Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2019 Progress Report
1 1200 New.fersey Avenue SE Washington DC 20590 US.S. Department A federal agency may not conduct or sponsor,and a person is not required to respond to,nor shall a person be subject to a penalty for failure to comply with a collection of inlbnmation subject to the requirements of the Paperwork Reduction Act unless that collection of of Transportation information displays a current valid OMB Control Number.The OMB Control Number for this information collection is 2137-0594. Pipeline and Hazardous Public reporting for this collection of information is estimated to be approximately 58 5 hours per response,including the time for Materials Safety reviewing instructions,gathering the data needed.and completing and reviewing the collection of information.All responses to this collection of information are mandatory.Send comments regarding this burden estimate or any other aspect of this collection of Administration information,including suggestions for reducing[his burden to:Information Collection Clearance Officer.Pipeline and Hazardous Materials Safety Administration(PHMSA),PHP-30,1200 New Jersey Ave SE.Washington,D.C.20590 Pipeline Safety 2018 Gas Base Grant Progress Report for IDAHO PUBLIC: UTILITIES COMMISSION Please follow the directions listed below: 1. Review the entire document for completeness. 2. Review and have an authorized signatory Sign and date page 2. 3. Scan the signed document to your computer and email it to Carrie.Winslow@dot.gov. II- zz t� C FedSTAR Information iC Electronic Submission Date: 3/14/2019 10:58:36 AM DUNS: 102589939 Ida1,o 2018 Gas Raw Crane Pro6a xs Hcpon IrAItO PtJBI JC IrTILIt'IFS COMMISSION.Page.1 �a'I of TRA4,. Q o9� a Pipeline and Hazardous Materials Safety Administration o Z 1200 New Jersey Avenue,SE Washington DC 20590 8)ArES of OFFICE OF PIPELINE SAFETY 2018 Gas Base Grant Progress Report Office: IDAHO PUBLIC UTILITIES COMMISSION Authorized'Signature Printed Name �, �, ��Ste✓ Title Date DUNS: 102589939 Idaho 2018 Gas Base Gram Progress Report IDAHO PUBLIC UTILITIES COMMISSION,Page:2 PROGRESS REPORT ATTACHMENTS (GAS ) PHMSA Form No. PHMSA F 999-92 INSTRUCTIONS: These attachments request infonnation either for the entire calendar year(CY 2018: January 1 through December 31, 2018) or as of(or on)December 31, 2018. Please report actual as opposed to estimated numbers on the attachments. Be careful to provide complete and accurate information since the PHMSA State Programs will be validating the attachments during the state's next annual evaluation. Attachment 1: State Jurisdiction and Agent Status Over Facilities. Requires the state to indicate those pipeline •operator types over which the state agency has jurisdiction under existing law. If the state does not have jurisdiction over an operator type, indicate why not in the column designated No,using the one alpha code(A or B)which best describes the reason. If the state agency has jurisdiction over an operator type, place an X in the column designated Yes and provide information on the number of operators, the number and percent of operators inspected, the number of inspection units, and the number and percent of inspection units inspected. If the jurisdiction over a type of operator is under a Section 60106 Agreement, indicate X/60106 in the column designated Yes. If an operator has multiple types of system(i.e. gas distribution and intrastate transmission),each type should be counted in corresponding category. Total operator count listed in Attachment 3 may not match Attachment 1 totals due to multiple types of systems per operator. If the same operator/inspection unit is visited more than once during the year, count only once under number of operators inspected/number of inspection units inspected on Attachment 1. The multiple visits would, however,be reflected under total inspection person-days in Attachment 2. • Attachment 2: Total State Field Inspection Activity. Requires the state to indicate by operator type the number of inspection person-days spent during CY 2018 on inspections; standard comprehensive; design,testing, and construction; on-site operator training; integrity management; operator qualification; investigating incidents or accidents; damage prevention activities; and compliance follow-up. Attachment 2 