HomeMy WebLinkAbout20240829PAC to Staff 130-2 - b.iii. GWS El A Approved Baseline Schedule 05.10.22.pdfAcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float PacifiCorp ‐ Gateway Sout hPacifiCorp ‐ Gateway South 500kV T‐Line Element A 2022‐03‐25 729.9 729.9 Jan‐14‐22 Dec‐15‐24 0.0 MilestonesMilestones 1066.0 1066.0 Jan‐14‐22 Dec‐15‐24 0.0 Key MilestonesKey Milestones 1066.0 1066.0 Jan‐14‐22 Dec‐15‐24 0.0 Cri Ɵcal & Interim MilCriƟcal & Interim Milestones 1066.0 1066.0 Jan‐14‐22 Dec‐15‐24 0.0 Overall  ProjectOverall Project 1066.0 1066.0 Jan‐14‐22 Dec‐15‐24 0.0 KM1030 Baseline Schedule Approval 0.0 0.0 0%Mar‐29‐22*0.0 KM1040 Issue QA/ QC Plan 0.0 0.0 0%Mar‐29‐22*0.0 KM1050 Issue Safety Plan 0.0 0.0 0%Mar‐29‐22*0.0 KM1060 Issue Environmental Assurance Plan 0.0 0.0 0%Mar‐30‐22*0.0 KM1090 FoundaƟons Complete 0.0 0.0 0%Jan‐20‐23*0.0 KM1100 ConstrucƟon Complete 0.0 0.0 0%Jun‐28‐24*0.0 KM1110 In‐Service Date 0.0 0.0 0%Sep‐13‐24*0.0 KM1120 As‐Built Documents 0.0 0.0 0%Sep‐15‐24*0.0 KM1130 RestoraƟon/ ReclamaƟon Complete 0.0 0.0 0%Jun‐28‐24*0.0 KM1140 Final Project CompleƟon 0.0 0.0 0%Dec‐15‐24*0.0 KM1010 Limited NoƟce to Proceed 0.0 0.0 0%Jan‐26‐22*11.0 KM1020 LeƩer of Credit 0.0 0.0 0%Jun‐01‐22*14.5 KM1080 Full NoƟce to Proceed 0.0 0.0 0%Jun‐01‐22*14.5 KM1150 LeƩer of Intent 0.0 0.0 0%Jan‐14‐22*23.0 KM1070 Site MobilizaƟon 0.0 0.0 0%Apr ‐15‐22*61.5 KM1000 Contract ExecuƟon 0.0 0.0 0%Jan‐26‐22*63.0 Element A: Constru cElement A: Construc Ɵon 958.0 958.0 Jan‐28‐22 Sep‐13‐24 0.0 KMA02 Conductor Order Placed 0.0 0.0 0%Mar‐18‐22*0.0 KMA08 Site Access/ Acces Road Complete 0.0 0.0 0%Oct ‐31‐22*0.0 KMA09 Structure Erec Ɵon Start 0.0 0.0 0%Jun‐20‐22*0.0 KMA15 OPGW Pulling Complete 0.0 0.0 0%Jan‐03‐24*0.0 KMA19 Project Element Substan Ɵal CompleƟon 0.0 0.0 0%Sep‐13‐24*0.0 KMA09.1 Structure Erec Ɵon Finish ‐ 2022 Work 0.0 0.0 0%Dec‐05‐22*0.0 KMA17 ConstrucƟon Complete 0.0 0.0 0%Feb‐01‐24*0.0 KMA18 Project Element Mechanical CompleƟon 0.0 0.0 0%Mar‐23‐24*0.0 KMA13 Reduced Tension Span Installed LiƩle Snake Subst. DE 0.0 0.0 0%Dec‐04‐23*0.2 KMA10 Structure Erec Ɵon Finish ‐ 2023 Work 0.0 0.0 0%Nov‐26‐23*0.2 KMA01 Laƫce Steel Order Placed 0.0 0.0 0%Jan‐28‐22 11.0 KMA04 First Laƫce Steel Delv 0.0 0.0 0%Jun ‐02‐22 11.0 KMA07 Site Access/ Acces Road Start 0.0 0.0 0%Jun ‐02‐22 13.5 KMA08.1 Spoƫng Complete 0.0 0.0 0%Nov‐15‐22*15.5 KMA05 First Conductor Delv 0.0 0.0 0%Jun ‐16‐22 22.0 KMA16 Contractor OPGW TesƟng Complete 0.0 0.0 0%Feb‐26‐24*27.0 KMA06 First OPGW Delv 0.0 0.0 0%Aug‐01‐22 28.9 KMA12 Reduced Tension Span Installed Aleous Subst. DE 0.0 0.0 0%Oct ‐02‐23*39.5 KMA03 OPGW Order Placed 0.0 0.0 0%Mar‐25‐22 65.0 KMA14 Wire Pulling Complete 0.0 0.0 0%Dec‐31‐23*84.0 KMA11 Wire Pulling Start 0.0 0.0 0%Jul‐24‐22 86.9 EngineeringEngineering 235.9 235.9 Jan‐26‐22 Jan‐08‐23 8.7 Detail Design & EnginDetail Design & Engineering 235.9 235.9 Jan‐26‐22 Jan‐08‐23 8.7 Access Road DesignAccess Road Design 88.9 88.9 Jan‐26‐22 May‐31‐22 8.0 Access Roads ‐ ElemAccess Roads ‐ Element A 88.9 88.9 Jan‐26‐22 May‐31‐22 8.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Dec‐15‐24, PacifiCorp ‐ G Dec‐15‐24, Milestones Dec‐15‐24, Key Mileston Dec‐15‐24, CriƟcal & Int Dec‐15‐24, Overall Proje Baseline Schedule Approval Issue QA/ QC Plan Issue Safety Plan Issue Environmental Assurance Plan FoundaƟons Complete ConstrucƟon Complete In‐Service Date As‐Built Documents RestoraƟon/ ReclamaƟon Complete Final Project CompleƟon Limited NoƟce to Proceed LeƩer of Credit Full NoƟce to Proceed LeƩer of Intent Site MobilizaƟon Contract ExecuƟon Sep‐13‐24, Element A: Construc Ɵon Conductor Order Placed Site Access/ Acces Road Complete Structure ErecƟon Start OPGW Pulling Complete Project Element Substan Ɵal Comple Structure Erec Ɵon Finish ‐ 2022 Work ConstrucƟon Complete Project Element Mechanical CompleƟon Reduced Tension Span Installed LiƩle Snake Subst. DE Structure Erec Ɵon Finish ‐ 2023 Work Laƫce Steel Order Placed First Laƫce Steel Delv Site Access/ Acces Road Start Spoƫng Complete First Conductor Delv Contractor OPGW TesƟng Complete First OPGW Delv Reduced Tension Span Installed Aleous Subst. DE OPGW Order Placed Wire Pulling Complet e Wire Pulling Start Jan ‐08‐23, Engineering Jan ‐08‐23, Detail Design & Engineering May‐31‐22, Access Road Design May‐31‐22, Access Roads ‐ Element A Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 1 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ENG‐AR220 Develop Access Road Design Package #1 29.9 29.9 0%Jan‐26‐22 Mar‐08‐22 8.0 ENG‐AR230 PAC Design Review #1 10.0 10.0 0%Mar‐09‐22 Mar‐22‐22 8.0 ENG‐AR240 Develop Access Road Design Package #2 23.0 23.0 0%Mar‐23‐22 Apr ‐22‐22 8.0 ENG‐AR250 PAC Design Review #2 10.0 10.0 0%Apr ‐25‐22 May‐06‐22 8.0 ENG‐AR260 Develop Access Road IFC Design Package 16.0 16.0 0%May‐09‐22 May‐31‐22 8.0 ENG‐AR270 IFC ‐ Access Road 0.0 0.0 0%May‐31‐22 8.0 Structure DesignStructure Design 58.0 58.0 Jan‐26‐22 Apr ‐18‐22 42.4 500kV Laƫce Struct500kV Laƫce Structures 58.0 58.0 Jan‐26‐22 Apr ‐18‐22 42.4 ENG‐LSD170 Steel Laƫce Procurement Design Package #1 17.0 17.0 0%Jan‐26‐22 Feb‐18‐22 42.4 ENG‐LSD220 PAC Design Review #1 9.0 9.0 0%Feb‐18‐22 Mar‐03‐22 42.4 ENG‐LSD230 Steel Laƫce Procurement Design Package #2 17.0 17.0 0%Mar‐03‐22 Mar‐28‐22 42.4 ENG‐LSD240 PAC Design Review #2 10.0 10.0 0%Mar‐28‐22 Apr ‐11‐22 42.4 ENG‐LSD260 IFC ‐ 500kV Laƫce Steel 5.0 5.0 0%Apr ‐11‐22 Apr ‐18‐22 42.4 Property  SupportProperty Support 89.9 89.9 Jan‐26‐22 Jun‐01‐22 32.6 ENG‐PS‐1020 Property AcquisiƟon (Completed by Owner)89.9 89.9 0%Jan‐26‐22 Jun‐01‐22 32.6 Close Out SupportsClose Out Supports 60.0 60.0 Nov‐09‐22 Jan‐08‐23 12.0 ENG‐CO‐1000 FoundaƟon Books 60.0 60.0 0%Nov‐09‐22 Jan‐08‐23 12.0 EnvironmentalEnvironmental 343.0 343.0 Jan‐26‐22 Jun‐09‐23 37.5 Environmental Field  SEnvironmental Field  Survey 343.0 343.0 Jan‐26‐22 Jun‐09‐23 37.5 ENV‐CCS‐1020 SWPPP Field Work 57.0 57.0 0%Jan‐26‐22 Apr ‐15‐22 32.9 ENV‐CCS‐1030 2022 Pre‐ConstrucƟon Biological Surveys 34.0 34.0 0%Apr ‐15‐22 Jun‐03‐22 32.9 ENV‐CCS‐1040 2023 Pre‐ConstrucƟon Biological Surveys 35.0 35.0 0%Apr ‐20‐23*Jun‐09‐23 37.5 ConstrucƟon MiƟgaƟoConstrucƟon MiƟgaƟon Plan  (Finalize POD  etc.)109.0 109.0 Feb‐24‐22 Jul‐29‐22 59.4 ENV‐CCS‐1320 Site Specific Environmental Plans (Preliminary)109.0 109.0 0%Feb‐24‐22 Jul‐29‐22 59.4 PermiƫngPermiƫng 155.9 155.9 Jan‐26‐22 Sep‐02‐22 9.4 FederalFederal 90.0 90.0 Jan‐26‐22 Jun‐02‐22 9.4 PMT‐FED‐1000 CWA Element 401/402 90.0 90.0 0%Jan‐26‐22 Jun‐02‐22 9.4 PMT‐FED‐1010 UƟlity Road Crossing Permit 90.0 90.0 0%Jan‐26‐22 Jun‐02‐22 9.4 WyomingWyoming 155.9 155.9 Jan‐26‐22 Sep‐02‐22 9.4 StateState 155.9 155.9 Jan‐26‐22 Sep‐02‐22 9.4 PMT‐STA‐1000 WYPDES Large Construc Ɵon Permit and SWPPP 79.0 79.0 0%Jan‐26‐22 May‐17‐22 9.4 PMT‐STA‐1010 Temporary Water Agreement 90.0 90.0 0%Jan‐26‐22 Jun‐02‐22 9.4 PMT‐STA‐1020 Non ‐Roadway Easement and Temporary Use Permit 112.9 112.9 0%Jan‐26‐22 Jul‐05‐22 9.4 PMT‐STA‐1030 UƟlity Road Crossing Permit 155.9 155.9 0%Jan‐26‐22 Sep‐02‐22 9.4 PMT‐STA‐1040 Air Emission ConstrucƟon Permit 90.0 90.0 0%Jan‐26‐22 Jun‐02‐22 9.4 PMT‐STA‐1190 Oversize/Overweight Permit 91.0 91.0 0%Jan‐26‐22 Jun‐03‐22 20.4 LocalLocal 79.0 79.0 Jan‐26‐22 May‐17‐22 20.4 PMT‐LOC‐1000 Building Permit Carbon County 63.0 63.0 0%Jan‐26‐22 Apr ‐25‐22 20.4 PMT‐LOC‐1010 Temporary Use Permit Carbon County 58.0 58.0 0%Jan‐26‐22 Apr ‐18‐22 20.4 PMT‐LOC‐1020 Floodplain Permit Carbon County 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 PMT‐LOC‐1030 UƟlity Crossing and Road Access (Encroachment) Permit Carbon County 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 PMT‐LOC‐1040 ConstrucƟon Permit Sweet Water County 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 PMT‐LOC‐1050 CondiƟonal Use Permit Sweet Water County 74.0 74.0 0%Jan‐26‐22 May‐10‐22 20.4 PMT‐LOC‐1060 Temporary Use Permit Sweet Water County 74.0 74.0 0%Jan‐26‐22 May‐10‐22 20.4 PMT‐LOC‐1070 UƟlity Crossing Permit Sweet Water County 74.0 74.0 0%Jan‐26‐22 May‐10‐22 20.4 PMT‐LOC‐1080 Driveway/Road Encroachment Permit Sweet Water County 74.0 74.0 0%Jan‐26‐22 May‐10‐22 20.4 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Develop Access Road Design Package #1 PAC Design Review #1 Develop Access Road Design Package #2 PAC Design Review #2 Develop Access Road IFC Design Package IFC ‐ Access Road Apr ‐18‐22, Structure Design Apr ‐18‐22, 500kV Laƫce Structures Steel Laƫce Procurement Design Package #1 PAC Design Review #1 Steel Laƫce Procurement Design Package #2 PAC Design Review #2 IFC ‐ 500kV Laƫce Steel Jun ‐01‐22, Property Support Property AcquisiƟon (Completed by Owner) Jan ‐08‐23, Close Out Supports FoundaƟon Books Jun ‐09‐23, Environmental Jun ‐09‐23, Environmental Field Survey SWPPP Field Work 2022 Pre‐ConstrucƟon Biological Surveys 2023 Pre‐ConstrucƟon Biological Surveys Jul‐29‐22, ConstrucƟon MiƟgaƟon Plan (Finalize POD etc.) Site Specific Environmental Plans (Preliminary) Sep‐02‐22, Permiƫng Jun ‐02‐22, Federal CWA Element 401/402 UƟlity Road Crossing Permit Sep‐02‐22, Wyoming Sep‐02‐22, State WYPDES Large Construc Ɵon Permit and SWPPP Temporary Water Agreement Non ‐Roadway Easement and Temporary Use Permit UƟlity Road Crossing Permit Air Emission ConstrucƟon Permit Oversize/Overweight Permit May‐17‐22, Local Building Permit Carbon County Temporary Use Permit Carbon County Floodplain Permit Carbon County UƟlity Crossing and Road Access (Encroachment) Permit Carbon County ConstrucƟon Permit Sweet Water County CondiƟonal Use Permit Sweet Water County Temporary Use Permit Sweet Water County UƟlity Crossing Permit Sweet Water County Driveway/Road Encroachment Permit Sweet Water County Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 2 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ColoradoColorado 79.0 79.0 Jan‐26‐22 May‐17‐22 20.4 StateState 79.0 79.0 Jan‐26‐22 May‐17‐22 20.4 PMT‐STA‐1060 Oversize/Overweight Permit 74.0 74.0 0%Jan‐26‐22 May‐10‐22 20.4 PMT‐STA‐1100 Element 401 Water Quality CerƟficaƟon 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 PMT‐STA‐1110 ConstrucƟon AcƟviƟes Stormwater Permit 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 PMT‐STA‐1140 APEN for Batch Plant 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 LocalLocal 79.0 79.0 Jan‐26‐22 May‐17‐22 20.4 PMT‐LOC‐1090 Temporary Use Permit Mo ffat County 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 PMT‐LOC‐1100 Building Permit Moffat County 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 PMT‐LOC‐1120 ROW Access Permit Moffat County 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 PMT‐LOC‐1130 UƟliƟes InstallaƟon Permit Moffat County 79.0 79.0 0%Jan‐26‐22 May‐17‐22 20.4 ProcurementProcurement 444.0 444.0 Jan‐26‐22 Apr ‐14‐23 77.0 Laƫce Steel TowersLaƫce Steel Towers 444.0 444.0 Jan‐26‐22 Apr ‐14‐23 77.0 MitasMitas 304.8 304.8 Jan‐29‐22 Nov‐29‐22 74.3 StubsStubs 112.0 112.0 Jan‐29‐22 May‐20‐22 22.4 PROC‐1000 ProducƟon 49.0 49.0 0%Jan‐29‐22 Mar‐18‐22 11.0 PROC‐1010 Packaging 12.0 12.0 0%Mar‐07‐22 Mar‐18‐22 22.4 PROC‐1020 FAT 0.0 0.0 0%Mar‐22‐22 22.4 PROC‐1030 Shipment 54.0 54.0 0%Mar‐28‐22 May‐20‐22 22.4 LOT 01LOT 01 103.0 103.0 Feb‐19‐22 Jun‐01‐22 11.0 PROC‐1040 ProducƟon 40.0 40.0 0%Feb‐19‐22 Mar‐30‐22 11.0 PROC‐1050 Packaging 26.0 26.0 0%Mar‐05‐22 Mar‐30‐22 11.0 PROC‐1060 FAT 0.0 0.0 0%Apr ‐06‐22 11.0 PROC‐1070 Shipment 56.0 56.0 0%Apr ‐07‐22 Jun‐01‐22 11.0 LOT 02LOT 02 110.0 110.0 Mar‐19‐22 Jul‐06‐22 53.9 PROC‐1080 ProducƟon 47.0 47.0 0%Mar‐19‐22 May‐04‐22 47.6 PROC‐1090 Packaging 33.0 33.0 0%Apr ‐02‐22 May‐04‐22 53.9 PROC‐1100 FAT 0.0 0.0 0%May‐11‐22 53.9 PROC‐1110 Shipment 56.0 56.0 0%May‐12‐22 Jul‐06‐22 53.9 LOT 03LOT 03 96.0 96.0 Apr ‐30‐22 Aug‐03‐22 79.0 PROC‐1120 ProducƟon 33.0 33.0 0%Apr ‐30‐22 Jun‐01‐22 47.6 PROC‐1130 Packaging 26.0 26.0 0%May‐07‐22 Jun‐01‐22 79.0 PROC‐1140 FAT 0.0 0.0 0%Jun‐08‐22 79.0 PROC‐1150 Shipment 56.0 56.0 0%Jun ‐09‐22 Aug‐03‐22 79.0 LOT 04LOT 04 98.0 98.0 Jun ‐02‐22 Sep‐07‐22 47.6 PROC‐1160 ProducƟon 35.0 35.0 0%Jun ‐02‐22 Jul‐06‐22 47.6 PROC‐1170 Packaging 28.0 28.0 0%Jun ‐09‐22 Jul‐06‐22 47.6 PROC‐1180 FAT 0.0 0.0 0%Jul‐13‐22 47.6 PROC‐1190 Shipment 56.0 56.0 0%Jul‐14‐22 Sep‐07‐22 47.6 LOT 05LOT 05 88.0 88.0 Jun ‐12‐22 Sep‐07‐22 47.6 PROC‐1200 ProducƟon 53.0 53.0 0%Jun ‐12‐22 Aug‐03‐22 47.6 PROC‐1210 Packaging 26.0 26.0 0%Jul‐09‐22 Aug‐03‐22 47.6 PROC‐1220 FAT 0.0 0.0 0%Aug‐10‐22 47.6 PROC‐1230 Shipment 28.0 28.0 0%Aug‐11‐22 Sep‐07‐22 47.6 LOT 06LOT 06 77.0 77.0 Jul‐23‐22 Oct ‐07‐22 52.8 PROC‐1240 ProducƟon 40.0 40.0 0%Jul‐23‐22 Aug‐31‐22 52.8 PROC‐1250 Packaging 26.0 26.0 0%Aug‐06‐22 Aug‐31‐22 52.8 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 May‐17‐22, Colorado May‐17‐22, State Oversize/Overweight Permit Element 401 Water Quality CerƟficaƟon ConstrucƟon AcƟviƟes Stormwater Permit APEN for Batch Plant May‐17‐22, Local Temporary Use Permit Mo ffat County Building Permit Moffat County ROW Access Permit Moffat County UƟliƟes InstallaƟon Permit Moffat County Apr ‐14‐23, Procurement Apr ‐14‐23, Laƫce Steel Towers Nov‐29‐22, Mitas May‐20‐22, Stubs ProducƟon Packaging FAT Shipment Jun ‐01‐22, LOT 01 ProducƟon Packaging FAT Shipment Jul‐06‐22, LOT 02 ProducƟon Packaging FAT Shipment Aug‐03‐22, LOT 03 ProducƟon Packaging FAT Shipment Sep‐07‐22, LOT 04 ProducƟon Packaging FAT Shipment Sep‐07‐22, LOT 05 ProducƟon Packaging FAT Shipment Oct ‐07‐22, LOT 06 ProducƟon Packaging Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 3 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float PROC‐1260 FAT 0.0 0.0 0%Sep‐07‐22 52.8 PROC‐1270 Shipment 30.0 30.0 0%Sep‐08‐22 Oct ‐07‐22 52.8 LOT 07LOT 07 94.8 94.8 Aug‐27‐22 Nov‐29‐22 74.3 PROC‐1280 ProducƟon 33.0 33.0 0%Aug‐27‐22 Sep‐28‐22 74.3 PROC‐1290 Packaging 18.8 18.8 0%Sep‐10‐22 Sep‐28‐22 74.3 PROC‐1300 FAT 0.0 0.0 0%Oct ‐05‐22 74.3 PROC‐1310 Shipment 55.0 55.0 0%Oct ‐05‐22 Nov‐29‐22 74.3 SA‐RASA‐RA 318.0 318.0 Jan‐26‐22 Dec‐09‐22 25.0 PrototypesPrototypes 37.0 37.0 Jan‐26‐22 Mar‐03‐22 22.0 PROC‐1320 Prototype 5GV 37.0 37.0 0%Jan‐26‐22 Mar‐03‐22 12.0 PROC‐1330 Prototype 5GV6 37.0 37.0 0%Jan‐26‐22 Mar‐03‐22 12.0 PROC‐1340 Prototype 5GVS 37.0 37.0 0%Jan‐26‐22 Mar‐03‐22 22.0 LOT 01LOT 01 103.0 103.0 Mar‐28‐22 Jul‐08‐22 82.0 PROC‐1350 Tower Mater ial 33.0 33.0 0%Mar‐28‐22 Apr ‐29‐22 25.0 PROC‐1360 FAT 33.0 33.0 0%Apr ‐04‐22 May‐06‐22 36.3 PROC‐1370 Container Loading 33.0 33.0 0%Apr ‐11‐22 May‐13‐22 36.3 PROC‐1380 Site Deliveries 33.0 33.0 0%Jun ‐06‐22 Jul‐08‐22 82.0 LOT 02LOT 02 117.0 117.0 Apr ‐25‐22 Aug‐19‐22 52.2 PROC‐1390 Tower Mater ial 47.0 47.0 0%Apr ‐25‐22 Jun‐10‐22 25.0 PROC‐1400 FAT 47.0 47.0 0%May‐02‐22 Jun‐17‐22 25.0 PROC‐1410 Container Loading 47.0 47.0 0%May‐09‐22 Jun‐24‐22 25.0 PROC‐1420 Site Deliveries 46.0 46.0 0%Jul‐05‐22 Aug‐19‐22 52.2 LOT 03LOT 03 103.0 103.0 Jun ‐06‐22 Sep‐16‐22 36.3 PROC‐1430 Tower Mater ial 33.0 33.0 0%Jun ‐06‐22 Jul‐08‐22 36.3 PROC‐1440 FAT 33.0 33.0 0%Jun ‐13‐22 Jul‐15‐22 36.3 PROC‐1450 Container Loading 33.0 33.0 0%Jun ‐20‐22 Jul‐22‐22 36.3 PROC‐1460 Site Deliveries 33.0 33.0 0%Aug‐15‐22 Sep‐16‐22 36.3 LOT 04LOT 04 102.0 102.0 Jul‐05‐22 Oct ‐14‐22 46.0 PROC‐1470 Tower Mater ial 32.0 32.0 0%Jul‐05‐22 Aug‐05‐22 25.0 PROC‐1480 FAT 32.0 32.0 0%Jul‐12‐22 Aug‐12‐22 25.0 PROC‐1490 Container Loading 32.0 32.0 0%Jul‐19‐22 Aug‐19‐22 25.0 PROC‐1500 Site Deliveries 33.0 33.0 0%Sep‐12‐22 Oct ‐14‐22 46.0 LOT 05LOT 05 79.0 79.0 Aug‐02‐22 Oct ‐19‐22 40.8 PROC‐1510 Tower Mater ial 32.0 32.0 0%Aug‐02‐22 Sep‐02‐22 40.8 PROC‐1520 FAT 32.0 32.0 0%Aug‐09‐22 Sep‐09‐22 40.8 PROC‐1530 Container Loading 32.0 32.0 0%Aug‐16‐22 Sep‐16‐22 40.8 PROC‐1540 Site Deliveries 33.0 33.0 0%Sep‐17‐22 Oct ‐19‐22 40.8 LOT 06LOT 06 103.0 103.0 Aug‐29‐22 Dec‐09‐22 25.0 PROC‐1550 Tower Mater ial 33.0 33.0 0%Aug‐29‐22 Sep‐30‐22 25.0 PROC‐1560 FAT 33.0 33.0 0%Sep‐05‐22 Oct ‐07‐22 25.0 PROC‐1570 Container Loading 33.0 33.0 0%Sep‐12‐22 Oct ‐14‐22 25.0 PROC‐1580 Site Deliveries 33.0 33.0 0%Nov‐07‐22 Dec‐09‐22 25.0 ConductorConductor 379.0 379.0 Apr ‐01‐22 Apr ‐14‐23 77.0 PROC‐1590 LOT 01‐ FabricaƟon / Delivery 76.0 76.0 0%Apr ‐01‐22 Jun‐15‐22 22.0 PROC‐1600 LOT 02‐ FabricaƟon / Delivery 106.0 106.0 0%Jul‐01‐22 Oct ‐14‐22 48.5 PROC‐1610 LOT 03‐ FabricaƟon / Delivery 123.0 123.0 0%Oct ‐15‐22 Feb‐14‐23 56.8 PROC‐1620 LOT 04‐ FabricaƟon / Delivery 103.0 103.0 0%Jan‐02‐23 Apr ‐14‐23 77.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FAT Shipment Nov‐29‐22, LOT 07 ProducƟon Packaging FAT Shipment Dec‐09‐22, SA‐RA Mar‐03‐22, Prototypes Prototype 5GV Prototype 5GV6 Prototype 5GVS Jul‐08‐22, LOT 01 Tower Mater ial FAT Container Loading Site Deliveries Aug‐19‐22, LOT 02 Tower Mater ial FAT Container Loading Site Deliveries Sep‐16‐22, LOT 03 Tower Mater ial FAT Container Loading Site Deliveries Oct ‐14‐22, LOT 04 Tower Mater ial FAT Container Loading Site Deliveries Oct ‐19‐22, LOT 05 Tower Mater ial FAT Container Loading Site Deliveries Dec‐09‐22, LOT 06 Tower Mater ial FAT Container Loading Site Deliveries Apr ‐14‐23, Conductor LOT 01‐ FabricaƟon / Delivery LOT 02‐ FabricaƟon / Delivery LOT 03‐ FabricaƟon / Delivery LOT 04‐ FabricaƟon / Delivery Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 4 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float Guy WireGuy Wire 183.0 183.0 Apr ‐01‐22 Sep‐30‐22 59.5 PROC‐1630 LOT 01‐ FabricaƟon / Delivery 61.0 61.0 0%Apr ‐01‐22 May‐31‐22 12.0 PROC‐1640 LOT 02‐ FabricaƟon / Delivery 71.0 71.0 0%Jun ‐01‐22 Aug‐10‐22 26.2 PROC‐1650 LOT 03‐ FabricaƟon / Delivery 63.0 63.0 0%Jul‐01‐22 Sep‐01‐22 39.2 PROC‐1660 LOT 04‐ FabricaƟon / Delivery 61.0 61.0 0%Aug‐01‐22 Sep‐30‐22 59.5 Shield WireShield Wire 183.0 183.0 Apr ‐01‐22 Sep‐30‐22 59.7 PROC‐1670 LOT 01‐ FabricaƟon / Delivery 61.0 61.0 0%Apr ‐01‐22 May‐31‐22 12.0 PROC‐1680 LOT 02‐ FabricaƟon / Delivery 71.0 71.0 0%Jun ‐01‐22 Aug‐10‐22 26.2 PROC‐1690 LOT 03‐ FabricaƟon / Delivery 63.0 63.0 0%Jul‐01‐22 Sep‐01‐22 49.0 PROC‐1700 LOT 04‐ FabricaƟon / Delivery 61.0 61.0 0%Aug‐01‐22 Sep‐30‐22 59.7 Conductor HardwareConductor Hardware 334.0 334.0 Apr ‐01‐22 Feb‐28‐23 48.0 PROC‐1720 LOT 01‐ FabricaƟon / Delivery 144.0 144.0 0%Apr ‐01‐22 Aug‐22‐22 28.0 PROC‐1710 LOT 00‐ FabricaƟon / Delivery 144.0 144.0 0%Apr ‐01‐22 Aug‐22‐22 48.0 PROC‐1730 LOT 02‐ FabricaƟon / Delivery 146.0 146.0 0%Jun ‐01‐22 Oct ‐24‐22 48.0 PROC‐1740 LOT 03‐ FabricaƟon / Delivery 123.0 123.0 0%Jul‐01‐22 Oct ‐31‐22 48.0 PROC‐1750 LOT 04 ‐ FabricaƟon / Delivery 120.0 120.0 0%Nov‐01‐22 Feb‐28‐23 48.0 OPGW/OPGW HardwOPGW/OPGW Hardware 260.0 260.0 May‐02‐22 Jan‐16‐23 91.7 PROC‐1760 LOT 01‐ FabricaƟon / Delivery 91.0 91.0 0%May‐02‐22 Jul‐31‐22 28.0 PROC‐1770 LOT 02‐ FabricaƟon / Delivery 77.0 77.0 0%Jul‐01‐22 Sep‐15‐22 85.8 PROC‐1780 LOT 03‐ FabricaƟon / Delivery 61.0 61.0 0%Sep‐01‐22 Oct ‐31‐22 91.7 PROC‐1790 LOT 04‐ FabricaƟon / Delivery 77.0 77.0 0%Nov‐01‐22 Jan‐16‐23 91.7 Insulator / Misc MateInsulator / Misc Material 184.0 184.0 May‐02‐22 Nov‐01‐22 28.0 PROC‐1800 LOT 01‐ FabricaƟon / Delivery 89.0 89.0 0%May‐02‐22 Jul‐29‐22 28.0 PROC‐1810 LOT 02‐ FabricaƟon / Delivery 77.0 77.0 0%Jul‐01‐22 Sep‐15‐22 28.0 PROC‐1820 LOT 03‐ FabricaƟon / Delivery 62.0 62.0 0%Sep‐01‐22 Nov‐01‐22 28.0 Construc ƟonConstrucƟon 449.0 449.0 Jun ‐01‐22 Mar‐23‐24 0.0 T‐ Line WorkT‐ Line Work 412.9 412.9 Jun ‐01‐22 Feb‐01‐24 0.0 Element A ‐ ( Aeolus  tElement A ‐ ( Aeolus  to LiƩle Snake )    148 miles 500kV 412.9 412.9 Jun ‐01‐22 Feb‐01‐24 0.0 ConstrucƟon Ac ƟviƟConstrucƟon Ac ƟviƟes 412.9 412.9 Jun ‐01‐22 Feb‐01‐24 0.0 Structure 1A-001Structure 1A-001 304.3 304.3 Sep‐24‐22 Dec‐03‐23 48.1 FDN‐1A‐001 FoundaƟons 1A‐001 0.9 0.9 0%Nov‐06‐22 Nov‐07‐22 13.8 CLR‐1A‐001 Clearing 1A‐001 0.5 0.5 0%Sep‐24‐22 Sep‐24‐22 15.6 SPT‐1A‐001 Spoƫng 1A‐001 0.5 0.5 0%Nov‐07‐22 Nov‐07‐22 20.8 ASY‐1A‐001 Tower Assembly 1A ‐001 1.3 1.3 0%Sep‐29‐23 Oct ‐01‐23 34.9 ERC‐1A‐001 Tower Erec Ɵon 1A‐001 1.3 1.3 0%Oct ‐01‐23 Oct ‐02‐23 34.9 REC‐1A‐001 ReclamaƟon 1A‐001 1.3 1.3 0%Dec‐02‐23 Dec‐03‐23 48.1 ACC ‐1A‐001 Access 1A‐001 0.5 0.5 0%Sep‐25‐22 Sep‐25‐22 55.3 Structure 1A-002Structure 1A-002 303.9 303.9 Sep‐23‐22 Dec‐02‐23 48.1 FDN‐1A‐002 FoundaƟons 1A‐002 0.9 0.9 0%Nov‐05‐22 Nov‐06‐22 13.8 CLR‐1A‐002 Clearing 1A‐002 0.5 0.5 0%Sep‐23‐22 Sep‐24‐22 15.6 SPT‐1A‐002 Spoƫng 1A‐002 0.5 0.5 0%Nov‐06‐22 Nov‐06‐22 21.3 ASY‐1A‐002 Tower Assembly 1A ‐002 1.3 1.3 0%Sep‐28‐23 Sep‐29‐23 31.2 ERC‐1A‐002 Tower Erec Ɵon 1A‐002 1.3 1.3 0%Sep‐29‐23 Oct ‐01‐23 31.2 REC‐1A‐002 ReclamaƟon 1A‐002 1.3 1.3 0%Dec‐01‐23 Dec‐02‐23 48.1 ACC ‐1A‐002 Access 1A‐002 0.5 0.5 0%Sep‐24‐22 Sep‐25‐22 54.8 Structure 1A-003Structure 1A-003 302.2 302.2 Sep‐24‐22 Dec‐01‐23 48.1 FDN‐1A‐003 FoundaƟons 1A‐003 0.9 0.9 0%Nov‐04‐22 Nov‐05‐22 13.8 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Sep‐30‐22, Guy Wire LOT 01‐ FabricaƟon / Delivery LOT 02‐ FabricaƟon / Delivery LOT 03‐ FabricaƟon / Delivery LOT 04‐ FabricaƟon / Delivery Sep‐30‐22, Shield Wir e LOT 01‐ FabricaƟon / Delivery LOT 02‐ FabricaƟon / Delivery LOT 03‐ FabricaƟon / Delivery LOT 04‐ FabricaƟon / Delivery Feb‐28‐23, Conductor Hardware LOT 01‐ FabricaƟon / Delivery LOT 00‐ FabricaƟon / Delivery LOT 02‐ FabricaƟon / Delivery LOT 03‐ FabricaƟon / Delivery LOT 04 ‐ FabricaƟon / Delivery Jan ‐16‐23, OPGW/OPGW Hardware LOT 01‐ FabricaƟon / Delivery LOT 02‐ FabricaƟon / Delivery LOT 03‐ FabricaƟon / Delivery LOT 04‐ FabricaƟon / Delivery Nov‐01‐22, Insulator / Misc Material LOT 01‐ FabricaƟon / Delivery LOT 02‐ FabricaƟon / Delivery LOT 03‐ FabricaƟon / Delivery Mar‐23‐24, Construc Ɵon Feb‐01‐24, T‐ Line Work Feb‐01‐24, Element A ‐ ( Aeolus to LiƩle Snake ) 148 miles 500kV Feb‐01‐24, ConstrucƟon AcƟviƟes Dec‐03‐23, Structure 1A‐001 FoundaƟons 1A‐001 Clearing 1A‐001 Spoƫng 1A‐001 Tower Assembly 1A ‐001 Tower Erec Ɵon 1A‐001 ReclamaƟon 1A‐001 Access 1A‐001 Dec‐02‐23, Structure 1A‐002 FoundaƟons 1A‐002 Clearing 1A‐002 Spoƫng 1A‐002 Tower Assembly 1A ‐002 Tower Erec Ɵon 1A‐002 ReclamaƟon 1A‐002 Access 1A‐002 Dec‐01‐23, Structure 1A‐003 FoundaƟons 1A‐003 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 5 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1A‐003 Clearing 1A‐003 0.5 0.5 0%Sep‐24‐22 Sep‐24‐22 15.6 SPT‐1A‐003 Spoƫng 1A‐003 0.5 0.5 0%Nov‐05‐22 Nov‐05‐22 21.7 ASY‐1A‐003 Tower Assembly 1A ‐003 1.3 1.3 0%Sep‐27‐23 Sep‐28‐23 31.2 ERC‐1A‐003 Tower Erec Ɵon 1A‐003 1.3 1.3 0%Sep‐28‐23 Sep‐29‐23 31.2 REC‐1A‐003 ReclamaƟon 1A‐003 1.3 1.3 0%Nov‐30‐23 Dec‐01‐23 48.1 ACC ‐1A‐003 Access 1A‐003 0.5 0.5 0%Sep‐24‐22 Sep‐24‐22 54.4 Structure 1A-004Structure 1A-004 302.3 302.3 Sep‐22‐22 Nov‐29‐23 48.1 FDN‐1A‐004 FoundaƟons 1A‐004 0.9 0.9 0%Nov‐03‐22 Nov‐04‐22 13.8 CLR‐1A‐004 Clearing 1A‐004 0.5 0.5 0%Sep‐22‐22 Sep‐23‐22 15.6 SPT‐1A‐004 Spoƫng 1A‐004 0.5 0.5 0%Nov‐04‐22 Nov‐04‐22 22.2 ASY‐1A‐004 Tower Assembly 1A ‐004 1.3 1.3 0%Sep‐26‐23 Sep‐27‐23 31.2 ERC‐1A‐004 Tower Erec Ɵon 1A‐004 1.3 1.3 0%Sep‐27‐23 Sep‐28‐23 31.2 REC‐1A‐004 ReclamaƟon 1A‐004 1.3 1.3 0%Nov‐28‐23 Nov‐29‐23 48.1 ACC ‐1A‐004 Access 1A‐004 0.5 0.5 0%Sep‐24‐22 Sep‐24‐22 53.9 Structure 1A-005Structure 1A-005 300.6 300.6 Sep‐23‐22 Nov‐28‐23 48.1 FDN‐1A‐005 FoundaƟons 1A‐005 0.9 0.9 0%Nov‐02‐22 Nov‐03‐22 13.8 CLR‐1A‐005 Clearing 1A‐005 0.5 0.5 0%Sep‐23‐22 Sep‐23‐22 15.6 SPT‐1A‐005 Spoƫng 1A‐005 0.5 0.5 0%Nov‐03‐22 Nov‐04‐22 22.6 ASY‐1A‐005 Tower Assembly 1A ‐005 1.3 1.3 0%Sep‐24‐23 Sep‐26‐23 31.2 ERC‐1A‐005 Tower Erec Ɵon 1A‐005 1.3 1.3 0%Sep‐26‐23 Sep‐27‐23 31.2 REC‐1A‐005 ReclamaƟon 1A‐005 1.3 1.3 0%Nov‐27‐23 Nov‐28‐23 48.1 ACC ‐1A‐005 Access 1A‐005 0.5 0.5 0%Sep‐23‐22 Sep‐24‐22 53.5 Structure 1A-006Structure 1A-006 300.2 300.2 Sep‐22‐22 Nov‐27‐23 48.1 FDN‐1A‐006 FoundaƟons 1A‐006 0.9 0.9 0%Nov‐01‐22 Nov‐02‐22 13.8 CLR‐1A‐006 Clearing 1A‐006 0.5 0.5 0%Sep‐22‐22 Sep‐22‐22 15.6 SPT‐1A‐006 Spoƫng 1A‐006 0.5 0.5 0%Nov‐02‐22 Nov‐03‐22 23.1 ASY‐1A‐006 Tower Assembly 1A ‐006 1.3 1.3 0%Sep‐23‐23 Sep‐24‐23 31.2 ERC‐1A‐006 Tower Erec Ɵon 1A‐006 1.3 1.3 0%Sep‐24‐23 Sep‐26‐23 31.2 REC‐1A‐006 ReclamaƟon 1A‐006 1.3 1.3 0%Nov‐26‐23 Nov‐27‐23 48.1 ACC ‐1A‐006 Access 1A‐006 0.5 0.5 0%Sep‐22‐22 Sep‐23‐22 53.5 Structure 1A-007Structure 1A-007 299.4 299.4 Sep‐21‐22 Nov‐26‐23 48.1 FDN‐1A‐007 FoundaƟons 1A‐007 0.9 0.9 0%Oct ‐31‐22 Nov‐01‐22 13.8 CLR‐1A‐007 Clearing 1A‐007 0.5 0.5 0%Sep‐21‐22 Sep‐22‐22 15.6 SPT‐1A‐007 Spoƫng 1A‐007 0.5 0.5 0%Nov‐01‐22 Nov‐02‐22 23.5 ASY‐1A‐007 Tower Assembly 1A ‐007 1.3 1.3 0%Sep‐22‐23 Sep‐23‐23 31.2 ERC‐1A‐007 Tower Erec Ɵon 1A‐007 1.3 1.3 0%Sep‐23‐23 Sep‐24‐23 31.2 REC‐1A‐007 ReclamaƟon 1A‐007 1.3 1.3 0%Nov‐22‐23 Nov‐26‐23 48.1 ACC ‐1A‐007 Access 1A‐007 0.5 0.5 0%Sep‐22‐22 Sep‐22‐22 53.0 Structure 1A-008Structure 1A-008 298.6 298.6 Sep‐21‐22 Nov‐22‐23 48.1 FDN‐1A‐008 FoundaƟons 1A‐008 0.9 0.9 0%Oct ‐30‐22 Oct ‐31‐22 13.8 CLR‐1A‐008 Clearing 1A‐008 0.5 0.5 0%Sep‐21‐22 Sep‐21‐22 15.6 SPT‐1A‐008 Spoƫng 1A‐008 0.5 0.5 0%Oct ‐31‐22 Nov‐01‐22 24.0 ASY‐1A‐008 Tower Assembly 1A ‐008 1.3 1.3 0%Sep‐21‐23 Sep‐22‐23 31.2 ERC‐1A‐008 Tower Erec Ɵon 1A‐008 1.3 1.3 0%Sep‐22‐23 Sep‐23‐23 31.2 REC‐1A‐008 ReclamaƟon 1A‐008 1.3 1.3 0%Nov‐21‐23 Nov‐22‐23 48.1 ACC ‐1A‐008 Access 1A‐008 0.5 0.5 0%Sep‐21‐22 Sep‐22‐22 52.5 Structure 1A-009Structure 1A-009 297.8 297.8 Sep‐20‐22 Nov‐21‐23 48.1 ASY‐1A‐009 Tower Assembly 1A ‐009 1.3 1.3 0%Sep‐19‐23 Sep‐21‐23 7.7 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1A‐003 Spoƫng 1A‐003 Tower Assembly 1A‐003 Tower Erec Ɵon 1A‐003 ReclamaƟon 1A‐003 Access 1A‐003 Nov‐29‐23, Structure 1A‐004 FoundaƟons 1A‐004 Clearing 1A‐004 Spoƫng 1A‐004 Tower Assembly 1A‐004 Tower Erec Ɵon 1A‐004 ReclamaƟon 1A‐004 Access 1A‐004 Nov‐28‐23, Structure 1A‐005 FoundaƟons 1A‐005 Clearing 1A‐005 Spoƫng 1A‐005 Tower Assembly 1A‐005 Tower Erec Ɵon 1A‐005 ReclamaƟon 1A‐005 Access 1A‐005 Nov‐27‐23, Structure 1A‐006 FoundaƟons 1A‐006 Clearing 1A‐006 Spoƫng 1A‐006 Tower Assembly 1A ‐006 Tower Erec Ɵon 1A‐006 ReclamaƟon 1A‐006 Access 1A‐006 Nov‐26‐23, Structure 1A‐007 FoundaƟons 1A‐007 Clearing 1A‐007 Spoƫng 1A‐007 Tower Assembly 1A ‐007 Tower Erec Ɵon 1A‐007 ReclamaƟon 1A‐007 Access 1A‐007 Nov‐22‐23, Structure 1A‐008 FoundaƟons 1A‐008 Clearing 1A‐008 Spoƫng 1A‐008 Tower Assembly 1A ‐008 Tower Erec Ɵon 1A‐008 ReclamaƟon 1A‐008 Access 1A‐008 Nov ‐21‐23, Structure 1A‐009 Tower Assembly 1A ‐009 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 6 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1A‐009 FoundaƟons 1A‐009 0.9 0.9 0%Oct ‐30‐22 Oct ‐30‐22 13.8 CLR‐1A‐009 Clearing 1A‐009 0.5 0.5 0%Sep‐20‐22 Sep‐21‐22 15.6 SPT‐1A‐009 Spoƫng 1A‐009 0.5 0.5 0%Oct ‐30‐22 Oct ‐31‐22 24.4 ERC‐1A‐009 Tower Erec Ɵon 1A‐009 1.3 1.3 0%Sep‐21‐23 Sep‐22‐23 31.2 REC‐1A‐009 ReclamaƟon 1A‐009 1.3 1.3 0%Nov‐20‐23 Nov‐21‐23 48.1 ACC ‐1A‐009 Access 1A‐009 0.5 0.5 0%Sep‐21‐22 Sep‐21‐22 52.1 Structure 1A-010Structure 1A-010 297.0 297.0 Sep‐20‐22 Nov‐20‐23 48.1 ASY‐1A‐010 Tower Assembly 1A ‐010 1.3 1.3 0%Sep‐18‐23 Sep‐19‐23 7.7 FDN‐1A‐010 FoundaƟons 1A‐010 0.9 0.9 0%Oct ‐29‐22 Oct ‐30‐22 13.8 CLR‐1A‐010 Clearing 1A‐010 0.5 0.5 0%Sep‐20‐22 Sep‐20‐22 15.6 SPT‐1A‐010 Spoƫng 1A‐010 0.5 0.5 0%Oct ‐30‐22 Oct ‐30‐22 24.9 ERC‐1A‐010 Tower Erec Ɵon 1A‐010 1.3 1.3 0%Sep‐19‐23 Sep‐21‐23 31.2 REC‐1A‐010 ReclamaƟon 1A‐010 1.3 1.3 0%Nov‐19‐23 Nov‐20‐23 48.1 ACC ‐1A‐010 Access 1A‐010 0.5 0.5 0%Sep‐20‐22 Sep‐21‐22 51.6 Structure 1A-011Structure 1A-011 296.2 296.2 Sep‐19‐22 Nov‐19‐23 48.1 ASY‐1A‐011 Tower Assembly 1A ‐011 1.3 1.3 0%Sep‐17‐23 Sep‐18‐23 7.7 FDN‐1A‐011 FoundaƟons 1A‐011 0.9 0.9 0%Oct ‐28‐22 Oct ‐29‐22 13.8 CLR‐1A‐011 Clearing 1A‐011 0.5 0.5 0%Sep‐19‐22 Sep‐20‐22 15.6 SPT‐1A‐011 Spoƫng 1A‐011 0.5 0.5 0%Oct ‐29‐22 Oct ‐29‐22 25.3 ERC‐1A‐011 Tower Erec Ɵon 1A‐011 1.3 1.3 0%Sep‐18‐23 Sep‐19‐23 31.2 REC‐1A‐011 ReclamaƟon 1A‐011 1.3 1.3 0%Nov‐17‐23 Nov‐19‐23 48.1 ACC ‐1A‐011 Access 1A‐011 0.5 0.5 0%Sep‐20‐22 Sep‐20‐22 51.2 Structure 1A-012Structure 1A-012 295.3 295.3 Sep‐19‐22 Nov‐17‐23 48.1 ASY‐1A‐012 Tower Assembly 1A ‐012 1.3 1.3 0%Sep‐15‐23 Sep‐17‐23 7.7 FDN‐1A‐012 FoundaƟons 1A‐012 0.9 0.9 0%Oct ‐27‐22 Oct ‐28‐22 13.8 CLR‐1A‐012 Clearing 1A‐012 0.5 0.5 0%Sep‐19‐22 Sep‐19‐22 15.6 SPT‐1A‐012 Spoƫng 1A‐012 0.5 0.5 0%Oct ‐28‐22 Oct ‐28‐22 25.8 ERC‐1A‐012 Tower Erec Ɵon 1A‐012 1.3 1.3 0%Sep‐17‐23 Sep‐18‐23 31.2 REC‐1A‐012 ReclamaƟon 1A‐012 1.3 1.3 0%Nov‐16‐23 Nov‐17‐23 48.1 ACC ‐1A‐012 Access 1A‐012 0.5 0.5 0%Sep‐19‐22 Sep‐20‐22 50.7 Structure 1A-013Structure 1A-013 294.8 294.8 Sep‐18‐22 Nov‐16‐23 48.1 FDN‐1A‐013 FoundaƟons 1A‐013 0.7 0.7 0%Nov‐09‐22 Nov‐09‐22 12.0 SPT‐1A‐013 Spoƫng 1A‐013 0.8 0.8 0%Nov‐14‐22 Nov‐15‐22 13.4 CLR‐1A‐013 Clearing 1A‐013 0.8 0.8 0%Sep‐18‐22 Sep‐19‐22 15.6 ASY‐1A‐013 Tower Assembly 1A ‐013 1.3 1.3 0%Aug‐07‐23 Aug‐09‐23 44.5 REC‐1A‐013 ReclamaƟon 1A‐013 1.0 1.0 0%Nov‐15‐23 Nov‐16‐23 48.1 ACC ‐1A‐013 Access 1A‐013 0.5 0.5 0%Sep‐19‐22 Sep‐19‐22 50.7 ERC‐1A‐013 Tower Erec Ɵon 1A‐013 1.0 1.0 0%Aug‐09‐23 Aug‐10‐23 78.3 Structure 1A-014Structure 1A-014 294.6 294.6 Sep‐17‐22 Nov‐15‐23 48.1 FDN‐1A‐014 FoundaƟons 1A‐014 0.7 0.7 0%Nov‐08‐22 Nov‐09‐22 12.0 CLR‐1A‐014 Clearing 1A‐014 0.8 0.8 0%Sep‐17‐22 Sep‐18‐22 12.7 SPT‐1A‐014 Spoƫng 1A‐014 0.8 0.8 0%Nov‐13‐22 Nov‐14‐22 13.4 ASY‐1A‐014 Tower Assembly 1A ‐014 1.0 1.0 0%Aug‐06‐23 Aug‐07‐23 44.5 REC‐1A‐014 ReclamaƟon 1A‐014 1.0 1.0 0%Nov‐14‐23 Nov‐15‐23 48.1 ACC ‐1A‐014 Access 1A‐014 0.5 0.5 0%Sep‐18‐22 Sep‐19‐22 51.1 ERC‐1A‐014 Tower Erec Ɵon 1A‐014 1.0 1.0 0%Aug‐07‐23 Aug‐08‐23 78.6 Structure 1A-015Structure 1A-015 294.4 294.4 Sep‐17‐22 Nov‐14‐23 48.1 FDN‐1A‐015 FoundaƟons 1A‐015 0.7 0.7 0%Nov‐07‐22 Nov‐08‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1A‐009 Clearing 1A‐009 Spoƫng 1A‐009 Tower Erec Ɵon 1A‐009 ReclamaƟon 1A‐009 Access 1A‐009 Nov ‐20‐23, Structure 1A‐010 Tower Assembly 1A ‐010 FoundaƟons 1A‐010 Clearing 1A‐010 Spoƫng 1A‐010 Tower Erec Ɵon 1A‐010 ReclamaƟon 1A‐010 Access 1A‐010 Nov‐19‐23, Structure 1A‐011 Tower Assembly 1A ‐011 FoundaƟons 1A‐011 Clearing 1A‐011 Spoƫng 1A‐011 Tower Erec Ɵon 1A‐011 ReclamaƟon 1A‐011 Access 1A‐011 Nov‐17‐23, Structure 1A‐012 Tower Assembly 1A‐012 FoundaƟons 1A‐012 Clearing 1A‐012 Spoƫng 1A‐012 Tower Erec Ɵon 1A‐012 ReclamaƟon 1A‐012 Access 1A‐012 Nov‐16‐23, Structure 1A‐013 FoundaƟons 1A‐013 Spoƫng 1A‐013 Clearing 1A‐013 Tower Assembly 1A ‐013 ReclamaƟon 1A‐013 Access 1A‐013 Tower Erec Ɵon 1A‐013 Nov‐15‐23, Structure 1A‐014 FoundaƟons 1A‐014 Clearing 1A‐014 Spoƫng 1A‐014 Tower Assembly 1A ‐014 ReclamaƟon 1A‐014 Access 1A‐014 Tower Erec Ɵon 1A‐014 Nov‐14‐23, Structure 1A‐015 FoundaƟons 1A‐015 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 7 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1A‐015 Clearing 1A‐015 0.8 0.8 0%Sep‐17‐22 Sep‐17‐22 12.7 SPT‐1A‐015 Spoƫng 1A‐015 0.8 0.8 0%Nov‐12‐22 Nov‐13‐22 13.4 ASY‐1A‐015 Tower Assembly 1A ‐015 1.0 1.0 0%Aug‐05‐23 Aug‐06‐23 44.5 REC‐1A‐015 ReclamaƟon 1A‐015 1.0 1.0 0%Nov‐13‐23 Nov‐14‐23 48.1 ACC ‐1A‐015 Access 1A‐015 0.5 0.5 0%Sep‐17‐22 Sep‐18‐22 51.4 ERC‐1A‐015 Tower Erec Ɵon 1A‐015 1.0 1.0 0%Aug‐06‐23 Aug‐07‐23 78.6 Structure 1A-016Structure 1A-016 294.2 294.2 Sep‐16‐22 Nov‐13‐23 48.1 FDN‐1A‐016 FoundaƟons 1A‐016 0.7 0.7 0%Nov‐07‐22 Nov‐07‐22 12.0 CLR‐1A‐016 Clearing 1A‐016 0.8 0.8 0%Sep‐16‐22 Sep‐17‐22 12.7 SPT‐1A‐016 Spoƫng 1A‐016 0.8 0.8 0%Nov‐11‐22 Nov‐12‐22 13.4 ASY‐1A‐016 Tower Assembly 1A ‐016 1.0 1.0 0%Aug‐04‐23 Aug‐05‐23 44.5 REC‐1A‐016 ReclamaƟon 1A‐016 1.0 1.0 0%Nov‐12‐23 Nov‐13‐23 48.1 ACC ‐1A‐016 Access 1A‐016 0.5 0.5 0%Sep‐17‐22 Sep‐17‐22 51.7 ERC‐1A‐016 Tower Erec Ɵon 1A‐016 1.0 1.0 0%Aug‐05‐23 Aug‐06‐23 78.6 Structure 1A-017Structure 1A-017 294.0 294.0 Sep‐15‐22 Nov‐12‐23 48.1 FDN‐1A‐017 FoundaƟons 1A‐017 0.7 0.7 0%Nov‐06‐22 Nov‐07‐22 12.0 CLR‐1A‐017 Clearing 1A‐017 0.8 0.8 0%Sep‐15‐22 Sep‐16‐22 12.7 SPT‐1A‐017 Spoƫng 1A‐017 0.8 0.8 0%Nov‐11‐22 Nov‐11‐22 13.4 ASY‐1A‐017 Tower Assembly 1A ‐017 1.0 1.0 0%Aug‐03‐23 Aug‐04‐23 44.5 REC‐1A‐017 ReclamaƟon 1A‐017 1.0 1.0 0%Nov‐11‐23 Nov‐12‐23 48.1 ACC ‐1A‐017 Access 1A‐017 0.5 0.5 0%Sep‐16‐22 Sep‐16‐22 52.0 ERC‐1A‐017 Tower Erec Ɵon 1A‐017 1.0 1.0 0%Aug‐04‐23 Aug‐05‐23 78.6 Structure 1A-018Structure 1A-018 293.7 293.7 Sep‐14‐22 Nov‐11‐23 48.1 FDN‐1A‐018 FoundaƟons 1A‐018 0.7 0.7 0%Nov‐05‐22 Nov‐06‐22 12.0 CLR‐1A‐018 Clearing 1A‐018 0.8 0.8 0%Sep‐14‐22 Sep‐15‐22 12.7 SPT‐1A‐018 Spoƫng 1A‐018 0.8 0.8 0%Nov‐10‐22 Nov‐11‐22 13.4 ASY‐1A‐018 Tower Assembly 1A ‐018 1.0 1.0 0%Aug‐02‐23 Aug‐03‐23 44.5 REC‐1A‐018 ReclamaƟon 1A‐018 1.0 1.0 0%Nov‐10‐23 Nov‐11‐23 48.1 ACC ‐1A‐018 Access 1A‐018 0.5 0.5 0%Sep‐15‐22 Sep‐16‐22 52.4 ERC‐1A‐018 Tower Erec Ɵon 1A‐018 1.0 1.0 0%Aug‐03‐23 Aug‐04‐23 78.6 Structure 1A-019Structure 1A-019 293.5 293.5 Sep‐14‐22 Nov‐10‐23 48.1 FDN‐1A‐019 FoundaƟons 1A‐019 0.7 0.7 0%Nov‐05‐22 Nov‐05‐22 12.0 CLR‐1A‐019 Clearing 1A‐019 0.8 0.8 0%Sep‐14‐22 Sep‐14‐22 12.7 SPT‐1A‐019 Spoƫng 1A‐019 0.8 0.8 0%Nov‐09‐22 Nov‐10‐22 13.4 ASY‐1A‐019 Tower Assembly 1A ‐019 1.0 1.0 0%Aug‐01‐23 Aug‐02‐23 44.5 REC‐1A‐019 ReclamaƟon 1A‐019 1.0 1.0 0%Nov‐09‐23 Nov‐10‐23 48.1 ACC ‐1A‐019 Access 1A‐019 0.5 0.5 0%Sep‐14‐22 Sep‐15‐22 52.7 ERC‐1A‐019 Tower Erec Ɵon 1A‐019 1.0 1.0 0%Aug‐02‐23 Aug‐03‐23 78.6 Structure 1A-020Structure 1A-020 293.3 293.3 Sep‐13‐22 Nov‐09‐23 48.1 ASY‐1A‐020 Tower Assembly 1A ‐020 1.0 1.0 0%Jul‐31‐23 Aug‐01‐23 0.0 FDN‐1A‐020 FoundaƟons 1A‐020 0.7 0.7 0%Nov‐04‐22 Nov‐05‐22 12.0 CLR‐1A‐020 Clearing 1A‐020 0.8 0.8 0%Sep‐13‐22 Sep‐14‐22 12.7 SPT‐1A‐020 Spoƫng 1A‐020 0.8 0.8 0%Nov‐08‐22 Nov‐09‐22 13.4 REC‐1A‐020 ReclamaƟon 1A‐020 1.0 1.0 0%Nov‐08‐23 Nov‐09‐23 48.1 ACC ‐1A‐020 Access 1A‐020 0.5 0.5 0%Sep‐14‐22 Sep‐14‐22 53.0 ERC‐1A‐020 Tower Erec Ɵon 1A‐020 1.0 1.0 0%Aug‐01‐23 Aug‐02‐23 78.6 Structure 1A-021Structure 1A-021 293.1 293.1 Sep‐12‐22 Nov‐08‐23 48.1 ASY‐1A‐021 Tower Assembly 1A ‐021 1.0 1.0 0%Jul‐30‐23 Jul‐31‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1A‐015 Spoƫng 1A‐015 Tower Assembly 1A ‐015 ReclamaƟon 1A‐015 Access 1A‐015 Tower Erec Ɵon 1A‐015 Nov‐13‐23, Structure 1A‐016 FoundaƟons 1A‐016 Clearing 1A‐016 Spoƫng 1A‐016 Tower Assembly 1A ‐016 ReclamaƟon 1A‐016 Access 1A‐016 Tower Erec Ɵon 1A‐016 Nov‐12‐23, Structure 1A‐017 FoundaƟons 1A‐017 Clearing 1A‐017 Spoƫng 1A‐017 Tower Assembly 1A‐017 ReclamaƟon 1A‐017 Access 1A‐017 Tower Erec Ɵon 1A‐017 Nov‐11‐23, Structure 1A‐018 FoundaƟons 1A‐018 Clearing 1A‐018 Spoƫng 1A‐018 Tower Assembly 1A‐018 ReclamaƟon 1A‐018 Access 1A‐018 Tower Erec Ɵon 1A‐018 Nov‐10‐23, Structure 1A‐019 FoundaƟons 1A‐019 Clearing 1A‐019 Spoƫng 1A‐019 Tower Assembly 1A‐019 ReclamaƟon 1A‐019 Access 1A‐019 Tower Erec Ɵon 1A‐019 Nov‐09‐23, Structure 1A‐020 Tower Assembly 1A‐020 FoundaƟons 1A‐020 Clearing 1A‐020 Spoƫng 1A‐020 ReclamaƟon 1A‐020 Access 1A‐020 Tower Erec Ɵon 1A‐020 Nov‐08‐23, Structure 1A‐021 Tower Assembly 1A ‐021 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 8 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1A‐021 FoundaƟons 1A‐021 0.7 0.7 0%Nov‐03‐22 Nov‐04‐22 12.0 CLR‐1A‐021 Clearing 1A‐021 0.8 0.8 0%Sep‐12‐22 Sep‐13‐22 12.7 SPT‐1A‐021 Spoƫng 1A‐021 0.8 0.8 0%Nov‐08‐22 Nov‐08‐22 13.4 REC‐1A‐021 ReclamaƟon 1A‐021 1.0 1.0 0%Nov‐07‐23 Nov‐08‐23 48.1 ACC ‐1A‐021 Access 1A‐021 0.5 0.5 0%Sep‐13‐22 Sep‐13‐22 53.3 ERC‐1A‐021 Tower Erec Ɵon 1A‐021 1.0 1.0 0%Jul‐31‐23 Aug‐01‐23 78.6 Structure 1A-022Structure 1A-022 252.5 252.5 Sep‐11‐22 Sep‐28‐23 0.0 ASY‐1A‐022 Tower Assembly 1A ‐022 1.0 1.0 0%Jul‐29‐23 Jul‐30‐23 0.0 REC‐1A‐022 ReclamaƟon 1A‐022 1.0 1.0 0%Sep‐27‐23 Sep‐28‐23 0.0 FDN‐1A‐022 FoundaƟons 1A‐022 0.7 0.7 0%Nov‐03‐22 Nov‐03‐22 12.0 CLR‐1A‐022 Clearing 1A‐022 0.8 0.8 0%Sep‐11‐22 Sep‐12‐22 12.7 SPT‐1A‐022 Spoƫng 1A‐022 0.8 0.8 0%Nov‐07‐22 Nov‐08‐22 13.4 ERC‐1A‐022 Tower Erec Ɵon 1A‐022 1.0 1.0 0%Jul‐30‐23 Jul‐31‐23 28.6 ACC ‐1A‐022 Access 1A‐022 0.5 0.5 0%Sep‐12‐22 Sep‐12‐22 53.6 Structure 1A-023Structure 1A-023 252.2 252.2 Sep‐10‐22 Sep‐27‐23 0.0 ASY‐1A‐023 Tower Assembly 1A ‐023 1.0 1.0 0%Jul‐28‐23 Jul‐29‐23 0.0 REC‐1A‐023 ReclamaƟon 1A‐023 1.0 1.0 0%Sep‐26‐23 Sep‐27‐23 0.0 FDN‐1A‐023 FoundaƟons 1A‐023 0.7 0.7 0%Nov‐02‐22 Nov‐03‐22 12.0 CLR‐1A‐023 Clearing 1A‐023 0.8 0.8 0%Sep‐10‐22 Sep‐11‐22 12.7 SPT‐1A‐023 Spoƫng 1A‐023 0.8 0.8 0%Nov‐06‐22 Nov‐07‐22 13.4 ERC‐1A‐023 Tower Erec Ɵon 1A‐023 1.0 1.0 0%Jul‐29‐23 Jul‐30‐23 28.6 ACC ‐1A‐023 Access 1A‐023 0.5 0.5 0%Sep‐11‐22 Sep‐12‐22 54.0 Structure 1A-024Structure 1A-024 252.0 252.0 Sep‐10‐22 Sep‐26‐23 0.0 ASY‐1A‐024 Tower Assembly 1A ‐024 1.0 1.0 0%Jul‐27‐23 Jul‐28‐23 0.0 REC‐1A‐024 ReclamaƟon 1A‐024 1.0 1.0 0%Sep‐25‐23 Sep‐26‐23 0.0 FDN‐1A‐024 FoundaƟons 1A‐024 0.7 0.7 0%Nov‐01‐22 Nov‐02‐22 12.0 CLR‐1A‐024 Clearing 1A‐024 0.8 0.8 0%Sep‐10‐22 Sep‐10‐22 12.7 SPT‐1A‐024 Spoƫng 1A‐024 0.8 0.8 0%Nov‐05‐22 Nov‐06‐22 13.4 ERC‐1A‐024 Tower Erec Ɵon 1A‐024 1.0 1.0 0%Jul‐28‐23 Jul‐29‐23 28.6 ACC ‐1A‐024 Access 1A‐024 0.5 0.5 0%Sep‐10‐22 Sep‐11‐22 54.3 Structure 1A-025Structure 1A-025 251.8 251.8 Sep‐09‐22 Sep‐25‐23 0.0 ASY‐1A‐025 Tower Assembly 1A ‐025 1.0 1.0 0%Jul‐26‐23 Jul‐27‐23 0.0 REC‐1A‐025 ReclamaƟon 1A‐025 1.0 1.0 0%Sep‐24‐23 Sep‐25‐23 0.0 FDN‐1A‐025 FoundaƟons 1A‐025 0.7 0.7 0%Nov‐01‐22 Nov‐01‐22 12.0 CLR‐1A‐025 Clearing 1A‐025 0.8 0.8 0%Sep‐09‐22 Sep‐10‐22 12.7 SPT‐1A‐025 Spoƫng 1A‐025 0.8 0.8 0%Nov‐04‐22 Nov‐05‐22 13.4 ERC‐1A‐025 Tower Erec Ɵon 1A‐025 1.0 1.0 0%Jul‐27‐23 Jul‐28‐23 28.6 ACC ‐1A‐025 Access 1A‐025 0.5 0.5 0%Sep‐10‐22 Sep‐10‐22 54.6 Structure 1A-026Structure 1A-026 251.6 251.6 Sep‐08‐22 Sep‐24‐23 0.0 ASY‐1A‐026 Tower Assembly 1A ‐026 1.0 1.0 0%Jul‐25‐23 Jul‐26‐23 0.0 REC‐1A‐026 ReclamaƟon 1A‐026 1.0 1.0 0%Sep‐23‐23 Sep‐24‐23 0.0 FDN‐1A‐026 FoundaƟons 1A‐026 0.7 0.7 0%Oct ‐31‐22 Nov‐01‐22 12.0 CLR‐1A‐026 Clearing 1A‐026 0.8 0.8 0%Sep‐08‐22 Sep‐09‐22 12.7 SPT‐1A‐026 Spoƫng 1A‐026 0.8 0.8 0%Nov‐04‐22 Nov‐04‐22 13.4 ERC‐1A‐026 Tower Erec Ɵon 1A‐026 1.0 1.0 0%Jul‐26‐23 Jul‐27‐23 28.6 ACC ‐1A‐026 Access 1A‐026 0.5 0.5 0%Sep‐09‐22 Sep‐09‐22 54.9 Structure 1A-027Structure 1A-027 251.3 251.3 Sep‐07‐22 Sep‐23‐23 0.0 ASY‐1A‐027 Tower Assembly 1A ‐027 1.0 1.0 0%Jul‐24‐23 Jul‐25‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1A‐021 Clearing 1A‐021 Spoƫng 1A‐021 ReclamaƟon 1A‐021 Access 1A‐021 Tower Erec Ɵon 1A‐021 Sep‐28‐23, Structure 1A‐022 Tower Assembly 1A ‐022 ReclamaƟon 1A‐022 FoundaƟons 1A‐022 Clearing 1A‐022 Spoƫng 1A‐022 Tower Erec Ɵon 1A‐022 Access 1A‐022 Sep‐27‐23, Structure 1A‐023 Tower Assembly 1A ‐023 ReclamaƟon 1A‐023 FoundaƟons 1A‐023 Clearing 1A‐023 Spoƫng 1A‐023 Tower Erec Ɵon 1A‐023 Access 1A‐023 Sep‐26‐23, Structure 1A‐024 Tower Assembly 1A ‐024 ReclamaƟon 1A‐024 FoundaƟons 1A‐024 Clearing 1A‐024 Spoƫng 1A‐024 Tower Erec Ɵon 1A‐024 Access 1A‐024 Sep‐25‐23, Structure 1A‐025 Tower Assembly 1A ‐025 ReclamaƟon 1A‐025 FoundaƟons 1A‐025 Clearing 1A‐025 Spoƫng 1A‐025 Tower Erec Ɵon 1A‐025 Access 1A‐025 Sep‐24‐23, Structure 1A‐026 Tower Assembly 1A ‐026 ReclamaƟon 1A‐026 FoundaƟons 1A‐026 Clearing 1A‐026 Spoƫng 1A‐026 Tower Erec Ɵon 1A‐026 Access 1A‐026 Sep‐23‐23, Structure 1A‐027 Tower Assembly 1A ‐027 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 9 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1A‐027 ReclamaƟon 1A‐027 1.0 1.0 0%Sep‐22‐23 Sep‐23‐23 0.0 FDN‐1A‐027 FoundaƟons 1A‐027 0.7 0.7 0%Oct ‐30‐22 Oct ‐31‐22 12.0 CLR‐1A‐027 Clearing 1A‐027 0.8 0.8 0%Sep‐07‐22 Sep‐08‐22 12.7 SPT‐1A‐027 Spoƫng 1A‐027 0.8 0.8 0%Nov‐03‐22 Nov‐04‐22 13.4 ERC‐1A‐027 Tower Erec Ɵon 1A‐027 1.0 1.0 0%Jul‐25‐23 Jul‐26‐23 28.6 ACC ‐1A‐027 Access 1A‐027 0.5 0.5 0%Sep‐08‐22 Sep‐09‐22 55.3 Structure 1A-028Structure 1A-028 251.1 251.1 Sep‐07‐22 Sep‐22‐23 0.0 ASY‐1A‐028 Tower Assembly 1A ‐028 1.0 1.0 0%Jul‐23‐23 Jul‐24‐23 0.0 REC‐1A‐028 ReclamaƟon 1A‐028 1.0 1.0 0%Sep‐21‐23 Sep‐22‐23 0.0 FDN‐1A‐028 FoundaƟons 1A‐028 0.7 0.7 0%Oct ‐30‐22 Oct ‐30‐22 12.0 CLR‐1A‐028 Clearing 1A‐028 0.8 0.8 0%Sep‐07‐22 Sep‐07‐22 12.7 SPT‐1A‐028 Spoƫng 1A‐028 0.8 0.8 0%Nov‐02‐22 Nov‐03‐22 13.4 ERC‐1A‐028 Tower Erec Ɵon 1A‐028 1.0 1.0 0%Jul‐24‐23 Jul‐25‐23 28.6 ACC ‐1A‐028 Access 1A‐028 0.5 0.5 0%Sep‐07‐22 Sep‐08‐22 55.6 Structure 1A-029Structure 1A-029 250.9 250.9 Sep‐06‐22 Sep‐21‐23 0.0 ASY‐1A‐029 Tower Assembly 1A ‐029 1.0 1.0 0%Jul‐22‐23 Jul‐23‐23 0.0 REC‐1A‐029 ReclamaƟon 1A‐029 1.0 1.0 0%Sep‐20‐23 Sep‐21‐23 0.0 FDN‐1A‐029 FoundaƟons 1A‐029 0.7 0.7 0%Oct ‐29‐22 Oct ‐30‐22 12.0 CLR‐1A‐029 Clearing 1A‐029 0.8 0.8 0%Sep‐06‐22 Sep‐07‐22 12.7 SPT‐1A‐029 Spoƫng 1A‐029 0.8 0.8 0%Nov‐01‐22 Nov‐02‐22 13.4 ERC‐1A‐029 Tower Erec Ɵon 1A‐029 1.0 1.0 0%Jul‐23‐23 Jul‐24‐23 28.6 ACC ‐1A‐029 Access 1A‐029 0.5 0.5 0%Sep‐07‐22 Sep‐07‐22 55.9 Structure 1A-030Structure 1A-030 250.7 250.7 Sep‐04‐22 Sep‐20‐23 0.0 ASY‐1A‐030 Tower Assembly 1A ‐030 1.0 1.0 0%Jul‐21‐23 Jul‐22‐23 0.0 REC‐1A‐030 ReclamaƟon 1A‐030 1.0 1.0 0%Sep‐19‐23 Sep‐20‐23 0.0 FDN‐1A‐030 FoundaƟons 1A‐030 0.7 0.7 0%Oct ‐29‐22 Oct ‐29‐22 12.0 CLR‐1A‐030 Clearing 1A‐030 0.8 0.8 0%Sep‐04‐22 Sep‐06‐22 12.7 SPT‐1A‐030 Spoƫng 1A‐030 0.8 0.8 0%Nov‐01‐22 Nov‐01‐22 13.4 ERC‐1A‐030 Tower Erec Ɵon 1A‐030 1.0 1.0 0%Jul‐22‐23 Jul‐23‐23 28.6 ACC ‐1A‐030 Access 1A‐030 0.5 0.5 0%Sep‐06‐22 Sep‐06‐22 56.2 Structure 1A-031Structure 1A-031 250.5 250.5 Sep‐03‐22 Sep‐19‐23 0.0 ASY‐1A‐031 Tower Assembly 1A ‐031 1.0 1.0 0%Jul‐20‐23 Jul‐21‐23 0.0 REC‐1A‐031 ReclamaƟon 1A‐031 1.0 1.0 0%Sep‐18‐23 Sep‐19‐23 0.0 FDN‐1A‐031 FoundaƟons 1A‐031 0.7 0.7 0%Oct ‐28‐22 Oct ‐29‐22 12.0 CLR‐1A‐031 Clearing 1A‐031 0.8 0.8 0%Sep‐03‐22 Sep‐04‐22 12.7 SPT‐1A‐031 Spoƫng 1A‐031 0.8 0.8 0%Oct ‐31‐22 Nov‐01‐22 13.4 ERC‐1A‐031 Tower Erec Ɵon 1A‐031 1.0 1.0 0%Jul‐21‐23 Jul‐22‐23 28.6 ACC ‐1A‐031 Access 1A‐031 0.5 0.5 0%Sep‐04‐22 Sep‐04‐22 56.6 Structure 1A-032Structure 1A-032 250.2 250.2 Sep‐02‐22 Sep‐18‐23 0.0 ASY‐1A‐032 Tower Assembly 1A ‐032 1.0 1.0 0%Jul‐19‐23 Jul‐20‐23 0.0 REC‐1A‐032 ReclamaƟon 1A‐032 1.0 1.0 0%Sep‐17‐23 Sep‐18‐23 0.0 FDN‐1A‐032 FoundaƟons 1A‐032 0.7 0.7 0%Oct ‐27‐22 Oct ‐28‐22 12.0 CLR‐1A‐032 Clearing 1A‐032 0.8 0.8 0%Sep‐02‐22 Sep‐03‐22 12.7 SPT‐1A‐032 Spoƫng 1A‐032 0.8 0.8 0%Oct ‐30‐22 Oct ‐31‐22 13.4 ERC‐1A‐032 Tower Erec Ɵon 1A‐032 1.0 1.0 0%Jul‐20‐23 Jul‐21‐23 28.6 ACC ‐1A‐032 Access 1A‐032 0.5 0.5 0%Sep‐03‐22 Sep‐04‐22 56.9 Structure 1A-033Structure 1A-033 250.0 250.0 Sep‐02‐22 Sep‐17‐23 0.0 ASY‐1A‐033 Tower Assembly 1A ‐033 1.0 1.0 0%Jul‐18‐23 Jul‐19‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1A‐027 FoundaƟons 1A‐027 Clearing 1A‐027 Spoƫng 1A‐027 Tower Erec Ɵon 1A‐027 Access 1A‐027 Sep‐22‐23, Structure 1A‐028 Tower Assembly 1A ‐028 ReclamaƟon 1A‐028 FoundaƟons 1A‐028 Clearing 1A‐028 Spoƫng 1A‐028 Tower Erec Ɵon 1A‐028 Access 1A‐028 Sep‐21‐23, Structure 1A‐029 Tower Assembly 1A‐029 ReclamaƟon 1A‐029 FoundaƟons 1A‐029 Clearing 1A‐029 Spoƫng 1A‐029 Tower Erec Ɵon 1A‐029 Access 1A‐029 Sep‐20‐23, Structure 1A‐030 Tower Assembly 1A‐030 ReclamaƟon 1A‐030 FoundaƟons 1A‐030 Clearing 1A‐030 Spoƫng 1A‐030 Tower Erec Ɵon 1A‐030 Access 1A‐030 Sep‐19‐23, Structure 1A‐031 Tower Assembly 1A‐031 ReclamaƟon 1A‐031 FoundaƟons 1A‐031 Clearing 1A‐031 Spoƫng 1A‐031 Tower Erec Ɵon 1A‐031 Access 1A‐031 Sep‐18‐23, Structure 1A‐032 Tower Assembly 1A ‐032 ReclamaƟon 1A‐032 FoundaƟons 1A‐032 Clearing 1A‐032 Spoƫng 1A‐032 Tower Erec Ɵon 1A‐032 Access 1A‐032 Sep‐17‐23, Structure 1A‐033 Tower Assembly 1A ‐033 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 10 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1A‐033 ReclamaƟon 1A‐033 1.0 1.0 0%Sep‐16‐23 Sep‐17‐23 0.0 FDN‐1A‐033 FoundaƟons 1A‐033 0.7 0.7 0%Oct ‐27‐22 Oct ‐27‐22 12.0 CLR‐1A‐033 Clearing 1A‐033 0.8 0.8 0%Sep‐02‐22 Sep‐02‐22 12.7 SPT‐1A‐033 Spoƫng 1A‐033 0.8 0.8 0%Oct ‐29‐22 Oct ‐30‐22 13.4 ERC‐1A‐033 Tower Erec Ɵon 1A‐033 1.0 1.0 0%Jul‐19‐23 Jul‐20‐23 28.6 ACC ‐1A‐033 Access 1A‐033 0.5 0.5 0%Sep‐02‐22 Sep‐03‐22 57.2 Structure 1A-034Structure 1A-034 249.8 249.8 Sep‐01‐22 Sep‐16‐23 0.0 ASY‐1A‐034 Tower Assembly 1A ‐034 1.0 1.0 0%Jul‐17‐23 Jul‐18‐23 0.0 REC‐1A‐034 ReclamaƟon 1A‐034 1.0 1.0 0%Sep‐15‐23 Sep‐16‐23 0.0 FDN‐1A‐034 FoundaƟons 1A‐034 0.7 0.7 0%Oct ‐26‐22 Oct ‐27‐22 12.0 CLR‐1A‐034 Clearing 1A‐034 0.8 0.8 0%Sep‐01‐22 Sep‐02‐22 12.7 SPT‐1A‐034 Spoƫng 1A‐034 0.8 0.8 0%Oct ‐28‐22 Oct ‐29‐22 13.4 ERC‐1A‐034 Tower Erec Ɵon 1A‐034 1.0 1.0 0%Jul‐18‐23 Jul‐19‐23 28.6 ACC ‐1A‐034 Access 1A‐034 0.5 0.5 0%Sep‐02‐22 Sep‐02‐22 57.5 Structure 1A-035Structure 1A-035 249.6 249.6 Aug‐31‐22 Sep‐15‐23 0.0 ASY‐1A‐035 Tower Assembly 1A ‐035 1.0 1.0 0%Jul‐16‐23 Jul‐17‐23 0.0 REC‐1A‐035 ReclamaƟon 1A‐035 1.0 1.0 0%Sep‐14‐23 Sep‐15‐23 0.0 FDN‐1A‐035 FoundaƟons 1A‐035 0.7 0.7 0%Oct ‐25‐22 Oct ‐26‐22 12.0 CLR‐1A‐035 Clearing 1A‐035 0.8 0.8 0%Aug‐31‐22 Sep‐01‐22 12.7 SPT‐1A‐035 Spoƫng 1A‐035 0.8 0.8 0%Oct ‐28‐22 Oct ‐28‐22 13.4 ERC‐1A‐035 Tower Erec Ɵon 1A‐035 1.0 1.0 0%Jul‐17‐23 Jul‐18‐23 28.6 ACC ‐1A‐035 Access 1A‐035 0.5 0.5 0%Sep‐01‐22 Sep‐01‐22 57.8 Structure 1A-036Structure 1A-036 249.4 249.4 Aug‐30‐22 Sep‐14‐23 0.0 ASY‐1A‐036 Tower Assembly 1A ‐036 1.0 1.0 0%Jul‐15‐23 Jul‐16‐23 0.0 REC‐1A‐036 ReclamaƟon 1A‐036 1.0 1.0 0%Sep‐13‐23 Sep‐14‐23 0.0 FDN‐1A‐036 FoundaƟons 1A‐036 0.7 0.7 0%Oct ‐25‐22 Oct ‐25‐22 12.0 CLR‐1A‐036 Clearing 1A‐036 0.8 0.8 0%Aug‐30‐22 Aug‐31‐22 12.7 SPT‐1A‐036 Spoƫng 1A‐036 0.8 0.8 0%Oct ‐27‐22 Oct ‐28‐22 13.4 ERC‐1A‐036 Tower Erec Ɵon 1A‐036 1.0 1.0 0%Jul‐16‐23 Jul‐17‐23 28.6 ACC ‐1A‐036 Access 1A‐036 0.5 0.5 0%Aug‐31‐22 Sep‐01‐22 58.2 Structure 1A-037Structure 1A-037 249.1 249.1 Aug‐30‐22 Sep‐13‐23 0.0 ASY‐1A‐037 Tower Assembly 1A ‐037 1.0 1.0 0%Jul‐14‐23 Jul‐15‐23 0.0 REC‐1A‐037 ReclamaƟon 1A‐037 1.0 1.0 0%Sep‐12‐23 Sep‐13‐23 0.0 FDN‐1A‐037 FoundaƟons 1A‐037 0.7 0.7 0%Oct ‐24‐22 Oct ‐25‐22 12.0 CLR‐1A‐037 Clearing 1A‐037 0.8 0.8 0%Aug‐30‐22 Aug‐30‐22 12.7 SPT‐1A‐037 Spoƫng 1A‐037 0.8 0.8 0%Oct ‐26‐22 Oct ‐27‐22 13.4 ERC‐1A‐037 Tower Erec Ɵon 1A‐037 1.0 1.0 0%Jul‐15‐23 Jul‐16‐23 28.6 ACC ‐1A‐037 Access 1A‐037 0.5 0.5 0%Aug‐30‐22 Aug‐31‐22 58.5 Structure 1A-038Structure 1A-038 248.9 248.9 Aug‐29‐22 Sep‐12‐23 0.0 ASY‐1A‐038 Tower Assembly 1A ‐038 4.7 4.7 0%Jul‐10‐23 Jul‐14‐23 0.0 REC‐1A‐038 ReclamaƟon 1A‐038 1.0 1.0 0%Sep‐11‐23 Sep‐12‐23 0.0 FDN‐1A‐038 FoundaƟons 1A‐038 0.7 0.7 0%Oct ‐23‐22 Oct ‐24‐22 12.0 CLR‐1A‐038 Clearing 1A‐038 0.8 0.8 0%Aug‐29‐22 Aug‐30‐22 12.7 SPT‐1A‐038 Spoƫng 1A‐038 0.8 0.8 0%Oct ‐25‐22 Oct ‐26‐22 13.4 ERC‐1A‐038 Tower Erec Ɵon 1A‐038 1.0 1.0 0%Jul‐14‐23 Jul‐15‐23 28.6 ACC ‐1A‐038 Access 1A‐038 0.5 0.5 0%Aug‐30‐22 Aug‐30‐22 58.8 Structure 1A-039Structure 1A-039 248.7 248.7 Aug‐28‐22 Sep‐11‐23 0.0 REC‐1A‐039 ReclamaƟon 1A‐039 0.7 0.7 0%Sep‐10‐23 Sep‐11‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1A‐033 FoundaƟons 1A‐033 Clearing 1A‐033 Spoƫng 1A‐033 Tower Erec Ɵon 1A‐033 Access 1A‐033 Sep‐16‐23, Structure 1A‐034 Tower Assembly 1A ‐034 ReclamaƟon 1A‐034 FoundaƟons 1A‐034 Clearing 1A‐034 Spoƫng 1A‐034 Tower Erec Ɵon 1A‐034 Access 1A‐034 Sep‐15‐23, Structure 1A‐035 Tower Assembly 1A ‐035 ReclamaƟon 1A‐035 FoundaƟons 1A‐035 Clearing 1A‐035 Spoƫng 1A‐035 Tower Erec Ɵon 1A‐035 Access 1A‐035 Sep‐14‐23, Structure 1A‐036 Tower Assembly 1A ‐036 ReclamaƟon 1A‐036 FoundaƟons 1A‐036 Clearing 1A‐036 Spoƫng 1A‐036 Tower Erec Ɵon 1A‐036 Access 1A‐036 Sep‐13‐23, Structure 1A‐037 Tower Assembly 1A ‐037 ReclamaƟon 1A‐037 FoundaƟons 1A‐037 Clearing 1A‐037 Spoƫng 1A‐037 Tower Erec Ɵon 1A‐037 Access 1A‐037 Sep‐12‐23, Structure 1A‐038 Tower Assembly 1A ‐038 ReclamaƟon 1A‐038 FoundaƟons 1A‐038 Clearing 1A‐038 Spoƫng 1A‐038 Tower Erec Ɵon 1A‐038 Access 1A‐038 Sep‐11‐23, Structure 1A‐039 ReclamaƟon 1A‐039 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 11 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1A‐039 Tower Erec Ɵon 1A‐039 0.7 0.7 0%Nov‐22‐22 Nov‐22‐22 10.1 ASY‐1A‐039 Tower Assembly 1A ‐039 0.7 0.7 0%Nov‐21‐22 Nov‐21‐22 10.3 FDN‐1A‐039 FoundaƟons 1A‐039 0.7 0.7 0%Oct ‐23‐22 Oct ‐23‐22 12.0 CLR‐1A‐039 Clearing 1A‐039 0.8 0.8 0%Aug‐28‐22 Aug‐29‐22 12.7 SPT‐1A‐039 Spoƫng 1A‐039 0.8 0.8 0%Oct ‐25‐22 Oct ‐25‐22 13.4 ACC ‐1A‐039 Access 1A‐039 0.5 0.5 0%Aug‐29‐22 Aug‐29‐22 59.1 Structure 1A-040Structure 1A-040 248.8 248.8 Aug‐27‐22 Sep‐10‐23 0.0 REC‐1A‐040 ReclamaƟon 1A‐040 0.7 0.7 0%Sep‐09‐23 Sep‐10‐23 0.0 ERC‐1A‐040 Tower Erec Ɵon 1A‐040 0.7 0.7 0%Nov‐21‐22 Nov‐22‐22 10.1 ASY‐1A‐040 Tower Assembly 1A ‐040 0.7 0.7 0%Nov‐20‐22 Nov‐21‐22 10.3 FDN‐1A‐040 FoundaƟons 1A‐040 0.7 0.7 0%Oct ‐22‐22 Oct ‐23‐22 12.0 CLR‐1A‐040 Clearing 1A‐040 0.8 0.8 0%Aug‐27‐22 Aug‐28‐22 12.7 SPT‐1A‐040 Spoƫng 1A‐040 0.8 0.8 0%Oct ‐24‐22 Oct ‐25‐22 13.4 ACC ‐1A‐040 Access 1A‐040 0.5 0.5 0%Aug‐28‐22 Aug‐28‐22 59.5 Structure 1A-041Structure 1A-041 248.9 248.9 Aug‐26‐22 Sep‐09‐23 0.0 REC‐1A‐041 ReclamaƟon 1A‐041 0.7 0.7 0%Sep‐09‐23 Sep‐09‐23 0.0 ERC‐1A‐041 Tower Erec Ɵon 1A‐041 0.7 0.7 0%Nov‐20‐22 Nov‐21‐22 10.1 ASY‐1A‐041 Tower Assembly 1A ‐041 0.7 0.7 0%Nov‐19‐22 Nov‐20‐22 10.3 CLR‐1A‐041 Clearing 1A‐041 0.8 0.8 0%Aug‐26‐22 Aug‐27‐22 12.0 FDN‐1A‐041 FoundaƟons 1A‐041 0.7 0.7 0%Oct ‐21‐22 Oct ‐22‐22 12.0 SPT‐1A‐041 Spoƫng 1A‐041 0.8 0.8 0%Oct ‐23‐22 Oct ‐24‐22 13.4 ACC ‐1A‐041 Access 1A‐041 0.5 0.5 0%Aug‐27‐22 Aug‐28‐22 59.8 Structure 1A-042Structure 1A-042 248.9 248.9 Aug‐26‐22 Sep‐09‐23 0.0 REC‐1A‐042 ReclamaƟon 1A‐042 0.7 0.7 0%Sep‐08‐23 Sep‐09‐23 0.0 ERC‐1A‐042 Tower Erec Ɵon 1A‐042 0.7 0.7 0%Nov‐19‐22 Nov‐20‐22 10.1 ASY‐1A‐042 Tower Assembly 1A ‐042 0.7 0.7 0%Nov‐19‐22 Nov‐19‐22 10.3 CLR‐1A‐042 Clearing 1A‐042 0.8 0.8 0%Aug‐26‐22 Aug‐26‐22 12.0 FDN‐1A‐042 FoundaƟons 1A‐042 0.7 0.7 0%Oct ‐21‐22 Oct ‐21‐22 12.0 SPT‐1A‐042 Spoƫng 1A‐042 0.8 0.8 0%Oct ‐22‐22 Oct ‐23‐22 13.4 ACC ‐1A‐042 Access 1A‐042 0.5 0.5 0%Aug‐26‐22 Aug‐27‐22 60.1 Structure 1A-043Structure 1A-043 343.0 343.0 Aug‐25‐22 Dec‐13‐23 38.5 ERC‐1A‐043 Tower Erec Ɵon 1A‐043 0.7 0.7 0%Nov‐19‐22 Nov‐19‐22 10.1 ASY‐1A‐043 Tower Assembly 1A ‐043 0.7 0.7 0%Nov‐18‐22 Nov‐19‐22 10.3 CLR‐1A‐043 Clearing 1A‐043 0.8 0.8 0%Aug‐25‐22 Aug‐26‐22 12.0 FDN‐1A‐043 FoundaƟons 1A‐043 0.7 0.7 0%Oct ‐20‐22 Oct ‐21‐22 12.0 SPT‐1A‐043 Spoƫng 1A‐043 0.8 0.8 0%Oct ‐21‐22 Oct ‐22‐22 13.4 REC‐1A‐043 ReclamaƟon 1A‐043 0.6 0.6 0%Dec‐12‐23 Dec‐13‐23 38.5 ACC ‐1A‐043 Access 1A‐043 0.5 0.5 0%Aug‐26‐22 Aug‐26‐22 60.4 Structure 1A-044Structure 1A-044 343.2 343.2 Aug‐24‐22 Dec‐12‐23 38.5 ERC‐1A‐044 Tower Erec Ɵon 1A‐044 0.7 0.7 0%Nov‐18‐22 Nov‐19‐22 10.1 ASY‐1A‐044 Tower Assembly 1A ‐044 0.7 0.7 0%Nov‐17‐22 Nov‐18‐22 10.3 CLR‐1A‐044 Clearing 1A‐044 0.8 0.8 0%Aug‐24‐22 Aug‐25‐22 12.0 FDN‐1A‐044 FoundaƟons 1A‐044 0.7 0.7 0%Oct ‐19‐22 Oct ‐20‐22 12.0 SPT‐1A‐044 Spoƫng 1A‐044 0.8 0.8 0%Oct ‐21‐22 Oct ‐21‐22 13.4 REC‐1A‐044 ReclamaƟon 1A‐044 0.6 0.6 0%Dec‐12‐23 Dec‐12‐23 38.5 ACC ‐1A‐044 Access 1A‐044 0.5 0.5 0%Aug‐25‐22 Aug‐25‐22 60.8 Structure 1A-045Structure 1A-045 343.3 343.3 Aug‐23‐22 Dec‐12‐23 38.5 ERC‐1A‐045 Tower Erec Ɵon 1A‐045 0.7 0.7 0%Nov‐17‐22 Nov‐18‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1A‐039 Tower Assembly 1A ‐039 FoundaƟons 1A‐039 Clearing 1A‐039 Spoƫng 1A‐039 Access 1A‐039 Sep‐10‐23, Structure 1A‐040 ReclamaƟon 1A‐040 Tower Erec Ɵon 1A‐040 Tower Assembly 1A ‐040 FoundaƟons 1A‐040 Clearing 1A‐040 Spoƫng 1A‐040 Access 1A‐040 Sep‐09‐23, Structure 1A‐041 ReclamaƟon 1A‐041 Tower Erec Ɵon 1A‐041 Tower Assembly 1A ‐041 Clearing 1A‐041 FoundaƟons 1A‐041 Spoƫng 1A‐041 Access 1A‐041 Sep‐09‐23, Structure 1A‐042 ReclamaƟon 1A‐042 Tower Erec Ɵon 1A‐042 Tower Assembly 1A ‐042 Clearing 1A‐042 FoundaƟons 1A‐042 Spoƫng 1A‐042 Access 1A‐042 Dec‐13‐23, Structure 1A‐043 Tower Erec Ɵon 1A‐043 Tower Assembly 1A ‐043 Clearing 1A‐043 FoundaƟons 1A‐043 Spoƫng 1A‐043 ReclamaƟon 1A‐043 Access 1A‐043 Dec‐12‐23, Structure 1A‐044 Tower Erec Ɵon 1A‐044 Tower Assembly 1A ‐044 Clearing 1A‐044 FoundaƟons 1A‐044 Spoƫng 1A‐044 ReclamaƟon 1A‐044 Access 1A‐044 Dec‐12‐23, Structure 1A‐045 Tower Erec Ɵon 1A‐045 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 12 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐045 Tower Assembly 1A ‐045 0.7 0.7 0%Nov‐16‐22 Nov‐17‐22 10.2 CLR‐1A‐045 Clearing 1A‐045 0.8 0.8 0%Aug‐23‐22 Aug‐24‐22 12.0 FDN‐1A‐045 FoundaƟons 1A‐045 0.7 0.7 0%Oct ‐19‐22 Oct ‐19‐22 12.0 SPT‐1A‐045 Spoƫng 1A‐045 0.8 0.8 0%Oct ‐20‐22 Oct ‐21‐22 13.4 REC‐1A‐045 ReclamaƟon 1A‐045 0.6 0.6 0%Dec‐11‐23 Dec‐12‐23 38.5 ACC ‐1A‐045 Access 1A‐045 0.5 0.5 0%Aug‐24‐22 Aug‐25‐22 61.1 Structure 1A-046Structure 1A-046 343.5 343.5 Aug‐23‐22 Dec‐11‐23 38.5 ERC‐1A‐046 Tower Erec Ɵon 1A‐046 0.7 0.7 0%Nov‐17‐22 Nov‐17‐22 10.1 ASY‐1A‐046 Tower Assembly 1A ‐046 0.7 0.7 0%Nov‐16‐22 Nov‐16‐22 10.2 CLR‐1A‐046 Clearing 1A‐046 0.8 0.8 0%Aug‐23‐22 Aug‐23‐22 12.0 FDN‐1A‐046 FoundaƟons 1A‐046 0.7 0.7 0%Oct ‐18‐22 Oct ‐19‐22 12.0 SPT‐1A‐046 Spoƫng 1A‐046 0.8 0.8 0%Oct ‐19‐22 Oct ‐20‐22 13.4 REC‐1A‐046 ReclamaƟon 1A‐046 0.6 0.6 0%Dec‐10‐23 Dec‐11‐23 38.5 ACC ‐1A‐046 Access 1A‐046 0.5 0.5 0%Aug‐23‐22 Aug‐24‐22 61.4 Structure 