HomeMy WebLinkAbout20240829PAC to Staff 134-2 - Anticline Schedule Schedule_July.pdf#Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 1 ANC-BL 1.44 Anticline Substation 1.44 ApprovedANC-BL 1.44 Anticline Substation 1.44 Approved 863 125 10-Mar-23 A 01-Jan-25 -50 2 ANC-BL 1.44.MS Project Major MilestonesANC-BL 1.44.MS Project Major Milestones 569 125 10-Mar-23 A 01-Jan-25 -50 3 ANC-BL 1.44.MS.CM Contract MilestonesANC-BL 1.44.MS.CM Contract Milestones 382 104 10-Mar-23 A 01-Jan-25 -41 ANC Winter off, PC Holidays 4 MS.CM-01 Contract Execution 0 0 10-Mar-23 A 100%ANC Winter off, PC Holidays 5 MS.CM-02 Full Notice To Proceed 0 0 31-Mar-23 A 100%ANC Winter off, PC Holidays 6 MS.CM-03 Period of Perfomance 349 104 31-Mar-23 A 01-Jan-25 -41 0%ANC Winter off, PC Holidays 7 MS.CM-04 Final Completion 0 0 01-Jan-25*-41 0%ANC Winter off, PC Holidays 8 MS.CM-05 Detailed preliminary schedule (60)0 0 01-May-23 A 100%ANC Winter off, PC Holidays 9 MS.CM-06 Detailed CPM Schedule 0 0 03-Oct-23 A 100%ANC Winter off, PC Holidays 10 MS.CM-07 QA/QC Plan 0 0 27-Apr-23 A 100%ANC Winter off, PC Holidays 11 MS.CM-08 Safety Plan 0 0 07-Apr-23 A 100%ANC Winter off, PC Holidays 12 MS.CM-09 Environmental Assurance Program 0 0 27-Apr-23 A 100%ANC Winter off, PC Holidays 13 MS.CM-10 345kV Temporary Shoofly Complete 0 0 10-May-23 A 100%ANC Winter off, PC Holidays 14 MS.CM-11 Phase shifter Foundations Complete 0 0 17-May-24 A 100%ANC Winter off, PC Holidays 15 MS.CM-12 Project Mechanical Completion 0 0 14-Aug-24 -19 0%ANC Winter off, PC Holidays 16 MS.CM-13 Project Substantial Completion 0 0 01-Nov-24 -41 0%ANC Winter off, PC Holidays 17 ANC-BL 1.44.MS.SAP Start 345kV yard PhaseshifterANC-BL 1.44.MS.SAP Start 345kV yard Phaseshifter 359 0 02-May-23 A 01-Jul-24 A 18 MS.SAP-01 Construction start 0 0 02-May-23 A 100%ANC Winter off, PC Holidays 19 MS.SAP-02 Foundation start 0 0 26-Jul-23 A 100%ANC Winter off, PC Holidays 20 MS.SAP-03 Dead End steel start 0 0 27-Mar-24 A 100%ANC Winter off, PC Holidays 21 MS.SAP-04 Substation steel start 0 0 25-Mar-24 A 100%ANC Winter off, PC Holidays 22 MS.SAP-05 Equipment install start 0 0 19-Sep-23 A 100%ANC Winter off, PC Holidays 23 MS.SAP-06 Bus installation start 0 0 21-May-24 A 100%ANC Winter off, PC Holidays 24 MS.SAP-07 Cable install start 0 0 02-Feb-24 A 100%AND Winter off, not concrete works25MS.SAP-08 Cable termination start 0 0 18-Mar-24 A 100%ANC Winter off, PC Holidays 26 MS.SAP-09 Contractor testing start 0 0 01-Jul-24 A 100%ANC Winter off, PC Holidays 27 ANC-BL 1.44.MS.FAP Finish 345kV yard PhaseshifterANC-BL 1.44.MS.FAP Finish 345kV yard Phaseshifter 120 76 14-Jun-24 A 01-Nov-24 -1 28 MS.FAP-01 Civil earthworks complete 0 0 30-Aug-24 -37 0%ANC Winter off, PC Holidays 29 MS.FAP-02 Underground piping complete 0 0 07-Aug-24 49 0%AND Winter off, not concrete works30MS.FAP-03 Underground conduits complete 0 0 01-Jul-24 A 100%AND Winter off, not concrete works31MS.FAP-04 Underground grounding complete 0 0 03-Jul-24 A 100%ANC Winter off, PC Holidays 32 MS.FAP-05 Foundations complete 0 0 14-Jun-24 A 100%ANC Winter off, PC Holidays 33 MS.FAP-06 Dead End steel complete 0 0 14-Jun-24 A 100%ANC Winter off, PC Holidays 34 MS.FAP-07 Substation steel complete 0 0 19-Jun-24 A 100%ANC Winter off, PC Holidays 35 MS.FAP-08 Equipment install complete 0 0 25-Jun-24 A 100%ANC Winter off, PC Holidays 36 MS.FAP-09 Bus installation complete 0 0 26-Aug-24 27 0%ANC Winter off, PC Holidays 37 MS.FAP-10 Cable install complete 0 0 05-Aug-24 -17 0%ANC Winter off, PC Holidays 38 MS.FAP-11 Cable termination complete 0 0 14-Aug-24 -25 0%ANC Winter off, PC Holidays 39 MS.FAP-12 Contractor testing complete 0 0 11-Oct-24 -41 0%ANC Winter off, PC Holidays 40 MS.FAP-13 Forms submittal complete, testing &comssing 0 0 01-Nov-24 -41 0%ANC Winter off, PC Holidays 41 ANC-BL 1.44.MS.SAY Start 500kV Yard MSANC-BL 1.44.MS.SAY Start 500kV Yard MS 288 49 24-Apr-23 A 14-Oct-24 14 ANC Winter off, PC Holidays 42 MS.SAY-01 Civil earthworks Start 0 0 24-Apr-23 A 100%ANC Winter off, PC Holidays 43 MS.SAY-02 11F37 Circuit Breaker Foundation Start 0 0 13-May-24 A 100%ANC Winter off, PC Holidays 44 MS.SAY-03 11E 33 Capacitor Bank Foundation Start 0 0 24-May-24 A 100%ANC Winter off, PC Holidays 45 MS.SAY-04 11F37 & Switches install Start 0 0 12-Jun-24 A 100%ANC Winter off, PC Holidays 46 MS.SAY-05 11E 33 & Switches Start 0 0 12-Jun-24 A 100%ANC Winter off, PC Holidays Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 Contract Execution Full Notice To Proceed Detailed preliminary schedule (60) Detailed CPM Schedule QA/QC Plan Safety Plan Environmental Assurance Program 345kV Temporary Shoofly Complete Phase shifter Foundations Complete Project Mechanical Completion 01-Jul-24 A, ANC-BL 1.44.MS.SAP Start 345kV yard Phaseshifter Construction start Foundation start Dead End steel start Substation steel start Equipment install start Bus installation start Cable install start Cable termination start Contractor testing start Civil earthworks complete Underground piping complete Underground conduits complete Underground grounding complete Foundations complete Dead End steel complete Substation steel complete Equipment install complete Bus installation complete Cable install complete Cable termination complete Contractor testing complete 14-Oct-24, ANC-BL 1.44.MS.SAY Start 500kV Yard MS Civil earthworks Start 11F37 Circuit Breaker Foundation Start 11E 33 Capacitor Bank Foundation Start 11F37 & Switches install Start 11E 33 & Switches Start Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 1 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 47 MS.SAY-06 Capacitor Bank 2 Start 0 0 05-Aug-24 -37 0%ANC Winter off, PC Holidays 48 MS.SAY-07 Construction Started 0 0 13-May-24 A 100%ANC Winter off, PC Holidays 49 MS.SAY-08 Dead End steel Start 0 0 27-Mar-24 A 100%ANC Winter off, PC Holidays 50 MS.SAY-09 Contractor testing Start 0 0 25-Sep-24 -40 0%ANC Winter off, PC Holidays 51 MS.SAY-10 Forms submittal complete, testing &comssing 0 0 14-Oct-24 -40 0%ANC Winter off, PC Holidays 52 ANC-BL 1.44.MS.FAY Finish MS 500kV Yard MSANC-BL 1.44.MS.FAY Finish MS 500kV Yard MS 128 64 09-May-24 A 01-Nov-24 -41 ANC Winter off, PC Holidays 53 MS.FAY.01 Civil earthworks complete 0 0 07-Aug-24 -26 0%ANC Winter off, PC Holidays 54 MS.FAY.02 11F37 Circuit Breaker Foundation Complete 0 0 09-May-24 A 100%ANC Winter off, PC Holidays 55 MS.FAY.03 11E 33 Capacitor Bank Foundation Complete 0 0 10-Jun-24 A 100%ANC Winter off, PC Holidays 56 MS.FAY.04 11F37 & Switches install complete 0 0 21-Jun-24 A 100%ANC Winter off, PC Holidays 57 MS.FAY.05 11E 33 & Switches complete 0 0 21-Jun-24 A 100%ANC Winter off, PC Holidays 58 MS.FAY.06 Capacitor Bank 2 complete 0 0 21-Jun-24 A 100%ANC Winter off, PC Holidays 59 MS.FAY.07 Dead End steel complete 0 0 14-Jun-24 A 100%ANC Winter off, PC Holidays 60 MS.FAY.08 Construction Complete 0 0 30-Aug-24 -37 0%ANC Winter off, PC Holidays 61 MS.FAY.09 Contractor testing complete 0 0 05-Aug-24 8 0%ANC Winter off, PC Holidays 62 MS.FAY.10 Forms submittal complete, testing &comssing 0 0 01-Nov-24 -41 0%ANC Winter off, PC Holidays 63 ANC-BL 1.44.MS.OF Owner Furnished Materials MILESTONESANC-BL 1.44.MS.OF Owner Furnished Materials MILESTONES 436 0 01-Apr-23 A 30-Aug-24 0 64 MS.OF.01 345kV Temporary Shoo-fly materials 0 0 01-Apr-23 A 100%ANC Calendar, PC Holidays 65 MS.OF.02 525kV Substation Steel & Anchor Bolts 0 0 15-Nov-23 A 100%ANC Calendar, PC Holidays 66 MS.OF.03 345kV Substation Steel & Anchor Bolts 0 0 10-Oct-23 A 100%ANC Calendar, PC Holidays 67 MS.OF.04 345kV CCVT (VT10)0 0 08-May-24 A 100%ANC Calendar, PC Holidays 68 MS.OF.05 525kV CCVT (VT9)0 0 14-Aug-23 A 100%ANC Calendar, PC Holidays 69 MS.OF.06 525kV Circuit Breakers (1 No)0 0 16-Nov-23 A 100%ANC Calendar, PC Holidays 70 MS.OF.07 525kV Shunt Capacitor #2 0 0 06-Sep-23 A 100%ANC Calendar, PC Holidays 71 MS.OF.08 345kV Switches 0 0 07-Aug-23 A 100%ANC Calendar, PC Holidays 72 MS.OF.09 525kV Switches 0 0 10-Nov-23 A 100%ANC Calendar, PC Holidays 73 MS.OF.10 345kV Substation Dead Ends & Anchor Bolts 0 0 11-Dec-23 A 100%ANC Calendar, PC Holidays 74 MS.OF.11 345kV Circuit Breakers (5 No)0 0 19-Dec-23 A 100%AND Winter off, not concrete works75MS.OF.12 PST Yard Control House 0 0 09-Oct-23 A 100%ANC Calendar, PC Holidays 76 MS.OF.13 Control Panels 0 0 23-May-24 A 100%ANC Calendar, PC Holidays 77 MS.OF.14 Reactor Current limiting 525KV 0 0 06-Sep-23 A 100%ANC Calendar, PC Holidays 78 MS.OF.24 345kV 533MVA PST #1 0 0 13-Sep-23 A 100%ANC Calendar, PC Holidays 79 MS.OF.34 345kV 533MVA PST #2 0 0 13-Sep-23 A 100%ANC Calendar, PC Holidays 80 MS.OF.44 345kV 533MVA PST #3 0 0 06-Nov-23 A 100%ANC Calendar, PC Holidays 81 MS.OF.54 345kV 533MVA PST #4 0 0 09-Nov-23 A 100%ANC Calendar, PC