should include drug and alcohol inspections. Counting"In Office" Inspection Time -An inspector may choose to review pipeline company procedure manuals or records away from the company facility in order to effectively use on-site inspection time. The amount of time spent reviewing procedures and records may be counted as part of the inspection process. It is important that an inspector only record time for activities that normally would be completed as part of an on-site inspection. For example, an inspector may attribute the three hours he or she spent reviewing a pipeline operator's procedure manual and records prior to an on-site inspection towards the total inspection time. Each supervisor must carefully review the reported time to ensure the time attributed is consistent with the activity completed and is carefully delineated from normal office duties. • Attachment 3: Facility Subject to State Safety Jurisdiction. States should only list the facilities that are jurisdictional under Parts 192 and 193 (Gas) and Part 195 (Hazardous Liquid)of which the state has safety authority over. This attachment requires the business name and address of each person subject to the pipeline safety jurisdiction of the state agency as of December 31, 2018. Also indicate the operator type(e.g., intrastate transmission)consistent with the listing in Attachment I and include the number of inspection units in each operator's system. The operator identification number(OPID)assigned by PHMSA must also be included on this attachment. If an operator has multiple types of system (i.e. gas distribution and intrastate transmission), each type should be counted in corresponding category. Total operator count listed in Attachment 3 may not match Attachment 1 totals due to multiple types of systems per operator. • Attachment 4: Pipeline Incidents. Requires a list of incidents investigated by or reported to the state agency that involved personal injury requiring hospitalization, a fatality,property damage exceeding$50,000, and others deemed significant by the operator. Clearly identify the operator's reported cause AND the state's determination of the cause of the incident using the one most appropriate alpha code footnoted in the attachment. We summarize this information for Congress by classifying the cause into one of eight top-level categories: (A)corrosion failure; C (B)natural force damage; (C) excavation damage; (D)other outside force damage; (E)material failure of pipe or weld; (F)equipment failure; (G) incorrect operation; (H) other accident cause. Within each top-level cause you will find multiple sub-causes,select the appropriate cause code. You can also choose(IP) Investigation Pending for those incidents remaining under investigation as of December 31. Then provide a summary of incident investigations. DUNS: 102589939 Idxlw 2019 Gas Bosc Grunt Prugyc R.purt IDAHO PUBLIC UTILITIES COMMISSION,Pegg 3 • Attachment 5: State Compliance Actions.This requires a summary of state pipeline inspection and compliance actions. [In the Number of Compliance Actions Taken column,keep in mind one compliance action can cover multiple probable violations.] • Attachment 6: State Record Maintenance and Reporting.Requires a list of records and reports maintained and required by the state agency. • Attachment 7: State Employees Directly Involved in the Pipeline Safety Program.This attachment requires a list by name and title of each employee directly involved in the pipeline safety program. Be sure to include the percentage of time each employee has been involved in the pipeline safety program during 2018. If an employee has not been in the pipeline safety program the full year of 2018,please note the number of months working on the program. Indicate a Qualification Category for each of the state's inspectors(see Attachment 7a). The categories are shown in descending order of education and experience. Please enter the number of the highest description applicable to each inspector. For each inspector and supervisor, indicate the month and year he/she successfully completed the training courses at the Pipeline Safety Office of Training and Qualifications in Oklahoma City,OK. Finally,provide in summary fonn the number of all staff(supervisors, inspectors/investigator,damage prevention/ technical and clerical/administrative)working