Loading...
HomeMy WebLinkAboutI202101 LOC Idaho Public Utilities Commission Brad Little,Govemor PO Box 83720,Boise,ID 83720-0074 Paul Kjellander,Commissioner Kristine Raper,Commissioner Eric Anderson,Commissioner Letter of Concern January 26, 2021 Report# 1202101 Pat Darras Intermountain Gas Company 400 N 0 St. Bismarck, ND 58501 Dear Mr. Darras: On January 25, 2021 representatives of the Idaho Public Utilities Commission, Pipeline Safety, pursuant to Chapter 601 of Title 49, United States Code, conducted an onsite construction inspection of the 318-57FS-123 project located at 605 N 7th St, in Parma, Idaho. As a result of the inspection, it appears there are area(s) of concern that do not fully meet the intent of the pipeline safety regulations Title 49, Code of Federal Regulations, Part 192 for calendar year 2021. The item(s) listed below are of concern: 1. § 192.605(a) General. Each operatorshall prepare and follow for each pipeline, a manual of written procedures for conducting operations and maintenance activities and for emergency response. For transmission lines, the manual must also include procedures for handling abnormal operations. This manual must be reviewed and updated by the operator at intervals not exceeding 15 months, but at least once each calendar year. This manual must be prepared before operations of a pipeline system commence. Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. During the inspection it was noted that the DAS-CO welding crew employed by IGC, when asked about preheating prior to welding, did not have a operational and calibrated infrared pyrometer to check the preheat temperature at the weld groove and weld area as required by IGC Operations and Maintenance Manual procedure 4106.1 (1.16.1). This area of concern has been a previous issue brought to your company's attention. 11331 W.Chinden Blvd.,Building 8,Suite 201-A,Boise ID 83714 Telephone:(208)334-0300 Facsimile:(208)334-3762 The above mentioned items were brought to the attention of your representatives during the onsite inspections. We would request that you review these matters and respond in writing within 30 days regarding the above issue including any planned corrective actions. If you have any questions concerning this notice, please contact me at (208) 334-0321. All written responses should be addressed to me at: 11311 W Chinden Blvd, Ste 201-A, Boise, Idaho 83714 or you can fax your response to (208) 334-3762. Because of the good faith that you have exhibited up to this time, we expect that you will take action to bring your program into compliance with pipeline safety regulations. We ap reciate your attention to this matter and your effort to promote pipeline safety. Sinc rely, Darrin M. Ulm Pipeline Safety, Program Manager Idaho Public Utility Commission 11331 W.Chinden Blvd.,Building 8,Suite 201-A,Boise ID 83714 Telephone:(208)334-0300 Facsimile:(208)334-3762