HomeMy WebLinkAbout20240829PAC to Staff 134-2 - Anticline Schedule Schedule_July.pdf#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
1 ANC-BL 1.44 Anticline Substation 1.44 ApprovedANC-BL 1.44 Anticline Substation 1.44 Approved 863 125 10-Mar-23 A 01-Jan-25 -50
2 ANC-BL 1.44.MS Project Major MilestonesANC-BL 1.44.MS Project Major Milestones 569 125 10-Mar-23 A 01-Jan-25 -50
3 ANC-BL 1.44.MS.CM Contract MilestonesANC-BL 1.44.MS.CM Contract Milestones 382 104 10-Mar-23 A 01-Jan-25 -41 ANC Winter off, PC Holidays
4 MS.CM-01 Contract Execution 0 0 10-Mar-23 A 100%ANC Winter off, PC Holidays
5 MS.CM-02 Full Notice To Proceed 0 0 31-Mar-23 A 100%ANC Winter off, PC Holidays
6 MS.CM-03 Period of Perfomance 349 104 31-Mar-23 A 01-Jan-25 -41 0%ANC Winter off, PC Holidays
7 MS.CM-04 Final Completion 0 0 01-Jan-25*-41 0%ANC Winter off, PC Holidays
8 MS.CM-05 Detailed preliminary schedule (60)0 0 01-May-23 A 100%ANC Winter off, PC Holidays
9 MS.CM-06 Detailed CPM Schedule 0 0 03-Oct-23 A 100%ANC Winter off, PC Holidays
10 MS.CM-07 QA/QC Plan 0 0 27-Apr-23 A 100%ANC Winter off, PC Holidays
11 MS.CM-08 Safety Plan 0 0 07-Apr-23 A 100%ANC Winter off, PC Holidays
12 MS.CM-09 Environmental Assurance Program 0 0 27-Apr-23 A 100%ANC Winter off, PC Holidays
13 MS.CM-10 345kV Temporary Shoofly Complete 0 0 10-May-23 A 100%ANC Winter off, PC Holidays
14 MS.CM-11 Phase shifter Foundations Complete 0 0 17-May-24 A 100%ANC Winter off, PC Holidays
15 MS.CM-12 Project Mechanical Completion 0 0 14-Aug-24 -19 0%ANC Winter off, PC Holidays
16 MS.CM-13 Project Substantial Completion 0 0 01-Nov-24 -41 0%ANC Winter off, PC Holidays
17 ANC-BL 1.44.MS.SAP Start 345kV yard PhaseshifterANC-BL 1.44.MS.SAP Start 345kV yard Phaseshifter 359 0 02-May-23 A 01-Jul-24 A
18 MS.SAP-01 Construction start 0 0 02-May-23 A 100%ANC Winter off, PC Holidays
19 MS.SAP-02 Foundation start 0 0 26-Jul-23 A 100%ANC Winter off, PC Holidays
20 MS.SAP-03 Dead End steel start 0 0 27-Mar-24 A 100%ANC Winter off, PC Holidays
21 MS.SAP-04 Substation steel start 0 0 25-Mar-24 A 100%ANC Winter off, PC Holidays
22 MS.SAP-05 Equipment install start 0 0 19-Sep-23 A 100%ANC Winter off, PC Holidays
23 MS.SAP-06 Bus installation start 0 0 21-May-24 A 100%ANC Winter off, PC Holidays
24 MS.SAP-07 Cable install start 0 0 02-Feb-24 A 100%AND Winter off, not concrete
works25MS.SAP-08 Cable termination start 0 0 18-Mar-24 A 100%ANC Winter off, PC Holidays
26 MS.SAP-09 Contractor testing start 0 0 01-Jul-24 A 100%ANC Winter off, PC Holidays
27 ANC-BL 1.44.MS.FAP Finish 345kV yard PhaseshifterANC-BL 1.44.MS.FAP Finish 345kV yard Phaseshifter 120 76 14-Jun-24 A 01-Nov-24 -1
28 MS.FAP-01 Civil earthworks complete 0 0 30-Aug-24 -37 0%ANC Winter off, PC Holidays
29 MS.FAP-02 Underground piping complete 0 0 07-Aug-24 49 0%AND Winter off, not concrete
works30MS.FAP-03 Underground conduits complete 0 0 01-Jul-24 A 100%AND Winter off, not concrete
works31MS.FAP-04 Underground grounding complete 0 0 03-Jul-24 A 100%ANC Winter off, PC Holidays
32 MS.FAP-05 Foundations complete 0 0 14-Jun-24 A 100%ANC Winter off, PC Holidays
33 MS.FAP-06 Dead End steel complete 0 0 14-Jun-24 A 100%ANC Winter off, PC Holidays
34 MS.FAP-07 Substation steel complete 0 0 19-Jun-24 A 100%ANC Winter off, PC Holidays
35 MS.FAP-08 Equipment install complete 0 0 25-Jun-24 A 100%ANC Winter off, PC Holidays
36 MS.FAP-09 Bus installation complete 0 0 26-Aug-24 27 0%ANC Winter off, PC Holidays
37 MS.FAP-10 Cable install complete 0 0 05-Aug-24 -17 0%ANC Winter off, PC Holidays
38 MS.FAP-11 Cable termination complete 0 0 14-Aug-24 -25 0%ANC Winter off, PC Holidays
39 MS.FAP-12 Contractor testing complete 0 0 11-Oct-24 -41 0%ANC Winter off, PC Holidays
40 MS.FAP-13 Forms submittal complete, testing &comssing 0 0 01-Nov-24 -41 0%ANC Winter off, PC Holidays
41 ANC-BL 1.44.MS.SAY Start 500kV Yard MSANC-BL 1.44.MS.SAY Start 500kV Yard MS 288 49 24-Apr-23 A 14-Oct-24 14 ANC Winter off, PC Holidays
42 MS.SAY-01 Civil earthworks Start 0 0 24-Apr-23 A 100%ANC Winter off, PC Holidays
43 MS.SAY-02 11F37 Circuit Breaker Foundation Start 0 0 13-May-24 A 100%ANC Winter off, PC Holidays
44 MS.SAY-03 11E 33 Capacitor Bank Foundation Start 0 0 24-May-24 A 100%ANC Winter off, PC Holidays
45 MS.SAY-04 11F37 & Switches install Start 0 0 12-Jun-24 A 100%ANC Winter off, PC Holidays
46 MS.SAY-05 11E 33 & Switches Start 0 0 12-Jun-24 A 100%ANC Winter off, PC Holidays
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
Contract Execution
Full Notice To Proceed
Detailed preliminary schedule (60)
Detailed CPM Schedule
QA/QC Plan
Safety Plan
Environmental Assurance Program
345kV Temporary Shoofly Complete
Phase shifter Foundations Complete
Project Mechanical Completion
01-Jul-24 A, ANC-BL 1.44.MS.SAP Start 345kV yard Phaseshifter
Construction start
Foundation start
Dead End steel start
Substation steel start
Equipment install start
Bus installation start
Cable install start
Cable termination start
Contractor testing start
Civil earthworks complete
Underground piping complete
Underground conduits complete
Underground grounding complete
Foundations complete
Dead End steel complete
Substation steel complete
Equipment install complete
Bus installation complete
Cable install complete
Cable termination complete
Contractor testing complete
14-Oct-24, ANC-BL 1.44.MS.SAY Start 500kV Yard MS
Civil earthworks Start
11F37 Circuit Breaker Foundation Start
11E 33 Capacitor Bank Foundation Start
11F37 & Switches install Start
11E 33 & Switches Start
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 1 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
47 MS.SAY-06 Capacitor Bank 2 Start 0 0 05-Aug-24 -37 0%ANC Winter off, PC Holidays
48 MS.SAY-07 Construction Started 0 0 13-May-24 A 100%ANC Winter off, PC Holidays
49 MS.SAY-08 Dead End steel Start 0 0 27-Mar-24 A 100%ANC Winter off, PC Holidays
50 MS.SAY-09 Contractor testing Start 0 0 25-Sep-24 -40 0%ANC Winter off, PC Holidays
51 MS.SAY-10 Forms submittal complete, testing &comssing 0 0 14-Oct-24 -40 0%ANC Winter off, PC Holidays
52 ANC-BL 1.44.MS.FAY Finish MS 500kV Yard MSANC-BL 1.44.MS.FAY Finish MS 500kV Yard MS 128 64 09-May-24 A 01-Nov-24 -41 ANC Winter off, PC Holidays
53 MS.FAY.01 Civil earthworks complete 0 0 07-Aug-24 -26 0%ANC Winter off, PC Holidays
54 MS.FAY.02 11F37 Circuit Breaker Foundation Complete 0 0 09-May-24 A 100%ANC Winter off, PC Holidays
55 MS.FAY.03 11E 33 Capacitor Bank Foundation Complete 0 0 10-Jun-24 A 100%ANC Winter off, PC Holidays
56 MS.FAY.04 11F37 & Switches install complete 0 0 21-Jun-24 A 100%ANC Winter off, PC Holidays
57 MS.FAY.05 11E 33 & Switches complete 0 0 21-Jun-24 A 100%ANC Winter off, PC Holidays
58 MS.FAY.06 Capacitor Bank 2 complete 0 0 21-Jun-24 A 100%ANC Winter off, PC Holidays
59 MS.FAY.07 Dead End steel complete 0 0 14-Jun-24 A 100%ANC Winter off, PC Holidays
60 MS.FAY.08 Construction Complete 0 0 30-Aug-24 -37 0%ANC Winter off, PC Holidays
61 MS.FAY.09 Contractor testing complete 0 0 05-Aug-24 8 0%ANC Winter off, PC Holidays
62 MS.FAY.10 Forms submittal complete, testing &comssing 0 0 01-Nov-24 -41 0%ANC Winter off, PC Holidays
63 ANC-BL 1.44.MS.OF Owner Furnished Materials MILESTONESANC-BL 1.44.MS.OF Owner Furnished Materials MILESTONES 436 0 01-Apr-23 A 30-Aug-24 0
64 MS.OF.01 345kV Temporary Shoo-fly materials 0 0 01-Apr-23 A 100%ANC Calendar, PC Holidays
65 MS.OF.02 525kV Substation Steel & Anchor Bolts 0 0 15-Nov-23 A 100%ANC Calendar, PC Holidays
66 MS.OF.03 345kV Substation Steel & Anchor Bolts 0 0 10-Oct-23 A 100%ANC Calendar, PC Holidays
67 MS.OF.04 345kV CCVT (VT10)0 0 08-May-24 A 100%ANC Calendar, PC Holidays
68 MS.OF.05 525kV CCVT (VT9)0 0 14-Aug-23 A 100%ANC Calendar, PC Holidays
69 MS.OF.06 525kV Circuit Breakers (1 No)0 0 16-Nov-23 A 100%ANC Calendar, PC Holidays
70 MS.OF.07 525kV Shunt Capacitor #2 0 0 06-Sep-23 A 100%ANC Calendar, PC Holidays
71 MS.OF.08 345kV Switches 0 0 07-Aug-23 A 100%ANC Calendar, PC Holidays
72 MS.OF.09 525kV Switches 0 0 10-Nov-23 A 100%ANC Calendar, PC Holidays
73 MS.OF.10 345kV Substation Dead Ends & Anchor Bolts 0 0 11-Dec-23 A 100%ANC Calendar, PC Holidays
74 MS.OF.11 345kV Circuit Breakers (5 No)0 0 19-Dec-23 A 100%AND Winter off, not concrete
works75MS.OF.12 PST Yard Control House 0 0 09-Oct-23 A 100%ANC Calendar, PC Holidays
76 MS.OF.13 Control Panels 0 0 23-May-24 A 100%ANC Calendar, PC Holidays
77 MS.OF.14 Reactor Current limiting 525KV 0 0 06-Sep-23 A 100%ANC Calendar, PC Holidays
78 MS.OF.24 345kV 533MVA PST #1 0 0 13-Sep-23 A 100%ANC Calendar, PC Holidays
79 MS.OF.34 345kV 533MVA PST #2 0 0 13-Sep-23 A 100%ANC Calendar, PC Holidays
80 MS.OF.44 345kV 533MVA PST #3 0 0 06-Nov-23 A 100%ANC Calendar, PC Holidays
81 MS.OF.54 345kV 533MVA PST #4 0 0 09-Nov-23 A 100%ANC Calendar, PC Holidays
82 MS.OF.64 Station Service Back Up Generator, 480 VAC, 1500KW 0 0 30-Aug-24*0 0%ANC Calendar, PC Holidays
83 ANC-BL 1.44.PM Project ManagementANC-BL 1.44.PM Project Management 532 76 10-Mar-23 A 01-Nov-24 -1
84 ANC-BL 1.44.PM.PC Project ControlANC-BL 1.44.PM.PC Project Control 44 0 10-Mar-23 A 02-Oct-23 A ANC Calendar, PC Holidays