Holidays 82 MS.OF.64 Station Service Back Up Generator, 480 VAC, 1500KW 0 0 30-Aug-24*0 0%ANC Calendar, PC Holidays 83 ANC-BL 1.44.PM Project ManagementANC-BL 1.44.PM Project Management 532 76 10-Mar-23 A 01-Nov-24 -1 84 ANC-BL 1.44.PM.PC Project ControlANC-BL 1.44.PM.PC Project Control 44 0 10-Mar-23 A 02-Oct-23 A ANC Calendar, PC Holidays 85 PM.PC-01 Detailed preliminary schedule 23 0 10-Mar-23 A 11-Apr-23 A 100%ANC Calendar, PC Holidays 86 PM.PC-02 RA Detailed preliminary schedule 14 0 12-Apr-23 A 01-May-23 A 100%ANC Calendar, PC Holidays 87 PM.PC-03 Detailed Critical Path Method Schedule BL 30 0 10-Mar-23 A 02-May-23 A 100%ANC Calendar, PC Holidays 88 PM.PC-04 RA Detailed Critical Path Method Schedule BL 14 0 21-Apr-23 A 02-Oct-23 A 100%ANC Calendar, PC Holidays 89 ANC-BL 1.44.PM.IFC Engineering IFC design packagesANC-BL 1.44.PM.IFC Engineering IFC design packages 112 0 10-Mar-23 A 03-May-24 A 90 PM.IFC.01 Shoofly IFC package 1 0 25-Apr-23 A 25-Apr-23 A 100%ANC Winter off, PC Holidays 91 PM.IFC.011 IFC Civil 1 0 10-Mar-23 A 10-Mar-23 A 100%ANC Winter off, PC Holidays 92 PM.IFC.02 Physical IFC package 1 0 26-Apr-23 A 26-Apr-23 A 100%AND Winter off, not concrete works Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 Capacitor Bank 2 Start Construction Started Dead End steel Start Contractor testing Start Forms submittal complete, testing &comssing Civil earthworks complete 11F37 Circuit Breaker Foundation Complete 11E 33 Capacitor Bank Foundation Complete 11F37 & Switches install complete 11E 33 & Switches complete Capacitor Bank 2 complete Dead End steel complete Construction Complete Contractor testing complete 30-Aug-24, ANC-BL 1.44.MS.OF Owner Furnished Materials MILESTONES 345kV Temporary Shoo-fly materials 525kV Substation Steel & Anchor Bolts 345kV Substation Steel & Anchor Bolts 345kV CCVT (VT10) 525kV CCVT (VT9) 525kV Circuit Breakers (1 No) 525kV Shunt Capacitor #2 345kV Switches 525kV Switches 345kV Substation Dead Ends & Anchor Bolts 345kV Circuit Breakers (5 No) PST Yard Control House Control Panels Reactor Current limiting 525KV 345kV 533MVA PST #1 345kV 533MVA PST #2 345kV 533MVA PST #3 345kV 533MVA PST #4 Station Service Back Up Generator, 480 VAC, 1500KW 02-Oct-23 A, ANC-BL 1.44.PM.PC Project Control Detailed preliminary schedule RA Detailed preliminary schedule Detailed Critical Path Method Schedule BL RA Detailed Critical Path Method Schedule BL 03-May-24 A, ANC-BL 1.44.PM.IFC Engineering IFC design packages Shoofly IFC package IFC Civil Physical IFC package Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 2 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 93 PM.IFC.021 345kV Steel / Foundations IFC 1 0 21-Jun-23 A 21-Jun-23 A 100%AND Winter off, not concrete works94PM.IFC.022 IFC PST Control Building Foundation 1 0 26-Apr-23 A 26-Apr-23 A 100%ANC Winter off, PC Holidays 95 PM.IFC.023 IFC PEMB Foundation Design (Summit responsibility)3 0 01-May-23 A 03-May-24 A 100%ANC Winter off, PC Holidays 96 PM.IFC.024 AN 345kV DE, SM and 500kV Equip IFC 1 0 13-Mar-23 A 14-Aug-23 A 100%ANC Calendar, PC Holidays 97 PM.IFC.025 AN CB, Shunt, Reactor Foundations IFC 1 0 10-Mar-23 A 05-Dec-23 A 100%ANC Calendar, PC Holidays 98 PM.IFC.026 Generator Pad IFC 1 0 13-Mar-23 A 01-May-24 A 100%ANC Calendar, PC Holidays 99 PM.IFC.04 IFC Electrical 1 0 10-Mar-23 A 10-Mar-23 A 100%ANC Winter off, PC Holidays 100 PM.IFC.05 IFC PNC 1 0 10-Mar-23 A 21-Oct-23 A 100%ANC Winter off, PC Holidays 101 ANC-BL 1.44.PM.PP Project PlanningANC-BL 1.44.PM.PP Project Planning 524 76 10-Mar-23 A 01-Nov-24 -1 102 PM.PP.01 Submit Letter of Credit 1 0 31-Mar-23 A 31-Mar-23 A 100%ANC Calendar, PC Holidays 103 PM.PP.02 RA Letter of Credit 1 0 31-Mar-23 A 31-Mar-23 A 100%ANC Calendar, PC Holidays 104 PM.PP.03 Submit Safety Plan 11 0 10-Mar-23 A 24-Mar-23 A 100%ANC Calendar, PC Holidays 105 PM.PP.04 RA Safety Plan 5 0 27-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays 106 PM.PP.05 Submit QA/QC Plan 25 0 10-Mar-23 A 13-Apr-23 A 100%ANC Calendar, PC Holidays 107 PM.PP.06 RA QA/QC Plan 8 0 14-Apr-23 A 25-Apr-23 A 100%ANC Calendar, PC Holidays 108 PM.PP.07 Submit Environmental Assurance plan 14 0 10-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays 109 PM.PP.08 RA Environmental Assurance plan 11 0 10-Apr-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays 110 PM.PP.09 Submit Environmental Training Plan 32 0 10-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays 111 PM.PP.10 RA Environmental Training Plan 7 0 10-Apr-23 A 17-Apr-23 A 100%ANC Calendar, PC Holidays 112 PM.PP.11 Substation SSEP 30 0 10-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays 113 PM.PP.12 RA Substation SSEP 13 0 10-Apr-23 A 21-Apr-23 A 100%ANC Calendar, PC Holidays 114 PM.PP.13 Submit SWPPP 30 0 10-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays 115 PM.PP.14 RA SWPPP 11 0 07-Apr-23 A 21-Apr-23 A 100%ANC Calendar, PC Holidays 116 PM.PP.15 Submit Concrete Mix Design 20 0 10-Mar-23 A 21-Apr-23 A 100%ANC Calendar, PC Holidays 117 PM.PP.16 RA Concrete Mix Design 14 0 22-Mar-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays 118 PM.PP.17 Submit Concrete Curing Methods Procedure 24 0 10-Mar-23 A 13-Apr-23 A 100%ANC Calendar, PC Holidays 119 PM.PP.18 RA Concrete Curing Methods Procedure 10 0 14-Apr-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays 120 PM.PP.19 Submit Cold weather concreting plan 20 0 10-Mar-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays 121 PM.PP.20 RA Cold weather concreting plan 2 0 28-Apr-23 A 24-May-23 A 100%ANC Calendar, PC Holidays 122 PM.PP.21 Submit Hot weather concreting plan 24 0 17-Mar-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays 123 PM.PP.22 RA Hot weather concreting plan 14 0 28-Apr-23 A 24-May-23 A 100%ANC Calendar, PC Holidays 124 PM.PP.23 Submit Drilled Pier Installation Plan 24 0 29-Mar-23 A 28-Apr-23 A 100%ANC Calendar, PC Holidays 125 PM.PP.24 RA Drilled Pier Installation Plan 12 0 01-May-23 A 05-May-23 A 100%ANC Calendar, PC Holidays 126 PM.PP.25 Submit Welding Procedures and plan 14 0 11-Apr-24 A 01-May-24 A 100%ANC Winter off, PC Holidays 127 PM.PP.26 RA Welding Procedures and plan 14 0 01-May-24 A 06-May-24 A 100%ANC Winter off, PC Holidays 128 PM.PP.27 Insulators Plan 13 0 08-Apr-24 A 24-Apr-24 A 100%ANC Calendar, PC Holidays 129 PM.PP.28 RA Insulators Plan 14 0 25-Apr-24 A 14-May-24 A 100%ANC Calendar, PC Holidays 130 PM.PP.29 Submit Foundation completion certificate 1 0 14-Jun-24 A 21-Jun-24 A 100%ANC Winter off, PC Holidays 131 PM.PP.30 RA Foundation completion certificate 14 0 24-Jun-24 A 15-Jul-24 A 100%ANC Winter off, PC Holidays 132 PM.PP.31 Submit Project Mechanical Comp Certificate 1 1 14-Aug-24 14-Aug-24 -39 0%ANC Calendar, PC Holidays 133 PM.PP.32 RA Project Mechanical Comp Certificate 14 14 15-Aug-24 04-Sep-24 -39 0%ANC Calendar, PC Holidays 134 PM.PP.33 Submit Mechanical Completion Test procedures 1 0 01-May-24 A 01-May-24 A 100%ANC Calendar, PC Holidays 135 PM.PP.34 RA Mechanical Completion Test procedures 14 0 03-Jun-24 A 21-Jun-24 A 100%ANC Calendar, PC Holidays 136 PM.PP.35 Submit Substation completion certificate 1 1 14-Oct-24 14-Oct-24 -41 0%ANC Winter off, PC Holidays 137 PM.PP.36 RA Substation completion certificate.14 14 15-Oct-24 01-Nov-24 -41 0%ANC Calendar, PC Holidays 138 PM.PP.37 Submit Pre-commissioning schedule and test plan 10 10 05-Aug-24 16-Aug-24 -41 0%ANC Calendar, PC Holidays 139 PM.PP.38 RA Pre-commissioning schedule and test plan 14 14 19-Aug-24 06-Sep-24 -41 0%ANC Calendar, PC Holidays Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 345kV Steel / Foundations IFC IFC PST Control Building Foundation IFC PEMB Foundation Design (Summit responsibility) AN 345kV DE, SM and 500kV Equip IFC AN CB, Shunt, Reactor Foundations IFC Generator Pad IFC IFC Electrical IFC PNC Submit Letter of Credit RA Letter of Credit Submit Safety Plan RA Safety Plan Submit QA/QC Plan RA QA/QC Plan Submit Environmental Assurance plan RA Environmental Assurance plan Submit Environmental Training Plan RA Environmental Training Plan Substation SSEP RA Substation SSEP Submit SWPPP RA SWPPP Submit Concrete Mix Design RA Concrete Mix Design Submit Concrete Curing Methods Procedure RA Concrete Curing Methods Procedure Submit Cold weather concreting plan RA Cold weather concreting plan Submit Hot weather concreting plan RA Hot weather concreting plan Submit Drilled Pier Installation Plan RA Drilled Pier Installation Plan Submit Welding Procedures and plan RA Welding Procedures and plan Insulators Plan RA Insulators Plan Submit Foundation completion certificate RA Foundation completion certificate Submit Project Mechanical Comp Certificate RA Project Mechanical Comp Certificate Submit Mechanical Completion Test procedures RA