HomeMy WebLinkAbout20240829PAC to Staff 140-2 - 140 (d) iii - Actual Schedule 20240615.pdfActivity ID Activity Name Responsible Party Start Finish Primary Constraint Orig Days Rem Days Q0754 Steel SolarQ0754 Steel SolarQ0754 Steel Solar 03-17-17 A 05-30-24 A 2212d 0d Project PlanningProject PlanningProject Planning 03-17-17 A 06-14-21 A 1538d 0d 0001 System Impact Study 03-17-17 A 0d 0d 0003 Facilities Study (Interconnection Agreement)08-11-17 A 0d 0d 0005 APR 94010015 ISD = 7-16-2023 10-01-19 A 0d 0d 0006 Original APR 24014249 ISD = 08-18-2020 09-27-18 A 0d 0d 0007 Sign Interconnection Agreement 06-04-18 A 06-28-18 A 60d 0d 0008 Customer Placed Project on Suspension 07-16-19 A 10-27-20 A 1d 0d 0009 Parental Guaranty Completed 09-21-20 A 0d 0d 0010 T&D PMO: PM Reassigned (Howcroft)06-01-21 A 0d 0d 0011 Revised LGIA Executed 05-24-21 A 0d 0d 0012 APR 94011668 ISD = 9-16-2022 06-14-21 A 09-16-22 0d 0d Project MilestonesProject MilestonesProject Milestones 05-30-24 A 05-30-24 A 0d 0d 8999.APR Commercial Operations - Approved APR # (94011668)05-30-24 A 06-30-23 0d 0d Project InitiationProject InitiationProject Initiation 11-28-18 A 05-06-21 A 30d 0d 0050 Scoping Request & Development (108F Form)04-01-21 A 05-06-21 A 20d 0d 0060 PSRAT Approval: Substation 05-06-21 A 0d 0d 0065 PSRAT Approval: Transmission 11-28-18 A 0d 0d 0080 Project Team Kick-Off Meeting 04-14-21 A 0d 0d Phase 1Phase 1Phase 1 08-02-17 A 05-30-24 A 709d 0d Phase 1 KPI'sPhase 1 KPI'sPhase 1 KPI's 08-30-21 A 02-15-23 A 380d 0d 1799.01 Permits Acquired 10-22-21 A 0d 0d 2215.01 Post to Jagger 04-22-22 A 04-22-22 A 2d 0d 2265.01 Contract Award 06-21-22 A 0d 0d 3818.01 CAISO Data Package Submittal 08-30-21 A 11-17-21 A 11-17-21 60d 0d 3879.01 Full IFC Complete 06-06-22 A 02-24-22 0d 0d 3890.01 CAISO Data Package Deployment 04-25-22 A 04-25-22 0d 0d 6902.01 Customer Provides Notice to Start Construction 06-06-22 A 0d 0d 6922.01 Mechanical Completion 12-21-22 A 0d 0d 8889.01 Contracted Backfeed Date (Constrain to Contract Backfeed Date)02-15-23 A 02-28-23 0d 0d Permitting & LandPermitting & LandPermitting & Land 06-04-18 A 08-18-23 A 270d 0d PermittingPermittingPermitting 06-04-18 A 09-30-21 A 207d 0d 1300.01 Customer Obtains All Permits 06-04-18 A 09-30-21 A 207d 0d Property AcquisitionProperty AcquisitionProperty Acquisition 06-04-18 A 08-18-23 A 270d 0d 1400.01 Customer Acquires Property 06-04-18 A 08-15-21 A 207d 0d 1401.01 Customer Conveys Property to PacifiCorp 04-15-22 A 08-18-23 A 90d 0d Right of Way ServiceRight of Way ServicesRight of Way Services 06-04-18 A 10-22-21 A 207d 0d 1500.01 Customer Acquires ROW 06-04-18 A 10-22-21 A 207d 0d EngineeringEngineeringEngineering 08-02-17 A 08-30-22 A 275d 0d Cost EngineeringCost EngineeringCost Engineering 08-02-17 A 03-24-22 A 275d 0d 3002.01 Un-Scoped Estimate (+/-50%)08-02-17 A 08-11-17 A 20d 0d 3003.01 Scoped Estimate (+/- 20%)04-01-21 A 04-28-21 A 1d 0d 3004.01 Preliminary Scope Estimate (+/-30%)03-28-18 A 04-09-18 A 20d 0d 3005.01 Final Estimate (+/-10%)02-25-22 A 03-24-22 A 1d 0d Customer EngineerinCustomer Engineering DeliverablesCustomer Engineering Deliverables 05-06-21 A 09-24-21 A 61d 0d 3007.01 Customer One-Line 05-06-21 A 09-24-21 A 61d 0d 3009.01 Customer General Plan 05-06-21 A 09-24-21 A 61d 0d EngineeringEngineeringEngineering 06-10-21 A 08-30-22 A 201d 0d 3000.01 Engineering Summary 06-10-21 A 08-30-22 A 201d 0d Geotech & SurveyGeotech & SurveyGeotech & Survey 08-02-21 A 09-09-21 A 20d 0d 3018.01 