on the pipeline safety program and the person-years devoted to pipeline safety. Person-years should be reported in hundreds(e.g., 3.25). • Attachment S: State Compliance with Federal Requirements. This requires the state to indicate whether it is in compliance with applicable federal requirements. If a particular requirement is not applicable to the state(e.g. offshore inspections),indicate NA in the column designated Y/N/NA and indicate in the notes section why the regulation is not applicable. If a regulation has been adopted, indicate the date adopted(e.g., 05/01/04)in the appropriate column. If the regulation is applicable but has not been adopted indicate N in the Y/N/NA column and explain why not in the appropriate column(e.g.,requires legislative action). If the state has not adopted the maximum penalty amounts for a related series of violations please indicate civil penalty levels in effect in the state as of December 31. For State Adoption of Part 198 State One Call Damage Prevention Program if a state has any penalty amount for its damage prevention law please mark item 7.h as"Adopted but Different Dollar Amounts" and list the penalty amount in the Note section.Note at the end of Attachment 8 we are requesting each state to indicate the frequency its legislature meets in general session. This information will be taken into account when determining if applicable federal regulations have been adopted within 24 months of the effective date or two general sessions of the state legislature. • Attachment 10: Performance and Damage Prevention Questions. This attachment requires a narrative of each states goals and accomplishments. In addition it requires a narrative on each states progress toward meeting the = nine elements of an effective damage prevention program as described in the PIPES Act of 2006. DUNS: 102589939 Idaho 20)B Gas Base Grant Progress Rcpori IDAHO PUBLIC UTILITIES COMMISSION.Page 4 DEFINITIONS • Inspection Unit. An inspection unit is all or part of an operator's pipeline facilities that are under the control of an administrative unit that provides sufficient communication and controls to ensure uniform design, construction, operation, and maintenance procedures for the facilities. (See Glossary of Terms in Guidelines for States Participating in the Pipeline Safety Program for application of the inspection unit concept to transmission and hazardous liquid pipeline systems, distribution systems, liquefied gas systems, municipality, master meter system,regulated gathering pipeline systems, and propane-air systems/petroleum gas systems.) • Inspection Person-Day. An inspection person-day is all or part of a day spent by a state agency representative including travel in an on-site examination or evaluation of an operator or his system to determine if the operator is in compliance with federal or state pipeline safety regulations, in an on-site investigation of a pipeline incident,or in job- site training of an operator. Time expended on such activities should be reported as one inspection person-day for each day devoted to safety issues, regardless of the number of operators visited during that day. • Probable Violation.A probable violation is a non-compliance with any section or,where a section is divided into subsections (a), (b),(c), etc., any subsection of federal or state pipeline regulations. Each numbered section should be counted separately. Multiple non-compliances of a numbered section discovered on the same inspection should be counted as one probable violation with multiple pieces of evidence. • Compliance Action.A compliance action is an action or series of sequential actions taken to enforce federal or state pipeline regulations. One compliance action can cover multiple probable violations. A compliance action may take the focrn of a letter warning of future penalties for continued violation,an administratively imposed monetary sanction or order directing compliance with the regulations, an order directing corrective action under hazardous conditions,a show-cause order, a criminal sanction, a court injunction, or a similar fonnal action. DUNS: 102589939 ld+An 2019 Gn Base Orom Progre5 Repon 1DAII0 PUBLIC 1 F]ILITI[S COMMISSION.Page 5 Attachment 1 - Stats on Operators STATE JURISDICTION AND AGENT STATUS OVER GAS FACILITIES AS OF DECEMBER 31, 2018 