Mechanical Completion Test procedures Submit Substation completion certificate Submit Pre-commissioning schedule and test plan RA Pre-commissioning schedule and test plan Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 3 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 140 PM.PP.39 Submit Final Equipment test reports 1 1 14-Oct-24 14-Oct-24 -41 0%ANC Calendar, PC Holidays 141 PM.PP.40 RA Final Equipment test reports 14 14 15-Oct-24 01-Nov-24 -41 0%ANC Calendar, PC Holidays 142 PM.PP.45 Submit Conductors 24 0 10-Mar-23 A 02-May-23 A 100%ANC Calendar, PC Holidays 143 PM.PP.46 RA Conductors 12 0 03-May-23 A 23-May-23 A 100%ANC Calendar, PC Holidays 144 PM.PP.47 Submit Control and Power Cables 24 0 31-Mar-23 A 24-Apr-23 A 100%ANC Calendar, PC Holidays 145 PM.PP.48 RA Control and Power Cables 22 0 25-Apr-23 A 24-May-23 A 100%ANC Calendar, PC Holidays 146 PM.PP.49 Submit Battery 24 0 26-Apr-23 A 28-Apr-23 A 100%ANC Calendar, PC Holidays 147 PM.PP.50 RA Battery 45 0 28-Apr-23 A 23-May-23 A 100%ANC Calendar, PC Holidays 148 PM.PP.51 Submit Ground Grid 24 0 27-Apr-23 A 28-Apr-23 A 100%ANC Calendar, PC Holidays 149 PM.PP.52 RA Ground Grid 14 0 28-Apr-23 A 08-May-23 A 100%ANC Calendar, PC Holidays 150 PM.PP.52.1 Submit Cable Trench 24 0 01-Jun-23 A 08-Jun-23 A 100%ANC Calendar, PC Holidays 151 PM.PP.52.2 RA Cable Trench 14 0 08-Jun-23 A 05-Jul-23 A 100%ANC Calendar, PC Holidays 152 PM.PP.53 Submit Bus Materials 24 0 27-Apr-23 A 02-May-23 A 100%ANC Calendar, PC Holidays 153 PM.PP.54 RA Bus Materials 14 0 02-May-23 A 11-May-23 A 100%ANC Calendar, PC Holidays 154 PM.PP.55 Submit Post insulator 24 0 27-Apr-23 A 02-May-23 A 100%ANC Calendar, PC Holidays 155 PM.PP.56 RA Post insulator 14 0 03-May-23 A 08-May-23 A 100%ANC Calendar, PC Holidays 156 PM.PP.57 Submit Arresters 24 0 27-Apr-23 A 02-May-23 A 100%ANC Calendar, PC Holidays 157 PM.PP.58 RA Arresters 14 0 03-May-23 A 08-May-23 A 100%ANC Calendar, PC Holidays 158 PM.PP.59 Submit Transformer 1500 KVA, 150 KVA,100KVA 24 0 24-May-23 A 30-May-23 A 100%ANC Calendar, PC Holidays 159 PM.PP.69 RA Transformer 1500 KVA, 150 KVA,100KVA 14 0 31-May-23 A 19-Jun-23 A 100%ANC Calendar, PC Holidays 160 PM.PP.70 Submit Rebar Shop Drawings 345kV Steel / Foundations IFC 3 0 29-Jun-23 A 30-Jun-23 A 100%ANC Calendar, PC Holidays 161 PM.PP.71 RA Rebar Shop Drawings 345kV Steel / Foundations IFC 26 0 05-Jul-23 A 06-Jul-23 A 100%ANC Calendar, PC Holidays 162 PM.PP.80 Submit Rebar SD PST Foundation 21 0 30-Mar-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays 163 PM.PP.81 RA Rebar SD PST Foundation 14 0 28-Apr-23 A 04-May-23 A 100%ANC Calendar, PC Holidays 164 PM.PP.90 Submit Rebar SD Control Building Foundation 24 0 18-Aug-23 A 22-Aug-23 A 100%ANC Calendar, PC Holidays 165 PM.PP.91 RA Rebar SD Control Building Foundation 14 0 23-Aug-23 A 05-Sep-23 A 100%ANC Calendar, PC Holidays 166 PM.PP.92 Submit PEMB Foundation Rebar Shop Drawings 0 0 06-May-24 A 06-May-24 A 100%ANC Calendar, PC Holidays 167 PM.PP.93 RA Submit PEMB Foundation Rebar Shop Drawings 14 0 07-May-24 A 07-May-24 A 100%ANC Calendar, PC Holidays 168 PM.PP.94 Submit Rebar SD 345kV DE, SM and 500kV Equip IFC 24 0 15-Aug-23 A 15-Aug-23 A 100%ANC Calendar, PC Holidays 169 PM.PP.95 RA Rebar SD 345kV DE, SM and 500kV Equipt 1 0 16-Aug-23 A 24-Aug-23 A 100%ANC Calendar, PC Holidays 170 PM.PP.96 Submit Rebar SD CB, Shunt, Reactor Foundations I 24 0 14-Sep-23 A 27-Sep-23 A 100%ANC Calendar, PC Holidays 171 PM.PP.97 RA Rebar SD CB, Shunt, Reactor Foundations 3 0 28-Sep-23 A 02-Oct-23 A 100%ANC Calendar, PC Holidays 172 PM.PP.98 Submit REabr SD Generator Pad 0 0 14-May-24 A 22-May-24 A 100%ANC Calendar, PC Holidays 173 PM.PP.99 RA Rebar SD Generator Pad 14 0 23-May-24 A 23-May-24 A 100%ANC Calendar, PC Holidays 174 ANC-BL 1.44.P PermittingANC-BL 1.44.P Permitting 282 0 10-Mar-23 A 05-Aug-24 23 ANC Winter off, PC Holidays 175 ANC-BL 1.44.P.SL State/LocalANC-BL 1.44.P.SL State/Local 282 0 10-Mar-23 A 05-Aug-24 23 ANC Winter off, PC Holidays 176 P.SLL.01 Provision of Storm Water Pollution Prevention Permits 10 0 05-Apr-23 A 18-Apr-23 A 100%ANC Winter off, PC Holidays 177 P.SLL.02 WY Process of reviewing the NOI, SWPPP, and site map 9 0 19-Apr-23 A 01-May-23 A 100%ANC Winter off, PC Holidays 178 P.SLL.03 Building drawings from Sub 30 0 10-Mar-23 A 05-Aug-24 23 100%ANC Winter off, PC Holidays 179 P.SLL.04 RA Building drawings PC 30 0 10-Jul-24 A 12-Jul-24 A 100%ANC Winter off, PC Holidays 180 P.SLL.05 APP Review and issue the Large Construction GP 15 0 13-May-24 A 03-Jun-24 A 100%ANC Winter off, PC Holidays 181 ANC-BL 1.44.PROC ProcurementANC-BL 1.44.PROC Procurement 894 0 17-Mar-23 A 07-Jun-24 A 24/7 Procurement 182 ANC-BL 1.44.PROC.CF Contractor Furnished MaterialANC-BL 1.44.PROC.CF Contractor Furnished Material 894 0 17-Mar-23 A 07-Jun-24 A 24/7 Procurement 183 PROC.CF-01 Ordering Conductors 16 0 24-May-23 A 31-May-23 A 100%24/7 Procurement 184 PROC.CF-02 Manufacturing Conductors 80 0 01-Jun-23 A 19-Sep-23 A 100%24/7 Procurement 185 PROC.CF-03 Delivery Conductors 10 0 20-Sep-23 A 29-Sep-23 A 100%24/7 Procurement Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 Submit Final Equipment test reports Submit Conductors RA Conductors Submit Control and Power Cables RA Control and Power Cables Submit Battery RA Battery Submit Ground Grid RA Ground Grid Submit Cable Trench RA Cable Trench Submit Bus Materials RA Bus Materials Submit Post insulator RA Post insulator Submit Arresters RA Arresters Submit Transformer 1500 KVA, 150 KVA,100KVA RA Transformer 1500 KVA, 150 KVA,100KVA Submit Rebar Shop Drawings 345kV Steel / Foundations IFC RA Rebar Shop Drawings 345kV Steel / Foundations IFC Submit Rebar SD PST Foundation RA Rebar SD PST Foundation Submit Rebar SD Control Building Foundation RA Rebar SD Control Building Foundation Submit PEMB Foundation Rebar Shop Drawings RA Submit PEMB Foundation Rebar Shop Drawings Submit Rebar SD 345kV DE, SM and 500kV Equip IFC RA Rebar SD 345kV DE, SM and 500kV Equipt Submit Rebar SD CB, Shunt, Reactor Foundations I RA Rebar SD CB, Shunt, Reactor Foundations Submit REabr SD Generator Pad RA Rebar SD Generator Pad 05-Aug-24, ANC-BL 1.44.P Permitting 05-Aug-24, ANC-BL 1.44.P.SL State/Local Provision of Storm Water Pollution Prevention Permits WY Process of reviewing the NOI, SWPPP, and site map Building drawings from Sub RA Building drawings PC APP Review and issue the Large Construction GP 07-Jun-24 A, ANC-BL 1.44.PROC Procurement 07-Jun-24 A, ANC-BL 1.44.PROC.CF Contractor Furnished Material Ordering Conductors Manufacturing Conductors Delivery Conductors Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 4 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 186 PROC.CF-04 Ordering Control and Power Cables 22 0 24-May-23 A 31-May-23 A 100%24/7 Procurement 187 PROC.CF-05 Manufacturing Control and Power Cables 100 0 01-Jun-23 A 19-Sep-23 A 100%24/7 Procurement 188 PROC.CF-06 Delivery Control and Power Cables 10 0 20-Sep-23 A 30-Sep-23 A 100%24/7 Procurement 189 PROC.CF-07 Ordering Conduits 24 0 17-Mar-23 A 04-Apr-23 A 100%24/7 Procurement 190 PROC.CF-08 Manufacturing Conduits 10 0 05-Apr-23 A 28-Apr-23 A 100%24/7 Procurement 191 PROC.CF-09 Delivery Conduits 6 0 01-May-23 A 11-May-23 A 100%24/7 Procurement 192 PROC.CF-10 Ordering Ground Grid 27 0 19-May-23 A 28-May-23 A 100%24/7 Procurement 193 PROC.CF-11 Manufacturing Ground Grid 38 0 29-May-23 A 06-Jul-23 A 100%24/7 Procurement 194 PROC.CF-12 Delivery Ground Grid 6 0 01-Aug-23 A 07-Aug-23 A 100%24/7 Procurement 195 PROC.CF-12.1 Ordering Cable Trench 1 0 30-Mar-23 A 31-Mar-23 A 100%24/7 Procurement 196 PROC.CF-12.11 Manufacturing Cable Trench 181 0 01-Apr-23 A 29-Sep-23 A 100%24/7 Procurement 197 PROC.CF-12.21 Delivery Cable Trench 0 0 02-Oct-23 A 06-Oct-23 A 100%24/7 Procurement 198 PROC.CF-13 Ordering Bus Materials 28 0 17-Apr-23 A 15-May-23 A 100%24/7 Procurement 199 PROC.CF-14 Manufacturing Bus Materials 106 0 15-May-23 A 21-Sep-23 A 100%24/7 Procurement 200 PROC.CF-15 Delivery Bus Materials 2 0 22-Sep-23 A 15-Dec-23 A 100%24/7 Procurement 201 PROC.CF-16 Ordering Battery 45 0 17-Apr-23 A 01-Jun-23 A 100%24/7 Procurement 202 PROC.CF-17 Manufacturing Battery 61 0 02-Jun-23 A 02-Aug-23 A 100%24/7 Procurement 203 PROC.CF-18 Delivery Battery 390 0 03-Aug-23 A 27-Aug-23 A 100%24/7 Procurement 204 PROC.CF-19 Ordering Post insulator 22 0 20-Apr-23 A 12-May-23 A 100%24/7 Procurement 205 PROC.CF-20 Manufacturing Post insulator 25 0 06-Oct-23 A 31-Oct-23 A 100%24/7 Procurement 206 PROC.CF-21 Delivery Post insulator 136 0 31-Oct-23 A 21-Dec-23 A 100%24/7 Procurement 207 PROC.CF-22 Ordering Arresters 28 0 17-Apr-23 A 15-May-23 A 100%24/7 Procurement 208 PROC.CF-23 Manufacturing Arresters 155 0 16-May-23 A 27-Jul-23 A 100%24/7 