Loading...
HomeMy WebLinkAboutIntermountain Gas 1-3 May Construction Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Perkins, Ulmer and Russo Date(s): 1-3May 2019 Company/Owner: Intermountain Gas Company Unit/OPID: 1 8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 5.5 Standard:F-] Construction: 5.5 Training: F-] (T)(D) Integrity Management: Incident: M/M: F-1 Follow-up: OQ: = Damage Prevention: D&A: Inspection Summary A construction inspection was performed on DAS-CO, a contractor for Intermountain Gas Company. 1-2 May 2019: (5.0 Construction) Crew was installing a 6" PE plastic main as part of a main replacement, new service lines and removal of HPSS project#367-0330 Areas observed during this project were: Other utility location, fusing, excavation, pot holing, abandoning, main line installation (tracer wire), line locating and backfilling. 3 May 2019: (.5 post Construction) Type construction report. Attachments: IPUC Form 4 Construction Inspections DAS-CO Daily Itineraries located in file for the project. OQ's for all observed employees are located in file for the project. Photo's are located in file for the project. Corrective Action Required: Follow-up Required: Yes No X Yes No X by(date): Inspector(Lead): Date: Bruce Perkins r Reviewer: I IL Date: Darrin Ulmer La M q e IPUC Form 1