Loading...
HomeMy WebLinkAboutIntermountain Gas 4 Sep Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Russo I Date(s): 4-Sep-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type&Time (1 day) I Total Inspection Days: 1 Standard: Construction: Training: (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 4 Sept 2019: (1.0 Construction) Observed a Dasco crew moved a riser due to it being too close to the electrical panel. They dug up, squeezed, pressure tested, tied in and backfilled the existing sevice. Typed up report. Areas observed during this project were: Excavating, Squeezing, Pressure testing Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes NoF X by(date): Inspector (Lead): DDate: Kyle Russo to lilt Reviewer: Date: IPUC Form 1