Geotech/Survey: Substation 08-02-21 A 09-09-21 A 20d 0d Engineering DesigEngineering Design & Review 1Engineering Design & Review 1 06-10-21 A 08-17-21 A 30d 0d 3110.01 Transmission - Design Review 1: PSRAT Scoping 06-21-21 A 07-07-21 A 30d 0d 3115.01 Civil/Sub/P&C/Metering/Comm/SCADA - Design & Review 1 06-10-21 A 08-06-21 A 08-06-21 30d 0d 3170.01 Review 1: Review & Approval 08-06-21 A 08-17-21 A 1d 0d Engineering DesigEngineering Design & Review 2Engineering Design & Review 2 06-15-21 A 10-01-21 A 201d 0d 3210.01 Transmission - Design & Review 2: PLS-CADD Model Review 07-12-21 A 09-20-21 A 40d 0d 3258.01 Civil/Sub/P&C/Metering/Comm/SCADA - Design & Review 2 08-17-21 A 09-24-21 A 09-24-21 30d 0d 3259.01 Review 2: Review & Approval 09-24-21 A 10-01-21 A 1d 0d 3280.01 Draft Protection Plan 06-15-21 A 06-30-21 A 20d 0d Engineering DesigEngineering Design & Review 3Engineering Design & Review 3 09-28-21 A 08-30-22 A 146d 0d 3310.01 Transmission - Design & Review 3 09-28-21 A 04-12-22 A 30d 0d 3315.01 Civil/Sub/P&C/Metering/Comm/SCADA - Design & Review 3 10-04-21 A 04-20-22 A 01-27-22 14d 0d 3353.01 Finalize & Approve CSP & Protection Plan 05-02-22 A 08-30-22 A 20d 0d 3370.01 Review 3: Review & Approval 04-20-22 A 04-29-22 A 10d 0d Issued for ConstructiIssued for Construction PackagesIssued for Construction Packages 04-15-22 A 06-14-22 A 33d 0d 3425.01 Transmission - IFC Package 04-15-22 A 0d 0d M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 System Impact Study Facilities Study (Interconnection Agreement) APR 94010015 ISD = 7-16-2023 Original APR 24014249 ISD = 08-18-2020 Sign Interconnection Agreement Customer Placed Project on Suspension Parental Guaranty Completed T&D PMO: PM Reassigned (Howcroft) Revised LGIA Executed APR 94011668 ISD = 9-16-2022 Commercial Operations - Approved APR # (94011668) Scoping Request & Development (108F Form) PSRAT Approval: Substation PSRAT Approval: Transmission Project Team Kick-Off Meeting Permits Acquired Post to Jagger Contract Award CAISO Data Package Submittal Full IFC Complete CAISO Data Package Deployment Customer Provides Notice to Start Construction Mechanical Completion Contracted Backfeed Date (Constrain to Contract Backfeed Date) Customer Obtains All Permits Customer Acquires Property Customer Conveys Property to PacifiCorp Customer Acquires ROW Un-Scoped Estimate (+/-50%) Scoped Estimate (+/- 20%) Preliminary Scope Estimate (+/-30%) Final Estimate (+/-10%) Customer One-Line Customer General Plan Engineering Summary Geotech/Survey: Substation Transmission - Design Review 1: PSRAT Scoping Civil/Sub/P&C/Metering/Comm/SCADA - Design & Review 1 Review 1: Review & Approval Transmission - Design & Review 2: PLS-CADD Model Review Civil/Sub/P&C/Metering/Comm/SCADA - Design & Review 2 Review 2: Review & Approval Draft Protection Plan Transmission - Design & Review 3 Civil/Sub/P&C/Metering/Comm/SCADA - Design & Review 3 Finalize & Approve CSP & Protection Plan Review 3: Review & Approval Transmission - IFC Package Q0754 Steel Solar Project Manager Jeff Howcroft Print Date 08-11-24 / 10:43 Page 1 of 4 Schedule Prepared by: Jeff Howcroft Data Date 06-14-24 Activity ID Activity Name Responsible Party Start Finish Primary Constraint Orig Days Rem Days 3430.01 Civil/Sub/P&C/Metering/Comm/SCADA - IFC Package 05-02-22 A 06-06-22 A 02-24-22 5d 0d 3435.01 Full IFC issued to Document Control 06-07-22 A 02-24-22 0d 0d 3440.01 Document Control Check in & Distribute IFC Package 06-07-22 A 