Loading...
HomeMy WebLinkAboutIntermountain Gas LNG Reportable Follow-up Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Perkins/Russo I Date(s): 3/7/2019 Company/Owner: Intermountain Gas Company Unit/OPID: Nampa/8160 Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 2 Standard:F-] Construction:F--] Training: F__] (T)(D) Integrity Management: 1:1 Incident: El M/M: F7 Follow-up: F2 oQ: F7 Damage Prevention: EJ D&A: Inspection Summary Audit consisted of onsite follow-up inspection of the IGC LNG plant in Nampa,following the Liquid Emergency Shutdown (LES)federal reportable incident. 7 March 2019: (2 Follow-up) A follow-up inspection was conducted by the Idaho Public Utilities Commission's Pipeline Safety Division on Intermountain Gas Companies LNG Plant in Nampa following the Liquid Emergency Shutdown. Typed report. Attachments: IGC's written notification Misc. photos Corrective Action Required: Follow-up Required: Yes No X Yes NoF 71 by(date): Inspector(Lead): Date: nit; I r r tl Reviewer: Date: IPUC Form 1