HomeMy WebLinkAboutIntermountain Gas LNG Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins Date(s): 5-Feb-19 Company/Owner: Intermountain Gas Company Unit/OPID: LNG/8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 5 Standard:F5 ConstructionT-1 Training: F___] (T)(D)Integrity Management: El Incident: M/M: = Follow-up: Oct: Damage Prevention: D&A: Inspection Summary February 4, 2019: (2 Standard Prep) Reviewed the LNG plant Emergency Manual, Fire Manual, Operations Procedure Manual, Preventative Maintenance Guide, Plant Maintenance Training Manual, Equipment Operations Manual and Security Training Manuals for compliance with 49 CFR part 193, NFPA 59A. Prepared for the LNG inspection through review of the inspection forms and 2018 inspection results. February 5, 2019: (2 Standard) Darrin Ulmer and Bruce Perkins of the Idaho Public Utilities Commission met with Intermountain Gas Company LNG Plant personnel Tim Murray,Jacob Tschida,Jamie Gould, Russ Nishikawa and Kelley Gorringe to conduct an audit of records and field review for plant operations for calendar year 2018. The PHMSA Inspector Assistant Program was used to conduct a LNG Facility Inspection on the records and field portions as they applied to the facility. The Procedural portion of the inspection was just conducted in November 2018 after construction was complete and procedures were updated to reflect the changes. February 6,2019: (1 Standard Post) Completed forms and typed report. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview Corrective Action Required: Yes No X Follow-up Required: by da Yes No X Close-out Letter Issued: Yes No X Inspector (Lead): Date: Reviewer: Date: IPUC Form 1