Loading...
HomeMy WebLinkAboutIntermountain Gas 2 Jul Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Russo I Date(s): 2-Jul-19 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days: 2.5 Standard: Construction: 2.5 Training: (T)(D) Integrity Management: EJ Incident: EJ M/M: 71 Follow-up: r7 oQ: F-1 Damage Prevention: El D&A: El Inspection Summary A construction inspection was performed on DAS-CO, a contractor for Intermountain Gas Company. 2 July 2019: (2.0 Construction) Crew was installing new 3/4" service lines to 3 new homes, using saddle T's off of 2" main and installing and pressure testing associated piping and EFV's.. Areas observed during this project were: Line locations,trenching, installing new service line and tracer wire, installing saddle T's and EFV, pressure testing, bedding/backfilling, 5 July 2019: (.5 post Construction) Type construction report. Attachments: IPUC Form 4 Construction Inspections DAS-CO Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Corrective Action Required: Follow-up Required: Yesl No X Yes No X by(date): Inspector(Lead): Date: Bruce Perkins Reviewer: Date: -; Z�/ 01 7-- 1 z IPUC Form 1