__] (T)(D) Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
S Sept 2019: (1.0 Construction)
Observed a Dasco crew excavating for a new service. They were exposing the stub and riser location but
decided to come back with the right equipment at a later date due to a concrete driveway being poured
before the gas was installed. Typed up report
Areas observed during this project were: Excavating, Line locating
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No X by(date):
Inspector (Lead): Date:
Kyle Russo 10 1 A
Reviewer: Date:
A Lac
IPUC Form 1