Procurement 209 PROC.CF-24 Delivery Arresters 24 0 28-Jul-23 A 07-Aug-23 A 100%24/7 Procurement 210 PROC.CF-25 Ordering Transformer 1500 KVA, 150 KVA,100KVA (345kV YD)29 0 17-May-23 A 15-Jun-23 A 100%24/7 Procurement 211 PROC.CF-251 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 82 0 16-Jun-23 A 06-Sep-23 A 100%24/7 Procurement 212 PROC.CF-252 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 82 0 07-Sep-23 A 01-Jan-24 A 100%24/7 Procurement 213 PROC.CF-253 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 13 0 02-Jan-24 A 10-Jan-24 A 100%24/7 Procurement 214 PROC.CF-254 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 9 0 11-Jan-24 A 19-Jan-24 A 100%24/7 Procurement 215 PROC.CF-255 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 0 0 20-Jan-24 A 24-Jan-24 A 100%24/7 Procurement 216 PROC.CF-256 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 7 0 24-Jan-24 A 31-Jan-24 A 100%24/7 Procurement 217 PROC.CF-26 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 7 0 31-Jan-24 A 08-Feb-24 A 100%24/7 Procurement 218 PROC.CF-27 Delivery Transformer 1500 KVA, 150 KVA,100KVA 8 0 09-Feb-24 A 17-Feb-24 A 100%24/7 Procurement 219 PROC.CF-28 Ordering Rebar 345kV Steel / Foundations 2 0 07-Jul-23 A 07-Jul-23 A 100%24/7 Procurement 220 PROC.CF-29 Manufacturing Rebar 345kV Steel / Foundations IFC 14 0 10-Jul-23 A 24-Jul-23 A 100%24/7 Procurement 221 PROC.CF-30 Delivery Rebar 345kV Steel / Foundations IFC 2 0 25-Jul-23 A 26-Jul-23 A 100%24/7 Procurement 222 PROC.CF-31 Ordering Rebar PST Foundation 15 0 05-May-23 A 06-May-23 A 100%24/7 Procurement 223 PROC.CF-32 Rebar PST Foundation 20 0 08-May-23 A 11-May-23 A 100%24/7 Procurement 224 PROC.CF-33 Delivery Rebar PST Foundation 5 0 12-May-23 A 15-May-23 A 100%24/7 Procurement 225 PROC.CF-34 Ordering Rebar Control Building Foundation 5 0 06-Sep-23 A 07-Sep-23 A 100%24/7 Procurement 226 PROC.CF-35 Manufacturing Rebar Control Building Foundation 15 0 08-Sep-23 A 12-Sep-23 A 100%24/7 Procurement 227 PROC.CF-36 Delivery Rebar Control Building Foundation 2 0 13-Sep-23 A 15-Sep-23 A 100%24/7 Procurement 228 PROC.CF-37 Ordering rebar PEMB Foundation 6 0 08-May-24 A 08-May-24 A 100%24/7 Procurement 229 PROC.CF-38 Manufacturing Rebar PEMB Foundation 15 0 09-May-24 A 13-May-24 A 100%24/7 Procurement 230 PROC.CF-48 Delivery Rebar PEMB Foundation 15 0 13-May-24 A 17-May-24 A 100%24/7 Procurement 231 PROC.CF-49 Ordering rebar 345kV DE, SM and 500kV Equip 0 0 25-Aug-23 A 05-Sep-23 A 100%24/7 Procurement 232 PROC.CF-50 Manufacturing rebar 345kV DE, SM and 500kV Equip 20 0 06-Sep-23 A 26-Sep-23 A 100%24/7 Procurement Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 Ordering Control and Power Cables Manufacturing Control and Power Cables Delivery Control and Power Cables Ordering Conduits Manufacturing Conduits Delivery Conduits Ordering Ground Grid Manufacturing Ground Grid Delivery Ground Grid Ordering Cable Trench Manufacturing Cable Trench Delivery Cable Trench Ordering Bus Materials Manufacturing Bus Materials Delivery Bus Materials Ordering Battery Manufacturing Battery Delivery Battery Ordering Post insulator Manufacturing Post insulator Delivery Post insulator Ordering Arresters Manufacturing Arresters Delivery Arresters Ordering Transformer 1500 KVA, 150 KVA,100KVA (345kV YD) Manufacturing Transformer 1500 KVA, 150 KVA,100KVA Manufacturing Transformer 1500 KVA, 150 KVA,100KVA Manufacturing Transformer 1500 KVA, 150 KVA,100KVA Manufacturing Transformer 1500 KVA, 150 KVA,100KVA Manufacturing Transformer 1500 KVA, 150 KVA,100KVA Manufacturing Transformer 1500 KVA, 150 KVA,100KVA Manufacturing Transformer 1500 KVA, 150 KVA,100KVA Delivery Transformer 1500 KVA, 150 KVA,100KVA Ordering Rebar 345kV Steel / Foundations Manufacturing Rebar 345kV Steel / Foundations IFC Delivery Rebar 345kV Steel / Foundations IFC Ordering Rebar PST Foundation Rebar PST Foundation Delivery Rebar PST Foundation Ordering Rebar Control Building Foundation Manufacturing Rebar Control Building Foundation Delivery Rebar Control Building Foundation Ordering rebar PEMB Foundation Manufacturing Rebar PEMB Foundation Delivery Rebar PEMB Foundation Ordering rebar 345kV DE, SM and 500kV Equip Manufacturing rebar 345kV DE, SM and 500kV Equip Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 5 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 233 PROC.CF-51 Delivery Rebar 345kV DE, SM and 500kV Equip 1 0 27-Sep-23 A 28-Sep-23 A 100%24/7 Procurement 234 PROC.CF-52 Ordering Rebar CB, Shunt, Reactor Foundations IFC 25 0 03-Oct-23 A 05-Dec-23 A 100%24/7 Procurement 235 PROC.CF-53 Manufacturing rebar CB, Shunt, Reactor Foundations IFC 104 0 11-Jan-24 A 05-Feb-24 A 100%24/7 Procurement 236 PROC.CF-54 Delivery Rebar CB, Shunt, Reactor Foundations IFC 10 0 09-Feb-24 A 16-Feb-24 A 100%24/7 Procurement 237 PROC.CF-55 Ordering rebar Generator Pad 0 0 03-Jun-24 A 03-Jun-24 A 100%24/7 Procurement 238 PROC.CF-56 Manufacturing rebar Generator Pad 15 0 04-Jun-24 A 06-Jun-24 A 100%24/7 Procurement 239 PROC.CF-66 Delivery Rebar Generator Pad 5 0 07-Jun-24 A 07-Jun-24 A 100%24/7 Procurement 240 ANC-BL 1.44.C ConstructionANC-BL 1.44.C Construction 547 110 14-Apr-23 A 13-Dec-24 -35 241 ANC-BL 1.44.C.TL Transmission LineANC-BL 1.44.C.TL Transmission Line 301 19 02-May-23 A 07-Nov-24 -25 ANC Winter off, PC Holidays 242 ANC-BL 1.44.C.TL.SH Shoofly installANC-BL 1.44.C.TL.SH Shoofly install 7 0 02-May-23 A 10-May-23 A ANC Winter off, PC Holidays 243 C.TL.SH.01 Framing & install, and (Remove old one)5 0 02-May-23 A 08-May-23 A 100%ANC Winter off, PC Holidays 244 C.TL.SH.02 OPGW 2 0 09-May-23 A 10-May-23 A 100%ANC Winter off, PC Holidays 245 C.TL.SH.021 Fiber Optic Cable, ADSS 1 0 09-May-23 A 09-May-23 A 100%ANC Winter off, PC Holidays 246 C.TL.SH.03 Outage scheduled on 05/09/2023 (6am)-05/10/2023 (6am).1 0 10-May-23 A 10-May-23 A 100%ANC Winter off, PC Holidays 247 ANC-BL 1.44.C.TL.SHR Shoofly removeANC-BL 1.44.C.TL.SHR Shoofly remove 19 19 14-Oct-24 07-Nov-24 -25 ANC Winter off, PC Holidays 248 C.TL.SHR.01 Shoofly removal, Final Span 19 19 14-Oct-24 07-Nov-24 -25 0%ANC Winter off, PC Holidays 249 ANC-BL 1.44.C.SS SubstationANC-BL 1.44.C.SS Substation 547 110 14-Apr-23 A 13-Dec-24 -35 250 ANC-BL 1.44.C.SS.TF MOB/DMOBANC-BL 1.44.C.SS.TF MOB/DMOB 325 8 02-May-23 A 13-Dec-24 -29 ANC Winter off, PC Holidays 251 C.SS.TF.01 Temporary Office Facilities 6 0 02-May-23 A 09-May-23 A 100%ANC Winter off, PC Holidays 252 C.SS.TF.012 Mobilization 15 0 02-May-23 A 22-May-23 A 100%ANC Winter off, PC Holidays 253 C.SS.TF.02 Staging Facilities 6 0 23-May-23 A 31-May-23 A 100%ANC Winter off, PC Holidays 254 C.SS.TF.03 Temporary Construction Facilities 4 0 25-May-23 A 31-May-23 A 100%ANC Winter off, PC Holidays 255 C.SS.TF.04 Demobilization 8 8 04-Dec-24 13-Dec-24 -29 0%ANC Winter off, PC Holidays 256 ANC-BL 1.44.C.SS.CE Civil Sitework and Finisih GradeANC-BL 1.44.C.SS.CE Civil Sitework and Finisih Grade 523 86 14-Apr-23 A 13-Nov-24 -11 257 C.SS.CE.01 Dust suppression/Dust abatement 1 24 0 12-May-23 A 15-Jun-23 A 100%ANC Winter off, PC Holidays 258 C.SS.CE.02 Dust suppression/Dust abatement 2 24 0 16-Jun-23 A 22-Sep-23 A 100%ANC Winter off, PC Holidays 259 C.SS.CE.03 Dust suppression/Dust abatement 3 24 0 25-Sep-23 A 16-May-24 A 100%ANC Winter off, PC Holidays 260 C.SS.CE.04 Dust suppression/Dust abatement 4 24 0 17-May-24 A 05-Jun-24 A 100%ANC Winter off, PC Holidays 261 C.SS.CE.05 Dust suppression/Dust abatement 5 8 0 03-Jun-24 A 10-Jun-24 A 100%ANC Winter off, PC Holidays 262 C.SS.CE.06 Dust suppression/Dust abatement 6 24 0 11-Jun-24 A 17-Jul-24 A 100%ANC Winter off, PC Holidays 263 C.SS.CE.07 Installation of SWPPP Measurers 3 0 15-May-23 A 02-Oct-23 A 100%ANC Winter off, PC Holidays 264 C.SS.CE.08 Removal and site Restoration 8 8 04-Nov-24 13-Nov-24 -29 0%ANC Winter off, PC Holidays 265 ANC-BL 1.44.C.SS.CE.AW Anticline WashANC-BL 1.44.C.SS.CE.AW Anticline Wash 312 3 14-Apr-23 A 07-Aug-24 -31 266 C.SS.CE.AW.01 Survey and Staking 5 0 14-Apr-23 A 20-Apr-23 A 100%ANC Winter off, PC Holidays 267 C.SS.CE.AW.02 Excavation, New Anticline Wash 1 7 0 27-Jul-23 A 05-Oct-23 A 100%ANC Winter off, PC Holidays 268 C.SS.CE.AW.03 Excavation, New Anticline Wash 2 20 0 06-Oct-23 A 17-Nov-23 A 100%ANC Winter off, PC Holidays 269 C.SS.CE.AW.04 Fill and Grading, Existing Anticline Wash 6 3 18-Nov-23 A 07-Aug-24 -31 100%AND Winter off, not concrete works270ANC-BL 1.44.C.SS.CE.SP Substation PadANC-BL 1.44.C.SS.CE.SP Substation Pad 245 20 17-Apr-23 A 30-Aug-24 43 ANC Winter off, PC Holidays 271 SS.CE.SP.01 Mass Site Excavation 23 0 04-May-23 A 05-Dec-23 A 100%ANC Winter off, PC Holidays 272 SS.CE.SP.02 Fill, compaction and grading 23 0 27-Jun-23 A 20-May-24 A 100%ANC Winter off, PC Holidays 273 SS.CE.SP.03 General Excavation, Spread