06-14-22 A 10d 0d Post Design EngineerinPost Design EngineeringPost Design Engineering 02-03-22 A 12-09-22 A 161d 0d 3900.01 Post Design Engineering Summary 02-03-22 A 12-09-22 A 161d 0d P & C EngineeringP & C EngineeringP & C Engineering 09-08-22 A 10-27-22 A 40d 0d 3902.01 Relay Settings Development 09-08-22 A 10-21-22 A 30d 0d 3904.01 Issue Relay Settings to Area Sub Operations Via P8 10-21-22 A 10-27-22 A 10-14-22 0d 0d MeteringMeteringMetering 10-11-22 A 11-22-22 A 12d 0d 3912.01 Meter Output Settings for SCADA and Alternate Control Path to SCADA, Comm 10-11-22 A 11-22-22 A 12d 0d IT SCADAIT SCADAIT SCADA 02-03-22 A 02-22-22 A 10d 0d 3922.01 SCADA Monarch Database DET Entry 02-03-22 A 02-22-22 A 10d 0d Dispatch - T&DDispatch - T&DDispatch - T&D 07-28-22 A 08-12-22 A 10d 0d 3932.01 Dispatch Display Build 07-28-22 A 08-12-22 A 10d 0d IT - Transmission SysIT - Transmission SystemsIT - Transmission Systems 02-18-22 A 12-09-22 A 144d 0d 3945.01 SCADA Monarch Database Build 02-18-22 A 03-01-22 A 20d 0d 3946.01 System Generated Points Created 10-17-22 A 12-02-22 A 15d 0d 3948.01 Link Data Points to Dispatch Display 12-06-22 A 12-09-22 A 1d 0d Grid Operations - TF Grid Operations - TF (Transmission)Grid Operations - TF (Transmission)03-11-22 A 04-21-22 A 30d 0d 3954.01 System Model Updated 03-11-22 A 04-21-22 A 30d 0d Commissioning NoteCommissioning NotebookCommissioning Notebook 04-11-22 A 04-22-22 A 15d 0d 3962.01 Commissioning Engineer to Create & Issue Notebook Prior to Bid Packages 04-11-22 A 04-22-22 A 15d 0d ProcurementProcurementProcurement 05-26-21 A 10-12-22 A 245d 0d 4000.01 Procurement Summary 05-26-21 A 10-12-22 A 245d 0d Procure ConstructionProcure Construction ServicesProcure Construction Services 04-11-22 A 06-21-22 A 27d 0d 4005.01 Compile Bid Package Documents 04-11-22 A 04-22-22 A 10d 0d 4008.01 Compile Engineering Bid Package Exhibits 04-15-22 A 04-22-22 A 5d 0d 4011.01 Bid Package Document Page Turn / Pre-Construction Project Plan Review 04-20-22 A 04-22-22 A 2d 0d 4012.01 Bid Package Complete 04-22-22 A 0d 0d 4020.01 Pre-Bid Meeting 05-19-22 A 05-19-22 A 1d 0d 4025.01 Vendors Prepare Bids 04-22-22 A 06-03-22 A 15d 0d 4030.01 Bids Due 05-31-22 A 0d 0d 4032.01 Pricing Review by Estimating 05-06-22 A 06-06-22 A 2d 0d 4040.01 Commercial Bid Evaluation (Schedule, EAP, CSP, Drill Plan)06-06-22 A 06-07-22 A 2d 0d 4050.01 Issue PO 06-21-22 A 06-21-22 A 1d 0d 4055.01 Requisition Created 06-07-22 A 06-21-22 A 1d 0d 4060.01 Notice to Proceed 06-06-22 A 06-06-22 A 2d 0d Procure MaterialProcure MaterialProcure Material 05-26-21 A 10-12-22 A 245d 0d Major Equipment -Major Equipment - TransmissionMajor Equipment - Transmission 11-29-21 A 04-11-22 A 57d 0d Transmission STransmission Steel StructuresTransmission Steel Structures 11-29-21 A 04-11-22 A 57d 0d 4206.01 Trans Steel Structures - Release PO 4501056082 (Crest Industries)11-29-21 A 12-07-21 A 5d 0d 4207.01 Trans Steel Structures - Ven Eq Dwgs Rcvd/Rvwd/Appvd 12-07-21 A 03-07-22 A 02-17-22 10d 0d 4208.01 Trans Steel Structures - Fabricate & Receive Steel Structures 12-13-21 A 04-11-22 A 04-12-22 52d 0d 4209.01 Trans Steel Structures - Fabricate and Receive Anchor Bolts 12-08-21 A 03-07-22 A 1d 0d Major Equipment -Major Equipment - MeteringMajor Equipment - Metering 05-26-21 A 03-23-22 A 245d 0d Metering CT/VTMetering CT/VT 138kVMetering CT/VT 138kV 05-26-21 A 03-07-22 A 225d 0d 4321.01 Metering CT/VT - Spec/Requisition 15049576 05-26-21 A 06-02-21 A 10d 0d 4326.01 