State Agency Jurisdiction/ No. of Operators No. of Operator Type gent Status Operators Inspected Inspection Units Inspected Units No' Yes # % # % Distribution Private X/60105 3 3 100.0% 10 10 100.0% Municipal A 0 0 N/A 0 0 N/A Master Meter X/60105 0 0 N/A 0 0 N/A LPG X/60105 0 0 N/A 0 0 N/A Other A 0 0 N/A 0 0 N/A Transmission Intrastate X/60105 2 2 100.0% 2 2 100.0% Interstate F 0 0 N/A 0 0 N/A LNG Intrastate X/60105 1 1 1100.0% 1 1 100.0% Interstate F 0 0 N/A 0 0 N/A Other Gathering Lines X/60105 1 1 100.0% 1 1 100.0% Offshore Facilities A 0 0 N/A 0 0 N/A Total 7 1 7 1100.00K 14 14 100.0% 'Codes: A -None in state and does not have jurisdiction; B - State does not have jurisdictional authority (Provide current status or action being taken to obtain authority in notes section below) F - No, State is currently not an interstate agent. X/60105P=Yes,I have Section 60105 (Certification) over some of the operator type(meaning: I have 60105 authority over some, but not all of this operator type and do not have a 60106 agreement with PHMSA to inspect them). These operators are identified in the notes below. X/IA-Yes, I have Interstate Agent jurisdiction over this type of operator Distribution "Other" -ie Co-ops, Public Utility Districts, etc. States should explain any special circumstances General Instructions-All above facilities should only include facilities as defined by federal pipeline regulations and should not include extended jurisdiction by state regulation. Attachment 1 Notes: C Idaho actually has only 4 operators: 1. Avista-Distribution only,2. Intermountain Gas Company-Transmission, DUNS: 102589939 Idaho 2018 Gas Base Grant Progress Report IDAHO PUBLIC UTILITIES COMMISSION.Page-6 Distribution and LNG, 3. Dominion Energy Idaho-Transmission and Distribution, 4. Northwest Gas Processing- Gathering s DUNS: 102589939 1tlahu 2010 taus R.,c Grant Props,Rcpnn IDAHO PUBLIC UTILrrIES COMMISSION,Page 7 - o x r .. c a`c �, fri ✓ i O U f. u m J Vi 6 vJ O C � Q a :A L � o Y eri � .D o •� c o o c 'V U >> O cz u kr; F".. r; z tA Cd aw � � csrA- - F- � CC U_ Q � Q � u « L V U U V Q C3 f sue, y J L 'i L C ... ' Cd U J U `I,cz U G M CZ cz ct !II I Ill 11 11 1 1 11 1 1 11 li l 11 lllll l it l 11 1 1 11 l 11 l I II A c c 4 Od Z fl % O r o0 �y L y a ... o a o o •-+ ,a c a � L � U � = A w o 0 0 � y o, a v� O a 0 001 � W o T � " c a ci Q O L 0 7 ti t L V Q ON r W � X r� F' 0 ►.� C o C h bL Z U � � 6 00C-J v Y h Qm LIO h� L cr tr V PLO C C M u cs. o Lz7 .,, U v s 0 O C O u C O C O H L? c�C z V g C o y 3 R as ° Joan O r� oa aM `� cN � � � vzM � m ��� III III IN 1111111111111111111111 IN III III o 0 0 r— a is — m G z 0 c. rj OL.L r C O CL L O •�• o L � C C r � O L U V O a y a+ y � °o a= d c Cd y V R L A ca O C L v u.y r G —1 L V r C H ^ y V rr rr '' V C 4 0 o � V L y ar d V y R a C �L "V « � G L V V a .. O � o �L 0. Q?. y « dO+ v r.. Zi OC c, 0 cd O G r III II'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III G o Attachment 4 - Incidents/Accidents SIGNIFICANT'GAS INCIDENTS/ACCIDENTS JANUARY 1,THROUGH DECEMBER 31,2018 Date of Location- System Injuries FatalitiesProperty Cause State Incident City/County/etc. 'Type # # Damage' Code' Cause $ Code' Name of Operator: Operator ID: Report No: Summary' 'High Level Cause Codes: A-Corrosion failure; B-Natural Force Damage; C-Excavation Damage; D -Other Outside Force Damage; E-Pipe,Weld or Joint Failure; F-Equipment Failure; G -Incorrect Operation; H -Other Incident Cause; IP- Investigation Pending; `Please provide a brief summary of the incident. 'Interstate agents should use the 191.3 Incident definition for listing incidents investigated on interstate facilities. 'Significant: Investigated by or reported to the state agency, involving personal injury requiring hospitalization, fatality, property damage exceeding $50,000 and other incidents otherwise considered significant which involved jurisdictional facilities. Attachment 4 Notes DUNS: 102589939 Who 2018 Gas How Gram Prosmi Rom IDAHOPUBLIC tM UMS COMMISSION,Pear I I Attachment 5 - Stats on Compliance Actions STATE COMPLIANCE ACTIONS -- CALENDAR YEAR (CY) 2018 Probable Violation Categories Intrastate Interstate Number carried over from all previous CY's 2 0 Number Found During CY 10 0 Number submitted for DOT action [60106 Agreement agent 0 0 only] Number corrected during CY(including carry over from 6 0 