on site 29 0 18-May-23 A 14-Jun-24 A 100%ANC Winter off, PC Holidays 274 SS.CE.SP.04 Crushed Rock, RG-2 Fill 20 20 10-Jul-23 A 30-Aug-24 -37 90%ANC Winter off, PC Holidays 275 SS.CE.SP.05 Crushed Rock, Aggregate Base Course 10 5 18-Jul-23 A 09-Aug-24 -22 85%ANC Winter off, PC Holidays 276 SS.CE.SP.06 Oil Containment Piping 25 2 13-May-24 A 06-Aug-24 41 95%ANC Winter off, PC Holidays 277 SS.CE.SP.08 Site Drainage 9 3 07-Jun-23 A 07-Aug-24 60 90%ANC Winter off, PC Holidays 278 SS.CE.SP.09 Crushed Rock, Rip Rap 10 8 17-Apr-23 A 15-Aug-24 -23 80%ANC Winter off, PC Holidays 279 SS.CE.SP.091 Substation Insulating Rock 10 10 18-Jun-24 A 21-Aug-24 -26 5%ANC Winter off, PC Holidays Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 Delivery Rebar 345kV DE, SM and 500kV Equip Ordering Rebar CB, Shunt, Reactor Foundations IFC Manufacturing rebar CB, Shunt, Reactor Foundations IFC Delivery Rebar CB, Shunt, Reactor Foundations IFC Ordering rebar Generator Pad Manufacturing rebar Generator Pad Delivery Rebar Generator Pad 10-May-23 A, ANC-BL 1.44.C.TL.SH Shoofly install Framing & install, and (Remove old one) OPGW Fiber Optic Cable, ADSS Outage scheduled on 05/09/2023 (6am)-05/10/2023 (6am). Temporary Office Facilities Mobilization Staging Facilities Temporary Construction Facilities Dust suppression/Dust abatement 1 Dust suppression/Dust abatement 2 Dust suppression/Dust abatement 3 Dust suppression/Dust abatement 4 Dust suppression/Dust abatement 5 Dust suppression/Dust abatement 6 Installation of SWPPP Measurers 07-Aug-24, ANC-BL 1.44.C.SS.CE.AW Anticline Wash Survey and Staking Excavation, New Anticline Wash 1 Excavation, New Anticline Wash 2 Fill and Grading, Existing Anticline Wash 30-Aug-24, ANC-BL 1.44.C.SS.CE.SP Substation Pad Mass Site Excavation Fill, compaction and grading General Excavation, Spread on site Crushed Rock, RG-2 Fill Crushed Rock, Aggregate Base Course Oil Containment Piping Site Drainage Crushed Rock, Rip Rap Substation Insulating Rock Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 6 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 280 SS.CE.SP.11 Substation Yard Rock 6 6 18-Jun-24 A 30-Aug-24 -37 5%ANC Winter off, PC Holidays 281 ANC-BL 1.44.C.SS.FND FoundationANC-BL 1.44.C.SS.FND Foundation 184 20 18-May-23 A 30-Aug-24 43 ANC Winter off, PC Holidays 282 ANC-BL 1.44.C.SS.FND.Pa Concrete - slab on gradeANC-BL 1.44.C.SS.FND.Pa Concrete - slab on grade 100 20 18-Sep-23 A 30-Aug-24 43 ANC Winter off, PC Holidays 283 SS.FND.Pa.01 345KV 3000A CIRCUIT BREAKER 23 0 09-Oct-23 A 15-Apr-24 A 100%ANC Winter off, PC Holidays 284 SS.FND.Pa.02 345KV CONTROL BUILDING FOUNDATION 10 0 18-Sep-23 A 06-Oct-23 A 100%ANC Winter off, PC Holidays 285 SS.FND.Pa.03 500KV CIRCUIT BREAKER, pad 8 0 30-Apr-24 A 09-May-24 A 100%ANC Winter off, PC Holidays 286 SS.FND.Pa.04 500KV BREAKER CONTROL CABINET FOUNDATION 3 0 02-May-24 A 16-May-24 A 100%ANC Winter off, PC Holidays 287 SS.FND.Pa.05 500KV STORAGE BUILDING 8 20 17-May-24 A 30-Aug-24 43 25%ANC Winter off, PC Holidays 288 SS.FND.Pa.06 345 Generator Pad 7 0 10-Jun-24 A 12-Jun-24 A 100%ANC Winter off, PC Holidays 289 ANC-BL 1.44.C.SS.FND.TY 345kV Concrete-drilled pier FNDANC-BL 1.44.C.SS.FND.TY 345kV Concrete-drilled pier FND 117 0 26-Jul-23 A 22-May-24 A ANC Winter off, PC Holidays 290 SS.FND.TY.01 345KVBUS SUPPORT Concrete 29 0 01-Aug-23 A 21-May-24 A 100%ANC Winter off, PC Holidays 291 SS.FND.TY.02 345KV CCVT SUPPORT 3 0 22-Aug-23 A 23-Aug-23 A 100%ANC Winter off, PC Holidays 292 SS.FND.TY.03 345KV PHASE SPACING 7 0 26-Jul-23 A 03-Nov-23 A 100%ANC Winter off, PC Holidays 293 SS.FND.TY.04 345KV SURGE ARRESTER 4 0 10-Aug-23 A 15-Aug-23 A 100%ANC Winter off, PC Holidays 294 SS.FND.TY.05 345KV STATIC SHIELD MAST 12 0 16-Oct-23 A 23-Apr-24 A 100%ANC Winter off, PC Holidays 295 SS.FND.TY.06 STATION SERVICE STRUCTURE 8 0 08-Apr-24 A 19-Apr-24 A 100%ANC Winter off, PC Holidays 296 SS.FND.TY.07 345KV JCT BOX POLE 11 0 08-Apr-24 A 23-Apr-24 A 100%ANC Winter off, PC Holidays 297 SS.FND.TY.08 345kV CCVT (VT10)11 0 08-Apr-24 A 23-Apr-24 A 100%ANC Winter off, PC Holidays 298 SS.FND.TY.18 345kV Switches, Misc 7 0 13-May-24 A 22-May-24 A 100%ANC Winter off, PC Holidays 299 ANC-BL 1.44.C.SS.FND.DP Dead End Structures PiersANC-BL 1.44.C.SS.FND.DP Dead End Structures Piers 15 0 29-Sep-23 A 11-Jun-24 A ANC Winter off, PC Holidays 300 SS.FND.DP.01 345KV 60' A-FRAME DE 15 0 29-Sep-23 A 11-Jun-24 A 100%ANC Winter off, PC Holidays 301 ANC-BL 1.44.C.SS.FND.PY 500kV Concrete-drilled pier FNDANC-BL 1.44.C.SS.FND.PY 500kV Concrete-drilled pier FND 15 0 30-Apr-24 A 12-Jun-24 A ANC Winter off, PC Holidays 302 SS.FND.PY.02 525kV CCVT (V9)2 0 13-May-24 A 12-Jun-24 A 100%ANC Winter off, PC Holidays 303 SS.FND.PY.03 525kV Circuit Breakers (5 No)3 0 30-Apr-24 A 09-May-24 A 100%ANC Winter off, PC Holidays 304 SS.FND.PY.04 Shunt Capacitor #2 5 0 14-May-24 A 10-Jun-24 A 100%ANC Winter off, PC Holidays 305 ANC-BL 1.44.C.SS.FND.RF Reactor foundationANC-BL 1.44.C.SS.FND.RF Reactor foundation 9 1 09-May-24 A 05-Aug-24 -38 ANC Winter off, PC Holidays 306 SS.FND.RF.01 525KV Reactor, Current Limiting 9 1 09-May-24 A 05-Aug-24 -38 67%ANC Winter off, PC Holidays 307 SS.FND.RF.02 Crosshole Sonic Logging 2 0 14-May-24 A 04-Jun-24 A 100%ANC Winter off, PC Holidays 308 ANC-BL 1.44.C.SS.FND.TF Transformer foundation & oil containmentANC-BL 1.44.C.SS.FND.TF Transformer foundation & oil containment 73 0 18-May-23 A 31-Aug-23 A ANC Winter off, PC Holidays 309 SS.FND.TF.01 345KV PST FOUNDATION 73 0 18-May-23 A 31-Aug-23 A 100%ANC Winter off, PC Holidays 310 ANC-BL 1.44.C.SS.GG Ground GridANC-BL 1.44.C.SS.GG Ground Grid 207 11 06-Oct-23 A 16-Aug-24 -31 311 C.SS.GG-01 Below Grade 345kV Yard 1 10 0 06-Oct-23 A 03-Jul-24 A 100%AND Winter off, not concrete works312C.SS.GG-02 Above Grade 345kV Yard 2 10 0 17-Oct-23 A 25-Jun-24 A 100%AND Winter off, not concrete works313C.SS.GG-03 Below Grade 500kV Yard 1 10 0 28-May-24 A 28-Jun-24 A 100%ANC Winter off, PC Holidays 314 C.SS.GG-04 Below Grade 500kV Yard 2 10 10 28-May-24 A 16-Aug-24 -26 85%ANC Winter off, PC Holidays 315 C.SS.GG-05 Above Grade 500kV Yard 3 10 10 28-May-24 A 16-Aug-24 -26 50%ANC Winter off, PC Holidays 316 ANC-BL 1.44.C.SS.CT Cable TrenchANC-BL 1.44.C.SS.CT Cable Trench 197 0 09-Oct-23 A 23-May-24 A 317 C.SS.CT.01 Cable Trench - 345kV Yard 1 10 0 09-Oct-23 A 06-Nov-23 A 100%AND Winter off, not concrete works318C.SS.CT.02 Cable Trench - 345kV Yard 2 14 0 14-Nov-23 A 01-Dec-23 A 100%AND Winter off, not concrete works319C.SS.CT.03 Cable Trench - 500kV Yard 1 8 0 01-May-24 A 21-May-24 A 100%ANC Winter off, PC Holidays 320 C.SS.CT.04 Cable Trench - 500kV Yard 2 8 0 21-May-24 A 23-May-24 A 100%ANC Winter off, PC Holidays 321 ANC-BL 1.44.C.SS.EC Electrical ConduitANC-BL 1.44.C.SS.EC Electrical Conduit 338 17 11-May-23 A 23-Aug-24 58 322 C.SS.EC.01 Conduit Below Grade 345kV Yard 1 13 0 11-May-23 A 25-Aug-23 A 100%ANC Winter off, PC Holidays 323 C.SS.EC.02 Conduit Below Grade 345kV Yard 2 12 0 25-Aug-23 A 21-Nov-23 A 100%AND Winter off, not concrete works324C.SS.EC.03 Conduit Below Grade 345kV Yard 3 8 0 22-Nov-23 A 15-Jul-24 A 100%AND Winter off, not concrete works325C.SS.EC.04 Conduit above Grade 345kV Yard 23 0 08-May-24 A 15-Jul-24 A 100%AND Winter off, not concrete works326C.SS.EC.05 Conduit Below Grade 500kV Yard 1 23 0 23-Apr-24 A 27-Jun-24 A 100%ANC Winter off, PC Holidays 327 C.SS.EC.06 Conduit Below Grade 500kV Yard 2 20 0 01-May-24 A 09-Jul-24 A 100%ANC Winter off, PC Holidays Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 Substation Yard Rock 30-Aug-24, ANC-BL 1.44.C.SS.FND Foundation 30-Aug-24, ANC-BL 1.44.C.SS.FND.Pa Concrete - slab on grade 345KV 3000A CIRCUIT BREAKER 345KV CONTROL BUILDING FOUNDATION 500KV CIRCUIT BREAKER, pad 500KV BREAKER CONTROL CABINET FOUNDATION 500KV STORAGE BUILDING 345 Generator Pad 22-May-24 A, ANC-BL 1.44.C.SS.FND.TY 345kV Concrete-drilled pier FND 345KVBUS SUPPORT Concrete 345KV CCVT SUPPORT 345KV PHASE SPACING 345KV SURGE ARRESTER 345KV STATIC SHIELD MAST STATION SERVICE STRUCTURE 345KV JCT BOX POLE 345kV CCVT (VT10) 345kV Switches, Misc 11-Jun-24 A, ANC-BL 1.44.C.SS.FND.DP Dead End Structures Piers 345KV 60' A-FRAME DE 12-Jun-24 A, ANC-BL 1.44.C.SS.FND.PY 500kV Concrete-drilled pier FND 525kV CCVT (V9) 525kV Circuit Breakers (5 No) Shunt Capacitor #2 05-Aug-24, ANC-BL 1.44.C.SS.FND.RF Reactor foundation 525KV Reactor, Current Limiting Crosshole Sonic Logging 31-Aug-23 A, ANC-BL 1.44.C.SS.FND.TF Transformer foundation & oil containment 345KV PST FOUNDATION 16-Aug-24, ANC-BL 1.44.C.SS.GG Ground Grid Below Grade 345kV Yard 1 Above Grade 345kV Yard 2 Below Grade 500kV Yard 1 Below Grade 500kV Yard 2 Above Grade 500kV Yard 3 23-May-24 A, ANC-BL 1.44.C.SS.CT Cable Trench Cable Trench - 345kV