Loading...
HomeMy WebLinkAboutAvista D&A Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Leckie Date(s): 6-10 May 2019 Company/Owner: Avista Unit/OPID: D&A Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 5 Standard: Construction: Training: (T)(D)Integrity Management: Incident: M/M: Follow-up: Oct: Damage Prevention: D&A: Inspection Summary 2019 Drug and Alcohol Program Inspection Avista Utilities May 6,2019: (1 D&A) Traveled to Spokane, WA May 7-8,2019: (2 D&A) Joe Leckie of the Idaho Public Utilities Commission met with Avista's Randy Bareither(Pipeline Safety Engineer) and Hallie Rowland (DER) at Avista's headquarters in Spokane, WA to review their DOT Anti-Drug and Alcohol Plan. PHMSA's Substance Abuse Program Comprehensive Audit and Inspection Protocol Form#3.1.11 Rev 2 was used as a guide throughout the audit to ensure all areas were completed. This audit was conducted jointly with Washington's UTC who led the inspection. As a result of the inspection, the MIS Data Collection Forms have revealed that Avista's consortium contractor pool may not have met the required 50 percent testing rate. May 9,2019: (1 D&A) Traveled to Boise, ID May 10, 2019: (1 D&A) Typed the inspection report, completed forms: PHMSA Substance Abuse Program Comprehensive Audit and Inspection Protocol Form #3.1.11 Rev 2, IPUC Form 1 and attached inspection documents. Attached: PHMSA OPS Substance Abuse Program Comprehensive Audit and Inspection Protocol Form #3.1.11 Rev 2 IPUC Form 1, Inspection Summary Corrective Action Required: Yes X No Follow-up Required: by(date): Oct 31, 2019 Yes X No Close-out Letter Issued: Yes No X Inspector(Lead): Date: Reviewer: Date: IPUC Form 1