Loading...
HomeMy WebLinkAbout20240829PAC to Staff 131-2 - Riverton Preliminary Baseline Schedule.pdfActivity Name Start Finish Original Duration Remaining Duration PC - Riverton 01-May-24 27-Sep-24 103 103 Key Dates 22-May-24 27-Sep-24 88 88 Preliminiary Award Notification 22-May-24*0 0 Notice to Proceed 23-May-24*0 0 Contract Award 29-May-24*0 0 Mobililation Date 03-Jun-24*0 0 Substantial Completetion Date 09-Sep-24*0 0 Final Completion Date 27-Sep-24*0 0 Material 01-May-24 03-Sep-24 85 85 Owner Furnished 01-May-24 03-Sep-24 85 85 Capacitor Bank (On Site 2/13)01-May-24 0 0 Group Operated Switches (On Site 4/1)01-May-24 0 0 Static Mast and Cage (Onsite 4/8)01-May-24 0 0 Control Cable (On-Site 3/1)01-May-24 0 0 Insulators 13-May-24*0 0 Cable Trench 23-Jul-24*0 0 Breaker 03-Sep-24*0 0 Contractor Furnished 23-May-24 12-Aug-24 55 55 Bus & Grounding Conductor 23-May-24 15-Jul-24 35 35 Flood Lights 23-May-24 22-Jul-24 40 40 Bus Fittings 23-May-24 12-Aug-24 55 55 Construction Activites 03-Jul-24 19-Sep-24 54 54 South Bus Outage 03-Jul-24 19-Sep-24 54 54 Intstall Below Grade Grounding and Conduit 22-Jul-24 02-Aug-24 10 10 Install Cable Trench 05-Aug-24 09-Aug-24 5 5 Install Substation Steel 12-Aug-24 13-Aug-24 2 2 Install Substation Equipment (Switches, Capacitor Bank) 14-Aug-24 22-Aug-24 7 7 Above Grade Grounding and Conduit 23-Aug-24 27-Aug-24 3 3 Install and Terminate Cable 28-Aug-24 10-Sep-24 9 9 Install Breaker, Cables Jumpers etc.03-Sep-24 10-Sep-24 6 6 Install Overhead Jumpers and Bus Work 11-Sep-24 17-Sep-24 5 5 Sucontractor Construction Activities 24-Jun-24 16-Sep-24 58 58 Civil Activities 24-Jun-24 02-Jul-24 7 7 Fence Installation 03-Jul-24 09-Jul-24 3 3 Foundation Installation 03-Jul-24 16-Jul-24 8 8 Hydro Vac Excavations for Conduit & Ground Grid 10-Jul-24 18-Jul-24 7 7 Testing 11-Sep-24 16-Sep-24 4 4 A A M M M M J J J J J J J J J A A A A S S S S S O O O O N N N N D D D D D J 27-Sep-24, PC - Riverton 27-Sep-24, Key Dates Preliminiary Award Notification Notice to Proceed Contract Award Mobililation Date Substantial Completetion Date Final Completion Date 03-Sep-24, Material 03-Sep-24, Owner Furnished Capacitor Bank (On Site 2/13) Group Operated Switches (On Site 4/1) Static Mast and Cage (Onsite 4/8) Control Cable (On-Site 3/1) Insulators Cable Trench Breaker 12-Aug-24, Contractor Furnished Bus & Grounding Conductor Flood Lights Bus Fittings 19-Sep-24, Construction Activites South Bus Outage Intstall Below Grade Grounding and Conduit Install Cable Trench Install Substation Steel Install Substation Equipment (Switches, Capacitor Bank) Above Grade Grounding and Conduit Install and Terminate Cable Install Breaker, Cables Jumpers etc. Install Overhead Jumpers and Bus Work 16-Sep-24, Sucontractor Construction Activities Civil Activities Fence Installation Foundation Installation Hydro Vac Excavations for Conduit & Ground Grid Testing PC - Riverton Classic Schedule Layout 15-May-24 08:11 Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 1 TASK filter: All Activities © Oracle Corporation