Yard 1 Cable Trench - 345kV Yard 2 Cable Trench - 500kV Yard 1 Cable Trench - 500kV Yard 2 23-Aug-24, ANC-BL 1.44.C.SS.EC Electrical Conduit Conduit Below Grade 345kV Yard 1 Conduit Below Grade 345kV Yard 2 Conduit Below Grade 345kV Yard 3 Conduit above Grade 345kV Yard Conduit Below Grade 500kV Yard 1 Conduit Below Grade 500kV Yard 2 Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 7 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 328 C.SS.EC.07 Conduit Below Grade 500kV Yard 3 15 15 28-May-24 A 23-Aug-24 48 10%ANC Winter off, PC Holidays 329 C.SS.EC.08 Conduit Above Grade 500kV Yard 15 15 28-May-24 A 23-Aug-24 48 60%ANC Winter off, PC Holidays 330 ANC-BL 1.44.C.SS.F FencingANC-BL 1.44.C.SS.F Fencing 17 13 01-Aug-24 A 26-Aug-24 -33 ANC Winter off, PC Holidays 331 C.SS.FF.01 Fencing, Gates, Signs 13 13 01-Aug-24 A 26-Aug-24 -33 0%ANC Winter off, PC Holidays 332 C.SS.FF.02 Ground Fence 5 5 19-Aug-24 26-Aug-24 -33 0%ANC Winter off, PC Holidays 333 ANC-BL 1.44.C.SS.SET Steel ErectionANC-BL 1.44.C.SS.SET Steel Erection 174 79 25-Mar-24 A 22-Nov-24 -36 ANC Winter off, PC Holidays 334 ANC-BL 1.44.C.SS.SET.SET 345kV Steel ErectionANC-BL 1.44.C.SS.SET.SET 345kV Steel Erection 36 3 25-Mar-24 A 07-Aug-24 -36 ANC Winter off, PC Holidays 335 SET.SET.01 345KV BUS SUPPORT 14 0 25-Mar-24 A 26-Apr-24 A 100%ANC Winter off, PC Holidays 336 SET.SET.02 345KV, PHASE SPACING DISCONNECT SWITCH SUPPORT 10 0 26-Mar-24 A 17-May-24 A 100%ANC Winter off, PC Holidays 337 SET.SET.03 345KV PHASE CCVT SUPPORT 1 0 28-Mar-24 A 19-Jun-24 A 100%ANC Winter off, PC Holidays 338 SET.SET.04 345KV SURGE ARRESTER SUPPORT Insulators 1 0 01-Apr-24 A 05-Apr-24 A 100%ANC Winter off, PC Holidays 339 SET.SET.05 STATION SERVICE Structural Steel Substation Yard Lighting 3 2 14-May-24 A 06-Aug-24 -36 90%ANC Winter off, PC Holidays 340 SET.SET.06 345KV STATIC SHIELD MAST, and G Mat 5 0 09-Apr-24 A 02-May-24 A 100%ANC Winter off, PC Holidays 341 SET.SET.07 345KV SURGE ARRESTER SUPPORT 1 0 02-Apr-24 A 03-Apr-24 A 100%ANC Winter off, PC Holidays 342 SET.SET.08 Structural Steel, STATION SERVICE 1 3 02-Apr-24 A 07-Aug-24 -36 100%ANC Winter off, PC Holidays 343 ANC-BL 1.44.C.SS.SET.DES Dead End Structures Piers 345ANC-BL 1.44.C.SS.SET.DES Dead End Structures Piers 345 14 0 27-Mar-24 A 14-Jun-24 A ANC Winter off, PC Holidays 344 SS.SET.DES.01 345KV 60' A-FRAME DEADEND 14 0 27-Mar-24 A 14-Jun-24 A 100%ANC Winter off, PC Holidays 345 ANC-BL 1.44.C.SS.SET.STF 500kV Steel ErectionANC-BL 1.44.C.SS.SET.STF 500kV Steel Erection 19 0 22-May-24 A 05-Aug-24 -37 ANC Winter off, PC Holidays 346 SET.STF.01 525KV LOW SWITCH STRUCTURE 2 0 22-May-24 A 24-May-24 A 100%ANC Winter off, PC Holidays 347 SET.STF.02 525kV, RELOCATION OF BUS SUPPORT 1 0 12-Jun-24 A 13-Jun-24 A 100%ANC Winter off, PC Holidays 348 SET.STF.03 525KV, CCVT SUPPORT 1 0 12-Jun-24 A 13-Jun-24 A 100%ANC Winter off, PC Holidays 349 SET.STF.04 525kV, SURGE ARRESTOR SUPPORT 2 0 24-Jun-24 A 05-Aug-24 -37 100%ANC Winter off, PC Holidays 350 ANC-BL 1.44.C.SS.SET.STB Storage Builidng PE-EngineeredANC-BL 1.44.C.SS.SET.STB Storage Builidng PE-Engineered 162 76 12-Apr-24 A 22-Nov-24 -36 ANC Winter off, PC Holidays 351 SET.STB.01 Building Structure 12 12 12-Apr-24 A 23-Aug-24 -36 0%ANC Winter off, PC Holidays 352 SET.STB.02 Building Erection 1 16 16 07-Aug-24 29-Aug-24 -36 0%ANC Winter off, PC Holidays 353 SET.STB.021 Building Erection 2 16 16 29-Aug-24 23-Sep-24 -36 0%ANC Winter off, PC Holidays 354 SET.STB.022 Building Erection 3 16 16 23-Sep-24 15-Oct-24 -36 0%ANC Winter off, PC Holidays 355 SET.STB.03 Garage Doors 7 7 15-Oct-24 24-Oct-24 -36 0%ANC Winter off, PC Holidays 356 SET.STB.04 Electrical 12 12 25-Oct-24 12-Nov-24 -36 0%ANC Winter off, PC Holidays 357 SET.STB.05 Pallet Racks 8 8 12-Nov-24 22-Nov-24 -36 0%ANC Winter off, PC Holidays 358 ANC-BL 1.44.C.SS.BW Bus-WorkANC-BL 1.44.C.SS.BW Bus-Work 52 0 20-May-24 A 26-Aug-24 27 ANC Winter off, PC Holidays 359 SS.BW.01 Strain Bus,Jumpers 1 20 0 20-May-24 A 26-Aug-24 27 92%ANC Winter off, PC Holidays 360 SS.BW.011 Strain Bus,Jumpers 2 20 0 03-Jun-24 A 26-Aug-24 27 92%ANC Winter off, PC Holidays 361 SS.BW.02 Solid Bus 20 0 05-Jun-24 A 24-Jul-24 A 100%ANC Winter off, PC Holidays 362 ANC-BL 1.44.C.SS.IE Installation EquipmentANC-BL 1.44.C.SS.IE Installation Equipment 304 31 14-Sep-23 A 10-Sep-24 20 363 ANC-BL 1.44.C.SS.IE.T 345KV YardANC-BL 1.44.C.SS.IE.T 345KV Yard 296 5 14-Sep-23 A 09-Aug-24 -11 364 SS.IE.T.01 345kV CCVT (VT10)1 0 09-Apr-24 A 10-May-24 A 100%ANC Winter off, PC Holidays 365 SS.IE.T.02 345kV Circuit Breakers 20 0 18-Mar-24 A 10-May-24 A 100%AND Winter off, not concrete works366SS.IE.T.03 345kV Switches 14 0 25-Apr-24 A 10-May-24 A 100%ANC Winter off, PC Holidays 367 SS.IE.T.04 345KV SURGE ARRESTER 1 0 01-May-24 A 10-May-24 A 100%ANC Winter off, PC Holidays 368 SS.IE.T.05 STATION SERVICE Substation Yard Lighting 3 0 13-May-24 A 03-Jun-24 A 100%ANC Winter off, PC Holidays 369 SS.IE.T.06 345KV STATIC SHIELD MAST 1 0 01-May-24 A 10-May-24 A 100%ANC Winter off, PC Holidays 370 SS.IE.T.07 345KV SURGE ARRESTER 6 0 25-Apr-24 A 20-Jun-24 A 100%ANC Winter off, PC Holidays 371 SS.IE.T.08 STATION SERVICE 3 0 25-Mar-24 A 30-Apr-24 A 100%ANC Winter off, PC Holidays 372 SS.IE.T.09 345kV 533MVA PST #1 4 0 14-Sep-23 A 19-Sep-23 A 100%ANC Winter off, PC Holidays 373 SS.IE.T.19 345kV 533MVA PST #2 5 0 20-Sep-23 A 26-Sep-23 A 100%ANC Winter off, PC Holidays 374 SS.IE.T.29 345kV 533MVA PST #3 5 0 06-Nov-23 A 17-Nov-23 A 100%AND Winter off, not concrete works375SS.IE.T.39 345kV 533MVA PST #4 5 0 10-Nov-23 A 17-Nov-23 A 100%AND Winter off, not concrete works Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 Conduit Below Grade 500kV Yard 3 Conduit Above Grade 500kV Yard 26-Aug-24, ANC-BL 1.44.C.SS.F Fencing Fencing, Gates, Signs Ground Fence 07-Aug-24, ANC-BL 1.44.C.SS.SET.SET 345kV Steel Erection 345KV BUS SUPPORT 345KV, PHASE SPACING DISCONNECT SWITCH SUPPORT 345KV PHASE CCVT SUPPORT 345KV SURGE ARRESTER SUPPORT Insulators STATION SERVICE Structural Steel Substation Yard Lighting 345KV STATIC SHIELD MAST, and G Mat 345KV SURGE ARRESTER SUPPORT Structural Steel, STATION SERVICE 14-Jun-24 A, ANC-BL 1.44.C.SS.SET.DES Dead End Structures Piers 345 345KV 60' A-FRAME DEADEND 05-Aug-24, ANC-BL 1.44.C.SS.SET.STF 500kV Steel Erection 525KV LOW SWITCH STRUCTURE 525kV, RELOCATION OF BUS SUPPORT 525KV, CCVT SUPPORT 525kV, SURGE ARRESTOR SUPPORT Building Structure Building Erection 1 Building Erection 2 Building Erection 3 26-Aug-24, ANC-BL 1.44.C.SS.BW Bus-Work Strain Bus,Jumpers 1 Strain Bus,Jumpers 2 Solid Bus 10-Sep-24, ANC-BL 1.44.C.SS.IE Installation Equipment 09-Aug-24, ANC-BL 1.44.C.SS.IE.T 345KV Yard 345kV CCVT (VT10) 345kV Circuit Breakers 345kV Switches 345KV SURGE ARRESTER STATION SERVICE Substation Yard Lighting 345KV STATIC SHIELD MAST 345KV SURGE ARRESTER STATION SERVICE 345kV 533MVA PST #1 345kV 533MVA PST #2 345kV 533MVA PST #3 345kV 533MVA PST #4 Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 8 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 376 SS.IE.T.40 345KV Yard Inspection and testing PacifiCorp Forms 5 5 05-Jun-24 A 09-Aug-24 -37 50%ANC Winter off, PC Holidays 377 ANC-BL 1.44.C.SS.IE.F 525kv YardANC-BL 1.44.C.SS.IE.F 525kv Yard 69 7 15-May-24 A 13-Aug-24 -39 ANC Winter off, PC Holidays 378 SS.IE.F.01 525kV CCVT (VT9)1 0 10-Jun-24 A 10-Jun-24 A 100%ANC Winter off, PC Holidays 379 SS.IE.F.02 525kV Circuit Breakers (5 No)5 0 15-May-24 A 23-May-24 A 100%ANC Winter off, PC Holidays 380 SS.IE.F.03 525kV Shunt Capacitor #2 1 2 22-Jul-24 A 06-Aug-24 -39 90%ANC Winter off, PC Holidays 381 SS.IE.F.04 525kV, SURGE ARRESTOR 5 5 12-Jun-24 A 13-Aug-24 -39 0%ANC Winter off, PC Holidays 382 SS.IE.F.05 525kV Switches 10 0 12-Jun-24 A 21-Jun-24 A 100%ANC Winter off, PC Holidays 383 SS.IE.F.15 525KV Yard Inspection and testing PacifiCorp Forms 5 5 26-Jun-24 A 13-Aug-24 -39 50%ANC Winter off, PC Holidays 384 ANC-BL 1.44.C.SS.IE.R ReactorANC-BL 1.44.C.SS.IE.R Reactor 10 5 31-Jul-24 A 13-Aug-24 -39 ANC Winter off, PC Holidays 385 SS.IE.R.01 Reactor Current limiting 525KV 1 1 31-Jul-24 A 07-Aug-24 -39 15%ANC Winter off, PC Holidays 386 SS.IE.R.11 525KV Reactor Inspection and testing PacifiCorp Forms 5 5 07-Aug-24 13-Aug-24 -39 0%ANC Winter off, PC Holidays 387 ANC-BL 1.44.C.SS.IE.P Protection & Control EquipmentANC-BL 1.44.C.SS.IE.P Protection & Control Equipment 198 0 11-Jan-24 A 24-Jul-24 A 388 SS.IE.P.01 345 kV Control and Relay Panels 30 0 11-Jan-24 A 22-May-24 A 100%AND Winter off, not concrete works389SS.IE.P.02 345 kV Annunciator and RTU Panels 30 0 01-Jul-24 A 11-Jul-24 A 100%AND Winter off, not concrete works390SS.IE.P.12 Forms, Inspection and testing PacifiCorp Forms 345KV Protection $ and Control Equipment5015-Jul-24 A 24-Jul-24 