HomeMy WebLinkAboutIntermountain Gas LNG Reportable Follow-up Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Perkins/Russo I Date(s): 3/7/2019
Company/Owner: Intermountain Gas Company Unit/OPID: Nampa/8160
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 2
Standard:F-] Construction:F--] Training: F__] (T)(D) Integrity Management: 1:1 Incident: El
M/M: F7 Follow-up: F2 oQ: F7 Damage Prevention: EJ D&A:
Inspection Summary
Audit consisted of onsite follow-up inspection of the IGC LNG plant in Nampa,following the Liquid Emergency
Shutdown (LES)federal reportable incident.
7 March 2019: (2 Follow-up)
A follow-up inspection was conducted by the Idaho Public Utilities Commission's Pipeline Safety Division on
Intermountain Gas Companies LNG Plant in Nampa following the Liquid Emergency Shutdown. Typed report.
Attachments:
IGC's written notification
Misc. photos
Corrective Action Required: Follow-up Required: Yes No X
Yes NoF 71 by(date):
Inspector(Lead): Date: nit; I
r
r tl
Reviewer: Date:
IPUC Form 1