85 PM.PC-01 Detailed preliminary schedule 23 0 10-Mar-23 A 11-Apr-23 A 100%ANC Calendar, PC Holidays
86 PM.PC-02 RA Detailed preliminary schedule 14 0 12-Apr-23 A 01-May-23 A 100%ANC Calendar, PC Holidays
87 PM.PC-03 Detailed Critical Path Method Schedule BL 30 0 10-Mar-23 A 02-May-23 A 100%ANC Calendar, PC Holidays
88 PM.PC-04 RA Detailed Critical Path Method Schedule BL 14 0 21-Apr-23 A 02-Oct-23 A 100%ANC Calendar, PC Holidays
89 ANC-BL 1.44.PM.IFC Engineering IFC design packagesANC-BL 1.44.PM.IFC Engineering IFC design packages 112 0 10-Mar-23 A 03-May-24 A
90 PM.IFC.01 Shoofly IFC package 1 0 25-Apr-23 A 25-Apr-23 A 100%ANC Winter off, PC Holidays
91 PM.IFC.011 IFC Civil 1 0 10-Mar-23 A 10-Mar-23 A 100%ANC Winter off, PC Holidays
92 PM.IFC.02 Physical IFC package 1 0 26-Apr-23 A 26-Apr-23 A 100%AND Winter off, not concrete
works
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
Capacitor Bank 2 Start
Construction Started
Dead End steel Start
Contractor testing Start
Forms submittal complete, testing &comssing
Civil earthworks complete
11F37 Circuit Breaker Foundation Complete
11E 33 Capacitor Bank Foundation Complete
11F37 & Switches install complete
11E 33 & Switches complete
Capacitor Bank 2 complete
Dead End steel complete
Construction Complete
Contractor testing complete
30-Aug-24, ANC-BL 1.44.MS.OF Owner Furnished Materials MILESTONES
345kV Temporary Shoo-fly materials
525kV Substation Steel & Anchor Bolts
345kV Substation Steel & Anchor Bolts
345kV CCVT (VT10)
525kV CCVT (VT9)
525kV Circuit Breakers (1 No)
525kV Shunt Capacitor #2
345kV Switches
525kV Switches
345kV Substation Dead Ends & Anchor Bolts
345kV Circuit Breakers (5 No)
PST Yard Control House
Control Panels
Reactor Current limiting 525KV
345kV 533MVA PST #1
345kV 533MVA PST #2
345kV 533MVA PST #3
345kV 533MVA PST #4
Station Service Back Up Generator, 480 VAC, 1500KW
02-Oct-23 A, ANC-BL 1.44.PM.PC Project Control
Detailed preliminary schedule
RA Detailed preliminary schedule
Detailed Critical Path Method Schedule BL
RA Detailed Critical Path Method Schedule BL
03-May-24 A, ANC-BL 1.44.PM.IFC Engineering IFC design packages
Shoofly IFC package
IFC Civil
Physical IFC package
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 2 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
93 PM.IFC.021 345kV Steel / Foundations IFC 1 0 21-Jun-23 A 21-Jun-23 A 100%AND Winter off, not concrete
works94PM.IFC.022 IFC PST Control Building Foundation 1 0 26-Apr-23 A 26-Apr-23 A 100%ANC Winter off, PC Holidays
95 PM.IFC.023 IFC PEMB Foundation Design (Summit responsibility)3 0 01-May-23 A 03-May-24 A 100%ANC Winter off, PC Holidays
96 PM.IFC.024 AN 345kV DE, SM and 500kV Equip IFC 1 0 13-Mar-23 A 14-Aug-23 A 100%ANC Calendar, PC Holidays
97 PM.IFC.025 AN CB, Shunt, Reactor Foundations IFC 1 0 10-Mar-23 A 05-Dec-23 A 100%ANC Calendar, PC Holidays
98 PM.IFC.026 Generator Pad IFC 1 0 13-Mar-23 A 01-May-24 A 100%ANC Calendar, PC Holidays
99 PM.IFC.04 IFC Electrical 1 0 10-Mar-23 A 10-Mar-23 A 100%ANC Winter off, PC Holidays
100 PM.IFC.05 IFC PNC 1 0 10-Mar-23 A 21-Oct-23 A 100%ANC Winter off, PC Holidays
101 ANC-BL 1.44.PM.PP Project PlanningANC-BL 1.44.PM.PP Project Planning 524 76 10-Mar-23 A 01-Nov-24 -1
102 PM.PP.01 Submit Letter of Credit 1 0 31-Mar-23 A 31-Mar-23 A 100%ANC Calendar, PC Holidays
103 PM.PP.02 RA Letter of Credit 1 0 31-Mar-23 A 31-Mar-23 A 100%ANC Calendar, PC Holidays
104 PM.PP.03 Submit Safety Plan 11 0 10-Mar-23 A 24-Mar-23 A 100%ANC Calendar, PC Holidays
105 PM.PP.04 RA Safety Plan 5 0 27-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays
106 PM.PP.05 Submit QA/QC Plan 25 0 10-Mar-23 A 13-Apr-23 A 100%ANC Calendar, PC Holidays
107 PM.PP.06 RA QA/QC Plan 8 0 14-Apr-23 A 25-Apr-23 A 100%ANC Calendar, PC Holidays
108 PM.PP.07 Submit Environmental Assurance plan 14 0 10-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays
109 PM.PP.08 RA Environmental Assurance plan 11 0 10-Apr-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays
110 PM.PP.09 Submit Environmental Training Plan 32 0 10-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays
111 PM.PP.10 RA Environmental Training Plan 7 0 10-Apr-23 A 17-Apr-23 A 100%ANC Calendar, PC Holidays
112 PM.PP.11 Substation SSEP 30 0 10-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays
113 PM.PP.12 RA Substation SSEP 13 0 10-Apr-23 A 21-Apr-23 A 100%ANC Calendar, PC Holidays
114 PM.PP.13 Submit SWPPP 30 0 10-Mar-23 A 07-Apr-23 A 100%ANC Calendar, PC Holidays
115 PM.PP.14 RA SWPPP 11 0 07-Apr-23 A 21-Apr-23 A 100%ANC Calendar, PC Holidays
116 PM.PP.15 Submit Concrete Mix Design 20 0 10-Mar-23 A 21-Apr-23 A 100%ANC Calendar, PC Holidays
117 PM.PP.16 RA Concrete Mix Design 14 0 22-Mar-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays
118 PM.PP.17 Submit Concrete Curing Methods Procedure 24 0 10-Mar-23 A 13-Apr-23 A 100%ANC Calendar, PC Holidays
119 PM.PP.18 RA Concrete Curing Methods Procedure 10 0 14-Apr-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays
120 PM.PP.19 Submit Cold weather concreting plan 20 0 10-Mar-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays
121 PM.PP.20 RA Cold weather concreting plan 2 0 28-Apr-23 A 24-May-23 A 100%ANC Calendar, PC Holidays
122 PM.PP.21 Submit Hot weather concreting plan 24 0 17-Mar-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays
123 PM.PP.22 RA Hot weather concreting plan 14 0 28-Apr-23 A 24-May-23 A 100%ANC Calendar, PC Holidays
124 PM.PP.23 Submit Drilled Pier Installation Plan 24 0 29-Mar-23 A 28-Apr-23 A 100%ANC Calendar, PC Holidays
125 PM.PP.24 RA Drilled Pier Installation Plan 12 0 01-May-23 A 05-May-23 A 100%ANC Calendar, PC Holidays
126 PM.PP.25 Submit Welding Procedures and plan 14 0 11-Apr-24 A 01-May-24 A 100%ANC Winter off, PC Holidays
127 PM.PP.26 RA Welding Procedures and plan 14 0 01-May-24 A 06-May-24 A 100%ANC Winter off, PC Holidays
128 PM.PP.27 Insulators Plan 13 0 08-Apr-24 A 24-Apr-24 A 100%ANC Calendar, PC Holidays
129 PM.PP.28 RA Insulators Plan 14 0 25-Apr-24 A 14-May-24 A 100%ANC Calendar, PC Holidays
130 PM.PP.29 Submit Foundation completion certificate 1 0 14-Jun-24 A 21-Jun-24 A 100%ANC Winter off, PC Holidays
131 PM.PP.30 RA Foundation completion certificate 14 0 24-Jun-24 A 15-Jul-24 A 100%ANC Winter off, PC Holidays
132 PM.PP.31 Submit Project Mechanical Comp Certificate 1 1 14-Aug-24 14-Aug-24 -39 0%ANC Calendar, PC Holidays
133 PM.PP.32 RA Project Mechanical Comp Certificate 14 14 15-Aug-24 04-Sep-24 -39 0%ANC Calendar, PC Holidays
134 PM.PP.33 Submit Mechanical Completion Test procedures 1 0 01-May-24 A 01-May-24 A 100%ANC Calendar, PC Holidays
135 PM.PP.34 RA Mechanical Completion Test procedures 14 0 03-Jun-24 A 21-Jun-24 A 100%ANC Calendar, PC Holidays
136 PM.PP.35 Submit Substation completion certificate 1 1 14-Oct-24 14-Oct-24 -41 0%ANC Winter off, PC Holidays
137 PM.PP.36 RA Substation completion certificate.14 14 15-Oct-24 01-Nov-24 -41 0%ANC Calendar, PC Holidays
138 PM.PP.37 Submit Pre-commissioning schedule and test plan 10 10 05-Aug-24 16-Aug-24 -41 0%ANC Calendar, PC Holidays
139 PM.PP.38 RA Pre-commissioning schedule and test plan 14 14 19-Aug-24 06-Sep-24 -41 0%ANC Calendar, PC Holidays
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
345kV Steel / Foundations IFC
IFC PST Control Building Foundation
IFC PEMB Foundation Design (Summit responsibility)
AN 345kV DE, SM and 500kV Equip IFC
AN CB, Shunt, Reactor Foundations IFC
Generator Pad IFC
IFC Electrical
IFC PNC
Submit Letter of Credit
RA Letter of Credit
Submit Safety Plan
RA Safety Plan
Submit QA/QC Plan
RA QA/QC Plan
Submit Environmental Assurance plan
RA Environmental Assurance plan
Submit Environmental Training Plan
RA Environmental Training Plan
Substation SSEP
RA Substation SSEP
Submit SWPPP
RA SWPPP
Submit Concrete Mix Design
RA Concrete Mix Design
Submit Concrete Curing Methods Procedure
RA Concrete Curing Methods Procedure
Submit Cold weather concreting plan
RA Cold weather concreting plan
Submit Hot weather concreting plan
RA Hot weather concreting plan
Submit Drilled Pier Installation Plan
RA Drilled Pier Installation Plan
Submit Welding Procedures and plan
RA Welding Procedures and plan
Insulators Plan
RA Insulators Plan
Submit Foundation completion certificate
RA Foundation completion certificate
Submit Project Mechanical Comp Certificate
RA Project Mechanical Comp Certificate
Submit Mechanical Completion Test procedures
RA Mechanical Completion Test procedures
Submit Substation completion certificate
Submit Pre-commissioning schedule and test plan
RA Pre-commissioning schedule and test plan
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 3 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
140 PM.PP.39 Submit Final Equipment test reports 1 1 14-Oct-24 14-Oct-24 -41 0%ANC Calendar, PC Holidays
141 PM.PP.40 RA Final Equipment test reports 14 14 15-Oct-24 01-Nov-24 -41 0%ANC Calendar, PC Holidays
142 PM.PP.45 Submit Conductors 24 0 10-Mar-23 A 02-May-23 A 100%ANC Calendar, PC Holidays