previous year(s)) Number to be corrected at end of CY(including carry over) 6 0 Number of Compliance Actions Taken ' (see definition) 10 Civil Penalties Number assessed during CY 0 Dollars assessed during CY $0.00 Number collected during CY 0 Dollars collected during CY $0.00 'Do not double count for a related series of actions. Attachment 5 Notes DUNS: 102589939 Idaho 2018 Gas Base Grant Progress Report IDAHO PUBLIC UTILITIES COMMISSION,Page:12 Attachment 6 - List of Records Kept GAS STATE RECORD MAINTENANCE AND REPORTING DURING CY 2018 Records Maintained by the State Agency Pipeline Safety Program Annual Certification/Progress Report Operator Annual Reports Common Ground Alliance Compliance Actions Damage Prevention Program Inspection Field Days Annual Inspection Schedule One-call Campaign Operator Incident/Accident PHMSA Correspondence PUC Pipeline Safety Program Plan(POP) PHMSA Program Evaluation OPS Grants-Base Grant Application Safety Related Condition Reports Pipeline Training T& Q Seminars NAPSR Surveys Inspection Reports 2014, 2015, 2016, 2017, 2018 Reports Required from Operators Incident Reports as per IPUC ru1C Operators Annual Report Attachment 6 Notes =1 DUNS: 102589939 Ia,na 2019 Gus base Crum Progress Repots IDAHO P1181.W I'TII ITIES COMMISSION.Page,13 O Q A 9 � C a N_ vl N N Z O O O O a C�. cV N N N f d Q a.+ 00 ON O C� \ N N N m u F F a O f C W O z U W cs W � A, o C W E o w x p O U o a � � ¢ � � r w � 0 E" Z �'• .� tin a A0i o E110 o ^ en rn N _M N rrr yr„ N N N COO ►-� r-1 W d o L d o o c 0 LA o x x x a w W w Er O O � ,Z -- rM C O cal z wwww y wwww 8 0 " rA an o q cc a C v ai c W W W We A c Ca o $ x o i > °_ o 0 •i �= cz Q h: v = o o ctbcz F- R y AC rK o a; = x � WcnAAC� E- Q ¢ Q ¢ co III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III o 0 C v. vv m M V7 cV N _ C) O C) r•l 0 7 0 N M N N N u) O C t— 11C l— l— t— 1.0 V7 V1 11C IC �D z O — O O O C O O O O O O N O N O — T — O _O — — — — O O cV O cV C rl C N 0 0 0 0 00 0 0 0 0 — O O N CDO O O O O O O O O N v N N N N N N N N N O N O N N C) O N NC)C) N N N N N N N N N N N N Cj M — O� N cV 00 O� O ^ r— — � O� C) N N 00 V7 00 O t'- V> O O� V7 — 00NNNpVN \ NO O \ \ \N N 00 N N N W) 00 00 u a) — r 0. y N Q o U o U a U U o ° U CO) b 0 . f O U F" E ° U a� U f ,, ci o c o a p ;, ° U Ua EU � U C) o v o ti E a C >, p c a. CJ O o >' ¢' avi O vOi ►N- '� cC V] (s O 'M `� 0 �zii C'J v0 CZ CO y O 0 0 7 0 �O cJ ^ ^ O W O O o Ua, o ° Ua ° QQ 0a � o � 'a� o � oU ° a c 7b �, U U oA o aU an .-. o U C a o U -o >• O .O C , v� co ca O m C 0, U �, E°- o a o a, O .° M zoom O 0 o � v � U .� a c orA _ ° c o .. F- o � o c Q. �. >> c C o C � v) cn ° O . e� 0. v a� o O J o t:A v ;� U .. U s ocnU cj ° � � ai _ U 0.,0 awn: >, a � C� t~ C'sc � a. a � c � •OF- a� F. O c o C7 < �v o -c o 'd Q o = -v° a ew o < a o .� a .� o x0 z •� c c03 a. c +i. Q .+ O m cad Q o cc o wwUU¢'o c z a 1,3 40, cd '- C O E- (' bL-a > O m O O O O t. cd O O �' ,� E- > bA O O U C O v b4 O O �" C O e+A .� C 0 C " C O C ..r C .�. R, "C7 �C. C O r C� cs 0 4. Q.ci. ru O a� QC o t, c c °. — .. �, a� �, .o O o 0 0 �, .0 0 0 0 0 C 0 o ec W cz cz o Q cz ° a� >,^ >, brl 2 ° C O O y ti p, �, a, O O O cz C o C 0 co «. C—cl C U-TZ C 'ti cr C w' o _vo � ° �, � w>> ° w> w> � w>> ° � w> w> � �wC rw> 42 0 W > v � C0. v� v� c.. cd 4. C c.- .., c., cv C � �, :�. > � G) 2.M. Oa4aU4. •° aC70aEnw' Enwtoticn a. aIn V', p — O V) "t %C M C M q:T t-- V) t— �O O N V-, oc .c Vl fV t— t` N < N �,C t— O d () O1 U O O*, 01, O W) W) W) N a v7 V7 N W1 Cs cn O V1 fV �c CS O, S — U "Zrtn V1 V1 N O M cV cV M N " M N N (V N N N N M M " NM M M N N N N � Q N cV N N M M M M M M M M M1�r M M — — M M M M c'l M M M M M N — M M M M M — �1 �] J J J 1-1 1-1J 0-1 J �7 J J J J J J J J J ,_l �j J J J J J a aaac�, aaaa. aa. aaaa. aa. aaa, aa, cz, a, aawa. wa, aa, aa. a d ¢ < ¢ d < ¢ < d < d d d < ¢ ¢ < < ¢ Q Q ¢ < ¢ < d ¢ d d << d < d d [4e) Ln U) V) Cn V) V) V) V) V) V) V) v) V) cn V) V) V) o. a F- F- F• F- F- F- F- F F- F- F- F- F• F- � c.n cn cn cn cn cn cn v) vn v) vn Con cn cn rn cn cn cn cn CA M M CO Cc M X M IM CO 0 W �1 Cn Ln wwww wwwwwwwwwwwwwww 000000000000000o00oozzzzzzzzzzzzzzz J -] ,� JJ .a JJ J `' J JJJ .