A 100%ANC Winter off, PC Holidays 391 ANC-BL 1.44.C.SS.IE.CH Control HouseANC-BL 1.44.C.SS.IE.CH Control House 254 5 02-Nov-23 A 09-Aug-24 -35 392 SS.IE.CH.01 Structure, internal fixtures 1 0 02-Nov-23 A 04-Dec-23 A 100%AND Winter off, not concrete works393SS.IE.CH.02 DC Batteries, racks, Chargers 7 0 05-Dec-23 A 19-Jun-24 A 100%AND Winter off, not concrete works394SS.IE.CH.03 Panel Installation 30 0 20-Dec-23 A 26-Jun-24 A 100%AND Winter off, not concrete works395SS.IE.CH.13 CH Inspection and testing PacifiCorp Forms 5 5 27-Jun-24 A 09-Aug-24 -37 50%ANC Winter off, PC Holidays 396 ANC-BL 1.44.C.SS.IE.SP Station PowerANC-BL 1.44.C.SS.IE.SP Station Power 81 26 22-May-24 A 10-Sep-24 17 ANC Winter off, PC Holidays 397 SS.IE.SP.01 Transformer 1500KVA 4 0 22-May-24 A 24-May-24 A 100%ANC Winter off, PC Holidays 398 SS.IE.SP.02 Transformer 300 KVA 4 0 23-May-24 A 23-May-24 A 100%ANC Winter off, PC Holidays 399 SS.IE.SP.03 Transformer 100KVA 4 0 24-May-24 A 24-May-24 A 100%ANC Winter off, PC Holidays 400 SS.IE.SP.04 Manual Transfer Switch 4 3 10-Jun-24 A 07-Aug-24 -37 50%ANC Winter off, PC Holidays 401 SS.IE.SP.05 Safety Switch 2 2 15-Jul-24 A 06-Aug-24 -37 50%ANC Winter off, PC Holidays 402 SS.IE.SP.06 Transformer 300KVA 2 0 24-May-24 A 24-May-24 A 100%ANC Winter off, PC Holidays 403 SS.IE.SP.07 Circuit BreakerEnclosure 2 0 10-Jun-24 A 26-Jun-24 A 100%ANC Winter off, PC Holidays 404 SS.IE.SP.08 Station Service Generator, 1500kW, 480V 7 7 30-Aug-24 10-Sep-24 17 0%ANC Winter off, PC Holidays 405 SS.IE.SP.09 Panelboard, AC 1 2 10-Jun-24 A 06-Aug-24 -37 90%ANC Winter off, PC Holidays 406 SS.IE.SP.10 Station Lighting Fixtures and Outlet Assemblies 1 2 17-Jun-24 A 06-Aug-24 -37 65%ANC Winter off, PC Holidays 407 SS.IE.SP.20 SP Inspection and testing PacifiCorp Forms 5 5 08-Jul-24 A 09-Aug-24 -37 50%ANC Winter off, PC Holidays 408 ANC-BL 1.44.C.SS.CTE Cables & TerminationANC-BL 1.44.C.SS.CTE Cables & Termination 148 9 22-Jan-24 A 14-Aug-24 -27 409 SS.CET.01 Control wiring/Power cable 345kV Yard 1 Field Cable Installation 30 0 20-Apr-24 A 24-Jun-24 A 100%AND Winter off, not concrete works410SS.CET.011 Control wiring/Power cable 345kV Yard BW Field Cable Installation0 0 25-Jun-24 A 25-Jun-24 A 100%AND Winter off, not concrete works411SS.CET.02 Control wiring/Power cable 345kV Yard 2 33 0 05-Jun-24 A 26-Jun-24 A 100%AND Winter off, not concrete works412SS.CET.03 Control wiring/Power cable 525kV Yard 1 7 7 05-Jun-24 A 13-Aug-24 -25 95%ANC Winter off, PC Holidays 413 SS.CET.04 Control wiring/Power cable 525kV Yard 2 9 1 05-Jun-24 A 14-Aug-24 -25 95%ANC Winter off, PC Holidays 414 SS.CET.05 345kv Yard Cable Termination 1 7 3 03-Jun-24 A 07-Aug-24 -20 95%ANC Winter off, PC Holidays 415 SS.CET.06 345kv Yard Cable Termination 2 7 3 04-Jun-24 A 07-Aug-24 -20 95%ANC Winter off, PC Holidays 416 SS.CET.07 Control House Cable Installation 20 0 22-Jan-24 A 02-Feb-24 A 100%AND Winter off, not concrete works417SS.CET.08 Control House Cable Terminations 10 0 05-Feb-24 A 02-Jul-24 A 100%AND Winter off, not concrete works418SS.CET.09 525kV Yard Cable Termination 6 0 06-Jun-24 A 24-Jul-24 A 100%ANC Winter off, PC Holidays 419 ANC-BL 1.44.TST Testing & CommissioningANC-BL 1.44.TST Testing & Commissioning 164 80 15-May-24 A 01-Jan-25 -41 ANC Winter off, PC Holidays 420 ANC-BL 1.44.TST.S SubstationANC-BL 1.44.TST.S Substation 164 80 15-May-24 A 01-Jan-25 -41 ANC Winter off, PC Holidays 421 ANC-BL 1.44.TST.S.ST 345kV Yard Equipment Testing & CommissioningANC-BL 1.44.TST.S.ST 345kV Yard Equipment Testing & Commissioning 91 7 15-May-24 A 17-Sep-24 -41 ANC Winter off, PC Holidays 422 TST.S.ST.01 Surge Arrestors 2 1 1 09-Sep-24 09-Sep-24 -41 0%ANC Winter off, PC Holidays Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 345KV Yard Inspection and testing PacifiCorp Forms 13-Aug-24, ANC-BL 1.44.C.SS.IE.F 525kv Yard 525kV CCVT (VT9) 525kV Circuit Breakers (5 No) 525kV Shunt Capacitor #2 525kV, SURGE ARRESTOR 525kV Switches 525KV Yard Inspection and testing PacifiCorp Forms 13-Aug-24, ANC-BL 1.44.C.SS.IE.R Reactor Reactor Current limiting 525KV 525KV Reactor Inspection and testing PacifiCorp Forms 24-Jul-24 A, ANC-BL 1.44.C.SS.IE.P Protection & Control Equipment 345 kV Control and Relay Panels 345 kV Annunciator and RTU Panels Forms, Inspection and testing PacifiCorp Forms 345KV Protection $ and Control Equipment 09-Aug-24, ANC-BL 1.44.C.SS.IE.CH Control House Structure, internal fixtures DC Batteries, racks, Chargers Panel Installation CH Inspection and testing PacifiCorp Forms 10-Sep-24, ANC-BL 1.44.C.SS.IE.SP Station Power Transformer 1500KVA Transformer 300 KVA Transformer 100KVA Manual Transfer Switch Safety Switch Transformer 300KVA Circuit BreakerEnclosure Station Service Generator, 1500kW, 480V Panelboard, AC Station Lighting Fixtures and Outlet Assemblies SP Inspection and testing PacifiCorp Forms 14-Aug-24, ANC-BL 1.44.C.SS.CTE Cables & Termination Control wiring/Power cable 345kV Yard 1 Field Cable Installation Control wiring/Power cable 345kV Yard BW Field Cable Installation Control wiring/Power cable 345kV Yard 2 Control wiring/Power cable 525kV Yard 1 Control wiring/Power cable 525kV Yard 2 345kv Yard Cable Termination 1 345kv Yard Cable Termination 2 Control House Cable Installation Control House Cable Terminations 525kV Yard Cable Termination 17-Sep-24, ANC-BL 1.44.TST.S.ST 345kV Yard Equipment Testing & Commissioning Surge Arrestors 2 Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 9 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 423 TST.S.ST.011 MOAB / Transrupter 4 1 1 10-Sep-24 10-Sep-24 -41 0%ANC Winter off, PC Holidays 424 TST.S.ST.012 Fiber Splicing 1 1 10-Sep-24 10-Sep-24 -41 0%ANC Winter off, PC Holidays 425 ANC-BL 1.44.TST.S.ST.02 Circuit BreakersANC-BL 1.44.TST.S.ST.02 Circuit Breakers 4 0 15-May-24 A 20-May-24 A ANC Winter off, PC Holidays 426 TST.S.ST.022 SF6 Gas Charging CB (345kV) 5 3 0 15-May-24 A 17-May-24 A 100%ANC Winter off, PC Holidays 427 TST.S.ST.023 Vacuum Per CB (345kV) 5 1 0 20-May-24 A 20-May-24 A 100%ANC Winter off, PC Holidays 428 ANC-BL 1.44.TST.S.ST.03 TransformersANC-BL 1.44.TST.S.ST.03 Transformers 2 2 11-Sep-24 12-Sep-24 -41 ANC Winter off, PC Holidays 429 TST.S.ST.032 Power Transformer (W/DETC) 0 1 1 11-Sep-24 11-Sep-24 -41 0%ANC Winter off, PC Holidays 430 TST.S.ST.033 Station Service 4 1 1 12-Sep-24 12-Sep-24 -41 0%ANC Winter off, PC Holidays 431 ANC-BL 1.44.TST.S.ST.04 Instrument TransformersANC-BL 1.44.TST.S.ST.04 Instrument Transformers 3 3 12-Sep-24 16-Sep-24 -41 ANC Winter off, PC Holidays 432 TST.S.ST.041 CCVT 1 2 2 12-Sep-24 13-Sep-24 -41 0%ANC Winter off, PC Holidays 433 TST.S.ST.042 CT (Transformers) 0 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays 434 TST.S.ST.043 CT (CB's) 30 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays 435 TST.S.ST.044 Current Circuit Secondaries 30 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays 436 TST.S.ST.045 Voltage Circuit Secondaries 1 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays 437 ANC-BL 1.44.TST.S.ST.05 GroundingANC-BL 1.44.TST.S.ST.05 Grounding 1 1 16-Sep-24 16-Sep-24 -41 ANC Winter off, PC Holidays 438 TST.S.ST.051 Ground Grid Injection 1 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays 439 ANC-BL 1.44.TST.S.ST.06 Controls CircuitsANC-BL 1.44.TST.S.ST.06 Controls Circuits 28 0 21-May-24 A 27-Jun-24 A ANC Winter off, PC Holidays 440 TST.S.ST.061 Functional Testing (Per Breaker) 5 1 0 25-Jun-24 A 25-Jun-24 A 100%ANC Winter off, PC Holidays 441 TST.S.ST.062 Functional Testing (Per Xfmr) 0 1 0 25-Jun-24 A 25-Jun-24 A 100%ANC Winter off, PC Holidays 442 TST.S.ST.063 Point to Point wire verification (Per Breaker) 5 1 0 21-May-24 A 22-May-24 A 100%ANC Winter off, PC Holidays 443 TST.S.ST.064 Point to Point wire verification (Per Transformer) 4 3 0 25-Jun-24 A 27-Jun-24 A 100%ANC Winter off, PC Holidays 444 ANC-BL 1.44.TST.S.ST.07 Cable TestingANC-BL 1.44.TST.S.ST.07 Cable Testing 1 1 17-Sep-24 17-Sep-24 -41 ANC Winter off, PC Holidays 445 TST.S.ST.071 VLF 5 1 1 17-Sep-24 17-Sep-24 -41 0%ANC Winter off, PC Holidays 446 ANC-BL 1.44.TST.S.ST.08 Low Voltage Section (Verifications)ANC-BL 1.44.TST.S.ST.08 Low Voltage Section (Verifications)1 1 17-Sep-24 17-Sep-24 -41 ANC Winter off, PC Holidays 447 TST.S.ST.081 LV Yard Panels 4 1 1 17-Sep-24 17-Sep-24 -41 0%ANC Winter off, PC Holidays 448 TST.S.ST.082 LV Yard Panels Mod's 2 1 1 17-Sep-24 17-Sep-24 -41 0%ANC Winter off, PC Holidays 449 TST.S.ST.083 LV Safety Switches 5 1 1 17-Sep-24 17-Sep-24 -41 0%ANC Winter off, PC Holidays 450 ANC-BL 1.44.TST.S.CH Control House Testing & CommissioningANC-BL 1.44.TST.S.CH Control House Testing & Commissioning 92 5 27-May-24 A 24-Sep-24 -41 ANC Winter off, PC Holidays 451 TST.S.CH.01 Reports / Project