143 PM.PP.46 RA Conductors 12 0 03-May-23 A 23-May-23 A 100%ANC Calendar, PC Holidays
144 PM.PP.47 Submit Control and Power Cables 24 0 31-Mar-23 A 24-Apr-23 A 100%ANC Calendar, PC Holidays
145 PM.PP.48 RA Control and Power Cables 22 0 25-Apr-23 A 24-May-23 A 100%ANC Calendar, PC Holidays
146 PM.PP.49 Submit Battery 24 0 26-Apr-23 A 28-Apr-23 A 100%ANC Calendar, PC Holidays
147 PM.PP.50 RA Battery 45 0 28-Apr-23 A 23-May-23 A 100%ANC Calendar, PC Holidays
148 PM.PP.51 Submit Ground Grid 24 0 27-Apr-23 A 28-Apr-23 A 100%ANC Calendar, PC Holidays
149 PM.PP.52 RA Ground Grid 14 0 28-Apr-23 A 08-May-23 A 100%ANC Calendar, PC Holidays
150 PM.PP.52.1 Submit Cable Trench 24 0 01-Jun-23 A 08-Jun-23 A 100%ANC Calendar, PC Holidays
151 PM.PP.52.2 RA Cable Trench 14 0 08-Jun-23 A 05-Jul-23 A 100%ANC Calendar, PC Holidays
152 PM.PP.53 Submit Bus Materials 24 0 27-Apr-23 A 02-May-23 A 100%ANC Calendar, PC Holidays
153 PM.PP.54 RA Bus Materials 14 0 02-May-23 A 11-May-23 A 100%ANC Calendar, PC Holidays
154 PM.PP.55 Submit Post insulator 24 0 27-Apr-23 A 02-May-23 A 100%ANC Calendar, PC Holidays
155 PM.PP.56 RA Post insulator 14 0 03-May-23 A 08-May-23 A 100%ANC Calendar, PC Holidays
156 PM.PP.57 Submit Arresters 24 0 27-Apr-23 A 02-May-23 A 100%ANC Calendar, PC Holidays
157 PM.PP.58 RA Arresters 14 0 03-May-23 A 08-May-23 A 100%ANC Calendar, PC Holidays
158 PM.PP.59 Submit Transformer 1500 KVA, 150 KVA,100KVA 24 0 24-May-23 A 30-May-23 A 100%ANC Calendar, PC Holidays
159 PM.PP.69 RA Transformer 1500 KVA, 150 KVA,100KVA 14 0 31-May-23 A 19-Jun-23 A 100%ANC Calendar, PC Holidays
160 PM.PP.70 Submit Rebar Shop Drawings 345kV Steel / Foundations IFC 3 0 29-Jun-23 A 30-Jun-23 A 100%ANC Calendar, PC Holidays
161 PM.PP.71 RA Rebar Shop Drawings 345kV Steel / Foundations IFC 26 0 05-Jul-23 A 06-Jul-23 A 100%ANC Calendar, PC Holidays
162 PM.PP.80 Submit Rebar SD PST Foundation 21 0 30-Mar-23 A 27-Apr-23 A 100%ANC Calendar, PC Holidays
163 PM.PP.81 RA Rebar SD PST Foundation 14 0 28-Apr-23 A 04-May-23 A 100%ANC Calendar, PC Holidays
164 PM.PP.90 Submit Rebar SD Control Building Foundation 24 0 18-Aug-23 A 22-Aug-23 A 100%ANC Calendar, PC Holidays
165 PM.PP.91 RA Rebar SD Control Building Foundation 14 0 23-Aug-23 A 05-Sep-23 A 100%ANC Calendar, PC Holidays
166 PM.PP.92 Submit PEMB Foundation Rebar Shop Drawings 0 0 06-May-24 A 06-May-24 A 100%ANC Calendar, PC Holidays
167 PM.PP.93 RA Submit PEMB Foundation Rebar Shop Drawings 14 0 07-May-24 A 07-May-24 A 100%ANC Calendar, PC Holidays
168 PM.PP.94 Submit Rebar SD 345kV DE, SM and 500kV Equip IFC 24 0 15-Aug-23 A 15-Aug-23 A 100%ANC Calendar, PC Holidays
169 PM.PP.95 RA Rebar SD 345kV DE, SM and 500kV Equipt 1 0 16-Aug-23 A 24-Aug-23 A 100%ANC Calendar, PC Holidays
170 PM.PP.96 Submit Rebar SD CB, Shunt, Reactor Foundations I 24 0 14-Sep-23 A 27-Sep-23 A 100%ANC Calendar, PC Holidays
171 PM.PP.97 RA Rebar SD CB, Shunt, Reactor Foundations 3 0 28-Sep-23 A 02-Oct-23 A 100%ANC Calendar, PC Holidays
172 PM.PP.98 Submit REabr SD Generator Pad 0 0 14-May-24 A 22-May-24 A 100%ANC Calendar, PC Holidays
173 PM.PP.99 RA Rebar SD Generator Pad 14 0 23-May-24 A 23-May-24 A 100%ANC Calendar, PC Holidays
174 ANC-BL 1.44.P PermittingANC-BL 1.44.P Permitting 282 0 10-Mar-23 A 05-Aug-24 23 ANC Winter off, PC Holidays
175 ANC-BL 1.44.P.SL State/LocalANC-BL 1.44.P.SL State/Local 282 0 10-Mar-23 A 05-Aug-24 23 ANC Winter off, PC Holidays
176 P.SLL.01 Provision of Storm Water Pollution Prevention Permits 10 0 05-Apr-23 A 18-Apr-23 A 100%ANC Winter off, PC Holidays
177 P.SLL.02 WY Process of reviewing the NOI, SWPPP, and site map 9 0 19-Apr-23 A 01-May-23 A 100%ANC Winter off, PC Holidays
178 P.SLL.03 Building drawings from Sub 30 0 10-Mar-23 A 05-Aug-24 23 100%ANC Winter off, PC Holidays
179 P.SLL.04 RA Building drawings PC 30 0 10-Jul-24 A 12-Jul-24 A 100%ANC Winter off, PC Holidays
180 P.SLL.05 APP Review and issue the Large Construction GP 15 0 13-May-24 A 03-Jun-24 A 100%ANC Winter off, PC Holidays
181 ANC-BL 1.44.PROC ProcurementANC-BL 1.44.PROC Procurement 894 0 17-Mar-23 A 07-Jun-24 A 24/7 Procurement
182 ANC-BL 1.44.PROC.CF Contractor Furnished MaterialANC-BL 1.44.PROC.CF Contractor Furnished Material 894 0 17-Mar-23 A 07-Jun-24 A 24/7 Procurement
183 PROC.CF-01 Ordering Conductors 16 0 24-May-23 A 31-May-23 A 100%24/7 Procurement
184 PROC.CF-02 Manufacturing Conductors 80 0 01-Jun-23 A 19-Sep-23 A 100%24/7 Procurement
185 PROC.CF-03 Delivery Conductors 10 0 20-Sep-23 A 29-Sep-23 A 100%24/7 Procurement
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
Submit Final Equipment test reports
Submit Conductors
RA Conductors
Submit Control and Power Cables
RA Control and Power Cables
Submit Battery
RA Battery
Submit Ground Grid
RA Ground Grid
Submit Cable Trench
RA Cable Trench
Submit Bus Materials
RA Bus Materials
Submit Post insulator
RA Post insulator
Submit Arresters
RA Arresters
Submit Transformer 1500 KVA, 150 KVA,100KVA
RA Transformer 1500 KVA, 150 KVA,100KVA
Submit Rebar Shop Drawings 345kV Steel / Foundations IFC
RA Rebar Shop Drawings 345kV Steel / Foundations IFC
Submit Rebar SD PST Foundation
RA Rebar SD PST Foundation
Submit Rebar SD Control Building Foundation
RA Rebar SD Control Building Foundation
Submit PEMB Foundation Rebar Shop Drawings
RA Submit PEMB Foundation Rebar Shop Drawings
Submit Rebar SD 345kV DE, SM and 500kV Equip IFC
RA Rebar SD 345kV DE, SM and 500kV Equipt
Submit Rebar SD CB, Shunt, Reactor Foundations I
RA Rebar SD CB, Shunt, Reactor Foundations
Submit REabr SD Generator Pad
RA Rebar SD Generator Pad
05-Aug-24, ANC-BL 1.44.P Permitting
05-Aug-24, ANC-BL 1.44.P.SL State/Local
Provision of Storm Water Pollution Prevention Permits
WY Process of reviewing the NOI, SWPPP, and site map
Building drawings from Sub
RA Building drawings PC
APP Review and issue the Large Construction GP
07-Jun-24 A, ANC-BL 1.44.PROC Procurement
07-Jun-24 A, ANC-BL 1.44.PROC.CF Contractor Furnished Material
Ordering Conductors
Manufacturing Conductors
Delivery Conductors
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 4 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
186 PROC.CF-04 Ordering Control and Power Cables 22 0 24-May-23 A 31-May-23 A 100%24/7 Procurement
187 PROC.CF-05 Manufacturing Control and Power Cables 100 0 01-Jun-23 A 19-Sep-23 A 100%24/7 Procurement
188 PROC.CF-06 Delivery Control and Power Cables 10 0 20-Sep-23 A 30-Sep-23 A 100%24/7 Procurement
189 PROC.CF-07 Ordering Conduits 24 0 17-Mar-23 A 04-Apr-23 A 100%24/7 Procurement
190 PROC.CF-08 Manufacturing Conduits 10 0 05-Apr-23 A 28-Apr-23 A 100%24/7 Procurement
191 PROC.CF-09 Delivery Conduits 6 0 01-May-23 A 11-May-23 A 100%24/7 Procurement
192 PROC.CF-10 Ordering Ground Grid 27 0 19-May-23 A 28-May-23 A 100%24/7 Procurement
193 PROC.CF-11 Manufacturing Ground Grid 38 0 29-May-23 A 06-Jul-23 A 100%24/7 Procurement
194 PROC.CF-12 Delivery Ground Grid 6 0 01-Aug-23 A 07-Aug-23 A 100%24/7 Procurement
195 PROC.CF-12.1 Ordering Cable Trench 1 0 30-Mar-23 A 31-Mar-23 A 100%24/7 Procurement
196 PROC.CF-12.11 Manufacturing Cable Trench 181 0 01-Apr-23 A 29-Sep-23 A 100%24/7 Procurement
197 PROC.CF-12.21 Delivery Cable Trench 0 0 02-Oct-23 A 06-Oct-23 A 100%24/7 Procurement
198 PROC.CF-13 Ordering Bus Materials 28 0 17-Apr-23 A 15-May-23 A 100%24/7 Procurement
199 PROC.CF-14 Manufacturing Bus Materials 106 0 15-May-23 A 21-Sep-23 A 100%24/7 Procurement
200 PROC.CF-15 Delivery Bus Materials 2 0 22-Sep-23 A 15-Dec-23 A 100%24/7 Procurement
201 PROC.CF-16 Ordering Battery 45 0 17-Apr-23 A 01-Jun-23 A 100%24/7 Procurement
202 PROC.CF-17 Manufacturing Battery 61 0 02-Jun-23 A 02-Aug-23 A 100%24/7 Procurement
203 PROC.CF-18 Delivery Battery 390 0 03-Aug-23 A 27-Aug-23 A 100%24/7 Procurement
204 PROC.CF-19 Ordering Post insulator 22 0 20-Apr-23 A 12-May-23 A 100%24/7 Procurement
205 PROC.CF-20 Manufacturing Post insulator 25 0 06-Oct-23 A 31-Oct-23 A 100%24/7 Procurement
206 PROC.CF-21 Delivery Post insulator 136 0 31-Oct-23 A 21-Dec-23 A 100%24/7 Procurement
207 PROC.CF-22 Ordering Arresters 28 0 17-Apr-23 A 15-May-23 A 100%24/7 Procurement
208 PROC.CF-23 Manufacturing Arresters 155 0 16-May-23 A 27-Jul-23 A 100%24/7 Procurement
209 PROC.CF-24 Delivery Arresters 24 0 28-Jul-23 A 07-Aug-23 A 100%24/7 Procurement
210 PROC.CF-25 Ordering Transformer 1500 KVA, 150 KVA,100KVA (345kV YD)29 0 17-May-23 A 15-Jun-23 A 100%24/7 Procurement
211 PROC.CF-251 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 82 0 16-Jun-23 A 06-Sep-23 A 100%24/7 Procurement
212 PROC.CF-252 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 82 0 07-Sep-23 A 01-Jan-24 A 100%24/7 Procurement
213 PROC.CF-253 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 13 0 02-Jan-24 A 10-Jan-24 A 100%24/7 Procurement
214 PROC.CF-254 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 9 0 11-Jan-24 A 19-Jan-24 A 100%24/7 Procurement
215 PROC.CF-255 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 0 0 20-Jan-24 A 24-Jan-24 A 100%24/7 Procurement
216 PROC.CF-256 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 7 0 24-Jan-24 A 31-Jan-24 A 100%24/7 Procurement