� J `' JJJ000000000000000 xV) V) V) co0V) 0Cn0V) V) V) cnCn V) � F— F- F• F- F- F- F F✓ F_ F� F_ F- F- F- F- F- F, F- F- F- .r ... -. �. .. ... ... < < < ¢ ¢ < < < < < < < ¢ < < ¢ ¢ ¢ ¢ d d ¢ < < ¢ < ¢ < < < < ¢ ¢ < < III IN Mill III 1111111111111111111111111111111 o o.o s- v is 00 00 00 00 00 00 00 00 00 r- O O O O N N N O vi O C O O N O O C N N N N N N N N rq C N N N O N N N N N N N N N r- M t N N O fV N N N It N " -- -- -- O O N O O N 00 O M to �_ �D - -- O O_ M_ N �-- O 00 M Wn N M M \ O O O � Cr� M C N — 0 0 0 0 C N N M N N N \ O � o Q U o G] �, A U o U U U o 0 b �q a� 0 ' o y 0 bb u to 3 a y o 0 0 0 rZZa a ° c O b °' ¢. -0 0 (U °' a U o -v o fi O . O y a> c4 0 E U co T bA O y U CU 0. cz O bA p y U > a; y cJ y �. m Y cC y cz s. O cz 0 O o Oct 0 p 0 ,� 0 c0^s O 0 0 0 0 o N N o . U o a� �. �. 0 o O o 0 a, �. 0 O �. O �. ,e 0 O � a „ CA ? � � °' ° U U >, �, a ' .,°°__, U o � 0 � °� 0 0U >, � a � Via' �'' c U - c 0 o co �, U o E 3 �, Ln o u U o 'A ECOO 0 cl c -p (� oA ctS o W ¢'C7 'a ¢ 3 bA.cC � cm H bA.S'''b O Q. 0 � Qz .6'-- � ¢ 'cq Paz a � oQ s � F � R. 0 cl � Q Q. a. s_ A •� � > Tco � � � ,5 _� a •+; T > O' . ao.^ 3 � � Q. .° ¢ C� - i V) r- C7 U •° p c% �; .� ; o bo Ll cz o o C7 •° ;; p- o0 O c,, m U cC c.. ., 4. G) 4. C c� c«. �+" c.. } +� „ 4- O cd `'^ cz 'v� O O cz — C7 0 o co > 0 C7 0 O wo co c >r. O '� ° o -o o � � � �c o 03C� :+ r- c '� O � � � iC O � c� O cC cz O O c.r cC O cd 0 ° O O bU 0 -0 O O U .o � � 0 O O � � O U '� a 0 c w cl 0 10 vn a � cl a .� cd c � -v > rS. w Cl > -0 N > c a 0 0 0 w > u c� > `� 0 o . a`�'i a� W as a� a4 W y W 0 cd a� cz n� W is p «s I.- 4: U H .^ 'w >,'.'_. E " �n c� C ^� U c� cd O C. �' .+ O v' +� .0 A �' ° ,= _ O a`'i t 0 c� 0 0 0 0 0 k cn o c. 0 M o . 0 0 ¢ .�" as Cd 0 O O > a . M ¢ 0. > m cz � 0 0007w .-� v� c� C7ii, .-� c� ►a30Ln Ua, aCD04Wwav� K, OrcnCD0. UN3 p M to cM v) C v1 �c O M N to cn rM Vn O N [— 110 cn O cn C rM M N QN v'1 to C l— v1 U W) N Wn � all r O fV 110 N U W) N �-- Q� F- 'It O N N N N N `D N CV r—, N N N N N N M N N �O M " N N '3 O -- N N M " W N M M M M M M M M M M M M M M M i M M _ M M 0-- r., �j r j r-j .--I r-� r--j i.j 1-i f.-i ►--� r� ►-a �--� �--� aaaaaa aaaaaaaa. a. a, o, aa. aain. in. a aa, aaaaaa, a, QQQ ¢ ¢ ¢ Q ¢ QQQ < ¢ Q ¢ Qd ¢ ¢ ¢ ¢ ¢ ¢ Q ¢ Qdd ¢ ¢ ¢ Q ¢ yrAC/) V) ono7V� LnC/) C/) yLn Con V) (AEnrALn V) � � � � x x ]C Z Z 0 Z X Z Z x x Z x 0 ]C x x = X aC x ° ax. a x x x x ]C x x wwwwwwww w www 0 0 0 0 0 0 0 0 0 0 0 0 titititititititi ti � titi alc� r� r� o: ac wwwww w wwwww www Wwwww w 00000000 0 OOODUUUU U UUUUU UUU mmmaaoa m F- F- F- F- F-- F- F- F- F- F- F- �- 5a5 � 5 5 55a555 � a � UUUUUUUU - - . - 00000 0 — — — — .- - . — . — xxxxx w C4wwC4wxxxx m z z z z z z 140rnv� rnv� rn cnv� v� v� v� �nv� v� v� Me 00000 O wwwww � ww w wwwZzzZz� z zzzZzzzzZ �ncnv� �nv� v� aGaGaCaC � �C �G �G aC SC �G �C � X �G � � � �CaC �GaGaC �GaG �G �C UUUUUUUU U UUUaxxxc4 C4 wC40c xxxxxw ox Qd ¢ Q ¢ ¢ wwwwwwww w wwwwwwww w wwwwwwwww 00 00 00 00 00 00 ,� a N r`J N N (N N ^ � __ __ O O N O O o o N 0 0 0 -- O N C) O O C)00 O� N N r- N r`d O N r1! O N N — N N r`J O N N N N N _ C) N O O O __ rJ O � N C) fJ M 00 __ N ^ It CT t M ^ r- Ul N 00 N N N E r1 h N N N — M N rV ^ ^ ^ o r r- 00 00 _' aJ ^ U U o U 'o ,o U ° U m o o O O 0 Ln u to •• vi u cn ° W LAs. sr 0. 0 E a. ° U �j o � ° _ 3 _ ° ° yN d o O �O ° a) 0 cz Q o O U '� v, u 0 0 0 U "" '� O 0. � � U � a, ^ � � A � U C inn. s U _ " a a, to 7°- j ° �_ U E 5 O O x .� ° U 0 u a� _p O cz rOn U W O O y O O O 4] i f rz G• v� rn bU .-. U v Q. cl oa ¢ ¢ F- � o �•o ¢ O � a ' ~ct°n > a U � Via. A > a, 3 a, �.. c� c:� �- a) v U y w- ca �, �_ a) 4 c L« I.- t- A .Q c° c«. > bA 0 m c� cti F" CA yam, C7 > O O ° o � O a) r/! C!J �—. C a) a) °� C poq C p � o U ^Ci a �= o Q `'o ,� a: o C) E 'U-� ° L o a� .° o vi z. a .o M CA En 0 [i cin > a. ci a b U o c -o `� �- > y CO > U L > E = gi g U C W ° W W p ar, W o. CA O. L1. M a) 0 ¢ O O > m .cr O 2.I cz c13 m o cu O 0 a, rs. c� C7C7 —, 1. 0A U 0 -- cn �a r O W) v, r` ¢ r rV O M o N c v, W) N M W) N r1l N N r`J 3 N nl Q rJ rV M M N I° N N M rV C14 N N M M M :5 M M i M aaa. a � aaa. a. 0- P. a. a. a. a. aaaaa. a. a. a., a. n, a ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ cn � V) V) V) V) cnV) cnunV) V) cncn0V) cnv) cn0mV) V) V] EnLn ZZz ZZZZZZZZZZx ;TZZZZ o � xXZ 0. a. 0. a. x UICLICL a.Ia. 7KKKZK K �_zzK4 � � r4 wwwwcYa= � � a: c� a: a; aCaCr� c� r�Cr� a: a! a; 0 0 H 61 L L 4 C OOOOa' a: c� c� � a: cxa: aCc� c� a: a! r.