Letter of Concern
November 26, 2019 Report # 1201910
Pat Darras
Intermountain Gas Company
400 N 4" St.
Bismarck, ND 58501
Dear Mr. Darras:
On November 25, 2019, representatives of the Idaho Public Utilities Commission, Pipeline
Safety, pursuant to Chapter 601 of Title 49, United States Code, conducted an onsite
construction inspection of the 191GC-2004 project located at NW 11th-Kennedy, Washoe Rd in
Payette, Idaho.
As a result of the inspection, it appears there are area(s) of concern that do not fully meet the
intent of the pipeline safety regulations Title 49, Code of Federal Regulations, Part 192 for
calendar year 2019.
The item(s) listed below are of concern:
1. § 192.605(a) General. Each operator shall prepare and follow for each pipeline, a
manual of written procedures for conducting operations and maintenance activities and
for emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed and
updated by the operator at intervals not exceeding 15 months, but at least once each
calendar year. This manual must be prepared before operations of a pipeline system
commence. Appropriate parts of the manual must be kept at locations where operations
and maintenance activities are conducted.
During the inspection it was noted that the DAS-CO welding crew employed by IGC, did not
have a contact pyrometer or infrared pyrometer to check the preheat temperature at the weld
groove and weld area as required by IGC Operations and Maintenance Manual procedure
4106.1 (1.16.1).
11331 W.Chinden Blvd.,Building 8,Suite 201-A,Boise ID 83714
Telephone:(208)334-0300 Facsimile:(208)334-3762
The above mentioned items were brought to the attention of your representatives during the
onsite inspections. We would request that you review these matters and respond in writing
within 30 days regarding the above issue including any planned corrective actions.
If you have any questions concerning this notice, please contact me at (208) 334-0321. All
written responses should be addressed to me at: 11311 W Chinden Blvd, Ste 201-A, Boise,
Idaho 83714 or you can fax your response to (208) 334-3762.
Because of the good faith that you have exhibited up to this time, we expect that you will take
action to bring your program into compliance with pipeline safety regulations.
We a reciate your attention to this matter and your effort to promote pipeline safety.
Sinc r ly,
Darrin M. m
Pipeline Safety, Program Manager
Idaho Public Utility Commission