217 PROC.CF-26 Manufacturing Transformer 1500 KVA, 150 KVA,100KVA 7 0 31-Jan-24 A 08-Feb-24 A 100%24/7 Procurement
218 PROC.CF-27 Delivery Transformer 1500 KVA, 150 KVA,100KVA 8 0 09-Feb-24 A 17-Feb-24 A 100%24/7 Procurement
219 PROC.CF-28 Ordering Rebar 345kV Steel / Foundations 2 0 07-Jul-23 A 07-Jul-23 A 100%24/7 Procurement
220 PROC.CF-29 Manufacturing Rebar 345kV Steel / Foundations IFC 14 0 10-Jul-23 A 24-Jul-23 A 100%24/7 Procurement
221 PROC.CF-30 Delivery Rebar 345kV Steel / Foundations IFC 2 0 25-Jul-23 A 26-Jul-23 A 100%24/7 Procurement
222 PROC.CF-31 Ordering Rebar PST Foundation 15 0 05-May-23 A 06-May-23 A 100%24/7 Procurement
223 PROC.CF-32 Rebar PST Foundation 20 0 08-May-23 A 11-May-23 A 100%24/7 Procurement
224 PROC.CF-33 Delivery Rebar PST Foundation 5 0 12-May-23 A 15-May-23 A 100%24/7 Procurement
225 PROC.CF-34 Ordering Rebar Control Building Foundation 5 0 06-Sep-23 A 07-Sep-23 A 100%24/7 Procurement
226 PROC.CF-35 Manufacturing Rebar Control Building Foundation 15 0 08-Sep-23 A 12-Sep-23 A 100%24/7 Procurement
227 PROC.CF-36 Delivery Rebar Control Building Foundation 2 0 13-Sep-23 A 15-Sep-23 A 100%24/7 Procurement
228 PROC.CF-37 Ordering rebar PEMB Foundation 6 0 08-May-24 A 08-May-24 A 100%24/7 Procurement
229 PROC.CF-38 Manufacturing Rebar PEMB Foundation 15 0 09-May-24 A 13-May-24 A 100%24/7 Procurement
230 PROC.CF-48 Delivery Rebar PEMB Foundation 15 0 13-May-24 A 17-May-24 A 100%24/7 Procurement
231 PROC.CF-49 Ordering rebar 345kV DE, SM and 500kV Equip 0 0 25-Aug-23 A 05-Sep-23 A 100%24/7 Procurement
232 PROC.CF-50 Manufacturing rebar 345kV DE, SM and 500kV Equip 20 0 06-Sep-23 A 26-Sep-23 A 100%24/7 Procurement
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
Ordering Control and Power Cables
Manufacturing Control and Power Cables
Delivery Control and Power Cables
Ordering Conduits
Manufacturing Conduits
Delivery Conduits
Ordering Ground Grid
Manufacturing Ground Grid
Delivery Ground Grid
Ordering Cable Trench
Manufacturing Cable Trench
Delivery Cable Trench
Ordering Bus Materials
Manufacturing Bus Materials
Delivery Bus Materials
Ordering Battery
Manufacturing Battery
Delivery Battery
Ordering Post insulator
Manufacturing Post insulator
Delivery Post insulator
Ordering Arresters
Manufacturing Arresters
Delivery Arresters
Ordering Transformer 1500 KVA, 150 KVA,100KVA (345kV YD)
Manufacturing Transformer 1500 KVA, 150 KVA,100KVA
Manufacturing Transformer 1500 KVA, 150 KVA,100KVA
Manufacturing Transformer 1500 KVA, 150 KVA,100KVA
Manufacturing Transformer 1500 KVA, 150 KVA,100KVA
Manufacturing Transformer 1500 KVA, 150 KVA,100KVA
Manufacturing Transformer 1500 KVA, 150 KVA,100KVA
Manufacturing Transformer 1500 KVA, 150 KVA,100KVA
Delivery Transformer 1500 KVA, 150 KVA,100KVA
Ordering Rebar 345kV Steel / Foundations
Manufacturing Rebar 345kV Steel / Foundations IFC
Delivery Rebar 345kV Steel / Foundations IFC
Ordering Rebar PST Foundation
Rebar PST Foundation
Delivery Rebar PST Foundation
Ordering Rebar Control Building Foundation
Manufacturing Rebar Control Building Foundation
Delivery Rebar Control Building Foundation
Ordering rebar PEMB Foundation
Manufacturing Rebar PEMB Foundation
Delivery Rebar PEMB Foundation
Ordering rebar 345kV DE, SM and 500kV Equip
Manufacturing rebar 345kV DE, SM and 500kV Equip
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 5 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
233 PROC.CF-51 Delivery Rebar 345kV DE, SM and 500kV Equip 1 0 27-Sep-23 A 28-Sep-23 A 100%24/7 Procurement
234 PROC.CF-52 Ordering Rebar CB, Shunt, Reactor Foundations IFC 25 0 03-Oct-23 A 05-Dec-23 A 100%24/7 Procurement
235 PROC.CF-53 Manufacturing rebar CB, Shunt, Reactor Foundations IFC 104 0 11-Jan-24 A 05-Feb-24 A 100%24/7 Procurement
236 PROC.CF-54 Delivery Rebar CB, Shunt, Reactor Foundations IFC 10 0 09-Feb-24 A 16-Feb-24 A 100%24/7 Procurement
237 PROC.CF-55 Ordering rebar Generator Pad 0 0 03-Jun-24 A 03-Jun-24 A 100%24/7 Procurement
238 PROC.CF-56 Manufacturing rebar Generator Pad 15 0 04-Jun-24 A 06-Jun-24 A 100%24/7 Procurement
239 PROC.CF-66 Delivery Rebar Generator Pad 5 0 07-Jun-24 A 07-Jun-24 A 100%24/7 Procurement
240 ANC-BL 1.44.C ConstructionANC-BL 1.44.C Construction 547 110 14-Apr-23 A 13-Dec-24 -35
241 ANC-BL 1.44.C.TL Transmission LineANC-BL 1.44.C.TL Transmission Line 301 19 02-May-23 A 07-Nov-24 -25 ANC Winter off, PC Holidays
242 ANC-BL 1.44.C.TL.SH Shoofly installANC-BL 1.44.C.TL.SH Shoofly install 7 0 02-May-23 A 10-May-23 A ANC Winter off, PC Holidays
243 C.TL.SH.01 Framing & install, and (Remove old one)5 0 02-May-23 A 08-May-23 A 100%ANC Winter off, PC Holidays
244 C.TL.SH.02 OPGW 2 0 09-May-23 A 10-May-23 A 100%ANC Winter off, PC Holidays
245 C.TL.SH.021 Fiber Optic Cable, ADSS 1 0 09-May-23 A 09-May-23 A 100%ANC Winter off, PC Holidays
246 C.TL.SH.03 Outage scheduled on 05/09/2023 (6am)-05/10/2023 (6am).1 0 10-May-23 A 10-May-23 A 100%ANC Winter off, PC Holidays
247 ANC-BL 1.44.C.TL.SHR Shoofly removeANC-BL 1.44.C.TL.SHR Shoofly remove 19 19 14-Oct-24 07-Nov-24 -25 ANC Winter off, PC Holidays
248 C.TL.SHR.01 Shoofly removal, Final Span 19 19 14-Oct-24 07-Nov-24 -25 0%ANC Winter off, PC Holidays
249 ANC-BL 1.44.C.SS SubstationANC-BL 1.44.C.SS Substation 547 110 14-Apr-23 A 13-Dec-24 -35
250 ANC-BL 1.44.C.SS.TF MOB/DMOBANC-BL 1.44.C.SS.TF MOB/DMOB 325 8 02-May-23 A 13-Dec-24 -29 ANC Winter off, PC Holidays
251 C.SS.TF.01 Temporary Office Facilities 6 0 02-May-23 A 09-May-23 A 100%ANC Winter off, PC Holidays
252 C.SS.TF.012 Mobilization 15 0 02-May-23 A 22-May-23 A 100%ANC Winter off, PC Holidays
253 C.SS.TF.02 Staging Facilities 6 0 23-May-23 A 31-May-23 A 100%ANC Winter off, PC Holidays
254 C.SS.TF.03 Temporary Construction Facilities 4 0 25-May-23 A 31-May-23 A 100%ANC Winter off, PC Holidays
255 C.SS.TF.04 Demobilization 8 8 04-Dec-24 13-Dec-24 -29 0%ANC Winter off, PC Holidays
256 ANC-BL 1.44.C.SS.CE Civil Sitework and Finisih GradeANC-BL 1.44.C.SS.CE Civil Sitework and Finisih Grade 523 86 14-Apr-23 A 13-Nov-24 -11
257 C.SS.CE.01 Dust suppression/Dust abatement 1 24 0 12-May-23 A 15-Jun-23 A 100%ANC Winter off, PC Holidays
258 C.SS.CE.02 Dust suppression/Dust abatement 2 24 0 16-Jun-23 A 22-Sep-23 A 100%ANC Winter off, PC Holidays
259 C.SS.CE.03 Dust suppression/Dust abatement 3 24 0 25-Sep-23 A 16-May-24 A 100%ANC Winter off, PC Holidays
260 C.SS.CE.04 Dust suppression/Dust abatement 4 24 0 17-May-24 A 05-Jun-24 A 100%ANC Winter off, PC Holidays
261 C.SS.CE.05 Dust suppression/Dust abatement 5 8 0 03-Jun-24 A 10-Jun-24 A 100%ANC Winter off, PC Holidays
262 C.SS.CE.06 Dust suppression/Dust abatement 6 24 0 11-Jun-24 A 17-Jul-24 A 100%ANC Winter off, PC Holidays
263 C.SS.CE.07 Installation of SWPPP Measurers 3 0 15-May-23 A 02-Oct-23 A 100%ANC Winter off, PC Holidays
264 C.SS.CE.08 Removal and site Restoration 8 8 04-Nov-24 13-Nov-24 -29 0%ANC Winter off, PC Holidays
265 ANC-BL 1.44.C.SS.CE.AW Anticline WashANC-BL 1.44.C.SS.CE.AW Anticline Wash 312 3 14-Apr-23 A 07-Aug-24 -31
266 C.SS.CE.AW.01 Survey and Staking 5 0 14-Apr-23 A 20-Apr-23 A 100%ANC Winter off, PC Holidays
267 C.SS.CE.AW.02 Excavation, New Anticline Wash 1 7 0 27-Jul-23 A 05-Oct-23 A 100%ANC Winter off, PC Holidays
268 C.SS.CE.AW.03 Excavation, New Anticline Wash 2 20 0 06-Oct-23 A 17-Nov-23 A 100%ANC Winter off, PC Holidays
269 C.SS.CE.AW.04 Fill and Grading, Existing Anticline Wash 6 3 18-Nov-23 A 07-Aug-24 -31 100%AND Winter off, not concrete
works270ANC-BL 1.44.C.SS.CE.SP Substation PadANC-BL 1.44.C.SS.CE.SP Substation Pad 245 20 17-Apr-23 A 30-Aug-24 43 ANC Winter off, PC Holidays
271 SS.CE.SP.01 Mass Site Excavation 23 0 04-May-23 A 05-Dec-23 A 100%ANC Winter off, PC Holidays
272 SS.CE.SP.02 Fill, compaction and grading 23 0 27-Jun-23 A 20-May-24 A 100%ANC Winter off, PC Holidays
273 SS.CE.SP.03 General Excavation, Spread on site 29 0 18-May-23 A 14-Jun-24 A 100%ANC Winter off, PC Holidays
274 SS.CE.SP.04 Crushed Rock, RG-2 Fill 20 20 10-Jul-23 A 30-Aug-24 -37 90%ANC Winter off, PC Holidays
275 SS.CE.SP.05 Crushed Rock, Aggregate Base Course 10 5 18-Jul-23 A 09-Aug-24 -22 85%ANC Winter off, PC Holidays
276 SS.CE.SP.06 Oil Containment Piping 25 2 13-May-24 A 06-Aug-24 41 95%ANC Winter off, PC Holidays
277 SS.CE.SP.08 Site Drainage 9 3 07-Jun-23 A 07-Aug-24 60 90%ANC Winter off, PC Holidays
278 SS.CE.SP.09 Crushed Rock, Rip Rap 10 8 17-Apr-23 A 15-Aug-24 -23 80%ANC Winter off, PC Holidays
279 SS.CE.SP.091 Substation Insulating Rock 10 10 18-Jun-24 A 21-Aug-24 -26 5%ANC Winter off, PC Holidays
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
Delivery Rebar 345kV DE, SM and 500kV Equip
Ordering Rebar CB, Shunt, Reactor Foundations IFC
Manufacturing rebar CB, Shunt, Reactor Foundations IFC
Delivery Rebar CB, Shunt, Reactor Foundations IFC
Ordering rebar Generator Pad
Manufacturing rebar Generator Pad
Delivery Rebar Generator Pad
10-May-23 A, ANC-BL 1.44.C.TL.SH Shoofly install
Framing & install, and (Remove old one)
OPGW
Fiber Optic Cable, ADSS
Outage scheduled on 05/09/2023 (6am)-05/10/2023 (6am).