Metering CT/VT - Release PO 4501033160 (Koncar)06-02-21 A 06-03-21 A 5d 0d 4328.01 Metering CT/VT - Fabricate & Receive 06-04-21 A 03-07-22 A 01-31-22 215d 0d Junction Box foJunction Box for CT's & VT'sJunction Box for CT's & VT's 12-20-21 A 03-23-22 A 100d 0d 4311.01 Metering Junction Box for CT's & VT's - Spec/Requisition 15229689 12-20-21 A 01-06-22 A 10d 0d 4316.01 Metering Junction Box for CT's & VT's - Release PO 4501062179 (Rexel)01-10-22 A 02-02-22 A 5d 0d 4318.01 Metering Junction Box for CT's & VT's - Fabricate & Receive 02-02-22 A 03-23-22 A 90d 0d Major Equipment -Major Equipment - CommunicationsMajor Equipment - Communications 09-06-21 A 03-31-22 A 110d 0d SCADA RTU WSCADA RTU WheelonSCADA RTU Wheelon 09-27-21 A 11-15-21 A 100d 0d 4501.01 SCADA RTU - Spec/Requisition 15161151 09-27-21 A 10-06-21 A 10d 0d 4506.01 SCADA RTU - Release PO 4501049833 (NovaTech)10-06-21 A 10-18-21 A 5d 0d 4508.01 SCADA RTU - Fabricate & Receive 10-19-21 A 11-15-21 A 11-10-21 90d 0d SCADA RTU PlSCADA RTU PlymouthSCADA RTU Plymouth 11-30-21 A 03-31-22 A 6d 0d 4509.01 SCADA RTU - Spec/Requisition 15211158 11-30-21 A 12-10-21 A 1d 0d 4510.01 SCADA RTU - Release PO 4501062882 (NovaTech)12-14-21 A 12-17-21 A 1d 0d 4512.01 SCADA RTU - Fabricate & Receive 12-17-21 A 03-31-22 A 01-10-22 4d 0d CommunicationCommunication Cable (OPGW/Fiber)Communication Cable (OPGW/Fiber)09-06-21 A 01-31-22 A 70d 0d 4521.01 Comm Cable (OPGW/Fiber) - Spec/Requisition 15138032 09-06-21 A 09-13-21 A 10d 0d 4526.01 Comm Cable (OPGW/Fiber) - Release PO 4501045809 (AFL)09-13-21 A 09-16-21 A 5d 0d 4528.01 Comm Cable (OPGW/Fiber) - Fabricate & Receive 09-17-21 A 01-31-22 A 01-21-22 60d 0d Major Equipment -Major Equipment - CivilMajor Equipment - Civil 11-08-21 A 08-05-22 A 170d 0d M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Civil/Sub/P&C/Metering/Comm/SCADA - IFC Package Full IFC issued to Document Control Document Control Check in & Distribute IFC Package Post Design Engineering Summary Relay Settings Development Issue Relay Settings to Area Sub Operations Via P8 Meter Output Settings for SCADA and Alternate Control Path to SCADA, Comm or P&C Engr, as required SCADA Monarch Database DET Entry Dispatch Display Build SCADA Monarch Database Build System Generated Points Created Link Data Points to Dispatch Display System Model Updated Commissioning Engineer to Create & Issue Notebook Prior to Bid Packages Procurement Summary Compile Bid Package Documents Compile Engineering Bid Package Exhibits Bid Package Document Page Turn / Pre-Construction Project Plan Review Bid Package Complete Pre-Bid Meeting Vendors Prepare Bids Bids Due Pricing Review by Estimating Commercial Bid Evaluation (Schedule, EAP, CSP, Drill Plan) Issue PO Requisition Created Notice to Proceed Trans Steel Structures - Release PO 4501056082 (Crest Industries) Trans Steel Structures - Ven Eq Dwgs Rcvd/Rvwd/Appvd Trans Steel Structures - Fabricate & Receive Steel Structures Trans Steel Structures - Fabricate and Receive Anchor Bolts Metering CT/VT - Spec/Requisition 15049576 Metering CT/VT - Release PO 4501033160 (Koncar) Metering CT/VT - Fabricate & Receive Metering Junction Box for CT's & VT's - Spec/Requisition 15229689 Metering Junction Box for CT's & VT's - Release PO 4501062179 (Rexel) Metering Junction Box for CT's & VT's - Fabricate & Receive SCADA RTU - Spec/Requisition 15161151 SCADA RTU - Release PO 4501049833 (NovaTech) SCADA RTU - Fabricate & Receive SCADA RTU - Spec/Requisition 