HomeMy WebLinkAboutI201906 NOPV Public Utilities Commission BradLittle,Govemor
PO Box 83720,Boise,ID 83720.0074 Paul Kleiiander,Commissioner
(&__Idaho
Kristine Raper,Commissioner
Eric Anderson,Commissioner
July 2, 2019 Report# 1201906
Pat Darras
Intermountain Gas Company
400 N 4tn St.
Bismarck, ND 58501
Dear Mr. Darras:
On June 10-13, 2019,the Idaho Public Utilities Commission, Pipeline Safety Division, pursuant to Chapter
601 of Title 49, United States Code, conducted the field inspection of Intermountain Gas Company's
(IGC) equipment in the Twin Falls District.
During the inspection it was observed that some of the Idaho natural gas distribution system owned and
operated by IGC was out of compliance on some items. This results in probable violations of the
pipeline safety regulations Title 49, Code of Federal Regulations, Part 192.The probable violations are as
follows:
PROBABLE VIOLATIONS
1. 49 CFR§192.739(a)(1)Pressure limiting and regulating stations: Inspection and testing.
Each pressure limiting station, relief device(except rupture discs), and pressure regulating
station and its equipment must be subjected at intervals not exceeding 15 months, but at least
once each calendar year, to inspections and tests to determine that it is--(1)in good mechanical
condition.
Finding:
During the inspection it was noted that 1 regulator station on the list was not plumbed for lock-
up. Meter inspector was unable to demonstrate that the regulator was functioning properly
and was able to lock-up when the necessity arises.
2. 49 CFR§192.739 (a)(4)Pressure limiting and regulating stations: Inspection and testing.
Pressure limiting and regulating stations: Inspection and testing—reads: Properly installed and
protected from dirt, liquids, or other conditions that might prevent proper operation. Which is
also covered in IGC Procedure 4306 Sec.4.1.1.
472 West Washington Street,Boise ID 83702
Telephone:(208)334-0300 Facsimile:(208)334-3762
Finding:
During the inspection it was noted that regulator stations 50038, 50112, and 50114 had one or
both regulators fail to lock up at the pre-established set point preventing proper operation.
3. 49 CFR§192.707 (a)(1) Line markers for mains and transmission lines.
... a line marker must be placed and maintained as close as practical over each buried main and
transmission line:At each crossing of a public road and railroad;and....
Finding:
During the inspection it was noted that along regulator station 50109 the markers were laying
on the ground, not visible and needed to be installed properly.
REQUESTED ACTION
A reply to this letter,as outlined below, is required no later than 45 days from the date of this letter.
Please send all documents to our office at P.O. Box 83720-0074, Boise, Idaho 83720-0074. Be advised
that all material you submit in response to this enforcement action may be a public record, subject to
disclosure under Idaho's Public Records Law. See Idaho Code § 74-101-126.
You have a right to appear before the Pipeline Safety Division in an informal conference before August
19, 2019, at the Commission's offices at 472 W_. Washington St, Boise. You have the right to present
relevant documents to the Commission at that conference. The Commission will make available to you
any evidence which indicates that you may have violated the law, and you will have the opportunity to
rebut this evidence. If you intend to request an informal conference, please contact the Pipeline Safety
Division no later than August 5, 2019.
If you wish to dispute the allegations in this notice, but do not want an informal conference,you may
send the Pipeline Safety Division a written reply to this notice. This written reply must be filed with the
Commission on or before August 19, 2019, and must be signed by a Company Official. The reply must
include a complete statement of all relevant facts including a complete description of the corrective
action(s) taken and any and all actions to be taken to prevent future failures in these areas of concern.
If you do not respond to this notice, as specified above, by August 19, 2019,you may be subject to
statutory civil penalties and further enforcement, as allowed by law. Idaho Code §61-712A states that
"[a]ny person who violates or fails to comply with,or who procures,aids or abets any violation of title
61, Idaho Code, governing safety of pipeline facilities and the transportation of gas, or of any order,
decision, rule or regulation duly issued by the Idaho public utilities commission governing the safety of
pipeline facilities and the transportation of gas, shall be subject to a civil penalty of not to exceed two
thousand dollars($2,000) for each violation for each day that the violation persists. However,the
maximum civil penalty shall not exceed two hundred thousand dollars ($200,000)for any related series
of violation."
IGC TWIN FALLS FIELD AUDIT NOTICE OF PROBABLE VIOLATION—PAGE 2
If you have any questions concerning this notice, please contact me at(208) 334-0321. Also all written
responses hould be addressed to me at the above address or you may fax your response to (208) 334-
4045. We appreciate your attention to this matter and your effort to promote pipeline safety.
Sincere ,
Darri M. r
Pipeline Safety, Program anager
Idaho Public Utility Commission
IGCTWIN FALLS FIELD AUDIT NOTICE OF PROBABLE VIOLATION—PAGE 3