1A-047Structure 1A-047 343.7 343.7 Aug‐22‐22 Dec‐10‐23 38.5 ERC‐1A‐047 Tower Erec Ɵon 1A‐047 0.7 0.7 0%Nov‐16‐22 Nov‐17‐22 10.1 ASY‐1A‐047 Tower Assembly 1A ‐047 0.7 0.7 0%Nov‐15‐22 Nov‐16‐22 10.2 CLR‐1A‐047 Clearing 1A‐047 0.8 0.8 0%Aug‐22‐22 Aug‐23‐22 12.0 FDN‐1A‐047 FoundaƟons 1A‐047 0.7 0.7 0%Oct ‐17‐22 Oct ‐18‐22 12.0 SPT‐1A‐047 Spoƫng 1A‐047 0.8 0.8 0%Oct ‐18‐22 Oct ‐19‐22 13.4 REC‐1A‐047 ReclamaƟon 1A‐047 0.6 0.6 0%Dec‐10‐23 Dec‐10‐23 38.5 ACC ‐1A‐047 Access 1A‐047 0.5 0.5 0%Aug‐23‐22 Aug‐23‐22 61.7 Structure 1A-048Structure 1A-048 343.8 343.8 Aug‐21‐22 Dec‐10‐23 38.5 ERC‐1A‐048 Tower Erec Ɵon 1A‐048 0.7 0.7 0%Nov‐15‐22 Nov‐16‐22 10.1 ASY‐1A‐048 Tower Assembly 1A ‐048 0.7 0.7 0%Nov‐14‐22 Nov‐15‐22 10.2 CLR‐1A‐048 Clearing 1A‐048 0.8 0.8 0%Aug‐21‐22 Aug‐22‐22 12.0 FDN‐1A‐048 FoundaƟons 1A‐048 0.7 0.7 0%Oct ‐17‐22 Oct ‐17‐22 12.0 SPT‐1A‐048 Spoƫng 1A‐048 0.8 0.8 0%Oct ‐18‐22 Oct ‐18‐22 13.4 REC‐1A‐048 ReclamaƟon 1A‐048 0.6 0.6 0%Dec‐09‐23 Dec‐10‐23 38.5 ACC ‐1A‐048 Access 1A‐048 0.5 0.5 0%Aug‐22‐22 Aug‐22‐22 62.1 Structure 1A-049Structure 1A-049 344.0 344.0 Aug‐20‐22 Dec‐09‐23 38.5 ERC‐1A‐049 Tower Erec Ɵon 1A‐049 0.7 0.7 0%Nov‐14‐22 Nov‐15‐22 10.1 ASY‐1A‐049 Tower Assembly 1A ‐049 0.7 0.7 0%Nov‐14‐22 Nov‐14‐22 10.2 CLR‐1A‐049 Clearing 1A‐049 0.8 0.8 0%Aug‐20‐22 Aug‐21‐22 12.0 FDN‐1A‐049 FoundaƟons 1A‐049 0.7 0.7 0%Oct ‐16‐22 Oct ‐17‐22 12.0 SPT‐1A‐049 Spoƫng 1A‐049 0.8 0.8 0%Oct ‐17‐22 Oct ‐18‐22 13.4 REC‐1A‐049 ReclamaƟon 1A‐049 0.6 0.6 0%Dec‐09‐23 Dec‐09‐23 38.5 ACC ‐1A‐049 Access 1A‐049 0.5 0.5 0%Aug‐21‐22 Aug‐21‐22 62.4 Structure 1A-050Structure 1A-050 294.5 294.5 Oct ‐09‐22 Dec‐09‐23 38.5 ERC‐1A‐050 Tower Erec Ɵon 1A‐050 0.7 0.7 0%Nov‐14‐22 Nov‐14‐22 10.1 ASY‐1A‐050 Tower Assembly 1A ‐050 0.7 0.7 0%Nov‐13‐22 Nov‐14‐22 10.2 FDN‐1A‐050 FoundaƟons 1A‐050 0.7 0.7 0%Oct ‐16‐22 Oct ‐16‐22 12.0 SPT‐1A‐050 Spoƫng 1A‐050 0.6 0.6 0%Oct ‐16‐22 Oct ‐17‐22 13.5 CLR‐1A‐050 Clearing 1A‐050 0.6 0.6 0%Oct ‐09‐22 Oct ‐10‐22 17.3 ACC ‐1A‐050 Access 1A‐050 0.6 0.6 0%Oct ‐10‐22 Oct ‐10‐22 17.3 REC‐1A‐050 ReclamaƟon 1A‐050 0.6 0.6 0%Dec‐08‐23 Dec‐09‐23 38.5 Structure 1A-051Structure 1A-051 294.4 294.4 Oct ‐08‐22 Dec‐08‐23 38.5 ERC‐1A‐051 Tower Erec Ɵon 1A‐051 0.7 0.7 0%Nov‐13‐22 Nov‐14‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐045 Clearing 1A‐045 FoundaƟons 1A‐045 Spoƫng 1A‐045 ReclamaƟon 1A‐045 Access 1A‐045 Dec‐11‐23, Structure 1A‐046 Tower Erec Ɵon 1A‐046 Tower Assembly 1A ‐046 Clearing 1A‐046 FoundaƟons 1A‐046 Spoƫng 1A‐046 ReclamaƟon 1A‐046 Access 1A‐046 Dec‐10‐23, Structure 1A‐047 Tower Erec Ɵon 1A‐047 Tower Assembly 1A‐047 Clearing 1A‐047 FoundaƟons 1A‐047 Spoƫng 1A‐047 ReclamaƟon 1A‐047 Access 1A‐047 Dec‐10‐23, Structure 1A‐048 Tower Erec Ɵon 1A‐048 Tower Assembly 1A‐048 Clearing 1A‐048 FoundaƟons 1A‐048 Spoƫng 1A‐048 ReclamaƟon 1A‐048 Access 1A‐048 Dec‐09‐23, Structure 1A‐049 Tower Erec Ɵon 1A‐049 Tower Assembly 1A‐049 Clearing 1A‐049 FoundaƟons 1A‐049 Spoƫng 1A‐049 ReclamaƟon 1A‐049 Access 1A‐049 Dec‐09‐23, Structure 1A‐050 Tower Erec Ɵon 1A‐050 Tower Assembly 1A‐050 FoundaƟons 1A‐050 Spoƫng 1A‐050 Clearing 1A‐050 Access 1A‐050 ReclamaƟon 1A‐050 Dec‐08‐23, Structure 1A‐051 Tower Erec Ɵon 1A‐051 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 13 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐051 Tower Assembly 1A ‐051 0.7 0.7 0%Nov‐12‐22 Nov‐13‐22 10.2 FDN‐1A‐051 FoundaƟons 1A‐051 0.7 0.7 0%Oct ‐15‐22 Oct ‐16‐22 12.0 SPT‐1A‐051 Spoƫng 1A‐051 0.6 0.6 0%Oct ‐16‐22 Oct ‐16‐22 13.6 CLR‐1A‐051 Clearing 1A‐051 0.6 0.6 0%Oct ‐08‐22 Oct ‐09‐22 17.2 ACC ‐1A‐051 Access 1A‐051 0.6 0.6 0%Oct ‐09‐22 Oct ‐10‐22 17.2 REC‐1A‐051 ReclamaƟon 1A‐051 0.6 0.6 0%Dec‐07‐23 Dec‐08‐23 38.5 Structure 1A-052Structure 1A-052 294.4 294.4 Oct ‐08‐22 Dec‐07‐23 38.5 ERC‐1A‐052 Tower Erec Ɵon 1A‐052 0.7 0.7 0%Nov‐12‐22 Nov‐13‐22 10.1 ASY‐1A‐052 Tower Assembly 1A ‐052 0.7 0.7 0%Nov‐11‐22 Nov‐12‐22 10.2 FDN‐1A‐052 FoundaƟons 1A‐052 0.7 0.7 0%Oct ‐14‐22 Oct ‐15‐22 12.0 SPT‐1A‐052 Spoƫng 1A‐052 0.6 0.6 0%Oct ‐15‐22 Oct ‐15‐22 13.6 CLR‐1A‐052 Clearing 1A‐052 0.6 0.6 0%Oct ‐08‐22 Oct ‐08‐22 17.1 ACC ‐1A‐052 Access 1A‐052 0.6 0.6 0%Oct ‐08‐22 Oct ‐09‐22 17.1 REC‐1A‐052 ReclamaƟon 1A‐052 0.6 0.6 0%Dec‐07‐23 Dec‐07‐23 38.5 Structure 1A-053Structure 1A-053 294.3 294.3 Oct ‐07‐22 Dec‐07‐23 38.5 ERC‐1A‐053 Tower Erec Ɵon 1A‐053 0.7 0.7 0%Nov‐11‐22 Nov‐12‐22 10.1 ASY‐1A‐053 Tower Assembly 1A ‐053 0.7 0.7 0%Nov‐11‐22 Nov‐11‐22 10.2 FDN‐1A‐053 FoundaƟons 1A‐053 0.7 0.7 0%Oct ‐14‐22 Oct ‐14‐22 12.0 SPT‐1A‐053 Spoƫng 1A‐053 0.6 0.6 0%Oct ‐14‐22 Oct ‐15‐22 13.7 CLR‐1A‐053 Clearing 1A‐053 0.6 0.6 0%Oct ‐07‐22 Oct ‐08‐22 17.1 ACC ‐1A‐053 Access 1A‐053 0.6 0.6 0%Oct ‐08‐22 Oct ‐08‐22 17.1 REC‐1A‐053 ReclamaƟon 1A‐053 0.6 0.6 0%Dec‐06‐23 Dec‐07‐23 38.5 Structure 1A-054Structure 1A-054 294.3 294.3 Oct ‐07‐22 Dec‐06‐23 38.5 ERC‐1A‐054 Tower Erec Ɵon 1A‐054 0.7 0.7 0%Nov‐11‐22 Nov‐11‐22 10.1 ASY‐1A‐054 Tower Assembly 1A ‐054 0.7 0.7 0%Nov‐10‐22 Nov‐11‐22 10.2 FDN‐1A‐054 FoundaƟons 1A‐054 0.7 0.7 0%Oct ‐13‐22 Oct ‐14‐22 12.0 SPT‐1A‐054 Spoƫng 1A‐054 0.6 0.6 0%Oct ‐14‐22 Oct ‐14‐22 13.8 CLR‐1A‐054 Clearing 1A‐054 0.6 0.6 0%Oct ‐07‐22 Oct ‐07‐22 17.0 ACC ‐1A‐054 Access 1A‐054 0.6 0.6 0%Oct ‐07‐22 Oct ‐08‐22 17.0 REC‐1A‐054 ReclamaƟon 1A‐054 0.6 0.6 0%Dec‐05‐23 Dec‐06‐23 38.5 Structure 1A-055Structure 1A-055 294.3 294.3 Oct ‐06‐22 Dec‐05‐23 38.5 ERC‐1A‐055 Tower Erec Ɵon 1A‐055 0.7 0.7 0%Nov‐10‐22 Nov‐11‐22 10.1 ASY‐1A‐055 Tower Assembly 1A ‐055 0.7 0.7 0%Nov‐09‐22 Nov‐10‐22 10.2 FDN‐1A‐055 FoundaƟons 1A‐055 0.7 0.7 0%Oct ‐12‐22 Oct ‐13‐22 12.0 SPT‐1A‐055 Spoƫng 1A‐055 0.6 0.6 0%Oct ‐13‐22 Oct ‐13‐22 13.9 CLR‐1A‐055 Clearing 1A‐055 0.6 0.6 0%Oct ‐06‐22 Oct ‐07‐22 16.9 ACC ‐1A‐055 Access 1A‐055 0.6 0.6 0%Oct ‐07‐22 Oct ‐07‐22 16.9 REC‐1A‐055 ReclamaƟon 1A‐055 0.6 0.6 0%Dec‐05‐23 Dec‐05‐23 38.5 Structure 1A-056Structure 1A-056 294.2 294.2 Oct ‐06‐22 Dec‐05‐23 38.5 ERC‐1A‐056 Tower Erec Ɵon 1A‐056 0.7 0.7 0%Nov‐09‐22 Nov‐10‐22 10.1 ASY‐1A‐056 Tower Assembly 1A ‐056 0.7 0.7 0%Nov‐08‐22 Nov‐09‐22 10.2 FDN‐1A‐056 FoundaƟons 1A‐056 0.7 0.7 0%Oct ‐12‐22 Oct ‐12‐22 12.0 SPT‐1A‐056 Spoƫng 1A‐056 0.6 0.6 0%Oct ‐12‐22 Oct ‐13‐22 13.9 CLR‐1A‐056 Clearing 1A‐056 0.6 0.6 0%Oct ‐06‐22 Oct ‐06‐22 16.8 ACC ‐1A‐056 Access 1A‐056 0.6 0.6 0%Oct ‐06‐22 Oct ‐07‐22 16.8 REC‐1A‐056 ReclamaƟon 1A‐056 0.6 0.6 0%Dec‐04‐23 Dec‐05‐23 38.5 Structure 1A-057Structure 1A-057 294.2 294.2 Oct ‐05‐22 Dec‐04‐23 38.5 ERC‐1A‐057 Tower Erec Ɵon 1A‐057 0.7 0.7 0%Nov‐09‐22 Nov‐09‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A‐051 FoundaƟons 1A‐051 Spoƫng 1A‐051 Clearing 1A‐051 Access 1A‐051 ReclamaƟon 1A‐051 Dec‐07‐23, Structure 1A‐052 Tower Erec Ɵon 1A‐052 Tower Assembly 1A ‐052 FoundaƟons 1A‐052 Spoƫng 1A‐052 Clearing 1A‐052 Access 1A‐052 ReclamaƟon 1A‐052 Dec‐07‐23, Structure 1A‐053 Tower Erec Ɵon 1A‐053 Tower Assembly 1A ‐053 FoundaƟons 1A‐053 Spoƫng 1A‐053 Clearing 1A‐053 Access 1A‐053 ReclamaƟon 1A‐053 Dec ‐06‐23, Structure 1A‐054 Tower Erec Ɵon 1A‐054 Tower Assembly 1A ‐054 FoundaƟons 1A‐054 Spoƫng 1A‐054 Clearing 1A‐054 Access 1A‐054 ReclamaƟon 1A‐054 Dec ‐05‐23, Structure 1A‐055 Tower Erec Ɵon 1A‐055 Tower Assembly 1A ‐055 FoundaƟons 1A‐055 Spoƫng 1A‐055 Clearing 1A‐055 Access 1A‐055 ReclamaƟon 1A‐055 Dec ‐05‐23, Structure 1A‐056 Tower Erec Ɵon 1A‐056 Tower Assembly 1A ‐056 FoundaƟons 1A‐056 Spoƫng 1A‐056 Clearing 1A‐056 Access 1A‐056 ReclamaƟon 1A‐056 Dec‐04‐23, Structure 1A‐057 Tower Erec Ɵon 1A‐057 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 14 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐057 Tower Assembly 1A ‐057 0.7 0.7 0%Nov‐08‐22 Nov‐08‐22 10.2 FDN‐1A‐057 FoundaƟons 1A‐057 0.7 0.7 0%Oct ‐11‐22 Oct ‐12‐22 12.0 SPT‐1A‐057 Spoƫng 1A‐057 0.6 0.6 0%Oct ‐12‐22 Oct ‐12‐22 14.0 CLR‐1A‐057 Clearing 1A‐057 0.6 0.6 0%Oct ‐05‐22 Oct ‐06‐22 16.8 ACC ‐1A‐057 Access 1A‐057 0.6 0.6 0%Oct ‐06‐22 Oct ‐06‐22 16.8 REC‐1A‐057 ReclamaƟon 1A‐057 0.6 0.6 0%Dec‐04‐23 Dec‐04‐23 38.5 Structure 1A-058Structure 1A-058 294.1 294.1 Oct ‐04‐22 Dec‐04‐23 38.5 ERC‐1A‐058 Tower Erec Ɵon 1A‐058 0.7 0.7 0%Nov‐08‐22 Nov‐09‐22 10.1 ASY‐1A‐058 Tower Assembly 1A ‐058 0.7 0.7 0%Nov‐07‐22 Nov‐08‐22 10.2 FDN‐1A‐058 FoundaƟons 1A‐058 0.7 0.7 0%Oct ‐10‐22 Oct ‐11‐22 12.0 SPT‐1A‐058 Spoƫng 1A‐058 0.6 0.6 0%Oct ‐11‐22 Oct ‐12‐22 14.1 CLR‐1A‐058 Clearing 1A‐058 0.6 0.6 0%Oct ‐04‐22 Oct ‐05‐22 16.7 ACC ‐1A‐058 Access 1A‐058 0.6 0.6 0%Oct ‐05‐22 Oct ‐06‐22 16.7 REC‐1A‐058 ReclamaƟon 1A‐058 0.6 0.6 0%Dec‐03‐23 Dec‐04‐23 38.5 Structure 1A-059Structure 1A-059 294.1 294.1 Oct ‐04‐22 Dec‐03‐23 38.5 ERC‐1A‐059 Tower Erec Ɵon 1A‐059 0.7 0.7 0%Nov‐07‐22 Nov‐08‐22 10.1 ASY‐1A‐059 Tower Assembly 1A ‐059 0.7 0.7 0%Nov‐06‐22 Nov‐07‐22 10.2 FDN‐1A‐059 FoundaƟons 1A‐059 0.7 0.7 0%Oct ‐10‐22 Oct ‐10‐22 12.0 SPT‐1A‐059 Spoƫng 1A‐059 0.6 0.6 0%Oct ‐10‐22 Oct ‐11‐22 14.2 CLR‐1A‐059 Clearing 1A‐059 0.6 0.6 0%Oct ‐04‐22 Oct ‐04‐22 16.6 ACC ‐1A‐059 Access 1A‐059 0.6 0.6 0%Oct ‐04‐22 Oct ‐05‐22 16.6 REC‐1A‐059 ReclamaƟon 1A‐059 0.6 0.6 0%Dec‐02‐23 Dec‐03‐23 38.5 Structure 1A-060Structure 1A-060 294.0 294.0 Oct ‐03‐22 Dec‐02‐23 38.5 ERC‐1A‐060 Tower Erec Ɵon 1A‐060 0.7 0.7 0%Nov‐06‐22 Nov‐07‐22 10.1 ASY‐1A‐060 Tower Assembly 1A ‐060 0.7 0.7 0%Nov‐06‐22 Nov‐06‐22 10.2 FDN‐1A‐060 FoundaƟons 1A‐060 0.7 0.7 0%Oct ‐09‐22 Oct ‐10‐22 12.0 SPT‐1A‐060 Spoƫng 1A‐060 0.6 0.6 0%Oct ‐10‐22 Oct ‐10‐22 14.2 CLR‐1A‐060 Clearing 1A‐060 0.6 0.6 0%Oct ‐03‐22 Oct ‐04‐22 16.5 ACC ‐1A‐060 Access 1A‐060 0.6 0.6 0%Oct ‐04‐22 Oct ‐04‐22 16.5 REC‐1A‐060 ReclamaƟon 1A‐060 0.6 0.6 0%Dec‐02‐23 Dec‐02‐23 38.5 Structure 1A-061Structure 1A-061 294.0 294.0 Oct ‐03‐22 Dec‐02‐23 38.5 ERC‐1A‐061 Tower Erec Ɵon 1A‐061 0.7 0.7 0%Nov‐06‐22 Nov‐06‐22 10.1 ASY‐1A‐061 Tower Assembly 1A ‐061 0.7 0.7 0%Nov‐05‐22 Nov‐06‐22 10.2 FDN‐1A‐061 FoundaƟons 1A‐061 0.7 0.7 0%Oct ‐08‐22 Oct ‐09‐22 12.0 SPT‐1A‐061 Spoƫng 1A‐061 0.6 0.6 0%Oct ‐09‐22 Oct ‐10‐22 14.3 CLR‐1A‐061 Clearing 1A‐061 0.6 0.6 0%Oct ‐03‐22 Oct ‐03‐22 16.4 ACC ‐1A‐061 Access 1A‐061 0.6 0.6 0%Oct ‐03‐22 Oct ‐04‐22 16.4 REC‐1A‐061 ReclamaƟon 1A‐061 0.6 0.6 0%Dec‐01‐23 Dec‐02‐23 38.5 Structure 1A-062Structure 1A-062 293.9 293.9 Oct ‐02‐22 Dec‐01‐23 38.5 ERC‐1A‐062 Tower Erec Ɵon 1A‐062 0.7 0.7 0%Nov‐05‐22 Nov‐06‐22 10.1 ASY‐1A‐062 Tower Assembly 1A ‐062 0.7 0.7 0%Nov‐04‐22 Nov‐05‐22 10.2 FDN‐1A‐062 FoundaƟons 1A‐062 0.7 0.7 0%Oct ‐08‐22 Oct ‐08‐22 12.0 SPT‐1A‐062 Spoƫng 1A‐062 0.6 0.6 0%Oct ‐08‐22 Oct ‐09‐22 14.4 CLR‐1A‐062 Clearing 1A‐062 0.6 0.6 0%Oct ‐02‐22 Oct ‐03‐22 16.4 ACC ‐1A‐062 Access 1A‐062 0.6 0.6 0%Oct ‐03‐22 Oct ‐03‐22 16.4 REC‐1A‐062 ReclamaƟon 1A‐062 0.6 0.6 0%Nov‐30‐23 Dec‐01‐23 38.5 Structure 1A-063Structure 1A-063 293.9 293.9 Oct ‐02‐22 Nov‐30‐23 38.5 ERC‐1A‐063 Tower Erec Ɵon 1A‐063 0.7 0.7 0%Nov‐04‐22 Nov‐05‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐057 FoundaƟons 1A‐057 Spoƫng 1A‐057 Clearing 1A‐057 Access 1A‐057 ReclamaƟon 1A‐057 Dec‐04‐23, Structure 1A‐058 Tower Erec Ɵon 1A‐058 Tower Assembly 1A ‐058 FoundaƟons 1A‐058 Spoƫng 1A‐058 Clearing 1A‐058 Access 1A‐058 ReclamaƟon 1A‐058 Dec‐03‐23, Structure 1A‐059 Tower Erec Ɵon 1A‐059 Tower Assembly 1A ‐059 FoundaƟons 1A‐059 Spoƫng 1A‐059 Clearing 1A‐059 Access 1A‐059 ReclamaƟon 1A‐059 Dec‐02‐23, Structure 1A‐060 Tower Erec Ɵon 1A‐060 Tower Assembly 1A ‐060 FoundaƟons 1A‐060 Spoƫng 1A‐060 Clearing 1A‐060 Access 1A‐060 ReclamaƟon 1A‐060 Dec‐02‐23, Structure 1A‐061 Tower Erec Ɵon 1A‐061 Tower Assembly 1A ‐061 FoundaƟons 1A‐061 Spoƫng 1A‐061 Clearing 1A‐061 Access 1A‐061 ReclamaƟon 1A‐061 Dec‐01‐23, Structure 1A‐062 Tower Erec Ɵon 1A‐062 Tower Assembly 1A ‐062 FoundaƟons 1A‐062 Spoƫng 1A‐062 Clearing 1A‐062 Access 1A‐062 ReclamaƟon 1A‐062 Nov‐30‐23, Structure 1A‐063 Tower Erec Ɵon 1A‐063 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 15 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐063 Tower Assembly 1A ‐063 0.7 0.7 0%Nov‐03‐22 Nov‐04‐22 10.2 FDN‐1A‐063 FoundaƟons 1A‐063 0.7 0.7 0%Oct ‐07‐22 Oct ‐08‐22 12.0 SPT‐1A‐063 Spoƫng 1A‐063 0.6 0.6 0%Oct ‐08‐22 Oct ‐08‐22 14.5 CLR‐1A‐063 Clearing 1A‐063 0.6 0.6 0%Oct ‐02‐22 Oct ‐02‐22 16.3 ACC ‐1A‐063 Access 1A‐063 0.6 0.6 0%Oct ‐02‐22 Oct ‐03‐22 16.3 REC‐1A‐063 ReclamaƟon 1A‐063 0.6 0.6 0%Nov‐30‐23 Nov‐30‐23 38.5 Structure 1A-064Structure 1A-064 293.8 293.8 Oct ‐01‐22 Nov‐30‐23 38.5 ERC‐1A‐064 Tower Erec Ɵon 1A‐064 0.7 0.7 0%Nov‐04‐22 Nov‐04‐22 10.1 ASY‐1A‐064 Tower Assembly 1A ‐064 0.7 0.7 0%Nov‐03‐22 Nov‐03‐22 10.2 FDN‐1A‐064 FoundaƟons 1A‐064 0.7 0.7 0%Oct ‐06‐22 Oct ‐07‐22 12.0 SPT‐1A‐064 Spoƫng 1A‐064 0.6 0.6 0%Oct ‐07‐22 Oct ‐08‐22 14.6 CLR‐1A‐064 Clearing 1A‐064 0.6 0.6 0%Oct ‐01‐22 Oct ‐02‐22 16.2 ACC ‐1A‐064 Access 1A‐064 0.6 0.6 0%Oct ‐02‐22 Oct ‐02‐22 16.2 REC‐1A‐064 ReclamaƟon 1A‐064 0.6 0.6 0%Nov‐29‐23 Nov‐30‐23 38.5 Structure 1A-065Structure 1A-065 293.8 293.8 Sep‐30‐22 Nov‐29‐23 38.5 ERC‐1A‐065 Tower Erec Ɵon 1A‐065 0.7 0.7 0%Nov‐03‐22 Nov‐04‐22 10.1 ASY‐1A‐065 Tower Assembly 1A ‐065 0.7 0.7 0%Nov‐02‐22 Nov‐03‐22 10.2 FDN‐1A‐065 FoundaƟons 1A‐065 0.7 0.7 0%Oct ‐06‐22 Oct ‐06‐22 12.0 SPT‐1A‐065 Spoƫng 1A‐065 0.6 0.6 0%Oct ‐06‐22 Oct ‐07‐22 14.6 CLR‐1A‐065 Clearing 1A‐065 0.6 0.6 0%Sep‐30‐22 Oct ‐01‐22 16.1 ACC ‐1A‐065 Access 1A‐065 0.6 0.6 0%Oct ‐01‐22 Oct ‐02‐22 16.1 REC‐1A‐065 ReclamaƟon 1A‐065 0.6 0.6 0%Nov‐29‐23 Nov‐29‐23 38.5 Structure 1A-066Structure 1A-066 293.7 293.7 Sep‐30‐22 Nov‐29‐23 38.5 ERC‐1A‐066 Tower Erec Ɵon 1A‐066 0.7 0.7 0%Nov‐02‐22 Nov‐03‐22 10.1 ASY‐1A‐066 Tower Assembly 1A ‐066 0.7 0.7 0%Nov‐01‐22 Nov‐02‐22 10.2 FDN‐1A‐066 FoundaƟons 1A‐066 0.7 0.7 0%Oct ‐05‐22 Oct ‐06‐22 12.0 SPT‐1A‐066 Spoƫng 1A‐066 0.6 0.6 0%Oct ‐06‐22 Oct ‐06‐22 14.7 CLR‐1A‐066 Clearing 1A‐066 0.6 0.6 0%Sep‐30‐22 Sep‐30‐22 16.1 ACC ‐1A‐066 Access 1A‐066 0.6 0.6 0%Sep‐30‐22 Oct ‐01‐22 16.1 REC‐1A‐066 ReclamaƟon 1A‐066 0.6 0.6 0%Nov‐28‐23 Nov‐29‐23 38.5 Structure 1A-067Structure 1A-067 293.7 293.7 Sep‐29‐22 Nov‐28‐23 38.5 ERC‐1A‐067 Tower Erec Ɵon 1A‐067 0.7 0.7 0%Nov‐01‐22 Nov‐02‐22 10.1 ASY‐1A‐067 Tower Assembly 1A ‐067 0.7 0.7 0%Nov‐01‐22 Nov‐01‐22 10.2 FDN‐1A‐067 FoundaƟons 1A‐067 0.7 0.7 0%Oct ‐04‐22 Oct ‐05‐22 12.0 SPT‐1A‐067 Spoƫng 1A‐067 0.6 0.6 0%Oct ‐05‐22 Oct ‐06‐22 14.8 CLR‐1A‐067 Clearing 1A‐067 0.6 0.6 0%Sep‐29‐22 Sep‐30‐22 16.0 ACC ‐1A‐067 Access 1A‐067 0.6 0.6 0%Sep‐30‐22 Sep‐30‐22 16.0 REC‐1A‐067 ReclamaƟon 1A‐067 0.6 0.6 0%Nov‐27‐23 Nov‐28‐23 38.5 Structure 1A-068Structure 1A-068 293.6 293.6 Sep‐29‐22 Nov‐27‐23 38.5 ERC‐1A‐068 Tower Erec Ɵon 1A‐068 0.7 0.7 0%Nov‐01‐22 Nov‐01‐22 10.1 ASY‐1A‐068 Tower Assembly 1A ‐068 0.7 0.7 0%Oct ‐31‐22 Nov‐01‐22 10.2 FDN‐1A‐068 FoundaƟons 1A‐068 0.7 0.7 0%Oct ‐04‐22 Oct ‐04‐22 12.0 SPT‐1A‐068 Spoƫng 1A‐068 0.6 0.6 0%Oct ‐04‐22 Oct ‐05‐22 14.9 CLR‐1A‐068 Clearing 1A‐068 0.6 0.6 0%Sep‐29‐22 Sep‐29‐22 15.9 ACC ‐1A‐068 Access 1A‐068 0.6 0.6 0%Sep‐29‐22 Sep‐30‐22 15.9 REC‐1A‐068 ReclamaƟon 1A‐068 0.6 0.6 0%Nov‐27‐23 Nov‐27‐23 38.5 Structure 1A-069Structure 1A-069 293.6 293.6 Sep‐28‐22 Nov‐27‐23 38.5 ERC‐1A‐069 Tower Erec Ɵon 1A‐069 0.7 0.7 0%Oct ‐31‐22 Nov‐01‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A‐063 FoundaƟons 1A‐063 Spoƫng 1A‐063 Clearing 1A‐063 Access 1A‐063 ReclamaƟon 1A‐063 Nov‐30‐23, Structure 1A‐064 Tower Erec Ɵon 1A‐064 Tower Assembly 1A‐064 FoundaƟons 1A‐064 Spoƫng 1A‐064 Clearing 1A‐064 Access 1A‐064 ReclamaƟon 1A‐064 Nov‐29‐23, Structure 1A‐065 Tower Erec Ɵon 1A‐065 Tower Assembly 1A‐065 FoundaƟons 1A‐065 Spoƫng 1A‐065 Clearing 1A‐065 Access 1A‐065 ReclamaƟon 1A‐065 Nov‐29‐23, Structure 1A‐066 Tower Erec Ɵon 1A‐066 Tower Assembly 1A‐066 FoundaƟons 1A‐066 Spoƫng 1A‐066 Clearing 1A‐066 Access 1A‐066 ReclamaƟon 1A‐066 Nov‐28‐23, Structure 1A‐067 Tower Erec Ɵon 1A‐067 Tower Assembly 1A ‐067 FoundaƟons 1A‐067 Spoƫng 1A‐067 Clearing 1A‐067 Access 1A‐067 ReclamaƟon 1A‐067 Nov‐27‐23, Structure 1A‐068 Tower Erec Ɵon 1A‐068 Tower Assembly 1A ‐068 FoundaƟons 1A‐068 Spoƫng 1A‐068 Clearing 1A‐068 Access 1A‐068 ReclamaƟon 1A‐068 Nov‐27‐23, Structure 1A‐069 Tower Erec Ɵon 1A‐069 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 16 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐069 Tower Assembly 1A ‐069 0.7 0.7 0%Oct ‐30‐22 Oct ‐31‐22 10.2 FDN‐1A‐069 FoundaƟons 1A‐069 0.7 0.7 0%Oct ‐03‐22 Oct ‐04‐22 12.0 SPT‐1A‐069 Spoƫng 1A‐069 0.6 0.6 0%Oct ‐04‐22 Oct ‐04‐22 14.9 CLR‐1A‐069 Clearing 1A‐069 0.6 0.6 0%Sep‐28‐22 Sep‐29‐22 15.8 ACC ‐1A‐069 Access 1A‐069 0.6 0.6 0%Sep‐29‐22 Sep‐29‐22 15.8 REC‐1A‐069 ReclamaƟon 1A‐069 0.6 0.6 0%Nov‐26‐23 Nov‐27‐23 38.5 Structure 1A-070Structure 1A-070 293.6 293.6 Sep‐28‐22 Nov‐26‐23 38.5 ERC‐1A‐070 Tower Erec Ɵon 1A‐070 0.7 0.7 0%Oct ‐30‐22 Oct ‐31‐22 10.1 ASY‐1A‐070 Tower Assembly 1A ‐070 0.7 0.7 0%Oct ‐29‐22 Oct ‐30‐22 10.2 FDN‐1A‐070 FoundaƟons 1A‐070 0.7 0.7 0%Oct ‐03‐22 Oct ‐03‐22 12.0 SPT‐1A‐070 Spoƫng 1A‐070 0.6 0.6 0%Oct ‐03‐22 Oct ‐04‐22 15.0 CLR‐1A‐070 Clearing 1A‐070 0.6 0.6 0%Sep‐28‐22 Sep‐28‐22 15.8 ACC ‐1A‐070 Access 1A‐070 0.6 0.6 0%Sep‐28‐22 Sep‐29‐22 15.8 REC‐1A‐070 ReclamaƟon 1A‐070 0.6 0.6 0%Nov‐26‐23 Nov‐26‐23 38.5 Structure 1A-071Structure 1A-071 293.5 293.5 Sep‐27‐22 Nov‐26‐23 38.5 ERC‐1A‐071 Tower Erec Ɵon 1A‐071 0.7 0.7 0%Oct ‐30‐22 Oct ‐30‐22 10.1 ASY‐1A‐071 Tower Assembly 1A ‐071 0.7 0.7 0%Oct ‐29‐22 Oct ‐29‐22 10.2 FDN‐1A‐071 FoundaƟons 1A‐071 0.7 0.7 0%Oct ‐02‐22 Oct ‐03‐22 12.0 SPT‐1A‐071 Spoƫng 1A‐071 0.6 0.6 0%Oct ‐03‐22 Oct ‐03‐22 15.1 CLR‐1A‐071 Clearing 1A‐071 0.6 0.6 0%Sep‐27‐22 Sep‐28‐22 15.7 ACC ‐1A‐071 Access 1A‐071 0.6 0.6 0%Sep‐28‐22 Sep‐28‐22 15.7 REC‐1A‐071 ReclamaƟon 1A‐071 0.6 0.6 0%Nov‐25‐23 Nov‐26‐23 38.5 Structure 1A-072Structure 1A-072 293.5 293.5 Sep‐26‐22 Nov‐25‐23 38.5 ERC‐1A‐072 Tower Erec Ɵon 1A‐072 0.7 0.7 0%Oct ‐29‐22 Oct ‐30‐22 10.1 ASY‐1A‐072 Tower Assembly 1A ‐072 0.7 0.7 0%Oct ‐28‐22 Oct ‐29‐22 10.2 FDN‐1A‐072 FoundaƟons 1A‐072 0.7 0.7 0%Oct ‐01‐22 Oct ‐02‐22 12.0 SPT‐1A‐072 Spoƫng 1A‐072 0.6 0.6 0%Oct ‐02‐22 Oct ‐02‐22 15.2 CLR‐1A‐072 Clearing 1A‐072 0.6 0.6 0%Sep‐26‐22 Sep‐27‐22 15.6 ACC ‐1A‐072 Access 1A‐072 0.6 0.6 0%Sep‐27‐22 Sep‐28‐22 15.6 REC‐1A‐072 ReclamaƟon 1A‐072 0.6 0.6 0%Nov‐22‐23 Nov‐25‐23 38.5 Structure 1A-073Structure 1A-073 293.4 293.4 Sep‐26‐22 Nov‐22‐23 38.5 ERC‐1A‐073 Tower Erec Ɵon 1A‐073 0.7 0.7 0%Oct ‐28‐22 Oct ‐29‐22 10.1 ASY‐1A‐073 Tower Assembly 1A ‐073 0.7 0.7 0%Oct ‐27‐22 Oct ‐28‐22 10.2 FDN‐1A‐073 FoundaƟons 1A‐073 0.7 0.7 0%Oct ‐01‐22 Oct ‐01‐22 12.0 SPT‐1A‐073 Spoƫng 1A‐073 0.6 0.6 0%Oct ‐01‐22 Oct ‐02‐22 15.2 CLR‐1A‐073 Clearing 1A‐073 0.6 0.6 0%Sep‐26‐22 Sep‐26‐22 15.5 ACC ‐1A‐073 Access 1A‐073 0.6 0.6 0%Sep‐26‐22 Sep‐27‐22 15.5 REC‐1A‐073 ReclamaƟon 1A‐073 0.6 0.6 0%Nov‐22‐23 Nov‐22‐23 38.5 Structure 1A-074Structure 1A-074 293.4 293.4 Sep‐25‐22 Nov‐22‐23 38.5 ERC‐1A‐074 Tower Erec Ɵon 1A‐074 0.7 0.7 0%Oct ‐27‐22 Oct ‐28‐22 10.1 ASY‐1A‐074 Tower Assembly 1A ‐074 0.7 0.7 0%Oct ‐27‐22 Oct ‐27‐22 10.2 FDN‐1A‐074 FoundaƟons 1A‐074 0.7 0.7 0%Sep‐30‐22 Oct ‐01‐22 12.0 SPT‐1A‐074 Spoƫng 1A‐074 0.6 0.6 0%Oct ‐01‐22 Oct ‐01‐22 15.3 CLR‐1A‐074 Clearing 1A‐074 0.6 0.6 0%Sep‐25‐22 Sep‐26‐22 15.4 ACC ‐1A‐074 Access 1A‐074 0.6 0.6 0%Sep‐26‐22 Sep‐26‐22 15.4 REC‐1A‐074 ReclamaƟon 1A‐074 0.6 0.6 0%Nov‐21‐23 Nov‐22‐23 38.5 Structure 1A-075Structure 1A-075 293.3 293.3 Sep‐25‐22 Nov‐21‐23 38.5 ERC‐1A‐075 Tower Erec Ɵon 1A‐075 0.7 0.7 0%Oct ‐27‐22 Oct ‐27‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐069 FoundaƟons 1A‐069 Spoƫng 1A‐069 Clearing 1A‐069 Access 1A‐069 ReclamaƟon 1A‐069 Nov‐26‐23, Structure 1A‐070 Tower Erec Ɵon 1A‐070 Tower Assembly 1A ‐070 FoundaƟons 1A‐070 Spoƫng 1A‐070 Clearing 1A‐070 Access 1A‐070 ReclamaƟon 1A‐070 Nov‐26‐23, Structure 1A‐071 Tower Erec Ɵon 1A‐071 Tower Assembly 1A ‐071 FoundaƟons 1A‐071 Spoƫng 1A‐071 Clearing 1A‐071 Access 1A‐071 ReclamaƟon 1A‐071 Nov‐25‐23, Structure 1A‐072 Tower Erec Ɵon 1A‐072 Tower Assembly 1A ‐072 FoundaƟons 1A‐072 Spoƫng 1A‐072 Clearing 1A‐072 Access 1A‐072 ReclamaƟon 1A‐072 Nov‐22‐23, Structure 1A‐073 Tower Erec Ɵon 1A‐073 Tower Assembly 1A ‐073 FoundaƟons 1A‐073 Spoƫng 1A‐073 Clearing 1A‐073 Access 1A‐073 ReclamaƟon 1A‐073 Nov‐22‐23, Structure 1A‐074 Tower Erec Ɵon 1A‐074 Tower Assembly 1A ‐074 FoundaƟons 1A‐074 Spoƫng 1A‐074 Clearing 1A‐074 Access 1A‐074 ReclamaƟon 1A‐074 Nov ‐21‐23, Structure 1A‐075 Tower Erec Ɵon 1A‐075 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 17 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐075 Tower Assembly 1A ‐075 0.7 0.7 0%Oct ‐26‐22 Oct ‐27‐22 10.2 FDN‐1A‐075 FoundaƟons 1A‐075 0.7 0.7 0%Sep‐29‐22 Sep‐30‐22 12.0 CLR‐1A‐075 Clearing 1A‐075 0.6 0.6 0%Sep‐25‐22 Sep‐25‐22 15.4 ACC ‐1A‐075 Access 1A‐075 0.6 0.6 0%Sep‐25‐22 Sep‐26‐22 15.4 SPT‐1A‐075 Spoƫng 1A‐075 0.6 0.6 0%Sep‐30‐22 Sep‐30‐22 15.4 REC‐1A‐075 ReclamaƟon 1A‐075 0.6 0.6 0%Nov‐20‐23 Nov‐21‐23 38.5 Structure 1A-076Structure 1A-076 293.3 293.3 Sep‐24‐22 Nov‐20‐23 38.5 ERC‐1A‐076 Tower Erec Ɵon 1A‐076 0.7 0.7 0%Oct ‐26‐22 Oct ‐27‐22 10.1 ASY‐1A‐076 Tower Assembly 1A ‐076 0.7 0.7 0%Oct ‐25‐22 Oct ‐26‐22 10.2 FDN‐1A‐076 FoundaƟons 1A‐076 0.7 0.7 0%Sep‐29‐22 Sep‐29‐22 12.0 CLR‐1A‐076 Clearing 1A‐076 0.6 0.6 0%Sep‐24‐22 Sep‐25‐22 15.3 ACC ‐1A‐076 Access 1A‐076 0.6 0.6 0%Sep‐25‐22 Sep‐25‐22 15.3 SPT‐1A‐076 Spoƫng 1A‐076 0.6 0.6 0%Sep‐29‐22 Sep‐30‐22 15.5 REC‐1A‐076 ReclamaƟon 1A‐076 0.6 0.6 0%Nov‐20‐23 Nov‐20‐23 38.5 Structure 1A-077Structure 1A-077 293.2 293.2 Sep‐24‐22 Nov‐20‐23 38.5 ERC‐1A‐077 Tower Erec Ɵon 1A‐077 0.7 0.7 0%Oct ‐25‐22 Oct ‐26‐22 10.1 ASY‐1A‐077 Tower Assembly 1A ‐077 0.7 0.7 0%Oct ‐24‐22 Oct ‐25‐22 10.2 FDN‐1A‐077 FoundaƟons 1A‐077 0.7 0.7 0%Sep‐28‐22 Sep‐29‐22 12.0 CLR‐1A‐077 Clearing 1A‐077 0.6 0.6 0%Sep‐24‐22 Sep‐24‐22 15.2 ACC ‐1A‐077 Access 1A‐077 0.6 0.6 0%Sep‐24‐22 Sep‐25‐22 15.2 SPT‐1A‐077 Spoƫng 1A‐077 0.6 0.6 0%Sep‐29‐22 Sep‐29‐22 15.5 REC‐1A‐077 ReclamaƟon 1A‐077 0.6 0.6 0%Nov‐19‐23 Nov‐20‐23 38.5 Structure 1A-078Structure 1A-078 293.2 293.2 Sep‐23‐22 Nov‐19‐23 38.5 ERC‐1A‐078 Tower Erec Ɵon 1A‐078 0.7 0.7 0%Oct ‐24‐22 Oct ‐25‐22 10.1 ASY‐1A‐078 Tower Assembly 1A ‐078 0.7 0.7 0%Oct ‐24‐22 Oct ‐24‐22 10.2 FDN‐1A‐078 FoundaƟons 1A‐078 0.7 0.7 0%Sep‐27‐22 Sep‐28‐22 12.0 CLR‐1A‐078 Clearing 1A‐078 0.6 0.6 0%Sep‐23‐22 Sep‐24‐22 15.1 ACC ‐1A‐078 Access 1A‐078 0.6 0.6 0%Sep‐24‐22 Sep‐24‐22 15.1 SPT‐1A‐078 Spoƫng 1A‐078 0.6 0.6 0%Sep‐28‐22 Sep‐29‐22 15.6 REC‐1A‐078 ReclamaƟon 1A‐078 0.6 0.6 0%Nov‐19‐23 Nov‐19‐23 38.5 Structure 1A-079Structure 1A-079 293.1 293.1 Sep‐22‐22 Nov‐19‐23 38.5 ERC‐1A‐079 Tower Erec Ɵon 1A‐079 0.7 0.7 0%Oct ‐24‐22 Oct ‐24‐22 10.1 ASY‐1A‐079 Tower Assembly 1A ‐079 0.7 0.7 0%Oct ‐23‐22 Oct ‐24‐22 10.2 FDN‐1A‐079 FoundaƟons 1A‐079 0.7 0.7 0%Sep‐27‐22 Sep‐27‐22 12.0 CLR‐1A‐079 Clearing 1A‐079 0.6 0.6 0%Sep‐22‐22 Sep‐23‐22 15.1 ACC ‐1A‐079 Access 1A‐079 0.6 0.6 0%Sep‐23‐22 Sep‐24‐22 15.1 SPT‐1A‐079 Spoƫng 1A‐079 0.6 0.6 0%Sep‐27‐22 Sep‐28‐22 15.7 REC‐1A‐079 ReclamaƟon 1A‐079 0.6 0.6 0%Nov‐18‐23 Nov‐19‐23 38.5 Structure 1A-080Structure 1A-080 293.1 293.1 Sep‐22‐22 Nov‐18‐23 38.5 ERC‐1A‐080 Tower Erec Ɵon 1A‐080 0.7 0.7 0%Oct ‐23‐22 Oct ‐24‐22 10.1 ASY‐1A‐080 Tower Assembly 1A ‐080 0.7 0.7 0%Oct ‐22‐22 Oct ‐23‐22 10.2 FDN‐1A‐080 FoundaƟons 1A‐080 0.7 0.7 0%Sep‐26‐22 Sep‐27‐22 12.0 CLR‐1A‐080 Clearing 1A‐080 0.6 0.6 0%Sep‐22‐22 Sep‐22‐22 15.0 ACC ‐1A‐080 Access 1A‐080 0.6 0.6 0%Sep‐22‐22 Sep‐23‐22 15.0 SPT‐1A‐080 Spoƫng 1A‐080 0.6 0.6 0%Sep‐27‐22 Sep‐27‐22 15.8 REC‐1A‐080 ReclamaƟon 1A‐080 0.6 0.6 0%Nov‐17‐23 Nov‐18‐23 38.5 Structure 1A-081Structure 1A-081 293.0 293.0 Sep‐21‐22 Nov‐17‐23 38.5 ERC‐1A‐081 Tower Erec Ɵon 1A‐081 0.7 0.7 0%Oct ‐22‐22 Oct ‐23‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐075 FoundaƟons 1A‐075 Clearing 1A‐075 Access 1A‐075 Spoƫng 1A‐075 ReclamaƟon 1A‐075 Nov ‐20‐23, Structure 1A‐076 Tower Erec Ɵon 1A‐076 Tower Assembly 1A ‐076 FoundaƟons 1A‐076 Clearing 1A‐076 Access 1A‐076 Spoƫng 1A‐076 ReclamaƟon 1A‐076 Nov ‐20‐23, Structure 1A‐077 Tower Erec Ɵon 1A‐077 Tower Assembly 1A ‐077 FoundaƟons 1A‐077 Clearing 1A‐077 Access 1A‐077 Spoƫng 1A‐077 ReclamaƟon 1A‐077 Nov‐19‐23, Structure 1A‐078 Tower Erec Ɵon 1A‐078 Tower Assembly 1A‐078 FoundaƟons 1A‐078 Clearing 1A‐078 Access 1A‐078 Spoƫng 1A‐078 ReclamaƟon 1A‐078 Nov‐19‐23, Structure 1A‐079 Tower Erec Ɵon 1A‐079 Tower Assembly 1A‐079 FoundaƟons 1A‐079 Clearing 1A‐079 Access 1A‐079 Spoƫng 1A‐079 ReclamaƟon 1A‐079 Nov‐18‐23, Structure 1A‐080 Tower Erec Ɵon 1A‐080 Tower Assembly 1A‐080 FoundaƟons 1A‐080 Clearing 1A‐080 Access 1A‐080 Spoƫng 1A‐080 ReclamaƟon 1A‐080 Nov‐17‐23, Structure 1A‐081 Tower Erec Ɵon 1A‐081 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 18 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐081 Tower Assembly 1A ‐081 0.7 0.7 0%Oct ‐22‐22 Oct ‐22‐22 10.2 FDN‐1A‐081 FoundaƟons 1A‐081 0.7 0.7 0%Sep‐25‐22 Sep‐26‐22 12.0 CLR‐1A‐081 Clearing 1A‐081 0.6 0.6 0%Sep‐21‐22 Sep‐22‐22 14.9 ACC ‐1A‐081 Access 1A‐081 0.6 0.6 0%Sep‐22‐22 Sep‐22‐22 14.9 SPT‐1A‐081 Spoƫng 1A‐081 0.6 0.6 0%Sep‐26‐22 Sep‐27‐22 15.9 REC‐1A‐081 ReclamaƟon 1A‐081 0.6 0.6 0%Nov‐17‐23 Nov‐17‐23 38.5 Structure 1A-082Structure 1A-082 293.0 293.0 Sep‐21‐22 Nov‐17‐23 38.5 ERC‐1A‐082 Tower Erec Ɵon 1A‐082 0.7 0.7 0%Oct ‐22‐22 Oct ‐22‐22 10.1 ASY‐1A‐082 Tower Assembly 1A ‐082 0.7 0.7 0%Oct ‐21‐22 Oct ‐22‐22 10.2 FDN‐1A‐082 FoundaƟons 1A‐082 0.7 0.7 0%Sep‐25‐22 Sep‐25‐22 12.0 CLR‐1A‐082 Clearing 1A‐082 0.6 0.6 0%Sep‐21‐22 Sep‐21‐22 14.8 ACC ‐1A‐082 Access 1A‐082 0.6 0.6 0%Sep‐21‐22 Sep‐22‐22 14.8 SPT‐1A‐082 Spoƫng 1A‐082 0.6 0.6 0%Sep‐25‐22 Sep‐26‐22 15.9 REC‐1A‐082 ReclamaƟon 1A‐082 0.6 0.6 0%Nov‐16‐23 Nov‐17‐23 38.5 Structure 1A-083Structure 1A-083 292.9 292.9 Sep‐20‐22 Nov‐16‐23 38.5 ERC‐1A‐083 Tower Erec Ɵon 1A‐083 0.7 0.7 0%Oct ‐21‐22 Oct ‐22‐22 10.1 ASY‐1A‐083 Tower Assembly 1A ‐083 0.7 0.7 0%Oct ‐20‐22 Oct ‐21‐22 10.2 FDN‐1A‐083 FoundaƟons 1A‐083 0.7 0.7 0%Sep‐24‐22 Sep‐25‐22 12.0 CLR‐1A‐083 Clearing 1A‐083 0.6 0.6 0%Sep‐20‐22 Sep‐21‐22 14.8 ACC ‐1A‐083 Access 1A‐083 0.6 0.6 0%Sep‐21‐22 Sep‐21‐22 14.8 SPT‐1A‐083 Spoƫng 1A‐083 0.6 0.6 0%Sep‐25‐22 Sep‐25‐22 16.0 REC‐1A‐083 ReclamaƟon 1A‐083 0.6 0.6 0%Nov‐15‐23 Nov‐16‐23 38.5 Structure 1A-084Structure 1A-084 292.9 292.9 Sep‐20‐22 Nov‐15‐23 38.5 ERC‐1A‐084 Tower Erec Ɵon 1A‐084 0.7 0.7 0%Oct ‐20‐22 Oct ‐21‐22 10.1 ASY‐1A‐084 Tower Assembly 1A ‐084 0.7 0.7 0%Oct ‐19‐22 Oct ‐20‐22 10.2 FDN‐1A‐084 FoundaƟons 1A‐084 0.7 0.7 0%Sep‐23‐22 Sep‐24‐22 12.0 CLR‐1A‐084 Clearing 1A‐084 0.6 0.6 0%Sep‐20‐22 Sep‐20‐22 14.7 ACC ‐1A‐084 Access 1A‐084 0.6 0.6 0%Sep‐20‐22 Sep‐21‐22 14.7 SPT‐1A‐084 Spoƫng 1A‐084 0.6 0.6 0%Sep‐24‐22 Sep‐25‐22 16.1 REC‐1A‐084 ReclamaƟon 1A‐084 0.6 0.6 0%Nov‐15‐23 Nov‐15‐23 38.5 Structure 1A-085Structure 1A-085 292.9 292.9 Sep‐19‐22 Nov‐15‐23 38.5 ERC‐1A‐085 Tower Erec Ɵon 1A‐085 0.7 0.7 0%Oct ‐19‐22 Oct ‐20‐22 10.1 ASY‐1A‐085 Tower Assembly 1A ‐085 0.7 0.7 0%Oct ‐19‐22 Oct ‐19‐22 10.2 FDN‐1A‐085 FoundaƟons 1A‐085 0.7 0.7 0%Sep‐23‐22 Sep‐23‐22 12.0 CLR‐1A‐085 Clearing 1A‐085 0.6 0.6 0%Sep‐19‐22 Sep‐20‐22 14.6 ACC ‐1A‐085 Access 1A‐085 0.6 0.6 0%Sep‐20‐22 Sep‐20‐22 14.6 SPT‐1A‐085 Spoƫng 1A‐085 0.6 0.6 0%Sep‐23‐22 Sep‐24‐22 16.2 REC‐1A‐085 ReclamaƟon 1A‐085 0.6 0.6 0%Nov‐14‐23 Nov‐15‐23 38.5 Structure 1A-086Structure 1A-086 292.8 292.8 Sep‐18‐22 Nov‐14‐23 38.5 ERC‐1A‐086 Tower Erec Ɵon 1A‐086 0.7 0.7 0%Oct ‐19‐22 Oct ‐19‐22 10.1 ASY‐1A‐086 Tower Assembly 1A ‐086 0.7 0.7 0%Oct ‐18‐22 Oct ‐19‐22 10.2 FDN‐1A‐086 FoundaƟons 1A‐086 0.7 0.7 0%Sep‐22‐22 Sep‐23‐22 12.0 CLR‐1A‐086 Clearing 1A‐086 0.6 0.6 0%Sep‐18‐22 Sep‐19‐22 14.5 ACC ‐1A‐086 Access 1A‐086 0.6 0.6 0%Sep‐19‐22 Sep‐20‐22 14.5 SPT‐1A‐086 Spoƫng 1A‐086 0.6 0.6 0%Sep‐23‐22 Sep‐23‐22 16.2 REC‐1A‐086 ReclamaƟon 1A‐086 0.6 0.6 0%Nov‐14‐23 Nov‐14‐23 38.5 Structure 1A-087Structure 1A-087 292.8 292.8 Sep‐18‐22 Nov‐14‐23 38.5 ERC‐1A‐087 Tower Erec Ɵon 1A‐087 0.7 0.7 0%Oct ‐18‐22 Oct ‐19‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A‐081 FoundaƟons 1A‐081 Clearing 1A‐081 Access 1A‐081 Spoƫng 1A‐081 ReclamaƟon 1A‐081 Nov‐17‐23, Structure 1A‐082 Tower Erec Ɵon 1A‐082 Tower Assembly 1A‐082 FoundaƟons 1A‐082 Clearing 1A‐082 Access 1A‐082 Spoƫng 1A‐082 ReclamaƟon 1A‐082 Nov‐16‐23, Structure 1A‐083 Tower Erec Ɵon 1A‐083 Tower Assembly 1A ‐083 FoundaƟons 1A‐083 Clearing 1A‐083 Access 1A‐083 Spoƫng 1A‐083 ReclamaƟon 1A‐083 Nov‐15‐23, Structure 1A‐084 Tower Erec Ɵon 1A‐084 Tower Assembly 1A ‐084 FoundaƟons 1A‐084 Clearing 1A‐084 Access 1A‐084 Spoƫng 1A‐084 ReclamaƟon 1A‐084 Nov‐15‐23, Structure 1A‐085 Tower Erec Ɵon 1A‐085 Tower Assembly 1A ‐085 FoundaƟons 1A‐085 Clearing 1A‐085 Access 1A‐085 Spoƫng 1A‐085 ReclamaƟon 1A‐085 Nov‐14‐23, Structure 1A‐086 Tower Erec Ɵon 1A‐086 Tower Assembly 1A ‐086 FoundaƟons 1A‐086 Clearing 1A‐086 Access 1A‐086 Spoƫng 1A‐086 ReclamaƟon 1A‐086 Nov‐14‐23, Structure 1A‐087 Tower Erec Ɵon 1A‐087 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 19 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐087 Tower Assembly 1A ‐087 0.7 0.7 0%Oct ‐17‐22 Oct ‐18‐22 10.2 FDN‐1A‐087 FoundaƟons 1A‐087 0.7 0.7 0%Sep‐21‐22 Sep‐22‐22 12.0 CLR‐1A‐087 Clearing 1A‐087 0.6 0.6 0%Sep‐18‐22 Sep‐18‐22 14.5 ACC ‐1A‐087 Access 1A‐087 0.6 0.6 0%Sep‐18‐22 Sep‐19‐22 14.5 SPT‐1A‐087 Spoƫng 1A‐087 0.6 0.6 0%Sep‐22‐22 Sep‐23‐22 16.3 REC‐1A‐087 ReclamaƟon 1A‐087 0.6 0.6 0%Nov‐13‐23 Nov‐14‐23 38.5 Structure 1A-088Structure 1A-088 292.7 292.7 Sep‐17‐22 Nov‐13‐23 38.5 ERC‐1A‐088 Tower Erec Ɵon 1A‐088 0.7 0.7 0%Oct ‐17‐22 Oct ‐18‐22 10.1 ASY‐1A‐088 Tower Assembly 1A ‐088 0.7 0.7 0%Oct ‐17‐22 Oct ‐17‐22 10.2 FDN‐1A‐088 FoundaƟons 1A‐088 0.7 0.7 0%Sep‐21‐22 Sep‐21‐22 12.0 CLR‐1A‐088 Clearing 1A‐088 0.6 0.6 0%Sep‐17‐22 Sep‐18‐22 14.4 ACC ‐1A‐088 Access 1A‐088 0.6 0.6 0%Sep‐18‐22 Sep‐18‐22 14.4 SPT‐1A‐088 Spoƫng 1A‐088 0.6 0.6 0%Sep‐21‐22 Sep‐22‐22 16.4 REC‐1A‐088 ReclamaƟon 1A‐088 0.6 0.6 0%Nov‐12‐23 Nov‐13‐23 38.5 Structure 1A-089Structure 1A-089 292.7 292.7 Sep‐17‐22 Nov‐12‐23 38.5 ERC‐1A‐089 Tower Erec Ɵon 1A‐089 0.7 0.7 0%Oct ‐17‐22 Oct ‐17‐22 10.1 ASY‐1A‐089 Tower Assembly 1A ‐089 0.7 0.7 0%Oct ‐16‐22 Oct ‐17‐22 10.2 FDN‐1A‐089 FoundaƟons 1A‐089 0.7 0.7 0%Sep‐20‐22 Sep‐21‐22 12.0 CLR‐1A‐089 Clearing 1A‐089 0.6 0.6 0%Sep‐17‐22 Sep‐17‐22 14.3 ACC ‐1A‐089 Access 1A‐089 0.6 0.6 0%Sep‐17‐22 Sep‐18‐22 14.3 SPT‐1A‐089 Spoƫng 1A‐089 0.6 0.6 0%Sep‐21‐22 Sep‐21‐22 16.5 REC‐1A‐089 ReclamaƟon 1A‐089 0.6 0.6 0%Nov‐12‐23 Nov‐12‐23 38.5 Structure 1A-090Structure 1A-090 292.6 292.6 Sep‐16‐22 Nov‐12‐23 38.5 ERC‐1A‐090 Tower Erec Ɵon 1A‐090 0.7 0.7 0%Oct ‐16‐22 Oct ‐17‐22 10.1 ASY‐1A‐090 Tower Assembly 1A ‐090 0.7 0.7 0%Oct ‐15‐22 Oct ‐16‐22 10.2 FDN‐1A‐090 FoundaƟons 1A‐090 0.7 0.7 0%Sep‐20‐22 Sep‐20‐22 12.0 CLR‐1A‐090 Clearing 1A‐090 0.6 0.6 0%Sep‐16‐22 Sep‐17‐22 14.2 ACC ‐1A‐090 Access 1A‐090 0.6 0.6 0%Sep‐17‐22 Sep‐17‐22 14.2 SPT‐1A‐090 Spoƫng 1A‐090 0.6 0.6 0%Sep‐20‐22 Sep‐21‐22 16.5 REC‐1A‐090 ReclamaƟon 1A‐090 0.6 0.6 0%Nov‐11‐23 Nov‐12‐23 38.5 Structure 1A-091Structure 1A-091 292.6 292.6 Sep‐16‐22 Nov‐11‐23 38.5 ERC‐1A‐091 Tower Erec Ɵon 1A‐091 0.7 0.7 0%Oct ‐15‐22 Oct ‐16‐22 10.1 ASY‐1A‐091 Tower Assembly 1A ‐091 0.7 0.7 0%Oct ‐14‐22 Oct ‐15‐22 10.2 FDN‐1A‐091 FoundaƟons 1A‐091 0.7 0.7 0%Sep‐19‐22 Sep‐20‐22 12.0 CLR‐1A‐091 Clearing 1A‐091 0.6 0.6 0%Sep‐16‐22 Sep‐16‐22 14.1 ACC ‐1A‐091 Access 1A‐091 0.6 0.6 0%Sep‐16‐22 Sep‐17‐22 14.1 SPT‐1A‐091 Spoƫng 1A‐091 0.6 0.6 0%Sep‐20‐22 Sep‐20‐22 16.6 REC‐1A‐091 ReclamaƟon 1A‐091 0.6 0.6 0%Nov‐11‐23 Nov‐11‐23 38.5 Structure 1A-092Structure 1A-092 292.5 292.5 Sep‐15‐22 Nov‐11‐23 38.5 ERC‐1A‐092 Tower Erec Ɵon 1A‐092 0.7 0.7 0%Oct ‐14‐22 Oct ‐15‐22 10.1 ASY‐1A‐092 Tower Assembly 1A ‐092 0.7 0.7 0%Oct ‐14‐22 Oct ‐14‐22 10.2 FDN‐1A‐092 FoundaƟons 1A‐092 0.7 0.7 0%Sep‐18‐22 Sep‐19‐22 12.0 CLR‐1A‐092 Clearing 1A‐092 0.6 0.6 0%Sep‐15‐22 Sep‐16‐22 14.1 ACC ‐1A‐092 Access 1A‐092 0.6 0.6 0%Sep‐16‐22 Sep‐16‐22 14.1 SPT‐1A‐092 Spoƫng 1A‐092 0.6 0.6 0%Sep‐19‐22 Sep‐19‐22 16.7 REC‐1A‐092 ReclamaƟon 1A‐092 0.6 0.6 0%Nov‐10‐23 Nov‐11‐23 38.5 Structure 1A-093Structure 1A-093 292.5 292.5 Sep‐14‐22 Nov‐10‐23 38.5 ERC‐1A‐093 Tower Erec Ɵon 1A‐093 0.7 0.7 0%Oct ‐14‐22 Oct ‐14‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐087 FoundaƟons 1A‐087 Clearing 1A‐087 Access 1A‐087 Spoƫng 1A‐087 ReclamaƟon 1A‐087 Nov‐13‐23, Structure 1A‐088 Tower Erec Ɵon 1A‐088 Tower Assembly 1A ‐088 FoundaƟons 1A‐088 Clearing 1A‐088 Access 1A‐088 Spoƫng 1A‐088 ReclamaƟon 1A‐088 Nov‐12‐23, Structure 1A‐089 Tower Erec Ɵon 1A‐089 Tower Assembly 1A ‐089 FoundaƟons 1A‐089 Clearing 1A‐089 Access 1A‐089 Spoƫng 1A‐089 ReclamaƟon 1A‐089 Nov‐12‐23, Structure 1A‐090 Tower Erec Ɵon 1A‐090 Tower Assembly 1A ‐090 FoundaƟons 1A‐090 Clearing 1A‐090 Access 1A‐090 Spoƫng 1A‐090 ReclamaƟon 1A‐090 Nov‐11‐23, Structure 1A‐091 Tower Erec Ɵon 1A‐091 Tower Assembly 1A ‐091 FoundaƟons 1A‐091 Clearing 1A‐091 Access 1A‐091 Spoƫng 1A‐091 ReclamaƟon 1A‐091 Nov‐11‐23, Structure 1A‐092 Tower Erec Ɵon 1A‐092 Tower Assembly 1A ‐092 FoundaƟons 1A‐092 Clearing 1A‐092 Access 1A‐092 Spoƫng 1A‐092 ReclamaƟon 1A‐092 Nov‐10‐23, Structure 1A‐093 Tower Erec Ɵon 1A‐093 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 20 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐093 Tower Assembly 1A ‐093 0.7 0.7 0%Oct ‐13‐22 Oct ‐14‐22 10.2 FDN‐1A‐093 FoundaƟons 1A‐093 0.7 0.7 0%Sep‐18‐22 Sep‐18‐22 12.0 CLR‐1A‐093 Clearing 1A‐093 0.6 0.6 0%Sep‐14‐22 Sep‐15‐22 14.0 ACC ‐1A‐093 Access 1A‐093 0.6 0.6 0%Sep‐15‐22 Sep‐16‐22 14.0 SPT‐1A‐093 Spoƫng 1A‐093 0.6 0.6 0%Sep‐18‐22 Sep‐19‐22 16.8 REC‐1A‐093 ReclamaƟon 1A‐093 0.6 0.6 0%Nov‐09‐23 Nov‐10‐23 38.5 Structure 1A-094Structure 1A-094 292.4 292.4 Sep‐14‐22 Nov‐09‐23 38.5 ERC‐1A‐094 Tower Erec Ɵon 1A‐094 0.7 0.7 0%Oct ‐13‐22 Oct ‐14‐22 10.1 ASY‐1A‐094 Tower Assembly 1A ‐094 0.7 0.7 0%Oct ‐12‐22 Oct ‐13‐22 10.2 FDN‐1A‐094 FoundaƟons 1A‐094 0.7 0.7 0%Sep‐17‐22 Sep‐18‐22 12.0 CLR‐1A‐094 Clearing 1A‐094 0.6 0.6 0%Sep‐14‐22 Sep‐14‐22 13.9 ACC ‐1A‐094 Access 1A‐094 0.6 0.6 0%Sep‐14‐22 Sep‐15‐22 13.9 SPT‐1A‐094 Spoƫng 1A‐094 0.6 0.6 0%Sep‐18‐22 Sep‐18‐22 16.9 REC‐1A‐094 ReclamaƟon 1A‐094 0.6 0.6 0%Nov‐09‐23 Nov‐09‐23 38.5 Structure 1A-095Structure 1A-095 292.4 292.4 Sep‐13‐22 Nov‐09‐23 38.5 ERC‐1A‐095 Tower Erec Ɵon 1A‐095 0.7 0.7 0%Oct ‐12‐22 Oct ‐13‐22 10.1 ASY‐1A‐095 Tower Assembly 1A ‐095 0.7 0.7 0%Oct ‐11‐22 Oct ‐12‐22 10.2 FDN‐1A‐095 FoundaƟons 1A‐095 0.7 0.7 0%Sep‐16‐22 Sep‐17‐22 12.0 CLR‐1A‐095 Clearing 1A‐095 0.6 0.6 0%Sep‐13‐22 Sep‐14‐22 13.8 ACC ‐1A‐095 Access 1A‐095 0.6 0.6 0%Sep‐14‐22 Sep‐14‐22 13.8 SPT‐1A‐095 Spoƫng 1A‐095 0.6 0.6 0%Sep‐17‐22 Sep‐17‐22 16.9 REC‐1A‐095 ReclamaƟon 1A‐095 0.6 0.6 0%Nov‐08‐23 Nov‐09‐23 38.5 Structure 1A-096Structure 1A-096 292.3 292.3 Sep‐13‐22 Nov‐08‐23 38.5 ERC‐1A‐096 Tower Erec Ɵon 1A‐096 0.7 0.7 0%Oct ‐12‐22 Oct ‐12‐22 10.1 ASY‐1A‐096 Tower Assembly 1A ‐096 0.7 0.7 0%Oct ‐11‐22 Oct ‐11‐22 10.2 FDN‐1A‐096 FoundaƟons 1A‐096 0.7 0.7 0%Sep‐16‐22 Sep‐16‐22 12.0 CLR‐1A‐096 Clearing 1A‐096 0.6 0.6 0%Sep‐13‐22 Sep‐13‐22 13.8 ACC ‐1A‐096 Access 1A‐096 0.6 0.6 0%Sep‐13‐22 Sep‐14‐22 13.8 SPT‐1A‐096 Spoƫng 1A‐096 0.6 0.6 0%Sep‐16‐22 Sep‐17‐22 17.0 REC‐1A‐096 ReclamaƟon 1A‐096 0.6 0.6 0%Nov‐07‐23 Nov‐08‐23 38.5 Structure 1A-097Structure 1A-097 292.3 292.3 Sep‐12‐22 Nov‐07‐23 38.5 ERC‐1A‐097 Tower Erec Ɵon 1A‐097 0.7 0.7 0%Oct ‐11‐22 Oct ‐12‐22 10.1 ASY‐1A‐097 Tower Assembly 1A ‐097 0.7 0.7 0%Oct ‐10‐22 Oct ‐11‐22 10.2 FDN‐1A‐097 FoundaƟons 1A‐097 0.7 0.7 0%Sep‐15‐22 Sep‐16‐22 12.0 CLR‐1A‐097 Clearing 1A‐097 0.6 0.6 0%Sep‐12‐22 Sep‐13‐22 13.7 ACC ‐1A‐097 Access 1A‐097 0.6 0.6 0%Sep‐13‐22 Sep‐13‐22 13.7 SPT‐1A‐097 Spoƫng 1A‐097 0.6 0.6 0%Sep‐16‐22 Sep‐16‐22 17.1 REC‐1A‐097 ReclamaƟon 1A‐097 0.6 0.6 0%Nov‐07‐23 Nov‐07‐23 38.5 Structure 1A-098Structure 1A-098 292.2 292.2 Sep‐12‐22 Nov‐07‐23 38.5 ERC‐1A‐098 Tower Erec Ɵon 1A‐098 0.7 0.7 0%Oct ‐10‐22 Oct ‐11‐22 10.1 ASY‐1A‐098 Tower Assembly 1A ‐098 0.7 0.7 0%Oct ‐09‐22 Oct ‐10‐22 10.2 FDN‐1A‐098 FoundaƟons 1A‐098 0.7 0.7 0%Sep‐14‐22 Sep‐15‐22 12.0 CLR‐1A‐098 Clearing 1A‐098 0.6 0.6 0%Sep‐12‐22 Sep‐12‐22 13.6 ACC ‐1A‐098 Access 1A‐098 0.6 0.6 0%Sep‐12‐22 Sep‐13‐22 13.6 SPT‐1A‐098 Spoƫng 1A‐098 0.6 0.6 0%Sep‐15‐22 Sep‐16‐22 17.2 REC‐1A‐098 ReclamaƟon 1A‐098 0.6 0.6 0%Nov‐06‐23 Nov‐07‐23 38.5 Structure 1A-099Structure 1A-099 292.2 292.2 Sep‐11‐22 Nov‐06‐23 38.5 ERC‐1A‐099 Tower Erec Ɵon 1A‐099 0.7 0.7 0%Oct ‐09‐22 Oct ‐10‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐093 FoundaƟons 1A‐093 Clearing 1A‐093 Access 1A‐093 Spoƫng 1A‐093 ReclamaƟon 1A‐093 Nov‐09‐23, Structure 1A‐094 Tower Erec Ɵon 1A‐094 Tower Assembly 1A ‐094 FoundaƟons 1A‐094 Clearing 1A‐094 Access 1A‐094 Spoƫng 1A‐094 ReclamaƟon 1A‐094 Nov‐09‐23, Structure 1A‐095 Tower Erec Ɵon 1A‐095 Tower Assembly 1A ‐095 FoundaƟons 1A‐095 Clearing 1A‐095 Access 1A‐095 Spoƫng 1A‐095 ReclamaƟon 1A‐095 Nov‐08‐23, Structure 1A‐096 Tower Erec Ɵon 1A‐096 Tower Assembly 1A‐096 FoundaƟons 1A‐096 Clearing 1A‐096 Access 1A‐096 Spoƫng 1A‐096 ReclamaƟon 1A‐096 Nov‐07‐23, Structure 1A‐097 Tower Erec Ɵon 1A‐097 Tower Assembly 1A‐097 FoundaƟons 1A‐097 Clearing 1A‐097 Access 1A‐097 Spoƫng 1A‐097 ReclamaƟon 1A‐097 Nov‐07‐23, Structure 1A‐098 Tower Erec Ɵon 1A‐098 Tower Assembly 1A‐098 FoundaƟons 1A‐098 Clearing 1A‐098 Access 1A‐098 Spoƫng 1A‐098 ReclamaƟon 1A‐098 Nov‐06‐23, Structure 1A‐099 Tower Erec Ɵon 1A‐099 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 21 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐099 Tower Assembly 1A ‐099 0.7 0.7 0%Oct ‐09‐22 Oct ‐09‐22 10.2 FDN‐1A‐099 FoundaƟons 1A‐099 0.7 0.7 0%Sep‐14‐22 Sep‐14‐22 12.0 CLR‐1A‐099 Clearing 1A‐099 0.6 0.6 0%Sep‐11‐22 Sep‐12‐22 13.5 ACC ‐1A‐099 Access 1A‐099 0.6 0.6 0%Sep‐12‐22 Sep‐12‐22 13.5 SPT‐1A‐099 Spoƫng 1A‐099 0.6 0.6 0%Sep‐14‐22 Sep‐15‐22 17.2 REC‐1A‐099 ReclamaƟon 1A‐099 0.6 0.6 0%Nov‐06‐23 Nov‐06‐23 38.5 Structure 1A-100Structure 1A-100 292.2 292.2 Sep‐10‐22 Nov‐06‐23 38.5 ERC‐1A‐100 Tower Erec Ɵon 1A‐100 0.7 0.7 0%Oct ‐09‐22 Oct ‐09‐22 10.1 ASY‐1A‐100 Tower Assembly 1A ‐100 0.7 0.7 0%Oct ‐08‐22 Oct ‐09‐22 10.2 FDN‐1A‐100 FoundaƟons 1A‐100 0.7 0.7 0%Sep‐13‐22 Sep‐14‐22 12.0 CLR‐1A‐100 Clearing 1A‐100 0.6 0.6 0%Sep‐10‐22 Sep‐11‐22 13.5 ACC ‐1A‐100 Access 1A‐100 0.6 0.6 0%Sep‐11‐22 Sep‐12‐22 13.5 SPT‐1A‐100 Spoƫng 1A‐100 0.6 0.6 0%Sep‐14‐22 Sep‐14‐22 17.3 REC‐1A‐100 ReclamaƟon 1A‐100 0.6 0.6 0%Nov‐05‐23 Nov‐06‐23 38.5 Structure 1A-101Structure 1A-101 292.1 292.1 Sep‐10‐22 Nov‐05‐23 38.5 ERC‐1A‐101 Tower Erec Ɵon 1A‐101 0.7 0.7 0%Oct ‐08‐22 Oct ‐09‐22 10.1 ASY‐1A‐101 Tower Assembly 1A ‐101 0.7 0.7 0%Oct ‐07‐22 Oct ‐08‐22 10.2 FDN‐1A‐101 FoundaƟons 1A‐101 0.7 0.7 0%Sep‐12‐22 Sep‐13‐22 12.0 CLR‐1A‐101 Clearing 1A‐101 0.6 0.6 0%Sep‐10‐22 Sep‐10‐22 13.4 ACC ‐1A‐101 Access 1A‐101 0.6 0.6 0%Sep‐10‐22 Sep‐11‐22 13.4 SPT‐1A‐101 Spoƫng 1A‐101 0.6 0.6 0%Sep‐13‐22 Sep‐14‐22 17.4 REC‐1A‐101 ReclamaƟon 1A‐101 0.6 0.6 0%Nov‐04‐23 Nov‐05‐23 38.5 Structure 1A-102Structure 1A-102 292.1 292.1 Sep‐09‐22 Nov‐04‐23 38.5 ERC‐1A‐102 Tower Erec Ɵon 1A‐102 0.7 0.7 0%Oct ‐07‐22 Oct ‐08‐22 10.1 ASY‐1A‐102 Tower Assembly 1A ‐102 0.7 0.7 0%Oct ‐06‐22 Oct ‐07‐22 10.2 FDN‐1A‐102 FoundaƟons 1A‐102 0.7 0.7 0%Sep‐12‐22 Sep‐12‐22 12.0 CLR‐1A‐102 Clearing 1A‐102 0.6 0.6 0%Sep‐09‐22 Sep‐10‐22 13.3 ACC ‐1A‐102 Access 1A‐102 0.6 0.6 0%Sep‐10‐22 Sep‐10‐22 13.3 SPT‐1A‐102 Spoƫng 1A‐102 0.6 0.6 0%Sep‐12‐22 Sep‐13‐22 17.5 REC‐1A‐102 ReclamaƟon 1A‐102 0.6 0.6 0%Nov‐04‐23 Nov‐04‐23 38.5 Structure 1A-103Structure 1A-103 292.0 292.0 Sep‐09‐22 Nov‐04‐23 38.5 ERC‐1A‐103 Tower Erec Ɵon 1A‐103 0.7 0.7 0%Oct ‐06‐22 Oct ‐07‐22 10.1 ASY‐1A‐103 Tower Assembly 1A ‐103 0.7 0.7 0%Oct ‐06‐22 Oct ‐06‐22 10.2 FDN‐1A‐103 FoundaƟons 1A‐103 0.7 0.7 0%Sep‐11‐22 Sep‐12‐22 12.0 CLR‐1A‐103 Clearing 1A‐103 0.6 0.6 0%Sep‐09‐22 Sep‐09‐22 13.2 ACC ‐1A‐103 Access 1A‐103 0.6 0.6 0%Sep‐09‐22 Sep‐10‐22 13.2 SPT‐1A‐103 Spoƫng 1A‐103 0.6 0.6 0%Sep‐12‐22 Sep‐12‐22 17.5 REC‐1A‐103 ReclamaƟon 1A‐103 0.6 0.6 0%Nov‐03‐23 Nov‐04‐23 38.5 Structure 1A-104Structure 1A-104 282.5 282.5 Sep‐08‐22 Oct ‐25‐23 48.0 ERC‐1A‐104 Tower Erec Ɵon 1A‐104 0.7 0.7 0%Oct ‐06‐22 Oct ‐06‐22 10.1 ASY‐1A‐104 Tower Assembly 1A ‐104 0.7 0.7 0%Oct ‐05‐22 Oct ‐06‐22 10.2 FDN‐1A‐104 FoundaƟons 1A‐104 0.7 0.7 0%Sep‐10‐22 Sep‐11‐22 12.0 CLR‐1A‐104 Clearing 1A‐104 0.6 0.6 0%Sep‐08‐22 Sep‐09‐22 13.1 ACC ‐1A‐104 Access 1A‐104 0.6 0.6 0%Sep‐09‐22 Sep‐09‐22 13.1 SPT‐1A‐104 Spoƫng 1A‐104 0.6 0.6 0%Sep‐11‐22 Sep‐12‐22 17.6 REC‐1A‐104 ReclamaƟon 1A‐104 0.7 0.7 0%Oct ‐24‐23 Oct ‐25‐23 48.0 Structure 1A-105Structure 1A-105 282.3 282.3 Sep‐08‐22 Oct ‐24‐23 48.0 ERC‐1A‐105 Tower Erec Ɵon 1A‐105 0.7 0.7 0%Oct ‐05‐22 Oct ‐06‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐099 FoundaƟons 1A‐099 Clearing 1A‐099 Access 1A‐099 Spoƫng 1A‐099 ReclamaƟon 1A‐099 Nov‐06‐23, Structure 1A‐100 Tower Erec Ɵon 1A‐100 Tower Assembly 1A ‐100 FoundaƟons 1A‐100 Clearing 1A‐100 Access 1A‐100 Spoƫng 1A‐100 ReclamaƟon 1A‐100 Nov‐05‐23, Structure 1A‐101 Tower Erec Ɵon 1A‐101 Tower Assembly 1A ‐101 FoundaƟons 1A‐101 Clearing 1A‐101 Access 1A‐101 Spoƫng 1A‐101 ReclamaƟon 1A‐101 Nov‐04‐23, Structure 1A‐102 Tower Erec Ɵon 1A‐102 Tower Assembly 1A ‐102 FoundaƟons 1A‐102 Clearing 1A‐102 Access 1A‐102 Spoƫng 1A‐102 ReclamaƟon 1A‐102 Nov‐04‐23, Structure 1A‐103 Tower Erec Ɵon 1A‐103 Tower Assembly 1A ‐103 FoundaƟons 1A‐103 Clearing 1A‐103 Access 1A‐103 Spoƫng 1A‐103 ReclamaƟon 1A‐103 Oct ‐25‐23, Structure 1A‐104 Tower Erec Ɵon 1A‐104 Tower Assembly 1A ‐104 FoundaƟons 1A‐104 Clearing 1A‐104 Access 1A‐104 Spoƫng 1A‐104 ReclamaƟon 1A‐104 Oct ‐24‐23, Structure 1A‐105 Tower Erec Ɵon 1A‐105 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 22 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐105 Tower Assembly 1A ‐105 0.7 0.7 0%Oct ‐04‐22 Oct ‐05‐22 10.1 FDN‐1A‐105 FoundaƟons 1A‐105 0.7 0.7 0%Sep‐10‐22 Sep‐10‐22 12.0 CLR‐1A‐105 Clearing 1A‐105 0.6 0.6 0%Sep‐08‐22 Sep‐08‐22 13.1 ACC ‐1A‐105 Access 1A‐105 0.6 0.6 0%Sep‐08‐22 Sep‐09‐22 13.1 SPT‐1A‐105 Spoƫng 1A‐105 0.6 0.6 0%Sep‐10‐22 Sep‐11‐22 17.7 REC‐1A‐105 ReclamaƟon 1A‐105 0.7 0.7 0%Oct ‐23‐23 Oct ‐24‐23 48.0 Structure 1A-106Structure 1A-106 282.2 282.2 Sep‐07‐22 Oct ‐23‐23 48.0 ERC‐1A‐106 Tower Erec Ɵon 1A‐106 0.7 0.7 0%Oct ‐04‐22 Oct ‐05‐22 10.1 ASY‐1A‐106 Tower Assembly 1A ‐106 0.7 0.7 0%Oct ‐04‐22 Oct ‐04‐22 10.1 FDN‐1A‐106 FoundaƟons 1A‐106 0.7 0.7 0%Sep‐09‐22 Sep‐10‐22 12.0 CLR‐1A‐106 Clearing 1A‐106 0.6 0.6 0%Sep‐07‐22 Sep‐08‐22 13.0 ACC ‐1A‐106 Access 1A‐106 0.6 0.6 0%Sep‐08‐22 Sep‐08‐22 13.0 SPT‐1A‐106 Spoƫng 1A‐106 0.6 0.6 0%Sep‐10‐22 Sep‐10‐22 17.8 REC‐1A‐106 ReclamaƟon 1A‐106 0.7 0.7 0%Oct ‐22‐23 Oct ‐23‐23 48.0 Structure 1A-107Structure 1A-107 282.0 282.0 Sep‐06‐22 Oct ‐22‐23 48.0 ERC‐1A‐107 Tower Erec Ɵon 1A‐107 0.7 0.7 0%Oct ‐04‐22 Oct ‐04‐22 10.1 ASY‐1A‐107 Tower Assembly 1A ‐107 0.7 0.7 0%Oct ‐03‐22 Oct ‐04‐22 10.1 FDN‐1A‐107 FoundaƟons 1A‐107 0.7 0.7 0%Sep‐08‐22 Sep‐09‐22 12.0 CLR‐1A‐107 Clearing 1A‐107 0.6 0.6 0%Sep‐06‐22 Sep‐07‐22 12.9 ACC ‐1A‐107 Access 1A‐107 0.6 0.6 0%Sep‐07‐22 Sep‐08‐22 12.9 SPT‐1A‐107 Spoƫng 1A‐107 0.6 0.6 0%Sep‐09‐22 Sep‐10‐22 17.8 REC‐1A‐107 ReclamaƟon 1A‐107 0.7 0.7 0%Oct ‐22‐23 Oct ‐22‐23 48.0 Structure 1A-108Structure 1A-108 281.9 281.9 Sep‐06‐22 Oct ‐22‐23 48.0 ERC‐1A‐108 Tower Erec Ɵon 1A‐108 0.7 0.7 0%Oct ‐03‐22 Oct ‐04‐22 10.1 ASY‐1A‐108 Tower Assembly 1A ‐108 0.7 0.7 0%Oct ‐02‐22 Oct ‐03‐22 10.1 FDN‐1A‐108 FoundaƟons 1A‐108 0.7 0.7 0%Sep‐08‐22 Sep‐08‐22 12.0 CLR‐1A‐108 Clearing 1A‐108 0.6 0.6 0%Sep‐06‐22 Sep‐06‐22 12.8 ACC ‐1A‐108 Access 1A‐108 0.6 0.6 0%Sep‐06‐22 Sep‐07‐22 12.8 SPT‐1A‐108 Spoƫng 1A‐108 0.6 0.6 0%Sep‐08‐22 Sep‐09‐22 17.9 REC‐1A‐108 ReclamaƟon 1A‐108 0.7 0.7 0%Oct ‐21‐23 Oct ‐22‐23 48.0 Structure 1A-109Structure 1A-109 281.8 281.8 Sep‐04‐22 Oct ‐21‐23 48.0 ERC‐1A‐109 Tower Erec Ɵon 1A‐109 0.7 0.7 0%Oct ‐02‐22 Oct ‐03‐22 10.1 ASY‐1A‐109 Tower Assembly 1A ‐109 0.7 0.7 0%Oct ‐01‐22 Oct ‐02‐22 10.1 FDN‐1A‐109 FoundaƟons 1A‐109 0.7 0.7 0%Sep‐07‐22 Sep‐08‐22 12.0 CLR‐1A‐109 Clearing 1A‐109 0.6 0.6 0%Sep‐04‐22 Sep‐06‐22 12.8 ACC ‐1A‐109 Access 1A‐109 0.6 0.6 0%Sep‐06‐22 Sep‐06‐22 12.8 SPT‐1A‐109 Spoƫng 1A‐109 0.6 0.6 0%Sep‐08‐22 Sep‐08‐22 18.0 REC‐1A‐109 ReclamaƟon 1A‐109 0.7 0.7 0%Oct ‐20‐23 Oct ‐21‐23 48.0 Structure 1A-110Structure 1A-110 281.6 281.6 Sep‐04‐22 Oct ‐20‐23 48.0 ERC‐1A‐110 Tower Erec Ɵon 1A‐110 0.7 0.7 0%Oct ‐01‐22 Oct ‐02‐22 10.1 ASY‐1A‐110 Tower Assembly 1A ‐110 0.7 0.7 0%Oct ‐01‐22 Oct ‐01‐22 10.1 FDN‐1A‐110 FoundaƟons 1A‐110 0.7 0.7 0%Sep‐07‐22 Sep‐07‐22 12.0 CLR‐1A‐110 Clearing 1A‐110 0.6 0.6 0%Sep‐04‐22 Sep‐04‐22 12.7 ACC ‐1A‐110 Access 1A‐110 0.6 0.6 0%Sep‐04‐22 Sep‐06‐22 12.7 SPT‐1A‐110 Spoƫng 1A‐110 0.6 0.6 0%Sep‐07‐22 Sep‐08‐22 18.1 REC‐1A‐110 ReclamaƟon 1A‐110 0.7 0.7 0%Oct ‐20‐23 Oct ‐20‐23 48.0 Structure 1A-111Structure 1A-111 281.5 281.5 Sep‐03‐22 Oct ‐20‐23 48.0 ERC‐1A‐111 Tower Erec Ɵon 1A‐111 0.7 0.7 0%Oct ‐01‐22 Oct ‐01‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐105 FoundaƟons 1A‐105 Clearing 1A‐105 Access 1A‐105 Spoƫng 1A‐105 ReclamaƟon 1A‐105 Oct ‐23‐23, Structure 1A‐106 Tower Erec Ɵon 1A‐106 Tower Assembly 1A ‐106 FoundaƟons 1A‐106 Clearing 1A‐106 Access 1A‐106 Spoƫng 1A‐106 ReclamaƟon 1A‐106 Oct ‐22‐23, Structure 1A‐107 Tower Erec Ɵon 1A‐107 Tower Assembly 1A ‐107 FoundaƟons 1A‐107 Clearing 1A‐107 Access 1A‐107 Spoƫng 1A‐107 ReclamaƟon 1A‐107 Oct ‐22‐23, Structure 1A‐108 Tower Erec Ɵon 1A‐108 Tower Assembly 1A ‐108 FoundaƟons 1A‐108 Clearing 1A‐108 Access 1A‐108 Spoƫng 1A‐108 ReclamaƟon 1A‐108 Oct ‐21‐23, Structure 1A‐109 Tower Erec Ɵon 1A‐109 Tower Assembly 1A ‐109 FoundaƟons 1A‐109 Clearing 1A‐109 Access 1A‐109 Spoƫng 1A‐109 ReclamaƟon 1A‐109 Oct ‐20‐23, Structure 1A‐110 Tower Erec Ɵon 1A‐110 Tower Assembly 1A ‐110 FoundaƟons 1A‐110 Clearing 1A‐110 Access 1A‐110 Spoƫng 1A‐110 ReclamaƟon 1A‐110 Oct ‐20‐23, Structure 1A‐111 Tower Erec Ɵon 1A‐111 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 23 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐111 Tower Assembly 1A ‐111 0.7 0.7 0%Sep‐30‐22 Oct ‐01‐22 10.1 FDN‐1A‐111 FoundaƟons 1A‐111 0.7 0.7 0%Sep‐06‐22 Sep‐07‐22 12.0 CLR‐1A‐111 Clearing 1A‐111 0.6 0.6 0%Sep‐03‐22 Sep‐04‐22 12.6 ACC ‐1A‐111 Access 1A‐111 0.6 0.6 0%Sep‐04‐22 Sep‐04‐22 12.6 SPT‐1A‐111 Spoƫng 1A‐111 0.6 0.6 0%Sep‐07‐22 Sep‐07‐22 18.2 REC‐1A‐111 ReclamaƟon 1A‐111 0.7 0.7 0%Oct ‐19‐23 Oct ‐20‐23 48.0 Structure 1A-112Structure 1A-112 281.3 281.3 Sep‐03‐22 Oct ‐19‐23 48.0 ERC‐1A‐112 Tower Erec Ɵon 1A‐112 0.7 0.7 0%Sep‐30‐22 Oct ‐01‐22 10.1 ASY‐1A‐112 Tower Assembly 1A ‐112 0.7 0.7 0%Sep‐29‐22 Sep‐30‐22 10.1 FDN‐1A‐112 FoundaƟons 1A‐112 0.7 0.7 0%Sep‐04‐22 Sep‐06‐22 12.0 CLR‐1A‐112 Clearing 1A‐112 0.6 0.6 0%Sep‐03‐22 Sep‐03‐22 12.5 ACC ‐1A‐112 Access 1A‐112 0.6 0.6 0%Sep‐03‐22 Sep‐04‐22 12.5 SPT‐1A‐112 Spoƫng 1A‐112 0.6 0.6 0%Sep‐06‐22 Sep‐06‐22 18.2 REC‐1A‐112 ReclamaƟon 1A‐112 0.7 0.7 0%Oct ‐18‐23 Oct ‐19‐23 48.0 Structure 1A-113Structure 1A-113 281.2 281.2 Sep‐02‐22 Oct ‐18‐23 48.0 ERC‐1A‐113 Tower Erec Ɵon 1A‐113 0.7 0.7 0%Sep‐29‐22 Sep‐30‐22 10.1 ASY‐1A‐113 Tower Assembly 1A ‐113 0.7 0.7 0%Sep‐29‐22 Sep‐29‐22 10.1 FDN‐1A‐113 FoundaƟons 1A‐113 0.7 0.7 0%Sep‐04‐22 Sep‐04‐22 12.0 CLR‐1A‐113 Clearing 1A‐113 0.6 0.6 0%Sep‐02‐22 Sep‐03‐22 12.5 ACC ‐1A‐113 Access 1A‐113 0.6 0.6 0%Sep‐03‐22 Sep‐03‐22 12.5 SPT‐1A‐113 Spoƫng 1A‐113 0.6 0.6 0%Sep‐04‐22 Sep‐06‐22 18.3 REC‐1A‐113 ReclamaƟon 1A‐113 0.7 0.7 0%Oct ‐17‐23 Oct ‐18‐23 48.0 Structure 1A-114Structure 1A-114 281.0 281.0 Sep‐01‐22 Oct ‐17‐23 48.0 ERC‐1A‐114 Tower Erec Ɵon 1A‐114 0.7 0.7 0%Sep‐29‐22 Sep‐29‐22 10.1 ASY‐1A‐114 Tower Assembly 1A ‐114 0.7 0.7 0%Sep‐28‐22 Sep‐29‐22 10.1 FDN‐1A‐114 FoundaƟons 1A‐114 0.7 0.7 0%Sep‐03‐22 Sep‐04‐22 12.0 CLR‐1A‐114 Clearing 1A‐114 0.6 0.6 0%Sep‐01‐22 Sep‐02‐22 12.4 ACC ‐1A‐114 Access 1A‐114 0.6 0.6 0%Sep‐02‐22 Sep‐03‐22 12.4 SPT‐1A‐114 Spoƫng 1A‐114 0.6 0.6 0%Sep‐04‐22 Sep‐04‐22 18.4 REC‐1A‐114 ReclamaƟon 1A‐114 0.7 0.7 0%Oct ‐17‐23 Oct ‐17‐23 48.0 Structure 1A-115Structure 1A-115 280.9 280.9 Sep‐01‐22 Oct ‐17‐23 48.0 ERC‐1A‐115 Tower Erec Ɵon 1A‐115 0.7 0.7 0%Sep‐28‐22 Sep‐29‐22 10.1 ASY‐1A‐115 Tower Assembly 1A ‐115 0.7 0.7 0%Sep‐27‐22 Sep‐28‐22 10.1 FDN‐1A‐115 FoundaƟons 1A‐115 0.7 0.7 0%Sep‐02‐22 Sep‐03‐22 12.0 CLR‐1A‐115 Clearing 1A‐115 0.6 0.6 0%Sep‐01‐22 Sep‐01‐22 12.3 ACC ‐1A‐115 Access 1A‐115 0.6 0.6 0%Sep‐01‐22 Sep‐02‐22 12.3 SPT‐1A‐115 Spoƫng 1A‐115 0.6 0.6 0%Sep‐03‐22 Sep‐03‐22 18.5 REC‐1A‐115 ReclamaƟon 1A‐115 0.7 0.7 0%Oct ‐16‐23 Oct ‐17‐23 48.0 Structure 1A-116Structure 1A-116 280.7 280.7 Aug‐31‐22 Oct ‐16‐23 48.0 ERC‐1A‐116 Tower Erec Ɵon 1A‐116 0.7 0.7 0%Sep‐27‐22 Sep‐28‐22 10.1 ASY‐1A‐116 Tower Assembly 1A ‐116 0.7 0.7 0%Sep‐26‐22 Sep‐27‐22 10.1 FDN‐1A‐116 FoundaƟons 1A‐116 0.7 0.7 0%Sep‐02‐22 Sep‐02‐22 12.0 CLR‐1A‐116 Clearing 1A‐116 0.6 0.6 0%Aug‐31‐22 Sep‐01‐22 12.2 ACC ‐1A‐116 Access 1A‐116 0.6 0.6 0%Sep‐01‐22 Sep‐01‐22 12.2 SPT‐1A‐116 Spoƫng 1A‐116 0.6 0.6 0%Sep‐02‐22 Sep‐03‐22 18.5 REC‐1A‐116 ReclamaƟon 1A‐116 0.7 0.7 0%Oct ‐15‐23 Oct ‐16‐23 48.0 Structure 1A-117Structure 1A-117 280.6 280.6 Aug‐31‐22 Oct ‐15‐23 48.0 ERC‐1A‐117 Tower Erec Ɵon 1A‐117 0.7 0.7 0%Sep‐26‐22 Sep‐27‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐111 FoundaƟons 1A‐111 Clearing 1A‐111 Access 1A‐111 Spoƫng 1A‐111 ReclamaƟon 1A‐111 Oct ‐19‐23, Structure 1A‐112 Tower Erec Ɵon 1A‐112 Tower Assembly 1A‐112 FoundaƟons 1A‐112 Clearing 1A‐112 Access 1A‐112 Spoƫng 1A‐112 ReclamaƟon 1A‐112 Oct ‐18‐23, Structure 1A‐113 Tower Erec Ɵon 1A‐113 Tower Assembly 1A‐113 FoundaƟons 1A‐113 Clearing 1A‐113 Access 1A‐113 Spoƫng 1A‐113 ReclamaƟon 1A‐113 Oct ‐17‐23, Structure 1A‐114 Tower Erec Ɵon 1A‐114 Tower Assembly 1A‐114 FoundaƟons 1A‐114 Clearing 1A‐114 Access 1A‐114 Spoƫng 1A‐114 ReclamaƟon 1A‐114 Oct ‐17‐23, Structure 1A‐115 Tower Erec Ɵon 1A‐115 Tower Assembly 1A‐115 FoundaƟons 1A‐115 Clearing 1A‐115 Access 1A‐115 Spoƫng 1A‐115 ReclamaƟon 1A‐115 Oct ‐16‐23, Structure 1A‐116 Tower Erec Ɵon 1A‐116 Tower Assembly 1A‐116 FoundaƟons 1A‐116 Clearing 1A‐116 Access 1A‐116 Spoƫng 1A‐116 ReclamaƟon 1A‐116 Oct ‐15‐23, Structure 1A‐117 Tower Erec Ɵon 1A‐117 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 24 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1A‐117 Tower Assembly 1A ‐117 0.7 0.7 0%Sep‐26‐22 Sep‐26‐22 10.1 FDN‐1A‐117 FoundaƟons 1A‐117 0.7 0.7 0%Sep‐01‐22 Sep‐02‐22 12.0 CLR‐1A‐117 Clearing 1A‐117 0.6 0.6 0%Aug‐31‐22 Aug‐31‐22 12.2 ACC ‐1A‐117 Access 1A‐117 0.6 0.6 0%Aug‐31‐22 Sep‐01‐22 12.2 SPT‐1A‐117 Spoƫng 1A‐117 0.6 0.6 0%Sep‐02‐22 Sep‐02‐22 18.6 REC‐1A‐117 ReclamaƟon 1A‐117 0.7 0.7 0%Oct ‐15‐23 Oct ‐15‐23 48.0 Structure 1A-118Structure 1A-118 280.4 280.4 Aug‐30‐22 Oct ‐15‐23 48.0 ERC‐1A‐118 Tower Erec Ɵon 1A‐118 0.7 0.7 0%Sep‐26‐22 Sep‐26‐22 10.1 ASY‐1A‐118 Tower Assembly 1A ‐118 0.7 0.7 0%Sep‐25‐22 Sep‐26‐22 10.1 FDN‐1A‐118 FoundaƟons 1A‐118 0.7 0.7 0%Aug‐31‐22 Sep‐01‐22 12.0 CLR‐1A‐118 Clearing 1A‐118 0.6 0.6 0%Aug‐30‐22 Aug‐31‐22 12.1 ACC ‐1A‐118 Access 1A‐118 0.6 0.6 0%Aug‐31‐22 Aug‐31‐22 12.1 SPT‐1A‐118 Spoƫng 1A‐118 0.6 0.6 0%Sep‐01‐22 Sep‐02‐22 18.7 REC‐1A‐118 ReclamaƟon 1A‐118 0.7 0.7 0%Oct ‐14‐23 Oct ‐15‐23 48.0 Structure 1A-119Structure 1A-119 280.3 280.3 Aug‐30‐22 Oct ‐14‐23 48.0 ERC‐1A‐119 Tower Erec Ɵon 1A‐119 0.7 0.7 0%Sep‐25‐22 Sep‐26‐22 10.1 ASY‐1A‐119 Tower Assembly 1A ‐119 0.7 0.7 0%Sep‐24‐22 Sep‐25‐22 10.1 CLR‐1A‐119 Clearing 1A‐119 0.6 0.6 0%Aug‐30‐22 Aug‐30‐22 12.0 ACC ‐1A‐119 Access 1A‐119 0.6 0.6 0%Aug‐30‐22 Aug‐31‐22 12.0 FDN‐1A‐119 FoundaƟons 1A‐119 0.7 0.7 0%Aug‐31‐22 Aug‐31‐22 12.0 SPT‐1A‐119 Spoƫng 1A‐119 0.6 0.6 0%Aug‐31‐22 Sep‐01‐22 18.8 REC‐1A‐119 ReclamaƟon 1A‐119 0.7 0.7 0%Oct ‐13‐23 Oct ‐14‐23 48.0 Structure 1B-002Structure 1B-002 306.0 306.0 Aug‐29‐22 Nov‐08‐23 38.6 ERC‐1B‐002 Tower Erec Ɵon 1B‐002 0.7 0.7 0%Sep‐24‐22 Sep‐25‐22 10.1 ASY‐1B‐002 Tower Assembly 1B ‐002 0.7 0.7 0%Sep‐24‐22 Sep‐24‐22 10.1 CLR‐1B‐002 Clearing 1B‐002 0.6 0.6 0%Aug‐29‐22 Aug‐30‐22 12.0 ACC ‐1B‐002 Access 1B‐002 0.6 0.6 0%Aug‐30‐22 Aug‐30‐22 12.0 FDN‐1B‐002 FoundaƟons 1B‐002 0.7 0.7 0%Sep‐03‐22 Sep‐04‐22 28.2 SPT‐1B‐002 Spoƫng 1B‐002 0.6 0.6 0%Sep‐04‐22 Sep‐04‐22 28.2 REC‐1B‐002 ReclamaƟon 1B‐002 0.7 0.7 0%Nov‐07‐23 Nov‐08‐23 38.6 Structure 1B-003Structure 1B-003 305.9 305.9 Aug‐28‐22 Nov‐07‐23 38.6 ERC‐1B‐003 Tower Erec Ɵon 1B‐003 0.7 0.7 0%Sep‐24‐22 Sep‐24‐22 10.1 ASY‐1B‐003 Tower Assembly 1B ‐003 0.7 0.7 0%Sep‐23‐22 Sep‐24‐22 10.1 CLR‐1B‐003 Clearing 1B‐003 0.6 0.6 0%Aug‐28‐22 Aug‐29‐22 12.0 FDN‐1B‐003 FoundaƟons 1B‐003 0.7 0.7 0%Sep‐03‐22 Sep‐03‐22 28.1 SPT‐1B‐003 Spoƫng 1B‐003 0.6 0.6 0%Sep‐03‐22 Sep‐04‐22 28.1 ACC ‐1B‐003 Access 1B‐003 0.6 0.6 0%Aug‐29‐22 Aug‐30‐22 32.2 REC‐1B‐003 ReclamaƟon 1B‐003 0.7 0.7 0%Nov‐07‐23 Nov‐07‐23 38.6 Structure 1B-004Structure 1B-004 305.7 305.7 Aug‐28‐22 Nov‐07‐23 38.6 ERC‐1B‐004 Tower Erec Ɵon 1B‐004 0.7 0.7 0%Sep‐23‐22 Sep‐24‐22 10.1 ASY‐1B‐004 Tower Assembly 1B ‐004 0.7 