15211158 SCADA RTU - Release PO 4501062882 (NovaTech) SCADA RTU - Fabricate & Receive Comm Cable (OPGW/Fiber) - Spec/Requisition 15138032 Comm Cable (OPGW/Fiber) - Release PO 4501045809 (AFL) Comm Cable (OPGW/Fiber) - Fabricate & Receive Q0754 Steel Solar Project Manager Jeff Howcroft Print Date 08-11-24 / 10:43 Page 2 of 4 Schedule Prepared by: Jeff Howcroft Data Date 06-14-24 Activity ID Activity Name Responsible Party Start Finish Primary Constraint Orig Days Rem Days Civil Structural Civil Structural SteelCivil Structural Steel 11-08-21 A 08-05-22 A 170d 0d 4621.01 Civil Structural Steel - Requisition 15199086 11-08-21 A 11-23-21 A 10d 0d 4626.01 Civil Structural Steel - Release PO 4501061027 (Meyers)11-29-21 A 01-25-22 A 5d 0d 4627.01 Civil Structural Steel - Ven Eq Dwgs Rcvd/Rvwd/Appvd 01-25-22 A 03-21-22 A 02-15-22 10d 0d 4628.01 Civil Structural Steel - Anchor Bolt Cages Fabricate & Receive 01-25-22 A 06-27-22 A 06-28-22 100d 0d 4629.01 Civil Structural Steel - Stel Structure Fabricate & Receive 01-25-22 A 08-05-22 A 06-28-22 1d 0d Major Equipment -Major Equipment - SubstationMajor Equipment - Substation 06-03-21 A 10-12-22 A 236d 0d Substation CircSubstation Circuit Breaker 138kV 2000A, 40 kASubstation Circuit Breaker 138kV 2000A, 40 kA 09-27-21 A 06-20-22 A 160d 0d 4711.01 Sub Circuit Breaker - Requisition 15167694 09-27-21 A 10-13-21 A 10d 0d 4716.01 Sub Circuit Breaker - Release PO 4501049761 (Grid Solutions)10-14-21 A 10-15-21 A 5d 0d 4717.01 Sub Circuit Breaker - Ven Eq Dwgs Rcvd/Rvwd/Appvd 10-15-21 A 02-08-22 A 01-31-22 10d 0d 4718.01 Sub Circuit Breaker - Fabricate & Receive (One Damaged During Delivery)10-25-21 A 06-20-22 A 05-23-22 160d 0d Substation RelaSubstation Relay PanelsSubstation Relay Panels 12-02-21 A 09-21-22 A 110d 0d 4731.01 Relay Panels - Requisition 15215037 12-02-21 A 12-16-21 A 10d 0d 4736.01 Relay Panels - Release PO 4501058495 (Rexel)12-27-21 A 12-31-21 A 5d 0d 4738.01 Relay Panels - Fabricate & Receive 12-31-21 A 09-21-22 A 09-07-22 100d 0d Substation Air BSubstation Air Break Switch 138kV 2000A Vertical BreakSubstation Air Break Switch 138kV 2000A Vertical Break 09-27-21 A 05-19-22 A 100d 0d 4721.01 Sub Air Break Switch - Requisition 15167696 09-27-21 A 10-13-21 A 10d 0d 4726.01 Sub Air Break Switch - Release PO 4501064352 (Southern States)10-14-21 A 02-22-22 A 5d 0d 4727.01 Sub Air Break Switch - Ven Eq Dwgs Rcvd/Rvwd/Appvd 02-22-22 A 03-24-22 A 05-02-22 10d 0d 4728.01 Sub Air Break Switch - Fabricate & Receive 02-22-22 A 05-19-22 A 05-17-22 100d 0d Substation CCVSubstation CCVT 138kVSubstation CCVT 138kV 06-03-21 A 03-23-22 A 140d 0d 4741.01 Sub CCVT - Requisition 15050316 06-03-21 A 06-10-21 A 10d 0d 4746.01 Sub CCVT - Release PO 4501034502 (Koncar)06-10-21 A 06-15-21 A 5d 0d 4747.01 Sub CCVT - Ven Eq Dwgs Rcvd/Rvwd/Appvd 06-16-21 A 08-05-21 A 10d 0d 4748.01 Sub CCVT - Fabricate & Receive 06-21-21 A 03-23-22 A 02-08-22 130d 0d Substation ConSubstation Control Building 28' x 30'Substation Control Building 28' x 30'09-27-21 A 09-19-22 A 153d 0d 4751.01 Sub Control Bldg - Requisition 15167692 09-27-21 A 10-13-21 A 5d 0d 4756.01 Sub Control Bldg - Release PO 4501049340 (Trachte )10-12-21 A 10-13-21 A 5d 0d 4757.01 Sub Control Bldg - Ven Eq Dwgs Rcvd/Rvwd/Appvd 10-14-21 A 02-14-22 A 11-01-21 10d 0d 4758.01 Sub Control Bldg - Fabricate & Receive 10-25-21 A 09-19-22 A 09-19-22 140d 0d Substation BattSubstation Battery BankSubstation Battery Bank 12-13-21 A 04-06-22 A 72d 0d 4841.01 Sub