Temporary Office Facilities
Mobilization
Staging Facilities
Temporary Construction Facilities
Dust suppression/Dust abatement 1
Dust suppression/Dust abatement 2
Dust suppression/Dust abatement 3
Dust suppression/Dust abatement 4
Dust suppression/Dust abatement 5
Dust suppression/Dust abatement 6
Installation of SWPPP Measurers
07-Aug-24, ANC-BL 1.44.C.SS.CE.AW Anticline Wash
Survey and Staking
Excavation, New Anticline Wash 1
Excavation, New Anticline Wash 2
Fill and Grading, Existing Anticline Wash
30-Aug-24, ANC-BL 1.44.C.SS.CE.SP Substation Pad
Mass Site Excavation
Fill, compaction and grading
General Excavation, Spread on site
Crushed Rock, RG-2 Fill
Crushed Rock, Aggregate Base Course
Oil Containment Piping
Site Drainage
Crushed Rock, Rip Rap
Substation Insulating Rock
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 6 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
280 SS.CE.SP.11 Substation Yard Rock 6 6 18-Jun-24 A 30-Aug-24 -37 5%ANC Winter off, PC Holidays
281 ANC-BL 1.44.C.SS.FND FoundationANC-BL 1.44.C.SS.FND Foundation 184 20 18-May-23 A 30-Aug-24 43 ANC Winter off, PC Holidays
282 ANC-BL 1.44.C.SS.FND.Pa Concrete - slab on gradeANC-BL 1.44.C.SS.FND.Pa Concrete - slab on grade 100 20 18-Sep-23 A 30-Aug-24 43 ANC Winter off, PC Holidays
283 SS.FND.Pa.01 345KV 3000A CIRCUIT BREAKER 23 0 09-Oct-23 A 15-Apr-24 A 100%ANC Winter off, PC Holidays
284 SS.FND.Pa.02 345KV CONTROL BUILDING FOUNDATION 10 0 18-Sep-23 A 06-Oct-23 A 100%ANC Winter off, PC Holidays
285 SS.FND.Pa.03 500KV CIRCUIT BREAKER, pad 8 0 30-Apr-24 A 09-May-24 A 100%ANC Winter off, PC Holidays
286 SS.FND.Pa.04 500KV BREAKER CONTROL CABINET FOUNDATION 3 0 02-May-24 A 16-May-24 A 100%ANC Winter off, PC Holidays
287 SS.FND.Pa.05 500KV STORAGE BUILDING 8 20 17-May-24 A 30-Aug-24 43 25%ANC Winter off, PC Holidays
288 SS.FND.Pa.06 345 Generator Pad 7 0 10-Jun-24 A 12-Jun-24 A 100%ANC Winter off, PC Holidays
289 ANC-BL 1.44.C.SS.FND.TY 345kV Concrete-drilled pier FNDANC-BL 1.44.C.SS.FND.TY 345kV Concrete-drilled pier FND 117 0 26-Jul-23 A 22-May-24 A ANC Winter off, PC Holidays
290 SS.FND.TY.01 345KVBUS SUPPORT Concrete 29 0 01-Aug-23 A 21-May-24 A 100%ANC Winter off, PC Holidays
291 SS.FND.TY.02 345KV CCVT SUPPORT 3 0 22-Aug-23 A 23-Aug-23 A 100%ANC Winter off, PC Holidays
292 SS.FND.TY.03 345KV PHASE SPACING 7 0 26-Jul-23 A 03-Nov-23 A 100%ANC Winter off, PC Holidays
293 SS.FND.TY.04 345KV SURGE ARRESTER 4 0 10-Aug-23 A 15-Aug-23 A 100%ANC Winter off, PC Holidays
294 SS.FND.TY.05 345KV STATIC SHIELD MAST 12 0 16-Oct-23 A 23-Apr-24 A 100%ANC Winter off, PC Holidays
295 SS.FND.TY.06 STATION SERVICE STRUCTURE 8 0 08-Apr-24 A 19-Apr-24 A 100%ANC Winter off, PC Holidays
296 SS.FND.TY.07 345KV JCT BOX POLE 11 0 08-Apr-24 A 23-Apr-24 A 100%ANC Winter off, PC Holidays
297 SS.FND.TY.08 345kV CCVT (VT10)11 0 08-Apr-24 A 23-Apr-24 A 100%ANC Winter off, PC Holidays
298 SS.FND.TY.18 345kV Switches, Misc 7 0 13-May-24 A 22-May-24 A 100%ANC Winter off, PC Holidays
299 ANC-BL 1.44.C.SS.FND.DP Dead End Structures PiersANC-BL 1.44.C.SS.FND.DP Dead End Structures Piers 15 0 29-Sep-23 A 11-Jun-24 A ANC Winter off, PC Holidays
300 SS.FND.DP.01 345KV 60' A-FRAME DE 15 0 29-Sep-23 A 11-Jun-24 A 100%ANC Winter off, PC Holidays
301 ANC-BL 1.44.C.SS.FND.PY 500kV Concrete-drilled pier FNDANC-BL 1.44.C.SS.FND.PY 500kV Concrete-drilled pier FND 15 0 30-Apr-24 A 12-Jun-24 A ANC Winter off, PC Holidays
302 SS.FND.PY.02 525kV CCVT (V9)2 0 13-May-24 A 12-Jun-24 A 100%ANC Winter off, PC Holidays
303 SS.FND.PY.03 525kV Circuit Breakers (5 No)3 0 30-Apr-24 A 09-May-24 A 100%ANC Winter off, PC Holidays
304 SS.FND.PY.04 Shunt Capacitor #2 5 0 14-May-24 A 10-Jun-24 A 100%ANC Winter off, PC Holidays
305 ANC-BL 1.44.C.SS.FND.RF Reactor foundationANC-BL 1.44.C.SS.FND.RF Reactor foundation 9 1 09-May-24 A 05-Aug-24 -38 ANC Winter off, PC Holidays
306 SS.FND.RF.01 525KV Reactor, Current Limiting 9 1 09-May-24 A 05-Aug-24 -38 67%ANC Winter off, PC Holidays
307 SS.FND.RF.02 Crosshole Sonic Logging 2 0 14-May-24 A 04-Jun-24 A 100%ANC Winter off, PC Holidays
308 ANC-BL 1.44.C.SS.FND.TF Transformer foundation & oil containmentANC-BL 1.44.C.SS.FND.TF Transformer foundation & oil containment 73 0 18-May-23 A 31-Aug-23 A ANC Winter off, PC Holidays
309 SS.FND.TF.01 345KV PST FOUNDATION 73 0 18-May-23 A 31-Aug-23 A 100%ANC Winter off, PC Holidays
310 ANC-BL 1.44.C.SS.GG Ground GridANC-BL 1.44.C.SS.GG Ground Grid 207 11 06-Oct-23 A 16-Aug-24 -31
311 C.SS.GG-01 Below Grade 345kV Yard 1 10 0 06-Oct-23 A 03-Jul-24 A 100%AND Winter off, not concrete
works312C.SS.GG-02 Above Grade 345kV Yard 2 10 0 17-Oct-23 A 25-Jun-24 A 100%AND Winter off, not concrete
works313C.SS.GG-03 Below Grade 500kV Yard 1 10 0 28-May-24 A 28-Jun-24 A 100%ANC Winter off, PC Holidays
314 C.SS.GG-04 Below Grade 500kV Yard 2 10 10 28-May-24 A 16-Aug-24 -26 85%ANC Winter off, PC Holidays
315 C.SS.GG-05 Above Grade 500kV Yard 3 10 10 28-May-24 A 16-Aug-24 -26 50%ANC Winter off, PC Holidays
316 ANC-BL 1.44.C.SS.CT Cable TrenchANC-BL 1.44.C.SS.CT Cable Trench 197 0 09-Oct-23 A 23-May-24 A
317 C.SS.CT.01 Cable Trench - 345kV Yard 1 10 0 09-Oct-23 A 06-Nov-23 A 100%AND Winter off, not concrete
works318C.SS.CT.02 Cable Trench - 345kV Yard 2 14 0 14-Nov-23 A 01-Dec-23 A 100%AND Winter off, not concrete
works319C.SS.CT.03 Cable Trench - 500kV Yard 1 8 0 01-May-24 A 21-May-24 A 100%ANC Winter off, PC Holidays
320 C.SS.CT.04 Cable Trench - 500kV Yard 2 8 0 21-May-24 A 23-May-24 A 100%ANC Winter off, PC Holidays
321 ANC-BL 1.44.C.SS.EC Electrical ConduitANC-BL 1.44.C.SS.EC Electrical Conduit 338 17 11-May-23 A 23-Aug-24 58
322 C.SS.EC.01 Conduit Below Grade 345kV Yard 1 13 0 11-May-23 A 25-Aug-23 A 100%ANC Winter off, PC Holidays
323 C.SS.EC.02 Conduit Below Grade 345kV Yard 2 12 0 25-Aug-23 A 21-Nov-23 A 100%AND Winter off, not concrete
works324C.SS.EC.03 Conduit Below Grade 345kV Yard 3 8 0 22-Nov-23 A 15-Jul-24 A 100%AND Winter off, not concrete
works325C.SS.EC.04 Conduit above Grade 345kV Yard 23 0 08-May-24 A 15-Jul-24 A 100%AND Winter off, not concrete
works326C.SS.EC.05 Conduit Below Grade 500kV Yard 1 23 0 23-Apr-24 A 27-Jun-24 A 100%ANC Winter off, PC Holidays
327 C.SS.EC.06 Conduit Below Grade 500kV Yard 2 20 0 01-May-24 A 09-Jul-24 A 100%ANC Winter off, PC Holidays
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
Substation Yard Rock
30-Aug-24, ANC-BL 1.44.C.SS.FND Foundation
30-Aug-24, ANC-BL 1.44.C.SS.FND.Pa Concrete - slab on grade
345KV 3000A CIRCUIT BREAKER
345KV CONTROL BUILDING FOUNDATION
500KV CIRCUIT BREAKER, pad
500KV BREAKER CONTROL CABINET FOUNDATION
500KV STORAGE BUILDING
345 Generator Pad
22-May-24 A, ANC-BL 1.44.C.SS.FND.TY 345kV Concrete-drilled pier FND
345KVBUS SUPPORT Concrete
345KV CCVT SUPPORT
345KV PHASE SPACING
345KV SURGE ARRESTER
345KV STATIC SHIELD MAST
STATION SERVICE STRUCTURE
345KV JCT BOX POLE
345kV CCVT (VT10)
345kV Switches, Misc
11-Jun-24 A, ANC-BL 1.44.C.SS.FND.DP Dead End Structures Piers
345KV 60' A-FRAME DE
12-Jun-24 A, ANC-BL 1.44.C.SS.FND.PY 500kV Concrete-drilled pier FND
525kV CCVT (V9)
525kV Circuit Breakers (5 No)
Shunt Capacitor #2
05-Aug-24, ANC-BL 1.44.C.SS.FND.RF Reactor foundation
525KV Reactor, Current Limiting
Crosshole Sonic Logging
31-Aug-23 A, ANC-BL 1.44.C.SS.FND.TF Transformer foundation & oil containment
345KV PST FOUNDATION
16-Aug-24, ANC-BL 1.44.C.SS.GG Ground Grid
Below Grade 345kV Yard 1
Above Grade 345kV Yard 2
Below Grade 500kV Yard 1
Below Grade 500kV Yard 2
Above Grade 500kV Yard 3
23-May-24 A, ANC-BL 1.44.C.SS.CT Cable Trench
Cable Trench - 345kV Yard 1
Cable Trench - 345kV Yard 2
Cable Trench - 500kV Yard 1
Cable Trench - 500kV Yard 2
23-Aug-24, ANC-BL 1.44.C.SS.EC Electrical Conduit
Conduit Below Grade 345kV Yard 1
Conduit Below Grade 345kV Yard 2
Conduit Below Grade 345kV Yard 3
Conduit above Grade 345kV Yard
Conduit Below Grade 500kV Yard 1
Conduit Below Grade 500kV Yard 2
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 7 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
328 C.SS.EC.07 Conduit Below Grade 500kV Yard 3 15 15 28-May-24 A 23-Aug-24 48 10%ANC Winter off, PC Holidays
329 C.SS.EC.08 Conduit Above Grade 500kV Yard 15 15 28-May-24 A 23-Aug-24 48 60%ANC Winter off, PC Holidays
330 ANC-BL 1.44.C.SS.F FencingANC-BL 1.44.C.SS.F Fencing 17 13 01-Aug-24 A 26-Aug-24 -33 ANC Winter off, PC Holidays
331 C.SS.FF.01 Fencing, Gates, Signs 13 13 01-Aug-24 A 26-Aug-24 -33 0%ANC Winter off, PC Holidays