0.7 0%Sep‐22‐22 Sep‐23‐22 10.1 CLR‐1B‐004 Clearing 1B‐004 0.6 0.6 0%Aug‐28‐22 Aug‐28‐22 12.0 FDN‐1B‐004 FoundaƟons 1B‐004 0.7 0.7 0%Sep‐02‐22 Sep‐03‐22 28.0 SPT‐1B‐004 Spoƫng 1B‐004 0.6 0.6 0%Sep‐03‐22 Sep‐03‐22 28.0 ACC ‐1B‐004 Access 1B‐004 0.6 0.6 0%Aug‐28‐22 Aug‐29‐22 32.0 REC‐1B‐004 ReclamaƟon 1B‐004 0.7 0.7 0%Nov‐06‐23 Nov‐07‐23 38.6 Structure 1B-005Structure 1B-005 305.6 305.6 Aug‐27‐22 Nov‐06‐23 38.6 ASY‐1B‐005 Tower Assembly 1B ‐005 0.7 0.7 0%Sep‐21‐22 Sep‐22‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1A ‐117 FoundaƟons 1A‐117 Clearing 1A‐117 Access 1A‐117 Spoƫng 1A‐117 ReclamaƟon 1A‐117 Oct ‐15‐23, Structure 1A‐118 Tower Erec Ɵon 1A‐118 Tower Assembly 1A ‐118 FoundaƟons 1A‐118 Clearing 1A‐118 Access 1A‐118 Spoƫng 1A‐118 ReclamaƟon 1A‐118 Oct ‐14‐23, Structure 1A‐119 Tower Erec Ɵon 1A‐119 Tower Assembly 1A ‐119 Clearing 1A‐119 Access 1A‐119 FoundaƟons 1A‐119 Spoƫng 1A‐119 ReclamaƟon 1A‐119 Nov‐08‐23, Structure 1B‐002 Tower Erec Ɵon 1B‐002 Tower Assembly 1B ‐002 Clearing 1B‐002 Access 1B‐002 FoundaƟons 1B‐002 Spoƫng 1B‐002 ReclamaƟon 1B‐002 Nov‐07‐23, Structure 1B‐003 Tower Erec Ɵon 1B‐003 Tower Assembly 1B ‐003 Clearing 1B‐003 FoundaƟons 1B‐003 Spoƫng 1B‐003 Access 1B‐003 ReclamaƟon 1B‐003 Nov‐07‐23, Structure 1B‐004 Tower Erec Ɵon 1B‐004 Tower Assembly 1B ‐004 Clearing 1B‐004 FoundaƟons 1B‐004 Spoƫng 1B‐004 Access 1B‐004 ReclamaƟon 1B‐004 Nov‐06‐23, Structure 1B‐005 Tower Assembly 1B ‐005 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 25 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐005 Tower Erec Ɵon 1B‐005 0.7 0.7 0%Sep‐22‐22 Sep‐23‐22 10.1 CLR‐1B‐005 Clearing 1B‐005 0.6 0.6 0%Aug‐27‐22 Aug‐28‐22 12.0 FDN‐1B‐005 FoundaƟons 1B‐005 0.7 0.7 0%Sep‐01‐22 Sep‐02‐22 27.9 SPT‐1B‐005 Spoƫng 1B‐005 0.6 0.6 0%Sep‐02‐22 Sep‐03‐22 27.9 ACC ‐1B‐005 Access 1B‐005 0.6 0.6 0%Aug‐28‐22 Aug‐28‐22 31.9 REC‐1B‐005 ReclamaƟon 1B‐005 0.7 0.7 0%Nov‐05‐23 Nov‐06‐23 38.6 Structure 1B-006Structure 1B-006 276.8 276.8 Sep‐25‐22 Nov‐05‐23 38.6 ASY‐1B‐006 Tower Assembly 1B ‐006 0.8 0.8 0%Sep‐26‐23 Sep‐26‐23 7.7 ERC‐1B‐006 Tower Erec Ɵon 1B‐006 0.8 0.8 0%Sep‐26‐23 Sep‐27‐23 7.7 FDN‐1B‐006 FoundaƟons 1B‐006 0.8 0.8 0%Oct ‐20‐22 Oct ‐20‐22 13.7 CLR‐1B‐006 Clearing 1B‐006 0.7 0.7 0%Sep‐25‐22 Sep‐26‐22 17.9 SPT‐1B‐006 Spoƫng 1B‐006 0.7 0.7 0%Oct ‐20‐22 Oct ‐21‐22 33.9 ACC ‐1B‐006 Access 1B‐006 0.7 0.7 0%Sep‐26‐22 Sep‐27‐22 36.7 REC‐1B‐006 ReclamaƟon 1B‐006 0.8 0.8 0%Nov‐04‐23 Nov‐05‐23 38.6 Structure 1B-007Structure 1B-007 275.3 275.3 Sep‐26‐22 Nov‐04‐23 38.6 ASY‐1B‐007 Tower Assembly 1B ‐007 0.8 0.8 0%Sep‐25‐23 Sep‐26‐23 7.7 ERC‐1B‐007 Tower Erec Ɵon 1B‐007 0.8 0.8 0%Sep‐26‐23 Sep‐26‐23 7.7 FDN‐1B‐007 FoundaƟons 1B‐007 0.8 0.8 0%Oct ‐20‐22 Oct ‐21‐22 13.7 SPT‐1B‐007 Spoƫng 1B‐007 0.7 0.7 0%Oct ‐21‐22 Oct ‐22‐22 33.7 CLR‐1B‐007 Clearing 1B‐007 0.7 0.7 0%Sep‐26‐22 Sep‐27‐22 36.9 ACC ‐1B‐007 Access 1B‐007 0.7 0.7 0%Sep‐27‐22 Sep‐27‐22 36.9 REC‐1B‐007 ReclamaƟon 1B‐007 0.8 0.8 0%Nov‐03‐23 Nov‐04‐23 38.6 Structure 1B-008Structure 1B-008 273.8 273.8 Sep‐27‐22 Nov‐03‐23 38.6 ASY‐1B‐008 Tower Assembly 1B ‐008 0.8 0.8 0%Sep‐24‐23 Sep‐25‐23 7.7 ERC‐1B‐008 Tower Erec Ɵon 1B‐008 0.8 0.8 0%Sep‐25‐23 Sep‐26‐23 7.7 FDN‐1B‐008 FoundaƟons 1B‐008 0.8 0.8 0%Oct ‐21‐22 Oct ‐22‐22 13.7 SPT‐1B‐008 Spoƫng 1B‐008 0.7 0.7 0%Oct ‐22‐22 Oct ‐23‐22 33.6 CLR‐1B‐008 Clearing 1B‐008 0.7 0.7 0%Sep‐27‐22 Sep‐27‐22 37.0 ACC ‐1B‐008 Access 1B‐008 0.7 0.7 0%Sep‐27‐22 Sep‐28‐22 37.0 REC‐1B‐008 ReclamaƟon 1B‐008 0.8 0.8 0%Nov‐03‐23 Nov‐03‐23 38.6 Structure 1B-009Structure 1B-009 272.3 272.3 Sep‐27‐22 Nov‐03‐23 38.6 ASY‐1B‐009 Tower Assembly 1B ‐009 0.8 0.8 0%Sep‐23‐23 Sep‐24‐23 7.7 ERC‐1B‐009 Tower Erec Ɵon 1B‐009 0.8 0.8 0%Sep‐24‐23 Sep‐25‐23 7.7 FDN‐1B‐009 FoundaƟons 1B‐009 0.8 0.8 0%Oct ‐22‐22 Oct ‐23‐22 13.7 SPT‐1B‐009 Spoƫng 1B‐009 0.7 0.7 0%Oct ‐23‐22 Oct ‐24‐22 33.4 CLR‐1B‐009 Clearing 1B‐009 0.7 0.7 0%Sep‐27‐22 Sep‐28‐22 37.2 ACC ‐1B‐009 Access 1B‐009 0.7 0.7 0%Sep‐28‐22 Sep‐29‐22 37.2 REC‐1B‐009 ReclamaƟon 1B‐009 0.8 0.8 0%Nov‐02‐23 Nov‐03‐23 38.6 Structure 1B-010Structure 1B-010 270.8 270.8 Sep‐28‐22 Nov‐02‐23 38.6 ASY‐1B‐010 Tower Assembly 1B ‐010 0.8 0.8 0%Sep‐22‐23 Sep‐23‐23 7.7 ERC‐1B‐010 Tower Erec Ɵon 1B‐010 0.8 0.8 0%Sep‐23‐23 Sep‐24‐23 7.7 FDN‐1B‐010 FoundaƟons 1B‐010 0.8 0.8 0%Oct ‐23‐22 Oct ‐24‐22 13.7 SPT‐1B‐010 Spoƫng 1B‐010 0.7 0.7 0%Oct ‐24‐22 Oct ‐24‐22 33.2 CLR‐1B‐010 Clearing 1B‐010 0.7 0.7 0%Sep‐28‐22 Sep‐29‐22 37.4 ACC ‐1B‐010 Access 1B‐010 0.7 0.7 0%Sep‐29‐22 Sep‐29‐22 37.4 REC‐1B‐010 ReclamaƟon 1B‐010 0.8 0.8 0%Nov‐01‐23 Nov‐02‐23 38.6 Structure 1B-011Structure 1B-011 269.3 269.3 Sep‐29‐22 Nov‐01‐23 38.6 ASY‐1B‐011 Tower Assembly 1B ‐011 0.8 0.8 0%Sep‐21‐23 Sep‐22‐23 7.7 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐005 Clearing 1B‐005 FoundaƟons 1B‐005 Spoƫng 1B‐005 Access 1B‐005 ReclamaƟon 1B‐005 Nov‐05‐23, Structure 1B‐006 Tower Assembly 1B‐006 Tower Erec Ɵon 1B‐006 FoundaƟons 1B‐006 Clearing 1B‐006 Spoƫng 1B‐006 Access 1B‐006 ReclamaƟon 1B‐006 Nov‐04‐23, Structure 1B‐007 Tower Assembly 1B‐007 Tower Erec Ɵon 1B‐007 FoundaƟons 1B‐007 Spoƫng 1B‐007 Clearing 1B‐007 Access 1B‐007 ReclamaƟon 1B‐007 Nov‐03‐23, Structure 1B‐008 Tower Assembly 1B ‐008 Tower Erec Ɵon 1B‐008 FoundaƟons 1B‐008 Spoƫng 1B‐008 Clearing 1B‐008 Access 1B‐008 ReclamaƟon 1B‐008 Nov‐03‐23, Structure 1B‐009 Tower Assembly 1B ‐009 Tower Erec Ɵon 1B‐009 FoundaƟons 1B‐009 Spoƫng 1B‐009 Clearing 1B‐009 Access 1B‐009 ReclamaƟon 1B‐009 Nov‐02‐23, Structure 1B‐010 Tower Assembly 1B ‐010 Tower Erec Ɵon 1B‐010 FoundaƟons 1B‐010 Spoƫng 1B‐010 Clearing 1B‐010 Access 1B‐010 ReclamaƟon 1B‐010 Nov‐01‐23, Structure 1B‐011 Tower Assembly 1B ‐011 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 26 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐011 Tower Erec Ɵon 1B‐011 0.8 0.8 0%Sep‐22‐23 Sep‐23‐23 7.7 FDN‐1B‐011 FoundaƟons 1B‐011 0.8 0.8 0%Oct ‐24‐22 Oct ‐25‐22 13.7 SPT‐1B‐011 Spoƫng 1B‐011 0.7 0.7 0%Oct ‐25‐22 Oct ‐25‐22 33.1 CLR‐1B‐011 Clearing 1B‐011 0.7 0.7 0%Sep‐29‐22 Sep‐29‐22 37.5 ACC ‐1B‐011 Access 1B‐011 0.7 0.7 0%Sep‐29‐22 Sep‐30‐22 37.5 REC‐1B‐011 ReclamaƟon 1B‐011 0.8 0.8 0%Oct ‐31‐23 Nov‐01‐23 38.6 Structure 1B-012Structure 1B-012 267.8 267.8 Sep‐29‐22 Oct ‐31‐23 38.6 ASY‐1B‐012 Tower Assembly 1B ‐012 0.8 0.8 0%Sep‐21‐23 Sep‐21‐23 7.7 ERC‐1B‐012 Tower Erec Ɵon 1B‐012 0.8 0.8 0%Sep‐21‐23 Sep‐22‐23 7.7 FDN‐1B‐012 FoundaƟons 1B‐012 0.8 0.8 0%Oct ‐25‐22 Oct ‐25‐22 13.7 SPT‐1B‐012 Spoƫng 1B‐012 0.7 0.7 0%Oct ‐25‐22 Oct ‐26‐22 32.9 CLR‐1B‐012 Clearing 1B‐012 0.7 0.7 0%Sep‐29‐22 Sep‐30‐22 37.7 ACC ‐1B‐012 Access 1B‐012 0.7 0.7 0%Sep‐30‐22 Oct ‐01‐22 37.7 REC‐1B‐012 ReclamaƟon 1B‐012 0.8 0.8 0%Oct ‐30‐23 Oct ‐31‐23 38.6 Structure 1B-013Structure 1B-013 325.3 325.3 Aug‐01‐22 Oct ‐30‐23 38.6 CLR‐1B‐013 Clearing 1B‐013 0.6 0.6 0%Aug‐01‐22 Aug‐02‐22 12.0 FDN‐1B‐013 FoundaƟons 1B‐013 0.3 0.3 0%Aug‐26‐22 Aug‐26‐22 14.3 SPT‐1B‐013 Spoƫng 1B‐013 0.6 0.6 0%Aug‐26‐22 Aug‐27‐22 21.9 ASY‐1B‐013 Tower Assembly 1B ‐013 1.1 1.1 0%Aug‐19‐23 Aug‐20‐23 37.9 ACC ‐1B‐013 Access 1B‐013 0.6 0.6 0%Aug‐02‐22 Aug‐02‐22 38.0 REC‐1B‐013 ReclamaƟon 1B‐013 1.1 1.1 0%Oct ‐29‐23 Oct ‐30‐23 38.6 ERC‐1B‐013 Tower Erec Ɵon 1B‐013 1.1 1.1 0%Aug‐20‐23 Aug‐21‐23 43.5 Structure 1B-014Structure 1B-014 323.6 323.6 Aug‐02‐22 Oct ‐29‐23 38.6 CLR‐1B‐014 Clearing 1B‐014 0.6 0.6 0%Aug‐02‐22 Aug‐02‐22 12.0 FDN‐1B‐014 FoundaƟons 1B‐014 0.3 0.3 0%Aug‐26‐22 Aug‐26‐22 14.3 SPT‐1B‐014 Spoƫng 1B‐014 0.6 0.6 0%Aug‐27‐22 Aug‐27‐22 21.9 ACC ‐1B‐014 Access 1B‐014 0.6 0.6 0%Aug‐02‐22 Aug‐03‐22 37.7 ASY‐1B‐014 Tower Assembly 1B ‐014 1.1 1.1 0%Aug‐18‐23 Aug‐19‐23 37.9 REC‐1B‐014 ReclamaƟon 1B‐014 1.1 1.1 0%Oct ‐28‐23 Oct ‐29‐23 38.6 ERC‐1B‐014 Tower Erec Ɵon 1B‐014 1.1 1.1 0%Aug‐19‐23 Aug‐20‐23 43.5 Structure 1B-015Structure 1B-015 322.0 322.0 Aug‐02‐22 Oct ‐28‐23 38.6 CLR‐1B‐015 Clearing 1B‐015 0.6 0.6 0%Aug‐02‐22 Aug‐03‐22 12.0 FDN‐1B‐015 FoundaƟons 1B‐015 0.3 0.3 0%Aug‐26‐22 Aug‐27‐22 14.3 SPT‐1B‐015 Spoƫng 1B‐015 0.6 0.6 0%Aug‐27‐22 Aug‐28‐22 21.9 ACC ‐1B‐015 Access 1B‐015 0.6 0.6 0%Aug‐03‐22 Aug‐03‐22 37.5 ASY‐1B‐015 Tower Assembly 1B ‐015 1.1 1.1 0%Aug‐17‐23 Aug‐18‐23 37.9 REC‐1B‐015 ReclamaƟon 1B‐015 1.1 1.1 0%Oct ‐27‐23 Oct ‐28‐23 38.6 ERC‐1B‐015 Tower Erec Ɵon 1B‐015 1.1 1.1 0%Aug‐18‐23 Aug‐19‐23 43.5 Structure 1B-016Structure 1B-016 320.4 320.4 Aug‐03‐22 Oct ‐27‐23 38.6 CLR‐1B‐016 Clearing 1B‐016 0.6 0.6 0%Aug‐03‐22 Aug‐03‐22 12.0 FDN‐1B‐016 FoundaƟons 1B‐016 0.3 0.3 0%Aug‐27‐22 Aug‐27‐22 14.3 SPT‐1B‐016 Spoƫng 1B‐016 0.6 0.6 0%Aug‐28‐22 Aug‐28‐22 21.9 ACC ‐1B‐016 Access 1B‐016 0.6 0.6 0%Aug‐03‐22 Aug‐04‐22 37.2 ASY‐1B‐016 Tower Assembly 1B ‐016 1.1 1.1 0%Aug‐16‐23 Aug‐17‐23 37.9 REC‐1B‐016 ReclamaƟon 1B‐016 1.1 1.1 0%Oct ‐26‐23 Oct ‐27‐23 38.6 ERC‐1B‐016 Tower Erec Ɵon 1B‐016 1.1 1.1 0%Aug‐17‐23 Aug‐18‐23 43.5 Structure 1B-017Structure 1B-017 291.9 291.9 Aug‐03‐22 Sep‐29‐23 61.9 CLR‐1B‐017 Clearing 1B‐017 0.6 0.6 0%Aug‐03‐22 Aug‐04‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐011 FoundaƟons 1B‐011 Spoƫng 1B‐011 Clearing 1B‐011 Access 1B‐011 ReclamaƟon 1B‐011 Oct ‐31‐23, Structure 1B‐012 Tower Assembly 1B ‐012 Tower Erec Ɵon 1B‐012 FoundaƟons 1B‐012 Spoƫng 1B‐012 Clearing 1B‐012 Access 1B‐012 ReclamaƟon 1B‐012 Oct ‐30‐23, Structure 1B‐013 Clearing 1B‐013 FoundaƟons 1B‐013 Spoƫng 1B‐013 Tower Assembly 1B ‐013 Access 1B‐013 ReclamaƟon 1B‐013 Tower Erec Ɵon 1B‐013 Oct ‐29‐23, Structure 1B‐014 Clearing 1B‐014 FoundaƟons 1B‐014 Spoƫng 1B‐014 Access 1B‐014 Tower Assembly 1B ‐014 ReclamaƟon 1B‐014 Tower Erec Ɵon 1B‐014 Oct ‐28‐23, Structure 1B‐015 Clearing 1B‐015 FoundaƟons 1B‐015 Spoƫng 1B‐015 Access 1B‐015 Tower Assembly 1B ‐015 ReclamaƟon 1B‐015 Tower Erec Ɵon 1B‐015 Oct ‐27‐23, Structure 1B‐016 Clearing 1B‐016 FoundaƟons 1B‐016 Spoƫng 1B‐016 Access 1B‐016 Tower Assembly 1B ‐016 ReclamaƟon 1B‐016 Tower Erec Ɵon 1B‐016 Sep‐29‐23, Structure 1B‐017 Clearing 1B‐017 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 27 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐017 FoundaƟons 1B‐017 0.3 0.3 0%Aug‐27‐22 Aug‐27‐22 16.7 SPT‐1B‐017 Spoƫng 1B‐017 0.6 0.6 0%Aug‐28‐22 Aug‐29‐22 21.9 ASY‐1B‐017 Tower Assembly 1B ‐017 1.1 1.1 0%Aug‐15‐23 Aug‐16‐23 37.9 ACC ‐1B‐017 Access 1B‐017 0.6 0.6 0%Aug‐04‐22 Aug‐04‐22 39.3 ERC‐1B‐017 Tower Erec Ɵon 1B‐017 1.1 1.1 0%Aug‐16‐23 Aug‐17‐23 41.7 REC‐1B‐017 ReclamaƟon 1B‐017 1.1 1.1 0%Sep‐28‐23 Sep‐29‐23 61.9 Structure 1B-018Structure 1B-018 290.3 290.3 Aug‐04‐22 Sep‐28‐23 61.9 CLR‐1B‐018 Clearing 1B‐018 0.6 0.6 0%Aug‐04‐22 Aug‐04‐22 12.0 FDN‐1B‐018 FoundaƟons 1B‐018 0.3 0.3 0%Aug‐27‐22 Aug‐28‐22 16.7 SPT‐1B‐018 Spoƫng 1B‐018 0.6 0.6 0%Aug‐29‐22 Aug‐29‐22 21.9 ASY‐1B‐018 Tower Assembly 1B ‐018 1.1 1.1 0%Aug‐14‐23 Aug‐15‐23 37.9 ACC ‐1B‐018 Access 1B‐018 0.6 0.6 0%Aug‐04‐22 Aug‐05‐22 39.0 ERC‐1B‐018 Tower Erec Ɵon 1B‐018 1.1 1.1 0%Aug‐15‐23 Aug‐16‐23 41.7 REC‐1B‐018 ReclamaƟon 1B‐018 1.1 1.1 0%Sep‐27‐23 Sep‐28‐23 61.9 Structure 1B-019Structure 1B-019 288.7 288.7 Aug‐04‐22 Sep‐27‐23 61.9 CLR‐1B‐019 Clearing 1B‐019 0.6 0.6 0%Aug‐04‐22 Aug‐05‐22 12.0 FDN‐1B‐019 FoundaƟons 1B‐019 0.3 0.3 0%Aug‐28‐22 Aug‐28‐22 16.7 SPT‐1B‐019 Spoƫng 1B‐019 0.6 0.6 0%Aug‐29‐22 Aug‐30‐22 21.9 ASY‐1B‐019 Tower Assembly 1B ‐019 1.1 1.1 0%Aug‐13‐23 Aug‐14‐23 37.9 ACC ‐1B‐019 Access 1B‐019 0.6 0.6 0%Aug‐05‐22 Aug‐05‐22 38.8 ERC‐1B‐019 Tower Erec Ɵon 1B‐019 1.1 1.1 0%Aug‐14‐23 Aug‐15‐23 41.7 REC‐1B‐019 ReclamaƟon 1B‐019 1.1 1.1 0%Sep‐26‐23 Sep‐27‐23 61.9 Structure 1B-020Structure 1B-020 287.1 287.1 Aug‐05‐22 Sep‐26‐23 61.9 CLR‐1B‐020 Clearing 1B‐020 0.6 0.6 0%Aug‐05‐22 Aug‐05‐22 12.0 FDN‐1B‐020 FoundaƟons 1B‐020 0.3 0.3 0%Aug‐28‐22 Aug‐28‐22 16.7 SPT‐1B‐020 Spoƫng 1B‐020 0.6 0.6 0%Aug‐30‐22 Aug‐31‐22 21.9 ASY‐1B‐020 Tower Assembly 1B ‐020 1.1 1.1 0%Aug‐12‐23 Aug‐13‐23 37.9 ACC ‐1B‐020 Access 1B‐020 0.6 0.6 0%Aug‐05‐22 Aug‐06‐22 38.5 ERC‐1B‐020 Tower Erec Ɵon 1B‐020 1.1 1.1 0%Aug‐13‐23 Aug‐14‐23 38.9 REC‐1B‐020 ReclamaƟon 1B‐020 1.1 1.1 0%Sep‐25‐23 Sep‐26‐23 61.9 Structure 1B-021Structure 1B-021 285.4 285.4 Aug‐05‐22 Sep‐25‐23 61.9 CLR‐1B‐021 Clearing 1B‐021 0.6 0.6 0%Aug‐05‐22 Aug‐06‐22 12.0 FDN‐1B‐021 FoundaƟons 1B‐021 0.3 0.3 0%Aug‐28‐22 Aug‐28‐22 16.7 SPT‐1B‐021 Spoƫng 1B‐021 0.6 0.6 0%Aug‐31‐22 Aug‐31‐22 21.9 ASY‐1B‐021 Tower Assembly 1B ‐021 1.1 1.1 0%Aug‐11‐23 Aug‐12‐23 37.9 ACC ‐1B‐021 Access 1B‐021 0.6 0.6 0%Aug‐06‐22 Aug‐07‐22 38.2 ERC‐1B‐021 Tower Erec Ɵon 1B‐021 1.1 1.1 0%Aug‐12‐23 Aug‐13‐23 38.9 REC‐1B‐021 ReclamaƟon 1B‐021 1.1 1.1 0%Sep‐24‐23 Sep‐25‐23 61.9 Structure 1B-022Structure 1B-022 283.8 283.8 Aug‐06‐22 Sep‐24‐23 61.9 CLR‐1B‐022 Clearing 1B‐022 0.6 0.6 0%Aug‐06‐22 Aug‐07‐22 12.0 FDN‐1B‐022 FoundaƟons 1B‐022 0.3 0.3 0%Aug‐28‐22 Aug‐29‐22 16.7 SPT‐1B‐022 Spoƫng 1B‐022 0.6 0.6 0%Aug‐31‐22 Sep‐01‐22 21.9 ACC ‐1B‐022 Access 1B‐022 0.6 0.6 0%Aug‐07‐22 Aug‐07‐22 37.9 ASY‐1B‐022 Tower Assembly 1B ‐022 1.1 1.1 0%Aug‐10‐23 Aug‐11‐23 37.9 ERC‐1B‐022 Tower Erec Ɵon 1B‐022 1.1 1.1 0%Aug‐11‐23 Aug‐12‐23 38.9 REC‐1B‐022 ReclamaƟon 1B‐022 1.1 1.1 0%Sep‐23‐23 Sep‐24‐23 61.9 Structure 1B-023Structure 1B-023 282.2 282.2 Aug‐07‐22 Sep‐23‐23 61.9 CLR‐1B‐023 Clearing 1B‐023 0.6 0.6 0%Aug‐07‐22 Aug‐07‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐017 Spoƫng 1B‐017 Tower Assembly 1B ‐017 Access 1B‐017 Tower Erec Ɵon 1B‐017 ReclamaƟon 1B‐017 Sep‐28‐23, Structure 1B‐018 Clearing 1B‐018 FoundaƟons 1B‐018 Spoƫng 1B‐018 Tower Assembly 1B‐018 Access 1B‐018 Tower Erec Ɵon 1B‐018 ReclamaƟon 1B‐018 Sep‐27‐23, Structure 1B‐019 Clearing 1B‐019 FoundaƟons 1B‐019 Spoƫng 1B‐019 Tower Assembly 1B‐019 Access 1B‐019 Tower Erec Ɵon 1B‐019 ReclamaƟon 1B‐019 Sep‐26‐23, Structure 1B‐020 Clearing 1B‐020 FoundaƟons 1B‐020 Spoƫng 1B‐020 Tower Assembly 1B‐020 Access 1B‐020 Tower Erec Ɵon 1B‐020 ReclamaƟon 1B‐020 Sep‐25‐23, Structure 1B‐021 Clearing 1B‐021 FoundaƟons 1B‐021 Spoƫng 1B‐021 Tower Assembly 1B‐021 Access 1B‐021 Tower Erec Ɵon 1B‐021 ReclamaƟon 1B‐021 Sep‐24‐23, Structure 1B‐022 Clearing 1B‐022 FoundaƟons 1B‐022 Spoƫng 1B‐022 Access 1B‐022 Tower Assembly 1B ‐022 Tower Erec Ɵon 1B‐022 ReclamaƟon 1B‐022 Sep‐23‐23, Structure 1B‐023 Clearing 1B‐023 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 28 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐023 FoundaƟons 1B‐023 0.3 0.3 0%Aug‐29‐22 Aug‐29‐22 16.7 SPT‐1B‐023 Spoƫng 1B‐023 0.6 0.6 0%Sep‐01‐22 Sep‐01‐22 21.9 ACC ‐1B‐023 Access 1B‐023 0.6 0.6 0%Aug‐07‐22 Aug‐08‐22 37.6 ASY‐1B‐023 Tower Assembly 1B ‐023 1.1 1.1 0%Aug‐09‐23 Aug‐10‐23 37.9 ERC‐1B‐023 Tower Erec Ɵon 1B‐023 1.1 1.1 0%Aug‐10‐23 Aug‐11‐23 38.9 REC‐1B‐023 ReclamaƟon 1B‐023 1.1 1.1 0%Sep‐22‐23 Sep‐23‐23 61.9 Structure 1B-024Structure 1B-024 280.6 280.6 Aug‐07‐22 Sep‐22‐23 61.9 CLR‐1B‐024 Clearing 1B‐024 0.6 0.6 0%Aug‐07‐22 Aug‐08‐22 12.0 FDN‐1B‐024 FoundaƟons 1B‐024 0.3 0.3 0%Aug‐29‐22 Aug‐29‐22 16.7 SPT‐1B‐024 Spoƫng 1B‐024 0.6 0.6 0%Sep‐01‐22 Sep‐02‐22 21.9 ACC ‐1B‐024 Access 1B‐024 0.6 0.6 0%Aug‐08‐22 Aug‐08‐22 37.4 ASY‐1B‐024 Tower Assembly 1B ‐024 1.1 1.1 0%Aug‐08‐23 Aug‐09‐23 37.9 ERC‐1B‐024 Tower Erec Ɵon 1B‐024 1.1 1.1 0%Aug‐09‐23 Aug‐10‐23 38.9 REC‐1B‐024 ReclamaƟon 1B‐024 1.1 1.1 0%Sep‐21‐23 Sep‐22‐23 61.9 Structure 1B-025Structure 1B-025 279.0 279.0 Aug‐08‐22 Sep‐21‐23 61.9 CLR‐1B‐025 Clearing 1B‐025 0.6 0.6 0%Aug‐08‐22 Aug‐08‐22 12.0 FDN‐1B‐025 FoundaƟons 1B‐025 0.3 0.3 0%Aug‐29‐22 Aug‐29‐22 16.7 SPT‐1B‐025 Spoƫng 1B‐025 0.6 0.6 0%Sep‐02‐22 Sep‐02‐22 21.9 ACC ‐1B‐025 Access 1B‐025 0.6 0.6 0%Aug‐08‐22 Aug‐09‐22 37.1 ASY‐1B‐025 Tower Assembly 1B ‐025 1.1 1.1 0%Aug‐07‐23 Aug‐08‐23 37.9 ERC‐1B‐025 Tower Erec Ɵon 1B‐025 1.1 1.1 0%Aug‐08‐23 Aug‐09‐23 38.9 REC‐1B‐025 ReclamaƟon 1B‐025 1.1 1.1 0%Sep‐20‐23 Sep‐21‐23 61.9 Structure 1B-026Structure 1B-026 277.4 277.4 Aug‐08‐22 Sep‐20‐23 61.9 CLR‐1B‐026 Clearing 1B‐026 0.6 0.6 0%Aug‐08‐22 Aug‐09‐22 12.0 FDN‐1B‐026 FoundaƟons 1B‐026 0.3 0.3 0%Aug‐29‐22 Aug‐30‐22 16.7 SPT‐1B‐026 Spoƫng 1B‐026 0.6 0.6 0%Sep‐02‐22 Sep‐03‐22 21.9 ACC ‐1B‐026 Access 1B‐026 0.6 0.6 0%Aug‐09‐22 Aug‐09‐22 36.8 ASY‐1B‐026 Tower Assembly 1B ‐026 1.1 1.1 0%Aug‐06‐23 Aug‐07‐23 37.9 ERC‐1B‐026 Tower Erec Ɵon 1B‐026 1.1 1.1 0%Aug‐07‐23 Aug‐08‐23 38.9 REC‐1B‐026 ReclamaƟon 1B‐026 1.1 1.1 0%Sep‐19‐23 Sep‐20‐23 61.9 Structure 1B-027Structure 1B-027 275.8 275.8 Aug‐09‐22 Sep‐19‐23 61.9 CLR‐1B‐027 Clearing 1B‐027 0.6 0.6 0%Aug‐09‐22 Aug‐09‐22 12.0 FDN‐1B‐027 FoundaƟons 1B‐027 0.3 0.3 0%Aug‐30‐22 Aug‐30‐22 16.7 SPT‐1B‐027 Spoƫng 1B‐027 0.6 0.6 0%Sep‐03‐22 Sep‐03‐22 21.9 ACC ‐1B‐027 Access 1B‐027 0.6 0.6 0%Aug‐09‐22 Aug‐10‐22 36.5 ASY‐1B‐027 Tower Assembly 1B ‐027 1.1 1.1 0%Aug‐05‐23 Aug‐06‐23 37.9 ERC‐1B‐027 Tower Erec Ɵon 1B‐027 1.1 1.1 0%Aug‐06‐23 Aug‐07‐23 38.9 REC‐1B‐027 ReclamaƟon 1B‐027 1.1 1.1 0%Sep‐18‐23 Sep‐19‐23 61.9 Structure 1B-028Structure 1B-028 274.2 274.2 Aug‐09‐22 Sep‐18‐23 61.9 CLR‐1B‐028 Clearing 1B‐028 0.6 0.6 0%Aug‐09‐22 Aug‐10‐22 12.0 FDN‐1B‐028 FoundaƟons 1B‐028 0.3 0.3 0%Aug‐30‐22 Aug‐30‐22 16.7 SPT‐1B‐028 Spoƫng 1B‐028 0.6 0.6 0%Sep‐04‐22 Sep‐04‐22 21.9 ACC ‐1B‐028 Access 1B‐028 0.6 0.6 0%Aug‐10‐22 Aug‐11‐22 36.2 ASY‐1B‐028 Tower Assembly 1B ‐028 1.1 1.1 0%Aug‐03‐23 Aug‐05‐23 37.9 ERC‐1B‐028 Tower Erec Ɵon 1B‐028 1.1 1.1 0%Aug‐05‐23 Aug‐06‐23 38.9 REC‐1B‐028 ReclamaƟon 1B‐028 1.1 1.1 0%Sep‐17‐23 Sep‐18‐23 61.9 Structure 1B-029Structure 1B-029 272.6 272.6 Aug‐10‐22 Sep‐17‐23 61.9 CLR‐1B‐029 Clearing 1B‐029 0.6 0.6 0%Aug‐10‐22 Aug‐11‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐023 Spoƫng 1B‐023 Access 1B‐023 Tower Assembly 1B ‐023 Tower Erec Ɵon 1B‐023 ReclamaƟon 1B‐023 Sep‐22‐23, Structure 1B‐024 Clearing 1B‐024 FoundaƟons 1B‐024 Spoƫng 1B‐024 Access 1B‐024 Tower Assembly 1B ‐024 Tower Erec Ɵon 1B‐024 ReclamaƟon 1B‐024 Sep‐21‐23, Structure 1B‐025 Clearing 1B‐025 FoundaƟons 1B‐025 Spoƫng 1B‐025 Access 1B‐025 Tower Assembly 1B ‐025 Tower Erec Ɵon 1B‐025 ReclamaƟon 1B‐025 Sep‐20‐23, Structure 1B‐026 Clearing 1B‐026 FoundaƟons 1B‐026 Spoƫng 1B‐026 Access 1B‐026 Tower Assembly 1B ‐026 Tower Erec Ɵon 1B‐026 ReclamaƟon 1B‐026 Sep‐19‐23, Structure 1B‐027 Clearing 1B‐027 FoundaƟons 1B‐027 Spoƫng 1B‐027 Access 1B‐027 Tower Assembly 1B ‐027 Tower Erec Ɵon 1B‐027 ReclamaƟon 1B‐027 Sep‐18‐23, Structure 1B‐028 Clearing 1B‐028 FoundaƟons 1B‐028 Spoƫng 1B‐028 Access 1B‐028 Tower Assembly 1B ‐028 Tower Erec Ɵon 1B‐028 ReclamaƟon 1B‐028 Sep‐17‐23, Structure 1B‐029 Clearing 1B‐029 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 29 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐029 FoundaƟons 1B‐029 0.3 0.3 0%Aug‐30‐22 Aug‐31‐22 16.7 SPT‐1B‐029 Spoƫng 1B‐029 0.6 0.6 0%Sep‐04‐22 Sep‐06‐22 21.9 ACC ‐1B‐029 Access 1B‐029 0.6 0.6 0%Aug‐11‐22 Aug‐11‐22 36.0 ASY‐1B‐029 Tower Assembly 1B ‐029 1.1 1.1 0%Aug‐02‐23 Aug‐03‐23 37.9 ERC‐1B‐029 Tower Erec Ɵon 1B‐029 1.1 1.1 0%Aug‐03‐23 Aug‐05‐23 38.9 REC‐1B‐029 ReclamaƟon 1B‐029 1.1 1.1 0%Sep‐15‐23 Sep‐17‐23 61.9 Structure 1B-030Structure 1B-030 271.0 271.0 Aug‐11‐22 Sep‐15‐23 61.9 CLR‐1B‐030 Clearing 1B‐030 0.6 0.6 0%Aug‐11‐22 Aug‐11‐22 12.0 FDN‐1B‐030 FoundaƟons 1B‐030 0.3 0.3 0%Aug‐31‐22 Aug‐31‐22 16.7 SPT‐1B‐030 Spoƫng 1B‐030 0.6 0.6 0%Sep‐06‐22 Sep‐06‐22 21.9 ACC ‐1B‐030 Access 1B‐030 0.6 0.6 0%Aug‐11‐22 Aug‐12‐22 35.7 ASY‐1B‐030 Tower Assembly 1B ‐030 1.1 1.1 0%Aug‐01‐23 Aug‐02‐23 37.9 ERC‐1B‐030 Tower Erec Ɵon 1B‐030 1.1 1.1 0%Aug‐02‐23 Aug‐03‐23 38.9 REC‐1B‐030 ReclamaƟon 1B‐030 1.1 1.1 0%Sep‐14‐23 Sep‐15‐23 61.9 Structure 1B-031Structure 1B-031 269.4 269.4 Aug‐11‐22 Sep‐14‐23 61.9 CLR‐1B‐031 Clearing 1B‐031 0.6 0.6 0%Aug‐11‐22 Aug‐12‐22 12.0 FDN‐1B‐031 FoundaƟons 1B‐031 0.3 0.3 0%Aug‐31‐22 Aug‐31‐22 16.7 SPT‐1B‐031 Spoƫng 1B‐031 0.6 0.6 0%Sep‐06‐22 Sep‐07‐22 21.9 ACC ‐1B‐031 Access 1B‐031 0.6 0.6 0%Aug‐12‐22 Aug‐12‐22 35.4 ASY‐1B‐031 Tower Assembly 1B ‐031 1.1 1.1 0%Jul‐31‐23 Aug‐01‐23 37.9 ERC‐1B‐031 Tower Erec Ɵon 1B‐031 1.1 1.1 0%Aug‐01‐23 Aug‐02‐23 38.9 REC‐1B‐031 ReclamaƟon 1B‐031 1.1 1.1 0%Sep‐13‐23 Sep‐14‐23 61.9 Structure 1B-032Structure 1B-032 267.8 267.8 Aug‐12‐22 Sep‐13‐23 61.9 CLR‐1B‐032 Clearing 1B‐032 0.6 0.6 0%Aug‐12‐22 Aug‐12‐22 12.0 FDN‐1B‐032 FoundaƟons 1B‐032 0.7 0.7 0%Oct ‐29‐22 Oct ‐29‐22 13.0 SPT‐1B‐032 Spoƫng 1B‐032 0.6 0.6 0%Oct ‐29‐22 Oct ‐30‐22 29.0 ASY‐1B‐032 Tower Assembly 1B ‐032 1.1 1.1 0%Jul‐30‐23 Jul‐31‐23 37.9 ERC‐1B‐032 Tower Erec Ɵon 1B‐032 1.1 1.1 0%Jul‐31‐23 Aug‐01‐23 38.9 REC‐1B‐032 ReclamaƟon 1B‐032 1.1 1.1 0%Sep‐12‐23 Sep‐13‐23 61.9 ACC ‐1B‐032 Access 1B‐032 0.6 0.6 0%Aug‐12‐22 Aug‐13‐22 89.1 Structure 1B-033Structure 1B-033 266.1 266.1 Aug‐12‐22 Sep‐12‐23 61.9 CLR‐1B‐033 Clearing 1B‐033 0.6 0.6 0%Aug‐12‐22 Aug‐13‐22 12.0 FDN‐1B‐033 FoundaƟons 1B‐033 0.7 0.7 0%Oct ‐28‐22 Oct ‐29‐22 13.0 SPT‐1B‐033 Spoƫng 1B‐033 0.6 0.6 0%Oct ‐29‐22 Oct ‐29‐22 29.1 ASY‐1B‐033 Tower Assembly 1B ‐033 1.1 1.1 0%Jul‐29‐23 Jul‐30‐23 37.9 ERC‐1B‐033 Tower Erec Ɵon 1B‐033 1.1 1.1 0%Jul‐30‐23 Jul‐31‐23 38.9 REC‐1B‐033 ReclamaƟon 1B‐033 1.1 1.1 0%Sep‐11‐23 Sep‐12‐23 61.9 ACC ‐1B‐033 Access 1B‐033 0.6 0.6 0%Aug‐13‐22 Aug‐13‐22 87.8 Structure 1B-034Structure 1B-034 264.5 264.5 Aug‐13‐22 Sep‐11‐23 61.9 CLR‐1B‐034 Clearing 1B‐034 0.6 0.6 0%Aug‐13‐22 Aug‐13‐22 12.0 FDN‐1B‐034 FoundaƟons 1B‐034 0.7 0.7 0%Oct ‐27‐22 Oct ‐28‐22 13.0 ERC‐1B‐034 Tower Erec Ɵon 1B‐034 1.0 1.0 0%Nov‐17‐22 Nov‐18‐22 14.8 ASY‐1B‐034 Tower Assembly 1B ‐034 1.0 1.0 0%Nov‐15‐22 Nov‐16‐22 15.0 SPT‐1B‐034 Spoƫng 1B‐034 0.6 0.6 0%Oct ‐28‐22 Oct ‐29‐22 29.2 REC‐1B‐034 ReclamaƟon 1B‐034 1.0 1.0 0%Sep‐10‐23 Sep‐11‐23 61.9 ACC ‐1B‐034 Access 1B‐034 0.6 0.6 0%Aug‐13‐22 Aug‐14‐22 86.6 Structure 1B-035Structure 1B-035 262.9 262.9 Aug‐13‐22 Sep‐10‐23 61.9 CLR‐1B‐035 Clearing 1B‐035 0.6 0.6 0%Aug‐13‐22 Aug‐14‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐029 Spoƫng 1B‐029 Access 1B‐029 Tower Assembly 1B‐029 Tower Erec Ɵon 1B‐029 ReclamaƟon 1B‐029 Sep‐15‐23, Structure 1B‐030 Clearing 1B‐030 FoundaƟons 1B‐030 Spoƫng 1B‐030 Access 1B‐030 Tower Assembly 1B‐030 Tower Erec Ɵon 1B‐030 ReclamaƟon 1B‐030 Sep‐14‐23, Structure 1B‐031 Clearing 1B‐031 FoundaƟons 1B‐031 Spoƫng 1B‐031 Access 1B‐031 Tower Assembly 1B‐031 Tower Erec Ɵon 1B‐031 ReclamaƟon 1B‐031 Sep‐13‐23, Structure 1B‐032 Clearing 1B‐032 FoundaƟons 1B‐032 Spoƫng 1B‐032 Tower Assembly 1B ‐032 Tower Erec Ɵon 1B‐032 ReclamaƟon 1B‐032 Access 1B‐032 Sep‐12‐23, Structure 1B‐033 Clearing 1B‐033 FoundaƟons 1B‐033 Spoƫng 1B‐033 Tower Assembly 1B ‐033 Tower Erec Ɵon 1B‐033 ReclamaƟon 1B‐033 Access 1B‐033 Sep‐11‐23, Structure 1B‐034 Clearing 1B‐034 FoundaƟons 1B‐034 Tower Erec Ɵon 1B‐034 Tower Assembly 1B ‐034 Spoƫng 1B‐034 ReclamaƟon 1B‐034 Access 1B‐034 Sep‐10‐23, Structure 1B‐035 Clearing 1B‐035 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 30 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐035 FoundaƟons 1B‐035 0.7 0.7 0%Oct ‐27‐22 Oct ‐27‐22 13.0 ERC‐1B‐035 Tower Erec Ɵon 1B‐035 1.0 1.0 0%Nov‐15‐22 Nov‐17‐22 14.8 ASY‐1B‐035 Tower Assembly 1B ‐035 1.0 1.0 0%Nov‐14‐22 Nov‐15‐22 15.0 SPT‐1B‐035 Spoƫng 1B‐035 0.6 0.6 0%Oct ‐27‐22 Oct ‐28‐22 29.3 REC‐1B‐035 ReclamaƟon 1B‐035 1.0 1.0 0%Sep‐09‐23 Sep‐10‐23 61.9 ACC ‐1B‐035 Access 1B‐035 0.6 0.6 0%Aug‐14‐22 Aug‐14‐22 85.4 Structure 1B-036Structure 1B-036 116.7 116.7 Aug‐14‐22 Dec‐12‐22 58.8 CLR‐1B‐036 Clearing 1B‐036 0.6 0.6 0%Aug‐14‐22 Aug‐14‐22 12.0 FDN‐1B‐036 FoundaƟons 1B‐036 0.7 0.7 0%Oct ‐26‐22 Oct ‐27‐22 13.0 ERC‐1B‐036 Tower Erec Ɵon 1B‐036 1.0 1.0 0%Nov‐14‐22 Nov‐15‐22 14.8 ASY‐1B‐036 Tower Assembly 1B ‐036 1.0 1.0 0%Nov‐13‐22 Nov‐14‐22 15.0 SPT‐1B‐036 Spoƫng 1B‐036 0.6 0.6 0%Oct ‐27‐22 Oct ‐27‐22 29.4 REC‐1B‐036 ReclamaƟon 1B‐036 1.0 1.0 0%Dec‐11‐22 Dec‐12‐22 58.8 ACC ‐1B‐036 Access 1B‐036 0.6 0.6 0%Aug‐14‐22 Aug‐15‐22 84.2 Structure 1B-038Structure 1B-038 115.1 115.1 Aug‐14‐22 Dec‐11‐22 58.8 CLR‐1B‐038 Clearing 1B‐038 0.6 0.6 0%Aug‐14‐22 Aug‐15‐22 12.0 FDN‐1B‐038 FoundaƟons 1B‐038 0.7 0.7 0%Oct ‐26‐22 Oct ‐26‐22 13.0 ERC‐1B‐038 Tower Erec Ɵon 1B‐038 1.0 1.0 0%Nov‐13‐22 Nov‐14‐22 14.8 ASY‐1B‐038 Tower Assembly 1B ‐038 1.0 1.0 0%Nov‐12‐22 Nov‐13‐22 15.0 SPT‐1B‐038 Spoƫng 1B‐038 0.6 0.6 0%Oct ‐26‐22 Oct ‐27‐22 29.5 REC‐1B‐038 ReclamaƟon 1B‐038 1.0 1.0 0%Dec‐10‐22 Dec‐11‐22 58.8 ACC ‐1B‐038 Access 1B‐038 0.6 0.6 0%Aug‐15‐22 Aug‐16‐22 83.0 Structure 1B-039Structure 1B-039 113.5 113.5 Aug‐15‐22 Dec‐09‐22 58.8 CLR‐1B‐039 Clearing 1B‐039 0.6 0.6 0%Aug‐15‐22 Aug‐16‐22 12.0 FDN‐1B‐039 FoundaƟons 1B‐039 0.7 0.7 0%Oct ‐25‐22 Oct ‐26‐22 13.0 ERC‐1B‐039 Tower Erec Ɵon 1B‐039 1.0 1.0 0%Nov‐12‐22 Nov‐13‐22 14.8 ASY‐1B‐039 Tower Assembly 1B ‐039 1.0 1.0 0%Nov‐11‐22 Nov‐12‐22 15.0 SPT‐1B‐039 Spoƫng 1B‐039 0.6 0.6 0%Oct ‐26‐22 Oct ‐26‐22 29.6 REC‐1B‐039 ReclamaƟon 1B‐039 1.0 1.0 0%Dec‐08‐22 Dec‐09‐22 58.8 ACC ‐1B‐039 Access 1B‐039 0.6 0.6 0%Aug‐16‐22 Aug‐16‐22 81.8 Structure 1B-040Structure 1B-040 111.9 111.9 Aug‐16‐22 Dec‐08‐22 58.8 CLR‐1B‐040 Clearing 1B‐040 0.6 0.6 0%Aug‐16‐22 Aug‐16‐22 12.0 FDN‐1B‐040 FoundaƟons 1B‐040 0.7 0.7 0%Oct ‐24‐22 Oct ‐25‐22 13.0 ERC‐1B‐040 Tower Erec Ɵon 1B‐040 1.0 1.0 0%Nov‐11‐22 Nov‐12‐22 14.8 ASY‐1B‐040 Tower Assembly 1B ‐040 1.0 1.0 0%Nov‐10‐22 Nov‐11‐22 15.0 SPT‐1B‐040 Spoƫng 1B‐040 0.6 0.6 0%Oct ‐25‐22 Oct ‐25‐22 29.7 REC‐1B‐040 ReclamaƟon 1B‐040 1.0 1.0 0%Dec‐07‐22 Dec‐08‐22 58.8 ACC ‐1B‐040 Access 1B‐040 0.6 0.6 0%Aug‐16‐22 Aug‐17‐22 80.5 Structure 1B-041Structure 1B-041 110.3 110.3 Aug‐16‐22 Dec‐07‐22 58.8 CLR‐1B‐041 Clearing 1B‐041 0.6 0.6 0%Aug‐16‐22 Aug‐17‐22 12.0 FDN‐1B‐041 FoundaƟons 1B‐041 0.7 0.7 0%Oct ‐24‐22 Oct ‐24‐22 13.0 ERC‐1B‐041 Tower Erec Ɵon 1B‐041 1.0 1.0 0%Nov‐10‐22 Nov‐11‐22 14.8 ASY‐1B‐041 Tower Assembly 1B ‐041 1.0 1.0 0%Nov‐09‐22 Nov‐10‐22 15.0 SPT‐1B‐041 Spoƫng 1B‐041 0.6 0.6 0%Oct ‐24‐22 Oct ‐25‐22 29.8 REC‐1B‐041 ReclamaƟon 1B‐041 1.0 1.0 0%Dec‐06‐22 Dec‐07‐22 58.8 ACC ‐1B‐041 Access 1B‐041 0.6 0.6 0%Aug‐17‐22 Aug‐17‐22 79.3 Structure 1B-042Structure 1B-042 108.7 108.7 Aug‐17‐22 Dec‐06‐22 58.8 CLR‐1B‐042 Clearing 1B‐042 0.6 0.6 0%Aug‐17‐22 Aug‐17‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐035 Tower Erec Ɵon 1B‐035 Tower Assembly 1B‐035 Spoƫng 1B‐035 ReclamaƟon 1B‐035 Access 1B‐035 Dec‐12‐22, Structure 1B‐036 Clearing 1B‐036 FoundaƟons 1B‐036 Tower Erec Ɵon 1B‐036 Tower Assembly 1B‐036 Spoƫng 1B‐036 ReclamaƟon 1B‐036 Access 1B‐036 Dec‐11‐22, Structure 1B‐038 Clearing 1B‐038 FoundaƟons 1B‐038 Tower Erec Ɵon 1B‐038 Tower Assembly 1B‐038 Spoƫng 1B‐038 ReclamaƟon 1B‐038 Access 1B‐038 Dec‐09‐22, Structure 1B‐039 Clearing 1B‐039 FoundaƟons 1B‐039 Tower Erec Ɵon 1B‐039 Tower Assembly 1B ‐039 Spoƫng 1B‐039 ReclamaƟon 1B‐039 Access 1B‐039 Dec‐08‐22, Structure 1B‐040 Clearing 1B‐040 FoundaƟons 1B‐040 Tower Erec Ɵon 1B‐040 Tower Assembly 1B ‐040 Spoƫng 1B‐040 ReclamaƟon 1B‐040 Access 1B‐040 Dec‐07‐22, Structure 1B‐041 Clearing 1B‐041 FoundaƟons 1B‐041 Tower Erec Ɵon 1B‐041 Tower Assembly 1B ‐041 Spoƫng 1B‐041 ReclamaƟon 1B‐041 Access 1B‐041 Dec‐06‐22, Structure 1B‐042 Clearing 1B‐042 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 31 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐042 FoundaƟons 1B‐042 0.7 0.7 0%Oct ‐23‐22 Oct ‐24‐22 13.0 ERC‐1B‐042 Tower Erec Ɵon 1B‐042 1.0 1.0 0%Nov‐09‐22 Nov‐10‐22 14.8 ASY‐1B‐042 Tower Assembly 1B ‐042 1.0 1.0 0%Nov‐08‐22 Nov‐09‐22 15.0 SPT‐1B‐042 Spoƫng 1B‐042 0.6 0.6 0%Oct ‐24‐22 Oct ‐24‐22 29.9 REC‐1B‐042 ReclamaƟon 1B‐042 1.0 1.0 0%Dec‐05‐22 Dec‐06‐22 58.8 ACC ‐1B‐042 Access 1B‐042 0.6 0.6 0%Aug‐17‐22 Aug‐18‐22 78.1 Structure 1B-043Structure 1B-043 107.1 107.1 Aug‐17‐22 Dec‐05‐22 58.8 FDN‐1B‐043 FoundaƟons 1B‐043 0.7 0.7 0%Oct ‐22‐22 Oct ‐23‐22 13.0 ERC‐1B‐043 Tower Erec Ɵon 1B‐043 1.0 1.0 0%Nov‐08‐22 Nov‐09‐22 14.8 ASY‐1B‐043 Tower Assembly 1B ‐043 1.0 1.0 0%Nov‐07‐22 Nov‐08‐22 15.0 CLR‐1B‐043 Clearing 1B‐043 0.6 0.6 0%Aug‐17‐22 Aug‐18‐22 17.6 SPT‐1B‐043 Spoƫng 1B‐043 0.6 0.6 0%Oct ‐23‐22 Oct ‐23‐22 29.6 REC‐1B‐043 ReclamaƟon 1B‐043 1.0 1.0 0%Dec‐04‐22 Dec‐05‐22 58.8 ACC ‐1B‐043 Access 1B‐043 0.6 0.6 0%Aug‐18‐22 Aug‐18‐22 76.9 Structure 1B-044Structure 1B-044 105.5 105.5 Aug‐18‐22 Dec‐04‐22 58.8 FDN‐1B‐044 FoundaƟons 1B‐044 0.7 0.7 0%Oct ‐22‐22 Oct ‐22‐22 13.0 ERC‐1B‐044 Tower Erec Ɵon 1B‐044 1.0 1.0 0%Nov‐07‐22 Nov‐08‐22 14.8 ASY‐1B‐044 Tower Assembly 1B ‐044 1.0 1.0 0%Nov‐06‐22 Nov‐07‐22 15.0 CLR‐1B‐044 Clearing 1B‐044 0.6 0.6 0%Aug‐18‐22 Aug‐18‐22 17.6 SPT‐1B‐044 Spoƫng 1B‐044 0.6 0.6 0%Oct ‐22‐22 Oct ‐23‐22 29.2 REC‐1B‐044 ReclamaƟon 1B‐044 1.0 1.0 0%Dec‐03‐22 Dec‐04‐22 58.8 ACC ‐1B‐044 Access 1B‐044 0.6 0.6 0%Aug‐18‐22 Aug‐19‐22 75.7 Structure 1B-045Structure 1B-045 103.9 103.9 Aug‐18‐22 Dec‐03‐22 58.8 FDN‐1B‐045 FoundaƟons 1B‐045 0.7 0.7 0%Oct ‐21‐22 Oct ‐22‐22 13.0 ERC‐1B‐045 Tower Erec Ɵon 1B‐045 1.0 1.0 0%Nov‐06‐22 Nov‐07‐22 14.8 ASY‐1B‐045 Tower Assembly 1B ‐045 1.0 1.0 0%Nov‐05‐22 Nov‐06‐22 15.0 CLR‐1B‐045 Clearing 1B‐045 0.6 0.6 0%Aug‐18‐22 Aug‐19‐22 17.6 SPT‐1B‐045 Spoƫng 1B‐045 0.6 0.6 0%Oct ‐22‐22 Oct ‐22‐22 28.8 REC‐1B‐045 ReclamaƟon 1B‐045 1.0 1.0 0%Dec‐02‐22 Dec‐03‐22 58.8 ACC ‐1B‐045 Access 1B‐045 0.6 0.6 0%Aug‐19‐22 Aug‐19‐22 74.5 Structure 1B-046Structure 1B-046 102.3 102.3 Aug‐19‐22 Dec‐02‐22 58.8 FDN‐1B‐046 FoundaƟons 1B‐046 0.7 0.7 0%Oct ‐20‐22 Oct ‐21‐22 13.0 ERC‐1B‐046 Tower Erec Ɵon 1B‐046 1.0 1.0 0%Nov‐05‐22 Nov‐06‐22 14.8 ASY‐1B‐046 Tower Assembly 1B ‐046 1.0 1.0 0%Nov‐04‐22 Nov‐05‐22 15.0 CLR‐1B‐046 Clearing 1B‐046 0.6 0.6 0%Aug‐19‐22 Aug‐19‐22 17.6 SPT‐1B‐046 Spoƫng 1B‐046 0.6 0.6 0%Oct ‐21‐22 Oct ‐21‐22 28.4 REC‐1B‐046 ReclamaƟon 1B‐046 1.0 1.0 0%Dec‐01‐22 Dec‐02‐22 58.8 ACC ‐1B‐046 Access 1B‐046 0.6 0.6 0%Aug‐19‐22 Aug‐20‐22 73.2 Structure 1B-047Structure 1B-047 100.7 100.7 Aug‐19‐22 Dec‐01‐22 58.8 FDN‐1B‐047 FoundaƟons 1B‐047 0.7 0.7 0%Oct ‐20‐22 Oct ‐20‐22 13.0 ERC‐1B‐047 Tower Erec Ɵon 1B‐047 1.0 1.0 0%Nov‐04‐22 Nov‐05‐22 14.8 ASY‐1B‐047 Tower Assembly 1B ‐047 1.0 1.0 0%Nov‐03‐22 Nov‐04‐22 15.0 CLR‐1B‐047 Clearing 1B‐047 0.6 0.6 0%Aug‐19‐22 Aug‐20‐22 17.6 SPT‐1B‐047 Spoƫng 1B‐047 0.6 0.6 0%Oct ‐20‐22 Oct ‐21‐22 28.0 REC‐1B‐047 ReclamaƟon 1B‐047 1.0 1.0 0%Nov‐30‐22 Dec‐01‐22 58.8 ACC ‐1B‐047 Access 1B‐047 0.6 0.6 0%Aug‐20‐22 Aug‐21‐22 72.0 Structure 1B-048Structure 1B-048 99.1 99.1 Aug‐20‐22 Nov‐30‐22 58.8 FDN‐1B‐048 FoundaƟons 1B‐048 0.7 0.7 0%Oct ‐19‐22 Oct ‐20‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐042 Tower Erec Ɵon 1B‐042 Tower Assembly 1B ‐042 Spoƫng 1B‐042 ReclamaƟon 1B‐042 Access 1B‐042 Dec‐05‐22, Structure 1B‐043 FoundaƟons 1B‐043 Tower Erec Ɵon 1B‐043 Tower Assembly 1B ‐043 Clearing 1B‐043 Spoƫng 1B‐043 ReclamaƟon 1B‐043 Access 1B‐043 Dec‐04‐22, Structure 1B‐044 FoundaƟons 1B‐044 Tower Erec Ɵon 1B‐044 Tower Assembly 1B ‐044 Clearing 1B‐044 Spoƫng 1B‐044 ReclamaƟon 1B‐044 Access 1B‐044 Dec‐03‐22, Structure 1B‐045 FoundaƟons 1B‐045 Tower Erec Ɵon 1B‐045 Tower Assembly 1B ‐045 Clearing 1B‐045 Spoƫng 1B‐045 ReclamaƟon 1B‐045 Access 1B‐045 Dec‐02‐22, Structure 1B‐046 FoundaƟons 1B‐046 Tower Erec Ɵon 1B‐046 Tower Assembly 1B ‐046 Clearing 1B‐046 Spoƫng 1B‐046 ReclamaƟon 1B‐046 Access 1B‐046 Dec‐01‐22, Structure 1B‐047 FoundaƟons 1B‐047 Tower Erec Ɵon 1B‐047 Tower Assembly 1B‐047 Clearing 1B‐047 Spoƫng 1B‐047 ReclamaƟon 1B‐047 Access 1B‐047 Nov‐30‐22, Structure 1B‐048 FoundaƟons 1B‐048 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 32 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐048 Tower Erec Ɵon 1B‐048 1.0 1.0 0%Nov‐03‐22 Nov‐04‐22 14.8 ASY‐1B‐048 Tower Assembly 1B ‐048 1.0 1.0 0%Nov‐02‐22 Nov‐03‐22 15.0 SPT‐1B‐048 Spoƫng 1B‐048 0.6 0.6 0%Oct ‐20‐22 Oct ‐20‐22 27.7 REC‐1B‐048 ReclamaƟon 1B‐048 1.0 1.0 0%Nov‐29‐22 Nov‐30‐22 58.8 CLR‐1B‐048 Clearing 1B‐048 0.6 0.6 0%Aug‐20‐22 Aug‐21‐22 61.1 ACC ‐1B‐048 Access 1B‐048 0.6 0.6 0%Aug‐21‐22 Aug‐21‐22 70.8 Structure 1B-049Structure 1B-049 97.5 97.5 Aug‐21‐22 Nov‐29‐22 58.8 FDN‐1B‐049 FoundaƟons 1B‐049 0.7 0.7 0%Oct ‐18‐22 Oct ‐19‐22 13.0 ERC‐1B‐049 Tower Erec Ɵon 1B‐049 1.0 1.0 0%Nov‐02‐22 Nov‐03‐22 14.8 ASY‐1B‐049 Tower Assembly 1B ‐049 1.0 1.0 0%Nov‐01‐22 Nov‐02‐22 15.0 SPT‐1B‐049 Spoƫng 1B‐049 0.6 0.6 0%Oct ‐19‐22 Oct ‐19‐22 27.3 REC‐1B‐049 ReclamaƟon 1B‐049 1.0 1.0 0%Nov‐28‐22 Nov‐29‐22 58.8 CLR‐1B‐049 Clearing 1B‐049 0.6 0.6 0%Aug‐21‐22 Aug‐21‐22 61.1 ACC ‐1B‐049 Access 1B‐049 0.6 0.6 0%Aug‐21‐22 Aug‐22‐22 69.6 Structure 1B-050Structure 1B-050 95.9 95.9 Aug‐21‐22 Nov‐28‐22 58.8 FDN‐1B‐050 FoundaƟons 1B‐050 0.7 0.7 0%Oct ‐18‐22 Oct ‐18‐22 13.0 ERC‐1B‐050 Tower Erec Ɵon 1B‐050 1.0 1.0 0%Nov‐01‐22 Nov‐02‐22 14.8 ASY‐1B‐050 Tower Assembly 1B ‐050 1.0 1.0 0%Oct ‐31‐22 Nov‐01‐22 15.0 SPT‐1B‐050 Spoƫng 1B‐050 0.6 0.6 0%Oct ‐18‐22 Oct ‐19‐22 26.9 REC‐1B‐050 ReclamaƟon 1B‐050 1.0 1.0 0%Nov‐27‐22 Nov‐28‐22 58.8 CLR‐1B‐050 Clearing 1B‐050 0.6 0.6 0%Aug‐21‐22 Aug‐22‐22 61.1 ACC ‐1B‐050 Access 1B‐050 0.6 0.6 0%Aug‐22‐22 Aug‐22‐22 68.4 Structure 1B-051Structure 1B-051 94.3 94.3 Aug‐22‐22 Nov‐27‐22 58.8 FDN‐1B‐051 FoundaƟons 1B‐051 0.7 0.7 0%Oct ‐17‐22 Oct ‐18‐22 13.0 ERC‐1B‐051 Tower Erec Ɵon 1B‐051 1.0 1.0 0%Oct ‐31‐22 Nov‐01‐22 14.8 ASY‐1B‐051 Tower Assembly 1B ‐051 1.0 1.0 0%Oct ‐30‐22 Oct ‐31‐22 15.0 SPT‐1B‐051 Spoƫng 1B‐051 0.6 0.6 0%Oct ‐18‐22 Oct ‐18‐22 26.5 REC‐1B‐051 ReclamaƟon 1B‐051 1.0 1.0 0%Nov‐26‐22 Nov‐27‐22 58.8 CLR‐1B‐051 Clearing 1B‐051 0.6 0.6 0%Aug‐22‐22 Aug‐22‐22 61.1 ACC ‐1B‐051 Access 1B‐051 0.6 0.6 0%Aug‐22‐22 Aug‐23‐22 67.2 Structure 1B-052Structure 1B-052 92.7 92.7 Aug‐22‐22 Nov‐26‐22 58.8 FDN‐1B‐052 FoundaƟons 1B‐052 0.7 0.7 0%Oct ‐16‐22 Oct ‐17‐22 13.0 ERC‐1B‐052 Tower Erec Ɵon 1B‐052 1.0 1.0 0%Oct ‐30‐22 Oct ‐31‐22 14.8 ASY‐1B‐052 Tower Assembly 1B ‐052 1.0 1.0 0%Oct ‐29‐22 Oct ‐30‐22 15.0 SPT‐1B‐052 Spoƫng 1B‐052 0.6 0.6 0%Oct ‐17‐22 Oct ‐18‐22 26.1 REC‐1B‐052 ReclamaƟon 1B‐052 1.0 1.0 0%Nov‐23‐22 Nov‐26‐22 58.8 CLR‐1B‐052 Clearing 1B‐052 0.6 0.6 0%Aug‐22‐22 Aug‐23‐22 61.1 ACC ‐1B‐052 Access 1B‐052 0.6 0.6 0%Aug‐23‐22 Aug‐23‐22 65.9 Structure 1B-053Structure 1B-053 91.2 91.2 Aug‐23‐22 Nov‐23‐22 58.8 FDN‐1B‐053 FoundaƟons 1B‐053 0.7 0.7 0%Oct ‐16‐22 Oct ‐16‐22 13.0 ERC‐1B‐053 Tower Erec Ɵon 1B‐053 1.0 1.0 0%Oct ‐29‐22 Oct ‐30‐22 14.8 ASY‐1B‐053 Tower Assembly 1B ‐053 1.0 1.0 0%Oct ‐28‐22 Oct ‐29‐22 15.0 SPT‐1B‐053 Spoƫng 1B‐053 0.6 0.6 0%Oct ‐16‐22 Oct ‐17‐22 25.7 REC‐1B‐053 ReclamaƟon 1B‐053 1.0 1.0 0%Nov‐22‐22 Nov‐23‐22 58.8 CLR‐1B‐053 Clearing 1B‐053 0.6 0.6 0%Aug‐23‐22 Aug‐23‐22 61.1 ACC ‐1B‐053 Access 1B‐053 0.6 0.6 0%Aug‐23‐22 Aug‐24‐22 64.7 Structure 1B-054Structure 1B-054 89.6 89.6 Aug‐23‐22 Nov‐22‐22 58.8 FDN‐1B‐054 FoundaƟons 1B‐054 0.7 0.7 0%Oct ‐15‐22 Oct ‐16‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐048 Tower Assembly 1B‐048 Spoƫng 1B‐048 ReclamaƟon 1B‐048 Clearing 1B‐048 Access 1B‐048 Nov‐29‐22, Structure 1B‐049 FoundaƟons 1B‐049 Tower Erec Ɵon 1B‐049 Tower Assembly 1B‐049 Spoƫng 1B‐049 ReclamaƟon 1B‐049 Clearing 1B‐049 Access 1B‐049 Nov‐28‐22, Structure 1B‐050 FoundaƟons 1B‐050 Tower Erec Ɵon 1B‐050 Tower Assembly 1B ‐050 Spoƫng 1B‐050 ReclamaƟon 1B‐050 Clearing 1B‐050 Access 1B‐050 Nov‐27‐22, Structure 1B‐051 FoundaƟons 1B‐051 Tower Erec Ɵon 1B‐051 Tower Assembly 1B ‐051 Spoƫng 1B‐051 ReclamaƟon 1B‐051 Clearing 1B‐051 Access 1B‐051 Nov‐26‐22, Structure 1B‐052 FoundaƟons 1B‐052 Tower Erec Ɵon 1B‐052 Tower Assembly 1B ‐052 Spoƫng 1B‐052 ReclamaƟon 1B‐052 Clearing 1B‐052 Access 1B‐052 Nov ‐23‐22, Structure 1B‐053 FoundaƟons 1B‐053 Tower Erec Ɵon 1B‐053 Tower Assembly 1B ‐053 Spoƫng 1B‐053 ReclamaƟon 1B‐053 Clearing 1B‐053 Access 1B‐053 Nov ‐22‐22, Structure 1B‐054 FoundaƟons 1B‐054 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 33 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐054 Tower Erec Ɵon 1B‐054 1.0 1.0 0%Oct ‐28‐22 Oct ‐29‐22 14.8 ASY‐1B‐054 Tower Assembly 1B ‐054 1.0 1.0 0%Oct ‐27‐22 Oct ‐28‐22 15.0 SPT‐1B‐054 Spoƫng 1B‐054 0.6 0.6 0%Oct ‐16‐22 Oct ‐16‐22 25.4 REC‐1B‐054 ReclamaƟon 1B‐054 1.0 1.0 0%Nov‐21‐22 Nov‐22‐22 58.8 CLR‐1B‐054 Clearing 1B‐054 0.6 0.6 0%Aug‐23‐22 Aug‐24‐22 61.1 ACC ‐1B‐054 Access 1B‐054 0.6 0.6 0%Aug‐24‐22 Aug‐24‐22 63.5 Structure 1B-055Structure 1B-055 88.0 88.0 Aug‐24‐22 Nov‐21‐22 58.8 FDN‐1B‐055 FoundaƟons 1B‐055 0.7 0.7 0%Oct ‐14‐22 Oct ‐15‐22 13.0 ERC‐1B‐055 Tower Erec Ɵon 1B‐055 1.0 1.0 0%Oct ‐27‐22 Oct ‐28‐22 14.8 ASY‐1B‐055 Tower Assembly 1B ‐055 1.0 1.0 0%Oct ‐26‐22 Oct ‐27‐22 15.0 SPT‐1B‐055 Spoƫng 1B‐055 0.6 0.6 0%Oct ‐15‐22 Oct ‐16‐22 25.0 REC‐1B‐055 ReclamaƟon 1B‐055 1.0 1.0 0%Nov‐20‐22 Nov‐21‐22 58.8 CLR‐1B‐055 Clearing 1B‐055 0.6 0.6 0%Aug‐24‐22 Aug‐24‐22 61.1 ACC ‐1B‐055 Access 1B‐055 0.6 0.6 0%Aug‐24‐22 Aug‐25‐22 62.3 Structure 1B-056Structure 1B-056 86.4 86.4 Aug‐24‐22 Nov‐20‐22 58.8 FDN‐1B‐056 FoundaƟons 1B‐056 0.7 0.7 0%Oct ‐14‐22 Oct ‐14‐22 13.0 ERC‐1B‐056 Tower Erec Ɵon 1B‐056 1.0 1.0 0%Oct ‐26‐22 Oct ‐27‐22 14.8 ASY‐1B‐056 Tower Assembly 1B ‐056 1.0 1.0 0%Oct ‐25‐22 Oct ‐26‐22 14.9 SPT‐1B‐056 Spoƫng 1B‐056 0.6 0.6 0%Oct ‐14‐22 Oct ‐15‐22 24.6 REC‐1B‐056 ReclamaƟon 1B‐056 1.0 1.0 0%Nov‐19‐22 Nov‐20‐22 58.8 CLR‐1B‐056 Clearing 1B‐056 0.6 0.6 0%Aug‐24‐22 Aug‐25‐22 61.1 ACC ‐1B‐056 Access 1B‐056 0.6 0.6 0%Aug‐25‐22 Aug‐26‐22 61.1 Structure 1B-057Structure 1B-057 42.6 42.6 Oct ‐07‐22 Nov‐19‐22 58.8 FDN‐1B‐057 FoundaƟons 1B‐057 0.7 0.7 0%Oct ‐13‐22 Oct ‐14‐22 13.0 ERC‐1B‐057 Tower Erec Ɵon 1B‐057 1.0 1.0 0%Oct ‐25‐22 Oct ‐26‐22 14.8 ASY‐1B‐057 Tower Assembly 1B ‐057 1.0 1.0 0%Oct ‐24‐22 Oct ‐25‐22 14.9 CLR‐1B‐057 Clearing 1B‐057 0.5 0.5 0%Oct ‐07‐22 Oct ‐08‐22 17.7 ACC ‐1B‐057 Access 1B‐057 0.5 0.5 0%Oct ‐08‐22 Oct ‐08‐22 17.7 SPT‐1B‐057 Spoƫng 1B‐057 0.5 0.5 0%Oct ‐14‐22 Oct ‐14‐22 24.2 REC‐1B‐057 ReclamaƟon 1B‐057 1.0 1.0 0%Nov‐18‐22 Nov‐19‐22 58.8 Structure 1B-058Structure 1B-058 42.1 42.1 Oct ‐07‐22 Nov‐18‐22 58.8 FDN‐1B‐058 FoundaƟons 1B‐058 0.7 0.7 0%Oct ‐12‐22 Oct ‐13‐22 13.0 ERC‐1B‐058 Tower Erec Ɵon 1B‐058 1.0 1.0 0%Oct ‐24‐22 Oct ‐25‐22 14.8 ASY‐1B‐058 Tower Assembly 1B ‐058 1.0 1.0 0%Oct ‐22‐22 Oct ‐23‐22 14.9 CLR‐1B‐058 Clearing 1B‐058 0.5 0.5 0%Oct ‐07‐22 Oct ‐07‐22 17.6 ACC ‐1B‐058 Access 1B‐058 0.5 0.5 0%Oct ‐07‐22 Oct ‐08‐22 17.6 SPT‐1B‐058 Spoƫng 1B‐058 0.5 0.5 0%Oct ‐13‐22 Oct ‐14‐22 23.9 REC‐1B‐058 ReclamaƟon 1B‐058 1.0 1.0 0%Nov‐17‐22 Nov‐18‐22 58.8 Structure 1B-059Structure 1B-059 41.6 41.6 Oct ‐06‐22 Nov‐17‐22 58.8 FDN‐1B‐059 FoundaƟons 1B‐059 0.7 0.7 0%Oct ‐12‐22 Oct ‐12‐22 13.0 ERC‐1B‐059 Tower Erec Ɵon 1B‐059 1.0 1.0 0%Oct ‐23‐22 Oct ‐24‐22 14.8 ASY‐1B‐059 Tower Assembly 1B ‐059 1.0 1.0 0%Oct ‐21‐22 Oct ‐22‐22 14.9 CLR‐1B‐059 Clearing 1B‐059 0.5 0.5 0%Oct ‐06‐22 Oct ‐07‐22 17.5 ACC ‐1B‐059 Access 1B‐059 0.5 0.5 0%Oct ‐07‐22 Oct ‐07‐22 17.5 SPT‐1B‐059 Spoƫng 1B‐059 0.5 0.5 0%Oct ‐12‐22 Oct ‐13‐22 23.5 REC‐1B‐059 ReclamaƟon 1B‐059 1.0 1.0 0%Nov‐16‐22 Nov‐17‐22 58.8 Structure 1B-060Structure 1B-060 41.1 41.1 Oct ‐06‐22 Nov‐16‐22 58.8 FDN‐1B‐060 FoundaƟons 1B‐060 0.7 0.7 0%Oct ‐11‐22 Oct ‐12‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐054 Tower Assembly 1B ‐054 Spoƫng 1B‐054 ReclamaƟon 1B‐054 Clearing 1B‐054 Access 1B‐054 Nov‐21‐22, Structure 1B‐055 FoundaƟons 1B‐055 Tower Erec Ɵon 1B‐055 Tower Assembly 1B ‐055 Spoƫng 1B‐055 ReclamaƟon 1B‐055 Clearing 1B‐055 Access 1B‐055 Nov‐20‐22, Structure 1B‐056 FoundaƟons 1B‐056 Tower Erec Ɵon 1B‐056 Tower Assembly 1B ‐056 Spoƫng 1B‐056 ReclamaƟon 1B‐056 Clearing 1B‐056 Access 1B‐056 Nov‐19‐22, Structure 1B‐057 FoundaƟons 1B‐057 Tower Erec Ɵon 1B‐057 Tower Assembly 1B ‐057 Clearing 1B‐057 Access 1B‐057 Spoƫng 1B‐057 ReclamaƟon 1B‐057 Nov‐18‐22, Structure 1B‐058 FoundaƟons 1B‐058 Tower Erec Ɵon 1B‐058 Tower Assembly 1B‐058 Clearing 1B‐058 Access 1B‐058 Spoƫng 1B‐058 ReclamaƟon 1B‐058 Nov‐17‐22, Structure 1B‐059 FoundaƟons 1B‐059 Tower Erec Ɵon 1B‐059 Tower Assembly 1B‐059 Clearing 1B‐059 Access 1B‐059 Spoƫng 1B‐059 ReclamaƟon 1B‐059 Nov‐16‐22, Structure 1B‐060 FoundaƟons 1B‐060 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 34 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐060 Tower Erec Ɵon 1B‐060 1.0 1.0 0%Oct ‐22‐22 Oct ‐23‐22 14.8 ASY‐1B‐060 Tower Assembly 1B ‐060 1.0 1.0 0%Oct ‐20‐22 Oct ‐21‐22 14.9 CLR‐1B‐060 Clearing 1B‐060 0.5 0.5 0%Oct ‐06‐22 Oct ‐06‐22 17.4 ACC ‐1B‐060 Access 1B‐060 0.5 0.5 0%Oct ‐06‐22 Oct ‐07‐22 17.4 SPT‐1B‐060 Spoƫng 1B‐060 0.5 0.5 0%Oct ‐12‐22 Oct ‐12‐22 23.1 REC‐1B‐060 ReclamaƟon 1B‐060 1.0 1.0 0%Nov‐15‐22 Nov‐16‐22 58.8 Structure 1B-061Structure 1B-061 40.6 40.6 Oct ‐05‐22 Nov‐15‐22 58.8 FDN‐1B‐061 FoundaƟons 1B‐061 0.7 0.7 0%Oct ‐10‐22 Oct ‐11‐22 13.0 ERC‐1B‐061 Tower Erec Ɵon 1B‐061 1.0 1.0 0%Oct ‐20‐22 Oct ‐22‐22 14.8 ASY‐1B‐061 Tower Assembly 1B ‐061 1.0 1.0 0%Oct ‐19‐22 Oct ‐20‐22 14.9 CLR‐1B‐061 Clearing 1B‐061 0.5 0.5 0%Oct ‐05‐22 Oct ‐06‐22 17.2 ACC ‐1B‐061 Access 1B‐061 0.5 0.5 0%Oct ‐06‐22 Oct ‐06‐22 17.2 SPT‐1B‐061 Spoƫng 1B‐061 0.5 0.5 0%Oct ‐11‐22 Oct ‐12‐22 22.7 REC‐1B‐061 ReclamaƟon 1B‐061 1.0 1.0 0%Nov‐14‐22 Nov‐15‐22 58.8 Structure 1B-062Structure 1B-062 40.1 40.1 Oct ‐05‐22 Nov‐14‐22 58.8 FDN‐1B‐062 FoundaƟons 1B‐062 0.7 0.7 0%Oct ‐10‐22 Oct ‐10‐22 13.0 ERC‐1B‐062 Tower Erec Ɵon 1B‐062 1.0 1.0 0%Oct ‐19‐22 Oct ‐20‐22 14.8 ASY‐1B‐062 Tower Assembly 1B ‐062 1.0 1.0 0%Oct ‐18‐22 Oct ‐19‐22 14.9 CLR‐1B‐062 Clearing 1B‐062 0.5 0.5 0%Oct ‐05‐22 Oct ‐05‐22 17.1 ACC ‐1B‐062 Access 1B‐062 0.5 0.5 0%Oct ‐05‐22 Oct ‐06‐22 17.1 SPT‐1B‐062 Spoƫng 1B‐062 0.5 0.5 0%Oct ‐10‐22 Oct ‐11‐22 22.3 REC‐1B‐062 ReclamaƟon 1B‐062 1.0 1.0 0%Nov‐13‐22 Nov‐14‐22 58.8 Structure 1B-063Structure 1B-063 39.6 39.6 Oct ‐04‐22 Nov‐13‐22 58.8 FDN‐1B‐063 FoundaƟons 1B‐063 0.7 0.7 0%Oct ‐09‐22 Oct ‐10‐22 13.0 ERC‐1B‐063 Tower Erec Ɵon 1B‐063 1.0 1.0 0%Oct ‐18‐22 Oct ‐19‐22 14.8 ASY‐1B‐063 Tower Assembly 1B ‐063 1.0 1.0 0%Oct ‐17‐22 Oct ‐18‐22 14.9 CLR‐1B‐063 Clearing 1B‐063 0.5 0.5 0%Oct ‐04‐22 Oct ‐04‐22 17.0 ACC ‐1B‐063 Access 1B‐063 0.5 0.5 0%Oct ‐05‐22 Oct ‐05‐22 17.0 SPT‐1B‐063 Spoƫng 1B‐063 0.5 0.5 0%Oct ‐10‐22 Oct ‐10‐22 21.9 REC‐1B‐063 ReclamaƟon 1B‐063 1.0 1.0 0%Nov‐12‐22 Nov‐13‐22 58.8 Structure 1B-064Structure 1B-064 39.1 39.1 Oct ‐03‐22 Nov‐11‐22 58.8 FDN‐1B‐064 FoundaƟons 1B‐064 0.7 0.7 0%Oct ‐08‐22 Oct ‐09‐22 13.0 ERC‐1B‐064 Tower Erec Ɵon 1B‐064 1.0 1.0 0%Oct ‐17‐22 Oct ‐18‐22 14.8 ASY‐1B‐064 Tower Assembly 1B ‐064 1.0 1.0 0%Oct ‐16‐22 Oct ‐17‐22 14.9 CLR‐1B‐064 Clearing 1B‐064 0.5 0.5 0%Oct ‐03‐22 Oct ‐04‐22 16.9 ACC ‐1B‐064 Access 1B‐064 0.5 0.5 0%Oct ‐04‐22 Oct ‐04‐22 16.9 SPT‐1B‐064 Spoƫng 1B‐064 0.5 0.5 0%Oct ‐09‐22 Oct ‐10‐22 21.6 REC‐1B‐064 ReclamaƟon 1B‐064 1.0 1.0 0%Nov‐10‐22 Nov‐11‐22 58.8 Structure 1B-065Structure 1B-065 38.6 38.6 Oct ‐03‐22 Nov‐10‐22 58.8 FDN‐1B‐065 FoundaƟons 1B‐065 0.7 0.7 0%Oct ‐08‐22 Oct ‐08‐22 13.0 ERC‐1B‐065 Tower Erec Ɵon 1B‐065 1.0 1.0 0%Oct ‐16‐22 Oct ‐17‐22 14.8 ASY‐1B‐065 Tower Assembly 1B ‐065 1.0 1.0 0%Oct ‐15‐22 Oct ‐16‐22 14.9 CLR‐1B‐065 Clearing 1B‐065 0.5 0.5 0%Oct ‐03‐22 Oct ‐03‐22 16.8 ACC ‐1B‐065 Access 1B‐065 0.5 0.5 0%Oct ‐03‐22 Oct ‐04‐22 16.8 SPT‐1B‐065 Spoƫng 1B‐065 0.5 0.5 0%Oct ‐08‐22 Oct ‐09‐22 21.2 REC‐1B‐065 ReclamaƟon 1B‐065 1.0 1.0 0%Nov‐09‐22 Nov‐10‐22 58.8 Structure 1B-066Structure 1B-066 38.1 38.1 Oct ‐02‐22 Nov‐09‐22 58.8 FDN‐1B‐066 FoundaƟons 1B‐066 0.7 0.7 0%Oct ‐07‐22 Oct ‐08‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐060 Tower Assembly 1B‐060 Clearing 1B‐060 Access 1B‐060 Spoƫng 1B‐060 ReclamaƟon 1B‐060 Nov‐15‐22, Structure 1B‐061 FoundaƟons 1B‐061 Tower Erec Ɵon 1B‐061 Tower Assembly 1B ‐061 Clearing 1B‐061 Access 1B‐061 Spoƫng 1B‐061 ReclamaƟon 1B‐061 Nov‐14‐22, Structure 1B‐062 FoundaƟons 1B‐062 Tower Erec Ɵon 1B‐062 Tower Assembly 1B ‐062 Clearing 1B‐062 Access 1B‐062 Spoƫng 1B‐062 ReclamaƟon 1B‐062 Nov‐13‐22, Structure 1B‐063 FoundaƟons 1B‐063 Tower Erec Ɵon 1B‐063 Tower Assembly 1B ‐063 Clearing 1B‐063 Access 1B‐063 Spoƫng 1B‐063 ReclamaƟon 1B‐063 Nov‐11‐22, Structure 1B‐064 FoundaƟons 1B‐064 Tower Erec Ɵon 1B‐064 Tower Assembly 1B ‐064 Clearing 1B‐064 Access 1B‐064 Spoƫng 1B‐064 ReclamaƟon 1B‐064 Nov‐10‐22, Structure 1B‐065 FoundaƟons 1B‐065 Tower Erec Ɵon 1B‐065 Tower Assembly 1B ‐065 Clearing 1B‐065 Access 1B‐065 Spoƫng 1B‐065 ReclamaƟon 1B‐065 Nov‐09‐22, Structure 1B‐066 FoundaƟons 1B‐066 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 35 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐066 Tower Erec Ɵon 1B‐066 1.0 1.0 0%Oct ‐15‐22 Oct ‐16‐22 14.8 ASY‐1B‐066 Tower Assembly 1B ‐066 1.0 1.0 0%Oct ‐14‐22 Oct ‐15‐22 14.9 CLR‐1B‐066 Clearing 1B‐066 0.5 0.5 0%Oct ‐02‐22 Oct ‐03‐22 16.6 ACC ‐1B‐066 Access 1B‐066 0.5 0.5 0%Oct ‐03‐22 Oct ‐03‐22 16.6 SPT‐1B‐066 Spoƫng 1B‐066 0.5 0.5 0%Oct ‐08‐22 Oct ‐08‐22 20.8 REC‐1B‐066 ReclamaƟon 1B‐066 1.0 1.0 0%Nov‐08‐22 Nov‐09‐22 58.8 Structure 1B-067Structure 1B-067 37.6 37.6 Oct ‐02‐22 Nov‐08‐22 58.8 FDN‐1B‐067 FoundaƟons 1B‐067 0.7 0.7 0%Oct ‐06‐22 Oct ‐07‐22 13.0 ERC‐1B‐067 Tower Erec Ɵon 1B‐067 1.0 1.0 0%Oct ‐14‐22 Oct ‐15‐22 14.8 ASY‐1B‐067 Tower Assembly 1B ‐067 1.0 1.0 0%Oct ‐13‐22 Oct ‐14‐22 14.9 CLR‐1B‐067 Clearing 1B‐067 0.5 0.5 0%Oct ‐02‐22 Oct ‐02‐22 16.5 ACC ‐1B‐067 Access 1B‐067 0.5 0.5 0%Oct ‐02‐22 Oct ‐03‐22 16.5 SPT‐1B‐067 Spoƫng 1B‐067 0.5 0.5 0%Oct ‐07‐22 Oct ‐08‐22 20.4 REC‐1B‐067 ReclamaƟon 1B‐067 1.0 1.0 0%Nov‐07‐22 Nov‐08‐22 58.8 Structure 1B-068Structure 1B-068 37.1 37.1 Oct ‐01‐22 Nov‐07‐22 58.8 FDN‐1B‐068 FoundaƟons 1B‐068 0.7 0.7 0%Oct ‐06‐22 Oct ‐06‐22 13.0 ERC‐1B‐068 Tower Erec Ɵon 1B‐068 1.0 1.0 0%Oct ‐13‐22 Oct ‐14‐22 14.8 ASY‐1B‐068 Tower Assembly 1B ‐068 1.0 1.0 0%Oct ‐12‐22 Oct ‐13‐22 14.9 CLR‐1B‐068 Clearing 1B‐068 0.5 0.5 0%Oct ‐01‐22 Oct ‐02‐22 16.4 ACC ‐1B‐068 Access 1B‐068 0.5 0.5 0%Oct ‐02‐22 Oct ‐02‐22 16.4 SPT‐1B‐068 Spoƫng 1B‐068 0.5 0.5 0%Oct ‐06‐22 Oct ‐07‐22 20.0 REC‐1B‐068 ReclamaƟon 1B‐068 1.0 1.0 0%Nov‐06‐22 Nov‐07‐22 58.8 Structure 1B-069Structure 1B-069 36.6 36.6 Oct ‐01‐22 Nov‐06‐22 58.8 FDN‐1B‐069 FoundaƟons 1B‐069 0.7 0.7 0%Oct ‐05‐22 Oct ‐06‐22 13.0 ERC‐1B‐069 Tower Erec Ɵon 1B‐069 1.0 1.0 0%Oct ‐12‐22 Oct ‐13‐22 14.8 ASY‐1B‐069 Tower Assembly 1B ‐069 1.0 1.0 0%Oct ‐11‐22 Oct ‐12‐22 14.9 CLR‐1B‐069 Clearing 1B‐069 0.5 0.5 0%Oct ‐01‐22 Oct ‐01‐22 16.3 ACC ‐1B‐069 Access 1B‐069 0.5 0.5 0%Oct ‐01‐22 Oct ‐02‐22 16.3 SPT‐1B‐069 Spoƫng 1B‐069 0.5 0.5 0%Oct ‐06‐22 Oct ‐06‐22 19.7 REC‐1B‐069 ReclamaƟon 1B‐069 1.0 1.0 0%Nov‐05‐22 Nov‐06‐22 58.8 Structure 1B-070Structure 1B-070 36.1 36.1 Sep‐30‐22 Nov‐05‐22 58.8 FDN‐1B‐070 FoundaƟons 1B‐070 0.7 0.7 0%Oct ‐04‐22 Oct ‐05‐22 13.0 ERC‐1B‐070 Tower Erec Ɵon 1B‐070 1.0 1.0 0%Oct ‐11‐22 Oct ‐12‐22 14.8 ASY‐1B‐070 Tower Assembly 1B ‐070 1.0 1.0 0%Oct ‐10‐22 Oct ‐11‐22 14.9 CLR‐1B‐070 Clearing 1B‐070 0.5 0.5 0%Sep‐30‐22 Oct ‐01‐22 16.2 ACC ‐1B‐070 Access 1B‐070 0.5 0.5 0%Oct ‐01‐22 Oct ‐01‐22 16.2 SPT‐1B‐070 Spoƫng 1B‐070 0.5 0.5 0%Oct ‐05‐22 Oct ‐06‐22 19.3 REC‐1B‐070 ReclamaƟon 1B‐070 1.0 1.0 0%Nov‐04‐22 Nov‐05‐22 58.8 Structure 1B-071Structure 1B-071 96.3 96.3 Jul‐30‐22 Nov‐04‐22 58.8 CLR‐1B‐071 Clearing 1B‐071 0.9 0.9 0%Jul‐30‐22 Jul‐31‐22 12.0 ERC‐1B‐071 Tower Erec Ɵon 1B‐071 1.0 1.0 0%Oct ‐10‐22 Oct ‐11‐22 14.8 ASY‐1B‐071 Tower Assembly 1B ‐071 1.0 1.0 0%Oct ‐09‐22 Oct ‐10‐22 14.9 FDN‐1B‐071 FoundaƟons 1B‐071 1.5 1.5 0%Sep‐16‐22 Sep‐17‐22 35.5 SPT‐1B‐071 Spoƫng 1B‐071 0.9 0.9 0%Sep‐17‐22 Sep‐18‐22 35.5 REC‐1B‐071 ReclamaƟon 1B‐071 1.0 1.0 0%Nov‐03‐22 Nov‐04‐22 58.8 ACC ‐1B‐071 Access 1B‐071 0.9 0.9 0%Jul‐31‐22 Aug‐01‐22 80.8 Structure 1B-072Structure 1B-072 96.1 96.1 Jul‐29‐22 Nov‐03‐22 58.8 CLR‐1B‐072 Clearing 1B‐072 0.9 0.9 0%Jul‐29‐22 Jul‐30‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐066 Tower Assembly 1B ‐066 Clearing 1B‐066 Access 1B‐066 Spoƫng 1B‐066 ReclamaƟon 1B‐066 Nov‐08‐22, Structure 1B‐067 FoundaƟons 1B‐067 Tower Erec Ɵon 1B‐067 Tower Assembly 1B ‐067 Clearing 1B‐067 Access 1B‐067 Spoƫng 1B‐067 ReclamaƟon 1B‐067 Nov‐07‐22, Structure 1B‐068 FoundaƟons 1B‐068 Tower Erec Ɵon 1B‐068 Tower Assembly 1B ‐068 Clearing 1B‐068 Access 1B‐068 Spoƫng 1B‐068 ReclamaƟon 1B‐068 Nov‐06‐22, Structure 1B‐069 FoundaƟons 1B‐069 Tower Erec Ɵon 1B‐069 Tower Assembly 1B ‐069 Clearing 1B‐069 Access 1B‐069 Spoƫng 1B‐069 ReclamaƟon 1B‐069 Nov‐05‐22, Structure 1B‐070 FoundaƟons 1B‐070 Tower Erec Ɵon 1B‐070 Tower Assembly 1B‐070 Clearing 1B‐070 Access 1B‐070 Spoƫng 1B‐070 ReclamaƟon 1B‐070 Nov‐04‐22, Structure 1B‐071 Clearing 1B‐071 Tower Erec Ɵon 1B‐071 Tower Assembly 1B‐071 FoundaƟons 1B‐071 Spoƫng 1B‐071 ReclamaƟon 1B‐071 Access 1B‐071 Nov‐03‐22, Structure 1B‐072 Clearing 1B‐072 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 36 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐072 Tower Erec Ɵon 1B‐072 1.0 1.0 0%Oct ‐09‐22 Oct ‐10‐22 14.8 ASY‐1B‐072 Tower Assembly 1B ‐072 1.0 1.0 0%Oct ‐08‐22 Oct ‐09‐22 14.9 FDN‐1B‐072 FoundaƟons 1B‐072 1.5 1.5 0%Sep‐15‐22 Sep‐16‐22 35.5 SPT‐1B‐072 Spoƫng 1B‐072 0.9 0.9 0%Sep‐16‐22 Sep‐17‐22 35.9 REC‐1B‐072 ReclamaƟon 1B‐072 1.0 1.0 0%Nov‐02‐22 Nov‐03‐22 58.8 ACC ‐1B‐072 Access 1B‐072 0.9 0.9 0%Jul‐30‐22 Jul‐31‐22 80.3 Structure 1B-073Structure 1B-073 96.0 96.0 Jul‐28‐22 Nov‐02‐22 58.8 CLR‐1B‐073 Clearing 1B‐073 0.9 0.9 0%Jul‐28‐22 Jul‐29‐22 12.0 ERC‐1B‐073 Tower Erec Ɵon 1B‐073 1.0 1.0 0%Oct ‐08‐22 Oct ‐09‐22 14.8 ASY‐1B‐073 Tower Assembly 1B ‐073 1.0 1.0 0%Oct ‐07‐22 Oct ‐08‐22 14.9 FDN‐1B‐073 FoundaƟons 1B‐073 1.5 1.5 0%Sep‐13‐22 Sep‐15‐22 35.5 SPT‐1B‐073 Spoƫng 1B‐073 0.9 0.9 0%Sep‐15‐22 Sep‐15‐22 36.4 REC‐1B‐073 ReclamaƟon 1B‐073 1.0 1.0 0%Nov‐01‐22 Nov‐02‐22 58.8 ACC ‐1B‐073 Access 1B‐073 0.9 0.9 0%Jul‐29‐22 Jul‐30‐22 79.7 Structure 1B-074Structure 1B-074 95.8 95.8 Jul‐27‐22 Nov‐01‐22 58.8 CLR‐1B‐074 Clearing 1B‐074 0.9 0.9 0%Jul‐27‐22 Jul‐28‐22 12.0 ERC‐1B‐074 Tower Erec Ɵon 1B‐074 1.0 1.0 0%Oct ‐07‐22 Oct ‐08‐22 14.8 ASY‐1B‐074 Tower Assembly 1B ‐074 1.0 1.0 0%Oct ‐06‐22 Oct ‐07‐22 14.9 FDN‐1B‐074 FoundaƟons 1B‐074 1.5 1.5 0%Sep‐12‐22 Sep‐13‐22 35.5 SPT‐1B‐074 Spoƫng 1B‐074 0.9 0.9 0%Sep‐13‐22 Sep‐14‐22 36.8 REC‐1B‐074 ReclamaƟon 1B‐074 1.0 1.0 0%Oct ‐31‐22 Nov‐01‐22 58.8 ACC ‐1B‐074 Access 1B‐074 0.9 0.9 0%Jul‐28‐22 Jul‐29‐22 79.1 Structure 1B-074AStructure 1B-074A 95.4 95.4 Jul‐27‐22 Oct ‐31‐22 58.8 CLR‐1B‐074‐A Clearing 1B‐074‐A 0.7 0.7 0%Jul‐27‐22 Jul‐27‐22 12.0 ERC‐1B‐074‐A Tower Erec Ɵon 1B‐074‐A 1.0 1.0 0%Oct ‐06‐22 Oct ‐07‐22 14.8 ASY‐1B‐074‐A Tower Assembly 1B ‐074‐A 1.0 1.0 0%Oct ‐05‐22 Oct ‐06‐22 14.9 FDN‐1B‐074‐A FoundaƟons 1B‐074‐A 0.5 0.5 0%Sep‐11‐22 Sep‐12‐22 35.5 SPT‐1B‐074‐A Spoƫng 1B‐074‐A 0.9 0.9 0%Sep‐12‐22 Sep‐13‐22 36.9 REC‐1B‐074‐A ReclamaƟon 1B‐074‐A 1.0 1.0 0%Oct ‐30‐22 Oct ‐31‐22 58.8 ACC ‐1B‐074‐A Access 1B‐074‐A 0.7 0.7 0%Jul‐27‐22 Jul‐28‐22 79.6 Structure 1B-075Structure 1B-075 95.2 95.2 Jul‐26‐22 Oct ‐30‐22 58.8 CLR‐1B‐075 Clearing 1B‐075 0.9 0.9 0%Jul‐26‐22 Jul‐27‐22 12.0 ERC‐1B‐075 Tower Erec Ɵon 1B‐075 1.0 1.0 0%Oct ‐05‐22 Oct ‐06‐22 14.8 ASY‐1B‐075 Tower Assembly 1B ‐075 1.0 1.0 0%Oct ‐04‐22 Oct ‐05‐22 14.9 FDN‐1B‐075 FoundaƟons 1B‐075 1.5 1.5 0%Sep‐10‐22 Sep‐11‐22 35.5 SPT‐1B‐075 Spoƫng 1B‐075 0.9 0.9 0%Sep‐11‐22 Sep‐12‐22 36.7 REC‐1B‐075 ReclamaƟon 1B‐075 1.0 1.0 0%Oct ‐29‐22 Oct ‐30‐22 58.8 ACC ‐1B‐075 Access 1B‐075 0.9 0.9 0%Jul‐27‐22 Jul‐28‐22 78.6 Structure 1B-076Structure 1B-076 95.1 95.1 Jul‐25‐22 Oct ‐29‐22 58.8 CLR‐1B‐076 Clearing 1B‐076 0.9 0.9 0%Jul‐25‐22 Jul‐26‐22 12.0 ERC‐1B‐076 Tower Erec Ɵon 1B‐076 1.0 1.0 0%Oct ‐04‐22 Oct ‐05‐22 14.8 ASY‐1B‐076 Tower Assembly 1B ‐076 1.0 1.0 0%Oct ‐03‐22 Oct ‐04‐22 14.9 FDN‐1B‐076 FoundaƟons 1B‐076 1.5 1.5 0%Sep‐08‐22 Sep‐10‐22 35.5 SPT‐1B‐076 Spoƫng 1B‐076 0.9 0.9 0%Sep‐10‐22 Sep‐10‐22 37.2 REC‐1B‐076 ReclamaƟon 1B‐076 1.0 1.0 0%Oct ‐28‐22 Oct ‐29‐22 58.8 ACC ‐1B‐076 Access 1B‐076 0.9 0.9 0%Jul‐26‐22 Jul‐27‐22 78.0 Structure 1B-076AStructure 1B-076A 94.7 94.7 Jul‐24‐22 Oct ‐28‐22 58.8 CLR‐1B‐076‐A Clearing 1B‐076‐A 0.7 0.7 0%Jul‐24‐22 Jul‐25‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐072 Tower Assembly 1B ‐072 FoundaƟons 1B‐072 Spoƫng 1B‐072 ReclamaƟon 1B‐072 Access 1B‐072 Nov‐02‐22, Structure 1B‐073 Clearing 1B‐073 Tower Erec Ɵon 1B‐073 Tower Assembly 1B ‐073 FoundaƟons 1B‐073 Spoƫng 1B‐073 ReclamaƟon 1B‐073 Access 1B‐073 Nov‐01‐22, Structure 1B‐074 Clearing 1B‐074 Tower Erec Ɵon 1B‐074 Tower Assembly 1B ‐074 FoundaƟons 1B‐074 Spoƫng 1B‐074 ReclamaƟon 1B‐074 Access 1B‐074 Oct ‐31‐22, Structure 1B‐074A Clearing 1B‐074‐A Tower Erec Ɵon 1B‐074‐A Tower Assembly 1B ‐074‐A FoundaƟons 1B‐074‐A Spoƫng 1B‐074‐A ReclamaƟon 1B‐074‐A Access 1B‐074‐A Oct ‐30‐22, Structure 1B‐075 Clearing 1B‐075 Tower Erec Ɵon 1B‐075 Tower Assembly 1B ‐075 FoundaƟons 1B‐075 Spoƫng 1B‐075 ReclamaƟon 1B‐075 Access 1B‐075 Oct ‐29‐22, Structure 1B‐076 Clearing 1B‐076 Tower Erec Ɵon 1B‐076 Tower Assembly 1B ‐076 FoundaƟons 1B‐076 Spoƫng 1B‐076 ReclamaƟon 1B‐076 Access 1B‐076 Oct ‐28‐22, Structure 1B‐076A Clearing 1B‐076‐A Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 37 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐076‐A Tower Erec Ɵon 1B‐076‐A 1.0 1.0 0%Oct ‐03‐22 Oct ‐04‐22 14.8 ASY‐1B‐076‐A Tower Assembly 1B ‐076‐A 1.0 1.0 0%Oct ‐02‐22 Oct ‐03‐22 14.9 FDN‐1B‐076‐A FoundaƟons 1B‐076‐A 0.5 0.5 0%Sep‐08‐22 Sep‐08‐22 35.5 SPT‐1B‐076‐A