Battery Bank - Requisition 15240650 12-13-21 A 01-20-22 A 10d 0d 4846.01 Sub Battery Bank - Release PO 4501060857 (Action Battery)01-20-22 A 01-24-22 A 5d 0d 4848.01 Sub Battery Bank - Fabricate & Receive 01-24-22 A 04-06-22 A 57d 0d Substation XFMSubstation XFMR SSVT 138kV 120/240Substation XFMR SSVT 138kV 120/240 10-05-21 A 10-12-22 A 1d 0d 4852.01 XFMR SSVT - Requisition 15167695 10-05-21 A 10-13-21 A 1d 0d 4854.01 XFMR SSVT - Release PO 4501049947 (Koncar)10-14-21 A 10-19-21 A 1d 0d 4856.01 XFMR SSVT - Fabricate & Receive 10-20-21 A 10-12-22 A 10-01-22 1d 0d Balance of MateriaBalance of MaterialBalance of Material 04-01-22 A 05-25-22 A 0d 0d 4920.01 BOM - Transmission (RCMS order released)04-01-22 A 0d 0d 4930.01 BOM - Metering (Ordered)04-08-22 A 0d 0d 4950.01 BOM - Communications (Ordered)05-20-22 A 0d 0d 4960.01 BOM - Civil (Ordered)04-05-22 A 0d 0d 4970.01 BOM - Substation (Ordered)05-25-22 A 0d 0d ConstructionConstructionConstruction 06-09-22 A 05-30-24 A 486d 0d 6002.01 Preconstruction Meeting & CSP Review 06-16-22 A 06-16-22 A 1d 0d SubmittalsSubmittalsSubmittals 06-14-22 A 06-29-22 A 28d 0d 6051.01 Cable Trench 06-14-22 A 06-21-22 A 1d 0d 6070.01 Base Rock 06-24-22 A 06-29-22 A 5d 0d 6075.01 Finish Rock 06-24-22 A 06-29-22 A 5d 0d 6080.01 Concrete 06-14-22 A 06-21-22 A 1d 0d Construction - TransmConstruction - TransmissionConstruction - Transmission 08-29-22 A 10-28-22 A 90d 0d 6350.01 Insert Key CSP Activities - Transmission 09-01-22 A 10-28-22 A 50d 0d 6350.02 Install Temporary Shoofly 08-29-22 A 09-14-22 A 1d 0d Construction - MeteriConstruction - MeteringConstruction - Metering 09-15-22 A 12-16-22 A 30d 0d 6450.01 Insert Key CSP Activities - Metering 09-15-22 A 12-16-22 A 30d 0d Construction - CommConstruction - CommunicationConstruction - Communication 09-12-22 A 12-19-22 A 20d 0d 6510.01 RTU Lab Tested 09-12-22 A 09-16-22 A 5d 0d 6515.01 RTU Sent to Field for Installation 10-27-22 A 10-27-22 A 5d 0d 6520.01 Install RTU 11-01-22 A 11-10-22 A 5d 0d 6525.01 Insert Key CSP Activities - Communications 11-07-22 A 12-14-22 A 20d 0d 6526.01 Install ADSS from Deadend to Control House 11-29-22 A 11-30-22 A 1d 0d 6535.01 Install & Test Communication Channels 11-28-22 A 12-19-22 A 10d 0d Construction - CivilConstruction - CivilConstruction - Civil 06-09-22 A 12-22-22 A 160d 0d 6603.01 Contractor Mobilization 06-09-22 A 06-13-22 A 5d 0d 6605.01 Construction - Civil Site Prep 06-13-22 A 07-15-22 A 10d 0d M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Civil Structural Steel - Requisition 15199086 Civil Structural Steel - Release PO 4501061027 (Meyers) Civil Structural Steel - Ven Eq Dwgs Rcvd/Rvwd/Appvd Civil Structural Steel - Anchor Bolt Cages Fabricate & Receive Civil Structural Steel - Stel Structure Fabricate & Receive Sub Circuit Breaker - Requisition 15167694 Sub Circuit Breaker - Release PO 4501049761 (Grid Solutions) Sub Circuit Breaker - Ven Eq Dwgs Rcvd/Rvwd/Appvd Sub Circuit Breaker - Fabricate & Receive (One Damaged During Delivery) Relay Panels - Requisition 15215037 Relay Panels - Release PO 4501058495 (Rexel) Relay Panels - Fabricate & Receive Sub Air Break Switch - Requisition 15167696 Sub Air Break Switch - Release PO 4501064352 (Southern States) Sub Air Break Switch - Ven Eq Dwgs Rcvd/Rvwd/Appvd Sub Air Break Switch - Fabricate & Receive Sub CCVT - Requisition 15050316 Sub CCVT - Release PO 4501034502 (Koncar) Sub CCVT - Ven Eq Dwgs Rcvd/Rvwd/Appvd Sub CCVT - Fabricate & Receive Sub Control