� a: c� c� oG a; a: aCc� � cz W W W W W W W W W W W W W W W W W W W W W W 00 = ll ll t ll N U OG Q vi � III III I II II I�II IIIII I I II IIIII I II I II I I II I II I III � c L� '�O Y C Z O H Q� G ui E U at J ~ a N w e U 0 0 W C N cJ O 7 U C d N 4-0 ccz Q v o Q) z r.r oc O C L OEli • O O C v a ^ 03 O O tQ `•A c1 p L cl w 3 F c a s O Cd A ss5 o c o a� � t° Cd 1 a) o C -d ca ^p Ei V v C O i 4 w cd ❑� c C C O y �� O. —_ r� O O b � May •C h > �� y O ¢, % U O CL 'fl I M T c m N N W C G S ca 69) v) Q a 6 Q� Gl T O C✓ y O N N a a O O C O O r1 O M O O ,n O O E c .-. z rq 7_. o z o� z c, Z a, z o, z os z eq m y � 11111111ININ111111 Do t� 9 I •y Z J 0 U W F= u m c x t 0 O O ¢ C O G O G 0.O O O O ¢ ¢ z ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ 0 0 0 0 0 o a o o c O O v C O O O C O O O N N N N N N N N N N N O O C O O O O O O O O O � O M w G V tz Q tom. U t:. td u. L) C U v v G i cC3 C .0 b V7 > C3J U M n U v. C o ci v O L7 ECIS y U ' � > U u > x ° acl O " W Ca to C C N O 9 E G v O O E G M C/1 c. r U D In , G Q c O F- E Ca o c o 0 0 0 � �, o 0 O O O O O N O O O O O N N N O N N N N O N `4- �f 00 O %n N 7 O M M \ N O, CN ON IC CV V1 kn kn O s N 00 O a1 O Cl O O O O O O G C G N O O G O O z `e C, Z C, Z C` Z a, Z — z — z z — Z z t� Z p m (n A L N 9 4 a z 0 0 u u m a Oz 0 0 0 0 0 0 0 0 0 0 0 0 a -d b v b b b b v zs v d d Q ¢ Q Q d Q Q ¢ Q C O O O O O O O O O O N N N N N N N N N N N qT � It O O C O O O O O O O O M U =3 y Q. d 0 0 -ti U C W E E c3 U U � U :C U U _ �1. E 3 c V a o v o ) E w x w o Q cz w C7 i c° on ci E M � cz E CL cz Rio a' U •^ M U O � v O. y C U v m o vim, c�i `� <.. r w 0 W v > 6, EA > Y c �� a' E -o = 0. ii a �- `E m i� aCi Y ooaCi G cd c c ° co � ^ y o Qd oc o o � c� ON 0000 N D �7' M N N MO N N N 00 M 00 �O O CN O O In 0000 tn 00 Q` N CN 00 O- (V M CIS d �O r- N � 0.i w w r LL. w w w w kn � U z U i _U ,U U C O 00 S.'!O O O O O � O O O O oco z Z c Z z Z Z m III I III II II I I II I II II I I I'III'I I II I II I I'I I II I III Q o L N 9 v j 6 Z n U m J i J J z 7 T G" O O O C O O O O O Q Q Q Q Q Q t Q Q Q 1f1 00 O C O O O O O O O Cl C O O O t= O O O O O C O C d .b 0 cp0 C V Z M z ❑ C` y _ L C � O O c� O � � CL U O N N v ° '� c E Q 'Uto O O C C i O y C6 GU U -a = C V (_. m es y o :° > �+ ° M 73 ° cis y y a b a v b o o 0 a°°i Ca m .� i- U O O tLl O c3 N y .0 C) K cs n 0 CO �] 0 V7 U Q a � 0 wv>i Oz ¢ _ Q � CW) to 00 kn v� c o 0 0 N O G N I) 0`0 N .�� L N N 0000 _ a N 0000 � r- O O 01 00 N 000 00 0 �O N C Q tn �o oro 00 oc o0 000 �. N O r_� O N O O p0 ° O, O O E z z Z e o Z -- z — z o � III IN 1111111111111111111111111 IN III HE III e D L N •O ti a` Z O O 1= J_ J m zL O 0 0 0 0 0 0 o c o 0 Q Q Q Q Q ! Q Q Q Q Q C O O O O O O O C O O C O O O C O N N N N N N _N N N N N O O C O O M ^ O O G O C � A ftf 'C 'C m v C cl C O a+ C4 r U U v7 y u N U o U N tri Cw C C C cC U c w . ca Q ocuo Cx. 0 °° aU � .� o; m cc co cn a. oo a- a o ca o cnwi o U y zfJ -0 a cz .0 U -o � F' w^ 3 Q Q a Q , :g Q A tr . z Q A c d M ON cz� O O N C ^� O, O O N O C N N N O ^ O N N O N 0 N i L N M q' N N C eC 00 00 O\ M A. G. 0. M N r M rn 00 l� Q� Wn 00 00 00 00 00 r-j 00 00 CA U. to _ Wn 00 0 _ _ _ P y c t 1 Q l 1 0 0 W u a(.+ 0 ,0 a O N O M O O N C O O N O M O owe N Z N Z N Z N Z N Z vi Z z O Z N Z N Z N Z N Z C0 b m III II IIIIIIIII'll'IIIIIIIII'IIIIIIIIIIIIIII III G � I L N � S M a O f 'a 4 W F J J a O_ 0 0 0 0 0 0 o c 0 0 0 ON 0 0 o ON a` ON C, ON M eCC � y ,F3. U O b U C3 U Y u cn 00 y v o � >r u O U 0rA 't7 C U d U U Grp, C:IJca 0 0 U O � O > C C CL a �' O 0 = = O its 0 �. ea u c� v a> U a C u ,. v �c v tJ U U Ll C tvEr to O O O T cCt O eS co O cs G U d a was c> c� R is a�-i w > > CZ co a o c y s~ c a o a a o y v 0 u o c c c c w ¢ a O Z c O'oc v� a 0 N O O C a N r.+ _ C6 N i ON cc 000 T G. 00 O c r U U U ,1 - 4) , r - r .U+ ace. 0 O �O 0 O C O 0 O O O O CA Z N Z N Z fV Z L u Z 'O z Ci z 4: z co Z cv O o III II'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III C ` \ g \ 2 ) \ � § % / ( .\ § / \ § E § � U / k 2 � / _ \ o \ / / a � w u C6 0 0 � § / k \ \ M1. / � 0 cl u GO9 .