Spoƫng 1B‐076‐A 0.9 0.9 0%Sep‐08‐22 Sep‐09‐22 37.2 REC‐1B‐076‐A ReclamaƟon 1B‐076‐A 1.0 1.0 0%Oct ‐27‐22 Oct ‐28‐22 58.8 ACC ‐1B‐076‐A Access 1B‐076‐A 0.7 0.7 0%Jul‐25‐22 Jul‐26‐22 78.6 Structure 1B-077Structure 1B-077 94.5 94.5 Jul‐23‐22 Oct ‐27‐22 58.8 CLR‐1B‐077 Clearing 1B‐077 0.9 0.9 0%Jul‐23‐22 Jul‐24‐22 12.0 ERC‐1B‐077 Tower Erec Ɵon 1B‐077 1.0 1.0 0%Oct ‐02‐22 Oct ‐03‐22 14.8 ASY‐1B‐077 Tower Assembly 1B ‐077 1.0 1.0 0%Oct ‐01‐22 Oct ‐02‐22 14.9 FDN‐1B‐077 FoundaƟons 1B‐077 1.5 1.5 0%Sep‐06‐22 Sep‐08‐22 35.5 SPT‐1B‐077 Spoƫng 1B‐077 0.9 0.9 0%Sep‐08‐22 Sep‐08‐22 37.1 REC‐1B‐077 ReclamaƟon 1B‐077 1.0 1.0 0%Oct ‐26‐22 Oct ‐27‐22 58.8 ACC ‐1B‐077 Access 1B‐077 0.9 0.9 0%Jul‐24‐22 Jul‐25‐22 77.5 Structure 1B-078Structure 1B-078 94.4 94.4 Jul‐22‐22 Oct ‐26‐22 58.8 CLR‐1B‐078 Clearing 1B‐078 0.9 0.9 0%Jul‐22‐22 Jul‐23‐22 12.0 ERC‐1B‐078 Tower Erec Ɵon 1B‐078 1.0 1.0 0%Oct ‐01‐22 Oct ‐02‐22 14.8 ASY‐1B‐078 Tower Assembly 1B ‐078 1.0 1.0 0%Sep‐30‐22 Oct ‐01‐22 14.9 FDN‐1B‐078 FoundaƟons 1B‐078 1.5 1.5 0%Sep‐04‐22 Sep‐06‐22 35.5 SPT‐1B‐078 Spoƫng 1B‐078 0.9 0.9 0%Sep‐06‐22 Sep‐07‐22 37.5 REC‐1B‐078 ReclamaƟon 1B‐078 1.0 1.0 0%Oct ‐25‐22 Oct ‐26‐22 58.8 ACC ‐1B‐078 Access 1B‐078 0.9 0.9 0%Jul‐23‐22 Jul‐24‐22 76.9 Structure 1B-079Structure 1B-079 94.2 94.2 Jul‐22‐22 Oct ‐25‐22 58.8 CLR‐1B‐079 Clearing 1B‐079 0.9 0.9 0%Jul‐22‐22 Jul‐22‐22 12.0 ERC‐1B‐079 Tower Erec Ɵon 1B‐079 1.0 1.0 0%Sep‐30‐22 Oct ‐01‐22 14.8 ASY‐1B‐079 Tower Assembly 1B ‐079 1.0 1.0 0%Sep‐29‐22 Sep‐30‐22 14.9 FDN‐1B‐079 FoundaƟons 1B‐079 1.5 1.5 0%Sep‐02‐22 Sep‐04‐22 35.5 SPT‐1B‐079 Spoƫng 1B‐079 0.9 0.9 0%Sep‐04‐22 Sep‐06‐22 37.9 REC‐1B‐079 ReclamaƟon 1B‐079 1.0 1.0 0%Oct ‐24‐22 Oct ‐25‐22 58.8 ACC ‐1B‐079 Access 1B‐079 0.9 0.9 0%Jul‐22‐22 Jul‐23‐22 76.4 Structure 1B-080Structure 1B-080 82.0 82.0 Aug‐02‐22 Oct ‐24‐22 58.8 ERC‐1B‐080 Tower Erec Ɵon 1B‐080 1.0 1.0 0%Sep‐29‐22 Sep‐30‐22 14.8 ASY‐1B‐080 Tower Assembly 1B ‐080 1.0 1.0 0%Sep‐28‐22 Sep‐29‐22 14.9 FDN‐1B‐080 FoundaƟons 1B‐080 1.5 1.5 0%Sep‐01‐22 Sep‐02‐22 35.5 SPT‐1B‐080 Spoƫng 1B‐080 0.4 0.4 0%Sep‐02‐22 Sep‐03‐22 38.8 REC‐1B‐080 ReclamaƟon 1B‐080 1.0 1.0 0%Oct ‐23‐22 Oct ‐24‐22 58.8 CLR‐1B‐080 Clearing 1B‐080 0.4 0.4 0%Aug‐02‐22 Aug‐02‐22 64.6 ACC ‐1B‐080 Access 1B‐080 0.4 0.4 0%Aug‐02‐22 Aug‐03‐22 64.6 Structure 1B-081Structure 1B-081 81.3 81.3 Aug‐01‐22 Oct ‐23‐22 58.8 ERC‐1B‐081 Tower Erec Ɵon 1B‐081 1.0 1.0 0%Sep‐28‐22 Sep‐29‐22 14.8 ASY‐1B‐081 Tower Assembly 1B ‐081 1.0 1.0 0%Sep‐27‐22 Sep‐28‐22 14.9 FDN‐1B‐081 FoundaƟons 1B‐081 1.5 1.5 0%Aug‐30‐22 Sep‐01‐22 35.5 SPT‐1B‐081 Spoƫng 1B‐081 0.4 0.4 0%Sep‐01‐22 Sep‐01‐22 39.3 REC‐1B‐081 ReclamaƟon 1B‐081 1.0 1.0 0%Oct ‐22‐22 Oct ‐23‐22 58.8 CLR‐1B‐081 Clearing 1B‐081 0.4 0.4 0%Aug‐01‐22 Aug‐02‐22 63.6 ACC ‐1B‐081 Access 1B‐081 0.4 0.4 0%Aug‐02‐22 Aug‐02‐22 63.6 Structure 1B-082Structure 1B-082 80.7 80.7 Aug‐01‐22 Oct ‐22‐22 58.8 ERC‐1B‐082 Tower Erec Ɵon 1B‐082 1.0 1.0 0%Sep‐27‐22 Sep‐28‐22 14.8 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐076‐A Tower Assembly 1B ‐076‐A FoundaƟons 1B‐076‐A Spoƫng 1B‐076‐A ReclamaƟon 1B‐076‐A Access 1B‐076‐A Oct ‐27‐22, Structure 1B‐077 Clearing 1B‐077 Tower Erec Ɵon 1B‐077 Tower Assembly 1B ‐077 FoundaƟons 1B‐077 Spoƫng 1B‐077 ReclamaƟon 1B‐077 Access 1B‐077 Oct ‐26‐22, Structure 1B‐078 Clearing 1B‐078 Tower Erec Ɵon 1B‐078 Tower Assembly 1B ‐078 FoundaƟons 1B‐078 Spoƫng 1B‐078 ReclamaƟon 1B‐078 Access 1B‐078 Oct ‐25‐22, Structure 1B‐079 Clearing 1B‐079 Tower Erec Ɵon 1B‐079 Tower Assembly 1B‐079 FoundaƟons 1B‐079 Spoƫng 1B‐079 ReclamaƟon 1B‐079 Access 1B‐079 Oct ‐24‐22, Structure 1B‐080 Tower Erec Ɵon 1B‐080 Tower Assembly 1B‐080 FoundaƟons 1B‐080 Spoƫng 1B‐080 ReclamaƟon 1B‐080 Clearing 1B‐080 Access 1B‐080 Oct ‐23‐22, Structure 1B‐081 Tower Erec Ɵon 1B‐081 Tower Assembly 1B‐081 FoundaƟons 1B‐081 Spoƫng 1B‐081 ReclamaƟon 1B‐081 Clearing 1B‐081 Access 1B‐081 Oct ‐22‐22, Structure 1B‐082 Tower Erec Ɵon 1B‐082 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 38 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1B‐082 Tower Assembly 1B ‐082 1.0 1.0 0%Sep‐26‐22 Sep‐27‐22 14.9 FDN‐1B‐082 FoundaƟons 1B‐082 1.5 1.5 0%Aug‐29‐22 Aug‐30‐22 35.5 SPT‐1B‐082 Spoƫng 1B‐082 0.4 0.4 0%Aug‐30‐22 Aug‐31‐22 39.7 REC‐1B‐082 ReclamaƟon 1B‐082 1.0 1.0 0%Oct ‐21‐22 Oct ‐22‐22 58.8 CLR‐1B‐082 Clearing 1B‐082 0.4 0.4 0%Aug‐01‐22 Aug‐01‐22 62.5 ACC ‐1B‐082 Access 1B‐082 0.4 0.4 0%Aug‐01‐22 Aug‐02‐22 62.5 Structure 1B-083Structure 1B-083 80.0 80.0 Aug‐01‐22 Oct ‐21‐22 58.8 CLR‐1B‐083 Clearing 1B‐083 0.4 0.4 0%Aug‐01‐22 Aug‐01‐22 12.0 ERC‐1B‐083 Tower Erec Ɵon 1B‐083 1.0 1.0 0%Sep‐26‐22 Sep‐27‐22 14.8 ASY‐1B‐083 Tower Assembly 1B ‐083 1.0 1.0 0%Sep‐24‐22 Sep‐26‐22 14.9 FDN‐1B‐083 FoundaƟons 1B‐083 1.5 1.5 0%Aug‐27‐22 Aug‐29‐22 35.5 SPT‐1B‐083 Spoƫng 1B‐083 0.4 0.4 0%Aug‐29‐22 Aug‐29‐22 40.1 REC‐1B‐083 ReclamaƟon 1B‐083 1.0 1.0 0%Oct ‐20‐22 Oct ‐21‐22 58.8 ACC ‐1B‐083 Access 1B‐083 0.4 0.4 0%Aug‐01‐22 Aug‐01‐22 61.4 Structure 1B-084Structure 1B-084 79.4 79.4 Jul‐31‐22 Oct ‐20‐22 58.8 CLR‐1B‐084 Clearing 1B‐084 0.4 0.4 0%Jul‐31‐22 Aug‐01‐22 12.0 ERC‐1B‐084 Tower Erec Ɵon 1B‐084 1.0 1.0 0%Sep‐24‐22 Sep‐26‐22 14.8 ASY‐1B‐084 Tower Assembly 1B ‐084 1.0 1.0 0%Sep‐23‐22 Sep‐24‐22 14.8 FDN‐1B‐084 FoundaƟons 1B‐084 1.5 1.5 0%Aug‐26‐22 Aug‐27‐22 35.5 SPT‐1B‐084 Spoƫng 1B‐084 0.4 0.4 0%Aug‐27‐22 Aug‐28‐22 40.6 REC‐1B‐084 ReclamaƟon 1B‐084 1.0 1.0 0%Oct ‐19‐22 Oct ‐20‐22 58.8 ACC ‐1B‐084 Access 1B‐084 0.4 0.4 0%Aug‐01‐22 Aug‐01‐22 60.3 Structure 1B-085Structure 1B-085 78.8 78.8 Jul‐31‐22 Oct ‐19‐22 58.8 CLR‐1B‐085 Clearing 1B‐085 0.4 0.4 0%Jul‐31‐22 Jul‐31‐22 12.0 FDN‐1B‐085 FoundaƟons 1B‐085 1.5 1.5 0%Aug‐24‐22 Aug‐26‐22 14.3 ERC‐1B‐085 Tower Erec Ɵon 1B‐085 1.0 1.0 0%Sep‐23‐22 Sep‐24‐22 14.8 ASY‐1B‐085 Tower Assembly 1B ‐085 1.0 1.0 0%Sep‐22‐22 Sep‐23‐22 14.8 ACC ‐1B‐085 Access 1B‐085 0.4 0.4 0%Jul‐31‐22 Aug‐01‐22 38.1 SPT‐1B‐085 Spoƫng 1B‐085 0.4 0.4 0%Aug‐26‐22 Aug‐26‐22 41.0 REC‐1B‐085 ReclamaƟon 1B‐085 1.0 1.0 0%Oct ‐18‐22 Oct ‐19‐22 58.8 Structure 1B-086Structure 1B-086 88.9 88.9 Jul‐20‐22 Oct ‐18‐22 58.8 CLR‐1B‐086 Clearing 1B‐086 1.0 1.0 0%Jul‐20‐22 Jul‐21‐22 12.9 FDN‐1B‐086 FoundaƟons 1B‐086 1.5 1.5 0%Aug‐23‐22 Aug‐24‐22 14.3 ERC‐1B‐086 Tower Erec Ɵon 1B‐086 1.0 1.0 0%Sep‐22‐22 Sep‐23‐22 14.8 ASY‐1B‐086 Tower Assembly 1B ‐086 1.0 1.0 0%Sep‐21‐22 Sep‐22‐22 14.8 SPT‐1B‐086 Spoƫng 1B‐086 1.0 1.0 0%Aug‐24‐22 Aug‐25‐22 40.8 ACC ‐1B‐086 Access 1B‐086 1.0 1.0 0%Jul‐21‐22 Jul‐22‐22 46.5 REC‐1B‐086 ReclamaƟon 1B‐086 1.0 1.0 0%Oct ‐17‐22 Oct ‐18‐22 58.8 Structure 1B-087Structure 1B-087 88.8 88.8 Jul‐19‐22 Oct ‐16‐22 58.8 ASY‐1B‐087 Tower Assembly 1B ‐087 1.0 1.0 0%Sep‐20‐22 Sep‐21‐22 10.1 CLR‐1B‐087 Clearing 1B‐087 1.0 1.0 0%Jul‐19‐22 Jul‐20‐22 12.9 FDN‐1B‐087 FoundaƟons 1B‐087 1.5 1.5 0%Aug‐21‐22 Aug‐23‐22 14.3 ERC‐1B‐087 Tower Erec Ɵon 1B‐087 1.0 1.0 0%Sep‐21‐22 Sep‐22‐22 14.8 SPT‐1B‐087 Spoƫng 1B‐087 1.0 1.0 0%Aug‐23‐22 Aug‐24‐22 36.5 ACC ‐1B‐087 Access 1B‐087 1.0 1.0 0%Jul‐20‐22 Jul‐21‐22 46.1 REC‐1B‐087 ReclamaƟon 1B‐087 1.0 1.0 0%Oct ‐15‐22 Oct ‐16‐22 58.8 Structure 1B-088Structure 1B-088 88.8 88.8 Jul‐18‐22 Oct ‐15‐22 58.8 ASY‐1B‐088 Tower Assembly 1B ‐088 1.0 1.0 0%Sep‐19‐22 Sep‐20‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1B ‐082 FoundaƟons 1B‐082 Spoƫng 1B‐082 ReclamaƟon 1B‐082 Clearing 1B‐082 Access 1B‐082 Oct ‐21‐22, Structure 1B‐083 Clearing 1B‐083 Tower Erec Ɵon 1B‐083 Tower Assembly 1B ‐083 FoundaƟons 1B‐083 Spoƫng 1B‐083 ReclamaƟon 1B‐083 Access 1B‐083 Oct ‐20‐22, Structure 1B‐084 Clearing 1B‐084 Tower Erec Ɵon 1B‐084 Tower Assembly 1B ‐084 FoundaƟons 1B‐084 Spoƫng 1B‐084 ReclamaƟon 1B‐084 Access 1B‐084 Oct ‐19‐22, Structure 1B‐085 Clearing 1B‐085 FoundaƟons 1B‐085 Tower Erec Ɵon 1B‐085 Tower Assembly 1B ‐085 Access 1B‐085 Spoƫng 1B‐085 ReclamaƟon 1B‐085 Oct ‐18‐22, Structure 1B‐086 Clearing 1B‐086 FoundaƟons 1B‐086 Tower Erec Ɵon 1B‐086 Tower Assembly 1B ‐086 Spoƫng 1B‐086 Access 1B‐086 ReclamaƟon 1B‐086 Oct ‐16‐22, Structure 1B‐087 Tower Assembly 1B ‐087 Clearing 1B‐087 FoundaƟons 1B‐087 Tower Erec Ɵon 1B‐087 Spoƫng 1B‐087 Access 1B‐087 ReclamaƟon 1B‐087 Oct ‐15‐22, Structure 1B‐088 Tower Assembly 1B ‐088 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 39 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1B‐088 Clearing 1B‐088 1.0 1.0 0%Jul‐18‐22 Jul‐19‐22 12.9 FDN‐1B‐088 FoundaƟons 1B‐088 1.5 1.5 0%Aug‐20‐22 Aug‐21‐22 14.3 ERC‐1B‐088 Tower Erec Ɵon 1B‐088 1.0 1.0 0%Sep‐20‐22 Sep‐21‐22 14.8 SPT‐1B‐088 Spoƫng 1B‐088 1.0 1.0 0%Aug‐21‐22 Aug‐22‐22 37.0 ACC ‐1B‐088 Access 1B‐088 1.0 1.0 0%Jul‐19‐22 Jul‐20‐22 45.6 REC‐1B‐088 ReclamaƟon 1B‐088 1.0 1.0 0%Oct ‐14‐22 Oct ‐15‐22 58.8 Structure 1B-089Structure 1B-089 53.4 53.4 Jun ‐20‐22 Aug‐13‐22 85.7 ASY‐1B‐089 Tower Assembly 1B ‐089 1.2 1.2 0%Jun ‐27‐22 Jun‐28‐22 10.1 FDN‐1B‐089 FoundaƟons 1B‐089 0.9 0.9 0%Jun ‐24‐22 Jun‐25‐22 12.0 SPT‐1B‐089 Spoƫng 1B‐089 0.6 0.6 0%Jun ‐25‐22 Jun‐25‐22 12.0 CLR‐1B‐089 Clearing 1B‐089 0.6 0.6 0%Jun ‐20‐22 Jun‐20‐22 15.0 ACC ‐1B‐089 Access 1B‐089 0.6 0.6 0%Jun ‐20‐22 Jun‐21‐22 15.0 ERC‐1B‐089 Tower Erec Ɵon 1B‐089 0.9 0.9 0%Jul‐13‐22 Jul‐14‐22 71.8 REC‐1B‐089 ReclamaƟon 1B‐089 0.9 0.9 0%Aug‐12‐22 Aug‐13‐22 85.7 Structure 1B-090Structure 1B-090 52.4 52.4 Jun ‐21‐22 Aug‐14‐22 85.7 ASY‐1B‐090 Tower Assembly 1B ‐090 1.2 1.2 0%Jun ‐28‐22 Jun‐29‐22 10.1 FDN‐1B‐090 FoundaƟons 1B‐090 0.9 0.9 0%Jun ‐25‐22 Jun‐26‐22 12.2 SPT‐1B‐090 Spoƫng 1B‐090 0.6 0.6 0%Jun ‐26‐22 Jun‐26‐22 12.2 CLR‐1B‐090 Clearing 1B‐090 0.6 0.6 0%Jun ‐21‐22 Jun‐22‐22 14.3 ACC ‐1B‐090 Access 1B‐090 0.6 0.6 0%Jun ‐22‐22 Jun‐23‐22 14.3 ERC‐1B‐090 Tower Erec Ɵon 1B‐090 0.9 0.9 0%Jul‐14‐22 Jul‐15‐22 71.8 REC‐1B‐090 ReclamaƟon 1B‐090 0.9 0.9 0%Aug‐13‐22 Aug‐14‐22 85.7 Structure 1B-091Structure 1B-091 52.7 52.7 Jun ‐22‐22 Aug‐15‐22 85.7 ASY‐1B‐091 Tower Assembly 1B ‐091 1.2 1.2 0%Jun ‐29‐22 Jul‐01‐22 10.1 FDN‐1B‐091 FoundaƟons 1B‐091 0.9 0.9 0%Jun ‐26‐22 Jun‐26‐22 12.5 SPT‐1B‐091 Spoƫng 1B‐091 0.6 0.6 0%Jun ‐26‐22 Jun‐27‐22 12.5 CLR‐1B‐091 Clearing 1B‐091 0.6 0.6 0%Jun ‐22‐22 Jun‐23‐22 14.9 ACC ‐1B‐091 Access 1B‐091 0.6 0.6 0%Jun ‐23‐22 Jun‐23‐22 14.9 ERC‐1B‐091 Tower Erec Ɵon 1B‐091 0.9 0.9 0%Jul‐15‐22 Jul‐15‐22 71.8 REC‐1B‐091 ReclamaƟon 1B‐091 0.9 0.9 0%Aug‐14‐22 Aug‐15‐22 85.7 Structure 1B-092Structure 1B-092 53.1 53.1 Jun ‐23‐22 Aug‐16‐22 85.7 ASY‐1B‐092 Tower Assembly 1B ‐092 1.2 1.2 0%Jul‐01‐22 Jul‐02‐22 10.1 FDN‐1B‐092 FoundaƟons 1B‐092 0.9 0.9 0%Jun ‐26‐22 Jun‐27‐22 12.8 SPT‐1B‐092 Spoƫng 1B‐092 0.6 0.6 0%Jun ‐27‐22 Jun‐28‐22 12.8 CLR‐1B‐092 Clearing 1B‐092 0.6 0.6 0%Jun ‐23‐22 Jun‐23‐22 15.5 ACC ‐1B‐092 Access 1B‐092 0.6 0.6 0%Jun ‐23‐22 Jun‐24‐22 15.5 ERC‐1B‐092 Tower Erec Ɵon 1B‐092 0.9 0.9 0%Jul‐15‐22 Jul‐16‐22 71.8 REC‐1B‐092 ReclamaƟon 1B‐092 0.9 0.9 0%Aug‐15‐22 Aug‐16‐22 85.7 Structure 1B-093Structure 1B-093 53.4 53.4 Jun ‐23‐22 Aug‐17‐22 85.7 ASY‐1B‐093 Tower Assembly 1B ‐093 1.2 1.2 0%Jul‐02‐22 Jul‐03‐22 10.1 FDN‐1B‐093 FoundaƟons 1B‐093 0.9 0.9 0%Jun ‐27‐22 Jun‐28‐22 13.1 SPT‐1B‐093 Spoƫng 1B‐093 0.6 0.6 0%Jun ‐28‐22 Jun‐29‐22 13.1 CLR‐1B‐093 Clearing 1B‐093 0.6 0.6 0%Jun ‐23‐22 Jun‐24‐22 16.2 ACC ‐1B‐093 Access 1B‐093 0.6 0.6 0%Jun ‐24‐22 Jun‐24‐22 16.2 ERC‐1B‐093 Tower Erec Ɵon 1B‐093 0.9 0.9 0%Jul‐16‐22 Jul‐17‐22 71.8 REC‐1B‐093 ReclamaƟon 1B‐093 0.9 0.9 0%Aug‐16‐22 Aug‐17‐22 85.7 Structure 1B-094Structure 1B-094 53.7 53.7 Jun ‐24‐22 Aug‐17‐22 85.7 ASY‐1B‐094 Tower Assembly 1B ‐094 1.2 1.2 0%Jul‐03‐22 Jul‐05‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1B‐088 FoundaƟons 1B‐088 Tower Erec Ɵon 1B‐088 Spoƫng 1B‐088 Access 1B‐088 ReclamaƟon 1B‐088 Aug‐13‐22, Structure 1B‐089 Tower Assembly 1B ‐089 FoundaƟons 1B‐089 Spoƫng 1B‐089 Clearing 1B‐089 Access 1B‐089 Tower Erec Ɵon 1B‐089 ReclamaƟon 1B‐089 Aug‐14‐22, Structure 1B‐090 Tower Assembly 1B‐090 FoundaƟons 1B‐090 Spoƫng 1B‐090 Clearing 1B‐090 Access 1B‐090 Tower Erec Ɵon 1B‐090 ReclamaƟon 1B‐090 Aug‐15‐22, Structure 1B‐091 Tower Assembly 1B‐091 FoundaƟons 1B‐091 Spoƫng 1B‐091 Clearing 1B‐091 Access 1B‐091 Tower Erec Ɵon 1B‐091 ReclamaƟon 1B‐091 Aug‐16‐22, Structure 1B‐092 Tower Assembly 1B‐092 FoundaƟons 1B‐092 Spoƫng 1B‐092 Clearing 1B‐092 Access 1B‐092 Tower Erec Ɵon 1B‐092 ReclamaƟon 1B‐092 Aug‐17‐22, Structure 1B‐093 Tower Assembly 1B ‐093 FoundaƟons 1B‐093 Spoƫng 1B‐093 Clearing 1B‐093 Access 1B‐093 Tower Erec Ɵon 1B‐093 ReclamaƟon 1B‐093 Aug‐17‐22, Structure 1B‐094 Tower Assembly 1B ‐094 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 40 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐094 FoundaƟons 1B‐094 0.9 0.9 0%Jun ‐28‐22 Jun‐29‐22 13.4 SPT‐1B‐094 Spoƫng 1B‐094 0.6 0.6 0%Jun ‐29‐22 Jun‐30‐22 13.4 CLR‐1B‐094 Clearing 1B‐094 0.6 0.6 0%Jun ‐24‐22 Jun‐24‐22 16.8 ACC ‐1B‐094 Access 1B‐094 0.6 0.6 0%Jun ‐24‐22 Jun‐25‐22 16.8 ERC‐1B‐094 Tower Erec Ɵon 1B‐094 0.9 0.9 0%Jul‐17‐22 Jul‐18‐22 71.8 REC‐1B‐094 ReclamaƟon 1B‐094 0.9 0.9 0%Aug‐17‐22 Aug‐17‐22 85.7 Structure 1B-095Structure 1B-095 54.1 54.1 Jun ‐24‐22 Aug‐18‐22 85.7 ASY‐1B‐095 Tower Assembly 1B ‐095 1.2 1.2 0%Jul‐05‐22 Jul‐06‐22 10.1 FDN‐1B‐095 FoundaƟons 1B‐095 0.9 0.9 0%Jun ‐29‐22 Jun‐30‐22 13.7 SPT‐1B‐095 Spoƫng 1B‐095 0.6 0.6 0%Jun ‐30‐22 Jul‐01‐22 13.7 CLR‐1B‐095 Clearing 1B‐095 0.6 0.6 0%Jun ‐24‐22 Jun‐25‐22 17.5 ACC ‐1B‐095 Access 1B‐095 0.6 0.6 0%Jun ‐25‐22 Jun‐25‐22 17.5 ERC‐1B‐095 Tower Erec Ɵon 1B‐095 0.9 0.9 0%Jul‐18‐22 Jul‐19‐22 71.8 REC‐1B‐095 ReclamaƟon 1B‐095 0.9 0.9 0%Aug‐17‐22 Aug‐18‐22 85.7 Structure 1B-097Structure 1B-097 54.4 54.4 Jun ‐25‐22 Aug‐19‐22 85.7 ASY‐1B‐097 Tower Assembly 1B ‐097 1.2 1.2 0%Jul‐06‐22 Jul‐08‐22 10.1 FDN‐1B‐097 FoundaƟons 1B‐097 0.9 0.9 0%Jun ‐30‐22 Jul‐01‐22 14.0 SPT‐1B‐097 Spoƫng 1B‐097 0.6 0.6 0%Jul‐01‐22 Jul‐02‐22 14.0 CLR‐1B‐097 Clearing 1B‐097 0.6 0.6 0%Jun ‐25‐22 Jun‐25‐22 18.1 ACC ‐1B‐097 Access 1B‐097 0.6 0.6 0%Jun ‐25‐22 Jun‐26‐22 18.1 ERC‐1B‐097 Tower Erec Ɵon 1B‐097 0.9 0.9 0%Jul‐19‐22 Jul‐20‐22 71.8 REC‐1B‐097 ReclamaƟon 1B‐097 0.9 0.9 0%Aug‐18‐22 Aug‐19‐22 85.7 Structure 1B-098Structure 1B-098 54.8 54.8 Jun ‐25‐22 Aug‐20‐22 85.7 ASY‐1B‐098 Tower Assembly 1B ‐098 1.2 1.2 0%Jul‐08‐22 Jul‐09‐22 10.1 FDN‐1B‐098 FoundaƟons 1B‐098 0.9 0.9 0%Jul‐01‐22 Jul‐02‐22 14.3 SPT‐1B‐098 Spoƫng 1B‐098 0.6 0.6 0%Jul‐02‐22 Jul‐02‐22 14.3 CLR‐1B‐098 Clearing 1B‐098 0.6 0.6 0%Jun ‐25‐22 Jun‐26‐22 18.8 ACC ‐1B‐098 Access 1B‐098 0.6 0.6 0%Jun ‐26‐22 Jun‐26‐22 18.8 ERC‐1B‐098 Tower Erec Ɵon 1B‐098 0.9 0.9 0%Jul‐20‐22 Jul‐21‐22 71.8 REC‐1B‐098 ReclamaƟon 1B‐098 0.9 0.9 0%Aug‐19‐22 Aug‐20‐22 85.7 Structure 1B-099Structure 1B-099 55.1 55.1 Jun ‐26‐22 Aug‐21‐22 85.7 ASY‐1B‐099 Tower Assembly 1B ‐099 1.2 1.2 0%Jul‐09‐22 Jul‐10‐22 10.1 FDN‐1B‐099 FoundaƟons 1B‐099 0.9 0.9 0%Jul‐02‐22 Jul‐03‐22 14.5 SPT‐1B‐099 Spoƫng 1B‐099 0.6 0.6 0%Jul‐03‐22 Jul‐03‐22 14.5 CLR‐1B‐099 Clearing 1B‐099 0.6 0.6 0%Jun ‐26‐22 Jun‐26‐22 19.4 ACC ‐1B‐099 Access 1B‐099 0.6 0.6 0%Jun ‐26‐22 Jun‐27‐22 19.4 ERC‐1B‐099 Tower Erec Ɵon 1B‐099 0.9 0.9 0%Jul‐21‐22 Jul‐22‐22 71.8 REC‐1B‐099 ReclamaƟon 1B‐099 0.9 0.9 0%Aug‐20‐22 Aug‐21‐22 85.7 Structure 1B-100Structure 1B-100 55.4 55.4 Jun ‐26‐22 Aug‐22‐22 85.7 ASY‐1B‐100 Tower Assembly 1B ‐100 1.2 1.2 0%Jul‐10‐22 Jul‐11‐22 10.1 FDN‐1B‐100 FoundaƟons 1B‐100 0.9 0.9 0%Jul‐03‐22 Jul‐05‐22 14.8 SPT‐1B‐100 Spoƫng 1B‐100 0.6 0.6 0%Jul‐05‐22 Jul‐05‐22 14.8 CLR‐1B‐100 Clearing 1B‐100 0.6 0.6 0%Jun ‐26‐22 Jun‐27‐22 20.1 ACC ‐1B‐100 Access 1B‐100 0.6 0.6 0%Jun ‐27‐22 Jun‐28‐22 20.1 ERC‐1B‐100 Tower Erec Ɵon 1B‐100 1.9 1.9 0%Jul‐22‐22 Jul‐24‐22 71.8 REC‐1B‐100 ReclamaƟon 1B‐100 0.9 0.9 0%Aug‐21‐22 Aug‐22‐22 85.7 Structure 1B-101Structure 1B-101 55.8 55.8 Jun ‐27‐22 Aug‐23‐22 85.7 ASY‐1B‐101 Tower Assembly 1B ‐101 1.2 1.2 0%Jul‐11‐22 Jul‐12‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐094 Spoƫng 1B‐094 Clearing 1B‐094 Access 1B‐094 Tower Erec Ɵon 1B‐094 ReclamaƟon 1B‐094 Aug‐18‐22, Structure 1B‐095 Tower Assembly 1B ‐095 FoundaƟons 1B‐095 Spoƫng 1B‐095 Clearing 1B‐095 Access 1B‐095 Tower Erec Ɵon 1B‐095 ReclamaƟon 1B‐095 Aug‐19‐22, Structure 1B‐097 Tower Assembly 1B ‐097 FoundaƟons 1B‐097 Spoƫng 1B‐097 Clearing 1B‐097 Access 1B‐097 Tower Erec Ɵon 1B‐097 ReclamaƟon 1B‐097 Aug‐20‐22, Structure 1B‐098 Tower Assembly 1B ‐098 FoundaƟons 1B‐098 Spoƫng 1B‐098 Clearing 1B‐098 Access 1B‐098 Tower Erec Ɵon 1B‐098 ReclamaƟon 1B‐098 Aug‐21‐22, Structure 1B‐099 Tower Assembly 1B ‐099 FoundaƟons 1B‐099 Spoƫng 1B‐099 Clearing 1B‐099 Access 1B‐099 Tower Erec Ɵon 1B‐099 ReclamaƟon 1B‐099 Aug‐22‐22, Structure 1B‐100 Tower Assembly 1B ‐100 FoundaƟons 1B‐100 Spoƫng 1B‐100 Clearing 1B‐100 Access 1B‐100 Tower Erec Ɵon 1B‐100 ReclamaƟon 1B‐100 Aug‐23‐22, Structure 1B‐101 Tower Assembly 1B‐101 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 41 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐101 FoundaƟons 1B‐101 0.9 0.9 0%Jul‐05‐22 Jul‐06‐22 15.1 SPT‐1B‐101 Spoƫng 1B‐101 0.6 0.6 0%Jul‐06‐22 Jul‐06‐22 15.1 CLR‐1B‐101 Clearing 1B‐101 0.6 0.6 0%Jun ‐27‐22 Jun‐28‐22 20.7 ACC ‐1B‐101 Access 1B‐101 0.6 0.6 0%Jun ‐28‐22 Jun‐28‐22 20.7 ERC‐1B‐101 Tower Erec Ɵon 1B‐101 0.9 0.9 0%Jul‐24‐22 Jul‐24‐22 71.8 REC‐1B‐101 ReclamaƟon 1B‐101 0.9 0.9 0%Aug‐22‐22 Aug‐23‐22 85.7 Structure 1B-102Structure 1B-102 56.1 56.1 Jun ‐28‐22 Aug‐24‐22 85.7 ASY‐1B‐102 Tower Assembly 1B ‐102 1.2 1.2 0%Jul‐12‐22 Jul‐14‐22 10.1 FDN‐1B‐102 FoundaƟons 1B‐102 0.9 0.9 0%Jul‐06‐22 Jul‐07‐22 15.4 SPT‐1B‐102 Spoƫng 1B‐102 0.6 0.6 0%Jul‐07‐22 Jul‐07‐22 15.4 CLR‐1B‐102 Clearing 1B‐102 0.6 0.6 0%Jun ‐28‐22 Jun‐28‐22 21.3 ACC ‐1B‐102 Access 1B‐102 0.6 0.6 0%Jun ‐28‐22 Jun‐29‐22 21.3 ERC‐1B‐102 Tower Erec Ɵon 1B‐102 0.9 0.9 0%Jul‐24‐22 Jul‐25‐22 71.8 REC‐1B‐102 ReclamaƟon 1B‐102 0.9 0.9 0%Aug‐23‐22 Aug‐24‐22 85.7 Structure 1B-103Structure 1B-103 56.4 56.4 Jun ‐28‐22 Aug‐25‐22 85.7 ASY‐1B‐103 Tower Assembly 1B ‐103 1.2 1.2 0%Jul‐14‐22 Jul‐15‐22 10.1 FDN‐1B‐103 FoundaƟons 1B‐103 0.9 0.9 0%Jul‐07‐22 Jul‐07‐22 15.7 SPT‐1B‐103 Spoƫng 1B‐103 0.6 0.6 0%Jul‐07‐22 Jul‐08‐22 15.7 CLR‐1B‐103 Clearing 1B‐103 0.6 0.6 0%Jun ‐28‐22 Jun‐29‐22 22.0 ACC ‐1B‐103 Access 1B‐103 0.6 0.6 0%Jun ‐29‐22 Jun‐29‐22 22.0 ERC‐1B‐103 Tower Erec Ɵon 1B‐103 0.9 0.9 0%Jul‐25‐22 Jul‐26‐22 71.8 REC‐1B‐103 ReclamaƟon 1B‐103 0.9 0.9 0%Aug‐24‐22 Aug‐25‐22 85.7 Structure 1B-104Structure 1B-104 56.8 56.8 Jun ‐29‐22 Aug‐25‐22 85.7 ASY‐1B‐104 Tower Assembly 1B ‐104 1.2 1.2 0%Jul‐15‐22 Jul‐16‐22 10.1 FDN‐1B‐104 FoundaƟons 1B‐104 0.9 0.9 0%Jul‐07‐22 Jul‐08‐22 16.0 SPT‐1B‐104 Spoƫng 1B‐104 0.6 0.6 0%Jul‐08‐22 Jul‐09‐22 16.0 CLR‐1B‐104 Clearing 1B‐104 0.6 0.6 0%Jun ‐29‐22 Jun‐29‐22 22.6 ACC ‐1B‐104 Access 1B‐104 0.6 0.6 0%Jun ‐29‐22 Jun‐30‐22 22.6 ERC‐1B‐104 Tower Erec Ɵon 1B‐104 0.9 0.9 0%Jul‐26‐22 Jul‐27‐22 71.8 REC‐1B‐104 ReclamaƟon 1B‐104 0.9 0.9 0%Aug‐25‐22 Aug‐25‐22 85.7 Structure 1B-105Structure 1B-105 57.1 57.1 Jun ‐29‐22 Aug‐26‐22 85.7 ASY‐1B‐105 Tower Assembly 1B ‐105 1.2 1.2 0%Jul‐16‐22 Jul‐17‐22 10.1 FDN‐1B‐105 FoundaƟons 1B‐105 0.9 0.9 0%Jul‐08‐22 Jul‐09‐22 16.3 SPT‐1B‐105 Spoƫng 1B‐105 0.6 0.6 0%Jul‐09‐22 Jul‐10‐22 16.3 CLR‐1B‐105 Clearing 1B‐105 0.6 0.6 0%Jun ‐29‐22 Jun‐30‐22 23.3 ACC ‐1B‐105 Access 1B‐105 0.6 0.6 0%Jun ‐30‐22 Jun‐30‐22 23.3 ERC‐1B‐105 Tower Erec Ɵon 1B‐105 0.9 0.9 0%Jul‐27‐22 Jul‐28‐22 71.8 REC‐1B‐105 ReclamaƟon 1B‐105 0.9 0.9 0%Aug‐25‐22 Aug‐26‐22 85.7 Structure 1B-106Structure 1B-106 57.4 57.4 Jun ‐30‐22 Aug‐27‐22 85.7 ASY‐1B‐106 Tower Assembly 1B ‐106 1.2 1.2 0%Jul‐17‐22 Jul‐18‐22 10.1 FDN‐1B‐106 FoundaƟons 1B‐106 0.9 0.9 0%Jul‐09‐22 Jul‐10‐22 16.5 SPT‐1B‐106 Spoƫng 1B‐106 0.6 0.6 0%Jul‐10‐22 Jul‐11‐22 16.5 CLR‐1B‐106 Clearing 1B‐106 0.6 0.6 0%Jun ‐30‐22 Jun‐30‐22 23.9 ACC ‐1B‐106 Access 1B‐106 0.6 0.6 0%Jun ‐30‐22 Jul‐01‐22 23.9 ERC‐1B‐106 Tower Erec Ɵon 1B‐106 0.9 0.9 0%Jul‐28‐22 Jul‐29‐22 71.8 REC‐1B‐106 ReclamaƟon 1B‐106 0.9 0.9 0%Aug‐26‐22 Aug‐27‐22 85.7 Structure 1B-107Structure 1B-107 57.8 57.8 Jun ‐30‐22 Aug‐28‐22 85.7 ASY‐1B‐107 Tower Assembly 1B ‐107 1.2 1.2 0%Jul‐18‐22 Jul‐20‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐101 Spoƫng 1B‐101 Clearing 1B‐101 Access 1B‐101 Tower Erec Ɵon 1B‐101 ReclamaƟon 1B‐101 Aug‐24‐22, Structure 1B‐102 Tower Assembly 1B ‐102 FoundaƟons 1B‐102 Spoƫng 1B‐102 Clearing 1B‐102 Access 1B‐102 Tower Erec Ɵon 1B‐102 ReclamaƟon 1B‐102 Aug‐25‐22, Structure 1B‐103 Tower Assembly 1B ‐103 FoundaƟons 1B‐103 Spoƫng 1B‐103 Clearing 1B‐103 Access 1B‐103 Tower Erec Ɵon 1B‐103 ReclamaƟon 1B‐103 Aug‐25‐22, Structure 1B‐104 Tower Assembly 1B ‐104 FoundaƟons 1B‐104 Spoƫng 1B‐104 Clearing 1B‐104 Access 1B‐104 Tower Erec Ɵon 1B‐104 ReclamaƟon 1B‐104 Aug‐26‐22, Structure 1B‐105 Tower Assembly 1B ‐105 FoundaƟons 1B‐105 Spoƫng 1B‐105 Clearing 1B‐105 Access 1B‐105 Tower Erec Ɵon 1B‐105 ReclamaƟon 1B‐105 Aug‐27‐22, Structure 1B‐106 Tower Assembly 1B ‐106 FoundaƟons 1B‐106 Spoƫng 1B‐106 Clearing 1B‐106 Access 1B‐106 Tower Erec Ɵon 1B‐106 ReclamaƟon 1B‐106 Aug‐28‐22, Structure 1B‐107 Tower Assembly 1B ‐107 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 42 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐107 FoundaƟons 1B‐107 0.9 0.9 0%Jul‐10‐22 Jul‐11‐22 16.8 SPT‐1B‐107 Spoƫng 1B‐107 0.6 0.6 0%Jul‐11‐22 Jul‐12‐22 16.8 CLR‐1B‐107 Clearing 1B‐107 0.6 0.6 0%Jun ‐30‐22 Jul‐01‐22 24.6 ACC ‐1B‐107 Access 1B‐107 0.6 0.6 0%Jul‐01‐22 Jul‐01‐22 24.6 ERC‐1B‐107 Tower Erec Ɵon 1B‐107 0.9 0.9 0%Jul‐29‐22 Jul‐30‐22 71.8 REC‐1B‐107 ReclamaƟon 1B‐107 0.9 0.9 0%Aug‐27‐22 Aug‐28‐22 85.7 Structure 1B-108Structure 1B-108 58.1 58.1 Jul‐01‐22 Aug‐29‐22 85.7 ASY‐1B‐108 Tower Assembly 1B ‐108 1.2 1.2 0%Jul‐20‐22 Jul‐21‐22 10.1 FDN‐1B‐108 FoundaƟons 1B‐108 0.9 0.9 0%Jul‐11‐22 Jul‐12‐22 17.1 SPT‐1B‐108 Spoƫng 1B‐108 0.6 0.6 0%Jul‐12‐22 Jul‐13‐22 17.1 CLR‐1B‐108 Clearing 1B‐108 0.6 0.6 0%Jul‐01‐22 Jul‐01‐22 25.2 ACC ‐1B‐108 Access 1B‐108 0.6 0.6 0%Jul‐01‐22 Jul‐02‐22 25.2 ERC‐1B‐108 Tower Erec Ɵon 1B‐108 0.9 0.9 0%Jul‐30‐22 Jul‐31‐22 71.8 REC‐1B‐108 ReclamaƟon 1B‐108 0.9 0.9 0%Aug‐28‐22 Aug‐29‐22 85.7 Structure 1B-109Structure 1B-109 58.4 58.4 Jul‐01‐22 Aug‐30‐22 85.7 ASY‐1B‐109 Tower Assembly 1B ‐109 1.2 1.2 0%Jul‐21‐22 Jul‐22‐22 10.1 FDN‐1B‐109 FoundaƟons 1B‐109 0.9 0.9 0%Jul‐12‐22 Jul‐13‐22 17.4 SPT‐1B‐109 Spoƫng 1B‐109 0.6 0.6 0%Jul‐13‐22 Jul‐14‐22 17.4 CLR‐1B‐109 Clearing 1B‐109 0.6 0.6 0%Jul‐01‐22 Jul‐02‐22 25.9 ACC ‐1B‐109 Access 1B‐109 0.6 0.6 0%Jul‐02‐22 Jul‐03‐22 25.9 ERC‐1B‐109 Tower Erec Ɵon 1B‐109 0.9 0.9 0%Jul‐31‐22 Aug‐01‐22 71.8 REC‐1B‐109 ReclamaƟon 1B‐109 0.9 0.9 0%Aug‐29‐22 Aug‐30‐22 85.7 Structure 1B-110Structure 1B-110 58.8 58.8 Jul‐02‐22 Aug‐31‐22 85.7 ASY‐1B‐110 Tower Assembly 1B ‐110 1.2 1.2 0%Jul‐22‐22 Jul‐23‐22 10.1 FDN‐1B‐110 FoundaƟons 1B‐110 0.9 0.9 0%Jul‐13‐22 Jul‐14‐22 17.4 SPT‐1B‐110 Spoƫng 1B‐110 0.6 0.6 0%Jul‐14‐22 Jul‐14‐22 17.7 CLR‐1B‐110 Clearing 1B‐110 0.6 0.6 0%Jul‐02‐22 Jul‐03‐22 26.2 ACC ‐1B‐110 Access 1B‐110 0.6 0.6 0%Jul‐03‐22 Jul‐03‐22 26.2 ERC‐1B‐110 Tower Erec Ɵon 1B‐110 0.9 0.9 0%Aug‐01‐22 Aug‐01‐22 71.8 REC‐1B‐110 ReclamaƟon 1B‐110 0.9 0.9 0%Aug‐30‐22 Aug‐31‐22 85.7 Structure 1B-110.1Structure 1B-110.1 59.1 59.1 Jul‐03‐22 Sep‐01‐22 85.7 FDN‐1B‐110.1 FoundaƟons 1B‐110.1 0.6 0.6 0%Jul‐14‐22 Jul‐14‐22 17.4 SPT‐1B‐110.1 Spoƫng 1B‐110.1 0.6 0.6 0%Jul‐14‐22 Jul‐15‐22 17.7 CLR‐1B‐110.1 Clearing 1B‐110.1 0.6 0.6 0%Jul‐03‐22 Jul‐03‐22 26.5 ACC ‐1B‐110.1 Access 1B‐110.1 0.6 0.6 0%Jul‐03‐22 Jul‐05‐22 26.5 ERC‐1B‐110.1 Tower Erec Ɵon 1B‐110.1 0.9 0.9 0%Aug‐01‐22 Aug‐02‐22 71.8 ASY‐1B‐110.1 Tower Assembly 1B ‐110.1 1.2 1.2 0%Jul‐23‐22 Jul‐24‐22 79.8 REC‐1B‐110.1 ReclamaƟon 1B‐110.1 0.9 0.9 0%Aug‐31‐22 Sep‐01‐22 85.7 Structure 1B-111Structure 1B-111 59.4 59.4 Jul‐03‐22 Sep‐02‐22 85.7 ASY‐1B‐111 Tower Assembly 1B ‐111 1.2 1.2 0%Jul‐23‐22 Jul‐24‐22 10.1 FDN‐1B‐111 FoundaƟons 1B‐111 0.9 0.9 0%Jul‐14‐22 Jul‐15‐22 17.4 SPT‐1B‐111 Spoƫng 1B‐111 0.6 0.6 0%Jul‐15‐22 Jul‐16‐22 17.4 CLR‐1B‐111 Clearing 1B‐111 0.6 0.6 0%Jul‐03‐22 Jul‐05‐22 26.6 ACC ‐1B‐111 Access 1B‐111 0.6 0.6 0%Jul‐05‐22 Jul‐05‐22 26.6 ERC‐1B‐111 Tower Erec Ɵon 1B‐111 0.9 0.9 0%Aug‐02‐22 Aug‐03‐22 71.8 REC‐1B‐111 ReclamaƟon 1B‐111 0.9 0.9 0%Sep‐01‐22 Sep‐02‐22 85.7 Structure 1B-112Structure 1B-112 59.8 59.8 Jul‐05‐22 Sep‐02‐22 85.7 ASY‐1B‐112 Tower Assembly 1B ‐112 1.2 1.2 0%Jul‐24‐22 Jul‐26‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐107 Spoƫng 1B‐107 Clearing 1B‐107 Access 1B‐107 Tower Erec Ɵon 1B‐107 ReclamaƟon 1B‐107 Aug‐29‐22, Structure 1B‐108 Tower Assembly 1B ‐108 FoundaƟons 1B‐108 Spoƫng 1B‐108 Clearing 1B‐108 Access 1B‐108 Tower Erec Ɵon 1B‐108 ReclamaƟon 1B‐108 Aug‐30‐22, Structure 1B‐109 Tower Assembly 1B ‐109 FoundaƟons 1B‐109 Spoƫng 1B‐109 Clearing 1B‐109 Access 1B‐109 Tower Erec Ɵon 1B‐109 ReclamaƟon 1B‐109 Aug‐31‐22, Structure 1B‐110 Tower Assembly 1B‐110 FoundaƟons 1B‐110 Spoƫng 1B‐110 Clearing 1B‐110 Access 1B‐110 Tower Erec Ɵon 1B‐110 ReclamaƟon 1B‐110 Sep‐01‐22, Structure 1B‐110.1 FoundaƟons 1B‐110.1 Spoƫng 1B‐110.1 Clearing 1B‐110.1 Access 1B‐110.1 Tower Erec Ɵon 1B‐110.1 Tower Assembly 1B‐110.1 ReclamaƟon 1B‐110.1 Sep‐02‐22, Structure 1B‐111 Tower Assembly 1B‐111 FoundaƟons 1B‐111 Spoƫng 1B‐111 Clearing 1B‐111 Access 1B‐111 Tower Erec Ɵon 1B‐111 ReclamaƟon 1B‐111 Sep‐02‐22, Structure 1B‐112 Tower Assembly 1B‐112 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 43 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐112 FoundaƟons 1B‐112 0.9 0.9 0%Jul‐15‐22 Jul‐16‐22 17.7 SPT‐1B‐112 Spoƫng 1B‐112 0.6 0.6 0%Jul‐16‐22 Jul‐17‐22 17.7 CLR‐1B‐112 Clearing 1B‐112 0.6 0.6 0%Jul‐05‐22 Jul‐05‐22 27.2 ACC ‐1B‐112 Access 1B‐112 0.6 0.6 0%Jul‐05‐22 Jul‐06‐22 27.2 ERC‐1B‐112 Tower Erec Ɵon 1B‐112 0.9 0.9 0%Aug‐03‐22 Aug‐04‐22 71.8 REC‐1B‐112 ReclamaƟon 1B‐112 0.9 0.9 0%Sep‐02‐22 Sep‐02‐22 85.7 Structure 1B-113Structure 1B-113 60.1 60.1 Jul‐05‐22 Sep‐03‐22 85.7 ASY‐1B‐113 Tower Assembly 1B ‐113 1.2 1.2 0%Jul‐26‐22 Jul‐27‐22 10.1 FDN‐1B‐113 FoundaƟons 1B‐113 0.9 0.9 0%Jul‐16‐22 Jul‐17‐22 17.9 SPT‐1B‐113 Spoƫng 1B‐113 0.6 0.6 0%Jul‐17‐22 Jul‐18‐22 18.0 CLR‐1B‐113 Clearing 1B‐113 0.6 0.6 0%Jul‐05‐22 Jul‐06‐22 27.8 ACC ‐1B‐113 Access 1B‐113 0.6 0.6 0%Jul‐06‐22 Jul‐06‐22 27.8 ERC‐1B‐113 Tower Erec Ɵon 1B‐113 0.9 0.9 0%Aug‐04‐22 Aug‐05‐22 71.8 REC‐1B‐113 ReclamaƟon 1B‐113 0.9 0.9 0%Sep‐02‐22 Sep‐03‐22 85.7 Structure 1B-114Structure 1B-114 60.4 60.4 Jul‐06‐22 Sep‐04‐22 85.7 ASY‐1B‐114 Tower Assembly 1B ‐114 1.2 1.2 0%Jul‐27‐22 Jul‐28‐22 10.1 FDN‐1B‐114 FoundaƟons 1B‐114 0.9 0.9 0%Jul‐17‐22 Jul‐18‐22 17.9 SPT‐1B‐114 Spoƫng 1B‐114 0.6 0.6 0%Jul‐18‐22 Jul‐19‐22 18.3 CLR‐1B‐114 Clearing 1B‐114 0.6 0.6 0%Jul‐06‐22 Jul‐06‐22 28.2 ACC ‐1B‐114 Access 1B‐114 0.6 0.6 0%Jul‐06‐22 Jul‐07‐22 28.2 ERC‐1B‐114 Tower Erec Ɵon 1B‐114 0.9 0.9 0%Aug‐05‐22 Aug‐06‐22 71.8 REC‐1B‐114 ReclamaƟon 1B‐114 0.9 0.9 0%Sep‐03‐22 Sep‐04‐22 85.7 Structure 1B-115Structure 1B-115 60.8 60.8 Jul‐06‐22 Sep‐06‐22 85.7 ASY‐1B‐115 Tower Assembly 1B ‐115 1.2 1.2 0%Jul‐28‐22 Jul‐29‐22 10.1 FDN‐1B‐115 FoundaƟons 1B‐115 0.9 0.9 0%Jul‐18‐22 Jul‐19‐22 17.9 SPT‐1B‐115 Spoƫng 1B‐115 0.6 0.6 0%Jul‐19‐22 Jul‐20‐22 18.5 CLR‐1B‐115 Clearing 1B‐115 0.6 0.6 0%Jul‐06‐22 Jul‐07‐22 28.6 ACC ‐1B‐115 Access 1B‐115 0.6 0.6 0%Jul‐07‐22 Jul‐07‐22 28.6 ERC‐1B‐115 Tower Erec Ɵon 1B‐115 0.9 0.9 0%Aug‐06‐22 Aug‐07‐22 71.8 REC‐1B‐115 ReclamaƟon 1B‐115 0.9 0.9 0%Sep‐04‐22 Sep‐06‐22 85.7 Structure 1B-116Structure 1B-116 61.1 61.1 Jul‐07‐22 Sep‐07‐22 85.7 ASY‐1B‐116 Tower Assembly 1B ‐116 1.2 1.2 0%Jul‐29‐22 Jul‐30‐22 10.1 FDN‐1B‐116 FoundaƟons 1B‐116 0.9 0.9 0%Jul‐19‐22 Jul‐20‐22 17.9 SPT‐1B‐116 Spoƫng 1B‐116 0.6 0.6 0%Jul‐20‐22 Jul‐20‐22 18.8 CLR‐1B‐116 Clearing 1B‐116 0.6 0.6 0%Jul‐07‐22 Jul‐07‐22 28.9 ACC ‐1B‐116 Access 1B‐116 0.6 0.6 0%Jul‐07‐22 Jul‐08‐22 28.9 ERC‐1B‐116 Tower Erec Ɵon 1B‐116 0.9 0.9 0%Aug‐07‐22 Aug‐08‐22 71.8 REC‐1B‐116 ReclamaƟon 1B‐116 0.9 0.9 0%Sep‐06‐22 Sep‐07‐22 85.7 Structure 1B-117Structure 1B-117 52.5 52.5 Jul‐16‐22 Sep‐08‐22 85.7 ASY‐1B‐117 Tower Assembly 1B ‐117 1.2 1.2 0%Jul‐30‐22 Aug‐01‐22 10.1 FDN‐1B‐117 FoundaƟons 1B‐117 0.9 0.9 0%Jul‐20‐22 Jul‐21‐22 17.9 SPT‐1B‐117 Spoƫng 1B‐117 0.6 0.6 0%Jul‐21‐22 Jul‐21‐22 19.1 CLR‐1B‐117 Clearing 1B‐117 0.6 0.6 0%Jul‐16‐22 Jul‐17‐22 20.2 ACC ‐1B‐117 Access 1B‐117 0.6 0.6 0%Jul‐17‐22 Jul‐18‐22 20.2 ERC‐1B‐117 Tower Erec Ɵon 1B‐117 0.9 0.9 0%Aug‐08‐22 Aug‐09‐22 71.8 REC‐1B‐117 ReclamaƟon 1B‐117 0.9 0.9 0%Sep‐07‐22 Sep‐08‐22 85.7 Structure 1B-118Structure 1B-118 54.0 54.0 Jul‐16‐22 Sep‐09‐22 85.7 ASY‐1B‐118 Tower Assembly 1B ‐118 1.2 1.2 0%Aug‐01‐22 Aug‐02‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐112 Spoƫng 1B‐112 Clearing 1B‐112 Access 1B‐112 Tower Erec Ɵon 1B‐112 ReclamaƟon 1B‐112 Sep‐03‐22, Structure 1B‐113 Tower Assembly 1B ‐113 FoundaƟons 1B‐113 Spoƫng 1B‐113 Clearing 1B‐113 Access 1B‐113 Tower Erec Ɵon 1B‐113 ReclamaƟon 1B‐113 Sep‐04‐22, Structure 1B‐114 Tower Assembly 1B ‐114 FoundaƟons 1B‐114 Spoƫng 1B‐114 Clearing 1B‐114 Access 1B‐114 Tower Erec Ɵon 1B‐114 ReclamaƟon 1B‐114 Sep‐06‐22, Structure 1B‐115 Tower Assembly 1B ‐115 FoundaƟons 1B‐115 Spoƫng 1B‐115 Clearing 1B‐115 Access 1B‐115 Tower Erec Ɵon 1B‐115 ReclamaƟon 1B‐115 Sep‐07‐22, Structure 1B‐116 Tower Assembly 1B ‐116 FoundaƟons 1B‐116 Spoƫng 1B‐116 Clearing 1B‐116 Access 1B‐116 Tower Erec Ɵon 1B‐116 ReclamaƟon 1B‐116 Sep‐08‐22, Structure 1B‐117 Tower Assembly 1B ‐117 FoundaƟons 1B‐117 Spoƫng 1B‐117 Clearing 1B‐117 Access 1B‐117 Tower Erec Ɵon 1B‐117 ReclamaƟon 1B‐117 Sep‐09‐22, Structure 1B‐118 Tower Assembly 1B ‐118 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 44 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐118 FoundaƟons 1B‐118 0.9 0.9 0%Jul‐21‐22 Jul‐22‐22 17.9 SPT‐1B‐118 Spoƫng 1B‐118 0.6 0.6 0%Jul‐22‐22 Jul‐22‐22 19.3 CLR‐1B‐118 Clearing 1B‐118 0.6 0.6 0%Jul‐16‐22 Jul‐16‐22 20.2 ACC ‐1B‐118 Access 1B‐118 0.6 0.6 0%Jul‐16‐22 Jul‐17‐22 21.7 ERC‐1B‐118 Tower Erec Ɵon 1B‐118 0.9 0.9 0%Aug‐09‐22 Aug‐09‐22 71.8 REC‐1B‐118 ReclamaƟon 1B‐118 0.9 0.9 0%Sep‐08‐22 Sep‐09‐22 85.7 Structure 1B-119Structure 1B-119 55.5 55.5 Jul‐15‐22 Sep‐10‐22 85.7 ASY‐1B‐119 Tower Assembly 1B ‐119 1.2 1.2 0%Aug‐02‐22 Aug‐03‐22 10.1 FDN‐1B‐119 FoundaƟons 1B‐119 0.9 0.9 0%Jul‐22‐22 Jul‐23‐22 17.9 SPT‐1B‐119 Spoƫng 1B‐119 0.6 0.6 0%Jul‐23‐22 Jul‐23‐22 19.6 CLR‐1B‐119 Clearing 1B‐119 0.6 0.6 0%Jul‐15‐22 Jul‐16‐22 20.2 ACC ‐1B‐119 Access 1B‐119 0.6 0.6 0%Jul‐16‐22 Jul‐16‐22 23.2 ERC‐1B‐119 Tower Erec Ɵon 1B‐119 0.9 0.9 0%Aug‐09‐22 Aug‐10‐22 71.8 REC‐1B‐119 ReclamaƟon 1B‐119 0.9 0.9 0%Sep‐09‐22 Sep‐10‐22 85.7 Structure 1B-120Structure 1B-120 57.0 57.0 Jul‐15‐22 Sep‐11‐22 85.7 ASY‐1B‐120 Tower Assembly 1B ‐120 1.2 1.2 0%Aug‐03‐22 Aug‐04‐22 10.1 FDN‐1B‐120 FoundaƟons 1B‐120 0.9 0.9 0%Jul‐23‐22 Jul‐24‐22 17.9 SPT‐1B‐120 Spoƫng 1B‐120 0.6 0.6 0%Jul‐24‐22 Jul‐24‐22 19.9 CLR‐1B‐120 Clearing 1B‐120 0.6 0.6 0%Jul‐15‐22 Jul‐15‐22 20.2 ACC ‐1B‐120 Access 1B‐120 0.6 0.6 0%Jul‐15‐22 Jul‐16‐22 24.8 ERC‐1B‐120 Tower Erec Ɵon 1B‐120 0.9 0.9 0%Aug‐10‐22 Aug‐11‐22 71.8 REC‐1B‐120 ReclamaƟon 1B‐120 0.9 0.9 0%Sep‐10‐22 Sep‐11‐22 85.7 Structure 1B-121Structure 1B-121 58.5 58.5 Jul‐14‐22 Sep‐11‐22 85.7 ASY‐1B‐121 Tower Assembly 1B ‐121 1.2 1.2 0%Aug‐04‐22 Aug‐05‐22 10.1 CLR‐1B‐121 Clearing 1B‐121 0.6 0.6 0%Jul‐14‐22 Jul‐15‐22 12.6 FDN‐1B‐121 FoundaƟons 1B‐121 0.9 0.9 0%Jul‐24‐22 Jul‐24‐22 17.9 SPT‐1B‐121 Spoƫng 1B‐121 0.6 0.6 0%Jul‐25‐22 Jul‐25‐22 20.2 ACC ‐1B‐121 Access 1B‐121 0.6 0.6 0%Jul‐15‐22 Jul‐15‐22 26.3 ERC‐1B‐121 Tower Erec Ɵon 1B‐121 0.9 0.9 0%Aug‐11‐22 Aug‐12‐22 71.8 REC‐1B‐121 ReclamaƟon 1B‐121 0.9 0.9 0%Sep‐11‐22 Sep‐11‐22 85.7 Structure 1B-122Structure 1B-122 60.0 60.0 Jul‐13‐22 Sep‐12‐22 85.7 ASY‐1B‐122 Tower Assembly 1B ‐122 1.2 1.2 0%Aug‐05‐22 Aug‐07‐22 10.1 CLR‐1B‐122 Clearing 1B‐122 0.6 0.6 0%Jul‐13‐22 Jul‐14‐22 12.6 FDN‐1B‐122 FoundaƟons 1B‐122 0.9 0.9 0%Jul‐25‐22 Jul‐25‐22 17.9 SPT‐1B‐122 Spoƫng 1B‐122 0.6 0.6 0%Jul‐25‐22 Jul‐26‐22 20.5 ACC ‐1B‐122 Access 1B‐122 0.6 0.6 0%Jul‐14‐22 Jul‐15‐22 27.9 ERC‐1B‐122 Tower Erec Ɵon 1B‐122 0.9 0.9 0%Aug‐12‐22 Aug‐13‐22 71.8 REC‐1B‐122 ReclamaƟon 1B‐122 0.9 0.9 0%Sep‐11‐22 Sep‐12‐22 85.7 Structure 1B-123Structure 1B-123 61.6 61.6 Jul‐13‐22 Sep‐13‐22 85.7 ASY‐1B‐123 Tower Assembly 1B ‐123 1.2 1.2 0%Aug‐07‐22 Aug‐08‐22 10.1 CLR‐1B‐123 Clearing 1B‐123 0.6 0.6 0%Jul‐13‐22 Jul‐13‐22 12.6 FDN‐1B‐123 FoundaƟons 1B‐123 0.9 0.9 0%Jul‐25‐22 Jul‐26‐22 17.9 SPT‐1B‐123 Spoƫng 1B‐123 0.6 0.6 0%Jul‐26‐22 Jul‐27‐22 20.8 ACC ‐1B‐123 Access 1B‐123 0.6 0.6 0%Jul‐13‐22 Jul‐14‐22 29.4 ERC‐1B‐123 Tower Erec Ɵon 1B‐123 0.9 0.9 0%Aug‐13‐22 Aug‐14‐22 71.8 REC‐1B‐123 ReclamaƟon 1B‐123 0.9 0.9 0%Sep‐12‐22 Sep‐13‐22 85.7 Structure 1B-124Structure 1B-124 63.1 63.1 Jul‐12‐22 Sep‐14‐22 85.7 ASY‐1B‐124 Tower Assembly 1B ‐124 1.2 1.2 0%Aug‐08‐22 Aug‐09‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐118 Spoƫng 1B‐118 Clearing 1B‐118 Access 1B‐118 Tower Erec Ɵon 1B‐118 ReclamaƟon 1B‐118 Sep‐10‐22, Structure 1B‐119 Tower Assembly 1B‐119 FoundaƟons 1B‐119 Spoƫng 1B‐119 Clearing 1B‐119 Access 1B‐119 Tower Erec Ɵon 1B‐119 ReclamaƟon 1B‐119 Sep‐11‐22, Structure 1B‐120 Tower Assembly 1B‐120 FoundaƟons 1B‐120 Spoƫng 1B‐120 Clearing 1B‐120 Access 1B‐120 Tower Erec Ɵon 1B‐120 ReclamaƟon 1B‐120 Sep‐11‐22, Structure 1B‐121 Tower Assembly 1B‐121 Clearing 1B‐121 FoundaƟons 1B‐121 Spoƫng 1B‐121 Access 1B‐121 Tower Erec Ɵon 1B‐121 ReclamaƟon 1B‐121 Sep‐12‐22, Structure 1B‐122 Tower Assembly 1B ‐122 Clearing 1B‐122 FoundaƟons 1B‐122 Spoƫng 1B‐122 Access 1B‐122 Tower Erec Ɵon 1B‐122 ReclamaƟon 1B‐122 Sep‐13‐22, Structure 1B‐123 Tower Assembly 1B ‐123 Clearing 1B‐123 FoundaƟons 1B‐123 Spoƫng 1B‐123 Access 1B‐123 Tower Erec Ɵon 1B‐123 ReclamaƟon 1B‐123 Sep‐14‐22, Structure 1B‐124 Tower Assembly 1B ‐124 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 45 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1B‐124 Clearing 1B‐124 0.6 0.6 0%Jul‐12‐22 Jul‐13‐22 12.6 FDN‐1B‐124 FoundaƟons 1B‐124 0.9 0.9 0%Jul‐26‐22 Jul‐27‐22 17.9 SPT‐1B‐124 Spoƫng 1B‐124 0.6 0.6 0%Jul‐27‐22 Jul‐28‐22 21.1 ACC ‐1B‐124 Access 1B‐124 0.6 0.6 0%Jul‐13‐22 Jul‐13‐22 30.9 ERC‐1B‐124 Tower Erec Ɵon 1B‐124 0.9 0.9 0%Aug‐14‐22 Aug‐15‐22 71.8 REC‐1B‐124 ReclamaƟon 1B‐124 0.9 0.9 0%Sep‐13‐22 Sep‐14‐22 85.7 Structure 1B-125Structure 1B-125 64.6 64.6 Jul‐11‐22 Sep‐15‐22 85.7 ASY‐1B‐125 Tower Assembly 1B ‐125 1.2 1.2 0%Aug‐09‐22 Aug‐10‐22 10.1 CLR‐1B‐125 Clearing 1B‐125 0.6 0.6 0%Jul‐11‐22 Jul‐12‐22 12.6 FDN‐1B‐125 FoundaƟons 1B‐125 0.9 0.9 0%Jul‐27‐22 Jul‐28‐22 17.9 SPT‐1B‐125 Spoƫng 1B‐125 0.6 0.6 0%Jul‐28‐22 Jul‐29‐22 21.3 ACC ‐1B‐125 Access 1B‐125 0.6 0.6 0%Jul‐12‐22 Jul‐13‐22 32.5 ERC‐1B‐125 Tower Erec Ɵon 1B‐125 0.9 0.9 0%Aug‐15‐22 Aug‐16‐22 71.8 REC‐1B‐125 ReclamaƟon 1B‐125 0.9 0.9 0%Sep‐14‐22 Sep‐15‐22 85.7 Structure 1B-126Structure 1B-126 66.1 66.1 Jul‐11‐22 Sep‐16‐22 85.7 ASY‐1B‐126 Tower Assembly 1B ‐126 1.2 1.2 0%Aug‐10‐22 Aug‐11‐22 10.1 CLR‐1B‐126 Clearing 1B‐126 0.6 0.6 0%Jul‐11‐22 Jul‐11‐22 12.6 FDN‐1B‐126 FoundaƟons 1B‐126 0.9 0.9 0%Jul‐28‐22 Jul‐29‐22 17.9 SPT‐1B‐126 Spoƫng 1B‐126 0.6 0.6 0%Jul‐29‐22 Jul‐30‐22 21.6 ACC ‐1B‐126 Access 1B‐126 0.6 0.6 0%Jul‐11‐22 Jul‐12‐22 34.0 ERC‐1B‐126 Tower Erec Ɵon 1B‐126 0.9 0.9 0%Aug‐16‐22 Aug‐17‐22 71.8 REC‐1B‐126 ReclamaƟon 1B‐126 0.9 0.9 0%Sep‐15‐22 Sep‐16‐22 85.7 Structure 1B-127Structure 1B-127 67.6 67.6 Jul‐10‐22 Sep‐17‐22 85.7 ASY‐1B‐127 Tower Assembly 1B ‐127 1.2 1.2 0%Aug‐11‐22 Aug‐13‐22 10.1 CLR‐1B‐127 Clearing 1B‐127 0.6 0.6 0%Jul‐10‐22 Jul‐11‐22 12.6 FDN‐1B‐127 FoundaƟons 1B‐127 0.9 0.9 0%Jul‐29‐22 Jul‐30‐22 17.9 SPT‐1B‐127 Spoƫng 1B‐127 0.6 0.6 0%Jul‐30‐22 Jul‐31‐22 21.9 ACC ‐1B‐127 Access 1B‐127 0.6 0.6 0%Jul‐11‐22 Jul‐11‐22 35.6 ERC‐1B‐127 Tower Erec Ɵon 1B‐127 0.9 0.9 0%Aug‐17‐22 Aug‐17‐22 71.8 REC‐1B‐127 ReclamaƟon 1B‐127 0.9 0.9 0%Sep‐16‐22 Sep‐17‐22 85.7 Structure 1B-128Structure 1B-128 69.1 69.1 Jul‐10‐22 Sep‐18‐22 85.7 ASY‐1B‐128 Tower Assembly 1B ‐128 1.2 1.2 0%Aug‐13‐22 Aug‐14‐22 10.1 CLR‐1B‐128 Clearing 1B‐128 0.6 0.6 0%Jul‐10‐22 Jul‐10‐22 12.6 FDN‐1B‐128 FoundaƟons 1B‐128 0.9 0.9 0%Jul‐30‐22 Jul‐31‐22 17.9 SPT‐1B‐128 Spoƫng 1B‐128 0.6 0.6 0%Jul‐31‐22 Aug‐01‐22 22.2 ACC ‐1B‐128 Access 1B‐128 0.6 0.6 0%Jul‐10‐22 Jul‐11‐22 37.1 ERC‐1B‐128 Tower Erec Ɵon 1B‐128 0.9 0.9 0%Aug‐17‐22 Aug‐18‐22 71.8 REC‐1B‐128 ReclamaƟon 1B‐128 0.9 0.9 0%Sep‐17‐22 Sep‐18‐22 85.7 Structure 1B-129Structure 1B-129 70.7 70.7 Jul‐09‐22 Sep‐19‐22 85.7 ASY‐1B‐129 Tower Assembly 1B ‐129 1.2 1.2 0%Aug‐14‐22 Aug‐15‐22 10.1 CLR‐1B‐129 Clearing 1B‐129 0.6 0.6 0%Jul‐09‐22 Jul‐10‐22 12.6 FDN‐1B‐129 FoundaƟons 1B‐129 0.9 0.9 0%Jul‐31‐22 Aug‐01‐22 17.9 SPT‐1B‐129 Spoƫng 1B‐129 0.6 0.6 0%Aug‐01‐22 Aug‐01‐22 22.5 ACC ‐1B‐129 Access 1B‐129 0.6 0.6 0%Jul‐10‐22 Jul‐10‐22 38.6 ERC‐1B‐129 Tower Erec Ɵon 1B‐129 0.9 0.9 0%Aug‐18‐22 Aug‐19‐22 71.8 REC‐1B‐129 ReclamaƟon 1B‐129 0.9 0.9 0%Sep‐18‐22 Sep‐19‐22 85.7 Structure 1B-130Structure 1B-130 72.2 72.2 Jul‐08‐22 Sep‐20‐22 85.7 ASY‐1B‐130 Tower Assembly 1B ‐130 1.2 1.2 0%Aug‐15‐22 Aug‐16‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1B‐124 FoundaƟons 1B‐124 Spoƫng 1B‐124 Access 1B‐124 Tower Erec Ɵon 1B‐124 ReclamaƟon 1B‐124 Sep‐15‐22, Structure 1B‐125 Tower Assembly 1B ‐125 Clearing 1B‐125 FoundaƟons 1B‐125 Spoƫng 1B‐125 Access 1B‐125 Tower Erec Ɵon 1B‐125 ReclamaƟon 1B‐125 Sep‐16‐22, Structure 1B‐126 Tower Assembly 1B ‐126 Clearing 1B‐126 FoundaƟons 1B‐126 Spoƫng 1B‐126 Access 1B‐126 Tower Erec Ɵon 1B‐126 ReclamaƟon 1B‐126 Sep‐17‐22, Structure 1B‐127 Tower Assembly 1B ‐127 Clearing 1B‐127 FoundaƟons 1B‐127 Spoƫng 1B‐127 Access 1B‐127 Tower Erec Ɵon 1B‐127 ReclamaƟon 1B‐127 Sep‐18‐22, Structure 1B‐128 Tower Assembly 1B‐128 Clearing 1B‐128 FoundaƟons 1B‐128 Spoƫng 1B‐128 Access 1B‐128 Tower Erec Ɵon 1B‐128 ReclamaƟon 1B‐128 Sep‐19‐22, Structure 1B‐129 Tower Assembly 1B‐129 Clearing 1B‐129 FoundaƟons 1B‐129 Spoƫng 1B‐129 Access 1B‐129 Tower Erec Ɵon 1B‐129 ReclamaƟon 1B‐129 Sep‐20‐22, Structure 1B‐130 Tower Assembly 1B‐130 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 46 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1B‐130 Clearing 1B‐130 0.6 0.6 0%Jul‐08‐22 Jul‐09‐22 12.6 FDN‐1B‐130 FoundaƟons 1B‐130 0.9 0.9 0%Aug‐01‐22 Aug‐02‐22 17.9 SPT‐1B‐130 Spoƫng 1B‐130 0.6 0.6 0%Aug‐02‐22 Aug‐02‐22 22.8 ACC ‐1B‐130 Access 1B‐130 0.6 0.6 0%Jul‐09‐22 Jul‐10‐22 40.2 ERC‐1B‐130 Tower Erec Ɵon 1B‐130 0.9 0.9 0%Aug‐19‐22 Aug‐20‐22 71.8 REC‐1B‐130 ReclamaƟon 1B‐130 0.9 0.9 0%Sep‐19‐22 Sep‐20‐22 85.7 Structure 1B-131Structure 1B-131 73.7 73.7 Jul‐08‐22 Sep‐20‐22 85.7 ASY‐1B‐131 Tower Assembly 1B ‐131 1.2 1.2 0%Aug‐16‐22 Aug‐17‐22 10.1 CLR‐1B‐131 Clearing 1B‐131 0.6 0.6 0%Jul‐08‐22 Jul‐08‐22 12.6 FDN‐1B‐131 FoundaƟons 1B‐131 0.9 0.9 0%Aug‐02‐22 Aug‐03‐22 17.9 SPT‐1B‐131 Spoƫng 1B‐131 0.6 0.6 0%Aug‐03‐22 Aug‐03‐22 23.1 ACC ‐1B‐131 Access 1B‐131 0.6 0.6 0%Jul‐08‐22 Jul‐09‐22 41.7 ERC‐1B‐131 Tower Erec Ɵon 1B‐131 0.9 0.9 0%Aug‐20‐22 Aug‐21‐22 71.8 REC‐1B‐131 ReclamaƟon 1B‐131 0.9 0.9 0%Sep‐20‐22 Sep‐20‐22 85.7 Structure 1B-132Structure 1B-132 75.2 75.2 Jul‐07‐22 Sep‐21‐22 85.7 ASY‐1B‐132 Tower Assembly 1B ‐132 1.2 1.2 0%Aug‐17‐22 Aug‐19‐22 10.1 CLR‐1B‐132 Clearing 1B‐132 0.6 0.6 0%Jul‐07‐22 Jul‐08‐22 12.6 FDN‐1B‐132 FoundaƟons 1B‐132 0.9 0.9 0%Aug‐03‐22 Aug‐04‐22 17.9 SPT‐1B‐132 Spoƫng 1B‐132 0.6 0.6 0%Aug‐04‐22 Aug‐04‐22 23.4 ACC ‐1B‐132 Access 1B‐132 0.6 0.6 0%Jul‐08‐22 Jul‐08‐22 43.2 ERC‐1B‐132 Tower Erec Ɵon 1B‐132 0.9 0.9 0%Aug‐21‐22 Aug‐22‐22 71.8 REC‐1B‐132 ReclamaƟon 1B‐132 0.9 0.9 0%Sep‐20‐22 Sep‐21‐22 85.7 Structure 1B-133Structure 1B-133 76.7 76.7 Jul‐06‐22 Sep‐22‐22 85.7 ASY‐1B‐133 Tower Assembly 1B ‐133 1.2 1.2 0%Aug‐19‐22 Aug‐20‐22 10.1 CLR‐1B‐133 Clearing 1B‐133 0.6 0.6 0%Jul‐06‐22 Jul‐07‐22 12.6 FDN‐1B‐133 FoundaƟons 1B‐133 0.9 0.9 0%Aug‐04‐22 Aug‐04‐22 17.9 SPT‐1B‐133 Spoƫng 1B‐133 0.6 0.6 0%Aug‐04‐22 Aug‐05‐22 23.6 ACC ‐1B‐133 Access 1B‐133 0.6 0.6 0%Jul‐07‐22 Jul‐08‐22 44.8 ERC‐1B‐133 Tower Erec Ɵon 1B‐133 0.9 0.9 0%Aug‐22‐22 Aug‐23‐22 71.8 REC‐1B‐133 ReclamaƟon 1B‐133 0.9 0.9 0%Sep‐21‐22 Sep‐22‐22 85.7 Structure 1B-134Structure 1B-134 46.1 46.1 Aug‐07‐22 Sep‐23‐22 85.7 ASY‐1B‐134 Tower Assembly 1B ‐134 1.2 1.2 0%Aug‐20‐22 Aug‐21‐22 10.1 CLR‐1B‐134 Clearing 1B‐134 0.6 0.6 0%Aug‐07‐22 Aug‐08‐22 14.3 ACC ‐1B‐134 Access 1B‐134 0.6 0.6 0%Aug‐08‐22 Aug‐08‐22 14.3 FDN‐1B‐134 FoundaƟons 1B‐134 0.9 0.9 0%Aug‐08‐22 Aug‐09‐22 14.3 SPT‐1B‐134 Spoƫng 1B‐134 0.6 0.6 0%Aug‐09‐22 Aug‐10‐22 20.3 ERC‐1B‐134 Tower Erec Ɵon 1B‐134 0.9 0.9 0%Aug‐23‐22 Aug‐24‐22 71.8 REC‐1B‐134 ReclamaƟon 1B‐134 0.9 0.9 0%Sep‐22‐22 Sep‐23‐22 85.7 Structure 1B-135Structure 1B-135 46.4 46.4 Aug‐08‐22 Sep‐24‐22 85.7 ASY‐1B‐135 Tower Assembly 1B ‐135 1.2 1.2 0%Aug‐21‐22 Aug‐22‐22 10.1 FDN‐1B‐135 FoundaƟons 1B‐135 0.9 0.9 0%Aug‐09‐22 Aug‐10‐22 14.3 CLR‐1B‐135 Clearing 1B‐135 0.6 0.6 0%Aug‐08‐22 Aug‐08‐22 14.6 ACC ‐1B‐135 Access 1B‐135 0.6 0.6 0%Aug‐08‐22 Aug‐09‐22 14.6 SPT‐1B‐135 Spoƫng 1B‐135 0.6 0.6 0%Aug‐10‐22 Aug‐11‐22 20.6 ERC‐1B‐135 Tower Erec Ɵon 1B‐135 0.9 0.9 0%Aug‐24‐22 Aug‐25‐22 71.8 REC‐1B‐135 ReclamaƟon 1B‐135 0.9 0.9 0%Sep‐23‐22 Sep‐24‐22 85.7 Structure 1B-136Structure 1B-136 46.8 46.8 Aug‐08‐22 Sep‐25‐22 85.7 ASY‐1B‐136 Tower Assembly 1B ‐136 1.2 1.2 0%Aug‐22‐22 Aug‐23‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1B‐130 FoundaƟons 1B‐130 Spoƫng 1B‐130 Access 1B‐130 Tower Erec Ɵon 1B‐130 ReclamaƟon 1B‐130 Sep‐20‐22, Structure 1B‐131 Tower Assembly 1B‐131 Clearing 1B‐131 FoundaƟons 1B‐131 Spoƫng 1B‐131 Access 1B‐131 Tower Erec Ɵon 1B‐131 ReclamaƟon 1B‐131 Sep‐21‐22, Structure 1B‐132 Tower Assembly 1B ‐132 Clearing 1B‐132 FoundaƟons 1B‐132 Spoƫng 1B‐132 Access 1B‐132 Tower Erec Ɵon 1B‐132 ReclamaƟon 1B‐132 Sep‐22‐22, Structure 1B‐133 Tower Assembly 1B ‐133 Clearing 1B‐133 FoundaƟons 1B‐133 Spoƫng 1B‐133 Access 1B‐133 Tower Erec Ɵon 1B‐133 ReclamaƟon 1B‐133 Sep‐23‐22, Structure 1B‐134 Tower Assembly 1B ‐134 Clearing 1B‐134 Access 1B‐134 FoundaƟons 1B‐134 Spoƫng 1B‐134 Tower Erec Ɵon 1B‐134 ReclamaƟon 1B‐134 Sep‐24‐22, Structure 1B‐135 Tower Assembly 1B ‐135 FoundaƟons 1B‐135 Clearing 1B‐135 Access 1B‐135 Spoƫng 1B‐135 Tower Erec Ɵon 1B‐135 ReclamaƟon 1B‐135 Sep‐25‐22, Structure 1B‐136 Tower Assembly 1B ‐136 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 47 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐136 FoundaƟons 1B‐136 0.9 0.9 0%Aug‐10‐22 Aug‐11‐22 14.3 CLR‐1B‐136 Clearing 1B‐136 0.6 0.6 0%Aug‐08‐22 Aug‐09‐22 15.0 ACC ‐1B‐136 Access 1B‐136 0.6 0.6 0%Aug‐09‐22 Aug‐09‐22 15.0 SPT‐1B‐136 Spoƫng 1B‐136 0.6 0.6 0%Aug‐11‐22 Aug‐11‐22 20.9 ERC‐1B‐136 Tower Erec Ɵon 1B‐136 0.9 0.9 0%Aug‐25‐22 Aug‐25‐22 71.8 REC‐1B‐136 ReclamaƟon 1B‐136 0.9 0.9 0%Sep‐24‐22 Sep‐25‐22 85.7 Structure 1B-137Structure 1B-137 47.1 47.1 Aug‐09‐22 Sep‐26‐22 85.7 ASY‐1B‐137 Tower Assembly 1B ‐137 1.2 1.2 0%Aug‐23‐22 Aug‐25‐22 10.1 FDN‐1B‐137 FoundaƟons 1B‐137 0.9 0.9 0%Aug‐11‐22 Aug‐12‐22 14.3 CLR‐1B‐137 Clearing 1B‐137 0.6 0.6 0%Aug‐09‐22 Aug‐09‐22 15.3 ACC ‐1B‐137 Access 1B‐137 0.6 0.6 0%Aug‐09‐22 Aug‐10‐22 15.3 SPT‐1B‐137 Spoƫng 1B‐137 0.6 0.6 0%Aug‐12‐22 Aug‐12‐22 21.2 ERC‐1B‐137 Tower Erec Ɵon 1B‐137 0.9 0.9 0%Aug‐25‐22 Aug‐26‐22 71.8 REC‐1B‐137 ReclamaƟon 1B‐137 0.9 0.9 0%Sep‐25‐22 Sep‐26‐22 85.7 Structure 1B-138Structure 1B-138 47.4 47.4 Aug‐09‐22 Sep‐27‐22 85.7 ASY‐1B‐138 Tower Assembly 1B ‐138 1.2 1.2 0%Aug‐25‐22 Aug‐26‐22 10.1 FDN‐1B‐138 FoundaƟons 1B‐138 0.9 0.9 0%Aug‐12‐22 Aug‐13‐22 14.3 CLR‐1B‐138 Clearing 1B‐138 0.6 0.6 0%Aug‐09‐22 Aug‐10‐22 15.6 ACC ‐1B‐138 Access 1B‐138 0.6 0.6 0%Aug‐10‐22 Aug‐10‐22 15.6 SPT‐1B‐138 Spoƫng 1B‐138 0.6 0.6 0%Aug‐13‐22 Aug‐13‐22 21.5 ERC‐1B‐138 Tower Erec Ɵon 1B‐138 0.9 0.9 0%Aug‐26‐22 Aug‐27‐22 71.8 REC‐1B‐138 ReclamaƟon 1B‐138 0.9 0.9 0%Sep‐26‐22 Sep‐27‐22 85.7 Structure 1B-139Structure 1B-139 47.7 47.7 Aug‐10‐22 Sep‐28‐22 85.7 ASY‐1B‐139 Tower Assembly 1B ‐139 1.2 1.2 0%Aug‐26‐22 Aug‐27‐22 10.1 FDN‐1B‐139 FoundaƟons 1B‐139 0.9 0.9 0%Aug‐13‐22 Aug‐14‐22 14.3 CLR‐1B‐139 Clearing 1B‐139 0.6 0.6 0%Aug‐10‐22 Aug‐10‐22 16.0 ACC ‐1B‐139 Access 1B‐139 0.6 0.6 0%Aug‐10‐22 Aug‐11‐22 16.0 SPT‐1B‐139 Spoƫng 1B‐139 0.6 0.6 0%Aug‐14‐22 Aug‐14‐22 21.8 ERC‐1B‐139 Tower Erec Ɵon 1B‐139 0.9 0.9 0%Aug‐27‐22 Aug‐28‐22 71.8 REC‐1B‐139 ReclamaƟon 1B‐139 0.9 0.9 0%Sep‐27‐22 Sep‐28‐22 85.7 Structure 1B-140Structure 1B-140 48.0 48.0 Aug‐10‐22 Sep‐28‐22 85.7 ASY‐1B‐140 Tower Assembly 1B ‐140 1.2 1.2 0%Aug‐27‐22 Aug‐28‐22 10.1 FDN‐1B‐140 FoundaƟons 1B‐140 0.9 0.9 0%Aug‐14‐22 Aug‐14‐22 14.3 CLR‐1B‐140 Clearing 1B‐140 0.6 0.6 0%Aug‐10‐22 Aug‐11‐22 16.3 ACC ‐1B‐140 Access 1B‐140 0.6 0.6 0%Aug‐11‐22 Aug‐12‐22 16.3 SPT‐1B‐140 Spoƫng 1B‐140 0.6 0.6 0%Aug‐14‐22 Aug‐15‐22 22.1 ERC‐1B‐140 Tower Erec Ɵon 1B‐140 0.9 0.9 0%Aug‐28‐22 Aug‐29‐22 71.7 REC‐1B‐140 ReclamaƟon 1B‐140 0.9 0.9 0%Sep‐28‐22 Sep‐28‐22 85.7 Structure 1B-141Structure 1B-141 48.3 48.3 Aug‐11‐22 Sep‐29‐22 85.7 ASY‐1B‐141 Tower Assembly 1B ‐141 1.2 1.2 0%Aug‐28‐22 Aug‐29‐22 10.1 FDN‐1B‐141 FoundaƟons 1B‐141 0.9 0.9 0%Aug‐14‐22 Aug‐15‐22 14.3 CLR‐1B‐141 Clearing 1B‐141 0.6 0.6 0%Aug‐11‐22 Aug‐12‐22 16.6 ACC ‐1B‐141 Access 1B‐141 0.6 0.6 0%Aug‐12‐22 Aug‐12‐22 16.6 SPT‐1B‐141 Spoƫng 1B‐141 0.6 0.6 0%Aug‐15‐22 Aug‐16‐22 22.3 ERC‐1B‐141 Tower Erec Ɵon 1B‐141 0.9 0.9 0%Aug‐29‐22 Aug‐30‐22 71.4 REC‐1B‐141 ReclamaƟon 1B‐141 0.9 0.9 0%Sep‐28‐22 Sep‐29‐22 85.7 Structure 1B-142Structure 1B-142 48.6 48.6 Aug‐12‐22 Sep‐30‐22 85.7 ASY‐1B‐142 Tower Assembly 1B ‐142 0.8 0.8 0%Aug‐29‐22 Aug‐30‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐136 Clearing 1B‐136 Access 1B‐136 Spoƫng 1B‐136 Tower Erec Ɵon 1B‐136 ReclamaƟon 1B‐136 Sep‐26‐22, Structure 1B‐137 Tower Assembly 1B‐137 FoundaƟons 1B‐137 Clearing 1B‐137 Access 1B‐137 Spoƫng 1B‐137 Tower Erec Ɵon 1B‐137 ReclamaƟon 1B‐137 Sep‐27‐22, Structure 1B‐138 Tower Assembly 1B‐138 FoundaƟons 1B‐138 Clearing 1B‐138 Access 1B‐138 Spoƫng 1B‐138 Tower Erec Ɵon 1B‐138 ReclamaƟon 1B‐138 Sep‐28‐22, Structure 1B‐139 Tower Assembly 1B‐139 FoundaƟons 1B‐139 Clearing 1B‐139 Access 1B‐139 Spoƫng 1B‐139 Tower Erec Ɵon 1B‐139 ReclamaƟon 1B‐139 Sep‐28‐22, Structure 1B‐140 Tower Assembly 1B‐140 FoundaƟons 1B‐140 Clearing 1B‐140 Access 1B‐140 Spoƫng 1B‐140 Tower Erec Ɵon 1B‐140 ReclamaƟon 1B‐140 Sep‐29‐22, Structure 1B‐141 Tower Assembly 1B ‐141 FoundaƟons 1B‐141 Clearing 1B‐141 Access 1B‐141 Spoƫng 1B‐141 Tower Erec Ɵon 1B‐141 ReclamaƟon 1B‐141 Sep‐30‐22, Structure 1B‐142 Tower Assembly 1B ‐142 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 48 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1B‐142 FoundaƟons 1B‐142 0.9 0.9 0%Aug‐15‐22 Aug‐16‐22 14.3 CLR‐1B‐142 Clearing 1B‐142 0.6 0.6 0%Aug‐12‐22 Aug‐12‐22 17.0 ACC ‐1B‐142 Access 1B‐142 0.6 0.6 0%Aug‐12‐22 Aug‐13‐22 17.0 SPT‐1B‐142 Spoƫng 1B‐142 0.6 0.6 0%Aug‐16‐22 Aug‐17‐22 22.6 ERC‐1B‐142 Tower Erec Ɵon 1B‐142 0.9 0.9 0%Aug‐30‐22 Aug‐31‐22 71.4 REC‐1B‐142 ReclamaƟon 1B‐142 0.9 0.9 0%Sep‐29‐22 Sep‐30‐22 85.7 Structure 1B-143Structure 1B-143 48.9 48.9 Aug‐12‐22 Oct ‐01‐22 85.7 ASY‐1B‐143 Tower Assembly 1B ‐143 0.8 0.8 0%Aug‐30‐22 Aug‐31‐22 10.1 FDN‐1B‐143 FoundaƟons 1B‐143 0.9 0.9 0%Aug‐16‐22 Aug‐17‐22 14.3 CLR‐1B‐143 Clearing 1B‐143 0.6 0.6 0%Aug‐12‐22 Aug‐13‐22 17.3 ACC ‐1B‐143 Access 1B‐143 0.6 0.6 0%Aug‐13‐22 Aug‐13‐22 17.3 SPT‐1B‐143 Spoƫng 1B‐143 0.6 0.6 0%Aug‐17‐22 Aug‐18‐22 22.5 ERC‐1B‐143 Tower Erec Ɵon 1B‐143 0.9 0.9 0%Aug‐31‐22 Sep‐01‐22 71.4 REC‐1B‐143 ReclamaƟon 1B‐143 0.9 0.9 0%Sep‐30‐22 Oct ‐01‐22 85.7 Structure 1B-144Structure 1B-144 49.2 49.2 Aug‐13‐22 Oct ‐02‐22 85.7 ASY‐1B‐144 Tower Assembly 1B ‐144 0.8 0.8 0%Aug‐31‐22 Sep‐01‐22 10.1 FDN‐1B‐144 FoundaƟons 1B‐144 0.9 0.9 0%Aug‐17‐22 Aug‐18‐22 14.3 CLR‐1B‐144 Clearing 1B‐144 0.6 0.6 0%Aug‐13‐22 Aug‐13‐22 17.6 ACC ‐1B‐144 Access 1B‐144 0.6 0.6 0%Aug‐13‐22 Aug‐14‐22 17.6 SPT‐1B‐144 Spoƫng 1B‐144 0.6 0.6 0%Aug‐18‐22 Aug‐19‐22 22.4 ERC‐1B‐144 Tower Erec Ɵon 1B‐144 0.9 0.9 0%Sep‐01‐22 Sep‐02‐22 71.4 REC‐1B‐144 ReclamaƟon 1B‐144 0.9 0.9 0%Oct ‐01‐22 Oct ‐02‐22 85.7 Structure 1B-145Structure 1B-145 74.0 74.0 Aug‐13‐22 Oct ‐27‐22 85.7 ASY‐1B‐145 Tower Assembly 1B ‐145 0.8 0.8 0%Sep‐01‐22 Sep‐02‐22 10.1 FDN‐1B‐145 FoundaƟons 1B‐145 0.9 0.9 0%Aug‐18‐22 Aug‐19‐22 14.3 CLR‐1B‐145 Clearing 1B‐145 0.6 0.6 0%Aug‐13‐22 Aug‐14‐22 17.9 ACC ‐1B‐145 Access 1B‐145 0.6 0.6 0%Aug‐14‐22 Aug‐15‐22 17.9 SPT‐1B‐145 Spoƫng 1B‐145 0.6 0.6 0%Aug‐19‐22 Aug‐20‐22 22.3 ERC‐1B‐145 Tower Erec Ɵon 1B‐145 0.9 0.9 0%Sep‐02‐22 Sep‐03‐22 78.3 REC‐1B‐145 ReclamaƟon 1B‐145 0.9 0.9 0%Oct ‐26‐22 Oct ‐27‐22 85.7 Structure 1B-146Structure 1B-146 74.3 74.3 Aug‐14‐22 Oct ‐28‐22 85.7 ASY‐1B‐146 Tower Assembly 1B ‐146 0.8 0.8 0%Sep‐02‐22 Sep‐02‐22 10.1 FDN‐1B‐146 FoundaƟons 1B‐146 0.9 0.9 0%Aug‐19‐22 Aug‐20‐22 14.3 CLR‐1B‐146 Clearing 1B‐146 0.6 0.6 0%Aug‐14‐22 Aug‐15‐22 18.3 ACC ‐1B‐146 Access 1B‐146 0.6 0.6 0%Aug‐15‐22 Aug‐15‐22 18.3 SPT‐1B‐146 Spoƫng 1B‐146 0.6 0.6 0%Aug‐20‐22 Aug‐21‐22 22.2 ERC‐1B‐146 Tower Erec Ɵon 1B‐146 0.9 0.9 0%Sep‐03‐22 Sep‐04‐22 78.3 REC‐1B‐146 ReclamaƟon 1B‐146 0.9 0.9 0%Oct ‐27‐22 Oct ‐28‐22 85.7 Structure 1B-147Structure 1B-147 40.8 40.8 Sep‐18‐22 Oct ‐29‐22 85.7 CLR‐1B‐147 Clearing 1B‐147 0.8 0.8 0%Sep‐18‐22 Sep‐19‐22 12.7 ASY‐1B‐147 Tower Assembly 1B ‐147 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 33.5 ACC ‐1B‐147 Access 1B‐147 0.8 0.8 0%Sep‐19‐22 Sep‐20‐22 35.4 FDN‐1B‐147 FoundaƟons 1B‐147 0.8 0.8 0%Sep‐20‐22 Sep‐21‐22 35.4 SPT‐1B‐147 Spoƫng 1B‐147 0.8 0.8 0%Sep‐21‐22 Sep‐21‐22 35.4 ERC‐1B‐147 Tower Erec Ɵon 1B‐147 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 54.1 REC‐1B‐147 ReclamaƟon 1B‐147 0.8 0.8 0%Oct ‐28‐22 Oct ‐29‐22 85.7 Structure 1B-148Structure 1B-148 40.8 40.8 Sep‐19‐22 Oct ‐30‐22 85.7 ASY‐1B‐148 Tower Assembly 1B ‐148 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 33.5 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1B‐142 Clearing 1B‐142 Access 1B‐142 Spoƫng 1B‐142 Tower Erec Ɵon 1B‐142 ReclamaƟon 1B‐142 Oct ‐01‐22, Structure 1B‐143 Tower Assembly 1B ‐143 FoundaƟons 1B‐143 Clearing 1B‐143 Access 1B‐143 Spoƫng 1B‐143 Tower Erec Ɵon 1B‐143 ReclamaƟon 1B‐143 Oct ‐02‐22, Structure 1B‐144 Tower Assembly 1B ‐144 FoundaƟons 1B‐144 Clearing 1B‐144 Access 1B‐144 Spoƫng 1B‐144 Tower Erec Ɵon 1B‐144 ReclamaƟon 1B‐144 Oct ‐27‐22, Structure 1B‐145 Tower Assembly 1B ‐145 FoundaƟons 1B‐145 Clearing 1B‐145 Access 1B‐145 Spoƫng 1B‐145 Tower Erec Ɵon 1B‐145 ReclamaƟon 1B‐145 Oct ‐28‐22, Structure 1B‐146 Tower Assembly 1B ‐146 FoundaƟons 1B‐146 Clearing 1B‐146 Access 1B‐146 Spoƫng 1B‐146 Tower Erec Ɵon 1B‐146 ReclamaƟon 1B‐146 Oct ‐29‐22, Structure 1B‐147 Clearing 1B‐147 Tower Assembly 1B ‐147 Access 1B‐147 FoundaƟons 1B‐147 Spoƫng 1B‐147 Tower Erec Ɵon 1B‐147 ReclamaƟon 1B‐147 Oct ‐30‐22, Structure 1B‐148 Tower Assembly 1B ‐148 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 49 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1B‐148 Clearing 1B‐148 0.8 0.8 0%Sep‐19‐22 Sep‐20‐22 35.4 ACC ‐1B‐148 Access 1B‐148 0.8 0.8 0%Sep‐20‐22 Sep‐21‐22 35.4 FDN‐1B‐148 FoundaƟons 1B‐148 0.8 0.8 0%Sep‐21‐22 Sep‐21‐22 35.4 SPT‐1B‐148 Spoƫng 1B‐148 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 35.4 ERC‐1B‐148 Tower Erec Ɵon 1B‐148 0.8 0.8 0%Sep‐25‐22 Sep‐26‐22 54.1 REC‐1B‐148 ReclamaƟon 1B‐148 0.8 0.8 0%Oct ‐29‐22 Oct ‐30‐22 85.7 Structure 1B-149Structure 1B-149 40.8 40.8 Sep‐20‐22 Oct ‐31‐22 85.7 ASY‐1B‐149 Tower Assembly 1B ‐149 0.8 0.8 0%Sep‐25‐22 Sep‐26‐22 33.5 CLR‐1B‐149 Clearing 1B‐149 0.8 0.8 0%Sep‐20‐22 Sep‐21‐22 35.4 ACC ‐1B‐149 Access 1B‐149 0.8 0.8 0%Sep‐21‐22 Sep‐21‐22 35.4 FDN‐1B‐149 FoundaƟons 1B‐149 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 35.4 SPT‐1B‐149 Spoƫng 1B‐149 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 35.4 ERC‐1B‐149 Tower Erec Ɵon 1B‐149 0.8 0.8 0%Sep‐26‐22 Sep‐27‐22 54.1 REC‐1B‐149 ReclamaƟon 1B‐149 0.8 0.8 0%Oct ‐30‐22 Oct ‐31‐22 85.7 Structure 1B-150Structure 1B-150 40.8 40.8 Sep‐21‐22 Oct ‐31‐22 85.7 ASY‐1B‐150 Tower Assembly 1B ‐150 0.8 0.8 0%Sep‐26‐22 Sep‐27‐22 33.5 CLR‐1B‐150 Clearing 1B‐150 0.8 0.8 0%Sep‐21‐22 Sep‐21‐22 35.4 ACC ‐1B‐150 Access 1B‐150 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 35.4 FDN‐1B‐150 FoundaƟons 1B‐150 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 35.4 SPT‐1B‐150 Spoƫng 1B‐150 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 35.4 ERC‐1B‐150 Tower Erec Ɵon 1B‐150 0.8 0.8 0%Sep‐27‐22 Sep‐27‐22 54.1 REC‐1B‐150 ReclamaƟon 1B‐150 0.8 0.8 0%Oct ‐31‐22 Oct ‐31‐22 85.7 Structure 1B-151Structure 1B-151 40.8 40.8 Sep‐21‐22 Nov‐01‐22 85.7 ASY‐1B‐151 Tower Assembly 1B ‐151 0.8 0.8 0%Sep‐27‐22 Sep‐27‐22 33.5 CLR‐1B‐151 Clearing 1B‐151 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 35.4 ACC ‐1B‐151 Access 1B‐151 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 35.4 FDN‐1B‐151 FoundaƟons 1B‐151 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 35.4 SPT‐1B‐151 Spoƫng 1B‐151 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 35.4 ERC‐1B‐151 Tower Erec Ɵon 1B‐151 0.8 0.8 0%Sep‐27‐22 Sep‐28‐22 54.1 