HomeMy WebLinkAboutIntermountain Gas 4 Nov Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Russo Date(s): 4-Nov-19
Company/Owner: Intermountain Gas Company Unit/OPID: 8160
Inspection Type &Time (1 day) I Total Inspection Days: 1
Standard:F] Construction: � Training: F__� (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company.
4 Nov 2019: (1.0 Construction)
Observed a Dasco crew installing a new 3/4"PE service. They trenched and bored this service line due to
the main being on the opposite side of the street. The bore crew was wrapping up when I arrived. They
bolted on a new 2" x 3/4" service tee, installed an EFV, bedded and shaded the line and pressure tested it.
They also installed the meter bar at the riser. I left before they purged the service.
Areas observed during this project were: Excavating, material handling, bedding, pipe/tracer wire installation,
pressure test, EFV installation and riser installation
Attachments:
IPUC Form 4 Construction Inspections
Das-co Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yes No X
Yes No FX by(date):
Inspector(Lead): Date:
Kyle Russo 11/4/2019
Reviewer: Date:
cv l 0'
IPUC Form 1