Management 1 1 18-Sep-24 18-Sep-24 -41 0%ANC Winter off, PC Holidays 452 TST.S.CH.02 Drawing Control (when customer requests) 1 1 1 18-Sep-24 18-Sep-24 -41 0%ANC Winter off, PC Holidays 453 ANC-BL 1.44.TST.S.CH.03 BatteriesANC-BL 1.44.TST.S.CH.03 Batteries 6 0 27-May-24 A 30-May-24 A ANC Winter off, PC Holidays 454 TST.S.CH.031 Battery String Testing (1hr Discharge Rate)(125V) 2 1 0 27-May-24 A 30-May-24 A 100%ANC Winter off, PC Holidays 455 TST.S.CH.032 Battery String Testing (1hr Discharge Rate)(48V) 1 2 0 28-May-24 A 29-May-24 A 100%ANC Winter off, PC Holidays 456 TST.S.CH.033 Battery Charger 3 1 0 28-May-24 A 28-May-24 A 100%ANC Winter off, PC Holidays 457 ANC-BL 1.44.TST.S.CH.04 Controls CircuitsANC-BL 1.44.TST.S.CH.04 Controls Circuits 1 0 24-Jun-24 A 24-Jun-24 A ANC Winter off, PC Holidays 458 TST.S.CH.041 Point to Point wire verification (Per Panel) 27 1 0 24-Jun-24 A 24-Jun-24 A 100%ANC Winter off, PC Holidays 459 TST.S.CH.042 Point to Point wire verification (Per Cabinet) 3 1 0 24-Jun-24 A 24-Jun-24 A 100%ANC Winter off, PC Holidays 460 TST.S.CH.043 DFR 1 1 0 24-Jun-24 A 24-Jun-24 A 100%ANC Winter off, PC Holidays 461 TST.S.CH.044 Annuncaitor 2 1 0 24-Jun-24 A 24-Jun-24 A 100%ANC Winter off, PC Holidays 462 ANC-BL 1.44.TST.S.CH.05 MiscellaneousANC-BL 1.44.TST.S.CH.05 Miscellaneous 2 2 19-Sep-24 20-Sep-24 -41 ANC Winter off, PC Holidays 463 TST.S.CH.051 HVAC 3 1 1 19-Sep-24 19-Sep-24 -41 0%ANC Winter off, PC Holidays 464 TST.S.CH.052 Building Alarms 1 1 1 20-Sep-24 20-Sep-24 -41 0%ANC Winter off, PC Holidays 465 ANC-BL 1.44.TST.S.CH.06 Low Voltage SectionANC-BL 1.44.TST.S.CH.06 Low Voltage Section 2 2 20-Sep-24 23-Sep-24 -41 ANC Winter off, PC Holidays 466 TST.S.CH.061 DCLC 4 1 1 20-Sep-24 20-Sep-24 -41 0%ANC Winter off, PC Holidays 467 TST.S.CH.062 ACLC 2 1 1 23-Sep-24 23-Sep-24 -41 0%ANC Winter off, PC Holidays 468 TST.S.CH.063 Fuse Disco 2 1 1 23-Sep-24 23-Sep-24 -41 0%ANC Winter off, PC Holidays 469 ANC-BL 1.44.TST.S.CH.07 Post Energization IR ScanANC-BL 1.44.TST.S.CH.07 Post Energization IR Scan 1 1 24-Sep-24 24-Sep-24 -41 ANC Winter off, PC Holidays 470 TST.S.CH.071 IR Scan 1 1 24-Sep-24 24-Sep-24 -41 0%ANC Winter off, PC Holidays Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 MOAB / Transrupter 4 Fiber Splicing 20-May-24 A, ANC-BL 1.44.TST.S.ST.02 Circuit Breakers SF6 Gas Charging CB (345kV) 5 Vacuum Per CB (345kV) 5 12-Sep-24, ANC-BL 1.44.TST.S.ST.03 Transformers Power Transformer (W/DETC) 0 Station Service 4 16-Sep-24, ANC-BL 1.44.TST.S.ST.04 Instrument Transformers CCVT 1 CT (Transformers) 0 CT (CB's) 30 Current Circuit Secondaries 30 Voltage Circuit Secondaries 1 16-Sep-24, ANC-BL 1.44.TST.S.ST.05 Grounding Ground Grid Injection 1 27-Jun-24 A, ANC-BL 1.44.TST.S.ST.06 Controls Circuits Functional Testing (Per Breaker) 5 Functional Testing (Per Xfmr) 0 Point to Point wire verification (Per Breaker) 5 Point to Point wire verification (Per Transformer) 4 17-Sep-24, ANC-BL 1.44.TST.S.ST.07 Cable Testing VLF 5 17-Sep-24, ANC-BL 1.44.TST.S.ST.08 Low Voltage Section (Verifications) LV Yard Panels 4 LV Yard Panels Mod's 2 LV Safety Switches 5 24-Sep-24, ANC-BL 1.44.TST.S.CH Control House Testing & Commissioning Reports / Project Management Drawing Control (when customer requests) 1 30-May-24 A, ANC-BL 1.44.TST.S.CH.03 Batteries Battery String Testing (1hr Discharge Rate)(125V) 2 Battery String Testing (1hr Discharge Rate)(48V) 1 Battery Charger 3 24-Jun-24 A, ANC-BL 1.44.TST.S.CH.04 Controls Circuits Point to Point wire verification (Per Panel) 27 Point to Point wire verification (Per Cabinet) 3 DFR 1 Annuncaitor 2 20-Sep-24, ANC-BL 1.44.TST.S.CH.05 Miscellaneous HVAC 3 Building Alarms 1 23-Sep-24, ANC-BL 1.44.TST.S.CH.06 Low Voltage Section DCLC 4 ACLC 2 Fuse Disco 2 24-Sep-24, ANC-BL 1.44.TST.S.CH.07 Post Energization IR Scan IR Scan Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 10 of 11 Anticline Schedule Submmit Line Construction #Activity ID Activity Name Original Duration Remaining Duration Start Finish Total Float Physical % Complete Calendar 471 TST.S.CH.072 Substation 1 1 1 24-Sep-24 24-Sep-24 -41 0%ANC Winter off, PC Holidays 472 TST.S.CH.073 Fuse Disco 2 1 1 24-Sep-24 24-Sep-24 -41 0%ANC Winter off, PC Holidays 473 ANC-BL 1.44.TST.S.SF 525kV Yard Equipment Testing & CommissioningANC-BL 1.44.TST.S.SF 525kV Yard Equipment Testing & Commissioning 97 13 03-Jun-24 A 11-Oct-24 -41 ANC Winter off, PC Holidays 474 ANC-BL 1.44.TST.S.SF.01 Yard Equipment-1ANC-BL 1.44.TST.S.SF.01 Yard Equipment-1 2 2 25-Sep-24 26-Sep-24 -41 ANC Winter off, PC Holidays 475 TST.S.SF.011 Air Switch Testing 1 1 25-Sep-24 25-Sep-24 -41 0%ANC Winter off, PC Holidays 476 TST.S.SF.012 Surge Arrestors 2 1 1 26-Sep-24 26-Sep-24 -41 0%ANC Winter off, PC Holidays 477 ANC-BL 1.44.TST.S.SF.02 Circuit BreakersANC-BL 1.44.TST.S.SF.02 Circuit Breakers 3 3 27-Sep-24 01-Oct-24 -41 ANC Winter off, PC Holidays 478 TST.S.SF.021 SF6 CB (345kV) 5 1 1 27-Sep-24 27-Sep-24 -41 0%ANC Winter off, PC Holidays 479 TST.S.SF.022 SF6 Gas Charging CB (345kV) 5 1 1 30-Sep-24 30-Sep-24 -41 0%ANC Winter off, PC Holidays 480 TST.S.SF.023 Vacuum Per CB (345kV) 5 1 1 01-Oct-24 01-Oct-24 -41 0%ANC Winter off, PC Holidays 481 ANC-BL 1.44.TST.S.SF.03 Instrument TransformersANC-BL 1.44.TST.S.SF.03 Instrument Transformers 4 4 02-Oct-24 07-Oct-24 -41 ANC Winter off, PC Holidays 482 TST.S.SF.031 CCVT 1 1 1 02-Oct-24 02-Oct-24 -41 0%ANC Winter off, PC Holidays 483 TST.S.SF.032 CT (CB's) 12 1 1 03-Oct-24 03-Oct-24 -41 0%ANC Winter off, PC Holidays 484 TST.S.SF.033 Current Circuit Secondaries 12 1 1 04-Oct-24 04-Oct-24 -41 0%ANC Winter off, PC Holidays 485 TST.S.SF.034 Voltage Circuit Secondaries 1 1 1 07-Oct-24 07-Oct-24 -41 0%ANC Winter off, PC Holidays 486 ANC-BL 1.44.TST.S.SF.04 Capacitors / ReactorsANC-BL 1.44.TST.S.SF.04 Capacitors / Reactors 1 1 08-Oct-24 08-Oct-24 -41 ANC Winter off, PC Holidays 487 TST.S.SF.041 Capacitor Bank 1 1 1 08-Oct-24 08-Oct-24 -41 0%ANC Winter off, PC Holidays 488 TST.S.SF.043 Dry Core Reactor 3 1 1 08-Oct-24 08-Oct-24 -41 0%ANC Winter off, PC Holidays 489 ANC-BL 1.44.TST.S.SF.05 GroundingANC-BL 1.44.TST.S.SF.05 Grounding 1 1 09-Oct-24 09-Oct-24 -41 ANC Winter off, PC Holidays 490 TST.S.SF.051 Ground Grid Injection 1 1 1 09-Oct-24 09-Oct-24 -41 0%ANC Winter off, PC Holidays 491 ANC-BL 1.44.TST.S.SF.06 Controls CircuitsANC-BL 1.44.TST.S.SF.06 Controls Circuits 2 2 10-Oct-24 11-Oct-24 -41 ANC Winter off, PC Holidays 492 TST.S.SF.061 Functional Testing (Per Breaker) 2 1 1 10-Oct-24 10-Oct-24 -41 0%ANC Winter off, PC Holidays 493 TST.S.SF.062 Point to Point wire verification (Per Breaker) 2 1 1 11-Oct-24 11-Oct-24 -41 0%ANC Winter off, PC Holidays 494 ANC-BL 1.44.TST.S.SF.07 Circuit Breakers Post Bushing Install ActivitiesANC-BL 1.44.TST.S.SF.07 Circuit Breakers Post Bushing Install Activities 3 0 03-Jun-24 A 05-Jun-24 A ANC Winter off, PC Holidays 495 TST.S.SF.071 SF6 Gas Charging (525kV) 2 1 0 03-Jun-24 A 03-Jun-24 A 100%ANC Winter off, PC Holidays 496 TST.S.SF.072 Vacuum Per CB (525kV) 2 3 0 03-Jun-24 A 05-Jun-24 A 100%ANC Winter off, PC Holidays 497 ANC-BL 1.44.TST.S.SP PunchlistANC-BL 1.44.TST.S.SP Punchlist 40 40 04-Nov-24 01-Jan-25 -41 ANC Winter off, PC Holidays 498 ANC-BL 1.44.TST.S.SP.C addressing Punchlist itemsANC-BL 1.44.TST.S.SP.C addressing Punchlist items 40 40 04-Nov-24 01-Jan-25 -41 ANC Winter off, PC Holidays 499 TSt.S.SP.C.01 Punchlist correction 1 20 20 04-Nov-24 03-Dec-24 -41 0%ANC Winter off, PC Holidays 500 TSt.S.SP.C.11 Punchlist correction 2 20 20 04-Dec-24 01-Jan-25 -41 0%ANC Winter off, PC Holidays Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2023 2024 Substation 1 Fuse Disco 2 11-Oct-24, ANC-BL 1.44.TST.S.SF 525kV Yard Equipment Testing & Commissioning 26-Sep-24, ANC-BL 1.44.TST.S.SF.01 Yard Equipment-1 Air Switch Testing Surge Arrestors 2 01-Oct-24, ANC-BL 1.44.TST.S.SF.02 Circuit Breakers SF6 CB (345kV) 5 SF6 Gas Charging CB (345kV) 5 Vacuum Per CB (345kV) 5 07-Oct-24, ANC-BL 1.44.TST.S.SF.03 Instrument Transformers CCVT 1 CT (CB's) 12 Current Circuit Secondaries 12 Voltage Circuit Secondaries 1 08-Oct-24, ANC-BL 1.44.TST.S.SF.04 Capacitors / Reactors Capacitor Bank 1 Dry Core Reactor 3 09-Oct-24, ANC-BL 1.44.TST.S.SF.05 Grounding Ground Grid Injection 1 11-Oct-24, ANC-BL 1.44.TST.S.SF.06 Controls Circuits Functional Testing (Per Breaker) 2 Point to Point wire verification (Per Breaker) 2 05-Jun-24 A, ANC-BL 1.44.TST.S.SF.07 Circuit Breakers Post Bushing Install Activities SF6 Gas Charging (525kV) 2 Vacuum Per CB (525kV) 2 Anticline Substation Classic Schedule Layout 05-Aug-24 14:53 Remaining Level of Effort Project Baseline Bar Actual Work Remaining Work Critical Remaining Work Baseline Milestone Page 11 of 11 Anticline Schedule Submmit Line Construction