HomeMy WebLinkAboutIntermountain Gas 4 Oct Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Russo I Date(s): 4-Oct-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day) Total Inspection Days:1 1 Standard: Construction: � Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 4 Oct 2019: (1.0 Construction) Observed a Dasco crew backfilling the first service. We travelled to the next location and observed them excavating for a new service. They were exposing the stub and getting the service ready to install. I had left before the gas was installed and backfilled. Typed up report Areas observed during this project were: Excavating, Line locating, Backfilling Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes F7 No X by (date): /b I / 9 Inspector (Lead): ' Date: Kyle Russo - Reviewer: Date: j5 G0ei A)1 . IPUC Form 1