332 C.SS.FF.02 Ground Fence 5 5 19-Aug-24 26-Aug-24 -33 0%ANC Winter off, PC Holidays
333 ANC-BL 1.44.C.SS.SET Steel ErectionANC-BL 1.44.C.SS.SET Steel Erection 174 79 25-Mar-24 A 22-Nov-24 -36 ANC Winter off, PC Holidays
334 ANC-BL 1.44.C.SS.SET.SET 345kV Steel ErectionANC-BL 1.44.C.SS.SET.SET 345kV Steel Erection 36 3 25-Mar-24 A 07-Aug-24 -36 ANC Winter off, PC Holidays
335 SET.SET.01 345KV BUS SUPPORT 14 0 25-Mar-24 A 26-Apr-24 A 100%ANC Winter off, PC Holidays
336 SET.SET.02 345KV, PHASE SPACING DISCONNECT SWITCH SUPPORT 10 0 26-Mar-24 A 17-May-24 A 100%ANC Winter off, PC Holidays
337 SET.SET.03 345KV PHASE CCVT SUPPORT 1 0 28-Mar-24 A 19-Jun-24 A 100%ANC Winter off, PC Holidays
338 SET.SET.04 345KV SURGE ARRESTER SUPPORT Insulators 1 0 01-Apr-24 A 05-Apr-24 A 100%ANC Winter off, PC Holidays
339 SET.SET.05 STATION SERVICE Structural Steel Substation Yard Lighting 3 2 14-May-24 A 06-Aug-24 -36 90%ANC Winter off, PC Holidays
340 SET.SET.06 345KV STATIC SHIELD MAST, and G Mat 5 0 09-Apr-24 A 02-May-24 A 100%ANC Winter off, PC Holidays
341 SET.SET.07 345KV SURGE ARRESTER SUPPORT 1 0 02-Apr-24 A 03-Apr-24 A 100%ANC Winter off, PC Holidays
342 SET.SET.08 Structural Steel, STATION SERVICE 1 3 02-Apr-24 A 07-Aug-24 -36 100%ANC Winter off, PC Holidays
343 ANC-BL 1.44.C.SS.SET.DES Dead End Structures Piers 345ANC-BL 1.44.C.SS.SET.DES Dead End Structures Piers 345 14 0 27-Mar-24 A 14-Jun-24 A ANC Winter off, PC Holidays
344 SS.SET.DES.01 345KV 60' A-FRAME DEADEND 14 0 27-Mar-24 A 14-Jun-24 A 100%ANC Winter off, PC Holidays
345 ANC-BL 1.44.C.SS.SET.STF 500kV Steel ErectionANC-BL 1.44.C.SS.SET.STF 500kV Steel Erection 19 0 22-May-24 A 05-Aug-24 -37 ANC Winter off, PC Holidays
346 SET.STF.01 525KV LOW SWITCH STRUCTURE 2 0 22-May-24 A 24-May-24 A 100%ANC Winter off, PC Holidays
347 SET.STF.02 525kV, RELOCATION OF BUS SUPPORT 1 0 12-Jun-24 A 13-Jun-24 A 100%ANC Winter off, PC Holidays
348 SET.STF.03 525KV, CCVT SUPPORT 1 0 12-Jun-24 A 13-Jun-24 A 100%ANC Winter off, PC Holidays
349 SET.STF.04 525kV, SURGE ARRESTOR SUPPORT 2 0 24-Jun-24 A 05-Aug-24 -37 100%ANC Winter off, PC Holidays
350 ANC-BL 1.44.C.SS.SET.STB Storage Builidng PE-EngineeredANC-BL 1.44.C.SS.SET.STB Storage Builidng PE-Engineered 162 76 12-Apr-24 A 22-Nov-24 -36 ANC Winter off, PC Holidays
351 SET.STB.01 Building Structure 12 12 12-Apr-24 A 23-Aug-24 -36 0%ANC Winter off, PC Holidays
352 SET.STB.02 Building Erection 1 16 16 07-Aug-24 29-Aug-24 -36 0%ANC Winter off, PC Holidays
353 SET.STB.021 Building Erection 2 16 16 29-Aug-24 23-Sep-24 -36 0%ANC Winter off, PC Holidays
354 SET.STB.022 Building Erection 3 16 16 23-Sep-24 15-Oct-24 -36 0%ANC Winter off, PC Holidays
355 SET.STB.03 Garage Doors 7 7 15-Oct-24 24-Oct-24 -36 0%ANC Winter off, PC Holidays
356 SET.STB.04 Electrical 12 12 25-Oct-24 12-Nov-24 -36 0%ANC Winter off, PC Holidays
357 SET.STB.05 Pallet Racks 8 8 12-Nov-24 22-Nov-24 -36 0%ANC Winter off, PC Holidays
358 ANC-BL 1.44.C.SS.BW Bus-WorkANC-BL 1.44.C.SS.BW Bus-Work 52 0 20-May-24 A 26-Aug-24 27 ANC Winter off, PC Holidays
359 SS.BW.01 Strain Bus,Jumpers 1 20 0 20-May-24 A 26-Aug-24 27 92%ANC Winter off, PC Holidays
360 SS.BW.011 Strain Bus,Jumpers 2 20 0 03-Jun-24 A 26-Aug-24 27 92%ANC Winter off, PC Holidays
361 SS.BW.02 Solid Bus 20 0 05-Jun-24 A 24-Jul-24 A 100%ANC Winter off, PC Holidays
362 ANC-BL 1.44.C.SS.IE Installation EquipmentANC-BL 1.44.C.SS.IE Installation Equipment 304 31 14-Sep-23 A 10-Sep-24 20
363 ANC-BL 1.44.C.SS.IE.T 345KV YardANC-BL 1.44.C.SS.IE.T 345KV Yard 296 5 14-Sep-23 A 09-Aug-24 -11
364 SS.IE.T.01 345kV CCVT (VT10)1 0 09-Apr-24 A 10-May-24 A 100%ANC Winter off, PC Holidays
365 SS.IE.T.02 345kV Circuit Breakers 20 0 18-Mar-24 A 10-May-24 A 100%AND Winter off, not concrete
works366SS.IE.T.03 345kV Switches 14 0 25-Apr-24 A 10-May-24 A 100%ANC Winter off, PC Holidays
367 SS.IE.T.04 345KV SURGE ARRESTER 1 0 01-May-24 A 10-May-24 A 100%ANC Winter off, PC Holidays
368 SS.IE.T.05 STATION SERVICE Substation Yard Lighting 3 0 13-May-24 A 03-Jun-24 A 100%ANC Winter off, PC Holidays
369 SS.IE.T.06 345KV STATIC SHIELD MAST 1 0 01-May-24 A 10-May-24 A 100%ANC Winter off, PC Holidays
370 SS.IE.T.07 345KV SURGE ARRESTER 6 0 25-Apr-24 A 20-Jun-24 A 100%ANC Winter off, PC Holidays
371 SS.IE.T.08 STATION SERVICE 3 0 25-Mar-24 A 30-Apr-24 A 100%ANC Winter off, PC Holidays
372 SS.IE.T.09 345kV 533MVA PST #1 4 0 14-Sep-23 A 19-Sep-23 A 100%ANC Winter off, PC Holidays
373 SS.IE.T.19 345kV 533MVA PST #2 5 0 20-Sep-23 A 26-Sep-23 A 100%ANC Winter off, PC Holidays
374 SS.IE.T.29 345kV 533MVA PST #3 5 0 06-Nov-23 A 17-Nov-23 A 100%AND Winter off, not concrete
works375SS.IE.T.39 345kV 533MVA PST #4 5 0 10-Nov-23 A 17-Nov-23 A 100%AND Winter off, not concrete
works
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
Conduit Below Grade 500kV Yard 3
Conduit Above Grade 500kV Yard
26-Aug-24, ANC-BL 1.44.C.SS.F Fencing
Fencing, Gates, Signs
Ground Fence
07-Aug-24, ANC-BL 1.44.C.SS.SET.SET 345kV Steel Erection
345KV BUS SUPPORT
345KV, PHASE SPACING DISCONNECT SWITCH SUPPORT
345KV PHASE CCVT SUPPORT
345KV SURGE ARRESTER SUPPORT Insulators
STATION SERVICE Structural Steel Substation Yard Lighting
345KV STATIC SHIELD MAST, and G Mat
345KV SURGE ARRESTER SUPPORT
Structural Steel, STATION SERVICE
14-Jun-24 A, ANC-BL 1.44.C.SS.SET.DES Dead End Structures Piers 345
345KV 60' A-FRAME DEADEND
05-Aug-24, ANC-BL 1.44.C.SS.SET.STF 500kV Steel Erection
525KV LOW SWITCH STRUCTURE
525kV, RELOCATION OF BUS SUPPORT
525KV, CCVT SUPPORT
525kV, SURGE ARRESTOR SUPPORT
Building Structure
Building Erection 1
Building Erection 2
Building Erection 3
26-Aug-24, ANC-BL 1.44.C.SS.BW Bus-Work
Strain Bus,Jumpers 1
Strain Bus,Jumpers 2
Solid Bus
10-Sep-24, ANC-BL 1.44.C.SS.IE Installation Equipment
09-Aug-24, ANC-BL 1.44.C.SS.IE.T 345KV Yard
345kV CCVT (VT10)
345kV Circuit Breakers
345kV Switches
345KV SURGE ARRESTER
STATION SERVICE Substation Yard Lighting
345KV STATIC SHIELD MAST
345KV SURGE ARRESTER
STATION SERVICE
345kV 533MVA PST #1
345kV 533MVA PST #2
345kV 533MVA PST #3
345kV 533MVA PST #4
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 8 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
376 SS.IE.T.40 345KV Yard Inspection and testing PacifiCorp Forms 5 5 05-Jun-24 A 09-Aug-24 -37 50%ANC Winter off, PC Holidays
377 ANC-BL 1.44.C.SS.IE.F 525kv YardANC-BL 1.44.C.SS.IE.F 525kv Yard 69 7 15-May-24 A 13-Aug-24 -39 ANC Winter off, PC Holidays
378 SS.IE.F.01 525kV CCVT (VT9)1 0 10-Jun-24 A 10-Jun-24 A 100%ANC Winter off, PC Holidays
379 SS.IE.F.02 525kV Circuit Breakers (5 No)5 0 15-May-24 A 23-May-24 A 100%ANC Winter off, PC Holidays
380 SS.IE.F.03 525kV Shunt Capacitor #2 1 2 22-Jul-24 A 06-Aug-24 -39 90%ANC Winter off, PC Holidays
381 SS.IE.F.04 525kV, SURGE ARRESTOR 5 5 12-Jun-24 A 13-Aug-24 -39 0%ANC Winter off, PC Holidays
382 SS.IE.F.05 525kV Switches 10 0 12-Jun-24 A 21-Jun-24 A 100%ANC Winter off, PC Holidays
383 SS.IE.F.15 525KV Yard Inspection and testing PacifiCorp Forms 5 5 26-Jun-24 A 13-Aug-24 -39 50%ANC Winter off, PC Holidays
384 ANC-BL 1.44.C.SS.IE.R ReactorANC-BL 1.44.C.SS.IE.R Reactor 10 5 31-Jul-24 A 13-Aug-24 -39 ANC Winter off, PC Holidays
385 SS.IE.R.01 Reactor Current limiting 525KV 1 1 31-Jul-24 A 07-Aug-24 -39 15%ANC Winter off, PC Holidays
386 SS.IE.R.11 525KV Reactor Inspection and testing PacifiCorp Forms 5 5 07-Aug-24 13-Aug-24 -39 0%ANC Winter off, PC Holidays
387 ANC-BL 1.44.C.SS.IE.P Protection & Control EquipmentANC-BL 1.44.C.SS.IE.P Protection & Control Equipment 198 0 11-Jan-24 A 24-Jul-24 A
388 SS.IE.P.01 345 kV Control and Relay Panels 30 0 11-Jan-24 A 22-May-24 A 100%AND Winter off, not concrete
works389SS.IE.P.02 345 kV Annunciator and RTU Panels 30 0 01-Jul-24 A 11-Jul-24 A 100%AND Winter off, not concrete
works390SS.IE.P.12 Forms, Inspection and testing PacifiCorp Forms 345KV Protection $ and Control Equipment5015-Jul-24 A 24-Jul-24 A 100%ANC Winter off, PC Holidays
391 ANC-BL 1.44.C.SS.IE.CH Control HouseANC-BL 1.44.C.SS.IE.CH Control House 254 5 02-Nov-23 A 09-Aug-24 -35
392 SS.IE.CH.01 Structure, internal fixtures 1 0 02-Nov-23 A 04-Dec-23 A 100%AND Winter off, not concrete
works393SS.IE.CH.02 DC Batteries, racks, Chargers 7 0 05-Dec-23 A 19-Jun-24 A 100%AND Winter off, not concrete
works394SS.IE.CH.03 Panel Installation 30 0 20-Dec-23 A 26-Jun-24 A 100%AND Winter off, not concrete
works395SS.IE.CH.13 CH Inspection and testing PacifiCorp Forms 5 5 27-Jun-24 A 09-Aug-24 -37 50%ANC Winter off, PC Holidays
