HomeMy WebLinkAboutIntermountain Gas 4 Nov Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Russo Date(s): 4-Nov-19 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Inspection Type &Time (1 day) I Total Inspection Days: 1 Standard:F] Construction: � Training: F__� (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Das-co, a contractor for Intermountain Gas Company. 4 Nov 2019: (1.0 Construction) Observed a Dasco crew installing a new 3/4"PE service. They trenched and bored this service line due to the main being on the opposite side of the street. The bore crew was wrapping up when I arrived. They bolted on a new 2" x 3/4" service tee, installed an EFV, bedded and shaded the line and pressure tested it. They also installed the meter bar at the riser. I left before they purged the service. Areas observed during this project were: Excavating, material handling, bedding, pipe/tracer wire installation, pressure test, EFV installation and riser installation Attachments: IPUC Form 4 Construction Inspections Das-co Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No FX by(date): Inspector(Lead): Date: Kyle Russo 11/4/2019 Reviewer: Date: cv l 0' IPUC Form 1