Bldg - Requisition 15167692 Sub Control Bldg - Release PO 4501049340 (Trachte ) Sub Control Bldg - Ven Eq Dwgs Rcvd/Rvwd/Appvd Sub Control Bldg - Fabricate & Receive Sub Battery Bank - Requisition 15240650 Sub Battery Bank - Release PO 4501060857 (Action Battery) Sub Battery Bank - Fabricate & Receive XFMR SSVT - Requisition 15167695 XFMR SSVT - Release PO 4501049947 (Koncar) XFMR SSVT - Fabricate & Receive BOM - Transmission (RCMS order released) BOM - Metering (Ordered) BOM - Communications (Ordered) BOM - Civil (Ordered) BOM - Substation (Ordered) Preconstruction Meeting & CSP Review Cable Trench Base Rock Finish Rock Concrete Insert Key CSP Activities - Transmission Install Temporary Shoofly Insert Key CSP Activities - Metering RTU Lab Tested RTU Sent to Field for Installation Install RTU Insert Key CSP Activities - Communications Install ADSS from Deadend to Control House Install & Test Communication Channels Contractor Mobilization Construction - Civil Site Prep Q0754 Steel Solar Project Manager Jeff Howcroft Print Date 08-11-24 / 10:43 Page 3 of 4 Schedule Prepared by: Jeff Howcroft Data Date 06-14-24 Activity ID Activity Name Responsible Party Start Finish Primary Constraint Orig Days Rem Days Civil Below GradeCivil Below GradeCivil Below Grade 07-18-22 A 09-06-22 A 30d 0d 6610.01 Insert Key CSP Activities - Civil Below Grade 07-18-22 A 09-06-22 A 30d 0d Civil Above GradeCivil Above GradeCivil Above Grade 09-06-22 A 12-22-22 A 110d 0d 6620.01 Insert Key CSP Activities - Civil Above Grade 09-22-22 A 12-22-22 A 45d 0d 6625.01 Insert Key CSP Activities - Structural 09-06-22 A 09-28-22 A 30d 0d Construction - SubstaConstruction - SubstationConstruction - Substation 07-11-22 A 11-21-22 A 98d 0d 6707.01 Construction - Ground Grid Installation 07-11-22 A 10-13-22 A 30d 0d 6725.01 Insert Key CSP Activities - Substation 09-05-22 A 10-28-22 A 60d 0d 6729.01 Install Relays & Panels 09-26-22 A 11-21-22 A 10d 0d COMPASS Requests COMPASS Requests & OutagesCOMPASS Requests & Outages 08-22-22 A 01-17-23 A 116d 0d Pre-EnergizationPre-EnergizationPre-Energization 08-22-22 A 01-17-23 A 116d 0d 6813.01 Prepare & Submit Construction COMPASS Request (NOTIFICATION Requirem 08-22-22 A 08-25-22 A 3d 0d 6815.01 22-15285 - Outage on Malad-Wheelon Line to install Shoofly 09-12-22 A 09-13-22 A 57d 0d 6815.02 22-14662 - Outage on Washakie Wheelon Line to Install new Trans Structures 09-13-22 A 01-06-23 A 1d 0d 6815.05 22-00780 - Trip and check Breakers 7C6 and 7C9 01-17-23 A 01-17-23 A 01-17-23 1d 0d Testing & CommissioTesting & Commissioning / Project Start-UpTesting & Commissioning / Project Start-Up 11-10-22 A 12-28-22 A 41d 0d 6903.01 Schedule Techs (See Notebook for Instructions)11-10-22 A 11-11-22 A 10d 0d 6905.01 Final Point to Point Test & SCADA System Check Out 12-14-22 A 12-27-22 A 5d 0d 6907.01 Finalize Dispatch Display 11-21-22 A 12-28-22 A 2d 0d 6910.01 Comm System Test & Startup 11-28-22 A 12-12-22 A 5d 0d 6912.01 Metering Test & Startup 12-05-22 A 12-27-22 A 5d 0d 6915.01 Apparatus Testing & Startup 11-29-22 A 12-16-22 A 10d 0d 6917.01 Relay Testing & Commissioning 12-05-22 A 12-27-22 A 15d 0d 6925.01 Test & Startup Complete 12-27-22 A 0d 0d 6930.01 Final Walk Throughs / Inspections 12-21-22 A 12-21-22 A 1d 0d 6940.01 Verify Commissioning Notebook Complete - PM Ready to Energize 12-21-22 A 12-27-22 A 5d 0d BackfeedBackfeedBackfeed 01-09-23 A 02-15-23 A 39d 0d 6854.01 Customer Requests Backfeed 01-09-23 A 0d 0d 6855.01 Notify