396 ANC-BL 1.44.C.SS.IE.SP Station PowerANC-BL 1.44.C.SS.IE.SP Station Power 81 26 22-May-24 A 10-Sep-24 17 ANC Winter off, PC Holidays
397 SS.IE.SP.01 Transformer 1500KVA 4 0 22-May-24 A 24-May-24 A 100%ANC Winter off, PC Holidays
398 SS.IE.SP.02 Transformer 300 KVA 4 0 23-May-24 A 23-May-24 A 100%ANC Winter off, PC Holidays
399 SS.IE.SP.03 Transformer 100KVA 4 0 24-May-24 A 24-May-24 A 100%ANC Winter off, PC Holidays
400 SS.IE.SP.04 Manual Transfer Switch 4 3 10-Jun-24 A 07-Aug-24 -37 50%ANC Winter off, PC Holidays
401 SS.IE.SP.05 Safety Switch 2 2 15-Jul-24 A 06-Aug-24 -37 50%ANC Winter off, PC Holidays
402 SS.IE.SP.06 Transformer 300KVA 2 0 24-May-24 A 24-May-24 A 100%ANC Winter off, PC Holidays
403 SS.IE.SP.07 Circuit BreakerEnclosure 2 0 10-Jun-24 A 26-Jun-24 A 100%ANC Winter off, PC Holidays
404 SS.IE.SP.08 Station Service Generator, 1500kW, 480V 7 7 30-Aug-24 10-Sep-24 17 0%ANC Winter off, PC Holidays
405 SS.IE.SP.09 Panelboard, AC 1 2 10-Jun-24 A 06-Aug-24 -37 90%ANC Winter off, PC Holidays
406 SS.IE.SP.10 Station Lighting Fixtures and Outlet Assemblies 1 2 17-Jun-24 A 06-Aug-24 -37 65%ANC Winter off, PC Holidays
407 SS.IE.SP.20 SP Inspection and testing PacifiCorp Forms 5 5 08-Jul-24 A 09-Aug-24 -37 50%ANC Winter off, PC Holidays
408 ANC-BL 1.44.C.SS.CTE Cables & TerminationANC-BL 1.44.C.SS.CTE Cables & Termination 148 9 22-Jan-24 A 14-Aug-24 -27
409 SS.CET.01 Control wiring/Power cable 345kV Yard 1 Field Cable Installation 30 0 20-Apr-24 A 24-Jun-24 A 100%AND Winter off, not concrete
works410SS.CET.011 Control wiring/Power cable 345kV Yard BW Field Cable Installation0 0 25-Jun-24 A 25-Jun-24 A 100%AND Winter off, not concrete
works411SS.CET.02 Control wiring/Power cable 345kV Yard 2 33 0 05-Jun-24 A 26-Jun-24 A 100%AND Winter off, not concrete
works412SS.CET.03 Control wiring/Power cable 525kV Yard 1 7 7 05-Jun-24 A 13-Aug-24 -25 95%ANC Winter off, PC Holidays
413 SS.CET.04 Control wiring/Power cable 525kV Yard 2 9 1 05-Jun-24 A 14-Aug-24 -25 95%ANC Winter off, PC Holidays
414 SS.CET.05 345kv Yard Cable Termination 1 7 3 03-Jun-24 A 07-Aug-24 -20 95%ANC Winter off, PC Holidays
415 SS.CET.06 345kv Yard Cable Termination 2 7 3 04-Jun-24 A 07-Aug-24 -20 95%ANC Winter off, PC Holidays
416 SS.CET.07 Control House Cable Installation 20 0 22-Jan-24 A 02-Feb-24 A 100%AND Winter off, not concrete
works417SS.CET.08 Control House Cable Terminations 10 0 05-Feb-24 A 02-Jul-24 A 100%AND Winter off, not concrete
works418SS.CET.09 525kV Yard Cable Termination 6 0 06-Jun-24 A 24-Jul-24 A 100%ANC Winter off, PC Holidays
419 ANC-BL 1.44.TST Testing & CommissioningANC-BL 1.44.TST Testing & Commissioning 164 80 15-May-24 A 01-Jan-25 -41 ANC Winter off, PC Holidays
420 ANC-BL 1.44.TST.S SubstationANC-BL 1.44.TST.S Substation 164 80 15-May-24 A 01-Jan-25 -41 ANC Winter off, PC Holidays
421 ANC-BL 1.44.TST.S.ST 345kV Yard Equipment Testing & CommissioningANC-BL 1.44.TST.S.ST 345kV Yard Equipment Testing & Commissioning 91 7 15-May-24 A 17-Sep-24 -41 ANC Winter off, PC Holidays
422 TST.S.ST.01 Surge Arrestors 2 1 1 09-Sep-24 09-Sep-24 -41 0%ANC Winter off, PC Holidays
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
345KV Yard Inspection and testing PacifiCorp Forms
13-Aug-24, ANC-BL 1.44.C.SS.IE.F 525kv Yard
525kV CCVT (VT9)
525kV Circuit Breakers (5 No)
525kV Shunt Capacitor #2
525kV, SURGE ARRESTOR
525kV Switches
525KV Yard Inspection and testing PacifiCorp Forms
13-Aug-24, ANC-BL 1.44.C.SS.IE.R Reactor
Reactor Current limiting 525KV
525KV Reactor Inspection and testing PacifiCorp Forms
24-Jul-24 A, ANC-BL 1.44.C.SS.IE.P Protection & Control Equipment
345 kV Control and Relay Panels
345 kV Annunciator and RTU Panels
Forms, Inspection and testing PacifiCorp Forms 345KV Protection $ and Control Equipment
09-Aug-24, ANC-BL 1.44.C.SS.IE.CH Control House
Structure, internal fixtures
DC Batteries, racks, Chargers
Panel Installation
CH Inspection and testing PacifiCorp Forms
10-Sep-24, ANC-BL 1.44.C.SS.IE.SP Station Power
Transformer 1500KVA
Transformer 300 KVA
Transformer 100KVA
Manual Transfer Switch
Safety Switch
Transformer 300KVA
Circuit BreakerEnclosure
Station Service Generator, 1500kW, 480V
Panelboard, AC
Station Lighting Fixtures and Outlet Assemblies
SP Inspection and testing PacifiCorp Forms
14-Aug-24, ANC-BL 1.44.C.SS.CTE Cables & Termination
Control wiring/Power cable 345kV Yard 1 Field Cable Installation
Control wiring/Power cable 345kV Yard BW Field Cable Installation
Control wiring/Power cable 345kV Yard 2
Control wiring/Power cable 525kV Yard 1
Control wiring/Power cable 525kV Yard 2
345kv Yard Cable Termination 1
345kv Yard Cable Termination 2
Control House Cable Installation
Control House Cable Terminations
525kV Yard Cable Termination
17-Sep-24, ANC-BL 1.44.TST.S.ST 345kV Yard Equipment Testing & Commissioning
Surge Arrestors 2
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 9 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
423 TST.S.ST.011 MOAB / Transrupter 4 1 1 10-Sep-24 10-Sep-24 -41 0%ANC Winter off, PC Holidays
424 TST.S.ST.012 Fiber Splicing 1 1 10-Sep-24 10-Sep-24 -41 0%ANC Winter off, PC Holidays
425 ANC-BL 1.44.TST.S.ST.02 Circuit BreakersANC-BL 1.44.TST.S.ST.02 Circuit Breakers 4 0 15-May-24 A 20-May-24 A ANC Winter off, PC Holidays
426 TST.S.ST.022 SF6 Gas Charging CB (345kV) 5 3 0 15-May-24 A 17-May-24 A 100%ANC Winter off, PC Holidays
427 TST.S.ST.023 Vacuum Per CB (345kV) 5 1 0 20-May-24 A 20-May-24 A 100%ANC Winter off, PC Holidays
428 ANC-BL 1.44.TST.S.ST.03 TransformersANC-BL 1.44.TST.S.ST.03 Transformers 2 2 11-Sep-24 12-Sep-24 -41 ANC Winter off, PC Holidays
429 TST.S.ST.032 Power Transformer (W/DETC) 0 1 1 11-Sep-24 11-Sep-24 -41 0%ANC Winter off, PC Holidays
430 TST.S.ST.033 Station Service 4 1 1 12-Sep-24 12-Sep-24 -41 0%ANC Winter off, PC Holidays
431 ANC-BL 1.44.TST.S.ST.04 Instrument TransformersANC-BL 1.44.TST.S.ST.04 Instrument Transformers 3 3 12-Sep-24 16-Sep-24 -41 ANC Winter off, PC Holidays
432 TST.S.ST.041 CCVT 1 2 2 12-Sep-24 13-Sep-24 -41 0%ANC Winter off, PC Holidays
433 TST.S.ST.042 CT (Transformers) 0 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays
434 TST.S.ST.043 CT (CB's) 30 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays
435 TST.S.ST.044 Current Circuit Secondaries 30 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays
436 TST.S.ST.045 Voltage Circuit Secondaries 1 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays
437 ANC-BL 1.44.TST.S.ST.05 GroundingANC-BL 1.44.TST.S.ST.05 Grounding 1 1 16-Sep-24 16-Sep-24 -41 ANC Winter off, PC Holidays
438 TST.S.ST.051 Ground Grid Injection 1 1 1 16-Sep-24 16-Sep-24 -41 0%ANC Winter off, PC Holidays
439 ANC-BL 1.44.TST.S.ST.06 Controls CircuitsANC-BL 1.44.TST.S.ST.06 Controls Circuits 28 0 21-May-24 A 27-Jun-24 A ANC Winter off, PC Holidays
440 TST.S.ST.061 Functional Testing (Per Breaker) 5 1 0 25-Jun-24 A 25-Jun-24 A 100%ANC Winter off, PC Holidays
441 TST.S.ST.062 Functional Testing (Per Xfmr) 0 1 0 25-Jun-24 A 25-Jun-24 A 100%ANC Winter off, PC Holidays
442 TST.S.ST.063 Point to Point wire verification (Per Breaker) 5 1 0 21-May-24 A 22-May-24 A 100%ANC Winter off, PC Holidays
443 TST.S.ST.064 Point to Point wire verification (Per Transformer) 4 3 0 25-Jun-24 A 27-Jun-24 A 100%ANC Winter off, PC Holidays
444 ANC-BL 1.44.TST.S.ST.07 Cable TestingANC-BL 1.44.TST.S.ST.07 Cable Testing 1 1 17-Sep-24 17-Sep-24 -41 ANC Winter off, PC Holidays
445 TST.S.ST.071 VLF 5 1 1 17-Sep-24 17-Sep-24 -41 0%ANC Winter off, PC Holidays
446 ANC-BL 1.44.TST.S.ST.08 Low Voltage Section (Verifications)ANC-BL 1.44.TST.S.ST.08 Low Voltage Section (Verifications)1 1 17-Sep-24 17-Sep-24 -41 ANC Winter off, PC Holidays
447 TST.S.ST.081 LV Yard Panels 4 1 1 17-Sep-24 17-Sep-24 -41 0%ANC Winter off, PC Holidays
448 TST.S.ST.082 LV Yard Panels Mod's 2 1 1 17-Sep-24 17-Sep-24 -41 0%ANC Winter off, PC Holidays
449 TST.S.ST.083 LV Safety Switches 5 1 1 17-Sep-24 17-Sep-24 -41 0%ANC Winter off, PC Holidays
450 ANC-BL 1.44.TST.S.CH Control House Testing & CommissioningANC-BL 1.44.TST.S.CH Control House Testing & Commissioning 92 5 27-May-24 A 24-Sep-24 -41 ANC Winter off, PC Holidays
451 TST.S.CH.01 Reports / Project Management 1 1 18-Sep-24 18-Sep-24 -41 0%ANC Winter off, PC Holidays
452 TST.S.CH.02 Drawing Control (when customer requests) 1 1 1 18-Sep-24 18-Sep-24 -41 0%ANC Winter off, PC Holidays
453 ANC-BL 1.44.TST.S.CH.03 BatteriesANC-BL 1.44.TST.S.CH.03 Batteries 6 0 27-May-24 A 30-May-24 A ANC Winter off, PC Holidays
