Loading...
HomeMy WebLinkAboutI202003 NOPV Response K•<w+` $ li� EXECUTIVE OFFICES d-�, I^� 'f) INTERMOUNTAIN GAS COMPANYLJ } ; 555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707• (208)377-6000•FAX:377-6097 �F 1W'.qrJ July 29,2020 Mr.Darrin Ulmer,Programs Manager Idaho Public Utility Commission PO Box 83720 Boise,ID 83720-0074 Subject:Response to Notice of Probable Violation dated June 19,2020(Report# 1202003) Dear Mr. Ulmer, This letter is intended to address one probable violation stemming from a field inspection of Intermountain Gas Company's(IGC)equipment in the Nampa District conducted June 8-10,2020. PROBABLE VIOLATION 1. 49 CFR§192.739(a)(4)Pressure limiting and regulating stations: Inspection and testing. Pressure limiting and regulating stations: Inspection and testing—reads:Properly installed and protected from dirt, liquids, or other conditions that might prevent proper operation. Which is also covered in IGC Procedure 4306 Sec. 4.1.1. Finding: During the inspection it was noted that regulator stations 30017,30018,30019,30022,30084,30090, 30095, 30100, 30110 and 30195 had one or both regulators fail to lock up at the pre-established set point preventing proper operation. Intermountain Gas Response Intermountain Gas Company (IGC) acknowledges the findings brought forth by the IPUC stated above. As stated in previous responses, IGC created a Failed to Lockup Mitigation Plan that includes the following: • Identification of regulator station regulators that failed a lockup test two or more times during calendar years 2016-2018. • Review of the identified stations for an appropriate mitigation option: monitor, rebuild,pilot sulfur heater, pilot heater, stainless steel stems for pilots, line heater, or strainers. • Creation of a ten-year schedule based on a consequence of failure rating. Regulator station 30018 is scheduled to be replaced in 2020. Regulator station 30019 is scheduled to be retrofitted with strainers in 2022. The remaining eight regulator stations were not identified during the 2019 review.The following table was extracted from the annual inspection questions Regulator I Operated Properly and Regulator 2 Operated Properly. Based on the results,regulator stations 30017 and 30110 have been added to the Failed to Lockup Mitigation Plan; each being scheduled to have pilot sulfur filters installed in 2026. EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707• (208)377-6000• FAX:377-6097 Station 2017 2017 2018 2018 2019 2019 2020 2020 Add to Number Reg 1 Reg 2 Reg 1 Reg 2 Reg 1 Reg 2 Reg 1 Reg 2 Plan 30017 Yes Yes No Yes No Yes Yes Yes Yes 30022 Yes Yes Yes Yes Yes Yes Yes Yes No 30084 Yes Yes Yes Yes Yes Yes Yes Yes No 30090 Yes Yes Yes Yes Yes Yes No Yes No 30095 Yes Yes Yes No Yes Yes Yes Yes No 30100 Yes Yes Yes Yes Yes Yes Yes Yes No 30110 Yes Yes Yes Yes No Yes No Yes Yes 30195 NA NA NA NA Yes Yes Yes Yes No Please contact Josh Sanders at(701)222-7773 with questions or comments. Respectfully Submitted, �G�.,� �✓Gi�G4.0�2 Pat Darras Vice President,Engineering& Operations Services Intermountain Gas Company