Dispatch of Target Backfeed Date 01-09-23 A 01-10-23 A 1d 0d 6856.01 Grid Ops Approves Backfeed 01-11-23 A 02-15-23 A 10d 0d 6858.01 Transmission Services Authorizes Backfeed 01-30-23 A 02-15-23 A 02-28-23 0d 0d Initial SyncInitial SyncInitial Sync 02-16-24 A 02-26-24 A 49d 0d 7002.01 Customer Requests Initial Sync 02-16-24 A 02-05-24 0d 0d 7004.01 Grid Ops Approves Initial Sync 02-16-24 A 02-23-24 A 10d 0d 7006.01 Transmission Services Authorizes Initial Sync 02-23-24 A 02-26-24 A 05-08-23 0d 0d Commercial OperatioCommercial OperationsCommercial Operations 05-28-24 A 05-30-24 A 13d 0d 7102.01 Customer Requests Commercial Operations 05-28-24 A 05-13-24 0d 0d 7104.01 Grid Ops Approves Commercial Operations 05-28-24 A 05-30-24 A 10d 0d 7106.01 Transmission Services Authorizes Commercial Operations 05-28-24 A 05-30-24 A 06-30-23 0d 0d Close-OutClose-OutClose-Out 12-28-22 A 05-30-24 A 394d 0d Post EnergizationPost EnergizationPost Energization 04-28-23 A 05-05-23 A 20d 0d 8530 Reclamation 04-28-23 A 05-05-23 A 20d 0d Close Out ActivitiesClose Out ActivitiesClose Out Activities 12-28-22 A 05-30-24 A 394d 0d 9020 Completed Metering: Redlines Recv'd from Field 04-24-23 A 12-08-23 A 30d 0d 9030 Completed Substation: Redlines Submitted to Gatekeeper 12-28-22 A 01-17-24 A 30d 0d 9040 Completed Relay / P&C: Redlines Submitted to Gatekeeper 03-30-23 A 01-17-24 A 30d 0d 9050 Completed Transmission: Redlines Submitted to Gatekeeper 01-06-23 A 11-16-23 A 30d 0d 9060 Completed Communications / SCADA: Redlines Submitted to Gatekeeper 03-13-23 A 12-15-23 A 30d 0d 9080 Final Billing to Customer 05-30-24 A 0d 0d 9990 Project Close Out / Checklist Complete 02-01-24 A 04-24-24 A 90d 0d M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Insert Key CSP Activities - Civil Below Grade Insert Key CSP Activities - Civil Above Grade Insert Key CSP Activities - Structural Construction - Ground Grid Installation Insert Key CSP Activities - Substation Install Relays & Panels Prepare & Submit Construction COMPASS Request (NOTIFICATION Requirements - See Notebook) 22-15285 - Outage on Malad-Wheelon Line to install Shoofly 22-14662 - Outage on Washakie Wheelon Line to Install new Trans Structures 22-00780 - Trip and check Breakers 7C6 and 7C9 Schedule Techs (See Notebook for Instructions) Final Point to Point Test & SCADA System Check Out Finalize Dispatch Display Comm System Test & Startup Metering Test & Startup Apparatus Testing & Startup Relay Testing & Commissioning Test & Startup Complete Final Walk Throughs / Inspections Verify Commissioning Notebook Complete - PM Ready to Energize Customer Requests Backfeed Notify Dispatch of Target Backfeed Date Grid Ops Approves Backfeed Transmission Services Authorizes Backfeed Customer Requests Initial Sync Grid Ops Approves Initial Sync Transmission Services Authorizes Initial Sync Customer Requests Commercial Operations Grid Ops Approves Commercial Operations Transmission Services Authorizes Commercial Operations Reclamation Completed Metering: Redlines Recv'd from Field Completed Substation: Redlines Submitted to Gatekeeper Completed Relay / P&C: Redlines Submitted to Gatekeeper Completed Transmission: Redlines Submitted to Gatekeeper Completed Communications / SCADA: Redlines Submitted to Gatekeeper Final Billing to Customer Project Close Out / Checklist Complete Q0754 Steel Solar Project Manager Jeff Howcroft Print Date 08-11-24 / 10:43 Page 4 of 4 Schedule Prepared by: Jeff Howcroft Data Date 06-14-24