HomeMy WebLinkAboutIntermountain Gas Boise Field Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Ulmer/Perkins/Russo I Date(s): jApr 8-11, 2019 Company/Owner: Intermountain Gas Company Unit/OPID: Boise Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 17 Standard: 14 Construction: Training: = (T)(D) Integrity Management: Incident: M/M: Follow-up: OQ: F3 Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting field installed equipment and operator qualification for the Boise, Idaho inspection units. Records and procedures for all Idaho Intermountain Gas Units were inspected in February 2019 at the Intermountain Gas Company (IGC) headquarters in Boise, Idaho. April 3,2019: (2 Standard Prep) Prepared for the field audit of Intermountain Gas Company's natural gas distribution pipeline for the Boise, Idaho inspection unit. Reviewed operators operations/maintenance manuals, emergency manuals, operator qualification procedures and the previous years audit results. Prepared PHMSA Form 2 and IPUC Forms and worksheets for the inspection. April 8-11, 2019: (9 Standard and 3 OQ) Met with IGC company representatives in the Boise district office for in-brief and to begin field audit. Regulator Stations 40026,40030,40032,40033,40040,40044, 40047,40048, 40049,40050,40051,40053, 40055,40056, 40058,40061, 40062, 40065,40067, 40070,40072,40078,40080, 40085,40086,40087, 40088, 40091,40092,40094,40096,40097, 40098 and 40101 were inspected for proper operating parameters, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe-to soil interface wrap protection,station warning signs and right-of-way clearances. Eight casing-to-carrier isolation checks, three cathodic protection rectifier,five pipeline patrols, and ten emergency isolation valves were checked for proper operation, observations listed below. An operator qualification inspection was performed on Brandon Croy an IGC employee that was performing cathodic protection system: electrical connections. Brandon performed the task in a satisfactory manner. An operator qualification inspection was performed on Shawn Leasy an IGC employee that was performing valve maintenance: inspection/partial operation. Shawn performed the task in a satisfactory manner. An operator qualification inspection was performed on Chris Coe an IGC employee that was performing pressure regulating limiting/relief device operation and maintenance. Chris performed the task in a satisfactory An IPUC Form 3 (exit interview) was performed following the district inspection with Roger Phillips (Operations Manager), Kelley Gorringe (Compliance/Audit Specialist), Greg Watkins (Manager,Standards &Compliance) and Chris Coe (Meter Inspector) of Intermountain Gas Company. IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Observations: Not Plumbed for lock-up: Reg Stations: 40086, 40048,40087,40091 and 40092. Failed lock-up: Reg Stations: 40072, 40085, 40058,40049,40032, 40098 and 40094, corrected on the spot. OQ:Justin Koff when asked for his OQ Card couldn't produce, said it was in his filing cabinet in the office. Low CP Read: C2C: 42509702, 42509703 Reg Station: 40048, CP Tech is investigating. April 12, 2019: (3 Standard Post) Completed forms and typed report. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview IPUC Field Equipment Status Worksheets PHMSA IA Question Set, Field Inspection Portion (not attached but in IA database) PHMSA Form 15, (OQ) Field Inspection Forms Corrective Action Required: Yes X No Follow-up Required: by (date):2 Apr 2020 Yes X No Close-out Letter Issued: Yes No Inspector (Lead): Date: . 1�< 7v� r �^��� ' Z Reviewer: Date: IPUC Form 1