HomeMy WebLinkAboutIntermountain Gas Compressor Station Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): I Ulmer/Russo I Date(s): 5-7 Dec 2018
Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160
Inspection Type &Time (1 day, 0.5 day) Total Inspection Days: 4
Standard: Construction: Training: (T)(D)Integrity Management: F4 Incident:
M/M: Follow-up: OQ: Damage Prevention: D&A:
Inspection Summary
Audit consisted of inspecting IGC's Compressor Station against 49 CFR Part 192 and PHMSA's Gas Transmission
Integrity Management Inspection Protocols. This audit was performed by Idaho Public Utilities Commission's
Pipeline Safety inspectors in IGC's Twin Falls office and in Jerome, ID at IGC's Compressor Station.
December 5, 2018: (1 IMP Prep)
Prepared for the Compressor Station Audit of IGC. Reviewed previous audit results, Companies Procedure 3360
Compressor Station and prepared PHMSA Gas Transmission Integrity Management Inspection Protocols for the
audit.
December 6,2018: (2 IMP)
Met with IGC representatives to audit the companies Compressor Station. Went over PHMSA Form 1
Compressor Station questions in IGC's Twin Falls Office before heading out to Compressor Station. No areas of
concern were noted during this audit.
December 7, 2018: (1 IMP Post)
Completed PHMSA Protocols for the inspection.
Attendees:
Kelley Gorringe, IGC Pipeline Safety Specialist
Kenny Clapp, IGC Welder/Control Equipment Operator
Dustin Carney, IGC Utility Operator
Jay Parker,Service Technician
Attached:
IPUC Form 1 Inspection Summary
PHMSA Gas Transmission Integrity Management Inspection Protocols
Corrective Action Required: Yes No X
Follow-up Required: by(date): 4 Yes No X
Close-out Letter Issued: Yes No X
Inspector (Lead): Date:
Reviewer: Date:
IPUC Form 1