Loading...
HomeMy WebLinkAboutIntermountain Gas Records Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Perkins/Russo Date(s): Mar 15-16, 201 Company/Owner: Intermountain Gas Company Unit/OPID: Records/8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 9 Standard: 7.5 Construction: Training: (T)(D) Integrity Management: Incident: M/M: = Follow-up: OQ: Damage Prevention: D&A: 1.5 Inspection Summary 201 Records Audit Intermountain Gas Company March 13-14, 2018: (2 Standard prep) Prepared for the Intermountain Gas Company's records inspection through review of the PHMSA inspections Forms 2 and 2017 inspection results. Intermountain Gas Company's procedure standards were reviewed and compared to the PHMSA Form 2 checklist for completeness. The company's pipeline system in Idaho consists of transmission and distribution lines. March 15-16,2018: (4.5 Standard, 1.5 D&A) Darrin Ulmer, Bruce Perkins and Kyle Russo of the Idaho Public Utilities Commission met with IGC's compliance and engineering personnel at IGC's General Offices in Boise, ID to review records and procedures for the previous year 2017. The PHMSA Form 2 (Standard Inspection Report of a Gas Distribution Operator) was used as a guide throughout the audit to ensure all areas were completed as they pertain to required records and procedures. The field portion of the checklist will be used throughout calendar year 2018 at IGC's field units to ensure compliance with field requirements. PHMSA Form 13 was used for the Drug and Alcohol Audit. March 19, 2018: (1 Standard post) Wrote the inspection report, completed audit forms PHMSA Form 2, IPUC Form 1 and attached inspection documents. Attached: PHMSA Form 2, Gas Distribution Inspection Form PHMSA Form 13, Pipeline Drug &Alcohol Questions IPUC Form 1, Inspection Summary IPUC Form 2, Supplemental Checklist IPUC Form 3, Exit Interview Miscellaneous Operator Verification Documents Corrective Action Required: Yes No 'X, Follow-up Required: by(date): Yes No Close-out Letter Issued: Yes No Inspector(Lead ate: 1 qa v'C� Reviewer: Date: (r V U IPUC Form 1