Loading...
HomeMy WebLinkAboutAvista Feb Training Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins/Russo I Date(s): Feb 11-14, 201 Company/Owner: Avista Utilities Unit/OPID: 1 31232 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days:1 10 Standard:F-] Construction: Training: 10 (T)(D)Integrity Management: E] Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary 2019 Gas Refresher Training February 11,2019: (3 Operator Training) Traveled to Spokane,WA to conduct inspection. February 12,2019: Avista Fireside chat, no inspection days. February 13, 2019: (3 Operator Training) Met with Avista personnel at their Jack Stewart Training Center. Sat in and observed a Self-Contained Breathing Apparatus (SCBA) refresher class where employees and contractors had to don the gear and pinch off a simulated gas leak on PE and clamp a steel pipe. Fire extinguisher training consisted of simulated scenarios of four pipe fires (one stub, one service line, one meter set and one service line in a pit). Observed an Avista trainer conduct Qualifications on: PE Manual Butt Fusion, PE Mechanical Coupling, PE Mechanical Spigot and Sleeve coupling, PE Mechanical Service Tee, PE Electrofusion, PE Hydraulic Butt Fusion, Utility Locating and Odorization. February 14, 2019: (3 Operator Training) Traveled back to Boise, ID. February 15,2019: (1 Operator Training) Typed the inspection report. Attached: IPUC Form 1, Inspection Summary Attendance sheet for SCBA Refresher Class Misc. Photos Corrective Action Required: A Yes No X Follow-up Required: 11b (date): Yes No X Close-out Letter Issued: Yes No X Inspector(Lead): Date: Reviewer: Date: IPUC Form 1