HomeMy WebLinkAboutIntermountain Gas 2 Jul Construction Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Russo I Date(s): 2-Jul-19
Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2.5
Standard: Construction: 2.5 Training: (T)(D) Integrity Management: EJ Incident: EJ
M/M: 71 Follow-up: r7 oQ: F-1 Damage Prevention: El D&A: El
Inspection Summary
A construction inspection was performed on DAS-CO, a contractor for Intermountain Gas Company.
2 July 2019: (2.0 Construction)
Crew was installing new 3/4" service lines to 3 new homes, using saddle T's off of 2" main and installing and
pressure testing associated piping and EFV's..
Areas observed during this project were: Line locations,trenching, installing new service line and tracer wire,
installing saddle T's and EFV, pressure testing, bedding/backfilling,
5 July 2019: (.5 post Construction)
Type construction report.
Attachments:
IPUC Form 4 Construction Inspections
DAS-CO Daily Itineraries located in file for the project.
OQ's for all observed employees are located in file for the project.
Corrective Action Required: Follow-up Required: Yesl No X
Yes No X by(date):
Inspector(Lead): Date:
Bruce Perkins
Reviewer: Date:
-; Z�/ 01 7-- 1 z