Loading...
HomeMy WebLinkAboutIntermountain Gas TIMP Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins/Russo I Date(s): 22-24 Jan 2018 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 6 Standard:F—] Construction:F1 Training: (T)(D)Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting IGC's Integrity Management (IM) Plan, External Corrosion Direct Assessment (ECDA)Plan and Internal Corrosion Direct Assessment(ICDA) Plan against 49 CFR Part 192 and PHMSA's Gas Transmission Integrity Management Inspection Protocols. This audit was performed by Idaho Public Utilities Commission's Pipeline Safety inspectors in Boise, ID at IGC's headquarters General Office. January 22,2018: (2 IMP Prep) Prepared for the Transmission IM Plan Audit of IGC. Reviewed previous audit results, Companies Transmission IM Plan, Procedure 4051 ECDA, Procedure 4052 ICDA, and prepared PHMSA Gas Transmission Integrity Management Inspection Protocols for the audit. January 23,2018: (3 IMP) Met with IGC representatives to audit the companies IM Plan. No areas of concern were noted during this audit. Three updates were noted to the companies plan. January 24, 2018: (1 IMP Post) Completed PHMSA Protocols for the inspection. Attendees: Theresa Browne, IGC Pipeline Safety Specialist Kelley Gorringe, IGC Pipeline Safety Specialist Josh Fife, IGC Engineer Craig Chapin, Director, Engineering Services Greg Watkins, Manager, Standards& Compliance Attached: IPUC Forms 1 Inspection Summary, 2 Supplemental Checklist and 3 Exit Interview PHMSA Gas Transmission Integrity Management Inspection Protocols Miscellaneous Operator Verification Documents Corrective Action Required: Yes X No Follow-up Required: b (date): Next Inspection Yes X No Close-out Letter Issued: Yes X No inspector(Lead): Date: ' �'4 aL1ab1 Reviewer: Date: " -3,D / IPUC Form 1