HomeMy WebLinkAboutIntermountain Gas Training SIEO Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Ulmer/Russo Date(s): 1/7-11/2018
Company/Owner: Southern Idaho Eastern Oregon (SIEO) Unit/OPID: I Sun Valley, ID
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 11
Standard:F] Construction: F] Training: 11 (T)(D)Integrity Management: Incident:
M/M: = Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
Inspectors attended the 54th SIEO/NACE Winter Symposium. Received training: covering topics from NACE
International, AC Corrosion Control when CP is a Bad Thing, Integrity in Corrosion Control, 100mV Criteria, ILI
Update, New Trends in AC and Lighting Mitigation, Coupons,Trench Safety, and Wax Tapes Above Ground.
Prior to the Symposium the inspectors attended the Cathodic Protection Tester Training Course presented by
Jim Jenkins, PE. Topics covered were: CP Fundamentals, Electricity Fundamentals, Basic Chemistry Related to
CP, Galvanic Corrosion, Galvanic Anode CP Systems, Impressed Current CP Systems, Soil Resistivity Testing, Use
of Current Shunts in CP Testing, Routine CP Testing Structures to Electrolyte Potentials, Routine CP Testing
Periodic Rectifier Readings, and Other Routine CP System Measurements.
January 7, 2019: (2 Training)
Traveled up to Sun Valley, ID.
January 8, 2019: (2 Training)
Attended the Cathodic Protection Tester Training Course.
January 9, 2019: (2 Training)
Attended the Cathodic Protection Tester Training Course and attended social mixer.
January 10,2019: (2 Training)
Attended the SIEO Symposium.
January 11,2019: (2 Training)
Completed the SIEO Symposium and traveled back to Boise, ID.
January 14, 2019: (1 Training)
Typed training report.
Attachments:
54th SIEO Winter Symposium Agenda
Corrective Action Required: Follow p It uir d: Yes No X
YesF71 No X by (date):
Inspector (Lead): Date:
oA s h vi 1
Reviewer: Date:
IPUC Form 1