Loading...
HomeMy WebLinkAboutIntermountain Gas Compressor Station Idaho PUC Pipeline Safety Inspection Summary Inspector(s): I Ulmer/Russo I Date(s): 5-7 Dec 2018 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4 Standard: Construction: Training: (T)(D)Integrity Management: F4 Incident: M/M: Follow-up: OQ: Damage Prevention: D&A: Inspection Summary Audit consisted of inspecting IGC's Compressor Station against 49 CFR Part 192 and PHMSA's Gas Transmission Integrity Management Inspection Protocols. This audit was performed by Idaho Public Utilities Commission's Pipeline Safety inspectors in IGC's Twin Falls office and in Jerome, ID at IGC's Compressor Station. December 5, 2018: (1 IMP Prep) Prepared for the Compressor Station Audit of IGC. Reviewed previous audit results, Companies Procedure 3360 Compressor Station and prepared PHMSA Gas Transmission Integrity Management Inspection Protocols for the audit. December 6,2018: (2 IMP) Met with IGC representatives to audit the companies Compressor Station. Went over PHMSA Form 1 Compressor Station questions in IGC's Twin Falls Office before heading out to Compressor Station. No areas of concern were noted during this audit. December 7, 2018: (1 IMP Post) Completed PHMSA Protocols for the inspection. Attendees: Kelley Gorringe, IGC Pipeline Safety Specialist Kenny Clapp, IGC Welder/Control Equipment Operator Dustin Carney, IGC Utility Operator Jay Parker,Service Technician Attached: IPUC Form 1 Inspection Summary PHMSA Gas Transmission Integrity Management Inspection Protocols Corrective Action Required: Yes No X Follow-up Required: by(date): 4 Yes No X Close-out Letter Issued: Yes No X Inspector (Lead): Date: Reviewer: Date: IPUC Form 1