HomeMy WebLinkAboutAvista Jun Lewiston Construction II Idaho PUC Pipeline Safety Inspection Summary Inspector(s): Ulmer/Russo I Date(s): Jiun 18-21, 201 Company/Owner: Avista Utilities Unit/OPID: IlLewiston Inspection Type &Time (1 day, 0.5 day) I Total Inspection Days:1 9 Standard:F5 Construction:F74 Training: F__] (T)(D) Integrity Management: F-1 Incident: M/M: F7 Follow-up: F� OQ: F-1 Damage Prevention: D&A: Inspection Summary A construction inspection was performed on Avista in the Lewiston/Moscow area. June 18, 2018: (2 Standard) Traveled to Lewiston, ID to conduct construction inspection. June 19,2018: (2 Construction) A Curry Inc. crew (Avista Sub-contractor)was installing new service line from existing stub to a new residence. Installing a new 2" plastic service line to existing residence foundation on 24th Ave in Lewiston. Areas observed during this project were: excavation, pinching off, plastic pipe joining, hot tapping, pressure testing, purging, service line installation (tracer wire), riser placement and backfilling. June 20, 2018: (2 Construction) A Curry Inc. crew(Avista Sub-contractor) was installing new service lines from existing stubs to two new residences. Installing a new 2" plastic service line to existing residence on Granville Rd in Moscow. Areas observed during this project were: pinching off, plastic pipe joining, hot tapping, pressure testing, purging, service line installation (tracer wire), riser placement and backfilling. June 21, 2018: (2 Standard) Traveled back to Boise, ID. June 22, 2018: (1 Standard post) Typed the construction inspection report. Completed IPUC forms. Attached: IPUC Form 1, Inspection Summary IPUC Form 4, Construction Inspections Corrective Action Required: Follow-up Required: Yesi No X Yes No X_�) by(date): Inspector (Lead): Date: Reviewer: , Date: IPUC Form 1