454 TST.S.CH.031 Battery String Testing (1hr Discharge Rate)(125V) 2 1 0 27-May-24 A 30-May-24 A 100%ANC Winter off, PC Holidays
455 TST.S.CH.032 Battery String Testing (1hr Discharge Rate)(48V) 1 2 0 28-May-24 A 29-May-24 A 100%ANC Winter off, PC Holidays
456 TST.S.CH.033 Battery Charger 3 1 0 28-May-24 A 28-May-24 A 100%ANC Winter off, PC Holidays
457 ANC-BL 1.44.TST.S.CH.04 Controls CircuitsANC-BL 1.44.TST.S.CH.04 Controls Circuits 1 0 24-Jun-24 A 24-Jun-24 A ANC Winter off, PC Holidays
458 TST.S.CH.041 Point to Point wire verification (Per Panel) 27 1 0 24-Jun-24 A 24-Jun-24 A 100%ANC Winter off, PC Holidays
459 TST.S.CH.042 Point to Point wire verification (Per Cabinet) 3 1 0 24-Jun-24 A 24-Jun-24 A 100%ANC Winter off, PC Holidays
460 TST.S.CH.043 DFR 1 1 0 24-Jun-24 A 24-Jun-24 A 100%ANC Winter off, PC Holidays
461 TST.S.CH.044 Annuncaitor 2 1 0 24-Jun-24 A 24-Jun-24 A 100%ANC Winter off, PC Holidays
462 ANC-BL 1.44.TST.S.CH.05 MiscellaneousANC-BL 1.44.TST.S.CH.05 Miscellaneous 2 2 19-Sep-24 20-Sep-24 -41 ANC Winter off, PC Holidays
463 TST.S.CH.051 HVAC 3 1 1 19-Sep-24 19-Sep-24 -41 0%ANC Winter off, PC Holidays
464 TST.S.CH.052 Building Alarms 1 1 1 20-Sep-24 20-Sep-24 -41 0%ANC Winter off, PC Holidays
465 ANC-BL 1.44.TST.S.CH.06 Low Voltage SectionANC-BL 1.44.TST.S.CH.06 Low Voltage Section 2 2 20-Sep-24 23-Sep-24 -41 ANC Winter off, PC Holidays
466 TST.S.CH.061 DCLC 4 1 1 20-Sep-24 20-Sep-24 -41 0%ANC Winter off, PC Holidays
467 TST.S.CH.062 ACLC 2 1 1 23-Sep-24 23-Sep-24 -41 0%ANC Winter off, PC Holidays
468 TST.S.CH.063 Fuse Disco 2 1 1 23-Sep-24 23-Sep-24 -41 0%ANC Winter off, PC Holidays
469 ANC-BL 1.44.TST.S.CH.07 Post Energization IR ScanANC-BL 1.44.TST.S.CH.07 Post Energization IR Scan 1 1 24-Sep-24 24-Sep-24 -41 ANC Winter off, PC Holidays
470 TST.S.CH.071 IR Scan 1 1 24-Sep-24 24-Sep-24 -41 0%ANC Winter off, PC Holidays
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
MOAB / Transrupter 4
Fiber Splicing
20-May-24 A, ANC-BL 1.44.TST.S.ST.02 Circuit Breakers
SF6 Gas Charging CB (345kV) 5
Vacuum Per CB (345kV) 5
12-Sep-24, ANC-BL 1.44.TST.S.ST.03 Transformers
Power Transformer (W/DETC) 0
Station Service 4
16-Sep-24, ANC-BL 1.44.TST.S.ST.04 Instrument Transformers
CCVT 1
CT (Transformers) 0
CT (CB's) 30
Current Circuit Secondaries 30
Voltage Circuit Secondaries 1
16-Sep-24, ANC-BL 1.44.TST.S.ST.05 Grounding
Ground Grid Injection 1
27-Jun-24 A, ANC-BL 1.44.TST.S.ST.06 Controls Circuits
Functional Testing (Per Breaker) 5
Functional Testing (Per Xfmr) 0
Point to Point wire verification (Per Breaker) 5
Point to Point wire verification (Per Transformer) 4
17-Sep-24, ANC-BL 1.44.TST.S.ST.07 Cable Testing
VLF 5
17-Sep-24, ANC-BL 1.44.TST.S.ST.08 Low Voltage Section (Verifications)
LV Yard Panels 4
LV Yard Panels Mod's 2
LV Safety Switches 5
24-Sep-24, ANC-BL 1.44.TST.S.CH Control House Testing & Commissioning
Reports / Project Management
Drawing Control (when customer requests) 1
30-May-24 A, ANC-BL 1.44.TST.S.CH.03 Batteries
Battery String Testing (1hr Discharge Rate)(125V) 2
Battery String Testing (1hr Discharge Rate)(48V) 1
Battery Charger 3
24-Jun-24 A, ANC-BL 1.44.TST.S.CH.04 Controls Circuits
Point to Point wire verification (Per Panel) 27
Point to Point wire verification (Per Cabinet) 3
DFR 1
Annuncaitor 2
20-Sep-24, ANC-BL 1.44.TST.S.CH.05 Miscellaneous
HVAC 3
Building Alarms 1
23-Sep-24, ANC-BL 1.44.TST.S.CH.06 Low Voltage Section
DCLC 4
ACLC 2
Fuse Disco 2
24-Sep-24, ANC-BL 1.44.TST.S.CH.07 Post Energization IR Scan
IR Scan
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 10 of 11 Anticline Schedule
Submmit Line Construction
#Activity ID Activity Name Original
Duration
Remaining
Duration
Start Finish Total
Float
Physical %
Complete
Calendar
471 TST.S.CH.072 Substation 1 1 1 24-Sep-24 24-Sep-24 -41 0%ANC Winter off, PC Holidays
472 TST.S.CH.073 Fuse Disco 2 1 1 24-Sep-24 24-Sep-24 -41 0%ANC Winter off, PC Holidays
473 ANC-BL 1.44.TST.S.SF 525kV Yard Equipment Testing & CommissioningANC-BL 1.44.TST.S.SF 525kV Yard Equipment Testing & Commissioning 97 13 03-Jun-24 A 11-Oct-24 -41 ANC Winter off, PC Holidays
474 ANC-BL 1.44.TST.S.SF.01 Yard Equipment-1ANC-BL 1.44.TST.S.SF.01 Yard Equipment-1 2 2 25-Sep-24 26-Sep-24 -41 ANC Winter off, PC Holidays
475 TST.S.SF.011 Air Switch Testing 1 1 25-Sep-24 25-Sep-24 -41 0%ANC Winter off, PC Holidays
476 TST.S.SF.012 Surge Arrestors 2 1 1 26-Sep-24 26-Sep-24 -41 0%ANC Winter off, PC Holidays
477 ANC-BL 1.44.TST.S.SF.02 Circuit BreakersANC-BL 1.44.TST.S.SF.02 Circuit Breakers 3 3 27-Sep-24 01-Oct-24 -41 ANC Winter off, PC Holidays
478 TST.S.SF.021 SF6 CB (345kV) 5 1 1 27-Sep-24 27-Sep-24 -41 0%ANC Winter off, PC Holidays
479 TST.S.SF.022 SF6 Gas Charging CB (345kV) 5 1 1 30-Sep-24 30-Sep-24 -41 0%ANC Winter off, PC Holidays
480 TST.S.SF.023 Vacuum Per CB (345kV) 5 1 1 01-Oct-24 01-Oct-24 -41 0%ANC Winter off, PC Holidays
481 ANC-BL 1.44.TST.S.SF.03 Instrument TransformersANC-BL 1.44.TST.S.SF.03 Instrument Transformers 4 4 02-Oct-24 07-Oct-24 -41 ANC Winter off, PC Holidays
482 TST.S.SF.031 CCVT 1 1 1 02-Oct-24 02-Oct-24 -41 0%ANC Winter off, PC Holidays
483 TST.S.SF.032 CT (CB's) 12 1 1 03-Oct-24 03-Oct-24 -41 0%ANC Winter off, PC Holidays
484 TST.S.SF.033 Current Circuit Secondaries 12 1 1 04-Oct-24 04-Oct-24 -41 0%ANC Winter off, PC Holidays
485 TST.S.SF.034 Voltage Circuit Secondaries 1 1 1 07-Oct-24 07-Oct-24 -41 0%ANC Winter off, PC Holidays
486 ANC-BL 1.44.TST.S.SF.04 Capacitors / ReactorsANC-BL 1.44.TST.S.SF.04 Capacitors / Reactors 1 1 08-Oct-24 08-Oct-24 -41 ANC Winter off, PC Holidays
487 TST.S.SF.041 Capacitor Bank 1 1 1 08-Oct-24 08-Oct-24 -41 0%ANC Winter off, PC Holidays
488 TST.S.SF.043 Dry Core Reactor 3 1 1 08-Oct-24 08-Oct-24 -41 0%ANC Winter off, PC Holidays
489 ANC-BL 1.44.TST.S.SF.05 GroundingANC-BL 1.44.TST.S.SF.05 Grounding 1 1 09-Oct-24 09-Oct-24 -41 ANC Winter off, PC Holidays
490 TST.S.SF.051 Ground Grid Injection 1 1 1 09-Oct-24 09-Oct-24 -41 0%ANC Winter off, PC Holidays
491 ANC-BL 1.44.TST.S.SF.06 Controls CircuitsANC-BL 1.44.TST.S.SF.06 Controls Circuits 2 2 10-Oct-24 11-Oct-24 -41 ANC Winter off, PC Holidays
492 TST.S.SF.061 Functional Testing (Per Breaker) 2 1 1 10-Oct-24 10-Oct-24 -41 0%ANC Winter off, PC Holidays
493 TST.S.SF.062 Point to Point wire verification (Per Breaker) 2 1 1 11-Oct-24 11-Oct-24 -41 0%ANC Winter off, PC Holidays
494 ANC-BL 1.44.TST.S.SF.07 Circuit Breakers Post Bushing Install ActivitiesANC-BL 1.44.TST.S.SF.07 Circuit Breakers Post Bushing Install Activities 3 0 03-Jun-24 A 05-Jun-24 A ANC Winter off, PC Holidays
495 TST.S.SF.071 SF6 Gas Charging (525kV) 2 1 0 03-Jun-24 A 03-Jun-24 A 100%ANC Winter off, PC Holidays
496 TST.S.SF.072 Vacuum Per CB (525kV) 2 3 0 03-Jun-24 A 05-Jun-24 A 100%ANC Winter off, PC Holidays
497 ANC-BL 1.44.TST.S.SP PunchlistANC-BL 1.44.TST.S.SP Punchlist 40 40 04-Nov-24 01-Jan-25 -41 ANC Winter off, PC Holidays
498 ANC-BL 1.44.TST.S.SP.C addressing Punchlist itemsANC-BL 1.44.TST.S.SP.C addressing Punchlist items 40 40 04-Nov-24 01-Jan-25 -41 ANC Winter off, PC Holidays
499 TSt.S.SP.C.01 Punchlist correction 1 20 20 04-Nov-24 03-Dec-24 -41 0%ANC Winter off, PC Holidays
500 TSt.S.SP.C.11 Punchlist correction 2 20 20 04-Dec-24 01-Jan-25 -41 0%ANC Winter off, PC Holidays
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
2023 2024
Substation 1
Fuse Disco 2
11-Oct-24, ANC-BL 1.44.TST.S.SF 525kV Yard Equipment Testing & Commissioning
26-Sep-24, ANC-BL 1.44.TST.S.SF.01 Yard Equipment-1
Air Switch Testing
Surge Arrestors 2
01-Oct-24, ANC-BL 1.44.TST.S.SF.02 Circuit Breakers
SF6 CB (345kV) 5
SF6 Gas Charging CB (345kV) 5
Vacuum Per CB (345kV) 5
07-Oct-24, ANC-BL 1.44.TST.S.SF.03 Instrument Transformers
CCVT 1
CT (CB's) 12
Current Circuit Secondaries 12
Voltage Circuit Secondaries 1
08-Oct-24, ANC-BL 1.44.TST.S.SF.04 Capacitors / Reactors
Capacitor Bank 1
Dry Core Reactor 3
09-Oct-24, ANC-BL 1.44.TST.S.SF.05 Grounding
Ground Grid Injection 1
11-Oct-24, ANC-BL 1.44.TST.S.SF.06 Controls Circuits
Functional Testing (Per Breaker) 2
Point to Point wire verification (Per Breaker) 2
05-Jun-24 A, ANC-BL 1.44.TST.S.SF.07 Circuit Breakers Post Bushing Install Activities
SF6 Gas Charging (525kV) 2
Vacuum Per CB (525kV) 2
Anticline Substation Classic Schedule Layout 05-Aug-24 14:53
Remaining Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Baseline Milestone
Page 11 of 11 Anticline Schedule