REC‐1B‐151 ReclamaƟon 1B‐151 0.8 0.8 0%Oct ‐31‐22 Nov‐01‐22 85.7 Structure 1B-152Structure 1B-152 40.8 40.8 Sep‐22‐22 Nov‐02‐22 85.7 ASY‐1B‐152 Tower Assembly 1B ‐152 0.8 0.8 0%Sep‐27‐22 Sep‐28‐22 33.5 CLR‐1B‐152 Clearing 1B‐152 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 35.4 ACC ‐1B‐152 Access 1B‐152 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 35.4 FDN‐1B‐152 FoundaƟons 1B‐152 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 35.4 SPT‐1B‐152 Spoƫng 1B‐152 0.8 0.8 0%Sep‐25‐22 Sep‐25‐22 35.4 ERC‐1B‐152 Tower Erec Ɵon 1B‐152 0.8 0.8 0%Sep‐28‐22 Sep‐29‐22 54.1 REC‐1B‐152 ReclamaƟon 1B‐152 0.8 0.8 0%Nov‐01‐22 Nov‐02‐22 85.7 Structure 1B-153Structure 1B-153 117.3 117.3 Jul‐08‐22 Nov‐03‐22 85.7 ASY‐1B‐153 Tower Assembly 1B ‐153 0.9 0.9 0%Sep‐02‐22 Sep‐03‐22 10.1 CLR‐1B‐153 Clearing 1B‐153 0.6 0.6 0%Jul‐08‐22 Jul‐08‐22 12.0 FDN‐1B‐153 FoundaƟons 1B‐153 1.7 1.7 0%Aug‐27‐22 Aug‐29‐22 14.3 SPT‐1B‐153 Spoƫng 1B‐153 0.6 0.6 0%Aug‐29‐22 Aug‐29‐22 14.3 ERC‐1B‐153 Tower Erec Ɵon 1B‐153 0.9 0.9 0%Sep‐03‐22 Sep‐04‐22 57.4 ACC ‐1B‐153 Access 1B‐153 0.6 0.6 0%Jul‐08‐22 Jul‐09‐22 63.5 REC‐1B‐153 ReclamaƟon 1B‐153 0.9 0.9 0%Nov‐02‐22 Nov‐03‐22 85.7 Structure 1B-154Structure 1B-154 117.7 117.7 Jul‐08‐22 Nov‐04‐22 85.7 ASY‐1B‐154 Tower Assembly 1B ‐154 0.9 0.9 0%Sep‐03‐22 Sep‐04‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1B‐148 Access 1B‐148 FoundaƟons 1B‐148 Spoƫng 1B‐148 Tower Erec Ɵon 1B‐148 ReclamaƟon 1B‐148 Oct ‐31‐22, Structure 1B‐149 Tower Assembly 1B ‐149 Clearing 1B‐149 Access 1B‐149 FoundaƟons 1B‐149 Spoƫng 1B‐149 Tower Erec Ɵon 1B‐149 ReclamaƟon 1B‐149 Oct ‐31‐22, Structure 1B‐150 Tower Assembly 1B ‐150 Clearing 1B‐150 Access 1B‐150 FoundaƟons 1B‐150 Spoƫng 1B‐150 Tower Erec Ɵon 1B‐150 ReclamaƟon 1B‐150 Nov‐01‐22, Structure 1B‐151 Tower Assembly 1B‐151 Clearing 1B‐151 Access 1B‐151 FoundaƟons 1B‐151 Spoƫng 1B‐151 Tower Erec Ɵon 1B‐151 ReclamaƟon 1B‐151 Nov‐02‐22, Structure 1B‐152 Tower Assembly 1B‐152 Clearing 1B‐152 Access 1B‐152 FoundaƟons 1B‐152 Spoƫng 1B‐152 Tower Erec Ɵon 1B‐152 ReclamaƟon 1B‐152 Nov‐03‐22, Structure 1B‐153 Tower Assembly 1B ‐153 Clearing 1B‐153 FoundaƟons 1B‐153 Spoƫng 1B‐153 Tower Erec Ɵon 1B‐153 Access 1B‐153 ReclamaƟon 1B‐153 Nov‐04‐22, Structure 1B‐154 Tower Assembly 1B ‐154 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 50 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1B‐154 Clearing 1B‐154 0.6 0.6 0%Jul‐08‐22 Jul‐09‐22 12.0 FDN‐1B‐154 FoundaƟons 1B‐154 0.6 0.6 0%Aug‐29‐22 Aug‐29‐22 14.6 SPT‐1B‐154 Spoƫng 1B‐154 0.6 0.6 0%Aug‐29‐22 Aug‐30‐22 14.6 ERC‐1B‐154 Tower Erec Ɵon 1B‐154 0.9 0.9 0%Sep‐04‐22 Sep‐06‐22 57.4 ACC ‐1B‐154 Access 1B‐154 0.6 0.6 0%Jul‐09‐22 Jul‐09‐22 65.0 REC‐1B‐154 ReclamaƟon 1B‐154 0.9 0.9 0%Nov‐03‐22 Nov‐04‐22 85.7 Structure 1B-155Structure 1B-155 118.0 118.0 Jul‐09‐22 Nov‐05‐22 85.7 ASY‐1B‐155 Tower Assembly 1B ‐155 0.9 0.9 0%Sep‐04‐22 Sep‐06‐22 10.1 CLR‐1B‐155 Clearing 1B‐155 0.6 0.6 0%Jul‐09‐22 Jul‐09‐22 12.0 FDN‐1B‐155 FoundaƟons 1B‐155 0.6 0.6 0%Aug‐29‐22 Aug‐30‐22 14.9 SPT‐1B‐155 Spoƫng 1B‐155 0.6 0.6 0%Aug‐30‐22 Aug‐30‐22 14.9 ERC‐1B‐155 Tower Erec Ɵon 1B‐155 0.9 0.9 0%Sep‐06‐22 Sep‐07‐22 57.4 ACC ‐1B‐155 Access 1B‐155 0.6 0.6 0%Jul‐09‐22 Jul‐10‐22 65.3 REC‐1B‐155 ReclamaƟon 1B‐155 0.9 0.9 0%Nov‐04‐22 Nov‐05‐22 85.7 Structure 1B-156Structure 1B-156 84.6 84.6 Jul‐09‐22 Oct ‐03‐22 85.7 ASY‐1B‐156 Tower Assembly 1B ‐156 0.9 0.9 0%Sep‐06‐22 Sep‐07‐22 10.1 CLR‐1B‐156 Clearing 1B‐156 0.6 0.6 0%Jul‐09‐22 Jul‐10‐22 12.0 FDN‐1B‐156 FoundaƟons 1B‐156 0.6 0.6 0%Aug‐30‐22 Aug‐30‐22 15.2 SPT‐1B‐156 Spoƫng 1B‐156 0.6 0.6 0%Aug‐30‐22 Aug‐31‐22 15.2 ERC‐1B‐156 Tower Erec Ɵon 1B‐156 0.9 0.9 0%Sep‐07‐22 Sep‐08‐22 57.4 ACC ‐1B‐156 Access 1B‐156 0.6 0.6 0%Jul‐10‐22 Jul‐10‐22 65.7 REC‐1B‐156 ReclamaƟon 1B‐156 0.9 0.9 0%Oct ‐02‐22 Oct ‐03‐22 85.7 Structure 1B-157Structure 1B-157 84.9 84.9 Jul‐10‐22 Oct ‐04‐22 85.7 ASY‐1B‐157 Tower Assembly 1B ‐157 0.9 0.9 0%Sep‐07‐22 Sep‐08‐22 10.1 CLR‐1B‐157 Clearing 1B‐157 0.6 0.6 0%Jul‐10‐22 Jul‐10‐22 12.0 FDN‐1B‐157 FoundaƟons 1B‐157 0.6 0.6 0%Aug‐30‐22 Aug‐31‐22 15.5 SPT‐1B‐157 Spoƫng 1B‐157 0.6 0.6 0%Aug‐31‐22 Sep‐01‐22 15.5 ERC‐1B‐157 Tower Erec Ɵon 1B‐157 0.9 0.9 0%Sep‐08‐22 Sep‐09‐22 57.4 ACC ‐1B‐157 Access 1B‐157 0.6 0.6 0%Jul‐10‐22 Jul‐11‐22 66.0 REC‐1B‐157 ReclamaƟon 1B‐157 0.9 0.9 0%Oct ‐03‐22 Oct ‐04‐22 85.7 Structure 1B-158Structure 1B-158 85.3 85.3 Jul‐10‐22 Oct ‐05‐22 85.7 ASY‐1B‐158 Tower Assembly 1B ‐158 0.9 0.9 0%Sep‐08‐22 Sep‐09‐22 10.1 CLR‐1B‐158 Clearing 1B‐158 0.6 0.6 0%Jul‐10‐22 Jul‐11‐22 12.0 FDN‐1B‐158 FoundaƟons 1B‐158 0.6 0.6 0%Aug‐31‐22 Sep‐01‐22 15.8 SPT‐1B‐158 Spoƫng 1B‐158 0.6 0.6 0%Sep‐01‐22 Sep‐01‐22 15.8 ERC‐1B‐158 Tower Erec Ɵon 1B‐158 0.9 0.9 0%Sep‐09‐22 Sep‐10‐22 57.4 ACC ‐1B‐158 Access 1B‐158 0.6 0.6 0%Jul‐11‐22 Jul‐12‐22 66.4 REC‐1B‐158 ReclamaƟon 1B‐158 0.9 0.9 0%Oct ‐04‐22 Oct ‐05‐22 85.7 Structure 1B-159Structure 1B-159 85.6 85.6 Jul‐11‐22 Oct ‐06‐22 85.7 ASY‐1B‐159 Tower Assembly 1B ‐159 0.9 0.9 0%Sep‐09‐22 Sep‐10‐22 10.1 CLR‐1B‐159 Clearing 1B‐159 0.6 0.6 0%Jul‐11‐22 Jul‐12‐22 12.0 FDN‐1B‐159 FoundaƟons 1B‐159 0.6 0.6 0%Sep‐01‐22 Sep‐01‐22 16.1 SPT‐1B‐159 Spoƫng 1B‐159 0.6 0.6 0%Sep‐01‐22 Sep‐02‐22 16.1 ERC‐1B‐159 Tower Erec Ɵon 1B‐159 0.9 0.9 0%Sep‐10‐22 Sep‐11‐22 57.4 ACC ‐1B‐159 Access 1B‐159 0.6 0.6 0%Jul‐12‐22 Jul‐12‐22 66.7 REC‐1B‐159 ReclamaƟon 1B‐159 0.9 0.9 0%Oct ‐05‐22 Oct ‐06‐22 85.7 Structure 1B-160Structure 1B-160 86.0 86.0 Jul‐12‐22 Oct ‐07‐22 85.7 ASY‐1B‐160 Tower Assembly 1B ‐160 0.9 0.9 0%Sep‐10‐22 Sep‐11‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1B‐154 FoundaƟons 1B‐154 Spoƫng 1B‐154 Tower Erec Ɵon 1B‐154 Access 1B‐154 ReclamaƟon 1B‐154 Nov‐05‐22, Structure 1B‐155 Tower Assembly 1B‐155 Clearing 1B‐155 FoundaƟons 1B‐155 Spoƫng 1B‐155 Tower Erec Ɵon 1B‐155 Access 1B‐155 ReclamaƟon 1B‐155 Oct ‐03‐22, Structure 1B‐156 Tower Assembly 1B‐156 Clearing 1B‐156 FoundaƟons 1B‐156 Spoƫng 1B‐156 Tower Erec Ɵon 1B‐156 Access 1B‐156 ReclamaƟon 1B‐156 Oct ‐04‐22, Structure 1B‐157 Tower Assembly 1B‐157 Clearing 1B‐157 FoundaƟons 1B‐157 Spoƫng 1B‐157 Tower Erec Ɵon 1B‐157 Access 1B‐157 ReclamaƟon 1B‐157 Oct ‐05‐22, Structure 1B‐158 Tower Assembly 1B ‐158 Clearing 1B‐158 FoundaƟons 1B‐158 Spoƫng 1B‐158 Tower Erec Ɵon 1B‐158 Access 1B‐158 ReclamaƟon 1B‐158 Oct ‐06‐22, Structure 1B‐159 Tower Assembly 1B ‐159 Clearing 1B‐159 FoundaƟons 1B‐159 Spoƫng 1B‐159 Tower Erec Ɵon 1B‐159 Access 1B‐159 ReclamaƟon 1B‐159 Oct ‐07‐22, Structure 1B‐160 Tower Assembly 1B ‐160 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 51 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1B‐160 Clearing 1B‐160 0.6 0.6 0%Jul‐12‐22 Jul‐12‐22 12.0 FDN‐1B‐160 FoundaƟons 1B‐160 0.6 0.6 0%Sep‐01‐22 Sep‐02‐22 16.4 SPT‐1B‐160 Spoƫng 1B‐160 0.6 0.6 0%Sep‐02‐22 Sep‐02‐22 16.4 ERC‐1B‐160 Tower Erec Ɵon 1B‐160 0.9 0.9 0%Sep‐11‐22 Sep‐12‐22 57.4 ACC ‐1B‐160 Access 1B‐160 0.6 0.6 0%Jul‐12‐22 Jul‐13‐22 67.0 REC‐1B‐160 ReclamaƟon 1B‐160 0.9 0.9 0%Oct ‐06‐22 Oct ‐07‐22 85.7 Structure 1B-161Structure 1B-161 86.3 86.3 Jul‐12‐22 Oct ‐07‐22 85.7 ASY‐1B‐161 Tower Assembly 1B ‐161 0.9 0.9 0%Sep‐11‐22 Sep‐12‐22 10.1 CLR‐1B‐161 Clearing 1B‐161 0.6 0.6 0%Jul‐12‐22 Jul‐13‐22 12.0 FDN‐1B‐161 FoundaƟons 1B‐161 0.6 0.6 0%Sep‐02‐22 Sep‐03‐22 16.7 SPT‐1B‐161 Spoƫng 1B‐161 0.6 0.6 0%Sep‐03‐22 Sep‐03‐22 16.7 ERC‐1B‐161 Tower Erec Ɵon 1B‐161 0.9 0.9 0%Sep‐12‐22 Sep‐12‐22 57.4 ACC ‐1B‐161 Access 1B‐161 0.6 0.6 0%Jul‐13‐22 Jul‐13‐22 67.4 REC‐1B‐161 ReclamaƟon 1B‐161 0.9 0.9 0%Oct ‐07‐22 Oct ‐07‐22 85.7 Structure 1B-162Structure 1B-162 86.7 86.7 Jul‐13‐22 Oct ‐08‐22 85.7 ASY‐1B‐162 Tower Assembly 1B ‐162 0.9 0.9 0%Sep‐12‐22 Sep‐12‐22 10.1 CLR‐1B‐162 Clearing 1B‐162 0.6 0.6 0%Jul‐13‐22 Jul‐13‐22 12.0 FDN‐1B‐162 FoundaƟons 1B‐162 0.6 0.6 0%Sep‐03‐22 Sep‐03‐22 17.0 SPT‐1B‐162 Spoƫng 1B‐162 0.6 0.6 0%Sep‐03‐22 Sep‐04‐22 17.0 ERC‐1B‐162 Tower Erec Ɵon 1B‐162 0.9 0.9 0%Sep‐13‐22 Sep‐13‐22 57.4 ACC ‐1B‐162 Access 1B‐162 0.6 0.6 0%Jul‐13‐22 Jul‐14‐22 67.7 REC‐1B‐162 ReclamaƟon 1B‐162 0.9 0.9 0%Oct ‐07‐22 Oct ‐08‐22 85.7 Structure 1B-163Structure 1B-163 87.0 87.0 Jul‐13‐22 Oct ‐09‐22 85.7 ASY‐1B‐163 Tower Assembly 1B ‐163 0.9 0.9 0%Sep‐12‐22 Sep‐13‐22 10.1 CLR‐1B‐163 Clearing 1B‐163 0.6 0.6 0%Jul‐13‐22 Jul‐14‐22 12.0 FDN‐1B‐163 FoundaƟons 1B‐163 0.6 0.6 0%Sep‐03‐22 Sep‐04‐22 17.3 SPT‐1B‐163 Spoƫng 1B‐163 0.6 0.6 0%Sep‐04‐22 Sep‐04‐22 17.3 ERC‐1B‐163 Tower Erec Ɵon 1B‐163 0.9 0.9 0%Sep‐13‐22 Sep‐14‐22 57.4 ACC ‐1B‐163 Access 1B‐163 0.6 0.6 0%Jul‐14‐22 Jul‐14‐22 68.1 REC‐1B‐163 ReclamaƟon 1B‐163 0.9 0.9 0%Oct ‐08‐22 Oct ‐09‐22 85.7 Structure 1B-164Structure 1B-164 87.4 87.4 Jul‐14‐22 Oct ‐10‐22 85.7 ASY‐1B‐164 Tower Assembly 1B ‐164 0.9 0.9 0%Sep‐13‐22 Sep‐14‐22 10.1 CLR‐1B‐164 Clearing 1B‐164 0.6 0.6 0%Jul‐14‐22 Jul‐14‐22 12.0 FDN‐1B‐164 FoundaƟons 1B‐164 0.6 0.6 0%Sep‐04‐22 Sep‐04‐22 17.6 SPT‐1B‐164 Spoƫng 1B‐164 0.6 0.6 0%Sep‐04‐22 Sep‐06‐22 17.6 ERC‐1B‐164 Tower Erec Ɵon 1B‐164 0.9 0.9 0%Sep‐14‐22 Sep‐15‐22 57.4 ACC ‐1B‐164 Access 1B‐164 0.6 0.6 0%Jul‐14‐22 Jul‐15‐22 68.4 REC‐1B‐164 ReclamaƟon 1B‐164 0.9 0.9 0%Oct ‐09‐22 Oct ‐10‐22 85.7 Structure 1B-165Structure 1B-165 87.7 87.7 Jul‐14‐22 Oct ‐11‐22 85.7 ASY‐1B‐165 Tower Assembly 1B ‐165 0.9 0.9 0%Sep‐14‐22 Sep‐15‐22 10.1 CLR‐1B‐165 Clearing 1B‐165 0.6 0.6 0%Jul‐14‐22 Jul‐15‐22 12.0 FDN‐1B‐165 FoundaƟons 1B‐165 0.6 0.6 0%Sep‐04‐22 Sep‐06‐22 17.9 SPT‐1B‐165 Spoƫng 1B‐165 0.6 0.6 0%Sep‐06‐22 Sep‐07‐22 17.9 ERC‐1B‐165 Tower Erec Ɵon 1B‐165 0.9 0.9 0%Sep‐15‐22 Sep‐16‐22 57.4 ACC ‐1B‐165 Access 1B‐165 0.6 0.6 0%Jul‐15‐22 Jul‐15‐22 68.8 REC‐1B‐165 ReclamaƟon 1B‐165 0.9 0.9 0%Oct ‐10‐22 Oct ‐11‐22 85.7 Structure 1B-166Structure 1B-166 88.1 88.1 Jul‐15‐22 Oct ‐12‐22 85.7 ASY‐1B‐166 Tower Assembly 1B ‐166 0.9 0.9 0%Sep‐15‐22 Sep‐16‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1B‐160 FoundaƟons 1B‐160 Spoƫng 1B‐160 Tower Erec Ɵon 1B‐160 Access 1B‐160 ReclamaƟon 1B‐160 Oct ‐07‐22, Structure 1B‐161 Tower Assembly 1B ‐161 Clearing 1B‐161 FoundaƟons 1B‐161 Spoƫng 1B‐161 Tower Erec Ɵon 1B‐161 Access 1B‐161 ReclamaƟon 1B‐161 Oct ‐08‐22, Structure 1B‐162 Tower Assembly 1B ‐162 Clearing 1B‐162 FoundaƟons 1B‐162 Spoƫng 1B‐162 Tower Erec Ɵon 1B‐162 Access 1B‐162 ReclamaƟon 1B‐162 Oct ‐09‐22, Structure 1B‐163 Tower Assembly 1B ‐163 Clearing 1B‐163 FoundaƟons 1B‐163 Spoƫng 1B‐163 Tower Erec Ɵon 1B‐163 Access 1B‐163 ReclamaƟon 1B‐163 Oct ‐10‐22, Structure 1B‐164 Tower Assembly 1B ‐164 Clearing 1B‐164 FoundaƟons 1B‐164 Spoƫng 1B‐164 Tower Erec Ɵon 1B‐164 Access 1B‐164 ReclamaƟon 1B‐164 Oct ‐11‐22, Structure 1B‐165 Tower Assembly 1B ‐165 Clearing 1B‐165 FoundaƟons 1B‐165 Spoƫng 1B‐165 Tower Erec Ɵon 1B‐165 Access 1B‐165 ReclamaƟon 1B‐165 Oct ‐12‐22, Structure 1B‐166 Tower Assembly 1B‐166 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 52 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1B‐166 Clearing 1B‐166 0.6 0.6 0%Jul‐15‐22 Jul‐15‐22 12.0 FDN‐1B‐166 FoundaƟons 1B‐166 0.6 0.6 0%Sep‐06‐22 Sep‐07‐22 18.1 SPT‐1B‐166 Spoƫng 1B‐166 0.6 0.6 0%Sep‐07‐22 Sep‐07‐22 18.1 ERC‐1B‐166 Tower Erec Ɵon 1B‐166 0.9 0.9 0%Sep‐16‐22 Sep‐17‐22 57.4 ACC ‐1B‐166 Access 1B‐166 0.6 0.6 0%Jul‐15‐22 Jul‐16‐22 69.1 REC‐1B‐166 ReclamaƟon 1B‐166 0.9 0.9 0%Oct ‐11‐22 Oct ‐12‐22 85.7 Structure 1B-167Structure 1B-167 88.4 88.4 Jul‐15‐22 Oct ‐13‐22 85.7 ASY‐1B‐167 Tower Assembly 1B ‐167 0.9 0.9 0%Sep‐16‐22 Sep‐17‐22 10.1 CLR‐1B‐167 Clearing 1B‐167 0.6 0.6 0%Jul‐15‐22 Jul‐16‐22 12.0 FDN‐1B‐167 FoundaƟons 1B‐167 0.6 0.6 0%Sep‐07‐22 Sep‐07‐22 18.4 SPT‐1B‐167 Spoƫng 1B‐167 0.6 0.6 0%Sep‐07‐22 Sep‐08‐22 18.4 ERC‐1B‐167 Tower Erec Ɵon 1B‐167 0.9 0.9 0%Sep‐17‐22 Sep‐18‐22 57.4 ACC ‐1B‐167 Access 1B‐167 0.6 0.6 0%Jul‐16‐22 Jul‐17‐22 69.5 REC‐1B‐167 ReclamaƟon 1B‐167 0.9 0.9 0%Oct ‐12‐22 Oct ‐13‐22 85.7 Structure 1B-168Structure 1B-168 88.8 88.8 Jul‐16‐22 Oct ‐14‐22 85.7 ASY‐1B‐168 Tower Assembly 1B ‐168 0.9 0.9 0%Sep‐17‐22 Sep‐18‐22 10.1 CLR‐1B‐168 Clearing 1B‐168 0.6 0.6 0%Jul‐16‐22 Jul‐17‐22 12.0 FDN‐1B‐168 FoundaƟons 1B‐168 0.6 0.6 0%Sep‐07‐22 Sep‐08‐22 18.7 SPT‐1B‐168 Spoƫng 1B‐168 0.6 0.6 0%Sep‐08‐22 Sep‐08‐22 18.7 ERC‐1B‐168 Tower Erec Ɵon 1B‐168 0.9 0.9 0%Sep‐18‐22 Sep‐19‐22 57.4 ACC ‐1B‐168 Access 1B‐168 0.6 0.6 0%Jul‐17‐22 Jul‐17‐22 69.8 REC‐1B‐168 ReclamaƟon 1B‐168 0.9 0.9 0%Oct ‐13‐22 Oct ‐14‐22 85.7 Structure 1B-169Structure 1B-169 89.1 89.1 Jul‐17‐22 Oct ‐15‐22 85.7 ASY‐1B‐169 Tower Assembly 1B ‐169 0.9 0.9 0%Sep‐18‐22 Sep‐19‐22 10.1 CLR‐1B‐169 Clearing 1B‐169 0.6 0.6 0%Jul‐17‐22 Jul‐17‐22 12.0 FDN‐1B‐169 FoundaƟons 1B‐169 0.6 0.6 0%Sep‐08‐22 Sep‐08‐22 19.0 SPT‐1B‐169 Spoƫng 1B‐169 0.6 0.6 0%Sep‐08‐22 Sep‐09‐22 19.0 ERC‐1B‐169 Tower Erec Ɵon 1B‐169 0.9 0.9 0%Sep‐19‐22 Sep‐20‐22 57.4 ACC ‐1B‐169 Access 1B‐169 0.6 0.6 0%Jul‐17‐22 Jul‐18‐22 70.1 REC‐1B‐169 ReclamaƟon 1B‐169 0.9 0.9 0%Oct ‐14‐22 Oct ‐15‐22 85.7 Structure 1B-170Structure 1B-170 89.5 89.5 Jul‐17‐22 Oct ‐16‐22 85.7 CLR‐1B‐170 Clearing 1B‐170 0.6 0.6 0%Jul‐17‐22 Jul‐18‐22 12.0 FDN‐1B‐170 FoundaƟons 1B‐170 0.6 0.6 0%Sep‐08‐22 Sep‐09‐22 23.8 ASY‐1B‐170 Tower Assembly 1B ‐170 0.9 0.9 0%Sep‐19‐22 Sep‐20‐22 33.5 SPT‐1B‐170 Spoƫng 1B‐170 0.6 0.6 0%Sep‐09‐22 Sep‐10‐22 42.7 ERC‐1B‐170 Tower Erec Ɵon 1B‐170 0.9 0.9 0%Sep‐20‐22 Sep‐21‐22 57.4 ACC ‐1B‐170 Access 1B‐170 0.6 0.6 0%Jul‐18‐22 Jul‐18‐22 75.0 REC‐1B‐170 ReclamaƟon 1B‐170 0.9 0.9 0%Oct ‐15‐22 Oct ‐16‐22 85.7 Structure 1B-171Structure 1B-171 89.8 89.8 Jul‐18‐22 Oct ‐17‐22 85.7 CLR‐1B‐171 Clearing 1B‐171 0.6 0.6 0%Jul‐18‐22 Jul‐18‐22 12.0 ASY‐1B‐171 Tower Assembly 1B ‐171 0.9 0.9 0%Sep‐20‐22 Sep‐21‐22 33.5 FDN‐1B‐171 FoundaƟons 1B‐171 0.6 0.6 0%Sep‐09‐22 Sep‐10‐22 43.0 SPT‐1B‐171 Spoƫng 1B‐171 0.6 0.6 0%Sep‐10‐22 Sep‐10‐22 43.0 ERC‐1B‐171 Tower Erec Ɵon 1B‐171 0.9 0.9 0%Sep‐21‐22 Sep‐22‐22 57.4 REC‐1B‐171 ReclamaƟon 1B‐171 0.9 0.9 0%Oct ‐16‐22 Oct ‐17‐22 85.7 ACC ‐1B‐171 Access 1B‐171 0.6 0.6 0%Jul‐18‐22 Jul‐19‐22 94.3 Structure 1B-172Structure 1B-172 90.2 90.2 Jul‐18‐22 Oct ‐17‐22 85.7 CLR‐1B‐172 Clearing 1B‐172 0.6 0.6 0%Jul‐18‐22 Jul‐19‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1B‐166 FoundaƟons 1B‐166 Spoƫng 1B‐166 Tower Erec Ɵon 1B‐166 Access 1B‐166 ReclamaƟon 1B‐166 Oct ‐13‐22, Structure 1B‐167 Tower Assembly 1B‐167 Clearing 1B‐167 FoundaƟons 1B‐167 Spoƫng 1B‐167 Tower Erec Ɵon 1B‐167 Access 1B‐167 ReclamaƟon 1B‐167 Oct ‐14‐22, Structure 1B‐168 Tower Assembly 1B‐168 Clearing 1B‐168 FoundaƟons 1B‐168 Spoƫng 1B‐168 Tower Erec Ɵon 1B‐168 Access 1B‐168 ReclamaƟon 1B‐168 Oct ‐15‐22, Structure 1B‐169 Tower Assembly 1B‐169 Clearing 1B‐169 FoundaƟons 1B‐169 Spoƫng 1B‐169 Tower Erec Ɵon 1B‐169 Access 1B‐169 ReclamaƟon 1B‐169 Oct ‐16‐22, Structure 1B‐170 Clearing 1B‐170 FoundaƟons 1B‐170 Tower Assembly 1B ‐170 Spoƫng 1B‐170 Tower Erec Ɵon 1B‐170 Access 1B‐170 ReclamaƟon 1B‐170 Oct ‐17‐22, Structure 1B‐171 Clearing 1B‐171 Tower Assembly 1B ‐171 FoundaƟons 1B‐171 Spoƫng 1B‐171 Tower Erec Ɵon 1B‐171 ReclamaƟon 1B‐171 Access 1B‐171 Oct ‐17‐22, Structure 1B‐172 Clearing 1B‐172 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 53 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1B‐172 Tower Assembly 1B ‐172 0.9 0.9 0%Sep‐21‐22 Sep‐22‐22 33.5 FDN‐1B‐172 FoundaƟons 1B‐172 0.6 0.6 0%Sep‐10‐22 Sep‐10‐22 43.3 SPT‐1B‐172 Spoƫng 1B‐172 0.6 0.6 0%Sep‐10‐22 Sep‐11‐22 43.3 ERC‐1B‐172 Tower Erec Ɵon 1B‐172 0.9 0.9 0%Sep‐22‐22 Sep‐23‐22 57.4 REC‐1B‐172 ReclamaƟon 1B‐172 0.9 0.9 0%Oct ‐17‐22 Oct ‐17‐22 85.7 ACC ‐1B‐172 Access 1B‐172 0.6 0.6 0%Jul‐19‐22 Jul‐19‐22 94.6 Structure 1B-173Structure 1B-173 90.5 90.5 Jul‐19‐22 Oct ‐18‐22 85.7 CLR‐1B‐173 Clearing 1B‐173 0.6 0.6 0%Jul‐19‐22 Jul‐19‐22 12.0 ASY‐1B‐173 Tower Assembly 1B ‐173 0.9 0.9 0%Sep‐22‐22 Sep‐22‐22 33.5 FDN‐1B‐173 FoundaƟons 1B‐173 0.6 0.6 0%Sep‐10‐22 Sep‐11‐22 43.6 SPT‐1B‐173 Spoƫng 1B‐173 0.6 0.6 0%Sep‐11‐22 Sep‐11‐22 43.6 ERC‐1B‐173 Tower Erec Ɵon 1B‐173 0.9 0.9 0%Sep‐23‐22 Sep‐23‐22 57.4 REC‐1B‐173 ReclamaƟon 1B‐173 0.9 0.9 0%Oct ‐17‐22 Oct ‐18‐22 85.7 ACC ‐1B‐173 Access 1B‐173 0.6 0.6 0%Jul‐19‐22 Jul‐20‐22 94.9 Structure 1B-174Structure 1B-174 90.9 90.9 Jul‐19‐22 Oct ‐19‐22 85.7 CLR‐1B‐174 Clearing 1B‐174 0.6 0.6 0%Jul‐19‐22 Jul‐20‐22 12.0 ASY‐1B‐174 Tower Assembly 1B ‐174 0.9 0.9 0%Sep‐22‐22 Sep‐23‐22 33.5 FDN‐1B‐174 FoundaƟons 1B‐174 0.6 0.6 0%Sep‐11‐22 Sep‐11‐22 43.9 SPT‐1B‐174 Spoƫng 1B‐174 0.6 0.6 0%Sep‐11‐22 Sep‐12‐22 43.9 ERC‐1B‐174 Tower Erec Ɵon 1B‐174 0.9 0.9 0%Sep‐23‐22 Sep‐24‐22 57.4 REC‐1B‐174 ReclamaƟon 1B‐174 0.9 0.9 0%Oct ‐18‐22 Oct ‐19‐22 85.7 ACC ‐1B‐174 Access 1B‐174 0.6 0.6 0%Jul‐20‐22 Jul‐20‐22 95.3 Structure 1B-175Structure 1B-175 91.0 91.0 Jul‐20‐22 Oct ‐20‐22 85.7 CLR‐1B‐175 Clearing 1B‐175 0.6 0.6 0%Jul‐20‐22 Jul‐20‐22 12.0 ASY‐1B‐175 Tower Assembly 1B ‐175 0.7 0.7 0%Sep‐29‐22 Sep‐29‐22 33.1 ERC‐1B‐175 Tower Erec Ɵon 1B‐175 0.7 0.7 0%Sep‐29‐22 Sep‐30‐22 33.2 ACC ‐1B‐175 Access 1B‐175 0.6 0.6 0%Jul‐20‐22 Jul‐21‐22 38.8 FDN‐1B‐175 FoundaƟons 1B‐175 0.6 0.6 0%Sep‐11‐22 Sep‐12‐22 49.0 SPT‐1B‐175 Spoƫng 1B‐175 0.6 0.6 0%Sep‐12‐22 Sep‐13‐22 49.0 REC‐1B‐175 ReclamaƟon 1B‐175 0.7 0.7 0%Oct ‐19‐22 Oct ‐20‐22 85.7 Structure 1B-176Structure 1B-176 91.2 91.2 Jul‐20‐22 Oct ‐21‐22 85.7 CLR‐1B‐176 Clearing 1B‐176 0.6 0.6 0%Jul‐20‐22 Jul‐21‐22 12.0 ASY‐1B‐176 Tower Assembly 1B ‐176 0.7 0.7 0%Sep‐29‐22 Sep‐30‐22 33.1 ERC‐1B‐176 Tower Erec Ɵon 1B‐176 0.7 0.7 0%Sep‐30‐22 Oct ‐01‐22 33.2 ACC ‐1B‐176 Access 1B‐176 0.6 0.6 0%Jul‐21‐22 Jul‐22‐22 38.8 FDN‐1B‐176 FoundaƟons 1B‐176 0.6 0.6 0%Sep‐12‐22 Sep‐13‐22 49.1 SPT‐1B‐176 Spoƫng 1B‐176 0.6 0.6 0%Sep‐13‐22 Sep‐13‐22 49.1 REC‐1B‐176 ReclamaƟon 1B‐176 0.7 0.7 0%Oct ‐20‐22 Oct ‐21‐22 85.7 Structure 1B-177Structure 1B-177 91.4 91.4 Jul‐21‐22 Oct ‐21‐22 85.7 CLR‐1B‐177 Clearing 1B‐177 0.6 0.6 0%Jul‐21‐22 Jul‐22‐22 12.0 ASY‐1B‐177 Tower Assembly 1B ‐177 0.7 0.7 0%Sep‐30‐22 Oct ‐01‐22 33.1 ERC‐1B‐177 Tower Erec Ɵon 1B‐177 0.7 0.7 0%Oct ‐01‐22 Oct ‐01‐22 33.2 ACC ‐1B‐177 Access 1B‐177 0.6 0.6 0%Jul‐22‐22 Jul‐22‐22 38.8 FDN‐1B‐177 FoundaƟons 1B‐177 0.6 0.6 0%Sep‐13‐22 Sep‐13‐22 49.2 SPT‐1B‐177 Spoƫng 1B‐177 0.6 0.6 0%Sep‐13‐22 Sep‐14‐22 49.2 REC‐1B‐177 ReclamaƟon 1B‐177 0.7 0.7 0%Oct ‐21‐22 Oct ‐21‐22 85.7 Structure 1B-178Structure 1B-178 91.5 91.5 Jul‐22‐22 Oct ‐22‐22 85.7 CLR‐1B‐178 Clearing 1B‐178 0.6 0.6 0%Jul‐22‐22 Jul‐22‐22 14.3 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1B ‐172 FoundaƟons 1B‐172 Spoƫng 1B‐172 Tower Erec Ɵon 1B‐172 ReclamaƟon 1B‐172 Access 1B‐172 Oct ‐18‐22, Structure 1B‐173 Clearing 1B‐173 Tower Assembly 1B ‐173 FoundaƟons 1B‐173 Spoƫng 1B‐173 Tower Erec Ɵon 1B‐173 ReclamaƟon 1B‐173 Access 1B‐173 Oct ‐19‐22, Structure 1B‐174 Clearing 1B‐174 Tower Assembly 1B ‐174 FoundaƟons 1B‐174 Spoƫng 1B‐174 Tower Erec Ɵon 1B‐174 ReclamaƟon 1B‐174 Access 1B‐174 Oct ‐20‐22, Structure 1B‐175 Clearing 1B‐175 Tower Assembly 1B‐175 Tower Erec Ɵon 1B‐175 Access 1B‐175 FoundaƟons 1B‐175 Spoƫng 1B‐175 ReclamaƟon 1B‐175 Oct ‐21‐22, Structure 1B‐176 Clearing 1B‐176 Tower Assembly 1B‐176 Tower Erec Ɵon 1B‐176 Access 1B‐176 FoundaƟons 1B‐176 Spoƫng 1B‐176 ReclamaƟon 1B‐176 Oct ‐21‐22, Structure 1B‐177 Clearing 1B‐177 Tower Assembly 1B ‐177 Tower Erec Ɵon 1B‐177 Access 1B‐177 FoundaƟons 1B‐177 Spoƫng 1B‐177 ReclamaƟon 1B‐177 Oct ‐22‐22, Structure 1B‐178 Clearing 1B‐178 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 54 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1B‐178 Tower Assembly 1B ‐178 0.7 0.7 0%Oct ‐01‐22 Oct ‐01‐22 33.1 ERC‐1B‐178 Tower Erec Ɵon 1B‐178 0.7 0.7 0%Oct ‐01‐22 Oct ‐02‐22 33.2 ACC ‐1B‐178 Access 1B‐178 0.6 0.6 0%Jul‐22‐22 Jul‐23‐22 38.8 FDN‐1B‐178 FoundaƟons 1B‐178 0.6 0.6 0%Sep‐13‐22 Sep‐14‐22 49.4 SPT‐1B‐178 Spoƫng 1B‐178 0.6 0.6 0%Sep‐14‐22 Sep‐14‐22 49.4 REC‐1B‐178 ReclamaƟon 1B‐178 0.7 0.7 0%Oct ‐21‐22 Oct ‐22‐22 85.7 Structure 1B-179Structure 1B-179 91.7 91.7 Jul‐22‐22 Oct ‐23‐22 85.7 CLR‐1B‐179 Clearing 1B‐179 0.6 0.6 0%Jul‐22‐22 Jul‐23‐22 14.3 ASY‐1B‐179 Tower Assembly 1B ‐179 0.7 0.7 0%Oct ‐01‐22 Oct ‐02‐22 33.1 ERC‐1B‐179 Tower Erec Ɵon 1B‐179 0.7 0.7 0%Oct ‐02‐22 Oct ‐03‐22 33.2 ACC ‐1B‐179 Access 1B‐179 0.6 0.6 0%Jul‐23‐22 Jul‐23‐22 38.8 FDN‐1B‐179 FoundaƟons 1B‐179 0.6 0.6 0%Sep‐14‐22 Sep‐15‐22 49.5 SPT‐1B‐179 Spoƫng 1B‐179 0.6 0.6 0%Sep‐15‐22 Sep‐15‐22 49.5 REC‐1B‐179 ReclamaƟon 1B‐179 0.7 0.7 0%Oct ‐22‐22 Oct ‐23‐22 85.7 Structure 1B-180Structure 1B-180 91.8 91.8 Jul‐23‐22 Oct ‐24‐22 85.7 CLR‐1B‐180 Clearing 1B‐180 0.6 0.6 0%Jul‐23‐22 Jul‐23‐22 14.3 ASY‐1B‐180 Tower Assembly 1B ‐180 0.7 0.7 0%Oct ‐02‐22 Oct ‐03‐22 33.1 ERC‐1B‐180 Tower Erec Ɵon 1B‐180 0.7 0.7 0%Oct ‐03‐22 Oct ‐04‐22 33.2 ACC ‐1B‐180 Access 1B‐180 0.6 0.6 0%Jul‐23‐22 Jul‐24‐22 38.8 FDN‐1B‐180 FoundaƟons 1B‐180 0.6 0.6 0%Sep‐15‐22 Sep‐15‐22 49.6 SPT‐1B‐180 Spoƫng 1B‐180 0.6 0.6 0%Sep‐15‐22 Sep‐16‐22 49.6 REC‐1B‐180 ReclamaƟon 1B‐180 0.7 0.7 0%Oct ‐23‐22 Oct ‐24‐22 85.7 Structure 1B-181Structure 1B-181 92.0 92.0 Jul‐23‐22 Oct ‐24‐22 85.7 CLR‐1B‐181 Clearing 1B‐181 0.6 0.6 0%Jul‐23‐22 Jul‐24‐22 14.3 ASY‐1B‐181 Tower Assembly 1B ‐181 0.7 0.7 0%Oct ‐03‐22 Oct ‐04‐22 33.1 ERC‐1B‐181 Tower Erec Ɵon 1B‐181 0.7 0.7 0%Oct ‐04‐22 Oct ‐04‐22 33.2 ACC ‐1B‐181 Access 1B‐181 0.6 0.6 0%Jul‐24‐22 Jul‐24‐22 38.8 FDN‐1B‐181 FoundaƟons 1B‐181 0.6 0.6 0%Sep‐15‐22 Sep‐16‐22 49.7 SPT‐1B‐181 Spoƫng 1B‐181 0.6 0.6 0%Sep‐16‐22 Sep‐16‐22 49.7 REC‐1B‐181 ReclamaƟon 1B‐181 0.7 0.7 0%Oct ‐24‐22 Oct ‐24‐22 85.7 Structure 1B-182Structure 1B-182 92.2 92.2 Jul‐24‐22 Oct ‐25‐22 85.7 CLR‐1B‐182 Clearing 1B‐182 0.6 0.6 0%Jul‐24‐22 Jul‐24‐22 14.3 ASY‐1B‐182 Tower Assembly 1B ‐182 0.7 0.7 0%Oct ‐04‐22 Oct ‐04‐22 33.1 ERC‐1B‐182 Tower Erec Ɵon 1B‐182 0.7 0.7 0%Oct ‐04‐22 Oct ‐05‐22 33.2 ACC ‐1B‐182 Access 1B‐182 0.6 0.6 0%Jul‐24‐22 Jul‐25‐22 38.8 FDN‐1B‐182 FoundaƟons 1B‐182 0.6 0.6 0%Sep‐16‐22 Sep‐16‐22 49.8 SPT‐1B‐182 Spoƫng 1B‐182 0.6 0.6 0%Sep‐16‐22 Sep‐17‐22 49.8 REC‐1B‐182 ReclamaƟon 1B‐182 0.7 0.7 0%Oct ‐24‐22 Oct ‐25‐22 85.7 Structure 1B-183Structure 1B-183 92.3 92.3 Jul‐24‐22 Oct ‐26‐22 85.7 CLR‐1B‐183 Clearing 1B‐183 0.6 0.6 0%Jul‐24‐22 Jul‐25‐22 14.3 ASY‐1B‐183 Tower Assembly 1B ‐183 0.7 0.7 0%Oct ‐04‐22 Oct ‐05‐22 33.1 ERC‐1B‐183 Tower Erec Ɵon 1B‐183 0.7 0.7 0%Oct ‐05‐22 Oct ‐06‐22 33.2 ACC ‐1B‐183 Access 1B‐183 0.6 0.6 0%Jul‐25‐22 Jul‐26‐22 38.8 FDN‐1B‐183 FoundaƟons 1B‐183 0.6 0.6 0%Sep‐16‐22 Sep‐17‐22 49.9 SPT‐1B‐183 Spoƫng 1B‐183 0.6 0.6 0%Sep‐17‐22 Sep‐18‐22 49.9 REC‐1B‐183 ReclamaƟon 1B‐183 0.7 0.7 0%Oct ‐25‐22 Oct ‐26‐22 85.7 Structure 1B-184Structure 1B-184 92.5 92.5 Jul‐25‐22 Oct ‐26‐22 85.7 CLR‐1B‐184 Clearing 1B‐184 0.6 0.6 0%Jul‐25‐22 Jul‐26‐22 14.3 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1B ‐178 Tower Erec Ɵon 1B‐178 Access 1B‐178 FoundaƟons 1B‐178 Spoƫng 1B‐178 ReclamaƟon 1B‐178 Oct ‐23‐22, Structure 1B‐179 Clearing 1B‐179 Tower Assembly 1B ‐179 Tower Erec Ɵon 1B‐179 Access 1B‐179 FoundaƟons 1B‐179 Spoƫng 1B‐179 ReclamaƟon 1B‐179 Oct ‐24‐22, Structure 1B‐180 Clearing 1B‐180 Tower Assembly 1B ‐180 Tower Erec Ɵon 1B‐180 Access 1B‐180 FoundaƟons 1B‐180 Spoƫng 1B‐180 ReclamaƟon 1B‐180 Oct ‐24‐22, Structure 1B‐181 Clearing 1B‐181 Tower Assembly 1B ‐181 Tower Erec Ɵon 1B‐181 Access 1B‐181 FoundaƟons 1B‐181 Spoƫng 1B‐181 ReclamaƟon 1B‐181 Oct ‐25‐22, Structure 1B‐182 Clearing 1B‐182 Tower Assembly 1B ‐182 Tower Erec Ɵon 1B‐182 Access 1B‐182 FoundaƟons 1B‐182 Spoƫng 1B‐182 ReclamaƟon 1B‐182 Oct ‐26‐22, Structure 1B‐183 Clearing 1B‐183 Tower Assembly 1B ‐183 Tower Erec Ɵon 1B‐183 Access 1B‐183 FoundaƟons 1B‐183 Spoƫng 1B‐183 ReclamaƟon 1B‐183 Oct ‐26‐22, Structure 1B‐184 Clearing 1B‐184 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 55 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1B‐184 Tower Assembly 1B ‐184 0.7 0.7 0%Oct ‐05‐22 Oct ‐06‐22 33.1 ERC‐1B‐184 Tower Erec Ɵon 1B‐184 0.7 0.7 0%Oct ‐06‐22 Oct ‐06‐22 33.2 ACC ‐1B‐184 Access 1B‐184 0.6 0.6 0%Jul‐26‐22 Jul‐26‐22 38.8 FDN‐1B‐184 FoundaƟons 1B‐184 0.6 0.6 0%Sep‐17‐22 Sep‐18‐22 50.0 SPT‐1B‐184 Spoƫng 1B‐184 0.6 0.6 0%Sep‐18‐22 Sep‐18‐22 50.0 REC‐1B‐184 ReclamaƟon 1B‐184 0.7 0.7 0%Oct ‐26‐22 Oct ‐26‐22 85.7 Structure 1B-185Structure 1B-185 140.8 140.8 Jul‐26‐22 Dec‐16‐22 46.9 CLR‐1B‐185 Clearing 1B‐185 0.6 0.6 0%Jul‐26‐22 Jul‐26‐22 14.3 ASY‐1B‐185 Tower Assembly 1B ‐185 0.7 0.7 0%Oct ‐06‐22 Oct ‐06‐22 33.1 ERC‐1B‐185 Tower Erec Ɵon 1B‐185 0.7 0.7 0%Oct ‐06‐22 Oct ‐07‐22 33.2 ACC ‐1B‐185 Access 1B‐185 0.6 0.6 0%Jul‐26‐22 Jul‐27‐22 38.8 REC‐1B‐185 ReclamaƟon 1B‐185 0.7 0.7 0%Dec‐16‐22 Dec‐16‐22 46.9 FDN‐1B‐185 FoundaƟons 1B‐185 0.6 0.6 0%Sep‐18‐22 Sep‐18‐22 50.1 SPT‐1B‐185 Spoƫng 1B‐185 0.6 0.6 0%Sep‐18‐22 Sep‐19‐22 50.1 Structure 1B-186Structure 1B-186 140.9 140.9 Jul‐26‐22 Dec‐17‐22 46.9 CLR‐1B‐186 Clearing 1B‐186 0.6 0.6 0%Jul‐26‐22 Jul‐27‐22 14.3 ASY‐1B‐186 Tower Assembly 1B ‐186 0.7 0.7 0%Oct ‐06‐22 Oct ‐07‐22 33.1 ERC‐1B‐186 Tower Erec Ɵon 1B‐186 0.7 0.7 0%Oct ‐07‐22 Oct ‐08‐22 33.2 ACC ‐1B‐186 Access 1B‐186 0.6 0.6 0%Jul‐27‐22 Jul‐27‐22 38.8 REC‐1B‐186 ReclamaƟon 1B‐186 0.7 0.7 0%Dec‐16‐22 Dec‐17‐22 46.9 FDN‐1B‐186 FoundaƟons 1B‐186 0.6 0.6 0%Sep‐18‐22 Sep‐19‐22 50.2 SPT‐1B‐186 Spoƫng 1B‐186 0.6 0.6 0%Sep‐19‐22 Sep‐19‐22 50.2 Structure 1B-187Structure 1B-187 141.1 141.1 Jul‐27‐22 Dec‐18‐22 46.9 CLR‐1B‐187 Clearing 1B‐187 0.6 0.6 0%Jul‐27‐22 Jul‐27‐22 14.3 ASY‐1B‐187 Tower Assembly 1B ‐187 0.7 0.7 0%Oct ‐07‐22 Oct ‐08‐22 33.1 ERC‐1B‐187 Tower Erec Ɵon 1B‐187 0.7 0.7 0%Oct ‐08‐22 Oct ‐09‐22 33.2 ACC ‐1B‐187 Access 1B‐187 0.6 0.6 0%Jul‐27‐22 Jul‐28‐22 38.8 REC‐1B‐187 ReclamaƟon 1B‐187 0.7 0.7 0%Dec‐17‐22 Dec‐18‐22 46.9 FDN‐1B‐187 FoundaƟons 1B‐187 0.6 0.6 0%Sep‐19‐22 Sep‐19‐22 50.4 SPT‐1B‐187 Spoƫng 1B‐187 0.6 0.6 0%Sep‐19‐22 Sep‐20‐22 50.4 Structure 1B-188Structure 1B-188 141.2 141.2 Jul‐27‐22 Dec‐18‐22 46.9 CLR‐1B‐188 Clearing 1B‐188 0.6 0.6 0%Jul‐27‐22 Jul‐28‐22 14.3 ASY‐1B‐188 Tower Assembly 1B ‐188 0.7 0.7 0%Oct ‐08‐22 Oct ‐09‐22 33.1 ERC‐1B‐188 Tower Erec Ɵon 1B‐188 0.7 0.7 0%Oct ‐09‐22 Oct ‐09‐22 33.2 ACC ‐1B‐188 Access 1B‐188 0.6 0.6 0%Jul‐28‐22 Jul‐28‐22 38.8 REC‐1B‐188 ReclamaƟon 1B‐188 0.7 0.7 0%Dec‐18‐22 Dec‐18‐22 46.9 FDN‐1B‐188 FoundaƟons 1B‐188 0.6 0.6 0%Sep‐19‐22 Sep‐20‐22 50.5 SPT‐1B‐188 Spoƫng 1B‐188 0.6 0.6 0%Sep‐20‐22 Sep‐21‐22 50.5 Structure 1B-189Structure 1B-189 141.4 141.4 Jul‐28‐22 Dec‐19‐22 46.9 CLR‐1B‐189 Clearing 1B‐189 0.6 0.6 0%Jul‐28‐22 Jul‐28‐22 14.3 ASY‐1B‐189 Tower Assembly 1B ‐189 0.7 0.7 0%Oct ‐09‐22 Oct ‐09‐22 33.1 ERC‐1B‐189 Tower Erec Ɵon 1B‐189 0.7 0.7 0%Oct ‐09‐22 Oct ‐10‐22 33.1 ACC ‐1B‐189 Access 1B‐189 0.6 0.6 0%Jul‐28‐22 Jul‐29‐22 38.8 REC‐1B‐189 ReclamaƟon 1B‐189 0.7 0.7 0%Dec‐18‐22 Dec‐19‐22 46.9 FDN‐1B‐189 FoundaƟons 1B‐189 0.6 0.6 0%Sep‐20‐22 Sep‐21‐22 50.6 SPT‐1B‐189 Spoƫng 1B‐189 0.6 0.6 0%Sep‐21‐22 Sep‐21‐22 50.6 Structure 1B-191Structure 1B-191 141.6 141.6 Jul‐28‐22 Dec‐20‐22 46.9 CLR‐1B‐191 Clearing 1B‐191 0.6 0.6 0%Jul‐28‐22 Jul‐29‐22 14.3 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1B ‐184 Tower Erec Ɵon 1B‐184 Access 1B‐184 FoundaƟons 1B‐184 Spoƫng 1B‐184 ReclamaƟon 1B‐184 Dec‐16‐22, Structure 1B‐185 Clearing 1B‐185 Tower Assembly 1B ‐185 Tower Erec Ɵon 1B‐185 Access 1B‐185 ReclamaƟon 1B‐185 FoundaƟons 1B‐185 Spoƫng 1B‐185 Dec‐17‐22, Structure 1B‐186 Clearing 1B‐186 Tower Assembly 1B ‐186 Tower Erec Ɵon 1B‐186 Access 1B‐186 ReclamaƟon 1B‐186 FoundaƟons 1B‐186 Spoƫng 1B‐186 Dec‐18‐22, Structure 1B‐187 Clearing 1B‐187 Tower Assembly 1B ‐187 Tower Erec Ɵon 1B‐187 Access 1B‐187 ReclamaƟon 1B‐187 FoundaƟons 1B‐187 Spoƫng 1B‐187 Dec‐18‐22, Structure 1B‐188 Clearing 1B‐188 Tower Assembly 1B ‐188 Tower Erec Ɵon 1B‐188 Access 1B‐188 ReclamaƟon 1B‐188 FoundaƟons 1B‐188 Spoƫng 1B‐188 Dec‐19‐22, Structure 1B‐189 Clearing 1B‐189 Tower Assembly 1B ‐189 Tower Erec Ɵon 1B‐189 Access 1B‐189 ReclamaƟon 1B‐189 FoundaƟons 1B‐189 Spoƫng 1B‐189 Dec‐20‐22, Structure 1B‐191 Clearing 1B‐191 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 56 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1B‐191 Tower Assembly 1B ‐191 0.7 0.7 0%Oct ‐09‐22 Oct ‐10‐22 33.1 ERC‐1B‐191 Tower Erec Ɵon 1B‐191 0.7 0.7 0%Oct ‐10‐22 Oct ‐11‐22 33.1 ACC ‐1B‐191 Access 1B‐191 0.6 0.6 0%Jul‐29‐22 Jul‐29‐22 38.8 REC‐1B‐191 ReclamaƟon 1B‐191 0.7 0.7 0%Dec‐19‐22 Dec‐20‐22 46.9 FDN‐1B‐191 FoundaƟons 1B‐191 0.6 0.6 0%Sep‐21‐22 Sep‐21‐22 50.7 SPT‐1B‐191 Spoƫng 1B‐191 0.6 0.6 0%Sep‐21‐22 Sep‐22‐22 50.7 Structure 1B-192Structure 1B-192 141.7 141.7 Jul‐29‐22 Dec‐21‐22 46.9 CLR‐1B‐192 Clearing 1B‐192 0.6 0.6 0%Jul‐29‐22 Jul‐29‐22 14.3 ASY‐1B‐192 Tower Assembly 1B ‐192 0.7 0.7 0%Oct ‐10‐22 Oct ‐11‐22 33.1 ERC‐1B‐192 Tower Erec Ɵon 1B‐192 0.7 0.7 0%Oct ‐11‐22 Oct ‐12‐22 33.1 ACC ‐1B‐192 Access 1B‐192 0.6 0.6 0%Jul‐29‐22 Jul‐30‐22 38.8 REC‐1B‐192 ReclamaƟon 1B‐192 0.7 0.7 0%Dec‐20‐22 Dec‐21‐22 46.9 FDN‐1B‐192 FoundaƟons 1B‐192 0.6 0.6 0%Sep‐21‐22 Sep‐22‐22 50.8 SPT‐1B‐192 Spoƫng 1B‐192 0.6 0.6 0%Sep‐22‐22 Sep‐22‐22 50.8 Structure 1B-193Structure 1B-193 141.9 141.9 Jul‐29‐22 Dec‐21‐22 46.9 CLR‐1B‐193 Clearing 1B‐193 0.6 0.6 0%Jul‐29‐22 Jul‐30‐22 14.3 ASY‐1B‐193 Tower Assembly 1B ‐193 0.7 0.7 0%Oct ‐11‐22 Oct ‐12‐22 33.1 ERC‐1B‐193 Tower Erec Ɵon 1B‐193 0.7 0.7 0%Oct ‐12‐22 Oct ‐12‐22 33.1 ACC ‐1B‐193 Access 1B‐193 0.6 0.6 0%Jul‐30‐22 Jul‐31‐22 38.8 REC‐1B‐193 ReclamaƟon 1B‐193 0.7 0.7 0%Dec‐21‐22 Dec‐21‐22 46.9 FDN‐1B‐193 FoundaƟons 1B‐193 0.6 0.6 0%Sep‐22‐22 Sep‐22‐22 50.8 SPT‐1B‐193 Spoƫng 1B‐193 0.6 0.6 0%Sep‐22‐22 Sep‐23‐22 50.9 Structure 1B-194Structure 1B-194 142.0 142.0 Jul‐30‐22 Dec‐22‐22 46.9 CLR‐1B‐194 Clearing 1B‐194 0.6 0.6 0%Jul‐30‐22 Jul‐31‐22 14.3 ASY‐1B‐194 Tower Assembly 1B ‐194 0.7 0.7 0%Oct ‐12‐22 Oct ‐12‐22 33.1 ERC‐1B‐194 Tower Erec Ɵon 1B‐194 0.7 0.7 0%Oct ‐12‐22 Oct ‐13‐22 33.1 ACC ‐1B‐194 Access 1B‐194 0.6 0.6 0%Jul‐31‐22 Jul‐31‐22 38.8 REC‐1B‐194 ReclamaƟon 1B‐194 0.7 0.7 0%Dec‐21‐22 Dec‐22‐22 46.9 FDN‐1B‐194 FoundaƟons 1B‐194 0.6 0.6 0%Sep‐22‐22 Sep‐23‐22 50.8 SPT‐1B‐194 Spoƫng 1B‐194 0.6 0.6 0%Sep‐23‐22 Sep‐24‐22 51.0 Structure 1B-195Structure 1B-195 142.2 142.2 Jul‐31‐22 Dec‐23‐22 46.9 CLR‐1B‐195 Clearing 1B‐195 0.6 0.6 0%Jul‐31‐22 Jul‐31‐22 14.3 ASY‐1B‐195 Tower Assembly 1B ‐195 0.7 0.7 0%Oct ‐12‐22 Oct ‐13‐22 33.1 ERC‐1B‐195 Tower Erec Ɵon 1B‐195 0.7 0.7 0%Oct ‐13‐22 Oct ‐14‐22 33.1 ACC ‐1B‐195 Access 1B‐195 0.6 0.6 0%Jul‐31‐22 Aug‐01‐22 38.8 REC‐1B‐195 ReclamaƟon 1B‐195 0.7 0.7 0%Dec‐22‐22 Dec‐23‐22 46.9 FDN‐1B‐195 FoundaƟons 1B‐195 0.6 0.6 0%Sep‐23‐22 Sep‐24‐22 50.8 SPT‐1B‐195 Spoƫng 1B‐195 0.6 0.6 0%Sep‐24‐22 Sep‐24‐22 51.1 Structure 1B-196Structure 1B-196 142.4 142.4 Jul‐31‐22 Dec‐23‐22 46.9 CLR‐1B‐196 Clearing 1B‐196 0.6 0.6 0%Jul‐31‐22 Aug‐01‐22 14.3 ASY‐1B‐196 Tower Assembly 1B ‐196 0.7 0.7 0%Oct ‐13‐22 Oct ‐14‐22 33.1 ERC‐1B‐196 Tower Erec Ɵon 1B‐196 0.7 0.7 0%Oct ‐14‐22 Oct ‐14‐22 33.1 ACC ‐1B‐196 Access 1B‐196 0.6 0.6 0%Aug‐01‐22 Aug‐01‐22 38.8 REC‐1B‐196 ReclamaƟon 1B‐196 0.7 0.7 0%Dec‐23‐22 Dec‐23‐22 46.9 FDN‐1B‐196 FoundaƟons 1B‐196 0.6 0.6 0%Sep‐24‐22 Sep‐24‐22 50.8 SPT‐1B‐196 Spoƫng 1B‐196 0.6 0.6 0%Sep‐24‐22 Sep‐25‐22 51.3 Structure 1B-197Structure 1B-197 142.5 142.5 Aug‐01‐22 Dec‐24‐22 46.9 CLR‐1B‐197 Clearing 1B‐197 0.6 0.6 0%Aug‐01‐22 Aug‐01‐22 14.3 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1B‐191 Tower Erec Ɵon 1B‐191 Access 1B‐191 ReclamaƟon 1B‐191 FoundaƟons 1B‐191 Spoƫng 1B‐191 Dec‐21‐22, Structure 1B‐192 Clearing 1B‐192 Tower Assembly 1B‐192 Tower Erec Ɵon 1B‐192 Access 1B‐192 ReclamaƟon 1B‐192 FoundaƟons 1B‐192 Spoƫng 1B‐192 Dec‐21‐22, Structure 1B‐193 Clearing 1B‐193 Tower Assembly 1B‐193 Tower Erec Ɵon 1B‐193 Access 1B‐193 ReclamaƟon 1B‐193 FoundaƟons 1B‐193 Spoƫng 1B‐193 Dec‐22‐22, Structure 1B‐194 Clearing 1B‐194 Tower Assembly 1B ‐194 Tower Erec Ɵon 1B‐194 Access 1B‐194 ReclamaƟon 1B‐194 FoundaƟons 1B‐194 Spoƫng 1B‐194 Dec‐23‐22, Structure 1B‐195 Clearing 1B‐195 Tower Assembly 1B ‐195 Tower Erec Ɵon 1B‐195 Access 1B‐195 ReclamaƟon 1B‐195 FoundaƟons 1B‐195 Spoƫng 1B‐195 Dec‐23‐22, Structure 1B‐196 Clearing 1B‐196 Tower Assembly 1B ‐196 Tower Erec Ɵon 1B‐196 Access 1B‐196 ReclamaƟon 1B‐196 FoundaƟons 1B‐196 Spoƫng 1B‐196 Dec‐24‐22, Structure 1B‐197 Clearing 1B‐197 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 57 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1B‐197 Tower Assembly 1B ‐197 0.7 0.7 0%Oct ‐14‐22 Oct ‐14‐22 33.1 ERC‐1B‐197 Tower Erec Ɵon 1B‐197 0.7 0.7 0%Oct ‐14‐22 Oct ‐15‐22 33.1 ACC ‐1B‐197 Access 1B‐197 0.6 0.6 0%Aug‐01‐22 Aug‐02‐22 38.8 REC‐1B‐197 ReclamaƟon 1B‐197 0.7 0.7 0%Dec‐23‐22 Dec‐24‐22 46.9 FDN‐1B‐197 FoundaƟons 1B‐197 0.6 0.6 0%Sep‐24‐22 Sep‐25‐22 50.8 SPT‐1B‐197 Spoƫng 1B‐197 0.6 0.6 0%Sep‐25‐22 Sep‐25‐22 51.4 Structure 1B-198Structure 1B-198 142.7 142.7 Aug‐01‐22 Dec‐26‐22 46.9 CLR‐1B‐198 Clearing 1B‐198 0.6 0.6 0%Aug‐01‐22 Aug‐02‐22 14.3 ASY‐1B‐198 Tower Assembly 1B ‐198 0.7 0.7 0%Oct ‐14‐22 Oct ‐15‐22 33.1 ERC‐1B‐198 Tower Erec Ɵon 1B‐198 0.7 0.7 0%Oct ‐15‐22 Oct ‐16‐22 33.1 ACC ‐1B‐198 Access 1B‐198 0.6 0.6 0%Aug‐02‐22 Aug‐02‐22 38.8 REC‐1B‐198 ReclamaƟon 1B‐198 0.7 0.7 0%Dec‐24‐22 Dec‐26‐22 46.9 FDN‐1B‐198 FoundaƟons 1B‐198 0.6 0.6 0%Sep‐25‐22 Sep‐25‐22 50.8 SPT‐1B‐198 Spoƫng 1B‐198 0.6 0.6 0%Sep‐25‐22 Sep‐26‐22 51.5 Structure 1B-199Structure 1B-199 142.8 142.8 Aug‐02‐22 Dec‐27‐22 46.9 CLR‐1B‐199 Clearing 1B‐199 0.6 0.6 0%Aug‐02‐22 Aug‐02‐22 14.3 ASY‐1B‐199 Tower Assembly 1B ‐199 0.7 0.7 0%Oct ‐15‐22 Oct ‐16‐22 33.1 ERC‐1B‐199 Tower Erec Ɵon 1B‐199 0.7 0.7 0%Oct ‐16‐22 Oct ‐17‐22 33.1 ACC ‐1B‐199 Access 1B‐199 0.6 0.6 0%Aug‐02‐22 Aug‐03‐22 38.8 REC‐1B‐199 ReclamaƟon 1B‐199 0.7 0.7 0%Dec‐26‐22 Dec‐27‐22 46.9 FDN‐1B‐199 FoundaƟons 1B‐199 0.6 0.6 0%Sep‐25‐22 Sep‐26‐22 50.8 SPT‐1B‐199 Spoƫng 1B‐199 0.6 0.6 0%Sep‐26‐22 Sep‐27‐22 51.6 Structure 1B-200Structure 1B-200 143.0 143.0 Aug‐02‐22 Dec‐27‐22 46.9 CLR‐1B‐200 Clearing 1B‐200 0.6 0.6 0%Aug‐02‐22 Aug‐03‐22 14.3 ASY‐1B‐200 Tower Assembly 1B ‐200 0.7 0.7 0%Oct ‐16‐22 Oct ‐17‐22 33.1 ERC‐1B‐200 Tower Erec Ɵon 1B‐200 0.7 0.7 0%Oct ‐17‐22 Oct ‐17‐22 33.1 ACC ‐1B‐200 Access 1B‐200 0.6 0.6 0%Aug‐03‐22 Aug‐03‐22 38.8 REC‐1B‐200 ReclamaƟon 1B‐200 0.7 0.7 0%Dec‐27‐22 Dec‐27‐22 46.9 FDN‐1B‐200 FoundaƟons 1B‐200 0.6 0.6 0%Sep‐26‐22 Sep‐27‐22 50.8 SPT‐1B‐200 Spoƫng 1B‐200 0.6 0.6 0%Sep‐27‐22 Sep‐27‐22 51.7 Structure 1B-201Structure 1B-201 143.2 143.2 Aug‐03‐22 Dec‐28‐22 46.9 ASY‐1B‐201 Tower Assembly 1B ‐201 0.7 0.7 0%Oct ‐17‐22 Oct ‐17‐22 33.1 ERC‐1B‐201 Tower Erec Ɵon 1B‐201 0.7 0.7 0%Oct ‐17‐22 Oct ‐18‐22 33.1 CLR‐1B‐201 Clearing 1B‐201 0.6 0.6 0%Aug‐03‐22 Aug‐03‐22 38.8 ACC ‐1B‐201 Access 1B‐201 0.6 0.6 0%Aug‐03‐22 Aug‐04‐22 38.8 REC‐1B‐201 ReclamaƟon 1B‐201 0.7 0.7 0%Dec‐27‐22 Dec‐28‐22 46.9 FDN‐1B‐201 FoundaƟons 1B‐201 0.6 0.6 0%Sep‐27‐22 Sep‐27‐22 50.8 SPT‐1B‐201 Spoƫng 1B‐201 0.6 0.6 0%Sep‐27‐22 Sep‐28‐22 51.8 Structure 1B-202Structure 1B-202 143.3 143.3 Aug‐03‐22 Dec‐29‐22 46.9 ASY‐1B‐202 Tower Assembly 1B ‐202 0.7 0.7 0%Oct ‐17‐22 Oct ‐18‐22 33.1 ERC‐1B‐202 Tower Erec Ɵon 1B‐202 0.7 0.7 0%Oct ‐18‐22 Oct ‐19‐22 33.1 CLR‐1B‐202 Clearing 1B‐202 0.6 0.6 0%Aug‐03‐22 Aug‐04‐22 38.8 ACC ‐1B‐202 Access 1B‐202 0.6 0.6 0%Aug‐04‐22 Aug‐05‐22 38.8 REC‐1B‐202 ReclamaƟon 1B‐202 0.7 0.7 0%Dec‐28‐22 Dec‐29‐22 46.9 FDN‐1B‐202 FoundaƟons 1B‐202 0.6 0.6 0%Oct ‐01‐22 Oct ‐01‐22 47.3 SPT‐1B‐202 Spoƫng 1B‐202 0.6 0.6 0%Oct ‐01‐22 Oct ‐02‐22 48.4 Structure 1B-203Structure 1B-203 143.5 143.5 Aug‐04‐22 Dec‐30‐22 46.9 ASY‐1B‐203 Tower Assembly 1B ‐203 0.7 0.7 0%Oct ‐18‐22 Oct ‐19‐22 33.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1B ‐197 Tower Erec Ɵon 1B‐197 Access 1B‐197 ReclamaƟon 1B‐197 FoundaƟons 1B‐197 Spoƫng 1B‐197 Dec‐26‐22, Structure 1B‐198 Clearing 1B‐198 Tower Assembly 1B ‐198 Tower Erec Ɵon 1B‐198 Access 1B‐198 ReclamaƟon 1B‐198 FoundaƟons 1B‐198 Spoƫng 1B‐198 Dec‐27‐22, Structure 1B‐199 Clearing 1B‐199 Tower Assembly 1B ‐199 Tower Erec Ɵon 1B‐199 Access 1B‐199 ReclamaƟon 1B‐199 FoundaƟons 1B‐199 Spoƫng 1B‐199 Dec‐27‐22, Structure 1B‐200 Clearing 1B‐200 Tower Assembly 1B ‐200 Tower Erec Ɵon 1B‐200 Access 1B‐200 ReclamaƟon 1B‐200 FoundaƟons 1B‐200 Spoƫng 1B‐200 Dec‐28‐22, Structure 1B‐201 Tower Assembly 1B ‐201 Tower Erec Ɵon 1B‐201 Clearing 1B‐201 Access 1B‐201 ReclamaƟon 1B‐201 FoundaƟons 1B‐201 Spoƫng 1B‐201 Dec‐29‐22, Structure 1B‐202 Tower Assembly 1B ‐202 Tower Erec Ɵon 1B‐202 Clearing 1B‐202 Access 1B‐202 ReclamaƟon 1B‐202 FoundaƟons 1B‐202 Spoƫng 1B‐202 Dec‐30‐22, Structure 1B‐203 Tower Assembly 1B ‐203 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 58 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐203 Tower Erec Ɵon 1B‐203 0.7 0.7 0%Oct ‐19‐22 Oct ‐19‐22 33.1 CLR‐1B‐203 Clearing 1B‐203 0.6 0.6 0%Aug‐04‐22 Aug‐05‐22 38.8 ACC ‐1B‐203 Access 1B‐203 0.6 0.6 0%Aug‐05‐22 Aug‐05‐22 38.8 REC‐1B‐203 ReclamaƟon 1B‐203 0.7 0.7 0%Dec‐29‐22 Dec‐30‐22 46.9 FDN‐1B‐203 FoundaƟons 1B‐203 0.6 0.6 0%Oct ‐01‐22 Oct ‐02‐22 47.3 SPT‐1B‐203 Spoƫng 1B‐203 0.6 0.6 0%Oct ‐02‐22 Oct ‐03‐22 48.3 Structure 1B-204Structure 1B-204 207.8 207.8 Jun ‐01‐22 Dec‐30‐22 46.9 CLR‐1B‐204 Clearing 1B‐204 0.6 0.6 0%Jun‐01‐22*Jun‐01‐22 10.1 ACC ‐1B‐204 Access 1B‐204 0.6 0.6 0%Jun ‐02‐22 Jun‐02‐22 13.4 ASY‐1B‐204 Tower Assembly 1B ‐204 0.7 0.7 0%Oct ‐19‐22 Oct ‐19‐22 33.1 ERC‐1B‐204 Tower Erec Ɵon 1B‐204 0.7 0.7 0%Oct ‐19‐22 Oct ‐20‐22 33.1 REC‐1B‐204 ReclamaƟon 1B‐204 0.7 0.7 0%Dec‐30‐22 Dec‐30‐22 46.9 FDN‐1B‐204 FoundaƟons 1B‐204 0.6 0.6 0%Oct ‐02‐22 Oct ‐03‐22 47.3 SPT‐1B‐204 Spoƫng 1B‐204 0.6 0.6 0%Oct ‐03‐22 Oct ‐03‐22 48.3 Structure 1B-205Structure 1B-205 207.9 207.9 Jun ‐01‐22 Dec‐31‐22 46.9 ACC ‐1B‐205 Access 1B‐205 0.6 0.6 0%Jun ‐02‐22 Jun‐03‐22 13.4 CLR‐1B‐205 Clearing 1B‐205 0.6 0.6 0%Jun ‐01‐22 Jun‐02‐22 14.0 ASY‐1B‐205 Tower Assembly 1B ‐205 0.7 0.7 0%Oct ‐19‐22 Oct ‐20‐22 33.1 ERC‐1B‐205 Tower Erec Ɵon 1B‐205 0.7 0.7 0%Oct ‐20‐22 Oct ‐21‐22 33.1 REC‐1B‐205 ReclamaƟon 1B‐205 0.7 0.7 0%Dec‐30‐22 Dec‐31‐22 46.9 FDN‐1B‐205 FoundaƟons 1B‐205 0.6 0.6 0%Oct ‐03‐22 Oct ‐03‐22 47.3 SPT‐1B‐205 Spoƫng 1B‐205 0.6 0.6 0%Oct ‐03‐22 Oct ‐04‐22 48.2 Structure 1B-206Structure 1B-206 208.1 208.1 Jun ‐02‐22 Jan‐04‐23 46.9 ACC ‐1B‐206 Access 1B‐206 0.6 0.6 0%Jun ‐03‐22 Jun‐03‐22 13.4 CLR‐1B‐206 Clearing 1B‐206 0.6 0.6 0%Jun ‐02‐22 Jun‐02‐22 14.0 ASY‐1B‐206 Tower Assembly 1B ‐206 0.7 0.7 0%Oct ‐20‐22 Oct ‐21‐22 33.1 ERC‐1B‐206 Tower Erec Ɵon 1B‐206 0.7 0.7 0%Oct ‐21‐22 Oct ‐22‐22 33.1 REC‐1B‐206 ReclamaƟon 1B‐206 0.7 0.7 0%Dec‐31‐22 Jan‐04‐23 46.9 FDN‐1B‐206 FoundaƟons 1B‐206 0.6 0.6 0%Oct ‐03‐22 Oct ‐04‐22 47.3 SPT‐1B‐206 Spoƫng 1B‐206 0.6 0.6 0%Oct ‐04‐22 Oct ‐04‐22 48.2 Structure 1B-207Structure 1B-207 208.2 208.2 Jun ‐02‐22 Jan‐04‐23 46.9 ACC ‐1B‐207 Access 1B‐207 0.6 0.6 0%Jun ‐03‐22 Jun‐04‐22 13.4 CLR‐1B‐207 Clearing 1B‐207 0.6 0.6 0%Jun ‐02‐22 Jun‐03‐22 14.0 ASY‐1B‐207 Tower Assembly 1B ‐207 0.7 0.7 0%Oct ‐21‐22 Oct ‐22‐22 33.1 ERC‐1B‐207 Tower Erec Ɵon 1B‐207 0.7 0.7 0%Oct ‐22‐22 Oct ‐22‐22 33.1 REC‐1B‐207 ReclamaƟon 1B‐207 0.7 0.7 0%Jan‐04‐23 Jan‐04‐23 46.9 FDN‐1B‐207 FoundaƟons 1B‐207 0.6 0.6 0%Oct ‐04‐22 Oct ‐04‐22 47.3 SPT‐1B‐207 Spoƫng 1B‐207 0.6 0.6 0%Oct ‐04‐22 Oct ‐05‐22 48.1 Structure 1B-208Structure 1B-208 208.4 208.4 Jun ‐03‐22 Jan‐05‐23 46.9 ACC ‐1B‐208 Access 1B‐208 0.6 0.6 0%Jun ‐04‐22 Jun‐04‐22 13.4 CLR‐1B‐208 Clearing 1B‐208 0.6 0.6 0%Jun ‐03‐22 Jun‐03‐22 14.0 ASY‐1B‐208 Tower Assembly 1B ‐208 0.7 0.7 0%Oct ‐22‐22 Oct ‐22‐22 33.1 ERC‐1B‐208 Tower Erec Ɵon 1B‐208 0.7 0.7 0%Oct ‐22‐22 Oct ‐23‐22 33.1 REC‐1B‐208 ReclamaƟon 1B‐208 0.7 0.7 0%Jan‐04‐23 Jan‐05‐23 46.9 FDN‐1B‐208 FoundaƟons 1B‐208 0.6 0.6 0%Oct ‐04‐22 Oct ‐05‐22 47.3 SPT‐1B‐208 Spoƫng 1B‐208 0.6 0.6 0%Oct ‐05‐22 Oct ‐06‐22 48.1 Structure 1B-209Structure 1B-209 208.6 208.6 Jun ‐03‐22 Jan‐06‐23 46.9 ACC ‐1B‐209 Access 1B‐209 0.6 0.6 0%Jun ‐04‐22 Jun‐05‐22 13.4 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐203 Clearing 1B‐203 Access 1B‐203 ReclamaƟon 1B‐203 FoundaƟons 1B‐203 Spoƫng 1B‐203 Dec‐30‐22, Structure 1B‐204 Clearing 1B‐204 Access 1B‐204 Tower Assembly 1B ‐204 Tower Erec Ɵon 1B‐204 ReclamaƟon 1B‐204 FoundaƟons 1B‐204 Spoƫng 1B‐204 Dec‐31‐22, Structure 1B‐205 Access 1B‐205 Clearing 1B‐205 Tower Assembly 1B ‐205 Tower Erec Ɵon 1B‐205 ReclamaƟon 1B‐205 FoundaƟons 1B‐205 Spoƫng 1B‐205 Jan ‐04‐23, Structure 1B‐206 Access 1B‐206 Clearing 1B‐206 Tower Assembly 1B ‐206 Tower Erec Ɵon 1B‐206 ReclamaƟon 1B‐206 FoundaƟons 1B‐206 Spoƫng 1B‐206 Jan ‐04‐23, Structure 1B‐207 Access 1B‐207 Clearing 1B‐207 Tower Assembly 1B‐207 Tower Erec Ɵon 1B‐207 ReclamaƟon 1B‐207 FoundaƟons 1B‐207 Spoƫng 1B‐207 Jan ‐05‐23, Structure 1B‐208 Access 1B‐208 Clearing 1B‐208 Tower Assembly 1B‐208 Tower Erec Ɵon 1B‐208 ReclamaƟon 1B‐208 FoundaƟons 1B‐208 Spoƫng 1B‐208 Jan ‐06‐23, Structure 1B‐209 Access 1B‐209 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 59 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1B‐209 Clearing 1B‐209 0.6 0.6 0%Jun ‐03‐22 Jun‐04‐22 14.0 ASY‐1B‐209 Tower Assembly 1B ‐209 0.7 0.7 0%Oct ‐22‐22 Oct ‐23‐22 33.1 ERC‐1B‐209 Tower Erec Ɵon 1B‐209 0.7 0.7 0%Oct ‐23‐22 Oct ‐24‐22 33.1 REC‐1B‐209 ReclamaƟon 1B‐209 0.7 0.7 0%Jan‐05‐23 Jan‐06‐23 46.9 FDN‐1B‐209 FoundaƟons 1B‐209 0.6 0.6 0%Oct ‐05‐22 Oct ‐06‐22 47.3 SPT‐1B‐209 Spoƫng 1B‐209 0.6 0.6 0%Oct ‐06‐22 Oct ‐06‐22 48.0 Structure 1B-210Structure 1B-210 208.7 208.7 Jun ‐04‐22 Jan‐07‐23 46.9 ACC ‐1B‐210 Access 1B‐210 0.6 0.6 0%Jun ‐05‐22 Jun‐05‐22 13.4 CLR‐1B‐210 Clearing 1B‐210 0.6 0.6 0%Jun ‐04‐22 Jun‐04‐22 14.0 ASY‐1B‐210 Tower Assembly 1B ‐210 0.7 0.7 0%Oct ‐23‐22 Oct ‐24‐22 33.1 ERC‐1B‐210 Tower Erec Ɵon 1B‐210 0.7 0.7 0%Oct ‐24‐22 Oct ‐25‐22 33.1 REC‐1B‐210 ReclamaƟon 1B‐210 0.7 0.7 0%Jan‐06‐23 Jan‐07‐23 46.9 FDN‐1B‐210 FoundaƟons 1B‐210 0.6 0.6 0%Oct ‐06‐22 Oct ‐06‐22 47.3 SPT‐1B‐210 Spoƫng 1B‐210 0.6 0.6 0%Oct ‐06‐22 Oct ‐07‐22 48.0 Structure 1B-211Structure 1B-211 208.9 208.9 Jun ‐04‐22 Jan‐07‐23 46.9 ACC ‐1B‐211 Access 1B‐211 0.6 0.6 0%Jun ‐05‐22 Jun‐06‐22 13.4 CLR‐1B‐211 Clearing 1B‐211 0.6 0.6 0%Jun ‐04‐22 Jun‐05‐22 14.0 ASY‐1B‐211 Tower Assembly 1B ‐211 0.7 0.7 0%Oct ‐24‐22 Oct ‐25‐22 33.1 ERC‐1B‐211 Tower Erec Ɵon 1B‐211 0.7 0.7 0%Oct ‐25‐22 Oct ‐25‐22 33.1 REC‐1B‐211 ReclamaƟon 1B‐211 0.7 0.7 0%Jan‐07‐23 Jan‐07‐23 46.9 FDN‐1B‐211 FoundaƟons 1B‐211 0.6 0.6 0%Oct ‐06‐22 Oct ‐07‐22 47.3 SPT‐1B‐211 Spoƫng 1B‐211 0.6 0.6 0%Oct ‐07‐22 Oct ‐07‐22 47.9 Structure 1B-212Structure 1B-212 209.1 209.1 Jun ‐05‐22 Jan‐08‐23 46.9 ACC ‐1B‐212 Access 1B‐212 0.6 0.6 0%Jun ‐06‐22 Jun‐07‐22 13.4 CLR‐1B‐212 Clearing 1B‐212 0.6 0.6 0%Jun ‐05‐22 Jun‐05‐22 14.0 ASY‐1B‐212 Tower Assembly 1B ‐212 0.7 0.7 0%Oct ‐25‐22 Oct ‐25‐22 33.1 ERC‐1B‐212 Tower Erec Ɵon 1B‐212 0.7 0.7 0%Oct ‐25‐22 Oct ‐26‐22 33.1 REC‐1B‐212 ReclamaƟon 1B‐212 0.7 0.7 0%Jan‐07‐23 Jan‐08‐23 46.9 FDN‐1B‐212 FoundaƟons 1B‐212 0.6 0.6 0%Oct ‐07‐22 Oct ‐08‐22 47.3 SPT‐1B‐212 Spoƫng 1B‐212 0.6 0.6 0%Oct ‐08‐22 Oct ‐08‐22 47.8 Structure 1B-213Structure 1B-213 209.2 209.2 Jun ‐05‐22 Jan‐09‐23 46.9 ACC ‐1B‐213 Access 1B‐213 0.6 0.6 0%Jun ‐07‐22 Jun‐07‐22 13.4 CLR‐1B‐213 Clearing 1B‐213 0.6 0.6 0%Jun ‐05‐22 Jun‐06‐22 14.0 ASY‐1B‐213 Tower Assembly 1B ‐213 0.7 0.7 0%Oct ‐25‐22 Oct ‐26‐22 33.1 ERC‐1B‐213 Tower Erec Ɵon 1B‐213 0.7 0.7 0%Oct ‐26‐22 Oct ‐27‐22 33.1 REC‐1B‐213 ReclamaƟon 1B‐213 0.7 0.7 0%Jan‐08‐23 Jan‐09‐23 46.9 FDN‐1B‐213 FoundaƟons 1B‐213 0.6 0.6 0%Oct ‐08‐22 Oct ‐08‐22 47.3 SPT‐1B‐213 Spoƫng 1B‐213 0.6 0.6 0%Oct ‐08‐22 Oct ‐09‐22 47.8 Structure 1B-214Structure 1B-214 90.4 90.4 Oct ‐05‐22 Jan‐09‐23 46.9 ASY‐1B‐214 Tower Assembly 1B ‐214 0.7 0.7 0%Oct ‐26‐22 Oct ‐27‐22 33.1 ERC‐1B‐214 Tower Erec Ɵon 1B‐214 0.7 0.7 0%Oct ‐27‐22 Oct ‐27‐22 33.1 REC‐1B‐214 ReclamaƟon 1B‐214 0.7 0.7 0%Jan‐09‐23 Jan‐09‐23 46.9 FDN‐1B‐214 FoundaƟons 1B‐214 0.6 0.6 0%Oct ‐08‐22 Oct ‐09‐22 47.3 SPT‐1B‐214 Spoƫng 1B‐214 0.5 0.5 0%Oct ‐09‐22 Oct ‐09‐22 47.7 CLR‐1B‐214 Clearing 1B‐214 0.5 0.5 0%Oct ‐05‐22 Oct ‐06‐22 49.4 ACC ‐1B‐214 Access 1B‐214 0.5 0.5 0%Oct ‐06‐22 Oct ‐06‐22 49.4 Structure 1B-215Structure 1B-215 90.6 90.6 Oct ‐06‐22 Jan‐10‐23 46.9 ASY‐1B‐215 Tower Assembly 1B ‐215 0.7 0.7 0%Oct ‐27‐22 Oct ‐27‐22 33.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1B‐209 Tower Assembly 1B‐209 Tower Erec Ɵon 1B‐209 ReclamaƟon 1B‐209 FoundaƟons 1B‐209 Spoƫng 1B‐209 Jan ‐07‐23, Structure 1B‐210 Access 1B‐210 Clearing 1B‐210 Tower Assembly 1B‐210 Tower Erec Ɵon 1B‐210 ReclamaƟon 1B‐210 FoundaƟons 1B‐210 Spoƫng 1B‐210 Jan ‐07‐23, Structure 1B‐211 Access 1B‐211 Clearing 1B‐211 Tower Assembly 1B ‐211 Tower Erec Ɵon 1B‐211 ReclamaƟon 1B‐211 FoundaƟons 1B‐211 Spoƫng 1B‐211 Jan ‐08‐23, Structure 1B‐212 Access 1B‐212 Clearing 1B‐212 Tower Assembly 1B ‐212 Tower Erec Ɵon 1B‐212 ReclamaƟon 1B‐212 FoundaƟons 1B‐212 Spoƫng 1B‐212 Jan ‐09‐23, Structure 1B‐213 Access 1B‐213 Clearing 1B‐213 Tower Assembly 1B ‐213 Tower Erec Ɵon 1B‐213 ReclamaƟon 1B‐213 FoundaƟons 1B‐213 Spoƫng 1B‐213 Jan ‐09‐23, Structure 1B‐214 Tower Assembly 1B ‐214 Tower Erec Ɵon 1B‐214 ReclamaƟon 1B‐214 FoundaƟons 1B‐214 Spoƫng 1B‐214 Clearing 1B‐214 Access 1B‐214 Jan ‐10‐23, Structure 1B‐215 Tower Assembly 1B ‐215 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 60 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ERC‐1B‐215 Tower Erec Ɵon 1B‐215 0.7 0.7 0%Oct ‐27‐22 Oct ‐28‐22 33.1 REC‐1B‐215 ReclamaƟon 1B‐215 0.7 0.7 0%Jan‐09‐23 Jan‐10‐23 46.9 FDN‐1B‐215 FoundaƟons 1B‐215 0.6 0.6 0%Oct ‐09‐22 Oct ‐09‐22 47.3 SPT‐1B‐215 Spoƫng 1B‐215 0.5 0.5 0%Oct ‐09‐22 Oct ‐10‐22 47.6 CLR‐1B‐215 Clearing 1B‐215 0.5 0.5 0%Oct ‐06‐22 Oct ‐06‐22 49.5 ACC ‐1B‐215 Access 1B‐215 0.5 0.5 0%Oct ‐06‐22 Oct ‐07‐22 49.5 Structure 1B-216Structure 1B-216 90.9 90.9 Oct ‐06‐22 Jan‐11‐23 46.9 ASY‐1B‐216 Tower Assembly 1B ‐216 0.7 0.7 0%Oct ‐27‐22 Oct ‐28‐22 33.1 ERC‐1B‐216 Tower Erec Ɵon 1B‐216 0.7 0.7 0%Oct ‐28‐22 Oct ‐29‐22 33.1 REC‐1B‐216 ReclamaƟon 1B‐216 0.7 0.7 0%Jan‐10‐23 Jan‐11‐23 46.9 FDN‐1B‐216 FoundaƟons 1B‐216 0.6 0.6 0%Oct ‐09‐22 Oct ‐10‐22 47.3 SPT‐1B‐216 Spoƫng 1B‐216 0.5 0.5 0%Oct ‐10‐22 Oct ‐10‐22 47.5 CLR‐1B‐216 Clearing 1B‐216 0.5 0.5 0%Oct ‐06‐22 Oct ‐07‐22 49.6 ACC ‐1B‐216 Access 1B‐216 0.5 0.5 0%Oct ‐07‐22 Oct ‐07‐22 49.6 Structure 1B-217Structure 1B-217 91.1 91.1 Oct ‐07‐22 Jan‐12‐23 46.9 ASY‐1B‐217 Tower Assembly 1B ‐217 0.7 0.7 0%Oct ‐28‐22 Oct ‐29‐22 33.1 ERC‐1B‐217 Tower Erec Ɵon 1B‐217 0.7 0.7 0%Oct ‐29‐22 Oct ‐30‐22 33.1 REC‐1B‐217 ReclamaƟon 1B‐217 0.7 0.7 0%Jan‐11‐23 Jan‐12‐23 46.9 FDN‐1B‐217 FoundaƟons 1B‐217 0.6 0.6 0%Oct ‐10‐22 Oct ‐11‐22 47.3 SPT‐1B‐217 Spoƫng 1B‐217 0.5 0.5 0%Oct ‐11‐22 Oct ‐11‐22 47.4 CLR‐1B‐217 Clearing 1B‐217 0.5 0.5 0%Oct ‐07‐22 Oct ‐07‐22 49.7 ACC ‐1B‐217 Access 1B‐217 0.5 0.5 0%Oct ‐07‐22 Oct ‐08‐22 49.7 Structure 1B-218Structure 1B-218 91.3 91.3 Oct ‐07‐22 Jan‐12‐23 46.9 ASY‐1B‐218 Tower Assembly 1B ‐218 0.7 0.7 0%Oct ‐29‐22 Oct ‐30‐22 33.1 ERC‐1B‐218 Tower Erec Ɵon 1B‐218 0.7 0.7 0%Oct ‐30‐22 Oct ‐30‐22 33.1 REC‐1B‐218 ReclamaƟon 1B‐218 0.7 0.7 0%Jan‐12‐23 Jan‐12‐23 46.9 FDN‐1B‐218 FoundaƟons 1B‐218 0.6 0.6 0%Oct ‐11‐22 Oct ‐11‐22 47.3 SPT‐1B‐218 Spoƫng 1B‐218 0.5 0.5 0%Oct ‐11‐22 Oct ‐12‐22 47.3 CLR‐1B‐218 Clearing 1B‐218 0.5 0.5 0%Oct ‐07‐22 Oct ‐08‐22 49.9 ACC ‐1B‐218 Access 1B‐218 0.5 0.5 0%Oct ‐08‐22 Oct ‐08‐22 49.9 Structure 1B-219Structure 1B-219 199.3 199.3 Jun ‐20‐22 Jan‐13‐23 46.9 ASY‐1B‐219 Tower Assembly 1B ‐219 0.8 0.8 0%Jun ‐26‐22 Jun‐27‐22 10.1 SPT‐1B‐219 Spoƫng 1B‐219 0.7 0.7 0%Jun ‐23‐22 Jun‐24‐22 12.5 CLR‐1B‐219 Clearing 1B‐219 0.8 0.8 0%Jun ‐20‐22 Jun‐21‐22 13.9 ACC ‐1B‐219 Access 1B‐219 0.7 0.7 0%Jun ‐21‐22 Jun‐21‐22 13.9 FDN‐1B‐219 FoundaƟons 1B‐219 0.5 0.5 0%Jun ‐21‐22 Jun‐22‐22 13.9 REC‐1B‐219 ReclamaƟon 1B‐219 0.7 0.7 0%Jan‐12‐23 Jan‐13‐23 46.9 ERC‐1B‐219 Tower Erec Ɵon 1B‐219 0.8 0.8 0%Jul‐12‐22 Jul‐13‐22 71.8 Structure 1B-220Structure 1B-220 200.7 200.7 Jun ‐19‐22 Jan‐14‐23 46.9 ASY‐1B‐220 Tower Assembly 1B ‐220 0.8 0.8 0%Jun ‐25‐22 Jun‐26‐22 10.1 SPT‐1B‐220 Spoƫng 1B‐220 0.7 0.7 0%Jun ‐22‐22 Jun‐23‐22 12.3 CLR‐1B‐220 Clearing 1B‐220 0.8 0.8 0%Jun ‐19‐22 Jun‐20‐22 13.8 ACC ‐1B‐220 Access 1B‐220 0.7 0.7 0%Jun ‐20‐22 Jun‐20‐22 13.8 FDN‐1B‐220 FoundaƟons 1B‐220 0.5 0.5 0%Jun ‐20‐22 Jun‐21‐22 13.8 REC‐1B‐220 ReclamaƟon 1B‐220 0.7 0.7 0%Jan‐13‐23 Jan‐14‐23 46.9 ERC‐1B‐220 Tower Erec Ɵon 1B‐220 0.8 0.8 0%Jul‐11‐22 Jul‐12‐22 71.8 Structure 1B-221Structure 1B-221 202.2 202.2 Jun ‐18‐22 Jan‐14‐23 46.9 ASY‐1B‐221 Tower Assembly 1B ‐221 0.8 0.8 0%Jun ‐25‐22 Jun‐25‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Erec Ɵon 1B‐215 ReclamaƟon 1B‐215 FoundaƟons 1B‐215 Spoƫng 1B‐215 Clearing 1B‐215 Access 1B‐215 Jan ‐11‐23, Structure 1B‐216 Tower Assembly 1B ‐216 Tower Erec Ɵon 1B‐216 ReclamaƟon 1B‐216 FoundaƟons 1B‐216 Spoƫng 1B‐216 Clearing 1B‐216 Access 1B‐216 Jan ‐12‐23, Structure 1B‐217 Tower Assembly 1B ‐217 Tower Erec Ɵon 1B‐217 ReclamaƟon 1B‐217 FoundaƟons 1B‐217 Spoƫng 1B‐217 Clearing 1B‐217 Access 1B‐217 Jan ‐12‐23, Structure 1B‐218 Tower Assembly 1B ‐218 Tower Erec Ɵon 1B‐218 ReclamaƟon 1B‐218 FoundaƟons 1B‐218 Spoƫng 1B‐218 Clearing 1B‐218 Access 1B‐218 Jan ‐13‐23, Structure 1B‐219 Tower Assembly 1B ‐219 Spoƫng 1B‐219 Clearing 1B‐219 Access 1B‐219 FoundaƟons 1B‐219 ReclamaƟon 1B‐219 Tower Erec Ɵon 1B‐219 Jan ‐14‐23, Structure 1B‐220 Tower Assembly 1B ‐220 Spoƫng 1B‐220 Clearing 1B‐220 Access 1B‐220 FoundaƟons 1B‐220 ReclamaƟon 1B‐220 Tower Erec Ɵon 1B‐220 Jan ‐14‐23, Structure 1B‐221 Tower Assembly 1B ‐221 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 61 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float SPT‐1B‐221 Spoƫng 1B‐221 0.7 0.7 0%Jun ‐20‐22 Jun‐21‐22 13.7 CLR‐1B‐221 Clearing 1B‐221 0.8 0.8 0%Jun ‐18‐22 Jun‐19‐22 13.8 ACC ‐1B‐221 Access 1B‐221 0.7 0.7 0%Jun ‐19‐22 Jun‐20‐22 13.8 FDN‐1B‐221 FoundaƟons 1B‐221 0.5 0.5 0%Jun ‐20‐22 Jun‐20‐22 13.8 REC‐1B‐221 ReclamaƟon 1B‐221 0.7 0.7 0%Jan‐14‐23 Jan‐14‐23 46.9 ERC‐1B‐221 Tower Erec Ɵon 1B‐221 0.8 0.8 0%Jul‐10‐22 Jul‐11‐22 71.8 Structure 1B-222Structure 1B-222 203.7 203.7 Jun ‐18‐22 Jan‐15‐23 46.9 ASY‐1B‐222 Tower Assembly 1B ‐222 0.8 0.8 0%Jun ‐24‐22 Jun‐25‐22 10.1 SPT‐1B‐222 Spoƫng 1B‐222 0.7 0.7 0%Jun ‐20‐22 Jun‐20‐22 13.5 CLR‐1B‐222 Clearing 1B‐222 0.8 0.8 0%Jun ‐18‐22 Jun‐18‐22 13.7 ACC ‐1B‐222 Access 1B‐222 0.7 0.7 0%Jun ‐18‐22 Jun‐19‐22 13.7 FDN‐1B‐222 FoundaƟons 1B‐222 0.5 0.5 0%Jun ‐19‐22 Jun‐20‐22 13.7 REC‐1B‐222 ReclamaƟon 1B‐222 0.7 0.7 0%Jan‐14‐23 Jan‐15‐23 46.9 ERC‐1B‐222 Tower Erec Ɵon 1B‐222 0.8 0.8 0%Jul‐09‐22 Jul‐10‐22 71.8 Structure 1B-223Structure 1B-223 205.1 205.1 Jun ‐17‐22 Jan‐17‐23 46.9 ASY‐1B‐223 Tower Assembly 1B ‐223 0.8 0.8 0%Jun ‐23‐22 Jun‐24‐22 10.1 SPT‐1B‐223 Spoƫng 1B‐223 0.7 0.7 0%Jun ‐19‐22 Jun‐20‐22 13.4 CLR‐1B‐223 Clearing 1B‐223 0.8 0.8 0%Jun ‐17‐22 Jun‐18‐22 13.6 ACC ‐1B‐223 Access 1B‐223 0.7 0.7 0%Jun ‐18‐22 Jun‐18‐22 13.6 FDN‐1B‐223 FoundaƟons 1B‐223 0.5 0.5 0%Jun ‐18‐22 Jun‐19‐22 13.6 REC‐1B‐223 ReclamaƟon 1B‐223 0.7 0.7 0%Jan‐15‐23 Jan‐17‐23 46.9 ERC‐1B‐223 Tower Erec Ɵon 1B‐223 0.8 0.8 0%Jul‐09‐22 Jul‐09‐22 71.8 Structure 1B-224Structure 1B-224 206.6 206.6 Jun ‐16‐22 Jan‐18‐23 46.9 ASY‐1B‐224 Tower Assembly 1B ‐224 0.8 0.8 0%Jun ‐22‐22 Jun‐23‐22 10.1 SPT‐1B‐224 Spoƫng 1B‐224 0.7 0.7 0%Jun ‐18‐22 Jun‐19‐22 13.2 CLR‐1B‐224 Clearing 1B‐224 0.8 0.8 0%Jun ‐16‐22 Jun‐17‐22 13.6 ACC ‐1B‐224 Access 1B‐224 0.7 0.7 0%Jun ‐17‐22 Jun‐17‐22 13.6 FDN‐1B‐224 FoundaƟons 1B‐224 0.5 0.5 0%Jun ‐17‐22 Jun‐18‐22 13.6 REC‐1B‐224 ReclamaƟon 1B‐224 0.7 0.7 0%Jan‐17‐23 Jan‐18‐23 46.9 ERC‐1B‐224 Tower Erec Ɵon 1B‐224 0.8 0.8 0%Jul‐08‐22 Jul‐09‐22 71.8 Structure 1B-225Structure 1B-225 208.1 208.1 Jun ‐15‐22 Jan‐18‐23 46.9 ASY‐1B‐225 Tower Assembly 1B ‐225 0.8 0.8 0%Jun ‐21‐22 Jun‐22‐22 10.1 SPT‐1B‐225 Spoƫng 1B‐225 0.7 0.7 0%Jun ‐18‐22 Jun‐18‐22 13.1 CLR‐1B‐225 Clearing 1B‐225 0.8 0.8 0%Jun ‐15‐22 Jun‐16‐22 13.5 ACC ‐1B‐225 Access 1B‐225 0.7 0.7 0%Jun ‐16‐22 Jun‐17‐22 13.5 FDN‐1B‐225 FoundaƟons 1B‐225 0.5 0.5 0%Jun ‐17‐22 Jun‐17‐22 13.5 REC‐1B‐225 ReclamaƟon 1B‐225 0.7 0.7 0%Jan‐18‐23 Jan‐18‐23 46.9 ERC‐1B‐225 Tower Erec Ɵon 1B‐225 0.8 0.8 0%Jul‐07‐22 Jul‐08‐22 71.8 Structure 1B-226Structure 1B-226 209.5 209.5 Jun ‐15‐22 Jan‐19‐23 46.9 ASY‐1B‐226 Tower Assembly 1B ‐226 0.8 0.8 0%Jun ‐20‐22 Jun‐21‐22 10.1 SPT‐1B‐226 Spoƫng 1B‐226 0.7 0.7 0%Jun ‐17‐22 Jun‐18‐22 12.9 CLR‐1B‐226 Clearing 1B‐226 0.8 0.8 0%Jun ‐15‐22 Jun‐15‐22 13.4 ACC ‐1B‐226 Access 1B‐226 0.7 0.7 0%Jun ‐15‐22 Jun‐16‐22 13.4 FDN‐1B‐226 FoundaƟons 1B‐226 0.5 0.5 0%Jun ‐16‐22 Jun‐17‐22 13.4 REC‐1B‐226 ReclamaƟon 1B‐226 0.7 0.7 0%Jan‐18‐23 Jan‐19‐23 46.9 ERC‐1B‐226 Tower Erec Ɵon 1B‐226 0.8 0.8 0%Jul‐06‐22 Jul‐07‐22 71.8 Structure 1B-227Structure 1B-227 211.0 211.0 Jun ‐14‐22 Jan‐20‐23 46.9 ASY‐1B‐227 Tower Assembly 1B ‐227 0.8 0.8 0%Jun ‐20‐22 Jun‐20‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Spoƫng 1B‐221 Clearing 1B‐221 Access 1B‐221 FoundaƟons 1B‐221 ReclamaƟon 1B‐221 Tower Erec Ɵon 1B‐221 Jan ‐15‐23, Structure 1B‐222 Tower Assembly 1B ‐222 Spoƫng 1B‐222 Clearing 1B‐222 Access 1B‐222 FoundaƟons 1B‐222 ReclamaƟon 1B‐222 Tower