HomeMy WebLinkAboutIntermountain Gas LNG Procedural Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Russo Date(s): 14-Nov-18 Company/Owner: Intermountain Gas Company Unit/OPID: LNG/8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days-7 4 Standard:F74 Construction: F] Training: F-1 (T)(D) Integrity Management: =1 Incident: E] M/M: F7 Follow-up: OQ: Damage Prevention: E] D&A: Inspection Summary November 13, 2018: (1 Standard Prep) Reviewed the LNG plant Emergency Manual, Fire Manual, Operations Procedure Manual, Preventative Maintenance Guide, Plant Maintenance Training Manual, Equipment Operations Manual and Security Training Manuals for compliance with 49 CFR part 193, NFPA 59A. Prepared for the LNG inspection through review of the inspection forms and 2017 inspection results. November 14, 2018: (2 Standard) Darrin Ulmer and Kyle Russo of the Idaho Public Utilities Commission met with Intermountain Gas Company LNG Plant personnel Craig Chapin, Tim Murray,Jamie Gould, Russ Nishikawa, Kelley Gorringe and Theresa Browne to conduct a procedural audit for plant operations. The PHMSA Form 4 (IA Equivalent) Standard Inspection Report for an LNG Facility (May 2015) was conducted on the procedural portion. Findings: Supplemental Incident Reports - no process National Registry of Pipeline & LNG Operators- add reference General Process Review and Update Requirements - bad cross-reference Control Systems-add "intervals not to exceed 6 months" Transfer Hoses- needs to be reworded Buried or Submerged Components - needs reference Interference currents- needs reference Venting in case of Emergency- no process Taking an LNG container out of service - no process November 15, 2018: (1 Standard Post) Completed forms and typed report. Attached: IPUC Form 1, Inspection Summary IPUC Form 3, Exit Interview PHMSA Form 4, Standard Inspection Report of an LNG Facility IPUC Form 1 Idaho PUC Pipeline Safety Inspection Summary Corrective Action Required• Yes X No Follow-up Required: y at s , Yes X No Inspector (Lead): Date: i:i- L^✓ Reviewer: Date: IPUC Form 1