Idaho PUC Pipeline Safety Inspection Summary
Inspector(s): Ulmer/Russo I Date(s): Jiun 18-21, 201
Company/Owner: Avista Utilities Unit/OPID: IlLewiston
Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 9
Standard:F5 Construction:F74 Training: F__] (T)(D) Integrity Management: F-1 Incident:
M/M: F7 Follow-up: F� OQ: F-1 Damage Prevention: D&A:
Inspection Summary
A construction inspection was performed on Avista in the Lewiston/Moscow area.
June 18, 2018: (2 Standard)
Traveled to Lewiston, ID to conduct construction inspection.
June 19,2018: (2 Construction)
A Curry Inc. crew (Avista Sub-contractor)was installing new service line from existing stub to a new residence.
Installing a new 2" plastic service line to existing residence foundation on 24th Ave in Lewiston.
Areas observed during this project were: excavation, pinching off, plastic pipe joining, hot tapping, pressure
testing, purging, service line installation (tracer wire), riser placement and backfilling.
June 20, 2018: (2 Construction)
A Curry Inc. crew(Avista Sub-contractor) was installing new service lines from existing stubs to two new
residences. Installing a new 2" plastic service line to existing residence on Granville Rd in Moscow.
Areas observed during this project were: pinching off, plastic pipe joining, hot tapping, pressure testing, purging,
service line installation (tracer wire), riser placement and backfilling.
June 21, 2018: (2 Standard)
Traveled back to Boise, ID.
June 22, 2018: (1 Standard post)
Typed the construction inspection report. Completed IPUC forms.
Attached:
IPUC Form 1, Inspection Summary
IPUC Form 4, Construction Inspections
Corrective Action Required: Follow-up Required: Yesi No X
Yes No X_�) by(date):
Inspector (Lead): Date:
Reviewer: , Date:
IPUC Form 1