Erec Ɵon 1B‐222 Jan ‐17‐23, Structure 1B‐223 Tower Assembly 1B ‐223 Spoƫng 1B‐223 Clearing 1B‐223 Access 1B‐223 FoundaƟons 1B‐223 ReclamaƟon 1B‐223 Tower Erec Ɵon 1B‐223 Jan ‐18‐23, Structure 1B‐224 Tower Assembly 1B ‐224 Spoƫng 1B‐224 Clearing 1B‐224 Access 1B‐224 FoundaƟons 1B‐224 ReclamaƟon 1B‐224 Tower Erec Ɵon 1B‐224 Jan‐18‐23, Structure 1B‐225 Tower Assembly 1B ‐225 Spoƫng 1B‐225 Clearing 1B‐225 Access 1B‐225 FoundaƟons 1B‐225 ReclamaƟon 1B‐225 Tower Erec Ɵon 1B‐225 Jan‐19‐23, Structure 1B‐226 Tower Assembly 1B ‐226 Spoƫng 1B‐226 Clearing 1B‐226 Access 1B‐226 FoundaƟons 1B‐226 ReclamaƟon 1B‐226 Tower Erec Ɵon 1B‐226 Jan‐20‐23, Structure 1B‐227 Tower Assembly 1B‐227 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 62 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float SPT‐1B‐227 Spoƫng 1B‐227 0.7 0.7 0%Jun ‐16‐22 Jun‐17‐22 12.8 CLR‐1B‐227 Clearing 1B‐227 0.8 0.8 0%Jun ‐14‐22 Jun‐15‐22 13.4 ACC ‐1B‐227 Access 1B‐227 0.7 0.7 0%Jun ‐15‐22 Jun‐15‐22 13.4 FDN‐1B‐227 FoundaƟons 1B‐227 0.5 0.5 0%Jun ‐15‐22 Jun‐16‐22 13.4 REC‐1B‐227 ReclamaƟon 1B‐227 0.7 0.7 0%Jan‐19‐23 Jan‐20‐23 46.9 ERC‐1B‐227 Tower Erec Ɵon 1B‐227 0.8 0.8 0%Jul‐05‐22 Jul‐06‐22 71.8 Structure 1B-228Structure 1B-228 212.5 212.5 Jun ‐13‐22 Jan‐21‐23 46.9 ASY‐1B‐228 Tower Assembly 1B ‐228 0.8 0.8 0%Jun ‐19‐22 Jun‐20‐22 10.1 SPT‐1B‐228 Spoƫng 1B‐228 0.7 0.7 0%Jun ‐16‐22 Jun‐16‐22 12.6 CLR‐1B‐228 Clearing 1B‐228 0.8 0.8 0%Jun ‐13‐22 Jun‐14‐22 13.3 ACC ‐1B‐228 Access 1B‐228 0.7 0.7 0%Jun ‐14‐22 Jun‐14‐22 13.3 FDN‐1B‐228 FoundaƟons 1B‐228 0.5 0.5 0%Jun ‐14‐22 Jun‐15‐22 13.3 REC‐1B‐228 ReclamaƟon 1B‐228 0.7 0.7 0%Jan‐20‐23 Jan‐21‐23 46.9 ERC‐1B‐228 Tower Erec Ɵon 1B‐228 0.8 0.8 0%Jul‐05‐22 Jul‐05‐22 71.8 Structure 1B-229Structure 1B-229 214.0 214.0 Jun ‐12‐22 Jan‐21‐23 46.9 ASY‐1B‐229 Tower Assembly 1B ‐229 0.8 0.8 0%Jun ‐18‐22 Jun‐19‐22 10.1 SPT‐1B‐229 Spoƫng 1B‐229 0.7 0.7 0%Jun ‐15‐22 Jun‐16‐22 12.5 CLR‐1B‐229 Clearing 1B‐229 0.8 0.8 0%Jun ‐12‐22 Jun‐13‐22 13.2 ACC ‐1B‐229 Access 1B‐229 0.7 0.7 0%Jun ‐13‐22 Jun‐14‐22 13.2 FDN‐1B‐229 FoundaƟons 1B‐229 0.5 0.5 0%Jun ‐14‐22 Jun‐14‐22 13.2 REC‐1B‐229 ReclamaƟon 1B‐229 0.7 0.7 0%Jan‐21‐23 Jan‐21‐23 46.9 ERC‐1B‐229 Tower Erec Ɵon 1B‐229 0.8 0.8 0%Jul‐03‐22 Jul‐05‐22 71.8 Structure 1B-230Structure 1B-230 215.4 215.4 Jun ‐12‐22 Jan‐22‐23 46.9 ASY‐1B‐230 Tower Assembly 1B ‐230 0.8 0.8 0%Jun ‐17‐22 Jun‐18‐22 10.1 SPT‐1B‐230 Spoƫng 1B‐230 0.7 0.7 0%Jun ‐14‐22 Jun‐15‐22 12.3 CLR‐1B‐230 Clearing 1B‐230 0.8 0.8 0%Jun ‐12‐22 Jun‐12‐22 13.2 ACC ‐1B‐230 Access 1B‐230 0.7 0.7 0%Jun ‐12‐22 Jun‐13‐22 13.2 FDN‐1B‐230 FoundaƟons 1B‐230 0.5 0.5 0%Jun ‐13‐22 Jun‐14‐22 13.2 REC‐1B‐230 ReclamaƟon 1B‐230 0.7 0.7 0%Jan‐21‐23 Jan‐22‐23 46.9 ERC‐1B‐230 Tower Erec Ɵon 1B‐230 0.8 0.8 0%Jul‐02‐22 Jul‐03‐22 71.8 Structure 1B-231Structure 1B-231 216.9 216.9 Jun ‐11‐22 Jan‐23‐23 46.9 ASY‐1B‐231 Tower Assembly 1B ‐231 0.8 0.8 0%Jun ‐16‐22 Jun‐17‐22 10.1 SPT‐1B‐231 Spoƫng 1B‐231 0.7 0.7 0%Jun ‐14‐22 Jun‐14‐22 12.2 CLR‐1B‐231 Clearing 1B‐231 0.8 0.8 0%Jun ‐11‐22 Jun‐12‐22 13.1 ACC ‐1B‐231 Access 1B‐231 0.7 0.7 0%Jun ‐12‐22 Jun‐12‐22 13.1 FDN‐1B‐231 FoundaƟons 1B‐231 0.5 0.5 0%Jun ‐12‐22 Jun‐13‐22 13.1 REC‐1B‐231 ReclamaƟon 1B‐231 0.7 0.7 0%Jan‐22‐23 Jan‐23‐23 46.9 ERC‐1B‐231 Tower Erec Ɵon 1B‐231 0.8 0.8 0%Jul‐01‐22 Jul‐02‐22 71.8 Structure 1B-232Structure 1B-232 218.4 218.4 Jun ‐10‐22 Jan‐23‐23 46.9 ASY‐1B‐232 Tower Assembly 1B ‐232 0.8 0.8 0%Jun ‐16‐22 Jun‐16‐22 10.1 SPT‐1B‐232 Spoƫng 1B‐232 0.7 0.7 0%Jun ‐13‐22 Jun‐14‐22 12.0 CLR‐1B‐232 Clearing 1B‐232 0.8 0.8 0%Jun ‐10‐22 Jun‐11‐22 13.0 ACC ‐1B‐232 Access 1B‐232 0.7 0.7 0%Jun ‐11‐22 Jun‐11‐22 13.0 FDN‐1B‐232 FoundaƟons 1B‐232 0.5 0.5 0%Jun ‐11‐22 Jun‐12‐22 13.0 REC‐1B‐232 ReclamaƟon 1B‐232 0.7 0.7 0%Jan‐23‐23 Jan‐23‐23 46.9 ERC‐1B‐232 Tower Erec Ɵon 1B‐232 0.8 0.8 0%Jun ‐30‐22 Jul‐01‐22 71.8 Structure 1B-233Structure 1B-233 219.8 219.8 Jun ‐09‐22 Jan‐24‐23 46.9 ASY‐1B‐233 Tower Assembly 1B ‐233 0.8 0.8 0%Jun ‐15‐22 Jun‐16‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Spoƫng 1B‐227 Clearing 1B‐227 Access 1B‐227 FoundaƟons 1B‐227 ReclamaƟon 1B‐227 Tower Erec Ɵon 1B‐227 Jan‐21‐23, Structure 1B‐228 Tower Assembly 1B‐228 Spoƫng 1B‐228 Clearing 1B‐228 Access 1B‐228 FoundaƟons 1B‐228 ReclamaƟon 1B‐228 Tower Erec Ɵon 1B‐228 Jan‐21‐23, Structure 1B‐229 Tower Assembly 1B‐229 Spoƫng 1B‐229 Clearing 1B‐229 Access 1B‐229 FoundaƟons 1B‐229 ReclamaƟon 1B‐229 Tower Erec Ɵon 1B‐229 Jan‐22‐23, Structure 1B‐230 Tower Assembly 1B‐230 Spoƫng 1B‐230 Clearing 1B‐230 Access 1B‐230 FoundaƟons 1B‐230 ReclamaƟon 1B‐230 Tower Erec Ɵon 1B‐230 Jan‐23‐23, Structure 1B‐231 Tower Assembly 1B ‐231 Spoƫng 1B‐231 Clearing 1B‐231 Access 1B‐231 FoundaƟons 1B‐231 ReclamaƟon 1B‐231 Tower Erec Ɵon 1B‐231 Jan‐23‐23, Structure 1B‐232 Tower Assembly 1B ‐232 Spoƫng 1B‐232 Clearing 1B‐232 Access 1B‐232 FoundaƟons 1B‐232 ReclamaƟon 1B‐232 Tower Erec Ɵon 1B‐232 Jan‐24‐23, Structure 1B‐233 Tower Assembly 1B ‐233 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 63 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float SPT‐1B‐233 Spoƫng 1B‐233 0.7 0.7 0%Jun ‐12‐22 Jun‐13‐22 11.9 CLR‐1B‐233 Clearing 1B‐233 0.8 0.8 0%Jun ‐09‐22 Jun‐10‐22 13.0 ACC ‐1B‐233 Access 1B‐233 0.7 0.7 0%Jun ‐10‐22 Jun‐11‐22 13.0 FDN‐1B‐233 FoundaƟons 1B‐233 0.5 0.5 0%Jun ‐11‐22 Jun‐11‐22 13.0 REC‐1B‐233 ReclamaƟon 1B‐233 0.7 0.7 0%Jan‐23‐23 Jan‐24‐23 46.9 ERC‐1B‐233 Tower Erec Ɵon 1B‐233 0.8 0.8 0%Jun ‐29‐22 Jun‐30‐22 71.8 Structure 1B-234Structure 1B-234 221.3 221.3 Jun ‐09‐22 Jan‐25‐23 46.9 ASY‐1B‐234 Tower Assembly 1B ‐234 0.8 0.8 0%Jun ‐14‐22 Jun‐15‐22 10.1 SPT‐1B‐234 Spoƫng 1B‐234 0.7 0.7 0%Jun ‐12‐22 Jun‐12‐22 11.8 CLR‐1B‐234 Clearing 1B‐234 0.8 0.8 0%Jun ‐09‐22 Jun‐09‐22 12.9 ACC ‐1B‐234 Access 1B‐234 0.7 0.7 0%Jun ‐09‐22 Jun‐10‐22 12.9 FDN‐1B‐234 FoundaƟons 1B‐234 0.5 0.5 0%Jun ‐10‐22 Jun‐11‐22 12.9 REC‐1B‐234 ReclamaƟon 1B‐234 0.7 0.7 0%Jan‐24‐23 Jan‐25‐23 46.9 ERC‐1B‐234 Tower Erec Ɵon 1B‐234 0.8 0.8 0%Jun ‐29‐22 Jun‐29‐22 71.8 Structure 1C-002Structure 1C-002 222.8 222.8 Jun ‐08‐22 Jan‐26‐23 46.9 ASY‐1C‐002 Tower Assembly 1C ‐002 0.8 0.8 0%Jun ‐13‐22 Jun‐14‐22 10.1 SPT‐1C‐002 Spoƫng 1C‐002 0.7 0.7 0%Jun ‐11‐22 Jun‐12‐22 11.6 CLR‐1C‐002 Clearing 1C‐002 0.8 0.8 0%Jun ‐08‐22 Jun‐09‐22 12.9 ACC ‐1C‐002 Access 1C‐002 0.7 0.7 0%Jun ‐09‐22 Jun‐09‐22 12.9 FDN‐1C‐002 FoundaƟons 1C‐002 0.5 0.5 0%Jun ‐09‐22 Jun‐10‐22 12.9 REC‐1C‐002 ReclamaƟon 1C‐002 0.7 0.7 0%Jan‐25‐23 Jan‐26‐23 46.9 ERC‐1C‐002 Tower Erec Ɵon 1C‐002 0.8 0.8 0%Jun ‐28‐22 Jun‐29‐22 71.8 Structure 1C-003Structure 1C-003 224.2 224.2 Jun ‐07‐22 Jan‐26‐23 46.9 ASY‐1C‐003 Tower Assembly 1C ‐003 0.8 0.8 0%Jun ‐12‐22 Jun‐13‐22 10.1 SPT‐1C‐003 Spoƫng 1C‐003 0.7 0.7 0%Jun ‐10‐22 Jun‐11‐22 11.5 CLR‐1C‐003 Clearing 1C‐003 0.8 0.8 0%Jun ‐07‐22 Jun‐08‐22 12.8 ACC ‐1C‐003 Access 1C‐003 0.7 0.7 0%Jun ‐08‐22 Jun‐08‐22 12.8 FDN‐1C‐003 FoundaƟons 1C‐003 0.5 0.5 0%Jun ‐08‐22 Jun‐09‐22 12.8 REC‐1C‐003 ReclamaƟon 1C‐003 0.7 0.7 0%Jan‐26‐23 Jan‐26‐23 46.9 ERC‐1C‐003 Tower Erec Ɵon 1C‐003 0.8 0.8 0%Jun ‐27‐22 Jun‐28‐22 71.8 Structure 1C-004Structure 1C-004 225.7 225.7 Jun ‐06‐22 Jan‐27‐23 46.9 ASY‐1C‐004 Tower Assembly 1C ‐004 0.8 0.8 0%Jun ‐12‐22 Jun‐12‐22 10.1 SPT‐1C‐004 Spoƫng 1C‐004 0.7 0.7 0%Jun ‐10‐22 Jun‐10‐22 11.3 CLR‐1C‐004 Clearing 1C‐004 0.8 0.8 0%Jun ‐06‐22 Jun‐07‐22 12.0 ACC ‐1C‐004 Access 1C‐004 0.7 0.7 0%Jun ‐07‐22 Jun‐08‐22 12.0 FDN‐1C‐004 FoundaƟons 1C‐004 0.5 0.5 0%Jun ‐08‐22 Jun‐08‐22 12.7 REC‐1C‐004 ReclamaƟon 1C‐004 0.7 0.7 0%Jan‐26‐23 Jan‐27‐23 46.9 ERC‐1C‐004 Tower Erec Ɵon 1C‐004 0.8 0.8 0%Jun ‐26‐22 Jun‐27‐22 71.8 Structure 1C-005Structure 1C-005 227.2 227.2 Jun ‐06‐22 Jan‐28‐23 46.9 ASY‐1C‐005 Tower Assembly 1C ‐005 0.8 0.8 0%Jun ‐11‐22 Jun‐12‐22 10.1 SPT‐1C‐005 Spoƫng 1C‐005 0.7 0.7 0%Jun ‐09‐22 Jun‐10‐22 11.2 CLR‐1C‐005 Clearing 1C‐005 0.8 0.8 0%Jun ‐06‐22 Jun‐06‐22 12.0 ACC ‐1C‐005 Access 1C‐005 0.7 0.7 0%Jun ‐06‐22 Jun‐07‐22 12.7 FDN‐1C‐005 FoundaƟons 1C‐005 0.5 0.5 0%Jun ‐07‐22 Jun‐08‐22 12.7 REC‐1C‐005 ReclamaƟon 1C‐005 0.7 0.7 0%Jan‐27‐23 Jan‐28‐23 46.9 ERC‐1C‐005 Tower Erec Ɵon 1C‐005 0.8 0.8 0%Jun ‐25‐22 Jun‐26‐22 71.8 Structure 1C-006Structure 1C-006 228.7 228.7 Jun ‐05‐22 Jan‐28‐23 46.9 ASY‐1C‐006 Tower Assembly 1C ‐006 0.8 0.8 0%Jun ‐10‐22 Jun‐11‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Spoƫng 1B‐233 Clearing 1B‐233 Access 1B‐233 FoundaƟons 1B‐233 ReclamaƟon 1B‐233 Tower Erec Ɵon 1B‐233 Jan‐25‐23, Structure 1B‐234 Tower Assembly 1B ‐234 Spoƫng 1B‐234 Clearing 1B‐234 Access 1B‐234 FoundaƟons 1B‐234 ReclamaƟon 1B‐234 Tower Erec Ɵon 1B‐234 Jan‐26‐23, Structure 1C‐002 Tower Assembly 1C ‐002 Spoƫng 1C‐002 Clearing 1C‐002 Access 1C‐002 FoundaƟons 1C‐002 ReclamaƟon 1C‐002 Tower Erec Ɵon 1C‐002 Jan‐26‐23, Structure 1C‐003 Tower Assembly 1C ‐003 Spoƫng 1C‐003 Clearing 1C‐003 Access 1C‐003 FoundaƟons 1C‐003 ReclamaƟon 1C‐003 Tower Erec Ɵon 1C‐003 Jan‐27‐23, Structure 1C‐004 Tower Assembly 1C ‐004 Spoƫng 1C‐004 Clearing 1C‐004 Access 1C‐004 FoundaƟons 1C‐004 ReclamaƟon 1C‐004 Tower Erec Ɵon 1C‐004 Jan‐28‐23, Structure 1C‐005 Tower Assembly 1C ‐005 Spoƫng 1C‐005 Clearing 1C‐005 Access 1C‐005 FoundaƟons 1C‐005 ReclamaƟon 1C‐005 Tower Erec Ɵon 1C‐005 Jan‐28‐23, Structure 1C‐006 Tower Assembly 1C ‐006 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 64 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float SPT‐1C‐006 Spoƫng 1C‐006 0.7 0.7 0%Jun ‐08‐22 Jun‐09‐22 11.0 CLR‐1C‐006 Clearing 1C‐006 0.8 0.8 0%Jun ‐05‐22 Jun‐06‐22 12.0 ACC ‐1C‐006 Access 1C‐006 0.7 0.7 0%Jun ‐06‐22 Jun‐06‐22 12.6 FDN‐1C‐006 FoundaƟons 1C‐006 0.5 0.5 0%Jun ‐06‐22 Jun‐07‐22 12.6 REC‐1C‐006 ReclamaƟon 1C‐006 0.7 0.7 0%Jan‐28‐23 Jan‐28‐23 46.9 ERC‐1C‐006 Tower Erec Ɵon 1C‐006 0.8 0.8 0%Jun ‐25‐22 Jun‐25‐22 71.8 Structure 1C-007Structure 1C-007 230.1 230.1 Jun ‐04‐22 Jan‐29‐23 46.9 ASY‐1C‐007 Tower Assembly 1C ‐007 0.8 0.8 0%Jun ‐09‐22 Jun‐10‐22 10.1 SPT‐1C‐007 Spoƫng 1C‐007 0.7 0.7 0%Jun ‐08‐22 Jun‐08‐22 10.9 CLR‐1C‐007 Clearing 1C‐007 0.8 0.8 0%Jun ‐04‐22 Jun‐05‐22 12.0 ACC ‐1C‐007 Access 1C‐007 0.7 0.7 0%Jun ‐05‐22 Jun‐05‐22 12.5 FDN‐1C‐007 FoundaƟons 1C‐007 0.5 0.5 0%Jun ‐05‐22 Jun‐06‐22 12.5 REC‐1C‐007 ReclamaƟon 1C‐007 0.7 0.7 0%Jan‐28‐23 Jan‐29‐23 46.9 ERC‐1C‐007 Tower Erec Ɵon 1C‐007 0.8 0.8 0%Jun ‐24‐22 Jun‐25‐22 71.8 Structure 1C-008Structure 1C-008 231.6 231.6 Jun ‐03‐22 Jan‐30‐23 46.9 ASY‐1C‐008 Tower Assembly 1C ‐008 0.8 0.8 0%Jun ‐08‐22 Jun‐09‐22 10.1 SPT‐1C‐008 Spoƫng 1C‐008 0.7 0.7 0%Jun ‐07‐22 Jun‐08‐22 10.7 CLR‐1C‐008 Clearing 1C‐008 0.8 0.8 0%Jun ‐03‐22 Jun‐04‐22 12.0 ACC ‐1C‐008 Access 1C‐008 0.7 0.7 0%Jun ‐04‐22 Jun‐05‐22 12.5 FDN‐1C‐008 FoundaƟons 1C‐008 0.5 0.5 0%Jun ‐05‐22 Jun‐05‐22 12.5 REC‐1C‐008 ReclamaƟon 1C‐008 0.7 0.7 0%Jan‐29‐23 Jan‐30‐23 46.9 ERC‐1C‐008 Tower Erec Ɵon 1C‐008 0.8 0.8 0%Jun ‐23‐22 Jun‐24‐22 71.8 Structure 1C-009Structure 1C-009 233.1 233.1 Jun ‐03‐22 Jan‐31‐23 46.9 ASY‐1C‐009 Tower Assembly 1C ‐009 0.8 0.8 0%Jun ‐07‐22 Jun‐08‐22 10.1 SPT‐1C‐009 Spoƫng 1C‐009 0.7 0.7 0%Jun ‐06‐22 Jun‐07‐22 10.6 CLR‐1C‐009 Clearing 1C‐009 0.8 0.8 0%Jun ‐03‐22 Jun‐03‐22 12.0 ACC ‐1C‐009 Access 1C‐009 0.7 0.7 0%Jun ‐03‐22 Jun‐04‐22 12.4 FDN‐1C‐009 FoundaƟons 1C‐009 0.5 0.5 0%Jun ‐04‐22 Jun‐05‐22 12.4 REC‐1C‐009 ReclamaƟon 1C‐009 0.7 0.7 0%Jan‐30‐23 Jan‐31‐23 46.9 ERC‐1C‐009 Tower Erec Ɵon 1C‐009 0.8 0.8 0%Jun ‐22‐22 Jun‐23‐22 71.8 Structure 1C-010Structure 1C-010 234.5 234.5 Jun ‐02‐22 Jan‐31‐23 46.9 ASY‐1C‐010 Tower Assembly 1C ‐010 0.8 0.8 0%Jun ‐07‐22 Jun‐07‐22 10.1 SPT‐1C‐010 Spoƫng 1C‐010 0.7 0.7 0%Jun ‐06‐22 Jun‐06‐22 10.4 CLR‐1C‐010 Clearing 1C‐010 0.8 0.8 0%Jun ‐02‐22 Jun‐03‐22 12.0 ACC ‐1C‐010 Access 1C‐010 0.7 0.7 0%Jun ‐03‐22 Jun‐03‐22 12.3 FDN‐1C‐010 FoundaƟons 1C‐010 0.5 0.5 0%Jun ‐03‐22 Jun‐04‐22 12.3 REC‐1C‐010 ReclamaƟon 1C‐010 0.7 0.7 0%Jan‐31‐23 Jan‐31‐23 46.9 ERC‐1C‐010 Tower Erec Ɵon 1C‐010 0.8 0.8 0%Jun ‐21‐22 Jun‐22‐22 71.8 Structure 1C-011Structure 1C-011 235.9 235.9 Jun ‐01‐22 Jun‐01‐23 46.9 ASY‐1C‐011 Tower Assembly 1C ‐011 0.8 0.8 0%Jun ‐06‐22 Jun‐07‐22 10.1 SPT‐1C‐011 Spoƫng 1C‐011 0.7 0.7 0%Jun ‐05‐22 Jun‐06‐22 10.3 CLR‐1C‐011 Clearing 1C‐011 0.7 0.7 0%Jun ‐01‐22 Jun‐02‐22 12.0 ACC ‐1C‐011 Access 1C‐011 0.7 0.7 0%Jun ‐02‐22 Jun‐02‐22 12.2 FDN‐1C‐011 FoundaƟons 1C‐011 0.5 0.5 0%Jun ‐02‐22 Jun‐03‐22 12.2 REC‐1C‐011 ReclamaƟon 1C‐011 0.7 0.7 0%Jan‐31‐23 Jun‐01‐23 46.9 ERC‐1C‐011 Tower Erec Ɵon 1C‐011 0.8 0.8 0%Jun ‐20‐22 Jun‐21‐22 71.8 Structure 1C-012Structure 1C-012 237.3 237.3 Jun ‐01‐22 Jun‐02‐23 46.9 CLR‐1C‐012 Clearing 1C‐012 0.7 0.7 0%Jun ‐01‐22 Jun‐01‐22 10.1 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Spoƫng 1C‐006 Clearing 1C‐006 Access 1C‐006 FoundaƟons 1C‐006 ReclamaƟon 1C‐006 Tower Erec Ɵon 1C‐006 Jan‐29‐23, Structure 1C‐007 Tower Assembly 1C ‐007 Spoƫng 1C‐007 Clearing 1C‐007 Access 1C‐007 FoundaƟons 1C‐007 ReclamaƟon 1C‐007 Tower Erec Ɵon 1C‐007 Jan‐30‐23, Structure 1C‐008 Tower Assembly 1C‐008 Spoƫng 1C‐008 Clearing 1C‐008 Access 1C‐008 FoundaƟons 1C‐008 ReclamaƟon 1C‐008 Tower Erec Ɵon 1C‐008 Jan‐31‐23, Structure 1C‐009 Tower Assembly 1C‐009 Spoƫng 1C‐009 Clearing 1C‐009 Access 1C‐009 FoundaƟons 1C‐009 ReclamaƟon 1C‐009 Tower Erec Ɵon 1C‐009 Jan‐31‐23, Structure 1C‐010 Tower Assembly 1C‐010 Spoƫng 1C‐010 Clearing 1C‐010 Access 1C‐010 FoundaƟons 1C‐010 ReclamaƟon 1C‐010 Tower Erec Ɵon 1C‐010 Jun‐01‐23, Structure 1C‐011 Tower Assembly 1C‐011 Spoƫng 1C‐011 Clearing 1C‐011 Access 1C‐011 FoundaƟons 1C‐011 ReclamaƟon 1C‐011 Tower Erec Ɵon 1C‐011 Jun‐02‐23, Structure 1C‐012 Clearing 1C‐012 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 65 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ACC ‐1C‐012 Access 1C‐012 0.7 0.7 0%Jun ‐01‐22 Jun‐02‐22 10.1 ASY‐1C‐012 Tower Assembly 1C ‐012 0.8 0.8 0%Jun ‐05‐22 Jun‐06‐22 10.1 FDN‐1C‐012 FoundaƟons 1C‐012 0.5 0.5 0%Jun ‐02‐22 Jun‐02‐22 10.1 SPT‐1C‐012 Spoƫng 1C‐012 2.6 2.6 0%Jun ‐02‐22 Jun‐05‐22 10.1 REC‐1C‐012 ReclamaƟon 1C‐012 0.7 0.7 0%Jun ‐01‐23 Jun‐02‐23 46.9 ERC‐1C‐012 Tower Erec Ɵon 1C‐012 0.8 0.8 0%Jun ‐20‐22 Jun‐20‐22 71.8 Structure 1C-013Structure 1C-013 173.2 173.2 Oct ‐07‐22 Aug‐04‐23 33.2 ASY‐1C‐013 Tower Assembly 1C ‐013 0.9 0.9 0%Aug‐01‐23 Aug‐02‐23 0.0 ERC‐1C‐013 Tower Erec Ɵon 1C‐013 0.9 0.9 0%Aug‐02‐23 Aug‐03‐23 0.0 CLR‐1C‐013 Clearing 1C‐013 0.8 0.8 0%Oct ‐07‐22 Oct ‐07‐22 17.6 SPT‐1C‐013 Spoƫng 1C‐013 0.8 0.8 0%Oct ‐27‐22 Oct ‐28‐22 31.2 REC‐1C‐013 ReclamaƟon 1C‐013 0.9 0.9 0%Aug‐03‐23 Aug‐04‐23 33.2 ACC ‐1C‐013 Access 1C‐013 0.8 0.8 0%Oct ‐07‐22 Oct ‐08‐22 49.4 FDN‐1C‐013 FoundaƟons 1C‐013 0.5 0.5 0%Oct ‐08‐22 Oct ‐09‐22 49.4 Structure 1C-014Structure 1C-014 174.9 174.9 Oct ‐06‐22 Aug‐05‐23 33.2 ERC‐1C‐014 Tower Erec Ɵon 1C‐014 0.9 0.9 0%Aug‐03‐23 Aug‐04‐23 0.0 ASY‐1C‐014 Tower Assembly 1C ‐014 0.9 0.9 0%Aug‐02‐23 Aug‐03‐23 0.0 CLR‐1C‐014 Clearing 1C‐014 0.8 0.8 0%Oct ‐06‐22 Oct ‐07‐22 17.6 SPT‐1C‐014 Spoƫng 1C‐014 0.8 0.8 0%Oct ‐26‐22 Oct ‐27‐22 31.2 REC‐1C‐014 ReclamaƟon 1C‐014 0.9 0.9 0%Aug‐04‐23 Aug‐05‐23 33.2 FDN‐1C‐014 FoundaƟons 1C‐014 0.5 0.5 0%Oct ‐08‐22 Oct ‐08‐22 49.4 ACC ‐1C‐014 Access 1C‐014 0.8 0.8 0%Oct ‐07‐22 Oct ‐07‐22 49.4 Structure 1C-015Structure 1C-015 214.9 214.9 Oct ‐05‐22 Sep‐14‐23 4.3 ERC‐1C‐015 Tower Erec Ɵon 1C‐015 0.9 0.9 0%Aug‐04‐23 Aug‐05‐23 0.0 ASY‐1C‐015 Tower Assembly 1C ‐015 0.9 0.9 0%Aug‐03‐23 Aug‐04‐23 0.0 REC‐1C‐015 ReclamaƟon 1C‐015 0.8 0.8 0%Sep‐13‐23 Sep‐14‐23 4.3 CLR‐1C‐015 Clearing 1C‐015 0.8 0.8 0%Oct ‐05‐22 Oct ‐06‐22 17.6 SPT‐1C‐015 Spoƫng 1C‐015 0.8 0.8 0%Oct ‐25‐22 Oct ‐26‐22 31.2 FDN‐1C‐015 FoundaƟons 1C‐015 0.5 0.5 0%Oct ‐07‐22 Oct ‐08‐22 49.1 ACC ‐1C‐015 Access 1C‐015 0.8 0.8 0%Oct ‐06‐22 Oct ‐07‐22 49.4 Structure 1C-016Structure 1C-016 216.5 216.5 Oct ‐04‐22 Sep‐15‐23 4.3 ERC‐1C‐016 Tower Erec Ɵon 1C‐016 0.9 0.9 0%Aug‐05‐23 Aug‐06‐23 0.0 ASY‐1C‐016 Tower Assembly 1C ‐016 0.9 0.9 0%Aug‐04‐23 Aug‐05‐23 0.0 REC‐1C‐016 ReclamaƟon 1C‐016 0.8 0.8 0%Sep‐14‐23 Sep‐15‐23 4.3 CLR‐1C‐016 Clearing 1C‐016 0.8 0.8 0%Oct ‐04‐22 Oct ‐05‐22 17.6 SPT‐1C‐016 Spoƫng 1C‐016 0.8 0.8 0%Oct ‐25‐22 Oct ‐25‐22 31.2 FDN‐1C‐016 FoundaƟons 1C‐016 0.5 0.5 0%Oct ‐07‐22 Oct ‐07‐22 48.8 ACC ‐1C‐016 Access 1C‐016 0.8 0.8 0%Oct ‐05‐22 Oct ‐06‐22 49.4 Structure 1C-017Structure 1C-017 218.1 218.1 Oct ‐03‐22 Sep‐16‐23 4.3 ERC‐1C‐017 Tower Erec Ɵon 1C‐017 0.9 0.9 0%Aug‐06‐23 Aug‐06‐23 0.0 ASY‐1C‐017 Tower Assembly 1C ‐017 0.9 0.9 0%Aug‐05‐23 Aug‐06‐23 0.0 REC‐1C‐017 ReclamaƟon 1C‐017 0.8 0.8 0%Sep‐15‐23 Sep‐16‐23 4.3 CLR‐1C‐017 Clearing 1C‐017 0.8 0.8 0%Oct ‐03‐22 Oct ‐04‐22 17.6 SPT‐1C‐017 Spoƫng 1C‐017 0.8 0.8 0%Oct ‐24‐22 Oct ‐25‐22 31.2 FDN‐1C‐017 FoundaƟons 1C‐017 0.5 0.5 0%Oct ‐06‐22 Oct ‐07‐22 48.4 ACC ‐1C‐017 Access 1C‐017 0.8 0.8 0%Oct ‐04‐22 Oct ‐05‐22 49.4 Structure 1C-018Structure 1C-018 219.7 219.7 Oct ‐03‐22 Sep‐16‐23 4.3 ERC‐1C‐018 Tower Erec Ɵon 1C‐018 0.9 0.9 0%Aug‐06‐23 Aug‐07‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Access 1C‐012 Tower Assembly 1C ‐012 FoundaƟons 1C‐012 Spoƫng 1C‐012 ReclamaƟon 1C‐012 Tower Erec Ɵon 1C‐012 Aug‐04‐23, Structure 1C‐013 Tower Assembly 1C‐013 Tower Erec Ɵon 1C‐013 Clearing 1C‐013 Spoƫng 1C‐013 ReclamaƟon 1C‐013 Access 1C‐013 FoundaƟons 1C‐013 Aug‐05‐23, Structure 1C‐014 Tower Erec Ɵon 1C‐014 Tower Assembly 1C‐014 Clearing 1C‐014 Spoƫng 1C‐014 ReclamaƟon 1C‐014 FoundaƟons 1C‐014 Access 1C‐014 Sep‐14‐23, Structure 1C‐015 Tower Erec Ɵon 1C‐015 Tower Assembly 1C‐015 ReclamaƟon 1C‐015 Clearing 1C‐015 Spoƫng 1C‐015 FoundaƟons 1C‐015 Access 1C‐015 Sep‐15‐23, Structure 1C‐016 Tower Erec Ɵon 1C‐016 Tower Assembly 1C ‐016 ReclamaƟon 1C‐016 Clearing 1C‐016 Spoƫng 1C‐016 FoundaƟons 1C‐016 Access 1C‐016 Sep‐16‐23, Structure 1C‐017 Tower Erec Ɵon 1C‐017 Tower Assembly 1C ‐017 ReclamaƟon 1C‐017 Clearing 1C‐017 Spoƫng 1C‐017 FoundaƟons 1C‐017 Access 1C‐017 Sep‐16‐23, Structure 1C‐018 Tower Erec Ɵon 1C‐018 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 66 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1C‐018 Tower Assembly 1C ‐018 0.9 0.9 0%Aug‐06‐23 Aug‐06‐23 0.0 REC‐1C‐018 ReclamaƟon 1C‐018 0.8 0.8 0%Sep‐16‐23 Sep‐16‐23 4.3 CLR‐1C‐018 Clearing 1C‐018 0.8 0.8 0%Oct ‐03‐22 Oct ‐03‐22 17.6 SPT‐1C‐018 Spoƫng 1C‐018 0.8 0.8 0%Oct ‐23‐22 Oct ‐24‐22 31.2 FDN‐1C‐018 FoundaƟons 1C‐018 0.5 0.5 0%Oct ‐06‐22 Oct ‐06‐22 48.1 ACC ‐1C‐018 Access 1C‐018 0.8 0.8 0%Oct ‐03‐22 Oct ‐04‐22 49.4 Structure 1C-019Structure 1C-019 221.3 221.3 Oct ‐02‐22 Sep‐17‐23 4.3 ERC‐1C‐019 Tower Erec Ɵon 1C‐019 0.9 0.9 0%Aug‐07‐23 Aug‐08‐23 0.0 ASY‐1C‐019 Tower Assembly 1C ‐019 0.9 0.9 0%Aug‐06‐23 Aug‐07‐23 0.0 REC‐1C‐019 ReclamaƟon 1C‐019 0.8 0.8 0%Sep‐16‐23 Sep‐17‐23 4.3 CLR‐1C‐019 Clearing 1C‐019 0.8 0.8 0%Oct ‐02‐22 Oct ‐03‐22 17.6 SPT‐1C‐019 Spoƫng 1C‐019 0.8 0.8 0%Oct ‐22‐22 Oct ‐23‐22 31.2 FDN‐1C‐019 FoundaƟons 1C‐019 0.5 0.5 0%Oct ‐05‐22 Oct ‐06‐22 47.8 ACC ‐1C‐019 Access 1C‐019 0.8 0.8 0%Oct ‐03‐22 Oct ‐03‐22 49.4 Structure 1C-020Structure 1C-020 222.9 222.9 Oct ‐01‐22 Sep‐18‐23 4.3 ERC‐1C‐020 Tower Erec Ɵon 1C‐020 0.9 0.9 0%Aug‐08‐23 Aug‐09‐23 0.0 ASY‐1C‐020 Tower Assembly 1C ‐020 0.9 0.9 0%Aug‐07‐23 Aug‐08‐23 0.0 REC‐1C‐020 ReclamaƟon 1C‐020 0.8 0.8 0%Sep‐17‐23 Sep‐18‐23 4.3 CLR‐1C‐020 Clearing 1C‐020 0.8 0.8 0%Oct ‐01‐22 Oct ‐02‐22 17.6 SPT‐1C‐020 Spoƫng 1C‐020 0.8 0.8 0%Oct ‐21‐22 Oct ‐22‐22 31.2 FDN‐1C‐020 FoundaƟons 1C‐020 0.5 0.5 0%Oct ‐05‐22 Oct ‐05‐22 47.5 ACC ‐1C‐020 Access 1C‐020 0.8 0.8 0%Oct ‐02‐22 Oct ‐03‐22 49.4 Structure 1C-020.1Structure 1C-020.1 224.3 224.3 Sep‐30‐22 Sep‐19‐23 4.3 ERC‐1C‐020.1 Tower Erec Ɵon 1C‐020.1 0.9 0.9 0%Aug‐09‐23 Aug‐10‐23 0.0 ASY‐1C‐020.1 Tower Assembly 1C ‐020.1 0.9 0.9 0%Aug‐08‐23 Aug‐09‐23 0.0 REC‐1C‐020.1 ReclamaƟon 1C‐020.1 0.8 0.8 0%Sep‐18‐23 Sep‐19‐23 4.3 CLR‐1C‐020.1 Clearing 1C‐020.1 0.7 0.7 0%Sep‐30‐22 Oct ‐01‐22 17.6 SPT‐1C‐020.1 Spoƫng 1C‐020.1 0.7 0.7 0%Oct ‐21‐22 Oct ‐21‐22 31.2 ACC ‐1C‐020.1 Access 1C‐020.1 0.7 0.7 0%Oct ‐01‐22 Oct ‐02‐22 49.7 FDN‐1C‐020.1 FoundaƟons 1C‐020.1 0.5 0.5 0%Oct ‐02‐22 Oct ‐02‐22 49.7 Structure 1C-021Structure 1C-021 225.9 225.9 Sep‐30‐22 Sep‐19‐23 4.3 ERC‐1C‐021 Tower Erec Ɵon 1C‐021 0.9 0.9 0%Aug‐10‐23 Aug‐11‐23 0.0 ASY‐1C‐021 Tower Assembly 1C ‐021 0.9 0.9 0%Aug‐09‐23 Aug‐10‐23 0.0 REC‐1C‐021 ReclamaƟon 1C‐021 0.8 0.8 0%Sep‐19‐23 Sep‐19‐23 4.3 CLR‐1C‐021 Clearing 1C‐021 0.8 0.8 0%Sep‐30‐22 Sep‐30‐22 17.6 SPT‐1C‐021 Spoƫng 1C‐021 0.8 0.8 0%Oct ‐20‐22 Oct ‐21‐22 31.2 FDN‐1C‐021 FoundaƟons 1C‐021 0.5 0.5 0%Oct ‐04‐22 Oct ‐05‐22 46.6 ACC ‐1C‐021 Access 1C‐021 0.8 0.8 0%Sep‐30‐22 Oct ‐01‐22 49.4 Structure 1C-022Structure 1C-022 227.5 227.5 Sep‐29‐22 Sep‐20‐23 4.3 ERC‐1C‐022 Tower Erec Ɵon 1C‐022 0.9 0.9 0%Aug‐11‐23 Aug‐12‐23 0.0 ASY‐1C‐022 Tower Assembly 1C ‐022 0.9 0.9 0%Aug‐10‐23 Aug‐11‐23 0.0 REC‐1C‐022 ReclamaƟon 1C‐022 0.8 0.8 0%Sep‐19‐23 Sep‐20‐23 4.3 CLR‐1C‐022 Clearing 1C‐022 0.8 0.8 0%Sep‐29‐22 Sep‐30‐22 17.6 SPT‐1C‐022 Spoƫng 1C‐022 0.8 0.8 0%Oct ‐19‐22 Oct ‐20‐22 31.2 FDN‐1C‐022 FoundaƟons 1C‐022 0.5 0.5 0%Oct ‐04‐22 Oct ‐04‐22 46.2 ACC ‐1C‐022 Access 1C‐022 0.8 0.8 0%Sep‐30‐22 Sep‐30‐22 49.4 Structure 1C-023Structure 1C-023 229.1 229.1 Sep‐28‐22 Sep‐21‐23 4.3 ERC‐1C‐023 Tower Erec Ɵon 1C‐023 0.9 0.9 0%Aug‐12‐23 Aug‐13‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1C ‐018 ReclamaƟon 1C‐018 Clearing 1C‐018 Spoƫng 1C‐018 FoundaƟons 1C‐018 Access 1C‐018 Sep‐17‐23, Structure 1C‐019 Tower Erec Ɵon 1C‐019 Tower Assembly 1C ‐019 ReclamaƟon 1C‐019 Clearing 1C‐019 Spoƫng 1C‐019 FoundaƟons 1C‐019 Access 1C‐019 Sep‐18‐23, Structure 1C‐020 Tower Erec Ɵon 1C‐020 Tower Assembly 1C ‐020 ReclamaƟon 1C‐020 Clearing 1C‐020 Spoƫng 1C‐020 FoundaƟons 1C‐020 Access 1C‐020 Sep‐19‐23, Structure 1C‐020.1 Tower Erec Ɵon 1C‐020.1 Tower Assembly 1C ‐020.1 ReclamaƟon 1C‐020.1 Clearing 1C‐020.1 Spoƫng 1C‐020.1 Access 1C‐020.1 FoundaƟons 1C‐020.1 Sep‐19‐23, Structure 1C‐021 Tower Erec Ɵon 1C‐021 Tower Assembly 1C ‐021 ReclamaƟon 1C‐021 Clearing 1C‐021 Spoƫng 1C‐021 FoundaƟons 1C‐021 Access 1C‐021 Sep‐20‐23, Structure 1C‐022 Tower Erec Ɵon 1C‐022 Tower Assembly 1C ‐022 ReclamaƟon 1C‐022 Clearing 1C‐022 Spoƫng 1C‐022 FoundaƟons 1C‐022 Access 1C ‐022 Sep‐21‐23, Structure 1C‐023 Tower Erec Ɵon 1C‐023 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 67 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1C‐023 Tower Assembly 1C ‐023 0.9 0.9 0%Aug‐11‐23 Aug‐12‐23 0.0 REC‐1C‐023 ReclamaƟon 1C‐023 0.8 0.8 0%Sep‐20‐23 Sep‐21‐23 4.3 CLR‐1C‐023 Clearing 1C‐023 0.8 0.8 0%Sep‐28‐22 Sep‐29‐22 17.6 SPT‐1C‐023 Spoƫng 1C‐023 0.8 0.8 0%Oct ‐18‐22 Oct ‐19‐22 31.2 FDN‐1C‐023 FoundaƟons 1C‐023 0.5 0.5 0%Oct ‐03‐22 Oct ‐04‐22 45.9 ACC ‐1C‐023 Access 1C‐023 0.8 0.8 0%Sep‐29‐22 Sep‐30‐22 49.4 Structure 1C-024Structure 1C-024 230.7 230.7 Sep‐27‐22 Sep‐22‐23 4.3 ERC‐1C‐024 Tower Erec Ɵon 1C‐024 0.9 0.9 0%Aug‐13‐23 Aug‐13‐23 0.0 ASY‐1C‐024 Tower Assembly 1C ‐024 0.9 0.9 0%Aug‐12‐23 Aug‐13‐23 0.0 REC‐1C‐024 ReclamaƟon 1C‐024 0.8 0.8 0%Sep‐21‐23 Sep‐22‐23 4.3 CLR‐1C‐024 Clearing 1C‐024 0.8 0.8 0%Sep‐27‐22 Sep‐28‐22 17.6 SPT‐1C‐024 Spoƫng 1C‐024 0.8 0.8 0%Oct ‐17‐22 Oct ‐18‐22 31.2 FDN‐1C‐024 FoundaƟons 1C‐024 0.5 0.5 0%Oct ‐03‐22 Oct ‐03‐22 45.6 ACC ‐1C‐024 Access 1C‐024 0.8 0.8 0%Sep‐28‐22 Sep‐29‐22 49.4 Structure 1C-025Structure 1C-025 232.3 232.3 Sep‐26‐22 Sep‐23‐23 4.3 ERC‐1C‐025 Tower Erec Ɵon 1C‐025 0.9 0.9 0%Aug‐13‐23 Aug‐14‐23 0.0 ASY‐1C‐025 Tower Assembly 1C ‐025 0.9 0.9 0%Aug‐13‐23 Aug‐13‐23 0.0 REC‐1C‐025 ReclamaƟon 1C‐025 0.8 0.8 0%Sep‐22‐23 Sep‐23‐23 4.3 CLR‐1C‐025 Clearing 1C‐025 0.8 0.8 0%Sep‐26‐22 Sep‐27‐22 17.6 SPT‐1C‐025 Spoƫng 1C‐025 0.8 0.8 0%Oct ‐17‐22 Oct ‐17‐22 31.2 FDN‐1C‐025 FoundaƟons 1C‐025 0.5 0.5 0%Oct ‐02‐22 Oct ‐03‐22 45.3 ACC ‐1C‐025 Access 1C‐025 0.8 0.8 0%Sep‐27‐22 Sep‐28‐22 49.4 Structure 1C-026Structure 1C-026 233.8 233.8 Sep‐25‐22 Sep‐23‐23 4.3 ERC‐1C‐026 Tower Erec Ɵon 1C‐026 0.9 0.9 0%Aug‐14‐23 Aug‐15‐23 0.0 ASY‐1C‐026 Tower Assembly 1C ‐026 0.9 0.9 0%Aug‐13‐23 Aug‐14‐23 0.1 REC‐1C‐026 ReclamaƟon 1C‐026 0.8 0.8 0%Sep‐23‐23 Sep‐23‐23 4.3 CLR‐1C‐026 Clearing 1C‐026 0.8 0.8 0%Sep‐25‐22 Sep‐26‐22 17.6 SPT‐1C‐026 Spoƫng 1C‐026 0.8 0.8 0%Oct ‐16‐22 Oct ‐17‐22 31.2 FDN‐1C‐026 FoundaƟons 1C‐026 0.5 0.5 0%Oct ‐02‐22 Oct ‐02‐22 45.0 ACC ‐1C‐026 Access 1C‐026 0.8 0.8 0%Sep‐26‐22 Sep‐27‐22 49.4 Structure 1C-027Structure 1C-027 239.8 239.8 Sep‐25‐22 Sep‐28‐23 0.0 ERC‐1C‐027 Tower Erec Ɵon 1C‐027 0.9 0.9 0%Aug‐15‐23 Aug‐16‐23 0.0 REC‐1C‐027 ReclamaƟon 1C‐027 0.8 0.8 0%Sep‐28‐23 Sep‐28‐23 0.0 ASY‐1C‐027 Tower Assembly 1C ‐027 0.9 0.9 0%Aug‐14‐23 Aug‐15‐23 0.1 CLR‐1C‐027 Clearing 1C‐027 0.8 0.8 0%Sep‐25‐22 Sep‐25‐22 17.6 SPT‐1C‐027 Spoƫng 1C‐027 0.8 0.8 0%Oct ‐15‐22 Oct ‐16‐22 31.2 FDN‐1C‐027 FoundaƟons 1C‐027 0.5 0.5 0%Oct ‐01‐22 Oct ‐02‐22 44.7 ACC ‐1C‐027 Access 1C‐027 0.8 0.8 0%Sep‐25‐22 Sep‐26‐22 49.4 Structure 1C-028Structure 1C-028 241.4 241.4 Sep‐24‐22 Sep‐29‐23 0.0 ERC‐1C‐028 Tower Erec Ɵon 1C‐028 0.9 0.9 0%Aug‐16‐23 Aug‐17‐23 0.0 REC‐1C‐028 ReclamaƟon 1C‐028 0.8 0.8 0%Sep‐28‐23 Sep‐29‐23 0.0 ASY‐1C‐028 Tower Assembly 1C ‐028 0.9 0.9 0%Aug‐15‐23 Aug‐16‐23 0.1 CLR‐1C‐028 Clearing 1C‐028 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 17.6 SPT‐1C‐028 Spoƫng 1C‐028 0.8 0.8 0%Oct ‐14‐22 Oct ‐15‐22 31.2 FDN‐1C‐028 FoundaƟons 1C‐028 0.5 0.5 0%Oct ‐01‐22 Oct ‐01‐22 44.4 ACC ‐1C‐028 Access 1C‐028 0.8 0.8 0%Sep‐25‐22 Sep‐25‐22 49.4 Structure 1C-029Structure 1C-029 242.9 242.9 Sep‐23‐22 Sep‐30‐23 0.0 ERC‐1C‐029 Tower Erec Ɵon 1C‐029 0.9 0.9 0%Aug‐17‐23 Aug‐18‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1C‐023 ReclamaƟon 1C‐023 Clearing 1C‐023 Spoƫng 1C‐023 FoundaƟons 1C‐023 Access 1C ‐023 Sep‐22‐23, Structure 1C‐024 Tower Erec Ɵon 1C‐024 Tower Assembly 1C‐024 ReclamaƟon 1C‐024 Clearing 1C‐024 Spoƫng 1C‐024 FoundaƟons 1C‐024 Access 1C ‐024 Sep‐23‐23, Structure 1C‐025 Tower Erec Ɵon 1C‐025 Tower Assembly 1C‐025 ReclamaƟon 1C‐025 Clearing 1C‐025 Spoƫng 1C‐025 FoundaƟons 1C‐025 Access 1C ‐025 Sep‐23‐23, Structure 1C‐026 Tower Erec Ɵon 1C‐026 Tower Assembly 1C‐026 ReclamaƟon 1C‐026 Clearing 1C‐026 Spoƫng 1C‐026 FoundaƟons 1C‐026 Access 1C ‐026 Sep‐28‐23, Structure 1C‐027 Tower Erec Ɵon 1C‐027 ReclamaƟon 1C‐027 Tower Assembly 1C‐027 Clearing 1C‐027 Spoƫng 1C‐027 FoundaƟons 1C‐027 Access 1C‐027 Sep‐29‐23, Structure 1C‐028 Tower Erec Ɵon 1C‐028 ReclamaƟon 1C‐028 Tower Assembly 1C ‐028 Clearing 1C‐028 Spoƫng 1C‐028 FoundaƟons 1C‐028 Access 1C‐028 Sep‐30‐23, Structure 1C‐029 Tower Erec Ɵon 1C‐029 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 68 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐029 ReclamaƟon 1C‐029 0.8 0.8 0%Sep‐29‐23 Sep‐30‐23 0.0 ASY‐1C‐029 Tower Assembly 1C ‐029 0.9 0.9 0%Aug‐16‐23 Aug‐17‐23 0.1 CLR‐1C‐029 Clearing 1C‐029 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 17.6 SPT‐1C‐029 Spoƫng 1C‐029 0.8 0.8 0%Oct ‐13‐22 Oct ‐14‐22 31.2 FDN‐1C‐029 FoundaƟons 1C‐029 0.5 0.5 0%Sep‐30‐22 Oct ‐01‐22 44.1 ACC ‐1C‐029 Access 1C‐029 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 49.4 Structure 1C-030Structure 1C-030 244.5 244.5 Sep‐22‐22 Oct ‐01‐23 0.0 ERC‐1C‐030 Tower Erec Ɵon 1C‐030 0.9 0.9 0%Aug‐18‐23 Aug‐19‐23 0.0 REC‐1C‐030 ReclamaƟon 1C‐030 0.8 0.8 0%Sep‐30‐23 Oct ‐01‐23 0.0 ASY‐1C‐030 Tower Assembly 1C ‐030 0.9 0.9 0%Aug‐17‐23 Aug‐18‐23 0.1 CLR‐1C‐030 Clearing 1C‐030 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 17.6 SPT‐1C‐030 Spoƫng 1C‐030 0.8 0.8 0%Oct ‐13‐22 Oct ‐13‐22 31.2 FDN‐1C‐030 FoundaƟons 1C‐030 0.5 0.5 0%Sep‐30‐22 Sep‐30‐22 43.8 ACC ‐1C‐030 Access 1C‐030 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 49.4 Structure 1C-031Structure 1C-031 246.1 246.1 Sep‐21‐22 Oct ‐02‐23 0.0 ERC‐1C‐031 Tower Erec Ɵon 1C‐031 0.9 0.9 0%Aug‐19‐23 Aug‐20‐23 0.0 REC‐1C‐031 ReclamaƟon 1C‐031 0.8 0.8 0%Oct ‐01‐23 Oct ‐02‐23 0.0 ASY‐1C‐031 Tower Assembly 1C ‐031 0.9 0.9 0%Aug‐18‐23 Aug‐19‐23 0.1 CLR‐1C‐031 Clearing 1C‐031 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 17.6 SPT‐1C‐031 Spoƫng 1C‐031 0.8 0.8 0%Oct ‐12‐22 Oct ‐13‐22 31.2 FDN‐1C‐031 FoundaƟons 1C‐031 0.5 0.5 0%Sep‐29‐22 Sep‐30‐22 43.5 ACC ‐1C‐031 Access 1C‐031 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 49.4 Structure 1C-032Structure 1C-032 247.7 247.7 Sep‐21‐22 Oct ‐02‐23 0.0 ERC‐1C‐032 Tower Erec Ɵon 1C‐032 0.9 0.9 0%Aug‐20‐23 Aug‐20‐23 0.0 REC‐1C‐032 ReclamaƟon 1C‐032 0.8 0.8 0%Oct ‐02‐23 Oct ‐02‐23 0.0 ASY‐1C‐032 Tower Assembly 1C ‐032 0.9 0.9 0%Aug‐19‐23 Aug‐19‐23 0.1 CLR‐1C‐032 Clearing 1C‐032 0.8 0.8 0%Sep‐21‐22 Sep‐21‐22 17.6 SPT‐1C‐032 Spoƫng 1C‐032 0.8 0.8 0%Oct ‐11‐22 Oct ‐12‐22 31.2 FDN‐1C‐032 FoundaƟons 1C‐032 0.5 0.5 0%Sep‐29‐22 Sep‐29‐22 43.2 ACC ‐1C‐032 Access 1C‐032 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 49.4 Structure 1C-033Structure 1C-033 249.3 249.3 Sep‐20‐22 Oct ‐03‐23 0.0 ERC‐1C‐033 Tower Erec Ɵon 1C‐033 0.9 0.9 0%Aug‐20‐23 Aug‐21‐23 0.0 REC‐1C‐033 ReclamaƟon 1C‐033 0.8 0.8 0%Oct ‐02‐23 Oct ‐03‐23 0.0 ASY‐1C‐033 Tower Assembly 1C ‐033 0.9 0.9 0%Aug‐19‐23 Aug‐20‐23 0.1 CLR‐1C‐033 Clearing 1C‐033 0.8 0.8 0%Sep‐20‐22 Sep‐21‐22 17.6 SPT‐1C‐033 Spoƫng 1C‐033 0.8 0.8 0%Oct ‐10‐22 Oct ‐11‐22 31.2 FDN‐1C‐033 FoundaƟons 1C‐033 0.5 0.5 0%Sep‐28‐22 Sep‐29‐22 42.9 ACC ‐1C‐033 Access 1C‐033 0.8 0.8 0%Sep‐21‐22 Sep‐21‐22 49.4 Structure 1C-034Structure 1C-034 250.9 250.9 Sep‐19‐22 Oct ‐04‐23 0.0 ERC‐1C‐034 Tower Erec Ɵon 1C‐034 0.9 0.9 0%Aug‐21‐23 Aug‐22‐23 0.0 REC‐1C‐034 ReclamaƟon 1C‐034 0.8 0.8 0%Oct ‐03‐23 Oct ‐04‐23 0.0 ASY‐1C‐034 Tower Assembly 1C ‐034 0.9 0.9 0%Aug‐20‐23 Aug‐21‐23 0.1 CLR‐1C‐034 Clearing 1C‐034 0.8 0.8 0%Sep‐19‐22 Sep‐20‐22 17.6 SPT‐1C‐034 Spoƫng 1C‐034 0.8 0.8 0%Oct ‐09‐22 Oct ‐10‐22 31.2 FDN‐1C‐034 FoundaƟons 1C‐034 0.5 0.5 0%Sep‐28‐22 Sep‐28‐22 42.6 ACC ‐1C‐034 Access 1C‐034 0.8 0.8 0%Sep‐20‐22 Sep‐21‐22 49.4 Structure 1C-035Structure 1C-035 252.5 252.5 Sep‐18‐22 Oct ‐05‐23 0.0 ERC‐1C‐035 Tower Erec Ɵon 1C‐035 0.9 0.9 0%Aug‐22‐23 Aug‐23‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐029 Tower Assembly 1C ‐029 Clearing 1C‐029 Spoƫng 1C‐029 FoundaƟons 1C‐029 Access 1C‐029 Oct ‐01‐23, Structure 1C‐030 Tower Erec Ɵon 1C‐030 ReclamaƟon 1C‐030 Tower Assembly 1C ‐030 Clearing 1C‐030 Spoƫng 1C‐030 FoundaƟons 1C‐030 Access 1C‐030 Oct ‐02‐23, Structure 1C‐031 Tower Erec Ɵon 1C‐031 ReclamaƟon 1C‐031 Tower Assembly 1C ‐031 Clearing 1C‐031 Spoƫng 1C‐031 FoundaƟons 1C‐031 Access 1C‐031 Oct ‐02‐23, Structure 1C‐032 Tower Erec Ɵon 1C‐032 ReclamaƟon 1C‐032 Tower Assembly 1C ‐032 Clearing 1C‐032 Spoƫng 1C‐032 FoundaƟons 1C‐032 Access 1C‐032 Oct ‐03‐23, Structure 1C‐033 Tower Erec Ɵon 1C‐033 ReclamaƟon 1C‐033 Tower Assembly 1C ‐033 Clearing 1C‐033 Spoƫng 1C‐033 FoundaƟons 1C‐033 Access 1C‐033 Oct ‐04‐23, Structure 1C‐034 Tower Erec Ɵon 1C‐034 ReclamaƟon 1C‐034 Tower Assembly 1C ‐034 Clearing 1C‐034 Spoƫng 1C‐034 FoundaƟons 1C‐034 Access 1C‐034 Oct ‐05‐23, Structure 1C‐035 Tower Erec Ɵon 1C‐035 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 69 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐035 ReclamaƟon 1C‐035 0.8 0.8 0%Oct ‐04‐23 Oct ‐05‐23 0.0 ASY‐1C‐035 Tower Assembly 1C ‐035 0.9 0.9 0%Aug‐21‐23 Aug‐22‐23 0.1 CLR‐1C‐035 Clearing 1C‐035 0.8 0.8 0%Sep‐18‐22 Sep‐19‐22 17.6 SPT‐1C‐035 Spoƫng 1C‐035 0.8 0.8 0%Oct ‐09‐22 Oct ‐09‐22 31.2 FDN‐1C‐035 FoundaƟons 1C‐035 0.5 0.5 0%Sep‐27‐22 Sep‐28‐22 42.3 ACC ‐1C‐035 Access 1C‐035 0.8 0.8 0%Sep‐19‐22 Sep‐20‐22 49.4 Structure 1C-036Structure 1C-036 254.1 254.1 Sep‐17‐22 Oct ‐05‐23 0.0 ERC‐1C‐036 Tower Erec Ɵon 1C‐036 0.9 0.9 0%Aug‐23‐23 Aug‐24‐23 0.0 REC‐1C‐036 ReclamaƟon 1C‐036 0.8 0.8 0%Oct ‐05‐23 Oct ‐05‐23 0.0 ASY‐1C‐036 Tower Assembly 1C ‐036 0.9 0.9 0%Aug‐22‐23 Aug‐23‐23 0.1 CLR‐1C‐036 Clearing 1C‐036 0.8 0.8 0%Sep‐17‐22 Sep‐18‐22 17.6 SPT‐1C‐036 Spoƫng 1C‐036 0.8 0.8 0%Oct ‐08‐22 Oct ‐09‐22 31.2 FDN‐1C‐036 FoundaƟons 1C‐036 0.5 0.5 0%Sep‐27‐22 Sep‐27‐22 42.0 ACC ‐1C‐036 Access 1C‐036 0.8 0.8 0%Sep‐18‐22 Sep‐19‐22 49.4 Structure 1C-037Structure 1C-037 255.6 255.6 Sep‐17‐22 Oct ‐06‐23 0.0 ERC‐1C‐037 Tower Erec Ɵon 1C‐037 0.9 0.9 0%Aug‐24‐23 Aug‐25‐23 0.0 REC‐1C‐037 ReclamaƟon 1C‐037 0.8 0.8 0%Oct ‐05‐23 Oct ‐06‐23 0.0 ASY‐1C‐037 Tower Assembly 1C ‐037 0.9 0.9 0%Aug‐23‐23 Aug‐24‐23 0.1 CLR‐1C‐037 Clearing 1C‐037 0.8 0.8 0%Sep‐17‐22 Sep‐17‐22 17.6 SPT‐1C‐037 Spoƫng 1C‐037 0.8 0.8 0%Oct ‐07‐22 Oct ‐08‐22 31.2 FDN‐1C‐037 FoundaƟons 1C‐037 0.5 0.5 0%Sep‐26‐22 Sep‐27‐22 41.6 ACC ‐1C‐037 Access 1C‐037 0.8 0.8 0%Sep‐17‐22 Sep‐18‐22 49.4 Structure 1C-038Structure 1C-038 257.2 257.2 Sep‐16‐22 Oct ‐07‐23 0.0 ERC‐1C‐038 Tower Erec Ɵon 1C‐038 0.9 0.9 0%Aug‐25‐23 Aug‐26‐23 0.0 REC‐1C‐038 ReclamaƟon 1C‐038 0.8 0.8 0%Oct ‐06‐23 Oct ‐07‐23 0.0 ASY‐1C‐038 Tower Assembly 1C ‐038 0.9 0.9 0%Aug‐24‐23 Aug‐25‐23 0.1 CLR‐1C‐038 Clearing 1C‐038 0.8 0.8 0%Sep‐16‐22 Sep‐17‐22 17.6 SPT‐1C‐038 Spoƫng 1C‐038 0.8 0.8 0%Oct ‐06‐22 Oct ‐07‐22 31.2 FDN‐1C‐038 FoundaƟons 1C‐038 0.5 0.5 0%Sep‐26‐22 Sep‐26‐22 41.3 ACC ‐1C‐038 Access 1C‐038 0.8 0.8 0%Sep‐17‐22 Sep‐17‐22 49.4 Structure 1C-039Structure 1C-039 258.8 258.8 Sep‐15‐22 Oct ‐08‐23 0.0 ERC‐1C‐039 Tower Erec Ɵon 1C‐039 0.9 0.9 0%Aug‐26‐23 Aug‐26‐23 0.0 REC‐1C‐039 ReclamaƟon 1C‐039 0.8 0.8 0%Oct ‐07‐23 Oct ‐08‐23 0.0 ASY‐1C‐039 Tower Assembly 1C ‐039 0.9 0.9 0%Aug‐25‐23 Aug‐26‐23 0.1 CLR‐1C‐039 Clearing 1C‐039 0.8 0.8 0%Sep‐15‐22 Sep‐16‐22 17.6 SPT‐1C‐039 Spoƫng 1C‐039 0.8 0.8 0%Oct ‐05‐22 Oct ‐06‐22 31.2 FDN‐1C‐039 FoundaƟons 1C‐039 0.5 0.5 0%Sep‐25‐22 Sep‐26‐22 41.0 ACC ‐1C‐039 Access 1C‐039 0.8 0.8 0%Sep‐16‐22 Sep‐17‐22 49.4 Structure 1C-040Structure 1C-040 260.4 260.4 Sep‐14‐22 Oct ‐09‐23 0.0 ERC‐1C‐040 Tower Erec Ɵon 1C‐040 0.9 0.9 0%Aug‐26‐23 Aug‐27‐23 0.0 REC‐1C‐040 ReclamaƟon 1C‐040 0.8 0.8 0%Oct ‐08‐23 Oct ‐09‐23 0.0 ASY‐1C‐040 Tower Assembly 1C ‐040 0.9 0.9 0%Aug‐26‐23 Aug‐26‐23 0.1 CLR‐1C‐040 Clearing 1C‐040 0.8 0.8 0%Sep‐14‐22 Sep‐15‐22 17.6 SPT‐1C‐040 Spoƫng 1C‐040 0.8 0.8 0%Oct ‐05‐22 Oct ‐05‐22 31.2 FDN‐1C‐040 FoundaƟons 1C‐040 0.5 0.5 0%Sep‐25‐22 Sep‐25‐22 40.7 ACC ‐1C‐040 Access 1C‐040 0.8 0.8 0%Sep‐15‐22 Sep‐16‐22 49.4 Structure 1C-041Structure 1C-041 262.0 262.0 Sep‐13‐22 Oct ‐09‐23 0.0 ERC‐1C‐041 Tower Erec Ɵon 1C‐041 0.9 0.9 0%Aug‐27‐23 Aug‐28‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐035 Tower Assembly 1C ‐035 Clearing 1C‐035 Spoƫng 1C‐035 FoundaƟons 1C‐035 Access 1C‐035 Oct ‐05‐23, Structure 1C‐036 Tower Erec Ɵon 1C‐036 ReclamaƟon 1C‐036 Tower Assembly 1C‐036 Clearing 1C‐036 Spoƫng 1C‐036 FoundaƟons 1C‐036 Access 1C ‐036 Oct ‐06‐23, Structure 1C‐037 Tower Erec Ɵon 1C‐037 ReclamaƟon 1C‐037 Tower Assembly 1C‐037 Clearing 1C‐037 Spoƫng 1C‐037 FoundaƟons 1C‐037 Access 1C ‐037 Oct ‐07‐23, Structure 1C‐038 Tower Erec Ɵon 1C‐038 ReclamaƟon 1C‐038 Tower Assembly 1C‐038 Clearing 1C‐038 Spoƫng 1C‐038 FoundaƟons 1C‐038 Access 1C ‐038 Oct ‐08‐23, Structure 1C‐039 Tower Erec Ɵon 1C‐039 ReclamaƟon 1C‐039 Tower Assembly 1C‐039 Clearing 1C‐039 Spoƫng 1C‐039 FoundaƟons 1C‐039 Access 1C ‐039 Oct ‐09‐23, Structure 1C‐040 Tower Erec Ɵon 1C‐040 ReclamaƟon 1C‐040 Tower Assembly 1C‐040 Clearing 1C‐040 Spoƫng 1C‐040 FoundaƟons 1C‐040 Access 1C ‐040 Oct ‐09‐23, Structure 1C‐041 Tower Erec Ɵon 1C‐041 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 70 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐041 ReclamaƟon 1C‐041 0.8 0.8 0%Oct ‐09‐23 Oct ‐09‐23 0.0 ASY‐1C‐041 Tower Assembly 1C ‐041 0.9 0.9 0%Aug‐26‐23 Aug‐27‐23 0.1 CLR‐1C‐041 Clearing 1C‐041 0.8 0.8 0%Sep‐13‐22 Sep‐14‐22 17.6 SPT‐1C‐041 Spoƫng 1C‐041 0.8 0.8 0%Oct ‐04‐22 Oct ‐05‐22 31.2 FDN‐1C‐041 FoundaƟons 1C‐041 0.5 0.5 0%Sep‐24‐22 Sep‐25‐22 40.4 ACC ‐1C‐041 Access 1C‐041 0.8 0.8 0%Sep‐14‐22 Sep‐15‐22 49.4 Structure 1C-042Structure 1C-042 263.6 263.6 Sep‐13‐22 Oct ‐10‐23 0.0 ERC‐1C‐042 Tower Erec Ɵon 1C‐042 0.9 0.9 0%Aug‐28‐23 Aug‐29‐23 0.0 REC‐1C‐042 ReclamaƟon 1C‐042 0.8 0.8 0%Oct ‐09‐23 Oct ‐10‐23 0.0 ASY‐1C‐042 Tower Assembly 1C ‐042 0.9 0.9 0%Aug‐27‐23 Aug‐28‐23 0.1 CLR‐1C‐042 Clearing 1C‐042 0.8 0.8 0%Sep‐13‐22 Sep‐13‐22 17.6 SPT‐1C‐042 Spoƫng 1C‐042 0.8 0.8 0%Oct ‐03‐22 Oct ‐04‐22 31.2 FDN‐1C‐042 FoundaƟons 1C‐042 0.5 0.5 0%Sep‐24‐22 Sep‐24‐22 40.1 ACC ‐1C‐042 Access 1C‐042 0.8 0.8 0%Sep‐13‐22 Sep‐14‐22 49.4 Structure 1C-043Structure 1C-043 265.2 265.2 Sep‐12‐22 Oct ‐11‐23 0.0 ERC‐1C‐043 Tower Erec Ɵon 1C‐043 0.9 0.9 0%Aug‐29‐23 Aug‐30‐23 0.0 REC‐1C‐043 ReclamaƟon 1C‐043 0.8 0.8 0%Oct ‐10‐23 Oct ‐11‐23 0.0 ASY‐1C‐043 Tower Assembly 1C ‐043 0.9 0.9 0%Aug‐28‐23 Aug‐29‐23 0.1 CLR‐1C‐043 Clearing 1C‐043 0.8 0.8 0%Sep‐12‐22 Sep‐13‐22 17.6 SPT‐1C‐043 Spoƫng 1C‐043 0.8 0.8 0%Oct ‐02‐22 Oct ‐03‐22 31.2 FDN‐1C‐043 FoundaƟons 1C‐043 0.5 0.5 0%Sep‐23‐22 Sep‐24‐22 39.8 ACC ‐1C‐043 Access 1C‐043 0.8 0.8 0%Sep‐13‐22 Sep‐13‐22 49.4 Structure 1C-044Structure 1C-044 266.7 266.7 Sep‐11‐22 Oct ‐12‐23 0.0 ERC‐1C‐044 Tower Erec Ɵon 1C‐044 0.9 0.9 0%Aug‐30‐23 Aug‐31‐23 0.0 REC‐1C‐044 ReclamaƟon 1C‐044 0.8 0.8 0%Oct ‐11‐23 Oct ‐12‐23 0.0 ASY‐1C‐044 Tower Assembly 1C ‐044 0.9 0.9 0%Aug‐29‐23 Aug‐30‐23 0.1 CLR‐1C‐044 Clearing 1C‐044 0.8 0.8 0%Sep‐11‐22 Sep‐12‐22 17.6 SPT‐1C‐044 Spoƫng 1C‐044 0.8 0.8 0%Oct ‐01‐22 Oct ‐02‐22 31.2 FDN‐1C‐044 FoundaƟons 1C‐044 0.5 0.5 0%Sep‐23‐22 Sep‐23‐22 39.5 ACC ‐1C‐044 Access 1C‐044 0.8 0.8 0%Sep‐12‐22 Sep‐13‐22 49.4 Structure 1C-045Structure 1C-045 268.3 268.3 Sep‐10‐22 Oct ‐12‐23 0.0 ERC‐1C‐045 Tower Erec Ɵon 1C‐045 0.9 0.9 0%Aug‐31‐23 Sep‐01‐23 0.0 REC‐1C‐045 ReclamaƟon 1C‐045 0.8 0.8 0%Oct ‐12‐23 Oct ‐12‐23 0.0 ASY‐1C‐045 Tower Assembly 1C ‐045 0.9 0.9 0%Aug‐30‐23 Aug‐31‐23 0.1 CLR‐1C‐045 Clearing 1C‐045 0.8 0.8 0%Sep‐10‐22 Sep‐11‐22 17.6 SPT‐1C‐045 Spoƫng 1C‐045 0.8 0.8 0%Sep‐30‐22 Oct ‐01‐22 31.2 FDN‐1C‐045 FoundaƟons 1C‐045 0.5 0.5 0%Sep‐22‐22 Sep‐23‐22 39.2 ACC ‐1C‐045 Access 1C‐045 0.8 0.8 0%Sep‐11‐22 Sep‐12‐22 49.4 Structure 1C-046Structure 1C-046 269.9 269.9 Sep‐09‐22 Oct ‐13‐23 0.0 ERC‐1C‐046 Tower Erec Ɵon 1C‐046 0.9 0.9 0%Sep‐01‐23 Sep‐02‐23 0.0 REC‐1C‐046 ReclamaƟon 1C‐046 0.8 0.8 0%Oct ‐12‐23 Oct ‐13‐23 0.0 ASY‐1C‐046 Tower Assembly 1C ‐046 0.9 0.9 0%Aug‐31‐23 Sep‐01‐23 0.1 CLR‐1C‐046 Clearing 1C‐046 0.8 0.8 0%Sep‐09‐22 Sep‐10‐22 17.6 SPT‐1C‐046 Spoƫng 1C‐046 0.8 0.8 0%Sep‐30‐22 Sep‐30‐22 31.2 FDN‐1C‐046 FoundaƟons 1C‐046 0.5 0.5 0%Sep‐22‐22 Sep‐22‐22 38.9 ACC ‐1C‐046 Access 1C‐046 0.8 0.8 0%Sep‐10‐22 Sep‐11‐22 49.4 Structure 1C-047Structure 1C-047 271.5 271.5 Sep‐09‐22 Oct ‐14‐23 0.0 ERC‐1C‐047 Tower Erec Ɵon 1C‐047 0.9 0.9 0%Sep‐02‐23 Sep‐02‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐041 Tower Assembly 1C ‐041 Clearing 1C‐041 Spoƫng 1C‐041 FoundaƟons 1C‐041 Access 1C‐041 Oct ‐10‐23, Structure 1C‐042 Tower Erec Ɵon 1C‐042 ReclamaƟon 1C‐042 Tower Assembly 1C ‐042 Clearing 1C‐042 Spoƫng 1C‐042 FoundaƟons 1C‐042 Access 1C‐042 Oct ‐11‐23, Structure 1C‐043 Tower Erec Ɵon 1C‐043 ReclamaƟon 1C‐043 Tower Assembly 1C ‐043 Clearing 1C‐043 Spoƫng 1C‐043 FoundaƟons 1C‐043 Access 1C‐043 Oct ‐12‐23, Structure 1C‐044 Tower Erec Ɵon 1C‐044 ReclamaƟon 1C‐044 Tower Assembly 1C ‐044 Clearing 1C‐044 Spoƫng 1C‐044 FoundaƟons 1C‐044 Access 1C‐044 Oct ‐12‐23, Structure 1C‐045 Tower Erec Ɵon 1C‐045 ReclamaƟon 1C‐045 Tower Assembly 1C ‐045 Clearing 1C‐045 Spoƫng 1C‐045 FoundaƟons 1C‐045 Access 1C‐045 Oct ‐13‐23, Structure 1C‐046 Tower Erec Ɵon 1C‐046 ReclamaƟon 1C‐046 Tower Assembly 1C ‐046 Clearing 1C‐046 Spoƫng 1C‐046 FoundaƟons 1C‐046 Access 1C‐046 Oct ‐14‐23, Structure 1C‐047 Tower Erec Ɵon 1C‐047 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 71 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐047 ReclamaƟon 1C‐047 0.8 0.8 0%Oct ‐13‐23 Oct ‐14‐23 0.0 ASY‐1C‐047 Tower Assembly 1C ‐047 0.9 0.9 0%Sep‐01‐23 Sep‐01‐23 0.1 CLR‐1C‐047 Clearing 1C‐047 0.8 0.8 0%Sep‐09‐22 Sep‐09‐22 17.6 SPT‐1C‐047 Spoƫng 1C‐047 0.8 0.8 0%Sep‐29‐22 Sep‐30‐22 31.2 FDN‐1C‐047 FoundaƟons 1C‐047 0.5 0.5 0%Sep‐21‐22 Sep‐22‐22 38.6 ACC ‐1C‐047 Access 1C‐047 0.8 0.8 0%Sep‐09‐22 Sep‐10‐22 49.4 Structure 1C-048Structure 1C-048 273.1 273.1 Sep‐08‐22 Oct ‐15‐23 0.0 ERC‐1C‐048 Tower Erec Ɵon 1C‐048 0.9 0.9 0%Sep‐02‐23 Sep‐03‐23 0.0 REC‐1C‐048 ReclamaƟon 1C‐048 0.8 0.8 0%Oct ‐14‐23 Oct ‐15‐23 0.0 ASY‐1C‐048 Tower Assembly 1C ‐048 0.9 0.9 0%Sep‐01‐23 Sep‐02‐23 0.1 CLR‐1C‐048 Clearing 1C‐048 0.8 0.8 0%Sep‐08‐22 Sep‐09‐22 17.6 FDN‐1C‐048 FoundaƟons 1C‐048 0.5 0.5 0%Sep‐21‐22 Sep‐21‐22 23.8 SPT‐1C‐048 Spoƫng 1C‐048 0.8 0.8 0%Sep‐28‐22 Sep‐29‐22 31.2 ACC ‐1C‐048 Access 1C‐048 0.8 0.8 0%Sep‐09‐22 Sep‐09‐22 35.0 Structure 1C-049Structure 1C-049 274.7 274.7 Sep‐07‐22 Oct ‐16‐23 0.0 ERC‐1C‐049 Tower Erec Ɵon 1C‐049 0.9 0.9 0%Sep‐03‐23 Sep‐05‐23 0.0 REC‐1C‐049 ReclamaƟon 1C‐049 0.8 0.8 0%Oct ‐15‐23 Oct ‐16‐23 0.0 ASY‐1C‐049 Tower Assembly 1C ‐049 0.9 0.9 0%Sep‐02‐23 Sep‐03‐23 0.1 CLR‐1C‐049 Clearing 1C‐049 0.8 0.8 0%Sep‐07‐22 Sep‐08‐22 17.6 FDN‐1C‐049 FoundaƟons 1C‐049 0.5 0.5 0%Sep‐20‐22 Sep‐21‐22 23.8 SPT‐1C‐049 Spoƫng 1C‐049 0.8 0.8 0%Sep‐27‐22 Sep‐28‐22 31.2 ACC ‐1C‐049 Access 1C‐049 0.8 0.8 0%Sep‐08‐22 Sep‐09‐22 35.3 Structure 1C-050Structure 1C-050 276.3 276.3 Sep‐06‐22 Oct ‐16‐23 0.0 ERC‐1C‐050 Tower Erec Ɵon 1C‐050 0.9 0.9 0%Sep‐05‐23 Sep‐06‐23 0.0 REC‐1C‐050 ReclamaƟon 1C‐050 0.8 0.8 0%Oct ‐16‐23 Oct ‐16‐23 0.0 ASY‐1C‐050 Tower Assembly 1C ‐050 0.9 0.9 0%Sep‐03‐23 Sep‐05‐23 0.1 CLR‐1C‐050 Clearing 1C‐050 0.8 0.8 0%Sep‐06‐22 Sep‐07‐22 17.6 FDN‐1C‐050 FoundaƟons 1C‐050 0.5 0.5 0%Sep‐20‐22 Sep‐20‐22 23.8 SPT‐1C‐050 Spoƫng 1C‐050 0.8 0.8 0%Sep‐26‐22 Sep‐27‐22 31.2 ACC ‐1C‐050 Access 1C‐050 0.8 0.8 0%Sep‐07‐22 Sep‐08‐22 35.6 Structure 1C-051Structure 1C-051 277.9 277.9 Sep‐04‐22 Oct ‐17‐23 0.0 ERC‐1C‐051 Tower Erec Ɵon 1C‐051 0.9 0.9 0%Sep‐06‐23 Sep‐07‐23 0.0 REC‐1C‐051 ReclamaƟon 1C‐051 0.8 0.8 0%Oct ‐16‐23 Oct ‐17‐23 0.0 ASY‐1C‐051 Tower Assembly 1C ‐051 0.9 0.9 0%Sep‐05‐23 Sep‐06‐23 0.1 CLR‐1C‐051 Clearing 1C‐051 0.8 0.8 0%Sep‐04‐22 Sep‐06‐22 17.6 FDN‐1C‐051 FoundaƟons 1C‐051 0.5 0.5 0%Sep‐19‐22 Sep‐20‐22 23.8 SPT‐1C‐051 Spoƫng 1C‐051 0.8 0.8 0%Sep‐26‐22 Sep‐26‐22 31.2 ACC ‐1C‐051 Access 1C‐051 0.8 0.8 0%Sep‐06‐22 Sep‐07‐22 35.9 Structure 1C-052Structure 1C-052 279.4 279.4 Sep‐04‐22 Oct ‐18‐23 0.0 ERC‐1C‐052 Tower Erec Ɵon 1C‐052 0.9 0.9 0%Sep‐07‐23 Sep‐08‐23 0.0 REC‐1C‐052 ReclamaƟon 1C‐052 0.8 0.8 0%Oct ‐17‐23 Oct ‐18‐23 0.0 ASY‐1C‐052 Tower Assembly 1C ‐052 0.9 0.9 0%Sep‐06‐23 Sep‐07‐23 0.1 CLR‐1C‐052 Clearing 1C‐052 0.8 0.8 0%Sep‐04‐22 Sep‐04‐22 17.6 FDN‐1C‐052 FoundaƟons 1C‐052 0.5 0.5 0%Sep‐19‐22 Sep‐19‐22 23.8 SPT‐1C‐052 Spoƫng 1C‐052 0.8 0.8 0%Sep‐25‐22 Sep‐26‐22 31.2 ACC ‐1C‐052 Access 1C‐052 0.8 0.8 0%Sep‐04‐22 Sep‐06‐22 36.2 Structure 1C-053Structure 1C-053 281.0 281.0 Sep‐03‐22 Oct ‐19‐23 0.0 ERC‐1C‐053 Tower Erec Ɵon 1C‐053 0.9 0.9 0%Sep‐08‐23 Sep‐09‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐047 Tower Assembly 1C ‐047 Clearing 1C‐047 Spoƫng 1C‐047 FoundaƟons 1C‐047 Access 1C‐047 Oct ‐15‐23, Structure 1C‐048 Tower Erec Ɵon 1C‐048 ReclamaƟon 1C‐048 Tower Assembly 1C ‐048 Clearing 1C‐048 FoundaƟons 1C‐048 Spoƫng 1C‐048 Access 1C‐048 Oct ‐16‐23, Structure 1C‐049 Tower Erec Ɵon 1C‐049 ReclamaƟon 1C‐049 Tower Assembly 1C‐049 Clearing 1C‐049 FoundaƟons 1C‐049 Spoƫng 1C‐049 Access 1C‐049 Oct ‐16‐23, Structure 1C‐050 Tower Erec Ɵon 1C‐050 ReclamaƟon 1C‐050 Tower Assembly 1C‐050 Clearing 1C‐050 FoundaƟons 1C‐050 Spoƫng 1C‐050 Access 1C‐050 Oct ‐17‐23, Structure 1C‐051 Tower Erec Ɵon 1C‐051 ReclamaƟon 1C‐051 Tower Assembly 1C‐051 Clearing 1C‐051 FoundaƟons 1C‐051 Spoƫng 1C‐051 Access 1C‐051 Oct ‐18‐23, Structure 1C‐052 Tower Erec Ɵon 1C‐052 ReclamaƟon 1C‐052 Tower Assembly 1C ‐052 Clearing 1C‐052 FoundaƟons 1C‐052 Spoƫng 1C‐052 Access 1C‐052 Oct ‐19‐23, Structure 1C‐053 Tower Erec Ɵon 1C‐053 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 72 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐053 ReclamaƟon 1C‐053 0.8 0.8 0%Oct ‐18‐23 Oct ‐19‐23 0.0 ASY‐1C‐053 Tower Assembly 1C ‐053 0.9 0.9 0%Sep‐07‐23 Sep‐08‐23 0.1 CLR‐1C‐053 Clearing 1C‐053 0.8 0.8 0%Sep‐03‐22 Sep‐04‐22 17.6 FDN‐1C‐053 FoundaƟons 1C‐053 0.5 0.5 0%Sep‐18‐22 Sep‐19‐22 23.8 SPT‐1C‐053 Spoƫng 1C‐053 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 31.2 ACC ‐1C‐053 Access 1C‐053 0.8 0.8 0%Sep‐04‐22 Sep‐04‐22 36.5 Structure 1C-054Structure 1C-054 282.6 282.6 Sep‐02‐22 Oct ‐20‐23 0.0 ERC‐1C‐054 Tower Erec Ɵon 1C‐054 0.9 0.9 0%Sep‐09‐23 Sep‐10‐23 0.0 REC‐1C‐054 ReclamaƟon 1C‐054 0.8 0.8 0%Oct ‐19‐23 Oct ‐20‐23 0.0 ASY‐1C‐054 Tower Assembly 1C ‐054 0.9 0.9 0%Sep‐08‐23 Sep‐09‐23 0.1 CLR‐1C‐054 Clearing 1C‐054 0.8 0.8 0%Sep‐02‐22 Sep‐03‐22 17.6 FDN‐1C‐054 FoundaƟons 1C‐054 0.5 0.5 0%Sep‐18‐22 Sep‐18‐22 23.8 SPT‐1C‐054 Spoƫng 1C‐054 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 31.2 ACC ‐1C‐054 Access 1C‐054 0.8 0.8 0%Sep‐03‐22 Sep‐04‐22 36.8 Structure 1C-055Structure 1C-055 284.2 284.2 Sep‐01‐22 Oct ‐20‐23 0.0 ERC‐1C‐055 Tower Erec Ɵon 1C‐055 0.9 0.9 0%Sep‐10‐23 Sep‐10‐23 0.0 REC‐1C‐055 ReclamaƟon 1C‐055 0.8 0.8 0%Oct ‐20‐23 Oct ‐20‐23 0.0 ASY‐1C‐055 Tower Assembly 1C ‐055 0.9 0.9 0%Sep‐09‐23 Sep‐09‐23 0.1 CLR‐1C‐055 Clearing 1C‐055 0.8 0.8 0%Sep‐01‐22 Sep‐02‐22 17.6 FDN‐1C‐055 FoundaƟons 1C‐055 0.5 0.5 0%Sep‐17‐22 Sep‐18‐22 23.8 SPT‐1C‐055 Spoƫng 1C‐055 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 31.2 ACC ‐1C‐055 Access 1C‐055 0.8 0.8 0%Sep‐02‐22 Sep‐03‐22 37.1 Structure 1C-056Structure 1C-056 285.8 285.8 Aug‐31‐22 Oct ‐21‐23 0.0 ERC‐1C‐056 Tower Erec Ɵon 1C‐056 0.9 0.9 0%Sep‐10‐23 Sep‐11‐23 0.0 REC‐1C‐056 ReclamaƟon 1C‐056 0.8 0.8 0%Oct ‐20‐23 Oct ‐21‐23 0.0 ASY‐1C‐056 Tower Assembly 1C ‐056 0.9 0.9 0%Sep‐09‐23 Sep‐10‐23 0.2 CLR‐1C‐056 Clearing 1C‐056 0.8 0.8 0%Aug‐31‐22 Sep‐01‐22 17.6 FDN‐1C‐056 FoundaƟons 1C‐056 0.5 0.5 0%Sep‐17‐22 Sep‐17‐22 23.8 SPT‐1C‐056 Spoƫng 1C‐056 0.8 0.8 0%Sep‐22‐22 Sep‐22‐22 31.2 ACC ‐1C‐056 Access 1C‐056 0.8 0.8 0%Sep‐01‐22 Sep‐02‐22 37.4 Structure 1C-057Structure 1C-057 287.4 287.4 Aug‐30‐22 Oct ‐22‐23 0.0 ERC‐1C‐057 Tower Erec Ɵon 1C‐057 0.9 0.9 0%Sep‐11‐23 Sep‐12‐23 0.0 REC‐1C‐057 ReclamaƟon 1C‐057 0.8 0.8 0%Oct ‐21‐23 Oct ‐22‐23 0.0 ASY‐1C‐057 Tower Assembly 1C ‐057 0.9 0.9 0%Sep‐10‐23 Sep‐11‐23 0.2 CLR‐1C‐057 Clearing 1C‐057 0.8 0.8 0%Aug‐30‐22 Aug‐31‐22 17.6 FDN‐1C‐057 FoundaƟons 1C‐057 0.5 0.5 0%Sep‐16‐22 Sep‐17‐22 23.8 SPT‐1C‐057 Spoƫng 1C‐057 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 31.2 ACC ‐1C‐057 Access 1C‐057 0.8 0.8 0%Aug‐31‐22 Sep‐01‐22 37.7 Structure 1C-058Structure 1C-058 289.0 289.0 Aug‐30‐22 Oct ‐23‐23 0.0 ERC‐1C‐058 Tower Erec Ɵon 1C‐058 0.9 0.9 0%Sep‐12‐23 Sep‐13‐23 0.0 REC‐1C‐058 ReclamaƟon 1C‐058 0.8 0.8 0%Oct ‐22‐23 Oct ‐23‐23 0.0 ASY‐1C‐058 Tower Assembly 1C ‐058 0.9 0.9 0%Sep‐11‐23 Sep‐12‐23 0.2 CLR‐1C‐058 Clearing 1C‐058 0.8 0.8 0%Aug‐30‐22 Aug‐30‐22 17.6 FDN‐1C‐058 FoundaƟons 1C‐058 0.5 0.5 0%Sep‐16‐22 Sep‐16‐22 23.8 SPT‐1C‐058 Spoƫng 1C‐058 0.8 0.8 0%Sep‐20‐22 Sep‐21‐22 31.2 ACC ‐1C‐058 Access 1C‐058 0.8 0.8 0%Aug‐30‐22 Aug‐31‐22 38.0 Structure 1C-059Structure 1C-059 290.5 290.5 Aug‐29‐22 Oct ‐23‐23 0.0 ERC‐1C‐059 Tower Erec Ɵon 1C‐059 0.9 0.9 0%Sep‐13‐23 Sep‐14‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐053 Tower Assembly 1C ‐053 Clearing 1C‐053 FoundaƟons 1C‐053 Spoƫng 1C‐053 Access 1C‐053 Oct ‐20‐23, Structure 1C‐054 Tower Erec Ɵon 1C‐054 ReclamaƟon 1C‐054 Tower Assembly 1C ‐054 Clearing 1C‐054 FoundaƟons 1C‐054 Spoƫng 1C‐054 Access 1C‐054 Oct ‐20‐23, Structure 1C‐055 Tower Erec Ɵon 1C‐055 ReclamaƟon 1C‐055 Tower Assembly 1C ‐055 Clearing 1C‐055 FoundaƟons 1C‐055 Spoƫng 1C‐055 Access 1C‐055 Oct ‐21‐23, Structure 1C‐056 Tower Erec Ɵon 1C‐056 ReclamaƟon 1C‐056 Tower Assembly 1C ‐056 Clearing 1C‐056 FoundaƟons 1C‐056 Spoƫng 1C‐056 Access 1C‐056 Oct ‐22‐23, Structure 1C‐057 Tower Erec Ɵon 1C‐057 ReclamaƟon 1C‐057 Tower Assembly 1C ‐057 Clearing 1C‐057 FoundaƟons 1C‐057 Spoƫng 1C‐057 Access 1C‐057 Oct ‐23‐23, Structure 1C‐058 Tower Erec Ɵon 1C‐058 ReclamaƟon 1C‐058 Tower Assembly 1C ‐058 Clearing 1C‐058 FoundaƟons 1C‐058 Spoƫng 1C‐058 Access 1C‐058 Oct ‐23‐23, Structure 1C‐059 Tower Erec Ɵon 1C‐059 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 73 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐059 ReclamaƟon 1C‐059 0.8 0.8 0%Oct ‐23‐23 Oct ‐23‐23 0.0 ASY‐1C‐059 Tower Assembly 1C ‐059 0.9 0.9 0%Sep‐12‐23 Sep‐13‐23 0.2 CLR‐1C‐059 Clearing 1C‐059 0.8 0.8 0%Aug‐29‐22 Aug‐30‐22 17.6 FDN‐1C‐059 FoundaƟons 1C‐059 0.5 0.5 0%Sep‐15‐22 Sep‐16‐22 23.8 SPT‐1C‐059 Spoƫng 1C‐059 0.8 0.8 0%Sep‐19‐22 Sep‐20‐22 31.2 ACC ‐1C‐059 Access 1C‐059 0.8 0.8 0%Aug‐30‐22 Aug‐30‐22 38.4 Structure 1C-060Structure 1C-060 292.1 292.1 Aug‐28‐22 Oct ‐24‐23 0.0 ERC‐1C‐060 Tower Erec Ɵon 1C‐060 0.9 0.9 0%Sep‐14‐23 Sep‐15‐23 0.0 REC‐1C‐060 ReclamaƟon 1C‐060 0.8 0.8 0%Oct ‐23‐23 Oct ‐24‐23 0.0 ASY‐1C‐060 Tower Assembly 1C ‐060 0.9 0.9 0%Sep‐13‐23 Sep‐14‐23 0.2 CLR‐1C‐060 Clearing 1C‐060 0.8 0.8 0%Aug‐28‐22 Aug‐29‐22 17.6 FDN‐1C‐060 FoundaƟons 1C‐060 0.5 0.5 0%Sep‐15‐22 Sep‐15‐22 23.8 SPT‐1C‐060 Spoƫng 1C‐060 0.8 0.8 0%Sep‐18‐22 Sep‐19‐22 31.2 ACC ‐1C‐060 Access 1C‐060 0.8 0.8 0%Aug‐29‐22 Aug‐30‐22 38.7 Structure 1C-061Structure 1C-061 293.7 293.7 Aug‐27‐22 Oct ‐25‐23 0.0 ERC‐1C‐061 Tower Erec Ɵon 1C‐061 0.9 0.9 0%Sep‐15‐23 Sep‐16‐23 0.0 REC‐1C‐061 ReclamaƟon 1C‐061 0.8 0.8 0%Oct ‐24‐23 Oct ‐25‐23 0.0 ASY‐1C‐061 Tower Assembly 1C ‐061 0.9 0.9 0%Sep‐14‐23 Sep‐15‐23 0.2 CLR‐1C‐061 Clearing 1C‐061 0.8 0.8 0%Aug‐27‐22 Aug‐28‐22 17.6 FDN‐1C‐061 FoundaƟons 1C‐061 0.5 0.5 0%Sep‐14‐22 Sep‐15‐22 23.8 SPT‐1C‐061 Spoƫng 1C‐061 0.8 0.8 0%Sep‐18‐22 Sep‐18‐22 31.2 ACC ‐1C‐061 Access 1C‐061 0.8 0.8 0%Aug‐28‐22 Aug‐29‐22 39.0 Structure 1C-062Structure 1C-062 295.3 295.3 Aug‐26‐22 Oct ‐26‐23 0.0 ERC‐1C‐062 Tower Erec Ɵon 1C‐062 0.9 0.9 0%Sep‐16‐23 Sep‐16‐23 0.0 REC‐1C‐062 ReclamaƟon 1C‐062 0.8 0.8 0%Oct ‐25‐23 Oct ‐26‐23 0.0 ASY‐1C‐062 Tower Assembly 1C ‐062 0.9 0.9 0%Sep‐15‐23 Sep‐15‐23 0.2 CLR‐1C‐062 Clearing 1C‐062 0.8 0.8 0%Aug‐26‐22 Aug‐27‐22 17.6 FDN‐1C‐062 FoundaƟons 1C‐062 0.5 0.5 0%Sep‐14‐22 Sep‐14‐22 23.8 SPT‐1C‐062 Spoƫng 1C‐062 0.8 0.8 0%Sep‐17‐22 Sep‐18‐22 31.2 ACC ‐1C‐062 Access 1C‐062 0.8 0.8 0%Aug‐27‐22 Aug‐28‐22 39.3 Structure 1C-063Structure 1C-063 296.9 296.9 Aug‐26‐22 Oct ‐27‐23 0.0 ERC‐1C‐063 Tower Erec Ɵon 1C‐063 0.9 0.9 0%Sep‐16‐23 Sep‐17‐23 0.0 REC‐1C‐063 ReclamaƟon 1C‐063 0.8 0.8 0%Oct ‐26‐23 Oct ‐27‐23 0.0 ASY‐1C‐063 Tower Assembly 1C ‐063 0.9 0.9 0%Sep‐15‐23 Sep‐16‐23 0.2 CLR‐1C‐063 Clearing 1C‐063 0.8 0.8 0%Aug‐26‐22 Aug‐26‐22 17.6 FDN‐1C‐063 FoundaƟons 1C‐063 0.5 0.5 0%Sep‐13‐22 Sep‐14‐22 23.8 SPT‐1C‐063 Spoƫng 1C‐063 0.8 0.8 0%Sep‐16‐22 Sep‐17‐22 31.2 ACC ‐1C‐063 Access 1C‐063 0.8 0.8 0%Aug‐26‐22 Aug‐27‐22 39.6 Structure 1C-064Structure 1C-064 298.5 298.5 Aug‐25‐22 Oct ‐27‐23 0.0 ERC‐1C‐064 Tower Erec Ɵon 1C‐064 0.9 0.9 0%Sep‐17‐23 Sep‐18‐23 0.0 REC‐1C‐064 ReclamaƟon 1C‐064 0.8 0.8 0%Oct ‐27‐23 Oct ‐27‐23 0.0 ASY‐1C‐064 Tower Assembly 1C ‐064 0.9 0.9 0%Sep‐16‐23 Sep‐17‐23 0.2 CLR‐1C‐064 Clearing 1C‐064 0.8 0.8 0%Aug‐25‐22 Aug‐26‐22 17.6 FDN‐1C‐064 FoundaƟons 1C‐064 0.5 0.5 0%Sep‐13‐22 Sep‐13‐22 23.8 SPT‐1C‐064 Spoƫng 1C‐064 0.8 0.8 0%Sep‐15‐22 Sep‐16‐22 31.2 ACC ‐1C‐064 Access 1C‐064 0.8 0.8 0%Aug‐26‐22 Aug‐26‐22 39.9 Structure 1C-065Structure 1C-065 300.1 300.1 Aug‐24‐22 Oct ‐28‐23 0.0 ERC‐1C‐065 Tower Erec Ɵon 1C‐065 0.9 0.9 0%Sep‐18‐23 Sep‐19‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐059 Tower Assembly 1C ‐059 Clearing 1C‐059 FoundaƟons 1C‐059 Spoƫng 1C‐059 Access 1C‐059 Oct ‐24‐23, Structure 1C‐060 Tower Erec Ɵon 1C‐060 ReclamaƟon 1C‐060 Tower Assembly 1C ‐060 Clearing 1C‐060 FoundaƟons 1C‐060 Spoƫng 1C‐060 Access 1C‐060 Oct ‐25‐23, Structure 1C‐061 Tower Erec Ɵon 1C‐061 ReclamaƟon 1C‐061 Tower Assembly 1C‐061 Clearing 1C‐061 FoundaƟons 1C‐061 Spoƫng 1C‐061 Access 1C‐061 Oct ‐26‐23, Structure 1C‐062 Tower Erec Ɵon 1C‐062 ReclamaƟon 1C‐062 Tower Assembly 1C‐062 Clearing 1C‐062 FoundaƟons 1C‐062 Spoƫng 1C‐062 Access 1C‐062 Oct ‐27‐23, Structure 1C‐063 Tower Erec Ɵon 1C‐063 ReclamaƟon 1C‐063 Tower Assembly 1C‐063 Clearing 1C‐063 FoundaƟons 1C‐063 Spoƫng 1C‐063 Access 1C‐063 Oct ‐27‐23, Structure 1C‐064 Tower Erec Ɵon 1C‐064 ReclamaƟon 1C‐064 Tower Assembly 1C‐064 Clearing 1C‐064 FoundaƟons 1C‐064 Spoƫng 1C‐064 Access 1C‐064 Oct ‐28‐23, Structure 1C‐065 Tower Erec Ɵon 1C‐065 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 74 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐065 ReclamaƟon 1C‐065 0.8 0.8 0%Oct ‐27‐23 Oct ‐28‐23 0.0 ASY‐1C‐065 Tower Assembly 1C ‐065 0.9 0.9 0%Sep‐17‐23 Sep‐18‐23 0.2 CLR‐1C‐065 Clearing 1C‐065 0.8 0.8 0%Aug‐24‐22 Aug‐25‐22 17.6 FDN‐1C‐065 FoundaƟons 1C‐065 0.5 0.5 0%Sep‐12‐22 Sep‐13‐22 23.8 SPT‐1C‐065 Spoƫng 1C‐065 0.8 0.8 0%Sep‐14‐22 Sep‐15‐22 31.2 ACC ‐1C‐065 Access 1C‐065 0.8 0.8 0%Aug‐25‐22 Aug‐26‐22 40.2 Structure 1C-066Structure 1C-066 301.7 301.7 Aug‐23‐22 Oct ‐29‐23 0.0 ERC‐1C‐066 Tower Erec Ɵon 1C‐066 0.9 0.9 0%Sep‐19‐23 Sep‐20‐23 0.0 REC‐1C‐066 ReclamaƟon 1C‐066 0.8 0.8 0%Oct ‐28‐23 Oct ‐29‐23 0.0 ASY‐1C‐066 Tower Assembly 1C ‐066 0.9 0.9 0%Sep‐18‐23 Sep‐19‐23 0.2 CLR‐1C‐066 