¢ 2 A a _ of � > 7 © co > ' > u v f Am@ rA / � 2 ■ -0 > e ° k s / f ° - © z 2 2 / '§ 2 rA \ / K � 4. u / ! o g c § 2 ( u 7 0 / k � a k wcr /02 . k 4 0 § § Attachment 10 - Performance and Damage Prevention Questions CALENDAR YEAR (CY) 2018 Planned Performance: What are your Planned Annual and Long-term goals for your Pipeline Safety Program? The IPUC Pipeline Safety Program is committed to improving our safety program. The Commission's annual goals are to ensure Idaho jurisdictional pipeline operators are providing the safe transportation and delivery of natural gas to its customers and doing this without affecting the safety of the public. This is accomplished by a comprehensive program of inspections and audits of the companies'records and field equipment and following-up on each incident and non-compliance found. During 2019,the Commission will conduct audits of the operator's integrity Management Programs, Drug& Alcohol Programs,Operator Qualification Program and Public Awareness Program. The Commission's inspection staff will conduct surveys of the high pressure service sets(farm taps)and will continue to identify possible master meter systems within the state. The Commission holds a position on the Damage Prevention Board that Idaho Legislature enacted as a damage prevention system to meet PHMSA requirements. The Commission is continuously pushing towards an increase to the civil penalties statute. The Commission is committed to have the newly hired inspector become trained and qualified. Past Performance: What did the Pipeline Safety Program accomplish during the subject year(to this document)to contribute toward the program's annual and long-term goals? Four Intrastate operators within the Commission's jurisdiction were inspected for the safe transportation and delivery of natural gas within the state according to the Commission's approved program of operating procedures. Any deficiencies noted were documented. discussed with the operators for corrective actions,and follow-up inspections were performed when required. IPUC inspectors completed 12 T&Q courses,all scheduled inspections,began an aggressive inspection for high pressure service sets,and continued new construction activities whenever possible. Conducted a PHMSA required State T&Q Seminar for all operators within the state. 1. Has the state or agency reviewed the Damage Prevention Assistance Program(DPAP)document in the fast twelve months? No 2. Has the state or agency developed or is in the process of developing a plan to address the nine elements contained in the PIPES Act of 2006 for an effective State Damage Prevention Program? Yes If yes to question 2,where does the state or agency stand on implementation of the nine elements contained in the PIPES Act of 2006? Please provide a description of how the state or agency has or will meet each element. If not,please provide a brief passage explaining the reasons why the state or agency has not. The Commission has continued to participate in the statewide coalition for damage prevention but does not have statutory authority to develop a State Damage Prevention Program that would have any enforcement ability. All enforcement authority for damage prevention is held within Idaho Department of Building Safety's Damage Prevention Board. The Commission does hold a seat on the C board but would not have any directive authority over it. The board's objective plan will address the nine elements for an effective State Damage Prevention Program. The Commission supports the program through an alliance with two one-call centers,Operator's public awareness programs,and utility coordinating councils. The goal of the coalition is to improve the underground damage prevention law, eliminate as many exemptions as possible,educate the public and establish an effective enforcement mechanism in accordance with the 9 elements contained in the PIPES Act. Our efforts include monitoring accidents,violations,and third arty di � g P g- ins for the purpose of identifying best practices and/or key contributing causes. During annual audit of each operator,the Commission continues to review operator's damage prevention program against rules and standards to ensure the programs processes are in place and effective. Noted deficiency(s)are documented on the IPUC Form I and the appropriate section of the PHMSA checklist, significant process deficiencies result in inunediate corrective actions requiring violation initiation,procedures for probable violation process established in the commissions program operating procedures will be followed. DUNS: 102589939 Idaho 2010 Gas Bau Grant Prograa Ripon IDAHO PUBLIC UTILITIES COMMISSION,Page 25 Attachment 10 Notes DUNS: 102589939 Idaho 2018 Gas Base Grata Progms Report IDAHO PUBLIC IMLITIES COMNUSSION.Pap 26