HomeMy WebLinkAboutIntermountain Gas 4 Oct Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Russo I Date(s): 4-Oct-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day) Total Inspection Days:1 1
Standard: Construction: � Training: (T)(D)Integrity Management: Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
4 Oct 2019: (1.0 Construction)
Observed a Dasco crew backfilling the first service. We travelled to the next location and observed them
excavating for a new service. They were exposing the stub and getting the service ready to install. I had
left before the gas was installed and backfilled. Typed up report
Areas observed during this project were: Excavating, Line locating, Backfilling
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes F7 No X by (date): /b I / 9
Inspector (Lead): ' Date:
Kyle Russo -