Clearing 1C‐066 0.8 0.8 0%Aug‐23‐22 Aug‐24‐22 17.6 FDN‐1C‐066 FoundaƟons 1C‐066 0.5 0.5 0%Sep‐12‐22 Sep‐12‐22 23.8 SPT‐1C‐066 Spoƫng 1C‐066 0.8 0.8 0%Sep‐14‐22 Sep‐14‐22 31.2 ACC ‐1C‐066 Access 1C‐066 0.8 0.8 0%Aug‐24‐22 Aug‐25‐22 40.5 Structure 1C-067Structure 1C-067 303.2 303.2 Aug‐22‐22 Oct ‐30‐23 0.0 ERC‐1C‐067 Tower Erec Ɵon 1C‐067 0.9 0.9 0%Sep‐20‐23 Sep‐21‐23 0.0 REC‐1C‐067 ReclamaƟon 1C‐067 0.8 0.8 0%Oct ‐29‐23 Oct ‐30‐23 0.0 ASY‐1C‐067 Tower Assembly 1C ‐067 0.9 0.9 0%Sep‐19‐23 Sep‐20‐23 0.2 CLR‐1C‐067 Clearing 1C‐067 0.8 0.8 0%Aug‐22‐22 Aug‐23‐22 17.6 FDN‐1C‐067 FoundaƟons 1C‐067 0.5 0.5 0%Sep‐11‐22 Sep‐12‐22 23.8 SPT‐1C‐067 Spoƫng 1C‐067 0.8 0.8 0%Sep‐13‐22 Sep‐14‐22 31.2 ACC ‐1C‐067 Access 1C‐067 0.8 0.8 0%Aug‐23‐22 Aug‐24‐22 40.8 Structure 1C-068Structure 1C-068 304.8 304.8 Aug‐22‐22 Oct ‐30‐23 0.0 ERC‐1C‐068 Tower Erec Ɵon 1C‐068 0.9 0.9 0%Sep‐21‐23 Sep‐22‐23 0.0 REC‐1C‐068 ReclamaƟon 1C‐068 0.8 0.8 0%Oct ‐30‐23 Oct ‐30‐23 0.0 ASY‐1C‐068 Tower Assembly 1C ‐068 0.9 0.9 0%Sep‐20‐23 Sep‐21‐23 0.2 CLR‐1C‐068 Clearing 1C‐068 0.8 0.8 0%Aug‐22‐22 Aug‐22‐22 17.6 FDN‐1C‐068 FoundaƟons 1C‐068 0.5 0.5 0%Sep‐11‐22 Sep‐11‐22 23.8 SPT‐1C‐068 Spoƫng 1C‐068 0.8 0.8 0%Sep‐12‐22 Sep‐13‐22 31.2 ACC ‐1C‐068 Access 1C‐068 0.8 0.8 0%Aug‐22‐22 Aug‐23‐22 41.1 Structure 1C-069Structure 1C-069 306.4 306.4 Aug‐21‐22 Oct ‐31‐23 0.0 ERC‐1C‐069 Tower Erec Ɵon 1C‐069 0.9 0.9 0%Sep‐22‐23 Sep‐23‐23 0.0 REC‐1C‐069 ReclamaƟon 1C‐069 0.8 0.8 0%Oct ‐30‐23 Oct ‐31‐23 0.0 ASY‐1C‐069 Tower Assembly 1C ‐069 0.9 0.9 0%Sep‐21‐23 Sep‐22‐23 0.2 CLR‐1C‐069 Clearing 1C‐069 0.8 0.8 0%Aug‐21‐22 Aug‐22‐22 17.6 FDN‐1C‐069 FoundaƟons 1C‐069 0.5 0.5 0%Sep‐10‐22 Sep‐11‐22 23.8 SPT‐1C‐069 Spoƫng 1C‐069 0.8 0.8 0%Sep‐11‐22 Sep‐12‐22 31.2 ACC ‐1C‐069 Access 1C‐069 0.8 0.8 0%Aug‐22‐22 Aug‐22‐22 41.4 Structure 1C-070Structure 1C-070 308.0 308.0 Aug‐20‐22 Nov‐01‐23 0.0 ERC‐1C‐070 Tower Erec Ɵon 1C‐070 0.9 0.9 0%Sep‐23‐23 Sep‐23‐23 0.0 REC‐1C‐070 ReclamaƟon 1C‐070 0.8 0.8 0%Oct ‐31‐23 Nov‐01‐23 0.0 ASY‐1C‐070 Tower Assembly 1C ‐070 0.9 0.9 0%Sep‐22‐23 Sep‐22‐23 0.2 CLR‐1C‐070 Clearing 1C‐070 0.8 0.8 0%Aug‐20‐22 Aug‐21‐22 17.6 FDN‐1C‐070 FoundaƟons 1C‐070 0.5 0.5 0%Sep‐10‐22 Sep‐10‐22 23.8 SPT‐1C‐070 Spoƫng 1C‐070 0.8 0.8 0%Sep‐10‐22 Sep‐11‐22 31.2 ACC ‐1C‐070 Access 1C‐070 0.8 0.8 0%Aug‐21‐22 Aug‐22‐22 41.7 Structure 1C-071Structure 1C-071 381.7 381.7 Jun ‐07‐22 Nov‐02‐23 0.0 ERC‐1C‐071 Tower Erec Ɵon 1C‐071 0.9 0.9 0%Sep‐23‐23 Sep‐24‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐065 Tower Assembly 1C ‐065 Clearing 1C‐065 FoundaƟons 1C‐065 Spoƫng 1C‐065 Access 1C‐065 Oct ‐29‐23, Structure 1C‐066 Tower Erec Ɵon 1C‐066 ReclamaƟon 1C‐066 Tower Assembly 1C ‐066 Clearing 1C‐066 FoundaƟons 1C‐066 Spoƫng 1C‐066 Access 1C‐066 Oct ‐30‐23, Structure 1C‐067 Tower Erec Ɵon 1C‐067 ReclamaƟon 1C‐067 Tower Assembly 1C ‐067 Clearing 1C‐067 FoundaƟons 1C‐067 Spoƫng 1C‐067 Access 1C‐067 Oct ‐30‐23, Structure 1C‐068 Tower Erec Ɵon 1C‐068 ReclamaƟon 1C‐068 Tower Assembly 1C ‐068 Clearing 1C‐068 FoundaƟons 1C‐068 Spoƫng 1C‐068 Access 1C‐068 Oct ‐31‐23, Structure 1C‐069 Tower Erec Ɵon 1C‐069 ReclamaƟon 1C‐069 Tower Assembly 1C ‐069 Clearing 1C‐069 FoundaƟons 1C‐069 Spoƫng 1C‐069 Access 1C‐069 Nov‐01‐23, Structure 1C‐070 Tower Erec Ɵon 1C‐070 ReclamaƟon 1C‐070 Tower Assembly 1C ‐070 Clearing 1C‐070 FoundaƟons 1C‐070 Spoƫng 1C‐070 Access 1C‐070 Nov‐02‐23, Structure 1C‐071 Tower Erec Ɵon 1C‐071 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 75 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐071 ReclamaƟon 1C‐071 0.8 0.8 0%Nov‐01‐23 Nov‐02‐23 0.0 ASY‐1C‐071 Tower Assembly 1C ‐071 0.9 0.9 0%Sep‐22‐23 Sep‐23‐23 0.2 CLR‐1C‐071 Clearing 1C‐071 0.8 0.8 0%Jun ‐07‐22 Jun‐08‐22 14.3 FDN‐1C‐071 FoundaƟons 1C‐071 0.5 0.5 0%Sep‐09‐22 Sep‐10‐22 23.8 SPT‐1C‐071 Spoƫng 1C‐071 0.8 0.8 0%Sep‐10‐22 Sep‐10‐22 31.2 ACC ‐1C‐071 Access 1C‐071 0.8 0.8 0%Jun ‐08‐22 Jun‐09‐22 73.3 Structure 1C-072Structure 1C-072 381.7 381.7 Jun ‐08‐22 Nov‐03‐23 0.0 ERC‐1C‐072 Tower Erec Ɵon 1C‐072 0.9 0.9 0%Sep‐24‐23 Sep‐25‐23 0.0 REC‐1C‐072 ReclamaƟon 1C‐072 0.8 0.8 0%Nov‐02‐23 Nov‐03‐23 0.0 ASY‐1C‐072 Tower Assembly 1C ‐072 0.9 0.9 0%Sep‐23‐23 Sep‐24‐23 0.2 CLR‐1C‐072 Clearing 1C‐072 0.8 0.8 0%Jun ‐08‐22 Jun‐09‐22 14.3 FDN‐1C‐072 FoundaƟons 1C‐072 0.8 0.8 0%Jul‐27‐22 Jul‐27‐22 26.3 SPT‐1C‐072 Spoƫng 1C‐072 0.8 0.8 0%Jul‐27‐22 Jul‐28‐22 26.3 ACC ‐1C‐072 Access 1C‐072 0.8 0.8 0%Jun ‐09‐22 Jun‐09‐22 72.5 Structure 1C-073Structure 1C-073 381.7 381.7 Jun ‐09‐22 Nov‐03‐23 0.0 ERC‐1C‐073 Tower Erec Ɵon 1C‐073 0.9 0.9 0%Sep‐25‐23 Sep‐26‐23 0.0 REC‐1C‐073 ReclamaƟon 1C‐073 0.8 0.8 0%Nov‐03‐23 Nov‐03‐23 0.0 ASY‐1C‐073 Tower Assembly 1C ‐073 0.9 0.9 0%Sep‐24‐23 Sep‐25‐23 0.2 CLR‐1C‐073 Clearing 1C‐073 0.8 0.8 0%Jun ‐09‐22 Jun‐09‐22 14.3 SPT‐1C‐073 Spoƫng 1C‐073 0.8 0.8 0%Jul‐28‐22 Jul‐29‐22 26.3 FDN‐1C‐073 FoundaƟons 1C‐073 0.8 0.8 0%Jul‐27‐22 Jul‐28‐22 26.4 ACC ‐1C‐073 Access 1C‐073 0.8 0.8 0%Jun ‐09‐22 Jun‐10‐22 72.5 Structure 1C-075Structure 1C-075 381.6 381.6 Jun ‐09‐22 Nov‐04‐23 0.0 ERC‐1C‐075 Tower Erec Ɵon 1C‐075 0.9 0.9 0%Sep‐26‐23 Sep‐27‐23 0.0 REC‐1C‐075 ReclamaƟon 1C‐075 0.8 0.8 0%Nov‐03‐23 Nov‐04‐23 0.0 ASY‐1C‐075 Tower Assembly 1C ‐075 0.9 0.9 0%Sep‐25‐23 Sep‐26‐23 0.2 CLR‐1C‐075 Clearing 1C‐075 0.8 0.8 0%Jun ‐09‐22 Jun‐10‐22 14.3 SPT‐1C‐075 Spoƫng 1C‐075 0.8 0.8 0%Jul‐29‐22 Jul‐30‐22 26.3 FDN‐1C‐075 FoundaƟons 1C‐075 0.8 0.8 0%Jul‐28‐22 Jul‐29‐22 26.4 ACC ‐1C‐075 Access 1C‐075 0.8 0.8 0%Jun ‐10‐22 Jun‐11‐22 72.5 Structure 1C-076Structure 1C-076 381.6 381.6 Jun ‐10‐22 Nov‐05‐23 0.0 ERC‐1C‐076 Tower Erec Ɵon 1C‐076 0.9 0.9 0%Sep‐27‐23 Sep‐28‐23 0.0 REC‐1C‐076 ReclamaƟon 1C‐076 0.8 0.8 0%Nov‐04‐23 Nov‐05‐23 0.0 ASY‐1C‐076 Tower Assembly 1C ‐076 0.9 0.9 0%Sep‐26‐23 Sep‐27‐23 0.2 CLR‐1C‐076 Clearing 1C‐076 0.7 0.7 0%Jun ‐10‐22 Jun‐11‐22 14.3 SPT‐1C‐076 Spoƫng 1C‐076 0.8 0.8 0%Jul‐30‐22 Jul‐31‐22 26.3 FDN‐1C‐076 FoundaƟons 1C‐076 0.8 0.8 0%Jul‐29‐22 Jul‐30‐22 26.5 ACC ‐1C‐076 Access 1C‐076 0.8 0.8 0%Jun ‐11‐22 Jun‐12‐22 72.7 Structure 1C-077Structure 1C-077 381.7 381.7 Jun ‐11‐22 Nov‐06‐23 0.0 ERC‐1C‐077 Tower Erec Ɵon 1C‐077 0.9 0.9 0%Sep‐28‐23 Sep‐29‐23 0.0 REC‐1C‐077 ReclamaƟon 1C‐077 0.8 0.8 0%Nov‐05‐23 Nov‐06‐23 0.0 ASY‐1C‐077 Tower Assembly 1C ‐077 0.9 0.9 0%Sep‐27‐23 Sep‐28‐23 0.2 CLR‐1C‐077 Clearing 1C‐077 0.8 0.8 0%Jun ‐11‐22 Jun‐12‐22 14.3 SPT‐1C‐077 Spoƫng 1C‐077 0.8 0.8 0%Jul‐31‐22 Jul‐31‐22 26.3 FDN‐1C‐077 FoundaƟons 1C‐077 0.8 0.8 0%Jul‐30‐22 Jul‐30‐22 26.5 ACC ‐1C‐077 Access 1C‐077 0.8 0.8 0%Jun ‐12‐22 Jun‐13‐22 72.7 Structure 1C-078Structure 1C-078 381.7 381.7 Jun ‐12‐22 Nov‐06‐23 0.0 ERC‐1C‐078 Tower Erec Ɵon 1C‐078 0.9 0.9 0%Sep‐29‐23 Sep‐30‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐071 Tower Assembly 1C ‐071 Clearing 1C‐071 FoundaƟons 1C‐071 Spoƫng 1C‐071 Access 1C‐071 Nov‐03‐23, Structure 1C‐072 Tower Erec Ɵon 1C‐072 ReclamaƟon 1C‐072 Tower Assembly 1C ‐072 Clearing 1C‐072 FoundaƟons 1C‐072 Spoƫng 1C‐072 Access 1C‐072 Nov‐03‐23, Structure 1C‐073 Tower Erec Ɵon 1C‐073 ReclamaƟon 1C‐073 Tower Assembly 1C ‐073 Clearing 1C‐073 Spoƫng 1C‐073 FoundaƟons 1C‐073 Access 1C‐073 Nov‐04‐23, Structure 1C‐075 Tower Erec Ɵon 1C‐075 ReclamaƟon 1C‐075 Tower Assembly 1C‐075 Clearing 1C‐075 Spoƫng 1C‐075 FoundaƟons 1C‐075 Access 1C‐075 Nov‐05‐23, Structure 1C‐076 Tower Erec Ɵon 1C‐076 ReclamaƟon 1C‐076 Tower Assembly 1C‐076 Clearing 1C‐076 Spoƫng 1C‐076 FoundaƟons 1C‐076 Access 1C‐076 Nov‐06‐23, Structure 1C‐077 Tower Erec Ɵon 1C‐077 ReclamaƟon 1C‐077 Tower Assembly 1C‐077 Clearing 1C‐077 Spoƫng 1C‐077 FoundaƟons 1C‐077 Access 1C‐077 Nov‐06‐23, Structure 1C‐078 Tower Erec Ɵon 1C‐078 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 76 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐078 ReclamaƟon 1C‐078 0.8 0.8 0%Nov‐06‐23 Nov‐06‐23 0.0 ASY‐1C‐078 Tower Assembly 1C ‐078 0.9 0.9 0%Sep‐28‐23 Sep‐28‐23 0.2 CLR‐1C‐078 Clearing 1C‐078 0.8 0.8 0%Jun ‐12‐22 Jun‐13‐22 14.3 SPT‐1C‐078 Spoƫng 1C‐078 0.8 0.8 0%Jul‐31‐22 Aug‐01‐22 26.3 FDN‐1C‐078 FoundaƟons 1C‐078 0.8 0.8 0%Jul‐30‐22 Jul‐31‐22 26.6 ACC ‐1C‐078 Access 1C‐078 0.8 0.8 0%Jun ‐13‐22 Jun‐13‐22 72.7 Structure 1C-079Structure 1C-079 381.7 381.7 Jun ‐13‐22 Nov‐07‐23 0.0 ERC‐1C‐079 Tower Erec Ɵon 1C‐079 0.9 0.9 0%Sep‐30‐23 Sep‐30‐23 0.0 REC‐1C‐079 ReclamaƟon 1C‐079 0.8 0.8 0%Nov‐06‐23 Nov‐07‐23 0.0 ASY‐1C‐079 Tower Assembly 1C ‐079 0.9 0.9 0%Sep‐28‐23 Sep‐29‐23 0.2 CLR‐1C‐079 Clearing 1C‐079 0.8 0.8 0%Jun ‐13‐22 Jun‐13‐22 14.3 SPT‐1C‐079 Spoƫng 1C‐079 0.8 0.8 0%Aug‐01‐22 Aug‐02‐22 26.3 FDN‐1C‐079 FoundaƟons 1C‐079 0.8 0.8 0%Jul‐31‐22 Aug‐01‐22 26.6 ACC ‐1C‐079 Access 1C‐079 0.8 0.8 0%Jun ‐13‐22 Jun‐14‐22 72.7 Structure 1C-080Structure 1C-080 381.6 381.6 Jun ‐13‐22 Nov‐08‐23 0.0 ERC‐1C‐080 Tower Erec Ɵon 1C‐080 0.9 0.9 0%Sep‐30‐23 Oct ‐01‐23 0.0 REC‐1C‐080 ReclamaƟon 1C‐080 0.8 0.8 0%Nov‐07‐23 Nov‐08‐23 0.0 ASY‐1C‐080 Tower Assembly 1C ‐080 0.9 0.9 0%Sep‐29‐23 Sep‐30‐23 0.2 CLR‐1C‐080 Clearing 1C‐080 0.8 0.8 0%Jun ‐13‐22 Jun‐14‐22 14.3 SPT‐1C‐080 Spoƫng 1C‐080 0.8 0.8 0%Aug‐02‐22 Aug‐03‐22 26.3 FDN‐1C‐080 FoundaƟons 1C‐080 0.8 0.8 0%Aug‐01‐22 Aug‐02‐22 26.7 ACC ‐1C‐080 Access 1C‐080 0.8 0.8 0%Jun ‐14‐22 Jun‐15‐22 72.7 Structure 1C-081Structure 1C-081 381.6 381.6 Jun ‐14‐22 Nov‐09‐23 0.0 ERC‐1C‐081 Tower Erec Ɵon 1C‐081 0.9 0.9 0%Oct ‐01‐23 Oct ‐02‐23 0.0 REC‐1C‐081 ReclamaƟon 1C‐081 0.8 0.8 0%Nov‐08‐23 Nov‐09‐23 0.0 ASY‐1C‐081 Tower Assembly 1C ‐081 0.9 0.9 0%Sep‐30‐23 Oct ‐01‐23 0.2 CLR‐1C‐081 Clearing 1C‐081 0.8 0.8 0%Jun ‐14‐22 Jun‐15‐22 14.3 SPT‐1C‐081 Spoƫng 1C‐081 0.8 0.8 0%Aug‐03‐22 Aug‐04‐22 26.3 FDN‐1C‐081 FoundaƟons 1C‐081 0.8 0.8 0%Aug‐02‐22 Aug‐03‐22 26.7 ACC ‐1C‐081 Access 1C‐081 0.8 0.8 0%Jun ‐15‐22 Jun‐16‐22 72.7 Structure 1C-082Structure 1C-082 381.6 381.6 Jun ‐15‐22 Nov‐10‐23 0.0 ERC‐1C‐082 Tower Erec Ɵon 1C‐082 0.9 0.9 0%Oct ‐02‐23 Oct ‐03‐23 0.0 REC‐1C‐082 ReclamaƟon 1C‐082 0.8 0.8 0%Nov‐09‐23 Nov‐10‐23 0.0 ASY‐1C‐082 Tower Assembly 1C ‐082 0.9 0.9 0%Oct ‐01‐23 Oct ‐02‐23 0.2 CLR‐1C‐082 Clearing 1C‐082 0.8 0.8 0%Jun ‐15‐22 Jun‐16‐22 14.3 SPT‐1C‐082 Spoƫng 1C‐082 0.8 0.8 0%Aug‐04‐22 Aug‐05‐22 26.3 FDN‐1C‐082 FoundaƟons 1C‐082 0.8 0.8 0%Aug‐03‐22 Aug‐03‐22 26.8 ACC ‐1C‐082 Access 1C‐082 0.8 0.8 0%Jun ‐16‐22 Jun‐17‐22 72.7 Structure 1C-083Structure 1C-083 381.5 381.5 Jun ‐16‐22 Nov‐10‐23 0.0 ERC‐1C‐083 Tower Erec Ɵon 1C‐083 0.9 0.9 0%Oct ‐03‐23 Oct ‐04‐23 0.0 REC‐1C‐083 ReclamaƟon 1C‐083 0.8 0.8 0%Nov‐10‐23 Nov‐10‐23 0.0 ASY‐1C‐083 Tower Assembly 1C ‐083 0.9 0.9 0%Oct ‐02‐23 Oct ‐03‐23 0.2 CLR‐1C‐083 Clearing 1C‐083 0.8 0.8 0%Jun ‐16‐22 Jun‐17‐22 14.3 SPT‐1C‐083 Spoƫng 1C‐083 0.8 0.8 0%Aug‐05‐22 Aug‐05‐22 26.3 FDN‐1C‐083 FoundaƟons 1C‐083 0.8 0.8 0%Aug‐03‐22 Aug‐04‐22 26.8 ACC ‐1C‐083 Access 1C‐083 0.8 0.8 0%Jun ‐17‐22 Jun‐17‐22 72.7 Structure 1C-083AStructure 1C-083A 381.5 381.5 Jun ‐17‐22 Nov‐11‐23 0.0 ERC‐1C‐083‐A Tower Erec Ɵon 1C‐83A 0.9 0.9 0%Oct ‐04‐23 Oct ‐05‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐078 Tower Assembly 1C‐078 Clearing 1C‐078 Spoƫng 1C‐078 FoundaƟons 1C‐078 Access 1C‐078 Nov‐07‐23, Structure 1C‐079 Tower Erec Ɵon 1C‐079 ReclamaƟon 1C‐079 Tower Assembly 1C ‐079 Clearing 1C‐079 Spoƫng 1C‐079 FoundaƟons 1C‐079 Access 1C‐079 Nov‐08‐23, Structure 1C‐080 Tower Erec Ɵon 1C‐080 ReclamaƟon 1C‐080 Tower Assembly 1C ‐080 Clearing 1C‐080 Spoƫng 1C‐080 FoundaƟons 1C‐080 Access 1C‐080 Nov‐09‐23, Structure 1C‐081 Tower Erec Ɵon 1C‐081 ReclamaƟon 1C‐081 Tower Assembly 1C ‐081 Clearing 1C‐081 Spoƫng 1C‐081 FoundaƟons 1C‐081 Access 1C‐081 Nov‐10‐23, Structure 1C‐082 Tower Erec Ɵon 1C‐082 ReclamaƟon 1C‐082 Tower Assembly 1C ‐082 Clearing 1C‐082 Spoƫng 1C‐082 FoundaƟons 1C‐082 Access 1C‐082 Nov‐10‐23, Structure 1C‐083 Tower Erec Ɵon 1C‐083 ReclamaƟon 1C‐083 Tower Assembly 1C ‐083 Clearing 1C‐083 Spoƫng 1C‐083 FoundaƟons 1C‐083 Access 1C ‐083 Nov‐11‐23, Structure 1C‐083A Tower Erec Ɵon 1C‐83A Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 77 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐083‐A ReclamaƟon 1C‐83A 0.8 0.8 0%Nov‐10‐23 Nov‐11‐23 0.0 ASY‐1C‐083‐A Tower Assembly 1C ‐83A 0.9 0.9 0%Oct ‐03‐23 Oct ‐04‐23 0.2 CLR‐1C‐083‐A Clearing 1C‐83A 0.8 0.8 0%Jun ‐17‐22 Jun‐17‐22 14.3 SPT‐1C‐083‐A Spoƫng 1C‐83A 0.8 0.8 0%Aug‐05‐22 Aug‐06‐22 26.3 FDN‐1C‐083‐A FoundaƟons 1C‐83A 0.5 0.5 0%Aug‐04‐22 Aug‐05‐22 27.1 ACC ‐1C‐083‐A Access 1C‐83A 0.8 0.8 0%Jun ‐17‐22 Jun‐18‐22 72.9 Structure 1C-083BStructure 1C-083B 381.5 381.5 Jun ‐17‐22 Nov‐12‐23 0.0 ERC‐1C‐083‐B Tower Erec Ɵon 1C‐83B 0.9 0.9 0%Oct ‐05‐23 Oct ‐06‐23 0.0 REC‐1C‐083‐B ReclamaƟon 1C‐83B 0.8 0.8 0%Nov‐11‐23 Nov‐12‐23 0.0 ASY‐1C‐083‐B Tower Assembly 1C ‐83B 0.9 0.9 0%Oct ‐04‐23 Oct ‐05‐23 0.2 CLR‐1C‐083‐B Clearing 1C‐83B 0.8 0.8 0%Jun ‐17‐22 Jun‐18‐22 14.3 SPT‐1C‐083‐B Spoƫng 1C‐83B 0.8 0.8 0%Aug‐06‐22 Aug‐07‐22 26.3 FDN‐1C‐083‐B FoundaƟons 1C‐83B 0.5 0.5 0%Aug‐05‐22 Aug‐05‐22 27.4 ACC ‐1C‐083‐B Access 1C‐83B 0.8 0.8 0%Jun ‐18‐22 Jun‐19‐22 72.9 Structure 1C-084Structure 1C-084 381.4 381.4 Jun ‐18‐22 Nov‐13‐23 0.0 ERC‐1C‐084 Tower Erec Ɵon 1C‐084 0.9 0.9 0%Oct ‐06‐23 Oct ‐06‐23 0.0 REC‐1C‐084 ReclamaƟon 1C‐084 0.8 0.8 0%Nov‐12‐23 Nov‐13‐23 0.0 ASY‐1C‐084 Tower Assembly 1C ‐084 0.9 0.9 0%Oct ‐05‐23 Oct ‐05‐23 0.2 CLR‐1C‐084 Clearing 1C‐084 0.8 0.8 0%Jun ‐18‐22 Jun‐19‐22 14.3 SPT‐1C‐084 Spoƫng 1C‐084 0.8 0.8 0%Aug‐07‐22 Aug‐08‐22 26.3 FDN‐1C‐084 FoundaƟons 1C‐084 0.8 0.8 0%Aug‐05‐22 Aug‐06‐22 27.5 ACC ‐1C‐084 Access 1C‐084 0.8 0.8 0%Jun ‐19‐22 Jun‐20‐22 72.7 Structure 1C-085Structure 1C-085 381.4 381.4 Jun ‐19‐22 Nov‐13‐23 0.0 ERC‐1C‐085 Tower Erec Ɵon 1C‐085 0.9 0.9 0%Oct ‐06‐23 Oct ‐07‐23 0.0 REC‐1C‐085 ReclamaƟon 1C‐085 0.8 0.8 0%Nov‐13‐23 Nov‐13‐23 0.0 ASY‐1C‐085 Tower Assembly 1C ‐085 0.9 0.9 0%Oct ‐05‐23 Oct ‐06‐23 0.3 CLR‐1C‐085 Clearing 1C‐085 0.8 0.8 0%Jun ‐19‐22 Jun‐20‐22 14.3 SPT‐1C‐085 Spoƫng 1C‐085 0.8 0.8 0%Aug‐08‐22 Aug‐09‐22 26.3 FDN‐1C‐085 FoundaƟons 1C‐085 0.8 0.8 0%Aug‐06‐22 Aug‐07‐22 27.5 ACC ‐1C‐085 Access 1C‐085 0.8 0.8 0%Jun ‐20‐22 Jun‐21‐22 72.7 Structure 1C-086Structure 1C-086 381.4 381.4 Jun ‐20‐22 Nov‐14‐23 0.0 ERC‐1C‐086 Tower Erec Ɵon 1C‐086 0.9 0.9 0%Oct ‐07‐23 Oct ‐08‐23 0.0 REC‐1C‐086 ReclamaƟon 1C‐086 0.8 0.8 0%Nov‐13‐23 Nov‐14‐23 0.0 ASY‐1C‐086 Tower Assembly 1C ‐086 0.9 0.9 0%Oct ‐06‐23 Oct ‐07‐23 0.3 CLR‐1C‐086 Clearing 1C‐086 0.8 0.8 0%Jun ‐20‐22 Jun‐21‐22 14.3 SPT‐1C‐086 Spoƫng 1C‐086 0.8 0.8 0%Aug‐09‐22 Aug‐09‐22 26.3 FDN‐1C‐086 FoundaƟons 1C‐086 0.8 0.8 0%Aug‐07‐22 Aug‐07‐22 27.6 ACC ‐1C‐086 Access 1C‐086 0.8 0.8 0%Jun ‐21‐22 Jun‐21‐22 72.7 Structure 1C-087Structure 1C-087 381.4 381.4 Jun ‐21‐22 Nov‐15‐23 0.0 ERC‐1C‐087 Tower Erec Ɵon 1C‐087 0.9 0.9 0%Oct ‐08‐23 Oct ‐09‐23 0.0 REC‐1C‐087 ReclamaƟon 1C‐087 0.8 0.8 0%Nov‐14‐23 Nov‐15‐23 0.0 ASY‐1C‐087 Tower Assembly 1C ‐087 0.9 0.9 0%Oct ‐07‐23 Oct ‐08‐23 0.3 CLR‐1C‐087 Clearing 1C‐087 0.8 0.8 0%Jun ‐21‐22 Jun‐21‐22 14.3 SPT‐1C‐087 Spoƫng 1C‐087 0.8 0.8 0%Aug‐10‐22 Aug‐11‐22 25.3 FDN‐1C‐087 FoundaƟons 1C‐087 0.8 0.8 0%Aug‐07‐22 Aug‐08‐22 27.6 ACC ‐1C‐087 Access 1C‐087 0.8 0.8 0%Jun ‐21‐22 Jun‐22‐22 72.7 Structure 1C-088Structure 1C-088 293.8 293.8 Sep‐19‐22 Nov‐16‐23 0.0 ERC‐1C‐088 Tower Erec Ɵon 1C‐088 0.9 0.9 0%Oct ‐09‐23 Oct ‐10‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐83A Tower Assembly 1C ‐83A Clearing 1C‐83A Spoƫng 1C‐83A FoundaƟons 1C‐83A Access 1C ‐83A Nov‐12‐23, Structure 1C‐083B Tower Erec Ɵon 1C‐83B ReclamaƟon 1C‐83B Tower Assembly 1C ‐83B Clearing 1C‐83B Spoƫng 1C‐83B FoundaƟons 1C‐83B Access 1C ‐83B Nov‐13‐23, Structure 1C‐084 Tower Erec Ɵon 1C‐084 ReclamaƟon 1C‐084 Tower Assembly 1C ‐084 Clearing 1C‐084 Spoƫng 1C‐084 FoundaƟons 1C‐084 Access 1C ‐084 Nov‐13‐23, Structure 1C‐085 Tower Erec Ɵon 1C‐085 ReclamaƟon 1C‐085 Tower Assembly 1C ‐085 Clearing 1C‐085 Spoƫng 1C‐085 FoundaƟons 1C‐085 Access 1C‐085 Nov‐14‐23, Structure 1C‐086 Tower Erec Ɵon 1C‐086 ReclamaƟon 1C‐086 Tower Assembly 1C ‐086 Clearing 1C‐086 Spoƫng 1C‐086 FoundaƟons 1C‐086 Access 1C‐086 Nov‐15‐23, Structure 1C‐087 Tower Erec Ɵon 1C‐087 ReclamaƟon 1C‐087 Tower Assembly 1C ‐087 Clearing 1C‐087 Spoƫng 1C‐087 FoundaƟons 1C‐087 Access 1C‐087 Nov‐16‐23, Structure 1C‐088 Tower Erec Ɵon 1C‐088 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 78 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐088 ReclamaƟon 1C‐088 0.8 0.8 0%Nov‐15‐23 Nov‐16‐23 0.0 ASY‐1C‐088 Tower Assembly 1C ‐088 0.9 0.9 0%Oct ‐08‐23 Oct ‐09‐23 0.3 CLR‐1C‐088 Clearing 1C‐088 3.5 3.5 0%Sep‐19‐22 Sep‐23‐22 12.7 ACC ‐1C‐088 Access 1C‐088 3.5 3.5 0%Sep‐23‐22 Sep‐26‐22 18.8 FDN‐1C‐088 FoundaƟons 1C‐088 0.4 0.4 0%Sep‐26‐22 Sep‐26‐22 18.8 SPT‐1C‐088 Spoƫng 1C‐088 3.5 3.5 0%Sep‐26‐22 Sep‐30‐22 26.4 Structure 1C-089Structure 1C-089 291.1 291.1 Sep‐23‐22 Nov‐17‐23 0.0 ERC‐1C‐089 Tower Erec Ɵon 1C‐089 0.9 0.9 0%Oct ‐10‐23 Oct ‐11‐23 0.0 REC‐1C‐089 ReclamaƟon 1C‐089 0.8 0.8 0%Nov‐16‐23 Nov‐17‐23 0.0 ASY‐1C‐089 Tower Assembly 1C ‐089 0.9 0.9 0%Oct ‐09‐23 Oct ‐10‐23 0.3 CLR‐1C‐089 Clearing 1C‐089 3.5 3.5 0%Sep‐23‐22 Sep‐26‐22 12.7 ACC ‐1C‐089 Access 1C‐089 3.5 3.5 0%Sep‐26‐22 Sep‐30‐22 15.8 FDN‐1C‐089 FoundaƟons 1C‐089 0.4 0.4 0%Sep‐30‐22 Sep‐30‐22 15.8 SPT‐1C‐089 Spoƫng 1C‐089 3.5 3.5 0%Sep‐30‐22 Oct ‐03‐22 26.4 Structure 1C-090Structure 1C-090 288.4 288.4 Sep‐26‐22 Nov‐17‐23 0.0 ERC‐1C‐090 Tower Erec Ɵon 1C‐090 0.9 0.9 0%Oct ‐11‐23 Oct ‐12‐23 0.0 REC‐1C‐090 ReclamaƟon 1C‐090 0.8 0.8 0%Nov‐17‐23 Nov‐17‐23 0.0 ASY‐1C‐090 Tower Assembly 1C ‐090 0.9 0.9 0%Oct ‐10‐23 Oct ‐11‐23 0.3 CLR‐1C‐090 Clearing 1C‐090 3.5 3.5 0%Sep‐26‐22 Sep‐30‐22 12.7 ACC ‐1C‐090 Access 1C‐090 3.5 3.5 0%Sep‐30‐22 Oct ‐03‐22 12.7 FDN‐1C‐090 FoundaƟons 1C‐090 0.4 0.4 0%Oct ‐03‐22 Oct ‐03‐22 12.7 SPT‐1C‐090 Spoƫng 1C‐090 3.5 3.5 0%Oct ‐03‐22 Oct ‐07‐22 26.4 Structure 1C-091Structure 1C-091 369.7 369.7 Jul‐06‐22 Nov‐18‐23 0.0 ERC‐1C‐091 Tower Erec Ɵon 1C‐091 0.9 0.9 0%Oct ‐12‐23 Oct ‐13‐23 0.0 REC‐1C‐091 ReclamaƟon 1C‐091 0.8 0.8 0%Nov‐17‐23 Nov‐18‐23 0.0 ASY‐1C‐091 Tower Assembly 1C ‐091 0.9 0.9 0%Oct ‐11‐23 Oct ‐11‐23 0.3 FDN‐1C‐091 FoundaƟons 1C‐091 0.4 0.4 0%Oct ‐03‐22 Oct ‐04‐22 12.7 CLR‐1C‐091 Clearing 1C‐091 0.7 0.7 0%Jul‐06‐22 Jul‐07‐22 20.1 SPT‐1C‐091 Spoƫng 1C‐091 0.7 0.7 0%Oct ‐07‐22 Oct ‐08‐22 26.4 ACC ‐1C‐091 Access 1C‐091 0.7 0.7 0%Jul‐07‐22 Jul‐08‐22 99.4 Structure 1C-092Structure 1C-092 371.1 371.1 Jul‐06‐22 Nov‐19‐23 0.0 ERC‐1C‐092 Tower Erec Ɵon 1C‐092 0.9 0.9 0%Oct ‐13‐23 Oct ‐13‐23 0.0 REC‐1C‐092 ReclamaƟon 1C‐092 0.8 0.8 0%Nov‐18‐23 Nov‐19‐23 0.0 ASY‐1C‐092 Tower Assembly 1C ‐092 0.9 0.9 0%Oct ‐11‐23 Oct ‐12‐23 0.3 CLR‐1C‐092 Clearing 1C‐092 0.7 0.7 0%Jul‐06‐22 Jul‐06‐22 12.6 FDN‐1C‐092 FoundaƟons 1C‐092 0.4 0.4 0%Oct ‐04‐22 Oct ‐04‐22 12.7 SPT‐1C‐092 Spoƫng 1C‐092 0.7 0.7 0%Oct ‐08‐22 Oct ‐08‐22 26.4 ACC ‐1C‐092 Access 1C‐092 0.7 0.7 0%Jul‐06‐22 Jul‐07‐22 29.3 Structure 1C-093Structure 1C-093 372.6 372.6 Jul‐05‐22 Nov‐20‐23 0.0 ERC‐1C‐093 Tower Erec Ɵon 1C‐093 0.9 0.9 0%Oct ‐13‐23 Oct ‐14‐23 0.0 REC‐1C‐093 ReclamaƟon 1C‐093 0.8 0.8 0%Nov‐19‐23 Nov‐20‐23 0.0 ASY‐1C‐093 Tower Assembly 1C ‐093 0.9 0.9 0%Oct ‐12‐23 Oct ‐13‐23 0.3 CLR‐1C‐093 Clearing 1C‐093 0.7 0.7 0%Jul‐05‐22 Jul‐06‐22 12.6 FDN‐1C‐093 FoundaƟons 1C‐093 0.4 0.4 0%Oct ‐04‐22 Oct ‐05‐22 12.7 SPT‐1C‐093 Spoƫng 1C‐093 0.7 0.7 0%Oct ‐08‐22 Oct ‐09‐22 26.4 ACC ‐1C‐093 Access 1C‐093 0.7 0.7 0%Jul‐06‐22 Jul‐06‐22 29.3 Structure 1C-094Structure 1C-094 374.0 374.0 Jul‐03‐22 Nov‐20‐23 0.0 ERC‐1C‐094 Tower Erec Ɵon 1C‐094 0.9 0.9 0%Oct ‐14‐23 Oct ‐15‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐088 Tower Assembly 1C‐088 Clearing 1C‐088 Access 1C‐088 FoundaƟons 1C‐088 Spoƫng 1C‐088 Nov‐17‐23, Structure 1C‐089 Tower Erec Ɵon 1C‐089 ReclamaƟon 1C‐089 Tower Assembly 1C ‐089 Clearing 1C‐089 Access 1C ‐089 FoundaƟons 1C‐089 Spoƫng 1C‐089 Nov‐17‐23, Structure 1C‐090 Tower Erec Ɵon 1C‐090 ReclamaƟon 1C‐090 Tower Assembly 1C ‐090 Clearing 1C‐090 Access 1C‐090 FoundaƟons 1C‐090 Spoƫng 1C‐090 Nov‐18‐23, Structure 1C‐091 Tower Erec Ɵon 1C‐091 ReclamaƟon 1C‐091 Tower Assembly 1C ‐091 FoundaƟons 1C‐091 Clearing 1C‐091 Spoƫng 1C‐091 Access 1C‐091 Nov‐19‐23, Structure 1C‐092 Tower Erec Ɵon 1C‐092 ReclamaƟon 1C‐092 Tower Assembly 1C ‐092 Clearing 1C‐092 FoundaƟons 1C‐092 Spoƫng 1C‐092 Access 1C‐092 Nov ‐20‐23, Structure 1C‐093 Tower Erec Ɵon 1C‐093 ReclamaƟon 1C‐093 Tower Assembly 1C ‐093 Clearing 1C‐093 FoundaƟons 1C‐093 Spoƫng 1C‐093 Access 1C‐093 Nov ‐20‐23, Structure 1C‐094 Tower Erec Ɵon 1C‐094 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 79 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐094 ReclamaƟon 1C‐094 0.8 0.8 0%Nov‐20‐23 Nov‐20‐23 0.0 ASY‐1C‐094 Tower Assembly 1C ‐094 0.9 0.9 0%Oct ‐13‐23 Oct ‐14‐23 0.3 CLR‐1C‐094 Clearing 1C‐094 0.7 0.7 0%Jul‐03‐22 Jul‐05‐22 12.6 FDN‐1C‐094 FoundaƟons 1C‐094 0.4 0.4 0%Oct ‐05‐22 Oct ‐05‐22 12.7 SPT‐1C‐094 Spoƫng 1C‐094 0.7 0.7 0%Oct ‐09‐22 Oct ‐10‐22 26.4 ACC ‐1C‐094 Access 1C‐094 0.7 0.7 0%Jul‐05‐22 Jul‐06‐22 29.3 Structure 1C-095Structure 1C-095 357.2 357.2 Jul‐22‐22 Nov‐21‐23 0.0 ERC‐1C‐095 Tower Erec Ɵon 1C‐095 0.9 0.9 0%Oct ‐15‐23 Oct ‐16‐23 0.0 REC‐1C‐095 ReclamaƟon 1C‐095 0.8 0.8 0%Nov‐20‐23 Nov‐21‐23 0.0 ASY‐1C‐095 Tower Assembly 1C ‐095 0.9 0.9 0%Oct ‐14‐23 Oct ‐15‐23 0.3 CLR‐1C‐095 Clearing 1C‐095 1.5 1.5 0%Jul‐22‐22 Jul‐24‐22 12.6 FDN‐1C‐095 FoundaƟons 1C‐095 0.4 0.4 0%Oct ‐05‐22 Oct ‐06‐22 12.7 SPT‐1C‐095 Spoƫng 1C‐095 1.5 1.5 0%Oct ‐10‐22 Oct ‐11‐22 26.4 ACC ‐1C‐095 Access 1C‐095 1.5 1.5 0%Jul‐24‐22 Jul‐25‐22 83.9 Structure 1C-096Structure 1C-096 359.5 359.5 Jul‐21‐22 Nov‐22‐23 0.0 ERC‐1C‐096 Tower Erec Ɵon 1C‐096 0.9 0.9 0%Oct ‐16‐23 Oct ‐17‐23 0.0 REC‐1C‐096 ReclamaƟon 1C‐096 0.8 0.8 0%Nov‐21‐23 Nov‐22‐23 0.0 ASY‐1C‐096 Tower Assembly 1C ‐096 0.9 0.9 0%Oct ‐15‐23 Oct ‐16‐23 0.3 CLR‐1C‐096 Clearing 1C‐096 1.5 1.5 0%Jul‐21‐22 Jul‐22‐22 12.6 FDN‐1C‐096 FoundaƟons 1C‐096 0.4 0.4 0%Oct ‐06‐22 Oct ‐06‐22 12.7 SPT‐1C‐096 Spoƫng 1C‐096 1.5 1.5 0%Oct ‐11‐22 Oct ‐13‐22 26.4 ACC ‐1C‐096 Access 1C‐096 1.5 1.5 0%Jul‐22‐22 Jul‐24‐22 85.8 Structure 1C-097Structure 1C-097 361.8 361.8 Jul‐19‐22 Nov‐25‐23 0.0 ERC‐1C‐097 Tower Erec Ɵon 1C‐097 0.9 0.9 0%Oct ‐17‐23 Oct ‐18‐23 0.0 REC‐1C‐097 ReclamaƟon 1C‐097 0.8 0.8 0%Nov‐22‐23 Nov‐25‐23 0.0 ASY‐1C‐097 Tower Assembly 1C ‐097 0.9 0.9 0%Oct ‐16‐23 Oct ‐17‐23 0.3 CLR‐1C‐097 Clearing 1C‐097 1.5 1.5 0%Jul‐19‐22 Jul‐21‐22 12.6 FDN‐1C‐097 FoundaƟons 1C‐097 0.4 0.4 0%Oct ‐06‐22 Oct ‐07‐22 12.7 SPT‐1C‐097 Spoƫng 1C‐097 1.5 1.5 0%Oct ‐13‐22 Oct ‐14‐22 26.4 ACC ‐1C‐097 Access 1C‐097 1.5 1.5 0%Jul‐21‐22 Jul‐22‐22 87.8 Structure 1C-098Structure 1C-098 364.0 364.0 Jul‐18‐22 Nov‐26‐23 0.0 ERC‐1C‐098 Tower Erec Ɵon 1C‐098 0.9 0.9 0%Oct ‐18‐23 Oct ‐19‐23 0.0 REC‐1C‐098 ReclamaƟon 1C‐098 0.8 0.8 0%Nov‐25‐23 Nov‐26‐23 0.0 ASY‐1C‐098 Tower Assembly 1C ‐098 0.9 0.9 0%Oct ‐17‐23 Oct ‐18‐23 0.3 CLR‐1C‐098 Clearing 1C‐098 1.5 1.5 0%Jul‐18‐22 Jul‐19‐22 12.6 FDN‐1C‐098 FoundaƟons 1C‐098 0.4 0.4 0%Oct ‐07‐22 Oct ‐07‐22 12.7 SPT‐1C‐098 Spoƫng 1C‐098 1.5 1.5 0%Oct ‐14‐22 Oct ‐16‐22 26.4 ACC ‐1C‐098 Access 1C‐098 1.5 1.5 0%Jul‐19‐22 Jul‐21‐22 89.7 Structure 1C-099Structure 1C-099 366.3 366.3 Jul‐16‐22 Nov‐26‐23 0.0 ERC‐1C‐099 Tower Erec Ɵon 1C‐099 0.9 0.9 0%Oct ‐19‐23 Oct ‐20‐23 0.0 REC‐1C‐099 ReclamaƟon 1C‐099 0.8 0.8 0%Nov‐26‐23 Nov‐26‐23 0.0 ASY‐1C‐099 Tower Assembly 1C ‐099 0.9 0.9 0%Oct ‐18‐23 Oct ‐18‐23 0.3 CLR‐1C‐099 Clearing 1C‐099 1.5 1.5 0%Jul‐16‐22 Jul‐18‐22 12.6 FDN‐1C‐099 FoundaƟons 1C‐099 0.4 0.4 0%Oct ‐07‐22 Oct ‐07‐22 12.7 SPT‐1C‐099 Spoƫng 1C‐099 1.5 1.5 0%Oct ‐16‐22 Oct ‐17‐22 26.4 ACC ‐1C‐099 Access 1C‐099 1.5 1.5 0%Jul‐18‐22 Jul‐19‐22 91.6 Structure 1C-100Structure 1C-100 368.6 368.6 Jul‐15‐22 Nov‐27‐23 0.0 ERC‐1C‐100 Tower Erec Ɵon 1C‐100 0.9 0.9 0%Oct ‐20‐23 Oct ‐20‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐094 Tower Assembly 1C ‐094 Clearing 1C‐094 FoundaƟons 1C‐094 Spoƫng 1C‐094 Access 1C‐094 Nov ‐21‐23, Structure 1C‐095 Tower Erec Ɵon 1C‐095 ReclamaƟon 1C‐095 Tower Assembly 1C ‐095 Clearing 1C‐095 FoundaƟons 1C‐095 Spoƫng 1C‐095 Access 1C‐095 Nov‐22‐23, Structure 1C‐096 Tower Erec Ɵon 1C‐096 ReclamaƟon 1C‐096 Tower Assembly 1C ‐096 Clearing 1C‐096 FoundaƟons 1C‐096 Spoƫng 1C‐096 Access 1C‐096 Nov‐25‐23, Structure 1C‐097 Tower Erec Ɵon 1C‐097 ReclamaƟon 1C‐097 Tower Assembly 1C ‐097 Clearing 1C‐097 FoundaƟons 1C‐097 Spoƫng 1C‐097 Access 1C‐097 Nov‐26‐23, Structure 1C‐098 Tower Erec Ɵon 1C‐098 ReclamaƟon 1C‐098 Tower Assembly 1C ‐098 Clearing 1C‐098 FoundaƟons 1C‐098 Spoƫng 1C‐098 Access 1C‐098 Nov‐26‐23, Structure 1C‐099 Tower Erec Ɵon 1C‐099 ReclamaƟon 1C‐099 Tower Assembly 1C ‐099 Clearing 1C‐099 FoundaƟons 1C‐099 Spoƫng 1C‐099 Access 1C‐099 Nov‐27‐23, Structure 1C‐100 Tower Erec Ɵon 1C‐100 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 80 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐100 ReclamaƟon 1C‐100 0.8 0.8 0%Nov‐26‐23 Nov‐27‐23 0.0 ASY‐1C‐100 Tower Assembly 1C ‐100 0.9 0.9 0%Oct ‐18‐23 Oct ‐19‐23 0.3 CLR‐1C‐100 Clearing 1C‐100 1.5 1.5 0%Jul‐15‐22 Jul‐16‐22 12.6 FDN‐1C‐100 FoundaƟons 1C‐100 0.4 0.4 0%Oct ‐07‐22 Oct ‐08‐22 12.7 SPT‐1C‐100 Spoƫng 1C‐100 1.5 1.5 0%Oct ‐17‐22 Oct ‐19‐22 26.4 ACC ‐1C‐100 Access 1C‐100 1.5 1.5 0%Jul‐16‐22 Jul‐18‐22 93.6 Structure 1C-101Structure 1C-101 385.4 385.4 Jun ‐28‐22 Nov‐28‐23 0.0 ERC‐1C‐101 Tower Erec Ɵon 1C‐101 0.9 0.9 0%Oct ‐20‐23 Oct ‐21‐23 0.0 REC‐1C‐101 ReclamaƟon 1C‐101 0.8 0.8 0%Nov‐27‐23 Nov‐28‐23 0.0 ASY‐1C‐101 Tower Assembly 1C ‐101 0.9 0.9 0%Oct ‐19‐23 Oct ‐20‐23 0.3 FDN‐1C‐101 FoundaƟons 1C‐101 0.4 0.4 0%Oct ‐08‐22 Oct ‐08‐22 12.7 CLR‐1C‐101 Clearing 1C‐101 1.2 1.2 0%Jun ‐28‐22 Jun‐29‐22 17.4 ACC ‐1C‐101 Access 1C‐101 1.2 1.2 0%Jun ‐29‐22 Jun‐30‐22 25.6 SPT‐1C‐101 Spoƫng 1C‐101 1.2 1.2 0%Oct ‐19‐22 Oct ‐20‐22 26.4 Structure 1C-102Structure 1C-102 387.4 387.4 Jun ‐26‐22 Nov‐29‐23 0.0 ERC‐1C‐102 Tower Erec Ɵon 1C‐102 0.9 0.9 0%Oct ‐21‐23 Oct ‐22‐23 0.0 REC‐1C‐102 ReclamaƟon 1C‐102 0.8 0.8 0%Nov‐28‐23 Nov‐29‐23 0.0 ASY‐1C‐102 Tower Assembly 1C ‐102 0.9 0.9 0%Oct ‐20‐23 Oct ‐21‐23 0.3 FDN‐1C‐102 FoundaƟons 1C‐102 0.4 0.4 0%Oct ‐08‐22 Oct ‐09‐22 12.7 CLR‐1C‐102 Clearing 1C‐102 1.2 1.2 0%Jun ‐26‐22 Jun‐28‐22 17.4 ACC ‐1C‐102 Access 1C‐102 1.2 1.2 0%Jun ‐28‐22 Jun‐29‐22 25.6 SPT‐1C‐102 Spoƫng 1C‐102 1.2 1.2 0%Oct ‐20‐22 Oct ‐21‐22 26.4 Structure 1C-103Structure 1C-103 389.3 389.3 Jun ‐25‐22 Nov‐30‐23 0.0 ERC‐1C‐103 Tower Erec Ɵon 1C‐103 0.9 0.9 0%Oct ‐22‐23 Oct ‐23‐23 0.0 REC‐1C‐103 ReclamaƟon 1C‐103 0.8 0.8 0%Nov‐29‐23 Nov‐30‐23 0.0 ASY‐1C‐103 Tower Assembly 1C ‐103 0.9 0.9 0%Oct ‐21‐23 Oct ‐22‐23 0.3 FDN‐1C‐103 FoundaƟons 1C‐103 0.4 0.4 0%Oct ‐09‐22 Oct ‐09‐22 12.7 CLR‐1C‐103 Clearing 1C‐103 1.2 1.2 0%Jun ‐25‐22 Jun‐26‐22 17.4 ACC ‐1C‐103 Access 1C‐103 1.2 1.2 0%Jun ‐26‐22 Jun‐28‐22 25.6 SPT‐1C‐103 Spoƫng 1C‐103 1.2 1.2 0%Oct ‐21‐22 Oct ‐22‐22 26.4 Structure 1C-104Structure 1C-104 391.2 391.2 Jun ‐24‐22 Nov‐30‐23 0.0 ERC‐1C‐104 Tower Erec Ɵon 1C‐104 0.9 0.9 0%Oct ‐23‐23 Oct ‐24‐23 0.0 REC‐1C‐104 ReclamaƟon 1C‐104 0.8 0.8 0%Nov‐30‐23 Nov‐30‐23 0.0 ASY‐1C‐104 Tower Assembly 1C ‐104 0.9 0.9 0%Oct ‐22‐23 Oct ‐23‐23 0.3 FDN‐1C‐104 FoundaƟons 1C‐104 0.4 0.4 0%Oct ‐09‐22 Oct ‐10‐22 12.7 CLR‐1C‐104 Clearing 1C‐104 1.2 1.2 0%Jun ‐24‐22 Jun‐25‐22 17.4 ACC ‐1C‐104 Access 1C‐104 1.2 1.2 0%Jun ‐25‐22 Jun‐26‐22 25.6 SPT‐1C‐104 Spoƫng 1C‐104 1.2 1.2 0%Oct ‐22‐22 Oct ‐23‐22 26.4 Structure 1C-105Structure 1C-105 393.2 393.2 Jun ‐23‐22 Dec‐01‐23 0.0 ERC‐1C‐105 Tower Erec Ɵon 1C‐105 0.9 0.9 0%Oct ‐24‐23 Oct ‐25‐23 0.0 REC‐1C‐105 ReclamaƟon 1C‐105 0.8 0.8 0%Nov‐30‐23 Dec‐01‐23 0.0 ASY‐1C‐105 Tower Assembly 1C ‐105 0.9 0.9 0%Oct ‐23‐23 Oct ‐24‐23 0.3 FDN‐1C‐105 FoundaƟons 1C‐105 0.4 0.4 0%Oct ‐10‐22 Oct ‐10‐22 12.7 CLR‐1C‐105 Clearing 1C‐105 1.2 1.2 0%Jun ‐23‐22 Jun‐24‐22 17.4 ACC ‐1C‐105 Access 1C‐105 1.2 1.2 0%Jun ‐24‐22 Jun‐25‐22 25.6 SPT‐1C‐105 Spoƫng 1C‐105 1.2 1.2 0%Oct ‐23‐22 Oct ‐24‐22 26.4 Structure 1C-106Structure 1C-106 395.1 395.1 Jun ‐22‐22 Dec‐02‐23 0.0 ERC‐1C‐106 Tower Erec Ɵon 1C‐106 0.9 0.9 0%Oct ‐25‐23 Oct ‐26‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐100 Tower Assembly 1C ‐100 Clearing 1C‐100 FoundaƟons 1C‐100 Spoƫng 1C‐100 Access 1C‐100 Nov‐28‐23, Structure 1C‐101 Tower Erec Ɵon 1C‐101 ReclamaƟon 1C‐101 Tower Assembly 1C‐101 FoundaƟons 1C‐101 Clearing 1C‐101 Access 1C ‐101 Spoƫng 1C‐101 Nov‐29‐23, Structure 1C‐102 Tower Erec Ɵon 1C‐102 ReclamaƟon 1C‐102 Tower Assembly 1C‐102 FoundaƟons 1C‐102 Clearing 1C‐102 Access 1C ‐102 Spoƫng 1C‐102 Nov‐30‐23, Structure 1C‐103 Tower Erec Ɵon 1C‐103 ReclamaƟon 1C‐103 Tower Assembly 1C‐103 FoundaƟons 1C‐103 Clearing 1C‐103 Access 1C‐103 Spoƫng 1C‐103 Nov‐30‐23, Structure 1C‐104 Tower Erec Ɵon 1C‐104 ReclamaƟon 1C‐104 Tower Assembly 1C ‐104 FoundaƟons 1C‐104 Clearing 1C‐104 Access 1C‐104 Spoƫng 1C‐104 Dec‐01‐23, Structure 1C‐105 Tower Erec Ɵon 1C‐105 ReclamaƟon 1C‐105 Tower Assembly 1C ‐105 FoundaƟons 1C‐105 Clearing 1C‐105 Access 1C‐105 Spoƫng 1C‐105 Dec‐02‐23, Structure 1C‐106 Tower Erec Ɵon 1C‐106 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 81 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐106 ReclamaƟon 1C‐106 0.8 0.8 0%Dec‐01‐23 Dec‐02‐23 0.0 ASY‐1C‐106 Tower Assembly 1C ‐106 0.9 0.9 0%Oct ‐24‐23 Oct ‐24‐23 0.3 FDN‐1C‐106 FoundaƟons 1C‐106 0.4 0.4 0%Oct ‐10‐22 Oct ‐11‐22 12.7 CLR‐1C‐106 Clearing 1C‐106 1.2 1.2 0%Jun ‐22‐22 Jun‐23‐22 17.4 ACC ‐1C‐106 Access 1C‐106 1.2 1.2 0%Jun ‐23‐22 Jun‐24‐22 25.6 SPT‐1C‐106 Spoƫng 1C‐106 1.2 1.2 0%Oct ‐24‐22 Oct ‐26‐22 26.4 Structure 1C-107Structure 1C-107 397.1 397.1 Jun ‐21‐22 Dec‐03‐23 0.0 ERC‐1C‐107 Tower Erec Ɵon 1C‐107 0.9 0.9 0%Oct ‐26‐23 Oct ‐26‐23 0.0 REC‐1C‐107 ReclamaƟon 1C‐107 0.8 0.8 0%Dec‐02‐23 Dec‐03‐23 0.0 ASY‐1C‐107 Tower Assembly 1C ‐107 0.9 0.9 0%Oct ‐24‐23 Oct ‐25‐23 0.3 FDN‐1C‐107 FoundaƟons 1C‐107 0.4 0.4 0%Oct ‐11‐22 Oct ‐11‐22 12.7 CLR‐1C‐107 Clearing 1C‐107 1.2 1.2 0%Jun ‐21‐22 Jun‐22‐22 17.4 ACC ‐1C‐107 Access 1C‐107 1.2 1.2 0%Jun ‐22‐22 Jun‐23‐22 25.6 SPT‐1C‐107 Spoƫng 1C‐107 1.2 1.2 0%Oct ‐26‐22 Oct ‐27‐22 26.4 Structure 1C-108Structure 1C-108 297.4 297.4 Oct ‐01‐22 Dec‐03‐23 0.0 ERC‐1C‐108 Tower Erec Ɵon 1C‐108 0.9 0.9 0%Oct ‐26‐23 Oct ‐27‐23 0.0 REC‐1C‐108 ReclamaƟon 1C‐108 0.8 0.8 0%Dec‐03‐23 Dec‐03‐23 0.0 ASY‐1C‐108 Tower Assembly 1C ‐108 0.9 0.9 0%Oct ‐25‐23 Oct ‐26‐23 0.3 FDN‐1C‐108 FoundaƟons 1C‐108 0.4 0.4 0%Oct ‐11‐22 Oct ‐11‐22 12.7 CLR‐1C‐108 Clearing 1C‐108 0.8 0.8 0%Oct ‐01‐22 Oct ‐02‐22 21.0 ACC ‐1C‐108 Access 1C‐108 0.8 0.8 0%Oct ‐02‐22 Oct ‐03‐22 21.0 SPT‐1C‐108 Spoƫng 1C‐108 0.8 0.8 0%Oct ‐27‐22 Oct ‐28‐22 26.4 Structure 1C-109Structure 1C-109 299.0 299.0 Sep‐30‐22 Dec‐04‐23 0.0 ERC‐1C‐109 Tower Erec Ɵon 1C‐109 0.9 0.9 0%Oct ‐27‐23 Oct ‐28‐23 0.0 REC‐1C‐109 ReclamaƟon 1C‐109 0.8 0.8 0%Dec‐03‐23 Dec‐04‐23 0.0 ASY‐1C‐109 Tower Assembly 1C ‐109 0.9 0.9 0%Oct ‐26‐23 Oct ‐27‐23 0.3 FDN‐1C‐109 FoundaƟons 1C‐109 0.4 0.4 0%Oct ‐11‐22 Oct ‐12‐22 12.7 CLR‐1C‐109 Clearing 1C‐109 0.8 0.8 0%Sep‐30‐22 Oct ‐01‐22 21.0 ACC ‐1C‐109 Access 1C‐109 0.8 0.8 0%Oct ‐01‐22 Oct ‐02‐22 22.3 SPT‐1C‐109 Spoƫng 1C‐109 0.8 0.8 0%Oct ‐28‐22 Oct ‐28‐22 26.4 Structure 1C-110Structure 1C-110 300.6 300.6 Sep‐29‐22 Dec‐05‐23 0.0 ERC‐1C‐110 Tower Erec Ɵon 1C‐110 0.9 0.9 0%Oct ‐28‐23 Oct ‐29‐23 0.0 REC‐1C‐110 ReclamaƟon 1C‐110 0.8 0.8 0%Dec‐04‐23 Dec‐05‐23 0.0 ASY‐1C‐110 Tower Assembly 1C ‐110 0.9 0.9 0%Oct ‐27‐23 Oct ‐28‐23 0.3 FDN‐1C‐110 FoundaƟons 1C‐110 0.4 0.4 0%Oct ‐12‐22 Oct ‐12‐22 12.7 CLR‐1C‐110 Clearing 1C‐110 0.8 0.8 0%Sep‐29‐22 Sep‐30‐22 16.2 ACC ‐1C‐110 Access 1C‐110 0.8 0.8 0%Sep‐30‐22 Oct ‐01‐22 23.6 SPT‐1C‐110 Spoƫng 1C‐110 0.8 0.8 0%Oct ‐28‐22 Oct ‐29‐22 26.4 Structure 1C-111Structure 1C-111 302.2 302.2 Sep‐29‐22 Dec‐06‐23 0.0 ERC‐1C‐111 Tower Erec Ɵon 1C‐111 0.9 0.9 0%Oct ‐29‐23 Oct ‐30‐23 0.0 REC‐1C‐111 ReclamaƟon 1C‐111 0.8 0.8 0%Dec‐05‐23 Dec‐06‐23 0.0 ASY‐1C‐111 Tower Assembly 1C ‐111 0.9 0.9 0%Oct ‐28‐23 Oct ‐29‐23 0.3 FDN‐1C‐111 FoundaƟons 1C‐111 0.4 0.4 0%Oct ‐12‐22 Oct ‐13‐22 12.7 CLR‐1C‐111 Clearing 1C‐111 0.8 0.8 0%Sep‐29‐22 Sep‐29‐22 16.2 ACC ‐1C‐111 Access 1C‐111 0.8 0.8 0%Sep‐29‐22 Sep‐30‐22 24.9 SPT‐1C‐111 Spoƫng 1C‐111 0.8 0.8 0%Oct ‐29‐22 Oct ‐30‐22 26.4 Structure 1C-112Structure 1C-112 303.8 303.8 Sep‐28‐22 Dec‐07‐23 0.0 ERC‐1C‐112 Tower Erec Ɵon 1C‐112 0.9 0.9 0%Oct ‐30‐23 Oct ‐31‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐106 Tower Assembly 1C ‐106 FoundaƟons 1C‐106 Clearing 1C‐106 Access 1C‐106 Spoƫng 1C‐106 Dec‐03‐23, Structure 1C‐107 Tower Erec Ɵon 1C‐107 ReclamaƟon 1C‐107 Tower Assembly 1C ‐107 FoundaƟons 1C‐107 Clearing 1C‐107 Access 1C‐107 Spoƫng 1C‐107 Dec‐03‐23, Structure 1C‐108 Tower Erec Ɵon 1C‐108 ReclamaƟon 1C‐108 Tower Assembly 1C ‐108 FoundaƟons 1C‐108 Clearing 1C‐108 Access 1C‐108 Spoƫng 1C‐108 Dec‐04‐23, Structure 1C‐109 Tower Erec Ɵon 1C‐109 ReclamaƟon 1C‐109 Tower Assembly 1C ‐109 FoundaƟons 1C‐109 Clearing 1C‐109 Access 1C‐109 Spoƫng 1C‐109 Dec ‐05‐23, Structure 1C‐110 Tower Erec Ɵon 1C‐110 ReclamaƟon 1C‐110 Tower Assembly 1C ‐110 FoundaƟons 1C‐110 Clearing 1C‐110 Access 1C‐110 Spoƫng 1C‐110 Dec ‐06‐23, Structure 1C‐111 Tower Erec Ɵon 1C‐111 ReclamaƟon 1C‐111 Tower Assembly 1C ‐111 FoundaƟons 1C‐111 Clearing 1C‐111 Access 1C ‐111 Spoƫng 1C‐111 Dec‐07‐23, Structure 1C‐112 Tower Erec Ɵon 1C‐112 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 82 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐112 ReclamaƟon 1C‐112 0.8 0.8 0%Dec‐06‐23 Dec‐07‐23 0.0 ASY‐1C‐112 Tower Assembly 1C ‐112 0.9 0.9 0%Oct ‐29‐23 Oct ‐30‐23 0.3 FDN‐1C‐112 FoundaƟons 1C‐112 0.4 0.4 0%Oct ‐13‐22 Oct ‐13‐22 12.7 CLR‐1C‐112 Clearing 1C‐112 0.8 0.8 0%Sep‐28‐22 Sep‐29‐22 16.2 ACC ‐1C‐112 Access 1C‐112 0.8 0.8 0%Sep‐29‐22 Sep‐29‐22 26.2 SPT‐1C‐112 Spoƫng 1C‐112 0.8 0.8 0%Oct ‐30‐22 Oct ‐31‐22 26.4 Structure 1C-113Structure 1C-113 305.5 305.5 Sep‐27‐22 Dec‐07‐23 0.0 ERC‐1C‐113 Tower Erec Ɵon 1C‐113 0.9 0.9 0%Oct ‐31‐23 Nov‐01‐23 0.0 REC‐1C‐113 ReclamaƟon 1C‐113 0.8 0.8 0%Dec‐07‐23 Dec‐07‐23 0.0 ASY‐1C‐113 Tower Assembly 1C ‐113 0.9 0.9 0%Oct ‐30‐23 Oct ‐31‐23 0.3 FDN‐1C‐113 FoundaƟons 1C‐113 0.4 0.4 0%Oct ‐13‐22 Oct ‐14‐22 12.7 CLR‐1C‐113 Clearing 1C‐113 0.8 0.8 0%Sep‐27‐22 Sep‐28‐22 16.2 SPT‐1C‐113 Spoƫng 1C‐113 0.8 0.8 0%Oct ‐31‐22 Nov‐01‐22 26.4 ACC ‐1C‐113 Access 1C‐113 0.8 0.8 0%Sep‐28‐22 Sep‐29‐22 27.4 Structure 1C-114Structure 1C-114 307.1 307.1 Sep‐26‐22 Dec‐08‐23 0.0 ERC‐1C‐114 Tower Erec Ɵon 1C‐114 0.9 0.9 0%Nov‐01‐23 Nov‐02‐23 0.0 REC‐1C‐114 ReclamaƟon 1C‐114 0.8 0.8 0%Dec‐07‐23 Dec‐08‐23 0.0 ASY‐1C‐114 Tower Assembly 1C ‐114 0.9 0.9 0%Oct ‐31‐23 Oct ‐31‐23 0.3 FDN‐1C‐114 FoundaƟons 1C‐114 0.4 0.4 0%Oct ‐14‐22 Oct ‐14‐22 12.7 CLR‐1C‐114 Clearing 1C‐114 0.8 0.8 0%Sep‐26‐22 Sep‐27‐22 16.2 SPT‐1C‐114 Spoƫng 1C‐114 0.8 0.8 0%Nov‐01‐22 Nov‐02‐22 26.4 ACC ‐1C‐114 Access 1C‐114 0.8 0.8 0%Sep‐27‐22 Sep‐28‐22 28.7 Structure 1C-115Structure 1C-115 423.4 423.4 Jun ‐01‐22 Dec‐09‐23 0.0 ERC‐1C‐115 Tower Erec Ɵon 1C‐115 0.9 0.9 0%Nov‐02‐23 Nov‐02‐23 0.0 REC‐1C‐115 ReclamaƟon 1C‐115 0.8 0.8 0%Dec‐08‐23 Dec‐09‐23 0.0 ASY‐1C‐115 Tower Assembly 1C ‐115 0.9 0.9 0%Oct ‐31‐23 Nov‐01‐23 0.4 ACC ‐1C‐115 Access 1C‐115 1.2 1.2 0%Jun ‐08‐22 Jun‐09‐22 12.0 CLR‐1C‐115 Clearing 1C‐115 0.7 0.7 0%Jun ‐01‐22 Jun‐01‐22 12.0 FDN‐1C‐115 FoundaƟons 1C‐115 0.8 0.8 0%Jun ‐09‐22 Jun‐10‐22 12.3 SPT‐1C‐115 Spoƫng 1C‐115 0.8 0.8 0%Jun ‐10‐22 Jun‐10‐22 12.3 Structure 1C-116Structure 1C-116 423.5 423.5 Jun ‐01‐22 Dec‐10‐23 0.0 ERC‐1C‐116 Tower Erec Ɵon 1C‐116 0.9 0.9 0%Nov‐02‐23 Nov‐03‐23 0.0 REC‐1C‐116 ReclamaƟon 1C‐116 0.8 0.8 0%Dec‐09‐23 Dec‐10‐23 0.0 ASY‐1C‐116 Tower Assembly 1C ‐116 0.9 0.9 0%Nov‐01‐23 Nov‐02‐23 0.4 ACC ‐1C‐116 Access 1C‐116 0.8 0.8 0%Jun ‐09‐22 Jun‐10‐22 12.0 CLR‐1C‐116 Clearing 1C‐116 0.7 0.7 0%Jun ‐01‐22 Jun‐02‐22 12.0 FDN‐1C‐116 FoundaƟons 1C‐116 0.8 0.8 0%Jun ‐10‐22 Jun‐10‐22 12.3 SPT‐1C‐116 Spoƫng 1C‐116 0.8 0.8 0%Jun ‐10‐22 Jun‐11‐22 12.3 Structure 1C-117Structure 1C-117 423.6 423.6 Jun ‐02‐22 Dec‐10‐23 0.0 ERC‐1C‐117 Tower Erec Ɵon 1C‐117 0.9 0.9 0%Nov‐03‐23 Nov‐04‐23 0.0 REC‐1C‐117 ReclamaƟon 1C‐117 0.8 0.8 0%Dec‐10‐23 Dec‐10‐23 0.0 ASY‐1C‐117 Tower Assembly 1C ‐117 0.9 0.9 0%Nov‐02‐23 Nov‐03‐23 0.4 ACC ‐1C‐117 Access 1C‐117 0.8 0.8 0%Jun ‐10‐22 Jun‐11‐22 12.0 CLR‐1C‐117 Clearing 1C‐117 0.7 0.7 0%Jun ‐02‐22 Jun‐02‐22 12.0 FDN‐1C‐117 FoundaƟons 1C‐117 0.8 0.8 0%Jun ‐11‐22 Jun‐11‐22 12.3 SPT‐1C‐117 Spoƫng 1C‐117 0.8 0.8 0%Jun ‐11‐22 Jun‐12‐22 12.3 Structure 1C-118Structure 1C-118 423.8 423.8 Jun ‐02‐22 Dec‐11‐23 0.0 ERC‐1C‐118 Tower Erec Ɵon 1C‐118 0.9 0.9 0%Nov‐04‐23 Nov‐05‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐112 Tower Assembly 1C ‐112 FoundaƟons 1C‐112 Clearing 1C‐112 Access 1C ‐112 Spoƫng 1C‐112 Dec‐07‐23, Structure 1C‐113 Tower Erec Ɵon 1C‐113 ReclamaƟon 1C‐113 Tower Assembly 1C‐113 FoundaƟons 1C‐113 Clearing 1C‐113 Spoƫng 1C‐113 Access 1C ‐113 Dec‐08‐23, Structure 1C‐114 Tower Erec Ɵon 1C‐114 ReclamaƟon 1C‐114 Tower Assembly 1C‐114 FoundaƟons 1C‐114 Clearing 1C‐114 Spoƫng 1C‐114 Access 1C ‐114 Dec‐09‐23, Structure 1C‐115 Tower Erec Ɵon 1C‐115 ReclamaƟon 1C‐115 Tower Assembly 1C‐115 Access 1C‐115 Clearing 1C‐115 FoundaƟons 1C‐115 Spoƫng 1C‐115 Dec‐10‐23, Structure 1C‐116 Tower Erec Ɵon 1C‐116 ReclamaƟon 1C‐116 Tower Assembly 1C‐116 Access 1C‐116 Clearing 1C‐116 FoundaƟons 1C‐116 Spoƫng 1C‐116 Dec‐10‐23, Structure 1C‐117 Tower Erec Ɵon 1C‐117 ReclamaƟon 1C‐117 Tower Assembly 1C ‐117 Access 1C‐117 Clearing 1C‐117 FoundaƟons 1C‐117 Spoƫng 1C‐117 Dec‐11‐23, Structure 1C‐118 Tower Erec Ɵon 1C‐118 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 83 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐118 ReclamaƟon 1C‐118 0.8 0.8 0%Dec‐10‐23 Dec‐11‐23 0.0 ASY‐1C‐118 Tower Assembly 1C ‐118 0.9 0.9 0%Nov‐03‐23 Nov‐04‐23 0.4 ACC ‐1C‐118 Access 1C‐118 0.8 0.8 0%Jun ‐11‐22 Jun‐11‐22 12.0 CLR‐1C‐118 Clearing 1C‐118 0.7 0.7 0%Jun ‐02‐22 Jun‐03‐22 12.0 FDN‐1C‐118 FoundaƟons 1C‐118 0.8 0.8 0%Jun ‐11‐22 Jun‐12‐22 12.3 SPT‐1C‐118 Spoƫng 1C‐118 0.8 0.8 0%Jun ‐12‐22 Jun‐13‐22 12.3 Structure 1C-119Structure 1C-119 423.9 423.9 Jun ‐03‐22 Dec‐12‐23 0.0 ERC‐1C‐119 Tower Erec Ɵon 1C‐119 0.9 0.9 0%Nov‐05‐23 Nov‐06‐23 0.0 REC‐1C‐119 ReclamaƟon 1C‐119 0.8 0.8 0%Dec‐11‐23 Dec‐12‐23 0.0 ASY‐1C‐119 Tower Assembly 1C ‐119 0.9 0.9 0%Nov‐04‐23 Nov‐05‐23 0.4 ACC ‐1C‐119 Access 1C‐119 0.8 0.8 0%Jun ‐11‐22 Jun‐12‐22 12.0 CLR‐1C‐119 Clearing 1C‐119 0.7 0.7 0%Jun ‐03‐22 Jun‐04‐22 12.0 FDN‐1C‐119 FoundaƟons 1C‐119 0.8 0.8 0%Jun ‐12‐22 Jun‐13‐22 12.3 SPT‐1C‐119 Spoƫng 1C‐119 0.8 0.8 0%Jun ‐13‐22 Jun‐14‐22 12.3 Structure 1C-120Structure 1C-120 424.0 424.0 Jun ‐04‐22 Dec‐13‐23 0.0 ERC‐1C‐120 Tower Erec Ɵon 1C‐120 0.9 0.9 0%Nov‐06‐23 Nov‐07‐23 0.0 REC‐1C‐120 ReclamaƟon 1C‐120 0.8 0.8 0%Dec‐12‐23 Dec‐13‐23 0.0 ASY‐1C‐120 Tower Assembly 1C ‐120 0.9 0.9 0%Nov‐05‐23 Nov‐06‐23 0.4 ACC ‐1C‐120 Access 1C‐120 0.8 0.8 0%Jun ‐12‐22 Jun‐13‐22 12.0 CLR‐1C‐120 Clearing 1C‐120 0.7 0.7 0%Jun ‐04‐22 Jun‐04‐22 12.0 FDN‐1C‐120 FoundaƟons 1C‐120 0.8 0.8 0%Jun ‐13‐22 Jun‐14‐22 12.3 SPT‐1C‐120 Spoƫng 1C‐120 0.8 0.8 0%Jun ‐14‐22 Jun‐14‐22 12.3 Structure 1C-121Structure 1C-121 424.2 424.2 Jun ‐04‐22 Dec‐14‐23 0.0 ERC‐1C‐121 Tower Erec Ɵon 1C‐121 0.9 0.9 0%Nov‐07‐23 Nov‐08‐23 0.0 REC‐1C‐121 ReclamaƟon 1C‐121 0.8 0.8 0%Dec‐13‐23 Dec‐14‐23 0.0 ASY‐1C‐121 Tower Assembly 1C ‐121 0.9 0.9 0%Nov‐06‐23 Nov‐06‐23 0.4 ACC ‐1C‐121 Access 1C‐121 0.8 0.8 0%Jun ‐13‐22 Jun‐14‐22 12.0 CLR‐1C‐121 Clearing 1C‐121 0.7 0.7 0%Jun ‐04‐22 Jun‐05‐22 12.0 FDN‐1C‐121 FoundaƟons 1C‐121 0.8 0.8 0%Jun ‐14‐22 Jun‐14‐22 12.3 SPT‐1C‐121 Spoƫng 1C‐121 0.8 0.8 0%Jun ‐14‐22 Jun‐15‐22 12.3 Structure 1C-122Structure 1C-122 424.3 424.3 Jun ‐05‐22 Dec‐14‐23 0.0 ERC‐1C‐122 Tower Erec Ɵon 1C‐122 0.9 0.9 0%Nov‐08‐23 Nov‐09‐23 0.0 REC‐1C‐122 ReclamaƟon 1C‐122 0.8 0.8 0%Dec‐14‐23 Dec‐14‐23 0.0 ASY‐1C‐122 Tower Assembly 1C ‐122 0.9 0.9 0%Nov‐06‐23 Nov‐07‐23 0.4 ACC ‐1C‐122 Access 1C‐122 0.8 0.8 0%Jun ‐14‐22 Jun‐15‐22 12.0 CLR‐1C‐122 Clearing 1C‐122 0.7 0.7 0%Jun ‐05‐22 Jun‐06‐22 12.0 FDN‐1C‐122 FoundaƟons 1C‐122 0.8 0.8 0%Jun ‐15‐22 Jun‐15‐22 12.3 SPT‐1C‐122 Spoƫng 1C‐122 0.8 0.8 0%Jun ‐15‐22 Jun‐16‐22 12.3 Structure 1C-123Structure 1C-123 424.4 424.4 Jun ‐06‐22 Dec‐15‐23 0.0 ERC‐1C‐123 Tower Erec Ɵon 1C‐123 0.9 0.9 0%Nov‐09‐23 Nov‐09‐23 0.0 REC‐1C‐123 ReclamaƟon 1C‐123 0.8 0.8 0%Dec‐14‐23 Dec‐15‐23 0.0 ASY‐1C‐123 Tower Assembly 1C ‐123 0.9 0.9 0%Nov‐07‐23 Nov‐08‐23 0.4 ACC ‐1C‐123 Access 1C‐123 0.8 0.8 0%Jun ‐15‐22 Jun‐15‐22 12.0 CLR‐1C‐123 Clearing 1C‐123 0.7 0.7 0%Jun ‐06‐22 Jun‐06‐22 12.0 FDN‐1C‐123 FoundaƟons 1C‐123 0.8 0.8 0%Jun ‐15‐22 Jun‐16‐22 12.3 SPT‐1C‐123 Spoƫng 1C‐123 0.8 0.8 0%Jun ‐16‐22 Jun‐17‐22 12.3 Structure 1C-124Structure 1C-124 424.5 424.5 Jun ‐06‐22 Dec‐16‐23 0.0 ERC‐1C‐124 Tower Erec Ɵon 1C‐124 0.9 0.9 0%Nov‐09‐23 Nov‐10‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐118 Tower Assembly 1C ‐118 Access 1C‐118 Clearing 1C‐118 FoundaƟons 1C‐118 Spoƫng 1C‐118 Dec‐12‐23, Structure 1C‐119 Tower Erec Ɵon 1C‐119 ReclamaƟon 1C‐119 Tower Assembly 1C ‐119 Access 1C‐119 Clearing 1C‐119 FoundaƟons 1C‐119 Spoƫng 1C‐119 Dec‐13‐23, Structure 1C‐120 Tower Erec Ɵon 1C‐120 ReclamaƟon 1C‐120 Tower Assembly 1C ‐120 Access 1C‐120 Clearing 1C‐120 FoundaƟons 1C‐120 Spoƫng 1C‐120 Dec‐14‐23, Structure 1C‐121 Tower Erec Ɵon 1C‐121 ReclamaƟon 1C‐121 Tower Assembly 1C ‐121 Access 1C‐121 Clearing 1C‐121 FoundaƟons 1C‐121 Spoƫng 1C‐121 Dec‐14‐23, Structure 1C‐122 Tower Erec Ɵon 1C‐122 ReclamaƟon 1C‐122 Tower Assembly 1C ‐122 Access 1C‐122 Clearing 1C‐122 FoundaƟons 1C‐122 Spoƫng 1C‐122 Dec‐15‐23, Structure 1C‐123 Tower Erec Ɵon 1C‐123 ReclamaƟon 1C‐123 Tower Assembly 1C ‐123 Access 1C‐123 Clearing 1C‐123 FoundaƟons 1C‐123 Spoƫng 1C‐123 Dec‐16‐23, Structure 1C‐124 Tower Erec Ɵon 1C‐124 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 84 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐124 ReclamaƟon 1C‐124 0.8 0.8 0%Dec‐15‐23 Dec‐16‐23 0.0 ASY‐1C‐124 Tower Assembly 1C ‐124 0.9 0.9 0%Nov‐08‐23 Nov‐09‐23 0.4 ACC ‐1C‐124 Access 1C‐124 0.8 0.8 0%Jun ‐15‐22 Jun‐16‐22 12.0 CLR‐1C‐124 Clearing 1C‐124 0.8 0.8 0%Jun ‐06‐22 Jun‐07‐22 12.0 FDN‐1C‐124 FoundaƟons 1C‐124 0.8 0.8 0%Jun ‐16‐22 Jun‐17‐22 12.3 SPT‐1C‐124 Spoƫng 1C‐124 0.8 0.8 0%Jun ‐17‐22 Jun‐18‐22 12.3 Structure 1C-125Structure 1C-125 424.5 424.5 Jun ‐07‐22 Dec‐17‐23 0.0 ERC‐1C‐125 Tower Erec Ɵon 1C‐125 0.9 0.9 0%Nov‐10‐23 Nov‐11‐23 0.0 REC‐1C‐125 ReclamaƟon 1C‐125 0.8 0.8 0%Dec‐16‐23 Dec‐17‐23 0.0 ASY‐1C‐125 Tower Assembly 1C ‐125 0.9 0.9 0%Nov‐09‐23 Nov‐10‐23 0.4 ACC ‐1C‐125 Access 1C‐125 0.8 0.8 0%Jun ‐16‐22 Jun‐17‐22 12.0 CLR‐1C‐125 Clearing 1C‐125 0.8 0.8 0%Jun ‐07‐22 Jun‐08‐22 12.0 FDN‐1C‐125 FoundaƟons 1C‐125 0.8 0.8 0%Jun ‐17‐22 Jun‐18‐22 12.2 SPT‐1C‐125 Spoƫng 1C‐125 0.8 0.8 0%Jun ‐18‐22 Jun‐18‐22 12.3 Structure 1C-126Structure 1C-126 424.5 424.5 Jun ‐08‐22 Dec‐17‐23 0.0 ERC‐1C‐126 Tower Erec Ɵon 1C‐126 0.9 0.9 0%Nov‐11‐23 Nov‐12‐23 0.0 REC‐1C‐126 ReclamaƟon 1C‐126 0.8 0.8 0%Dec‐17‐23 Dec‐17‐23 0.0 ASY‐1C‐126 Tower Assembly 1C ‐126 0.9 0.9 0%Nov‐10‐23 Nov‐11‐23 0.4 ACC ‐1C‐126 Access 1C‐126 0.8 0.8 0%Jun ‐17‐22 Jun‐18‐22 12.0 CLR‐1C‐126 Clearing 1C‐126 0.8 0.8 0%Jun ‐08‐22 Jun‐09‐22 12.0 FDN‐1C‐126 FoundaƟons 1C‐126 0.8 0.8 0%Jun ‐18‐22 Jun‐18‐22 12.2 SPT‐1C‐126 Spoƫng 1C‐126 0.8 0.8 0%Jun ‐18‐22 Jun‐19‐22 12.3 Structure 1C-127Structure 1C-127 424.5 424.5 Jun ‐09‐22 Dec‐18‐23 0.0 ERC‐1C‐127 Tower Erec Ɵon 1C‐127 0.9 0.9 0%Nov‐12‐23 Nov‐13‐23 0.0 REC‐1C‐127 ReclamaƟon 1C‐127 0.8 0.8 0%Dec‐17‐23 Dec‐18‐23 0.0 ASY‐1C‐127 Tower Assembly 1C ‐127 0.9 0.9 0%Nov‐11‐23 Nov‐12‐23 0.4 ACC ‐1C‐127 Access 1C‐127 0.8 0.8 0%Jun ‐18‐22 Jun‐19‐22 12.0 CLR‐1C‐127 Clearing 1C‐127 0.8 0.8 0%Jun ‐09‐22 Jun‐10‐22 12.0 FDN‐1C‐127 FoundaƟons 1C‐127 0.8 0.8 0%Jun ‐19‐22 Jun‐19‐22 12.1 SPT‐1C‐127 Spoƫng 1C‐127 0.8 0.8 0%Jun ‐19‐22 Jun‐20‐22 12.3 Structure 1C-128Structure 1C-128 424.4 424.4 Jun ‐10‐22 Dec‐19‐23 0.0 ERC‐1C‐128 Tower Erec Ɵon 1C‐128 0.9 0.9 0%Nov‐13‐23 Nov‐14‐23 0.0 REC‐1C‐128 ReclamaƟon 1C‐128 0.8 0.8 0%Dec‐18‐23 Dec‐19‐23 0.0 ASY‐1C‐128 Tower Assembly 1C ‐128 0.9 0.9 0%Nov‐12‐23 Nov‐13‐23 0.4 ACC ‐1C‐128 Access 1C‐128 0.8 0.8 0%Jun ‐19‐22 Jun‐19‐22 12.0 CLR‐1C‐128 Clearing 1C‐128 0.8 0.8 0%Jun ‐10‐22 Jun‐10‐22 12.0 FDN‐1C‐128 FoundaƟons 1C‐128 0.8 0.8 0%Jun ‐19‐22 Jun‐20‐22 12.1 SPT‐1C‐128 Spoƫng 1C‐128 0.8 0.8 0%Jun ‐20‐22 Jun‐21‐22 12.3 Structure 1C-129Structure 1C-129 424.4 424.4 Jun ‐10‐22 Dec‐20‐23 0.0 ERC‐1C‐129 Tower Erec Ɵon 1C‐129 0.9 0.9 0%Nov‐14‐23 Nov‐15‐23 0.0 REC‐1C‐129 ReclamaƟon 1C‐129 0.8 0.8 0%Dec‐19‐23 Dec‐20‐23 0.0 ASY‐1C‐129 Tower Assembly 1C ‐129 0.9 0.9 0%Nov‐13‐23 Nov‐13‐23 0.4 ACC ‐1C‐129 Access 1C‐129 0.8 0.8 0%Jun ‐19‐22 Jun‐20‐22 12.0 CLR‐1C‐129 Clearing 1C‐129 0.7 0.7 0%Jun ‐10‐22 Jun‐11‐22 12.0 FDN‐1C‐129 FoundaƟons 1C‐129 0.8 0.8 0%Jun ‐20‐22 Jun‐21‐22 12.0 SPT‐1C‐129 Spoƫng 1C‐129 0.8 0.8 0%Jun ‐21‐22 Jun‐22‐22 12.3 Structure 1C-130Structure 1C-130 424.5 424.5 Jun ‐11‐22 Dec‐21‐23 0.0 ERC‐1C‐130 Tower Erec Ɵon 1C‐130 0.9 0.9 0%Nov‐15‐23 Nov‐16‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐124 Tower Assembly 1C ‐124 Access 1C‐124 Clearing 1C‐124 FoundaƟons 1C‐124 Spoƫng 1C‐124 Dec‐17‐23, Structure 1C‐125 Tower Erec Ɵon 1C‐125 ReclamaƟon 1C‐125 Tower Assembly 1C ‐125 Access 1C‐125 Clearing 1C‐125 FoundaƟons 1C‐125 Spoƫng 1C‐125 Dec‐17‐23, Structure 1C‐126 Tower Erec Ɵon 1C‐126 ReclamaƟon 1C‐126 Tower Assembly 1C‐126 Access 1C ‐126 Clearing 1C‐126 FoundaƟons 1C‐126 Spoƫng 1C‐126 Dec‐18‐23, Structure 1C‐127 Tower Erec Ɵon 1C‐127 ReclamaƟon 1C‐127 Tower Assembly 1C‐127 Access 1C ‐127 Clearing 1C‐127 FoundaƟons 1C‐127 Spoƫng 1C‐127 Dec‐19‐23, Structure 1C‐128 Tower Erec Ɵon 1C‐128 ReclamaƟon 1C‐128 Tower Assembly 1C‐128 Access 1C ‐128 Clearing 1C‐128 FoundaƟons 1C‐128 Spoƫng 1C‐128 Dec‐20‐23, Structure 1C‐129 Tower Erec Ɵon 1C‐129 ReclamaƟon 1C‐129 Tower Assembly 1C‐129 Access 1C ‐129 Clearing 1C‐129 FoundaƟons 1C‐129 Spoƫng 1C‐129 Dec‐21‐23, Structure 1C‐130 Tower Erec Ɵon 1C‐130 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 85 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐130 ReclamaƟon 1C‐130 0.8 0.8 0%Dec‐20‐23 Dec‐21‐23 0.0 ASY‐1C‐130 Tower Assembly 1C ‐130 0.9 0.9 0%Nov‐13‐23 Nov‐14‐23 0.4 ACC ‐1C‐130 Access 1C‐130 0.8 0.8 0%Jun ‐20‐22 Jun‐21‐22 12.0 FDN‐1C‐130 FoundaƟons 1C‐130 0.8 0.8 0%Jun ‐21‐22 Jun‐22‐22 12.0 CLR‐1C‐130 Clearing 1C‐130 0.5 0.5 0%Jun ‐11‐22 Jun‐12‐22 12.0 SPT‐1C‐130 Spoƫng 1C‐130 0.8 0.8 0%Jun ‐22‐22 Jun‐22‐22 12.3 Structure 1C-131Structure 1C-131 328.1 328.1 Sep‐18‐22 Dec‐21‐23 0.0 ERC‐1C‐131 Tower Erec Ɵon 1C‐131 0.9 0.9 0%Nov‐16‐23 Nov‐16‐23 0.0 REC‐1C‐131 ReclamaƟon 1C‐131 0.8 0.8 0%Dec‐21‐23 Dec‐21‐23 0.0 ASY‐1C‐131 Tower Assembly 1C ‐131 0.9 0.9 0%Nov‐14‐23 Nov‐15‐23 0.4 CLR‐1C‐131 Clearing 1C‐131 0.7 0.7 0%Sep‐18‐22 Sep‐19‐22 15.9 ACC ‐1C‐131 Access 1C‐131 0.8 0.8 0%Sep‐19‐22 Sep‐20‐22 47.3 FDN‐1C‐131 FoundaƟons 1C‐131 1.1 1.1 0%Sep‐20‐22 Sep‐21‐22 47.3 SPT‐1C‐131 Spoƫng 1C‐131 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 60.4 Structure 1C-132Structure 1C-132 328.2 328.2 Sep‐19‐22 Jan‐02‐24 0.0 ERC‐1C‐132 Tower Erec Ɵon 1C‐132 0.9 0.9 0%Nov‐16‐23 Nov‐17‐23 0.0 REC‐1C‐132 ReclamaƟon 1C‐132 0.8 0.8 0%Dec‐21‐23 Jan‐02‐24 0.0 ASY‐1C‐132 Tower Assembly 1C ‐132 0.9 0.9 0%Nov‐15‐23 Nov‐16‐23 0.4 CLR‐1C‐132 Clearing 1C‐132 0.7 0.7 0%Sep‐19‐22 Sep‐20‐22 15.9 FDN‐1C‐132 FoundaƟons 1C‐132 1.1 1.1 0%Sep‐21‐22 Sep‐22‐22 47.3 ACC ‐1C‐132 Access 1C‐132 0.8 0.8 0%Sep‐20‐22 Sep‐21‐22 47.6 SPT‐1C‐132 Spoƫng 1C‐132 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 60.0 Structure 1C-133Structure 1C-133 328.2 328.2 Sep‐20‐22 Jan‐03‐24 0.0 ERC‐1C‐133 Tower Erec Ɵon 1C‐133 0.9 0.9 0%Nov‐17‐23 Nov‐18‐23 0.0 REC‐1C‐133 ReclamaƟon 1C‐133 0.8 0.8 0%Jan‐02‐24 Jan‐03‐24 0.0 ASY‐1C‐133 Tower Assembly 1C ‐133 0.9 0.9 0%Nov‐16‐23 Nov‐17‐23 0.4 CLR‐1C‐133 Clearing 1C‐133 0.7 0.7 0%Sep‐20‐22 Sep‐20‐22 15.9 FDN‐1C‐133 FoundaƟons 1C‐133 1.1 1.1 0%Sep‐22‐22 Sep‐23‐22 47.3 ACC ‐1C‐133 Access 1C‐133 0.8 0.8 0%Sep‐21‐22 Sep‐21‐22 48.0 SPT‐1C‐133 Spoƫng 1C‐133 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 59.7 Structure 1C-134Structure 1C-134 328.3 328.3 Sep‐20‐22 Jan‐04‐24 0.0 ERC‐1C‐134 Tower Erec Ɵon 1C‐134 0.9 0.9 0%Nov‐18‐23 Nov‐19‐23 0.0 REC‐1C‐134 ReclamaƟon 1C‐134 0.8 0.8 0%Jan‐03‐24 Jan‐04‐24 0.0 ASY‐1C‐134 Tower Assembly 1C ‐134 0.9 0.9 0%Nov‐17‐23 Nov‐18‐23 0.4 CLR‐1C‐134 Clearing 1C‐134 0.7 0.7 0%Sep‐20‐22 Sep‐21‐22 15.9 FDN‐1C‐134 FoundaƟons 1C‐134 1.1 1.1 0%Sep‐23‐22 Sep‐24‐22 47.3 ACC ‐1C‐134 Access 1C‐134 0.8 0.8 0%Sep‐21‐22 Sep‐22‐22 48.3 SPT‐1C‐134 Spoƫng 1C‐134 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 59.4 Structure 1C-135Structure 1C-135 328.3 328.3 Sep‐21‐22 Jan‐04‐24 0.0 ERC‐1C‐135 Tower Erec Ɵon 1C‐135 0.9 0.9 0%Nov‐19‐23 Nov‐20‐23 0.0 REC‐1C‐135 ReclamaƟon 1C‐135 0.8 0.8 0%Jan‐04‐24 Jan‐04‐24 0.0 ASY‐1C‐135 Tower Assembly 1C ‐135 0.9 0.9 0%Nov‐18‐23 Nov‐19‐23 0.4 CLR‐1C‐135 Clearing 1C‐135 0.7 0.7 0%Sep‐21‐22 Sep‐22‐22 15.9 FDN‐1C‐135 FoundaƟons 1C‐135 1.1 1.1 0%Sep‐24‐22 Sep‐25‐22 47.3 ACC ‐1C‐135 Access 1C‐135 0.8 0.8 0%Sep‐22‐22 Sep‐23‐22 48.6 SPT‐1C‐135 Spoƫng 1C‐135 0.8 0.8 0%Sep‐25‐22 Sep‐26‐22 59.0 Structure 1C-136Structure 1C-136 328.4 328.4 Sep‐22‐22 Jan‐05‐24 0.0 ERC‐1C‐136 Tower Erec Ɵon 1C‐136 0.9 0.9 0%Nov‐20‐23 Nov‐21‐23 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐130 Tower Assembly 1C ‐130 Access 1C‐130 FoundaƟons 1C‐130 Clearing 1C‐130 Spoƫng 1C‐130 Dec‐21‐23, Structure 1C‐131 Tower Erec Ɵon 1C‐131 ReclamaƟon 1C‐131 Tower Assembly 1C ‐131 Clearing 1C‐131 Access 1C‐131 FoundaƟons 1C‐131 Spoƫng 1C‐131 Jan ‐02‐24, Structure 1C‐132 Tower Erec Ɵon 1C‐132 ReclamaƟon 1C‐132 Tower Assembly 1C ‐132 Clearing 1C‐132 FoundaƟons 1C‐132 Access 1C‐132 Spoƫng 1C‐132 Jan ‐03‐24, Structure 1C‐133 Tower Erec Ɵon 1C‐133 ReclamaƟon 1C‐133 Tower Assembly 1C ‐133 Clearing 1C‐133 FoundaƟons 1C‐133 Access 1C‐133 Spoƫng 1C‐133 Jan ‐04‐24, Structure 1C‐134 Tower Erec Ɵon 1C‐134 ReclamaƟon 1C‐134 Tower Assembly 1C ‐134 Clearing 1C‐134 FoundaƟons 1C‐134 Access 1C‐134 Spoƫng 1C‐134 Jan ‐04‐24, Structure 1C‐135 Tower Erec Ɵon 1C‐135 ReclamaƟon 1C‐135 Tower Assembly 1C ‐135 Clearing 1C‐135 FoundaƟons 1C‐135 Access 1C‐135 Spoƫng 1C‐135 Jan ‐05‐24, Structure 1C‐136 Tower Erec Ɵon 1C‐136 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 86 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float REC‐1C‐136 ReclamaƟon 1C‐136 0.8 0.8 0%Jan‐04‐24 Jan‐05‐24 0.0 ASY‐1C‐136 Tower Assembly 1C ‐136 0.9 0.9 0%Nov‐19‐23 Nov‐19‐23 0.4 CLR‐1C‐136 Clearing 1C‐136 0.7 0.7 0%Sep‐22‐22 Sep‐23‐22 15.9 FDN‐1C‐136 FoundaƟons 1C‐136 1.1 1.1 0%Sep‐25‐22 Sep‐26‐22 47.3 ACC ‐1C‐136 Access 1C‐136 0.8 0.8 0%Sep‐23‐22 Sep‐24‐22 48.8 SPT‐1C‐136 Spoƫng 1C‐136 0.8 0.8 0%Sep‐26‐22 Sep‐27‐22 58.7 Structure 1C-137Structure 1C-137 328.5 328.5 Sep‐23‐22 Jan‐06‐24 0.0 ERC‐1C‐137 Tower Erec Ɵon 1C‐137 0.9 0.9 0%Nov‐21‐23 Nov‐22‐23 0.0 REC‐1C‐137 ReclamaƟon 1C‐137 0.8 0.8 0%Jan‐05‐24 Jan‐06‐24 0.0 ASY‐1C‐137 Tower Assembly 1C ‐137 0.9 0.9 0%Nov‐19‐23 Nov‐20‐23 0.4 CLR‐1C‐137 Clearing 1C‐137 0.7 0.7 0%Sep‐23‐22 Sep‐23‐22 15.9 FDN‐1C‐137 FoundaƟons 1C‐137 1.1 1.1 0%Sep‐26‐22 Sep‐28‐22 47.3 ACC ‐1C‐137 Access 1C‐137 0.8 0.8 0%Sep‐24‐22 Sep‐24‐22 48.8 SPT‐1C‐137 Spoƫng 1C‐137 0.8 0.8 0%Sep‐28‐22 Sep‐28‐22 58.4 Structure 1C-139Structure 1C-139 329.3 329.3 Sep‐23‐22 Jan‐08‐24 0.0 ERC‐1C‐139 Tower Erec Ɵon 1C‐139 0.9 0.9 0%Nov‐22‐23 Nov‐25‐23 0.0 REC‐1C‐139 ReclamaƟon 1C‐139 0.8 0.8 0%Jan‐07‐24 Jan‐08‐24 0.0 ASY‐1C‐139 Tower Assembly 1C ‐139 0.9 0.9 0%Nov‐21‐23 Nov‐22‐23 0.4 CLR‐1C‐139 Clearing 1C‐139 0.7 0.7 0%Sep‐23‐22 Sep‐24‐22 15.9 FDN‐1C‐139 FoundaƟons 1C‐139 1.1 1.1 0%Sep‐29‐22 Sep‐30‐22 47.3 ACC ‐1C‐139 Access 1C‐139 0.8 0.8 0%Sep‐24‐22 Sep‐25‐22 48.8 SPT‐1C‐139 Spoƫng 1C‐139 0.8 0.8 0%Sep‐30‐22 Sep‐30‐22 57.7 Structure 1C-138Structure 1C-138 327.8 327.8 Sep‐24‐22 Jan‐07‐24 0.0 ERC‐1C‐138 Tower Erec Ɵon 1C‐138 0.9 0.9 0%Nov‐22‐23 Nov‐22‐23 0.0 REC‐1C‐138 ReclamaƟon 1C‐138 0.8 0.8 0%Jan‐06‐24 Jan‐07‐24 0.0 ASY‐1C‐138 Tower Assembly 1C ‐138 0.9 0.9 0%Nov‐20‐23 Nov‐21‐23 0.4 CLR‐1C‐138 Clearing 1C‐138 0.7 0.7 0%Sep‐24‐22 Sep‐25‐22 15.9 FDN‐1C‐138 FoundaƟons 1C‐138 1.1 1.1 0%Sep‐28‐22 Sep‐29‐22 47.3 ACC ‐1C‐138 Access 1C‐138 0.8 0.8 0%Sep‐25‐22 Sep‐26‐22 48.8 SPT‐1C‐138 Spoƫng 1C‐138 0.8 0.8 0%Sep‐29‐22 Sep‐29‐22 58.1 Structure 1C-140Structure 1C-140 328.6 328.6 Sep‐25‐22 Jan‐08‐24 0.0 ERC‐1C‐140 Tower Erec Ɵon 1C‐140 0.9 0.9 0%Nov‐25‐23 Nov‐26‐23 0.0 REC‐1C‐140 ReclamaƟon 1C‐140 0.8 0.8 0%Jan‐08‐24 Jan‐08‐24 0.0 ASY‐1C‐140 Tower Assembly 1C ‐140 0.9 0.9 0%Nov‐22‐23 Nov‐25‐23 0.4 CLR‐1C‐140 Clearing 1C‐140 0.7 0.7 0%Sep‐25‐22 Sep‐25‐22 15.9 FDN‐1C‐140 FoundaƟons 1C‐140 1.1 1.1 0%Sep‐30‐22 Oct ‐01‐22 47.3 ACC ‐1C‐140 Access 1C‐140 0.8 0.8 0%Sep‐26‐22 Sep‐27‐22 50.3 SPT‐1C‐140 Spoƫng 1C‐140 0.8 0.8 0%Oct ‐01‐22 Oct ‐02‐22 57.4 Structure 1C-141Structure 1C-141 432.6 432.6 Jun ‐12‐22 Jan‐09‐24 0.0 REC‐1C‐141 ReclamaƟon 1C‐141 0.8 0.8 0%Jan‐08‐24 Jan‐09‐24 0.0 CLR‐1C‐141 Clearing 1C‐141 0.7 0.7 0%Jun ‐12‐22 Jun‐12‐22 12.0 ASY‐1C‐141 Tower Assembly 1C ‐141 0.9 0.9 0%Jul‐02‐22 Jul‐03‐22 18.5 FDN‐1C‐141 FoundaƟons 1C‐141 0.7 0.7 0%Jun ‐24‐22 Jun‐24‐22 25.2 SPT‐1C‐141 Spoƫng 1C‐141 0.7 0.7 0%Jun ‐24‐22 Jun‐25‐22 25.2 ACC ‐1C‐141 Access 1C‐141 0.7 0.7 0%Jun ‐12‐22 Jun‐13‐22 35.9 ERC‐1C‐141 Tower Erec Ɵon 1C‐141 0.9 0.9 0%Jul‐03‐22 Jul‐05‐22 66.8 Structure 1C-142Structure 1C-142 432.7 432.7 Jun ‐12‐22 Jan‐10‐24 0.0 REC‐1C‐142 ReclamaƟon 1C‐142 0.8 0.8 0%Jan‐09‐24 Jan‐10‐24 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 ReclamaƟon 1C‐136 Tower Assembly 1C ‐136 Clearing 1C‐136 FoundaƟons 1C‐136 Access 1C‐136 Spoƫng 1C‐136 Jan ‐06‐24, Structure 1C‐137 Tower Erec Ɵon 1C‐137 ReclamaƟon 1C‐137 Tower Assembly 1C ‐137 Clearing 1C‐137 FoundaƟons 1C‐137 Access 1C‐137 Spoƫng 1C‐137 Jan ‐08‐24, Structure 1C‐139 Tower Erec Ɵon 1C‐139 ReclamaƟon 1C‐139 Tower Assembly 1C‐139 Clearing 1C‐139 FoundaƟons 1C‐139 Access 1C‐139 Spoƫng 1C‐139 Jan ‐07‐24, Structure 1C‐138 Tower Erec Ɵon 1C‐138 ReclamaƟon 1C‐138 Tower Assembly 1C ‐138 Clearing 1C‐138 FoundaƟons 1C‐138 Access 1C‐138 Spoƫng 1C‐138 Jan ‐08‐24, Structure 1C‐140 Tower Erec Ɵon 1C‐140 ReclamaƟon 1C‐140 Tower Assembly 1C‐140 Clearing 1C‐140 FoundaƟons 1C‐140 Access 1C‐140 Spoƫng 1C‐140 Jan ‐09‐24, Structure 1C‐141 ReclamaƟon 1C‐141 Clearing 1C‐141 Tower Assembly 1C ‐141 FoundaƟons 1C‐141 Spoƫng 1C‐141 Access 1C‐141 Tower Erec Ɵon 1C‐141 Jan ‐10‐24, Structure 1C‐142 ReclamaƟon 1C‐142 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 87 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1C‐142 Clearing 1C‐142 0.7 0.7 0%Jun ‐12‐22 Jun‐13‐22 12.0 ASY‐1C‐142 Tower Assembly 1C ‐142 0.9 0.9 0%Jul‐03‐22 Jul‐05‐22 18.5 SPT‐1C‐142 Spoƫng 1C‐142 0.7 0.7 0%Jun ‐25‐22 Jun‐26‐22 25.4 FDN‐1C‐142 FoundaƟons 1C‐142 0.7 0.7 0%Jun ‐24‐22 Jun‐25‐22 25.5 ACC ‐1C‐142 Access 1C‐142 0.7 0.7 0%Jun ‐13‐22 Jun‐14‐22 36.1 ERC‐1C‐142 Tower Erec Ɵon 1C‐142 0.9 0.9 0%Jul‐05‐22 Jul‐06‐22 66.8 Structure 1C-143Structure 1C-143 432.8 432.8 Jun ‐13‐22 Jan‐11‐24 0.0 REC‐1C‐143 ReclamaƟon 1C‐143 0.8 0.8 0%Jan‐10‐24 Jan‐11‐24 0.0 CLR‐1C‐143 Clearing 1C‐143 0.7 0.7 0%Jun ‐13‐22 Jun‐14‐22 12.0 ASY‐1C‐143 Tower Assembly 1C ‐143 0.9 0.9 0%Jul‐05‐22 Jul‐06‐22 18.5 SPT‐1C‐143 Spoƫng 1C‐143 0.7 0.7 0%Jun ‐26‐22 Jun‐27‐22 25.6 FDN‐1C‐143 FoundaƟons 1C‐143 0.7 0.7 0%Jun ‐25‐22 Jun‐26‐22 25.7 ACC ‐1C‐143 Access 1C‐143 0.7 0.7 0%Jun ‐14‐22 Jun‐14‐22 36.3 ERC‐1C‐143 Tower Erec Ɵon 1C‐143 0.9 0.9 0%Jul‐06‐22 Jul‐07‐22 66.8 Structure 1C-144Structure 1C-144 432.8 432.8 Jun ‐14‐22 Jan‐11‐24 0.0 REC‐1C‐144 ReclamaƟon 1C‐144 0.8 0.8 0%Jan‐11‐24 Jan‐11‐24 0.0 CLR‐1C‐144 Clearing 1C‐144 0.7 0.7 0%Jun ‐14‐22 Jun‐14‐22 12.0 ASY‐1C‐144 Tower Assembly 1C ‐144 0.9 0.9 0%Jul‐06‐22 Jul‐07‐22 18.5 SPT‐1C‐144 Spoƫng 1C‐144 0.7 0.7 0%Jun ‐27‐22 Jun‐27‐22 25.8 FDN‐1C‐144 FoundaƟons 1C‐144 0.7 0.7 0%Jun ‐26‐22 Jun‐26‐22 26.0 ACC ‐1C‐144 Access 1C‐144 0.7 0.7 0%Jun ‐14‐22 Jun‐15‐22 36.5 ERC‐1C‐144 Tower Erec Ɵon 1C‐144 0.9 0.9 0%Jul‐07‐22 Jul‐07‐22 66.8 Structure 1C-145Structure 1C-145 432.8 432.8 Jun ‐14‐22 Jan‐12‐24 0.0 REC‐1C‐145 ReclamaƟon 1C‐145 0.8 0.8 0%Jan‐11‐24 Jan‐12‐24 0.0 CLR‐1C‐145 Clearing 1C‐145 0.7 0.7 0%Jun ‐14‐22 Jun‐15‐22 12.0 ASY‐1C‐145 Tower Assembly 1C ‐145 0.9 0.9 0%Jul‐07‐22 Jul‐07‐22 18.5 SPT‐1C‐145 Spoƫng 1C‐145 0.7 0.7 0%Jun ‐27‐22 Jun‐28‐22 26.0 FDN‐1C‐145 FoundaƟons 1C‐145 0.7 0.7 0%Jun ‐26‐22 Jun‐27‐22 26.3 ACC ‐1C‐145 Access 1C‐145 0.7 0.7 0%Jun ‐15‐22 Jun‐16‐22 36.7 ERC‐1C‐145 Tower Erec Ɵon 1C‐145 0.9 0.9 0%Jul‐07‐22 Jul‐08‐22 66.8 Structure 1C-146Structure 1C-146 432.9 432.9 Jun ‐15‐22 Jan‐13‐24 0.0 REC‐1C‐146 ReclamaƟon 1C‐146 0.8 0.8 0%Jan‐12‐24 Jan‐13‐24 0.0 CLR‐1C‐146 Clearing 1C‐146 0.7 0.7 0%Jun ‐15‐22 Jun‐16‐22 12.0 ASY‐1C‐146 Tower Assembly 1C ‐146 0.9 0.9 0%Jul‐07‐22 Jul‐08‐22 18.5 SPT‐1C‐146 Spoƫng 1C‐146 0.7 0.7 0%Jun ‐28‐22 Jun‐29‐22 26.2 FDN‐1C‐146 FoundaƟons 1C‐146 0.7 0.7 0%Jun ‐27‐22 Jun‐28‐22 26.5 ACC ‐1C‐146 Access 1C‐146 0.7 0.7 0%Jun ‐16‐22 Jun‐17‐22 36.9 ERC‐1C‐146 Tower Erec Ɵon 1C‐146 0.9 0.9 0%Jul‐08‐22 Jul‐09‐22 66.8 Structure 1C-147Structure 1C-147 432.9 432.9 Jun ‐16‐22 Jan‐14‐24 0.0 REC‐1C‐147 ReclamaƟon 1C‐147 0.8 0.8 0%Jan‐13‐24 Jan‐14‐24 0.0 CLR‐1C‐147 Clearing 1C‐147 0.7 0.7 0%Jun ‐16‐22 Jun‐17‐22 12.0 ASY‐1C‐147 Tower Assembly 1C ‐147 0.9 0.9 0%Jul‐08‐22 Jul‐09‐22 18.5 SPT‐1C‐147 Spoƫng 1C‐147 0.7 0.7 0%Jun ‐29‐22 Jun‐29‐22 26.4 FDN‐1C‐147 FoundaƟons 1C‐147 0.7 0.7 0%Jun ‐28‐22 Jun‐28‐22 26.8 ACC ‐1C‐147 Access 1C‐147 0.7 0.7 0%Jun ‐17‐22 Jun‐17‐22 37.1 ERC‐1C‐147 Tower Erec Ɵon 1C‐147 0.9 0.9 0%Jul‐09‐22 Jul‐10‐22 66.8 Structure 1C-148Structure 1C-148 433.0 433.0 Jun ‐17‐22 Jan‐16‐24 0.0 REC‐1C‐148 ReclamaƟon 1C‐148 0.8 0.8 0%Jan‐14‐24 Jan‐16‐24 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1C‐142 Tower Assembly 1C ‐142 Spoƫng 1C‐142 FoundaƟons 1C‐142 Access 1C‐142 Tower Erec Ɵon 1C‐142 Jan ‐11‐24, Structure 1C‐143 ReclamaƟon 1C‐143 Clearing 1C‐143 Tower Assembly 1C ‐143 Spoƫng 1C‐143 FoundaƟons 1C‐143 Access 1C‐143 Tower Erec Ɵon 1C‐143 Jan ‐11‐24, Structure 1C‐144 ReclamaƟon 1C‐144 Clearing 1C‐144 Tower Assembly 1C ‐144 Spoƫng 1C‐144 FoundaƟons 1C‐144 Access 1C‐144 Tower Erec Ɵon 1C‐144 Jan ‐12‐24, Structure 1C‐145 ReclamaƟon 1C‐145 Clearing 1C‐145 Tower Assembly 1C ‐145 Spoƫng 1C‐145 FoundaƟons 1C‐145 Access 1C‐145 Tower Erec Ɵon 1C‐145 Jan ‐13‐24, Structure 1C‐146 ReclamaƟon 1C‐146 Clearing 1C‐146 Tower Assembly 1C ‐146 Spoƫng 1C‐146 FoundaƟons 1C‐146 Access 1C‐146 Tower Erec Ɵon 1C‐146 Jan ‐14‐24, Structure 1C‐147 ReclamaƟon 1C‐147 Clearing 1C‐147 Tower Assembly 1C ‐147 Spoƫng 1C‐147 FoundaƟons 1C‐147 Access 1C ‐147 Tower Erec Ɵon 1C‐147 Jan ‐16‐24, Structure 1C‐148 ReclamaƟon 1C‐148 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 88 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1C‐148 Clearing 1C‐148 0.7 0.7 0%Jun ‐17‐22 Jun‐17‐22 12.0 ASY‐1C‐148 Tower Assembly 1C ‐148 0.9 0.9 0%Jul‐09‐22 Jul‐10‐22 18.5 SPT‐1C‐148 Spoƫng 1C‐148 0.7 0.7 0%Jun ‐29‐22 Jun‐30‐22 26.6 FDN‐1C‐148 FoundaƟons 1C‐148 0.7 0.7 0%Jun ‐28‐22 Jun‐29‐22 27.1 ACC ‐1C‐148 Access 1C‐148 0.7 0.7 0%Jun ‐17‐22 Jun‐18‐22 37.3 ERC‐1C‐148 Tower Erec Ɵon 1C‐148 0.9 0.9 0%Jul‐10‐22 Jul‐11‐22 66.8 Structure 1C-149Structure 1C-149 433.0 433.0 Jun ‐17‐22 Jan‐16‐24 0.0 REC‐1C‐149 ReclamaƟon 1C‐149 0.8 0.8 0%Jan‐16‐24 Jan‐16‐24 0.0 CLR‐1C‐149 Clearing 1C‐149 0.7 0.7 0%Jun ‐17‐22 Jun‐18‐22 12.0 ASY‐1C‐149 Tower Assembly 1C ‐149 0.9 0.9 0%Jul‐10‐22 Jul‐11‐22 18.5 SPT‐1C‐149 Spoƫng 1C‐149 0.7 0.7 0%Jun ‐30‐22 Jul‐01‐22 26.8 FDN‐1C‐149 FoundaƟons 1C‐149 0.7 0.7 0%Jun ‐29‐22 Jun‐30‐22 27.3 ACC ‐1C‐149 Access 1C‐149 0.7 0.7 0%Jun ‐18‐22 Jun‐19‐22 37.5 ERC‐1C‐149 Tower Erec Ɵon 1C‐149 0.9 0.9 0%Jul‐11‐22 Jul‐12‐22 66.8 Structure 1C-150Structure 1C-150 267.1 267.1 Jun ‐18‐22 Jul‐20‐23 46.9 CLR‐1C‐150 Clearing 1C‐150 0.7 0.7 0%Jun ‐18‐22 Jun‐19‐22 12.0 ASY‐1C‐150 Tower Assembly 1C ‐150 0.9 0.9 0%Jul‐11‐22 Jul‐12‐22 18.5 SPT‐1C‐150 Spoƫng 1C‐150 0.7 0.7 0%Jul‐01‐22 Jul‐02‐22 27.0 FDN‐1C‐150 FoundaƟons 1C‐150 0.7 0.7 0%Jun ‐30‐22 Jun‐30‐22 27.6 ACC ‐1C‐150 Access 1C‐150 0.7 0.7 0%Jun ‐19‐22 Jun‐20‐22 37.7 REC‐1C‐150 ReclamaƟon 1C‐150 0.9 0.9 0%Jul‐19‐23 Jul‐20‐23 46.9 ERC‐1C‐150 Tower Erec Ɵon 1C‐150 0.9 0.9 0%Jul‐12‐22 Jul‐13‐22 66.8 Structure 1C-151Structure 1C-151 265.4 265.4 Jun ‐19‐22 Jul‐19‐23 46.9 CLR‐1C‐151 Clearing 1C‐151 0.7 0.7 0%Jun ‐19‐22 Jun‐20‐22 12.0 ASY‐1C‐151 Tower Assembly 1C ‐151 0.9 0.9 0%Jul‐12‐22 Jul‐13‐22 18.5 SPT‐1C‐151 Spoƫng 1C‐151 0.7 0.7 0%Jul‐02‐22 Jul‐02‐22 27.2 FDN‐1C‐151 FoundaƟons 1C‐151 0.7 0.7 0%Jun ‐30‐22 Jul‐01‐22 27.9 ACC ‐1C‐151 Access 1C‐151 0.7 0.7 0%Jun ‐20‐22 Jun‐20‐22 37.9 REC‐1C‐151 ReclamaƟon 1C‐151 0.9 0.9 0%Jul‐18‐23 Jul‐19‐23 46.9 ERC‐1C‐151 Tower Erec Ɵon 1C‐151 0.9 0.9 0%Jul‐13‐22 Jul‐14‐22 66.8 Structure 1C-152Structure 1C-152 263.8 263.8 Jun ‐20‐22 Jul‐18‐23 46.9 CLR‐1C‐152 Clearing 1C‐152 0.7 0.7 0%Jun ‐20‐22 Jun‐20‐22 12.0 ASY‐1C‐152 Tower Assembly 1C ‐152 0.9 0.9 0%Jul‐13‐22 Jul‐14‐22 18.5 SPT‐1C‐152 Spoƫng 1C‐152 0.7 0.7 0%Jul‐02‐22 Jul‐03‐22 27.4 FDN‐1C‐152 FoundaƟons 1C‐152 0.7 0.7 0%Jul‐01‐22 Jul‐02‐22 28.1 ACC ‐1C‐152 Access 1C‐152 0.7 0.7 0%Jun ‐20‐22 Jun‐21‐22 38.1 REC‐1C‐152 ReclamaƟon 1C‐152 0.9 0.9 0%Jul‐17‐23 Jul‐18‐23 46.9 ERC‐1C‐152 Tower Erec Ɵon 1C‐152 0.9 0.9 0%Jul‐14‐22 Jul‐15‐22 66.8 Structure 1C-153Structure 1C-153 262.1 262.1 Jun ‐20‐22 Jul‐17‐23 46.9 CLR‐1C‐153 Clearing 1C‐153 0.7 0.7 0%Jun ‐20‐22 Jun‐21‐22 12.0 ASY‐1C‐153 Tower Assembly 1C ‐153 0.9 0.9 0%Jul‐14‐22 Jul‐15‐22 18.5 SPT‐1C‐153 Spoƫng 1C‐153 0.7 0.7 0%Jul‐03‐22 Jul‐05‐22 27.6 FDN‐1C‐153 FoundaƟons 1C‐153 0.7 0.7 0%Jul‐02‐22 Jul‐02‐22 28.4 ACC ‐1C‐153 Access 1C‐153 0.7 0.7 0%Jun ‐21‐22 Jun‐22‐22 38.3 REC‐1C‐153 ReclamaƟon 1C‐153 0.9 0.9 0%Jul‐16‐23 Jul‐17‐23 46.9 ERC‐1C‐153 Tower Erec Ɵon 1C‐153 0.9 0.9 0%Jul‐15‐22 Jul‐16‐22 66.8 Structure 1C-154Structure 1C-154 260.5 260.5 Jun ‐21‐22 Jul‐16‐23 46.9 CLR‐1C‐154 Clearing 1C‐154 0.7 0.7 0%Jun ‐21‐22 Jun‐22‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1C‐148 Tower Assembly 1C ‐148 Spoƫng 1C‐148 FoundaƟons 1C‐148 Access 1C ‐148 Tower Erec Ɵon 1C‐148 Jan ‐16‐24, Structure 1C‐149 ReclamaƟon 1C‐149 Clearing 1C‐149 Tower Assembly 1C ‐149 Spoƫng 1C‐149 FoundaƟons 1C‐149 Access 1C ‐149 Tower Erec Ɵon 1C‐149 Jul‐20‐23, Structure 1C‐150 Clearing 1C‐150 Tower Assembly 1C‐150 Spoƫng 1C‐150 FoundaƟons 1C‐150 Access 1C ‐150 ReclamaƟon 1C‐150 Tower Erec Ɵon 1C‐150 Jul‐19‐23, Structure 1C‐151 Clearing 1C‐151 Tower Assembly 1C‐151 Spoƫng 1C‐151 FoundaƟons 1C‐151 Access 1C ‐151 ReclamaƟon 1C‐151 Tower Erec Ɵon 1C‐151 Jul‐18‐23, Structure 1C‐152 Clearing 1C‐152 Tower Assembly 1C ‐152 Spoƫng 1C‐152 FoundaƟons 1C‐152 Access 1C‐152 ReclamaƟon 1C‐152 Tower Erec Ɵon 1C‐152 Jul‐17‐23, Structure 1C‐153 Clearing 1C‐153 Tower Assembly 1C ‐153 Spoƫng 1C‐153 FoundaƟons 1C‐153 Access 1C‐153 ReclamaƟon 1C‐153 Tower Erec Ɵon 1C‐153 Jul‐16‐23, Structure 1C‐154 Clearing 1C‐154 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 89 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1C‐154 Tower Assembly 1C ‐154 0.9 0.9 0%Jul‐15‐22 Jul‐16‐22 18.5 SPT‐1C‐154 Spoƫng 1C‐154 0.7 0.7 0%Jul‐05‐22 Jul‐06‐22 27.8 FDN‐1C‐154 FoundaƟons 1C‐154 0.7 0.7 0%Jul‐02‐22 Jul‐03‐22 28.7 ACC ‐1C‐154 Access 1C‐154 0.7 0.7 0%Jun ‐22‐22 Jun‐22‐22 38.5 REC‐1C‐154 ReclamaƟon 1C‐154 0.9 0.9 0%Jul‐16‐23 Jul‐16‐23 46.9 ERC‐1C‐154 Tower Erec Ɵon 1C‐154 0.9 0.9 0%Jul‐16‐22 Jul‐17‐22 66.8 Structure 1C-155Structure 1C-155 258.8 258.8 Jun ‐22‐22 Jul‐16‐23 46.9 CLR‐1C‐155 Clearing 1C‐155 0.7 0.7 0%Jun ‐22‐22 Jun‐22‐22 12.0 ASY‐1C‐155 Tower Assembly 1C ‐155 0.9 0.9 0%Jul‐16‐22 Jul‐17‐22 18.5 SPT‐1C‐155 Spoƫng 1C‐155 0.7 0.7 0%Jul‐06‐22 Jul‐06‐22 28.0 FDN‐1C‐155 FoundaƟons 1C‐155 0.7 0.7 0%Jul‐03‐22 Jul‐05‐22 28.9 ACC ‐1C‐155 Access 1C‐155 0.7 0.7 0%Jun ‐23‐22 Jun‐23‐22 38.7 REC‐1C‐155 ReclamaƟon 1C‐155 0.9 0.9 0%Jul‐15‐23 Jul‐16‐23 46.9 ERC‐1C‐155 Tower Erec Ɵon 1C‐155 0.9 0.9 0%Jul‐17‐22 Jul‐18‐22 66.8 Structure 1C-156Structure 1C-156 257.1 257.1 Jun ‐23‐22 Jul‐15‐23 46.9 CLR‐1C‐156 Clearing 1C‐156 0.7 0.7 0%Jun ‐23‐22 Jun‐23‐22 12.0 ASY‐1C‐156 Tower Assembly 1C ‐156 0.9 0.9 0%Jul‐17‐22 Jul‐18‐22 18.5 SPT‐1C‐156 Spoƫng 1C‐156 0.7 0.7 0%Jul‐06‐22 Jul‐07‐22 28.2 FDN‐1C‐156 FoundaƟons 1C‐156 0.7 0.7 0%Jul‐05‐22 Jul‐05‐22 29.2 ACC ‐1C‐156 Access 1C‐156 0.7 0.7 0%Jun ‐23‐22 Jun‐24‐22 38.9 REC‐1C‐156 ReclamaƟon 1C‐156 0.9 0.9 0%Jul‐14‐23 Jul‐15‐23 46.9 ERC‐1C‐156 Tower Erec Ɵon 1C‐156 0.9 0.9 0%Jul‐18‐22 Jul‐19‐22 66.7 Structure 1C-157Structure 1C-157 219.3 219.3 Jul‐30‐22 Jul‐14‐23 46.9 ASY‐1C‐157 Tower Assembly 1C ‐157 0.9 0.9 0%Sep‐01‐22 Sep‐02‐22 39.0 REC‐1C‐157 ReclamaƟon 1C‐157 0.9 0.9 0%Jul‐13‐23 Jul‐14‐23 46.9 SPT‐1C‐157 Spoƫng 1C‐157 0.8 0.8 0%Aug‐11‐22 Aug‐12‐22 59.0 ERC‐1C‐157 Tower Erec Ɵon 1C‐157 0.9 0.9 0%Sep‐02‐22 Sep‐03‐22 61.3 ACC ‐1C‐157 Access 1C‐157 0.8 0.8 0%Aug‐01‐22 Aug‐02‐22 68.0 FDN‐1C‐157 FoundaƟons 1C‐157 0.6 0.6 0%Aug‐02‐22 Aug‐02‐22 68.0 CLR‐1C‐157 Clearing 1C‐157 0.8 0.8 0%Jul‐30‐22 Jul‐31‐22 68.8 Structure 1C-158Structure 1C-158 219.2 219.2 Jul‐30‐22 Jul‐13‐23 46.9 ASY‐1C‐158 Tower Assembly 1C ‐158 0.9 0.9 0%Aug‐31‐22 Sep‐01‐22 39.0 REC‐1C‐158 ReclamaƟon 1C‐158 0.9 0.9 0%Jul‐12‐23 Jul‐13‐23 46.9 SPT‐1C‐158 Spoƫng 1C‐158 0.8 0.8 0%Aug‐11‐22 Aug‐11‐22 59.0 ERC‐1C‐158 Tower Erec Ɵon 1C‐158 0.9 0.9 0%Sep‐01‐22 Sep‐02‐22 61.3 FDN‐1C‐158 FoundaƟons 1C‐158 0.6 0.6 0%Aug‐01‐22 Aug‐02‐22 67.8 ACC ‐1C‐158 Access 1C‐158 0.8 0.8 0%Jul‐31‐22 Aug‐01‐22 67.9 CLR‐1C‐158 Clearing 1C‐158 0.8 0.8 0%Jul‐30‐22 Jul‐30‐22 68.7 Structure 1C-159Structure 1C-159 219.1 219.1 Jul‐29‐22 Jul‐12‐23 46.9 ASY‐1C‐159 Tower Assembly 1C ‐159 0.9 0.9 0%Aug‐30‐22 Aug‐31‐22 39.0 REC‐1C‐159 ReclamaƟon 1C‐159 0.9 0.9 0%Jul‐11‐23 Jul‐12‐23 46.9 SPT‐1C‐159 Spoƫng 1C‐159 0.8 0.8 0%Aug‐10‐22 Aug‐11‐22 58.9 ERC‐1C‐159 Tower Erec Ɵon 1C‐159 0.9 0.9 0%Aug‐31‐22 Sep‐01‐22 61.3 FDN‐1C‐159 FoundaƟons 1C‐159 0.6 0.6 0%Aug‐01‐22 Aug‐01‐22 67.6 ACC ‐1C‐159 Access 1C‐159 0.8 0.8 0%Jul‐30‐22 Jul‐31‐22 67.8 CLR‐1C‐159 Clearing 1C‐159 0.8 0.8 0%Jul‐29‐22 Jul‐30‐22 68.6 Structure 1C-160Structure 1C-160 219.0 219.0 Jul‐28‐22 Jul‐11‐23 46.9 ASY‐1C‐160 Tower Assembly 1C ‐160 0.9 0.9 0%Aug‐30‐22 Aug‐30‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1C ‐154 Spoƫng 1C‐154 FoundaƟons 1C‐154 Access 1C‐154 ReclamaƟon 1C‐154 Tower Erec Ɵon 1C‐154 Jul‐16‐23, Structure 1C‐155 Clearing 1C‐155 Tower Assembly 1C ‐155 Spoƫng 1C‐155 FoundaƟons 1C‐155 Access 1C‐155 ReclamaƟon 1C‐155 Tower Erec Ɵon 1C‐155 Jul‐15‐23, Structure 1C‐156 Clearing 1C‐156 Tower Assembly 1C ‐156 Spoƫng 1C‐156 FoundaƟons 1C‐156 Access 1C‐156 ReclamaƟon 1C‐156 Tower Erec Ɵon 1C‐156 Jul‐14‐23, Structure 1C‐157 Tower Assembly 1C ‐157 ReclamaƟon 1C‐157 Spoƫng 1C‐157 Tower Erec Ɵon 1C‐157 Access 1C‐157 FoundaƟons 1C‐157 Clearing 1C‐157 Jul‐13‐23, Structure 1C‐158 Tower Assembly 1C ‐158 ReclamaƟon 1C‐158 Spoƫng 1C‐158 Tower Erec Ɵon 1C‐158 FoundaƟons 1C‐158 Access 1C‐158 Clearing 1C‐158 Jul‐12‐23, Structure 1C‐159 Tower Assembly 1C ‐159 ReclamaƟon 1C‐159 Spoƫng 1C‐159 Tower Erec Ɵon 1C‐159 FoundaƟons 1C‐159 Access 1C‐159 Clearing 1C‐159 Jul‐11‐23, Structure 1C‐160 Tower Assembly 1C ‐160 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 90 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float SPT‐1C‐160 Spoƫng 1C‐160 0.8 0.8 0%Aug‐09‐22 Aug‐10‐22 32.9 FDN‐1C‐160 FoundaƟons 1C‐160 0.6 0.6 0%Jul‐31‐22 Aug‐01‐22 41.3 ACC ‐1C‐160 Access 1C‐160 0.8 0.8 0%Jul‐30‐22 Jul‐30‐22 41.8 CLR‐1C‐160 Clearing 1C‐160 0.8 0.8 0%Jul‐28‐22 Jul‐29‐22 42.6 REC‐1C‐160 ReclamaƟon 1C‐160 0.9 0.9 0%Jul‐10‐23 Jul‐11‐23 46.9 ERC‐1C‐160 Tower Erec Ɵon 1C‐160 0.9 0.9 0%Aug‐30‐22 Aug‐31‐22 61.3 Structure 1C-161Structure 1C-161 218.9 218.9 Jul‐27‐22 Jul‐10‐23 46.9 ASY‐1C‐161 Tower Assembly 1C ‐161 0.9 0.9 0%Aug‐29‐22 Aug‐30‐22 13.0 SPT‐1C‐161 Spoƫng 1C‐161 0.8 0.8 0%Aug‐08‐22 Aug‐09‐22 32.8 FDN‐1C‐161 FoundaƟons 1C‐161 0.6 0.6 0%Jul‐30‐22 Jul‐31‐22 41.1 ACC ‐1C‐161 Access 1C‐161 0.8 0.8 0%Jul‐29‐22 Jul‐30‐22 41.7 CLR‐1C‐161 Clearing 1C‐161 0.8 0.8 0%Jul‐27‐22 Jul‐28‐22 42.5 REC‐1C‐161 ReclamaƟon 1C‐161 0.9 0.9 0%Jul‐09‐23 Jul‐10‐23 46.9 ERC‐1C‐161 Tower Erec Ɵon 1C‐161 0.9 0.9 0%Aug‐30‐22 Aug‐30‐22 61.3 Structure 1C-162Structure 1C-162 218.9 218.9 Jul‐26‐22 Jul‐09‐23 46.9 ASY‐1C‐162 Tower Assembly 1C ‐162 0.9 0.9 0%Aug‐28‐22 Aug‐29‐22 13.0 SPT‐1C‐162 Spoƫng 1C‐162 0.8 0.8 0%Aug‐07‐22 Aug‐08‐22 32.8 FDN‐1C‐162 FoundaƟons 1C‐162 0.6 0.6 0%Jul‐30‐22 Jul‐30‐22 40.8 ACC ‐1C‐162 Access 1C‐162 0.8 0.8 0%Jul‐28‐22 Jul‐29‐22 41.7 CLR‐1C‐162 Clearing 1C‐162 0.8 0.8 0%Jul‐26‐22 Jul‐27‐22 42.4 REC‐1C‐162 ReclamaƟon 1C‐162 0.9 0.9 0%Jul‐08‐23 Jul‐09‐23 46.9 ERC‐1C‐162 Tower Erec Ɵon 1C‐162 0.9 0.9 0%Aug‐29‐22 Aug‐30‐22 61.3 Structure 1C-163Structure 1C-163 218.8 218.8 Jul‐26‐22 Jul‐08‐23 46.9 ASY‐1C‐163 Tower Assembly 1C ‐163 0.9 0.9 0%Aug‐27‐22 Aug‐28‐22 13.0 SPT‐1C‐163 Spoƫng 1C‐163 0.8 0.8 0%Aug‐07‐22 Aug‐07‐22 32.7 FDN‐1C‐163 FoundaƟons 1C‐163 0.6 0.6 0%Jul‐29‐22 Jul‐30‐22 40.6 ACC ‐1C‐163 Access 1C‐163 0.8 0.8 0%Jul‐27‐22 Jul‐28‐22 41.6 CLR‐1C‐163 Clearing 1C‐163 0.8 0.8 0%Jul‐26‐22 Jul‐26‐22 42.3 REC‐1C‐163 ReclamaƟon 1C‐163 0.9 0.9 0%Jul‐08‐23 Jul‐08‐23 46.9 ERC‐1C‐163 Tower Erec Ɵon 1C‐163 0.9 0.9 0%Aug‐28‐22 Aug‐29‐22 61.3 Structure 1C-164Structure 1C-164 218.7 218.7 Jul‐25‐22 Jul‐08‐23 46.9 ASY‐1C‐164 Tower Assembly 1C ‐164 0.9 0.9 0%Aug‐26‐22 Aug‐27‐22 13.0 SPT‐1C‐164 Spoƫng 1C‐164 0.8 0.8 0%Aug‐06‐22 Aug‐07‐22 32.6 FDN‐1C‐164 FoundaƟons 1C‐164 0.6 0.6 0%Jul‐28‐22 Jul‐29‐22 40.3 ACC ‐1C‐164 Access 1C‐164 0.8 0.8 0%Jul‐26‐22 Jul‐27‐22 41.5 CLR‐1C‐164 Clearing 1C‐164 0.8 0.8 0%Jul‐25‐22 Jul‐26‐22 42.3 REC‐1C‐164 ReclamaƟon 1C‐164 0.9 0.9 0%Jul‐07‐23 Jul‐08‐23 46.9 ERC‐1C‐164 Tower Erec Ɵon 1C‐164 0.9 0.9 0%Aug‐27‐22 Aug‐28‐22 61.3 Structure 1C-165Structure 1C-165 218.6 218.6 Jul‐24‐22 Jul‐07‐23 46.9 ASY‐1C‐165 Tower Assembly 1C ‐165 0.9 0.9 0%Aug‐25‐22 Aug‐26‐22 13.0 SPT‐1C‐165 Spoƫng 1C‐165 0.8 0.8 0%Aug‐05‐22 Aug‐06‐22 32.6 FDN‐1C‐165 FoundaƟons 1C‐165 0.6 0.6 0%Jul‐28‐22 Jul‐28‐22 40.0 ACC ‐1C‐165 Access 1C‐165 0.8 0.8 0%Jul‐26‐22 Jul‐26‐22 41.5 CLR‐1C‐165 Clearing 1C‐165 0.8 0.8 0%Jul‐24‐22 Jul‐25‐22 42.2 REC‐1C‐165 ReclamaƟon 1C‐165 0.9 0.9 0%Jul‐06‐23 Jul‐07‐23 46.9 ERC‐1C‐165 Tower Erec Ɵon 1C‐165 0.9 0.9 0%Aug‐26‐22 Aug‐27‐22 61.3 Structure 1C-166Structure 1C-166 218.5 218.5 Jul‐23‐22 Jul‐06‐23 46.9 ASY‐1C‐166 Tower Assembly 1C ‐166 0.9 0.9 0%Aug‐24‐22 Aug‐25‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Spoƫng 1C‐160 FoundaƟons 1C‐160 Access 1C‐160 Clearing 1C‐160 ReclamaƟon 1C‐160 Tower Erec Ɵon 1C‐160 Jul‐10‐23, Structure 1C‐161 Tower Assembly 1C ‐161 Spoƫng 1C‐161 FoundaƟons 1C‐161 Access 1C‐161 Clearing 1C‐161 ReclamaƟon 1C‐161 Tower Erec Ɵon 1C‐161 Jul‐09‐23, Structure 1C‐162 Tower Assembly 1C ‐162 Spoƫng 1C‐162 FoundaƟons 1C‐162 Access 1C‐162 Clearing 1C‐162 ReclamaƟon 1C‐162 Tower Erec Ɵon 1C‐162 Jul‐08‐23, Structure 1C‐163 Tower Assembly 1C‐163 Spoƫng 1C‐163 FoundaƟons 1C‐163 Access 1C‐163 Clearing 1C‐163 ReclamaƟon 1C‐163 Tower Erec Ɵon 1C‐163 Jul‐08‐23, Structure 1C‐164 Tower Assembly 1C‐164 Spoƫng 1C‐164 FoundaƟons 1C‐164 Access 1C‐164 Clearing 1C‐164 ReclamaƟon 1C‐164 Tower Erec Ɵon 1C‐164 Jul‐07‐23, Structure 1C‐165 Tower Assembly 1C‐165 Spoƫng 1C‐165 FoundaƟons 1C‐165 Access 1C‐165 Clearing 1C‐165 ReclamaƟon 1C‐165 Tower Erec Ɵon 1C‐165 Jul‐06‐23, Structure 1C‐166 Tower Assembly 1C‐166 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 91 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float SPT‐1C‐166 Spoƫng 1C‐166 0.8 0.8 0%Aug‐04‐22 Aug‐05‐22 32.5 FDN‐1C‐166 FoundaƟons 1C‐166 0.6 0.6 0%Jul‐27‐22 Jul‐28‐22 39.8 ACC ‐1C‐166 Access 1C‐166 0.8 0.8 0%Jul‐25‐22 Jul‐26‐22 41.4 CLR‐1C‐166 Clearing 1C‐166 0.8 0.8 0%Jul‐23‐22 Jul‐24‐22 42.1 REC‐1C‐166 ReclamaƟon 1C‐166 0.9 0.9 0%Jul‐05‐23 Jul‐06‐23 46.9 ERC‐1C‐166 Tower Erec Ɵon 1C‐166 0.9 0.9 0%Aug‐25‐22 Aug‐26‐22 61.3 Structure 1C-167Structure 1C-167 218.4 218.4 Jul‐23‐22 Jul‐05‐23 46.9 ASY‐1C‐167 Tower Assembly 1C ‐167 0.9 0.9 0%Aug‐24‐22 Aug‐24‐22 13.0 SPT‐1C‐167 Spoƫng 1C‐167 0.8 0.8 0%Aug‐03‐22 Aug‐04‐22 32.4 FDN‐1C‐167 FoundaƟons 1C‐167 0.6 0.6 0%Jul‐27‐22 Jul‐27‐22 39.5 ACC ‐1C‐167 Access 1C‐167 0.8 0.8 0%Jul‐24‐22 Jul‐25‐22 41.3 CLR‐1C‐167 Clearing 1C‐167 0.8 0.8 0%Jul‐23‐22 Jul‐23‐22 42.0 REC‐1C‐167 ReclamaƟon 1C‐167 0.9 0.9 0%Jul‐03‐23 Jul‐05‐23 46.9 ERC‐1C‐167 Tower Erec Ɵon 1C‐167 0.9 0.9 0%Aug‐24‐22 Aug‐25‐22 61.3 Structure 1C-168Structure 1C-168 218.4 218.4 Jul‐22‐22 Jul‐03‐23 46.9 ASY‐1C‐168 Tower Assembly 1C ‐168 0.9 0.9 0%Aug‐23‐22 Aug‐24‐22 13.0 FDN‐1C‐168 FoundaƟons 1C‐168 0.6 0.6 0%Jul‐26‐22 Jul‐27‐22 26.3 ACC ‐1C‐168 Access 1C‐168 0.8 0.8 0%Jul‐23‐22 Jul‐24‐22 28.4 CLR‐1C‐168 Clearing 1C‐168 0.8 0.8 0%Jul‐22‐22 Jul‐23‐22 29.0 SPT‐1C‐168 Spoƫng 1C‐168 0.8 0.8 0%Aug‐03‐22 Aug‐03‐22 32.4 REC‐1C‐168 ReclamaƟon 1C‐168 0.9 0.9 0%Jul‐02‐23 Jul‐03‐23 46.9 ERC‐1C‐168 Tower Erec Ɵon 1C‐168 0.9 0.9 0%Aug‐24‐22 Aug‐24‐22 61.3 Structure 1C-169Structure 1C-169 218.3 218.3 Jul‐21‐22 Jul‐02‐23 46.9 ASY‐1C‐169 Tower Assembly 1C ‐169 0.9 0.9 0%Aug‐22‐22 Aug‐23‐22 13.0 FDN‐1C‐169 FoundaƟons 1C‐169 0.6 0.6 0%Jul‐25‐22 Jul‐26‐22 26.3 ACC ‐1C‐169 Access 1C‐169 0.8 0.8 0%Jul‐22‐22 Jul‐23‐22 28.4 CLR‐1C‐169 Clearing 1C‐169 0.8 0.8 0%Jul‐21‐22 Jul‐22‐22 29.0 SPT‐1C‐169 Spoƫng 1C‐169 0.8 0.8 0%Aug‐02‐22 Aug‐03‐22 32.3 REC‐1C‐169 ReclamaƟon 1C‐169 0.9 0.9 0%Jul‐01‐23 Jul‐02‐23 46.9 ERC‐1C‐169 Tower Erec Ɵon 1C‐169 0.9 0.9 0%Aug‐23‐22 Aug‐24‐22 61.3 Structure 1C-170Structure 1C-170 218.2 218.2 Jul‐20‐22 Jul‐01‐23 46.9 ASY‐1C‐170 Tower Assembly 1C ‐170 0.9 0.9 0%Aug‐21‐22 Aug‐22‐22 13.0 FDN‐1C‐170 FoundaƟons 1C‐170 0.6 0.6 0%Jul‐25‐22 Jul‐25‐22 26.3 ACC ‐1C‐170 Access 1C‐170 0.8 0.8 0%Jul‐22‐22 Jul‐22‐22 28.4 CLR‐1C‐170 Clearing 1C‐170 0.8 0.8 0%Jul‐20‐22 Jul‐21‐22 29.0 SPT‐1C‐170 Spoƫng 1C‐170 0.8 0.8 0%Aug‐01‐22 Aug‐02‐22 32.2 REC‐1C‐170 ReclamaƟon 1C‐170 0.9 0.9 0%Jul‐01‐23 Jul‐01‐23 46.9 ERC‐1C‐170 Tower Erec Ɵon 1C‐170 0.9 0.9 0%Aug‐22‐22 Aug‐23‐22 61.3 Structure 1C-171Structure 1C-171 218.1 218.1 Jul‐19‐22 Jul‐01‐23 46.9 ASY‐1C‐171 Tower Assembly 1C ‐171 0.9 0.9 0%Aug‐20‐22 Aug‐21‐22 13.0 FDN‐1C‐171 FoundaƟons 1C‐171 0.6 0.6 0%Jul‐24‐22 Jul‐25‐22 26.3 ACC ‐1C‐171 Access 1C‐171 0.8 0.8 0%Jul‐21‐22 Jul‐22‐22 28.4 CLR‐1C‐171 Clearing 1C‐171 0.8 0.8 0%Jul‐19‐22 Jul‐20‐22 29.0 SPT‐1C‐171 Spoƫng 1C‐171 0.8 0.8 0%Jul‐31‐22 Aug‐01‐22 32.2 REC‐1C‐171 ReclamaƟon 1C‐171 0.9 0.9 0%Jun ‐30‐23 Jul‐01‐23 46.9 ERC‐1C‐171 Tower Erec Ɵon 1C‐171 0.9 0.9 0%Aug‐21‐22 Aug‐22‐22 61.3 Structure 1C-172Structure 1C-172 218.0 218.0 Jul‐19‐22 Jun‐30‐23 46.9 ASY‐1C‐172 Tower Assembly 1C ‐172 0.9 0.9 0%Aug‐19‐22 Aug‐20‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Spoƫng 1C‐166 FoundaƟons 1C‐166 Access 1C‐166 Clearing 1C‐166 ReclamaƟon 1C‐166 Tower Erec Ɵon 1C‐166 Jul‐05‐23, Structure 1C‐167 Tower Assembly 1C ‐167 Spoƫng 1C‐167 FoundaƟons 1C‐167 Access 1C‐167 Clearing 1C‐167 ReclamaƟon 1C‐167 Tower Erec Ɵon 1C‐167 Jul‐03‐23, Structure 1C‐168 Tower Assembly 1C ‐168 FoundaƟons 1C‐168 Access 1C‐168 Clearing 1C‐168 Spoƫng 1C‐168 ReclamaƟon 1C‐168 Tower Erec Ɵon 1C‐168 Jul‐02‐23, Structure 1C‐169 Tower Assembly 1C ‐169 FoundaƟons 1C‐169 Access 1C‐169 Clearing 1C‐169 Spoƫng 1C‐169 ReclamaƟon 1C‐169 Tower Erec Ɵon 1C‐169 Jul‐01‐23, Structure 1C‐170 Tower Assembly 1C ‐170 FoundaƟons 1C‐170 Access 1C‐170 Clearing 1C‐170 Spoƫng 1C‐170 ReclamaƟon 1C‐170 Tower Erec Ɵon 1C‐170 Jul‐01‐23, Structure 1C‐171 Tower Assembly 1C ‐171 FoundaƟons 1C‐171 Access 1C‐171 Clearing 1C‐171 Spoƫng 1C‐171 ReclamaƟon 1C‐171 Tower Erec Ɵon 1C‐171 Jun‐30‐23, Structure 1C‐172 Tower Assembly 1C ‐172 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 92 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1C‐172 FoundaƟons 1C‐172 0.6 0.6 0%Jul‐24‐22 Jul‐24‐22 26.3 ACC ‐1C‐172 Access 1C‐172 0.8 0.8 0%Jul‐20‐22 Jul‐21‐22 28.4 CLR‐1C‐172 Clearing 1C‐172 0.8 0.8 0%Jul‐19‐22 Jul‐19‐22 28.9 SPT‐1C‐172 Spoƫng 1C‐172 0.8 0.8 0%Jul‐30‐22 Jul‐31‐22 32.1 REC‐1C‐172 ReclamaƟon 1C‐172 0.9 0.9 0%Jun ‐29‐23 Jun‐30‐23 46.9 ERC‐1C‐172 Tower Erec Ɵon 1C‐172 0.9 0.9 0%Aug‐20‐22 Aug‐21‐22 61.3 Structure 1C-173Structure 1C-173 217.9 217.9 Jul‐18‐22 Jun‐29‐23 46.9 ASY‐1C‐173 Tower Assembly 1C ‐173 0.9 0.9 0%Aug‐18‐22 Aug‐19‐22 13.0 FDN‐1C‐173 FoundaƟons 1C‐173 0.6 0.6 0%Jul‐23‐22 Jul‐24‐22 26.3 ACC ‐1C‐173 Access 1C‐173 0.8 0.8 0%Jul‐19‐22 Jul‐20‐22 28.4 CLR‐1C‐173 Clearing 1C‐173 0.8 0.8 0%Jul‐18‐22 Jul‐19‐22 28.9 SPT‐1C‐173 Spoƫng 1C‐173 0.8 0.8 0%Jul‐30‐22 Jul‐30‐22 32.0 REC‐1C‐173 ReclamaƟon 1C‐173 0.9 0.9 0%Jun ‐28‐23 Jun‐29‐23 46.9 ERC‐1C‐173 Tower Erec Ɵon 1C‐173 0.9 0.9 0%Aug‐19‐22 Aug‐20‐22 61.3 Structure 1C-174Structure 1C-174 217.9 217.9 Jul‐17‐22 Jun‐28‐23 46.9 ASY‐1C‐174 Tower Assembly 1C ‐174 0.9 0.9 0%Aug‐17‐22 Aug‐18‐22 13.0 FDN‐1C‐174 FoundaƟons 1C‐174 0.6 0.6 0%Jul‐22‐22 Jul‐23‐22 26.3 ACC ‐1C‐174 Access 1C‐174 0.8 0.8 0%Jul‐18‐22 Jul‐19‐22 28.4 CLR‐1C‐174 Clearing 1C‐174 0.8 0.8 0%Jul‐17‐22 Jul‐18‐22 28.9 SPT‐1C‐174 Spoƫng 1C‐174 0.8 0.8 0%Jul‐29‐22 Jul‐30‐22 32.0 REC‐1C‐174 ReclamaƟon 1C‐174 0.9 0.9 0%Jun ‐27‐23 Jun‐28‐23 46.9 ERC‐1C‐174 Tower Erec Ɵon 1C‐174 0.9 0.9 0%Aug‐18‐22 Aug‐19‐22 61.3 Structure 1C-175Structure 1C-175 217.8 217.8 Jul‐16‐22 Jun‐27‐23 46.9 ASY‐1C‐175 Tower Assembly 1C ‐175 0.9 0.9 0%Aug‐17‐22 Aug‐17‐22 13.0 FDN‐1C‐175 FoundaƟons 1C‐175 0.6 0.6 0%Jul‐22‐22 Jul‐22‐22 26.3 ACC ‐1C‐175 Access 1C‐175 0.8 0.8 0%Jul‐18‐22 Jul‐18‐22 28.4 CLR‐1C‐175 Clearing 1C‐175 0.8 0.8 0%Jul‐16‐22 Jul‐17‐22 28.9 SPT‐1C‐175 Spoƫng 1C‐175 0.8 0.8 0%Jul‐28‐22 Jul‐29‐22 31.9 REC‐1C‐175 ReclamaƟon 1C‐175 0.9 0.9 0%Jun ‐26‐23 Jun‐27‐23 46.9 ERC‐1C‐175 Tower Erec Ɵon 1C‐175 0.9 0.9 0%Aug‐17‐22 Aug‐18‐22 61.3 Structure 1C-176Structure 1C-176 217.7 217.7 Jul‐15‐22 Jun‐26‐23 46.9 ASY‐1C‐176 Tower Assembly 1C ‐176 0.9 0.9 0%Aug‐16‐22 Aug‐17‐22 13.0 FDN‐1C‐176 FoundaƟons 1C‐176 0.6 0.6 0%Jul‐21‐22 Jul‐22‐22 26.3 ACC ‐1C‐176 Access 1C‐176 0.8 0.8 0%Jul‐17‐22 Jul‐18‐22 28.4 CLR‐1C‐176 Clearing 1C‐176 0.8 0.8 0%Jul‐15‐22 Jul‐16‐22 28.9 SPT‐1C‐176 Spoƫng 1C‐176 0.8 0.8 0%Jul‐27‐22 Jul‐28‐22 31.8 REC‐1C‐176 ReclamaƟon 1C‐176 0.9 0.9 0%Jun ‐25‐23 Jun‐26‐23 46.9 ERC‐1C‐176 Tower Erec Ɵon 1C‐176 0.9 0.9 0%Aug‐17‐22 Aug‐17‐22 61.3 Structure 1C-177Structure 1C-177 217.6 217.6 Jul‐15‐22 Jun‐25‐23 46.9 ASY‐1C‐177 Tower Assembly 1C ‐177 0.9 0.9 0%Aug‐15‐22 Aug‐16‐22 13.0 FDN‐1C‐177 FoundaƟons 1C‐177 0.6 0.6 0%Jul‐21‐22 Jul‐21‐22 26.3 ACC ‐1C‐177 Access 1C‐177 0.8 0.8 0%Jul‐16‐22 Jul‐17‐22 28.4 CLR‐1C‐177 Clearing 1C‐177 0.8 0.8 0%Jul‐15‐22 Jul‐15‐22 28.8 SPT‐1C‐177 Spoƫng 1C‐177 0.8 0.8 0%Jul‐26‐22 Jul‐27‐22 31.8 REC‐1C‐177 ReclamaƟon 1C‐177 0.9 0.9 0%Jun ‐24‐23 Jun‐25‐23 46.9 ERC‐1C‐177 Tower Erec Ɵon 1C‐177 0.9 0.9 0%Aug‐16‐22 Aug‐17‐22 61.3 Structure 1C-178Structure 1C-178 217.5 217.5 Jul‐14‐22 Jun‐24‐23 46.9 ASY‐1C‐178 Tower Assembly 1C ‐178 0.9 0.9 0%Aug‐14‐22 Aug‐15‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1C‐172 Access 1C‐172 Clearing 1C‐172 Spoƫng 1C‐172 ReclamaƟon 1C‐172 Tower Erec Ɵon 1C‐172 Jun‐29‐23, Structure 1C‐173 Tower Assembly 1C ‐173 FoundaƟons 1C‐173 Access 1C‐173 Clearing 1C‐173 Spoƫng 1C‐173 ReclamaƟon 1C‐173 Tower Erec Ɵon 1C‐173 Jun‐28‐23, Structure 1C‐174 Tower Assembly 1C ‐174 FoundaƟons 1C‐174 Access 1C‐174 Clearing 1C‐174 Spoƫng 1C‐174 ReclamaƟon 1C‐174 Tower Erec Ɵon 1C‐174 Jun‐27‐23, Structure 1C‐175 Tower Assembly 1C‐175 FoundaƟons 1C‐175 Access 1C‐175 Clearing 1C‐175 Spoƫng 1C‐175 ReclamaƟon 1C‐175 Tower Erec Ɵon 1C‐175 Jun ‐26‐23, Structure 1C‐176 Tower Assembly 1C‐176 FoundaƟons 1C‐176 Access 1C‐176 Clearing 1C‐176 Spoƫng 1C‐176 ReclamaƟon 1C‐176 Tower Erec Ɵon 1C‐176 Jun ‐25‐23, Structure 1C‐177 Tower Assembly 1C‐177 FoundaƟons 1C‐177 Access 1C‐177 Clearing 1C‐177 Spoƫng 1C‐177 ReclamaƟon 1C‐177 Tower Erec Ɵon 1C‐177 Jun ‐24‐23, Structure 1C‐178 Tower Assembly 1C‐178 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 93 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1C‐178 FoundaƟons 1C‐178 0.6 0.6 0%Jul‐20‐22 Jul‐21‐22 26.3 ACC ‐1C‐178 Access 1C‐178 0.8 0.8 0%Jul‐15‐22 Jul‐16‐22 28.4 CLR‐1C‐178 Clearing 1C‐178 0.8 0.8 0%Jul‐14‐22 Jul‐15‐22 28.8 SPT‐1C‐178 Spoƫng 1C‐178 0.8 0.8 0%Jul‐25‐22 Jul‐26‐22 31.7 REC‐1C‐178 ReclamaƟon 1C‐178 0.9 0.9 0%Jun ‐24‐23 Jun‐24‐23 46.9 ERC‐1C‐178 Tower Erec Ɵon 1C‐178 0.9 0.9 0%Aug‐15‐22 Aug‐16‐22 61.3 Structure 1C-179Structure 1C-179 217.4 217.4 Jul‐13‐22 Jun‐24‐23 46.9 ASY‐1C‐179 Tower Assembly 1C ‐179 0.9 0.9 0%Aug‐13‐22 Aug‐14‐22 13.0 FDN‐1C‐179 FoundaƟons 1C‐179 0.6 0.6 0%Jul‐19‐22 Jul‐20‐22 26.3 ACC ‐1C‐179 Access 1C‐179 0.8 0.8 0%Jul‐14‐22 Jul‐15‐22 28.4 CLR‐1C‐179 Clearing 1C‐179 0.8 0.8 0%Jul‐13‐22 Jul‐14‐22 28.8 SPT‐1C‐179 Spoƫng 1C‐179 0.8 0.8 0%Jul‐25‐22 Jul‐25‐22 31.6 REC‐1C‐179 ReclamaƟon 1C‐179 0.9 0.9 0%Jun ‐23‐23 Jun‐24‐23 46.9 ERC‐1C‐179 Tower Erec Ɵon 1C‐179 0.9 0.9 0%Aug‐14‐22 Aug‐15‐22 61.3 Structure 1C-180Structure 1C-180 217.4 217.4 Jul‐12‐22 Jun‐23‐23 46.9 ASY‐1C‐180 Tower Assembly 1C ‐180 0.9 0.9 0%Aug‐12‐22 Aug‐13‐22 13.0 FDN‐1C‐180 FoundaƟons 1C‐180 0.6 0.6 0%Jul‐19‐22 Jul‐19‐22 26.3 ACC ‐1C‐180 Access 1C‐180 0.8 0.8 0%Jul‐14‐22 Jul‐14‐22 28.4 CLR‐1C‐180 Clearing 1C‐180 0.8 0.8 0%Jul‐12‐22 Jul‐13‐22 28.8 SPT‐1C‐180 Spoƫng 1C‐180 0.8 0.8 0%Jul‐24‐22 Jul‐25‐22 31.6 REC‐1C‐180 ReclamaƟon 1C‐180 0.9 0.9 0%Jun ‐22‐23 Jun‐23‐23 46.9 ERC‐1C‐180 Tower Erec Ɵon 1C‐180 0.9 0.9 0%Aug‐13‐22 Aug‐14‐22 61.3 Structure 1C-181Structure 1C-181 217.3 217.3 Jul‐12‐22 Jun‐22‐23 46.9 ASY‐1C‐181 Tower Assembly 1C ‐181 0.9 0.9 0%Aug‐11‐22 Aug‐12‐22 13.0 FDN‐1C‐181 FoundaƟons 1C‐181 0.6 0.6 0%Jul‐18‐22 Jul‐19‐22 26.3 ACC ‐1C‐181 Access 1C‐181 0.8 0.8 0%Jul‐13‐22 Jul‐14‐22 28.4 CLR‐1C‐181 Clearing 1C‐181 0.8 0.8 0%Jul‐12‐22 Jul‐12‐22 28.8 SPT‐1C‐181 Spoƫng 1C‐181 0.8 0.8 0%Jul‐23‐22 Jul‐24‐22 31.5 REC‐1C‐181 ReclamaƟon 1C‐181 0.9 0.9 0%Jun ‐21‐23 Jun‐22‐23 46.9 ERC‐1C‐181 Tower Erec Ɵon 1C‐181 0.9 0.9 0%Aug‐12‐22 Aug‐13‐22 61.3 Structure 1C-182Structure 1C-182 217.2 217.2 Jul‐11‐22 Jun‐21‐23 46.9 ASY‐1C‐182 Tower Assembly 1C ‐182 0.9 0.9 0%Aug‐10‐22 Aug‐11‐22 13.0 FDN‐1C‐182 FoundaƟons 1C‐182 0.6 0.6 0%Jul‐18‐22 Jul‐18‐22 26.3 ACC ‐1C‐182 Access 1C‐182 0.8 0.8 0%Jul‐12‐22 Jul‐13‐22 28.4 CLR‐1C‐182 Clearing 1C‐182 0.8 0.8 0%Jul‐11‐22 Jul‐12‐22 28.8 SPT‐1C‐182 Spoƫng 1C‐182 0.8 0.8 0%Jul‐22‐22 Jul‐23‐22 31.5 REC‐1C‐182 ReclamaƟon 1C‐182 0.9 0.9 0%Jun ‐20‐23 Jun‐21‐23 46.9 ERC‐1C‐182 Tower Erec Ɵon 1C‐182 0.9 0.9 0%Aug‐11‐22 Aug‐12‐22 61.3 Structure 1C-183Structure 1C-183 217.1 217.1 Jul‐10‐22 Jun‐20‐23 46.9 ASY‐1C‐183 Tower Assembly 1C ‐183 0.9 0.9 0%Aug‐10‐22 Aug‐10‐22 13.0 FDN‐1C‐183 FoundaƟons 1C‐183 0.6 0.6 0%Jul‐17‐22 Jul‐18‐22 26.3 ACC ‐1C‐183 Access 1C‐183 0.8 0.8 0%Jul‐11‐22 Jul‐12‐22 28.4 CLR‐1C‐183 Clearing 1C‐183 0.8 0.8 0%Jul‐10‐22 Jul‐11‐22 28.7 SPT‐1C‐183 Spoƫng 1C‐183 0.8 0.8 0%Jul‐21‐22 Jul‐22‐22 31.4 REC‐1C‐183 ReclamaƟon 1C‐183 0.9 0.9 0%Jun ‐19‐23 Jun‐20‐23 46.9 ERC‐1C‐183 Tower Erec Ɵon 1C‐183 0.9 0.9 0%Aug‐10‐22 Aug‐11‐22 61.3 Structure 1C-184Structure 1C-184 217.0 217.0 Jul‐09‐22 Jun‐19‐23 46.9 ASY‐1C‐184 Tower Assembly 1C ‐184 0.9 0.9 0%Aug‐09‐22 Aug‐10‐22 13.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1C‐178 Access 1C‐178 Clearing 1C‐178 Spoƫng 1C‐178 ReclamaƟon 1C‐178 Tower Erec Ɵon 1C‐178 Jun ‐24‐23, Structure 1C‐179 Tower Assembly 1C‐179 FoundaƟons 1C‐179 Access 1C‐179 Clearing 1C‐179 Spoƫng 1C‐179 ReclamaƟon 1C‐179 Tower Erec Ɵon 1C‐179 Jun ‐23‐23, Structure 1C‐180 Tower Assembly 1C ‐180 FoundaƟons 1C‐180 Access 1C‐180 Clearing 1C‐180 Spoƫng 1C‐180 ReclamaƟon 1C‐180 Tower Erec Ɵon 1C‐180 Jun ‐22‐23, Structure 1C‐181 Tower Assembly 1C ‐181 FoundaƟons 1C‐181 Access 1C‐181 Clearing 1C‐181 Spoƫng 1C‐181 ReclamaƟon 1C‐181 Tower Erec Ɵon 1C‐181 Jun ‐21‐23, Structure 1C‐182 Tower Assembly 1C ‐182 FoundaƟons 1C‐182 Access 1C‐182 Clearing 1C‐182 Spoƫng 1C‐182 ReclamaƟon 1C‐182 Tower Erec Ɵon 1C‐182 Jun‐20‐23, Structure 1C‐183 Tower Assembly 1C ‐183 FoundaƟons 1C‐183 Access 1C‐183 Clearing 1C‐183 Spoƫng 1C‐183 ReclamaƟon 1C‐183 Tower Erec Ɵon 1C‐183 Jun‐19‐23, Structure 1C‐184 Tower Assembly 1C ‐184 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 94 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float FDN‐1C‐184 FoundaƟons 1C‐184 0.6 0.6 0%Jul‐16‐22 Jul‐17‐22 26.3 ACC ‐1C‐184 Access 1C‐184 0.8 0.8 0%Jul‐10‐22 Jul‐11‐22 28.4 CLR‐1C‐184 Clearing 1C‐184 0.8 0.8 0%Jul‐09‐22 Jul‐10‐22 28.7 SPT‐1C‐184 Spoƫng 1C‐184 0.8 0.8 0%Jul‐21‐22 Jul‐21‐22 31.3 REC‐1C‐184 ReclamaƟon 1C‐184 0.9 0.9 0%Jun ‐18‐23 Jun‐19‐23 46.9 ERC‐1C‐184 Tower Erec Ɵon 1C‐184 0.9 0.9 0%Aug‐10‐22 Aug‐10‐22 61.3 Structure 1C-185Structure 1C-185 216.9 216.9 Jul‐08‐22 Jun‐18‐23 46.9 ASY‐1C‐185 Tower Assembly 1C ‐185 0.9 0.9 0%Aug‐08‐22 Aug‐09‐22 13.0 FDN‐1C‐185 FoundaƟons 1C‐185 0.6 0.6 0%Jul‐16‐22 Jul‐16‐22 26.3 ACC ‐1C‐185 Access 1C‐185 0.8 0.8 0%Jul‐10‐22 Jul‐10‐22 28.4 CLR‐1C‐185 Clearing 1C‐185 0.8 0.8 0%Jul‐08‐22 Jul‐09‐22 28.7 SPT‐1C‐185 Spoƫng 1C‐185 0.8 0.8 0%Jul‐20‐22 Jul‐21‐22 31.3 REC‐1C‐185 ReclamaƟon 1C‐185 0.9 0.9 0%Jun ‐17‐23 Jun‐18‐23 46.9 ERC‐1C‐185 Tower Erec Ɵon 1C‐185 0.9 0.9 0%Aug‐09‐22 Aug‐10‐22 61.3 Structure 1C-186Structure 1C-186 216.9 216.9 Jul‐08‐22 Jun‐17‐23 46.9 ASY‐1C‐186 Tower Assembly 1C ‐186 0.9 0.9 0%Aug‐07‐22 Aug‐08‐22 13.0 FDN‐1C‐186 FoundaƟons 1C‐186 0.6 0.6 0%Jul‐15‐22 Jul‐16‐22 26.3 ACC ‐1C‐186 Access 1C‐186 0.8 0.8 0%Jul‐09‐22 Jul‐10‐22 28.4 CLR‐1C‐186 Clearing 1C‐186 0.8 0.8 0%Jul‐08‐22 Jul‐08‐22 28.7 SPT‐1C‐186 Spoƫng 1C‐186 0.8 0.8 0%Jul‐19‐22 Jul‐20‐22 31.2 REC‐1C‐186 ReclamaƟon 1C‐186 0.9 0.9 0%Jun ‐17‐23 Jun‐17‐23 46.9 ERC‐1C‐186 Tower Erec Ɵon 1C‐186 0.9 0.9 0%Aug‐08‐22 Aug‐09‐22 61.3 Structure 1C-187Structure 1C-187 216.8 216.8 Jul‐07‐22 Jun‐17‐23 46.9 CLR‐1C‐187 Clearing 1C‐187 0.8 0.8 0%Jul‐07‐22 Jul‐08‐22 12.0 ASY‐1C‐187 Tower Assembly 1C ‐187 0.9 0.9 0%Aug‐06‐22 Aug‐07‐22 13.0 FDN‐1C‐187 FoundaƟons 1C‐187 0.6 0.6 0%Jul‐14‐22 Jul‐15‐22 26.3 ACC ‐1C‐187 Access 1C‐187 0.8 0.8 0%Jul‐08‐22 Jul‐09‐22 28.4 SPT‐1C‐187 Spoƫng 1C‐187 0.8 0.8 0%Jul‐18‐22 Jul‐19‐22 31.1 REC‐1C‐187 ReclamaƟon 1C‐187 0.9 0.9 0%Jun ‐16‐23 Jun‐17‐23 46.9 ERC‐1C‐187 Tower Erec Ɵon 1C‐187 0.9 0.9 0%Aug‐07‐22 Aug‐08‐22 61.3 Structure 1C-188Structure 1C-188 216.7 216.7 Jul‐06‐22 Jun‐16‐23 46.9 CLR‐1C‐188 Clearing 1C‐188 0.8 0.8 0%Jul‐06‐22 Jul‐07‐22 12.0 ASY‐1C‐188 Tower Assembly 1C ‐188 0.9 0.9 0%Aug‐05‐22 Aug‐06‐22 13.0 FDN‐1C‐188 FoundaƟons 1C‐188 0.6 0.6 0%Jul‐14‐22 Jul‐14‐22 26.3 ACC ‐1C‐188 Access 1C‐188 0.8 0.8 0%Jul‐07‐22 Jul‐08‐22 28.4 SPT‐1C‐188 Spoƫng 1C‐188 0.8 0.8 0%Jul‐17‐22 Jul‐18‐22 31.1 REC‐1C‐188 ReclamaƟon 1C‐188 0.9 0.9 0%Jun ‐15‐23 Jun‐16‐23 46.9 ERC‐1C‐188 Tower Erec Ɵon 1C‐188 0.9 0.9 0%Aug‐06‐22 Aug‐07‐22 61.3 Structure 1C-189Structure 1C-189 216.6 216.6 Jul‐05‐22 Jun‐15‐23 46.9 CLR‐1C‐189 Clearing 1C‐189 0.8 0.8 0%Jul‐05‐22 Jul‐06‐22 12.0 ASY‐1C‐189 Tower Assembly 1C ‐189 0.9 0.9 0%Aug‐04‐22 Aug‐05‐22 13.0 FDN‐1C‐189 FoundaƟons 1C‐189 0.6 0.6 0%Jul‐13‐22 Jul‐14‐22 26.3 ACC ‐1C‐189 Access 1C‐189 0.8 0.8 0%Jul‐06‐22 Jul‐07‐22 28.4 SPT‐1C‐189 Spoƫng 1C‐189 0.8 0.8 0%Jul‐17‐22 Jul‐17‐22 31.0 REC‐1C‐189 ReclamaƟon 1C‐189 0.9 0.9 0%Jun ‐14‐23 Jun‐15‐23 46.9 ERC‐1C‐189 Tower Erec Ɵon 1C‐189 0.9 0.9 0%Aug‐05‐22 Aug‐06‐22 61.3 Structure 1C-190Structure 1C-190 216.5 216.5 Jul‐03‐22 Jun‐14‐23 46.9 CLR‐1C‐190 Clearing 1C‐190 0.8 0.8 0%Jul‐03‐22 Jul‐05‐22 12.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 FoundaƟons 1C‐184 Access 1C‐184 Clearing 1C‐184 Spoƫng 1C‐184 ReclamaƟon 1C‐184 Tower Erec Ɵon 1C‐184 Jun‐18‐23, Structure 1C‐185 Tower Assembly 1C ‐185 FoundaƟons 1C‐185 Access 1C‐185 Clearing 1C‐185 Spoƫng 1C‐185 ReclamaƟon 1C‐185 Tower Erec Ɵon 1C‐185 Jun‐17‐23, Structure 1C‐186 Tower Assembly 1C ‐186 FoundaƟons 1C‐186 Access 1C‐186 Clearing 1C‐186 Spoƫng 1C‐186 ReclamaƟon 1C‐186 Tower Erec Ɵon 1C‐186 Jun‐17‐23, Structure 1C‐187 Clearing 1C‐187 Tower Assembly 1C ‐187 FoundaƟons 1C‐187 Access 1C‐187 Spoƫng 1C‐187 ReclamaƟon 1C‐187 Tower Erec Ɵon 1C‐187 Jun‐16‐23, Structure 1C‐188 Clearing 1C‐188 Tower Assembly 1C‐188 FoundaƟons 1C‐188 Access 1C‐188 Spoƫng 1C‐188 ReclamaƟon 1C‐188 Tower Erec Ɵon 1C‐188 Jun‐15‐23, Structure 1C‐189 Clearing 1C‐189 Tower Assembly 1C‐189 FoundaƟons 1C‐189 Access 1C‐189 Spoƫng 1C‐189 ReclamaƟon 1C‐189 Tower Erec Ɵon 1C‐189 Jun‐14‐23, Structure 1C‐190 Clearing 1C‐190 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 95 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float ASY‐1C‐190 Tower Assembly 1C ‐190 0.9 0.9 0%Aug‐04‐22 Aug‐04‐22 13.0 FDN‐1C‐190 FoundaƟons 1C‐190 0.6 0.6 0%Jul‐13‐22 Jul‐13‐22 26.3 ACC ‐1C‐190 Access 1C‐190 0.8 0.8 0%Jul‐05‐22 Jul‐06‐22 28.4 SPT‐1C‐190 Spoƫng 1C‐190 0.8 0.8 0%Jul‐16‐22 Jul‐17‐22 30.9 REC‐1C‐190 ReclamaƟon 1C‐190 0.9 0.9 0%Jun ‐13‐23 Jun‐14‐23 46.9 ERC‐1C‐190 Tower Erec Ɵon 1C‐190 0.9 0.9 0%Aug‐04‐22 Aug‐05‐22 61.3 Structure 1C-191Structure 1C-191 216.4 216.4 Jul‐03‐22 Jun‐13‐23 46.9 CLR‐1C‐191 Clearing 1C‐191 0.8 0.8 0%Jul‐03‐22 Jul‐03‐22 12.0 ASY‐1C‐191 Tower Assembly 1C ‐191 0.9 0.9 0%Aug‐03‐22 Aug‐04‐22 13.0 FDN‐1C‐191 FoundaƟons 1C‐191 0.6 0.6 0%Jul‐12‐22 Jul‐13‐22 26.3 ACC ‐1C‐191 Access 1C‐191 0.8 0.8 0%Jul‐05‐22 Jul‐05‐22 28.4 SPT‐1C‐191 Spoƫng 1C‐191 0.8 0.8 0%Jul‐15‐22 Jul‐16‐22 30.9 REC‐1C‐191 ReclamaƟon 1C‐191 0.9 0.9 0%Jun ‐12‐23 Jun‐13‐23 46.9 ERC‐1C‐191 Tower Erec Ɵon 1C‐191 0.9 0.9 0%Aug‐04‐22 Aug‐04‐22 61.3 Structure 1C-192Structure 1C-192 216.4 216.4 Jul‐02‐22 Jun‐12‐23 46.9 CLR‐1C‐192 Clearing 1C‐192 0.8 0.8 0%Jul‐02‐22 Jul‐03‐22 12.0 ASY‐1C‐192 Tower Assembly 1C ‐192 0.9 0.9 0%Aug‐02‐22 Aug‐03‐22 13.0 FDN‐1C‐192 FoundaƟons 1C‐192 0.6 0.6 0%Jul‐11‐22 Jul‐12‐22 26.3 ACC ‐1C‐192 Access 1C‐192 0.8 0.8 0%Jul‐03‐22 Jul‐05‐22 28.4 SPT‐1C‐192 Spoƫng 1C‐192 0.8 0.8 0%Jul‐14‐22 Jul‐15‐22 30.8 REC‐1C‐192 ReclamaƟon 1C‐192 0.9 0.9 0%Jun ‐11‐23 Jun‐12‐23 46.9 ERC‐1C‐192 Tower Erec Ɵon 1C‐192 0.9 0.9 0%Aug‐03‐22 Aug‐04‐22 61.3 Structure 1C-193Structure 1C-193 216.3 216.3 Jul‐01‐22 Jun‐11‐23 46.9 CLR‐1C‐193 Clearing 1C‐193 0.8 0.8 0%Jul‐01‐22 Jul‐02‐22 12.0 ASY‐1C‐193 Tower Assembly 1C ‐193 0.9 0.9 0%Aug‐01‐22 Aug‐02‐22 13.0 FDN‐1C‐193 FoundaƟons 1C‐193 0.6 0.6 0%Jul‐11‐22 Jul‐11‐22 26.3 ACC ‐1C‐193 Access 1C‐193 0.8 0.8 0%Jul‐02‐22 Jul‐03‐22 28.4 SPT‐1C‐193 Spoƫng 1C‐193 0.8 0.8 0%Jul‐13‐22 Jul‐14‐22 30.7 REC‐1C‐193 ReclamaƟon 1C‐193 0.9 0.9 0%Jun ‐11‐23 Jun‐11‐23 46.9 ERC‐1C‐193 Tower Erec Ɵon 1C‐193 0.9 0.9 0%Aug‐02‐22 Aug‐03‐22 61.3 Structure 1C-194Structure 1C-194 216.2 216.2 Jun ‐30‐22 Jun‐11‐23 46.9 CLR‐1C‐194 Clearing 1C‐194 0.8 0.8 0%Jun ‐30‐22 Jul‐01‐22 12.0 ASY‐1C‐194 Tower Assembly 1C ‐194 0.9 0.9 0%Jul‐31‐22 Aug‐01‐22 13.0 FDN‐1C‐194 FoundaƟons 1C‐194 0.6 0.6 0%Jul‐10‐22 Jul‐11‐22 26.3 ACC ‐1C‐194 Access 1C‐194 0.8 0.8 0%Jul‐01‐22 Jul‐02‐22 28.4 SPT‐1C‐194 Spoƫng 1C‐194 0.8 0.8 0%Jul‐13‐22 Jul‐13‐22 30.7 REC‐1C‐194 ReclamaƟon 1C‐194 0.9 0.9 0%Jun ‐10‐23 Jun‐11‐23 46.9 ERC‐1C‐194 Tower Erec Ɵon 1C‐194 0.9 0.9 0%Aug‐01‐22 Aug‐02‐22 61.3 Structure 1C-195Structure 1C-195 216.1 216.1 Jun ‐30‐22 Jun‐10‐23 46.9 CLR‐1C‐195 Clearing 1C‐195 0.8 0.8 0%Jun ‐30‐22 Jun‐30‐22 12.0 ASY‐1C‐195 Tower Assembly 1C ‐195 0.9 0.9 0%Jul‐30‐22 Jul‐31‐22 13.0 FDN‐1C‐195 FoundaƟons 1C‐195 0.6 0.6 0%Jul‐10‐22 Jul‐10‐22 26.3 ACC ‐1C‐195 Access 1C‐195 0.8 0.8 0%Jun ‐30‐22 Jul‐01‐22 28.4 SPT‐1C‐195 Spoƫng 1C‐195 0.8 0.8 0%Jul‐12‐22 Jul‐13‐22 30.6 REC‐1C‐195 ReclamaƟon 1C‐195 0.9 0.9 0%Jun ‐09‐23 Jun‐10‐23 46.9 ERC‐1C‐195 Tower Erec Ɵon 1C‐195 0.9 0.9 0%Jul‐31‐22 Aug‐01‐22 61.3 Structure 1C-196Structure 1C-196 437.7 437.7 Jun ‐29‐22 Feb‐01‐24 0.0 REC‐1C‐196 ReclamaƟon 1C‐196 0.8 0.8 0%Feb‐01‐24 Feb‐01‐24 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Tower Assembly 1C‐190 FoundaƟons 1C‐190 Access 1C‐190 Spoƫng 1C‐190 ReclamaƟon 1C‐190 Tower Erec Ɵon 1C‐190 Jun‐13‐23, Structure 1C‐191 Clearing 1C‐191 Tower Assembly 1C‐191 FoundaƟons 1C‐191 Access 1C‐191 Spoƫng 1C‐191 ReclamaƟon 1C‐191 Tower Erec Ɵon 1C‐191 Jun‐12‐23, Structure 1C‐192 Clearing 1C‐192 Tower Assembly 1C‐192 FoundaƟons 1C‐192 Access 1C‐192 Spoƫng 1C‐192 ReclamaƟon 1C‐192 Tower Erec Ɵon 1C‐192 Jun ‐11‐23, Structure 1C‐193 Clearing 1C‐193 Tower Assembly 1C ‐193 FoundaƟons 1C‐193 Access 1C‐193 Spoƫng 1C‐193 ReclamaƟon 1C‐193 Tower Erec Ɵon 1C‐193 Jun ‐11‐23, Structure 1C‐194 Clearing 1C‐194 Tower Assembly 1C ‐194 FoundaƟons 1C‐194 Access 1C‐194 Spoƫng 1C‐194 ReclamaƟon 1C‐194 Tower Erec Ɵon 1C‐194 Jun ‐10‐23, Structure 1C‐195 Clearing 1C‐195 Tower Assembly 1C ‐195 FoundaƟons 1C‐195 Access 1C ‐195 Spoƫng 1C‐195 ReclamaƟon 1C‐195 Tower Erec Ɵon 1C‐195 Feb‐01‐24, Structure 1C‐196 ReclamaƟon 1C‐196 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 96 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1C‐196 Clearing 1C‐196 0.8 0.8 0%Jun ‐29‐22 Jun‐30‐22 12.0 ASY‐1C‐196 Tower Assembly 1C ‐196 0.9 0.9 0%Jul‐29‐22 Jul‐30‐22 13.0 FDN‐1C‐196 FoundaƟons 1C‐196 0.6 0.6 0%Jul‐09‐22 Jul‐10‐22 26.3 ACC ‐1C‐196 Access 1C‐196 0.8 0.8 0%Jun ‐30‐22 Jun‐30‐22 28.4 SPT‐1C‐196 Spoƫng 1C‐196 0.8 0.8 0%Jul‐11‐22 Jul‐12‐22 30.5 ERC‐1C‐196 Tower Erec Ɵon 1C‐196 0.9 0.9 0%Jul‐30‐22 Jul‐31‐22 61.3 Structure 1C-197Structure 1C-197 437.6 437.6 Jun ‐28‐22 Feb‐01‐24 0.0 REC‐1C‐197 ReclamaƟon 1C‐197 0.8 0.8 0%Jan‐31‐24 Feb‐01‐24 0.0 CLR‐1C‐197 Clearing 1C‐197 0.8 0.8 0%Jun ‐28‐22 Jun‐29‐22 12.0 ASY‐1C‐197 Tower Assembly 1C ‐197 0.9 0.9 0%Jul‐28‐22 Jul‐29‐22 13.0 FDN‐1C‐197 FoundaƟons 1C‐197 0.6 0.6 0%Jul‐08‐22 Jul‐09‐22 26.3 ACC ‐1C‐197 Access 1C‐197 0.8 0.8 0%Jun ‐29‐22 Jun‐30‐22 28.4 SPT‐1C‐197 Spoƫng 1C‐197 0.8 0.8 0%Jul‐10‐22 Jul‐11‐22 30.5 ERC‐1C‐197 Tower Erec Ɵon 1C‐197 0.9 0.9 0%Jul‐29‐22 Jul‐30‐22 61.3 Structure 1C-198Structure 1C-198 437.6 437.6 Jun ‐27‐22 Jan‐31‐24 0.0 REC‐1C‐198 ReclamaƟon 1C‐198 0.8 0.8 0%Jan‐30‐24 Jan‐31‐24 0.0 CLR‐1C‐198 Clearing 1C‐198 0.8 0.8 0%Jun ‐27‐22 Jun‐28‐22 12.0 ASY‐1C‐198 Tower Assembly 1C ‐198 0.9 0.9 0%Jul‐28‐22 Jul‐28‐22 13.0 FDN‐1C‐198 FoundaƟons 1C‐198 0.6 0.6 0%Jul‐08‐22 Jul‐08‐22 26.3 ACC ‐1C‐198 Access 1C‐198 0.8 0.8 0%Jun ‐28‐22 Jun‐29‐22 28.4 SPT‐1C‐198 Spoƫng 1C‐198 0.8 0.8 0%Jul‐09‐22 Jul‐10‐22 30.4 ERC‐1C‐198 Tower Erec Ɵon 1C‐198 0.9 0.9 0%Jul‐28‐22 Jul‐29‐22 61.3 Structure 1C-199Structure 1C-199 437.6 437.6 Jun ‐26‐22 Jan‐30‐24 0.0 REC‐1C‐199 ReclamaƟon 1C‐199 0.8 0.8 0%Jan‐29‐24 Jan‐30‐24 0.0 CLR‐1C‐199 Clearing 1C‐199 0.8 0.8 0%Jun ‐26‐22 Jun‐27‐22 12.0 ASY‐1C‐199 Tower Assembly 1C ‐199 0.9 0.9 0%Jul‐27‐22 Jul‐28‐22 13.0 FDN‐1C‐199 FoundaƟons 1C‐199 0.6 0.6 0%Jul‐07‐22 Jul‐08‐22 26.3 ACC ‐1C‐199 Access 1C‐199 0.8 0.8 0%Jun ‐27‐22 Jun‐28‐22 28.4 SPT‐1C‐199 Spoƫng 1C‐199 0.8 0.8 0%Jul‐09‐22 Jul‐09‐22 30.3 ERC‐1C‐199 Tower Erec Ɵon 1C‐199 0.9 0.9 0%Jul‐28‐22 Jul‐28‐22 61.3 Structure 1C-200Structure 1C-200 437.6 437.6 Jun ‐26‐22 Jan‐29‐24 0.0 REC‐1C‐200 ReclamaƟon 1C‐200 0.8 0.8 0%Jan‐28‐24 Jan‐29‐24 0.0 CLR‐1C‐200 Clearing 1C‐200 0.8 0.8 0%Jun ‐26‐22 Jun‐26‐22 12.0 ASY‐1C‐200 Tower Assembly 1C ‐200 0.9 0.9 0%Jul‐26‐22 Jul‐27‐22 13.0 FDN‐1C‐200 FoundaƟons 1C‐200 0.6 0.6 0%Jul‐07‐22 Jul‐07‐22 26.3 ACC ‐1C‐200 Access 1C‐200 0.8 0.8 0%Jun ‐26‐22 Jun‐27‐22 28.4 SPT‐1C‐200 Spoƫng 1C‐200 0.8 0.8 0%Jul‐08‐22 Jul‐09‐22 30.3 ERC‐1C‐200 Tower Erec Ɵon 1C‐200 0.9 0.9 0%Jul‐27‐22 Jul‐28‐22 61.3 Structure 1C-201Structure 1C-201 437.6 437.6 Jun ‐25‐22 Jan‐28‐24 0.0 REC‐1C‐201 ReclamaƟon 1C‐201 0.8 0.8 0%Jan‐28‐24 Jan‐28‐24 0.0 CLR‐1C‐201 Clearing 1C‐201 0.8 0.8 0%Jun ‐25‐22 Jun‐26‐22 12.0 ASY‐1C‐201 Tower Assembly 1C ‐201 0.9 0.9 0%Jul‐25‐22 Jul‐26‐22 13.0 FDN‐1C‐201 FoundaƟons 1C‐201 0.6 0.6 0%Jul‐06‐22 Jul‐07‐22 26.3 ACC ‐1C‐201 Access 1C‐201 0.8 0.8 0%Jun ‐26‐22 Jun‐26‐22 28.4 SPT‐1C‐201 Spoƫng 1C‐201 0.8 0.8 0%Jul‐07‐22 Jul‐08‐22 30.2 ERC‐1C‐201 Tower Erec Ɵon 1C‐201 0.9 0.9 0%Jul‐26‐22 Jul‐27‐22 61.3 Structure 1C-202Structure 1C-202 437.6 437.6 Jun ‐24‐22 Jan‐28‐24 0.0 REC‐1C‐202 ReclamaƟon 1C‐202 0.8 0.8 0%Jan‐27‐24 Jan‐28‐24 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1C‐196 Tower Assembly 1C ‐196 FoundaƟons 1C‐196 Access 1C ‐196 Spoƫng 1C‐196 Tower Erec Ɵon 1C‐196 Feb‐01‐24, Structure 1C‐197 ReclamaƟon 1C‐197 Clearing 1C‐197 Tower Assembly 1C ‐197 FoundaƟons 1C‐197 Access 1C ‐197 Spoƫng 1C‐197 Tower Erec Ɵon 1C‐197 Jan‐31‐24, Structure 1C‐198 ReclamaƟon 1C‐198 Clearing 1C‐198 Tower Assembly 1C ‐198 FoundaƟons 1C‐198 Access 1C ‐198 Spoƫng 1C‐198 Tower Erec Ɵon 1C‐198 Jan‐30‐24, Structure 1C‐199 ReclamaƟon 1C‐199 Clearing 1C‐199 Tower Assembly 1C ‐199 FoundaƟons 1C‐199 Access 1C‐199 Spoƫng 1C‐199 Tower Erec Ɵon 1C‐199 Jan‐29‐24, Structure 1C‐200 ReclamaƟon 1C‐200 Clearing 1C‐200 Tower Assembly 1C ‐200 FoundaƟons 1C‐200 Access 1C‐200 Spoƫng 1C‐200 Tower Erec Ɵon 1C‐200 Jan‐28‐24, Structure 1C‐201 ReclamaƟon 1C‐201 Clearing 1C‐201 Tower Assembly 1C‐201 FoundaƟons 1C‐201 Access 1C‐201 Spoƫng 1C‐201 Tower Erec Ɵon 1C‐201 Jan‐28‐24, Structure 1C‐202 ReclamaƟon 1C‐202 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 97 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1C‐202 Clearing 1C‐202 0.8 0.8 0%Jun ‐24‐22 Jun‐25‐22 12.0 ASY‐1C‐202 Tower Assembly 1C ‐202 0.9 0.9 0%Jul‐24‐22 Jul‐25‐22 13.0 FDN‐1C‐202 FoundaƟons 1C‐202 0.6 0.6 0%Jul‐05‐22 Jul‐06‐22 26.3 ACC ‐1C‐202 Access 1C‐202 0.8 0.8 0%Jun ‐25‐22 Jun‐26‐22 28.4 SPT‐1C‐202 Spoƫng 1C‐202 0.8 0.8 0%Jul‐06‐22 Jul‐07‐22 30.2 ERC‐1C‐202 Tower Erec Ɵon 1C‐202 0.9 0.9 0%Jul‐25‐22 Jul‐26‐22 61.3 Structure 1C-203Structure 1C-203 437.6 437.6 Jun ‐23‐22 Jan‐27‐24 0.0 REC‐1C‐203 ReclamaƟon 1C‐203 0.8 0.8 0%Jan‐26‐24 Jan‐27‐24 0.0 CLR‐1C‐203 Clearing 1C‐203 0.8 0.8 0%Jun ‐23‐22 Jun‐24‐22 12.0 ASY‐1C‐203 Tower Assembly 1C ‐203 0.9 0.9 0%Jul‐23‐22 Jul‐24‐22 13.0 FDN‐1C‐203 FoundaƟons 1C‐203 0.6 0.6 0%Jul‐05‐22 Jul‐05‐22 26.3 ACC ‐1C‐203 Access 1C‐203 0.8 0.8 0%Jun ‐24‐22 Jun‐25‐22 28.4 SPT‐1C‐203 Spoƫng 1C‐203 0.8 0.8 0%Jul‐05‐22 Jul‐06‐22 30.1 ERC‐1C‐203 Tower Erec Ɵon 1C‐203 0.9 0.9 0%Jul‐24‐22 Jul‐25‐22 61.3 Structure 1C-204Structure 1C-204 376.8 376.8 Aug‐23‐22 Jan‐26‐24 0.0 REC‐1C‐204 ReclamaƟon 1C‐204 0.8 0.8 0%Jan‐25‐24 Jan‐26‐24 0.0 ASY‐1C‐204 Tower Assembly 1C ‐204 0.8 0.8 0%Sep‐16‐22 Sep‐17‐22 35.1 CLR‐1C‐204 Clearing 1C‐204 1.5 1.5 0%Aug‐23‐22 Aug‐25‐22 52.9 ACC ‐1C‐204 Access 1C‐204 1.5 1.5 0%Aug‐25‐22 Aug‐26‐22 52.9 FDN‐1C‐204 FoundaƟons 1C‐204 0.9 0.9 0%Aug‐26‐22 Aug‐27‐22 52.9 SPT‐1C‐204 Spoƫng 1C‐204 1.5 1.5 0%Aug‐27‐22 Aug‐29‐22 52.9 ERC‐1C‐204 Tower Erec Ɵon 1C‐204 0.8 0.8 0%Sep‐17‐22 Sep‐18‐22 75.3 Structure 1C-205Structure 1C-205 377.5 377.5 Aug‐22‐22 Jan‐25‐24 0.0 REC‐1C‐205 ReclamaƟon 1C‐205 0.8 0.8 0%Jan‐24‐24 Jan‐25‐24 0.0 ASY‐1C‐205 Tower Assembly 1C ‐205 0.8 0.8 0%Sep‐16‐22 Sep‐16‐22 35.1 CLR‐1C‐205 Clearing 1C‐205 1.5 1.5 0%Aug‐22‐22 Aug‐23‐22 52.9 ACC ‐1C‐205 Access 1C‐205 1.5 1.5 0%Aug‐23‐22 Aug‐25‐22 52.9 FDN‐1C‐205 FoundaƟons 1C‐205 0.9 0.9 0%Aug‐25‐22 Aug‐26‐22 52.9 SPT‐1C‐205 Spoƫng 1C‐205 1.5 1.5 0%Aug‐26‐22 Aug‐27‐22 52.9 ERC‐1C‐205 Tower Erec Ɵon 1C‐205 0.8 0.8 0%Sep‐16‐22 Sep‐17‐22 75.3 Structure 1C-206Structure 1C-206 378.2 378.2 Aug‐20‐22 Jan‐24‐24 0.0 REC‐1C‐206 ReclamaƟon 1C‐206 0.8 0.8 0%Jan‐24‐24 Jan‐24‐24 0.0 ASY‐1C‐206 Tower Assembly 1C ‐206 0.8 0.8 0%Sep‐15‐22 Sep‐16‐22 35.1 CLR‐1C‐206 Clearing 1C‐206 1.5 1.5 0%Aug‐20‐22 Aug‐22‐22 52.9 ACC ‐1C‐206 Access 1C‐206 1.5 1.5 0%Aug‐22‐22 Aug‐23‐22 52.9 FDN‐1C‐206 FoundaƟons 1C‐206 0.9 0.9 0%Aug‐23‐22 Aug‐24‐22 52.9 SPT‐1C‐206 Spoƫng 1C‐206 1.5 1.5 0%Aug‐24‐22 Aug‐26‐22 52.9 ERC‐1C‐206 Tower Erec Ɵon 1C‐206 0.8 0.8 0%Sep‐16‐22 Sep‐16‐22 75.3 Structure 1C-207Structure 1C-207 378.9 378.9 Aug‐19‐22 Jan‐24‐24 0.0 REC‐1C‐207 ReclamaƟon 1C‐207 0.8 0.8 0%Jan‐23‐24 Jan‐24‐24 0.0 CLR‐1C‐207 Clearing 1C‐207 1.5 1.5 0%Aug‐19‐22 Aug‐20‐22 12.0 ASY‐1C‐207 Tower Assembly 1C ‐207 0.8 0.8 0%Sep‐14‐22 Sep‐15‐22 35.1 ACC ‐1C‐207 Access 1C‐207 1.5 1.5 0%Aug‐20‐22 Aug‐22‐22 52.9 FDN‐1C‐207 FoundaƟons 1C‐207 0.9 0.9 0%Aug‐22‐22 Aug‐23‐22 52.9 SPT‐1C‐207 Spoƫng 1C‐207 1.5 1.5 0%Aug‐23‐22 Aug‐24‐22 52.9 ERC‐1C‐207 Tower Erec Ɵon 1C‐207 0.8 0.8 0%Sep‐15‐22 Sep‐16‐22 75.3 Structure 1C-208Structure 1C-208 379.6 379.6 Aug‐17‐22 Jan‐23‐24 0.0 REC‐1C‐208 ReclamaƟon 1C‐208 0.8 0.8 0%Jan‐22‐24 Jan‐23‐24 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1C‐202 Tower Assembly 1C‐202 FoundaƟons 1C‐202 Access 1C‐202 Spoƫng 1C‐202 Tower Erec Ɵon 1C‐202 Jan‐27‐24, Structure 1C‐203 ReclamaƟon 1C‐203 Clearing 1C‐203 Tower Assembly 1C‐203 FoundaƟons 1C‐203 Access 1C‐203 Spoƫng 1C‐203 Tower Erec Ɵon 1C‐203 Jan‐26‐24, Structure 1C‐204 ReclamaƟon 1C‐204 Tower Assembly 1C‐204 Clearing 1C‐204 Access 1C‐204 FoundaƟons 1C‐204 Spoƫng 1C‐204 Tower Erec Ɵon 1C‐204 Jan‐25‐24, Structure 1C‐205 ReclamaƟon 1C‐205 Tower Assembly 1C‐205 Clearing 1C‐205 Access 1C‐205 FoundaƟons 1C‐205 Spoƫng 1C‐205 Tower Erec Ɵon 1C‐205 Jan‐24‐24, Structure 1C‐206 ReclamaƟon 1C‐206 Tower Assembly 1C ‐206 Clearing 1C‐206 Access 1C‐206 FoundaƟons 1C‐206 Spoƫng 1C‐206 Tower Erec Ɵon 1C‐206 Jan‐24‐24, Structure 1C‐207 ReclamaƟon 1C‐207 Clearing 1C‐207 Tower Assembly 1C ‐207 Access 1C‐207 FoundaƟons 1C‐207 Spoƫng 1C‐207 Tower Erec Ɵon 1C‐207 Jan‐23‐24, Structure 1C‐208 ReclamaƟon 1C‐208 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 98 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1C‐208 Clearing 1C‐208 1.5 1.5 0%Aug‐17‐22 Aug‐19‐22 12.0 ASY‐1C‐208 Tower Assembly 1C ‐208 0.8 0.8 0%Sep‐13‐22 Sep‐14‐22 35.1 ACC ‐1C‐208 Access 1C‐208 1.5 1.5 0%Aug‐19‐22 Aug‐20‐22 52.9 FDN‐1C‐208 FoundaƟons 1C‐208 0.9 0.9 0%Aug‐20‐22 Aug‐21‐22 52.9 SPT‐1C‐208 Spoƫng 1C‐208 1.5 1.5 0%Aug‐21‐22 Aug‐23‐22 52.9 ERC‐1C‐208 Tower Erec Ɵon 1C‐208 0.8 0.8 0%Sep‐14‐22 Sep‐15‐22 75.3 Structure 1C-209Structure 1C-209 385.1 385.1 Aug‐11‐22 Jan‐22‐24 0.0 REC‐1C‐209 ReclamaƟon 1C‐209 0.8 0.8 0%Jan‐21‐24 Jan‐22‐24 0.0 ASY‐1C‐209 Tower Assembly 1C ‐209 0.8 0.8 0%Sep‐12‐22 Sep‐13‐22 35.1 SPT‐1C‐209 Spoƫng 1C‐209 1.3 1.3 0%Aug‐15‐22 Aug‐17‐22 57.2 CLR‐1C‐209 Clearing 1C‐209 1.3 1.3 0%Aug‐11‐22 Aug‐12‐22 58.0 ACC ‐1C‐209 Access 1C‐209 1.3 1.3 0%Aug‐12‐22 Aug‐14‐22 58.0 FDN‐1C‐209 FoundaƟons 1C‐209 0.9 0.9 0%Aug‐14‐22 Aug‐15‐22 58.2 ERC‐1C‐209 Tower Erec Ɵon 1C‐209 0.8 0.8 0%Sep‐13‐22 Sep‐14‐22 75.3 Structure 1C-210Structure 1C-210 385.6 385.6 Aug‐10‐22 Jan‐21‐24 0.0 REC‐1C‐210 ReclamaƟon 1C‐210 0.8 0.8 0%Jan‐20‐24 Jan‐21‐24 0.0 ASY‐1C‐210 Tower Assembly 1C ‐210 0.8 0.8 0%Sep‐12‐22 Sep‐12‐22 35.1 SPT‐1C‐210 Spoƫng 1C‐210 1.3 1.3 0%Aug‐14‐22 Aug‐15‐22 57.2 CLR‐1C‐210 Clearing 1C‐210 1.3 1.3 0%Aug‐10‐22 Aug‐11‐22 58.0 ACC ‐1C‐210 Access 1C‐210 1.3 1.3 0%Aug‐11‐22 Aug‐12‐22 58.0 FDN‐1C‐210 FoundaƟons 1C‐210 0.9 0.9 0%Aug‐12‐22 Aug‐13‐22 58.2 ERC‐1C‐210 Tower Erec Ɵon 1C‐210 0.8 0.8 0%Sep‐12‐22 Sep‐13‐22 75.3 Structure 1C-211Structure 1C-211 386.1 386.1 Aug‐08‐22 Jan‐20‐24 0.0 REC‐1C‐211 ReclamaƟon 1C‐211 0.8 0.8 0%Jan‐20‐24 Jan‐20‐24 0.0 ASY‐1C‐211 Tower Assembly 1C ‐211 0.8 0.8 0%Sep‐11‐22 Sep‐12‐22 35.1 SPT‐1C‐211 Spoƫng 1C‐211 1.3 1.3 0%Aug‐13‐22 Aug‐14‐22 57.2 CLR‐1C‐211 Clearing 1C‐211 1.3 1.3 0%Aug‐08‐22 Aug‐10‐22 58.0 ACC ‐1C‐211 Access 1C‐211 1.3 1.3 0%Aug‐10‐22 Aug‐11‐22 58.0 FDN‐1C‐211 FoundaƟons 1C‐211 0.9 0.9 0%Aug‐11‐22 Aug‐12‐22 58.2 ERC‐1C‐211 Tower Erec Ɵon 1C‐211 0.8 0.8 0%Sep‐12‐22 Sep‐12‐22 75.3 Structure 1C-212Structure 1C-212 386.7 386.7 Aug‐07‐22 Jan‐20‐24 0.0 REC‐1C‐212 ReclamaƟon 1C‐212 0.8 0.8 0%Jan‐19‐24 Jan‐20‐24 0.0 ASY‐1C‐212 Tower Assembly 1C ‐212 0.8 0.8 0%Sep‐10‐22 Sep‐11‐22 35.1 SPT‐1C‐212 Spoƫng 1C‐212 1.3 1.3 0%Aug‐11‐22 Aug‐13‐22 57.2 CLR‐1C‐212 Clearing 1C‐212 1.3 1.3 0%Aug‐07‐22 Aug‐08‐22 58.0 ACC ‐1C‐212 Access 1C‐212 1.3 1.3 0%Aug‐08‐22 Aug‐10‐22 58.0 FDN‐1C‐212 FoundaƟons 1C‐212 0.9 0.9 0%Aug‐10‐22 Aug‐11‐22 58.2 ERC‐1C‐212 Tower Erec Ɵon 1C‐212 0.8 0.8 0%Sep‐11‐22 Sep‐12‐22 75.3 Structure 1C-213Structure 1C-213 387.2 387.2 Aug‐06‐22 Jan‐19‐24 0.0 REC‐1C‐213 ReclamaƟon 1C‐213 0.8 0.8 0%Jan‐18‐24 Jan‐19‐24 0.0 CLR‐1C‐213 Clearing 1C‐213 1.3 1.3 0%Aug‐06‐22 Aug‐07‐22 14.3 ASY‐1C‐213 Tower Assembly 1C ‐213 0.8 0.8 0%Sep‐09‐22 Sep‐10‐22 35.1 SPT‐1C‐213 Spoƫng 1C‐213 1.3 1.3 0%Aug‐10‐22 Aug‐11‐22 57.2 ACC ‐1C‐213 Access 1C‐213 1.3 1.3 0%Aug‐07‐22 Aug‐08‐22 58.0 FDN‐1C‐213 FoundaƟons 1C‐213 0.9 0.9 0%Aug‐08‐22 Aug‐09‐22 58.0 ERC‐1C‐213 Tower Erec Ɵon 1C‐213 0.8 0.8 0%Sep‐10‐22 Sep‐11‐22 75.3 Structure 1C-214Structure 1C-214 387.7 387.7 Aug‐04‐22 Jan‐18‐24 0.0 REC‐1C‐214 ReclamaƟon 1C‐214 0.8 0.8 0%Jan‐17‐24 Jan‐18‐24 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1C‐208 Tower Assembly 1C ‐208 Access 1C‐208 FoundaƟons 1C‐208 Spoƫng 1C‐208 Tower Erec Ɵon 1C‐208 Jan‐22‐24, Structure 1C‐209 ReclamaƟon 1C‐209 Tower Assembly 1C ‐209 Spoƫng 1C‐209 Clearing 1C‐209 Access 1C ‐209 FoundaƟons 1C‐209 Tower Erec Ɵon 1C‐209 Jan‐21‐24, Structure 1C‐210 ReclamaƟon 1C‐210 Tower Assembly 1C ‐210 Spoƫng 1C‐210 Clearing 1C‐210 Access 1C‐210 FoundaƟons 1C‐210 Tower Erec Ɵon 1C‐210 Jan‐20‐24, Structure 1C‐211 ReclamaƟon 1C‐211 Tower Assembly 1C ‐211 Spoƫng 1C‐211 Clearing 1C‐211 Access 1C‐211 FoundaƟons 1C‐211 Tower Erec Ɵon 1C‐211 Jan‐20‐24, Structure 1C‐212 ReclamaƟon 1C‐212 Tower Assembly 1C ‐212 Spoƫng 1C‐212 Clearing 1C‐212 Access 1C‐212 FoundaƟons 1C‐212 Tower Erec Ɵon 1C‐212 Jan‐19‐24, Structure 1C‐213 ReclamaƟon 1C‐213 Clearing 1C‐213 Tower Assembly 1C ‐213 Spoƫng 1C‐213 Access 1C‐213 FoundaƟons 1C‐213 Tower Erec Ɵon 1C‐213 Jan‐18‐24, Structure 1C‐214 ReclamaƟon 1C‐214 Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 99 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float CLR‐1C‐214 Clearing 1C‐214 1.3 1.3 0%Aug‐04‐22 Aug‐06‐22 14.3 ASY‐1C‐214 Tower Assembly 1C ‐214 0.8 0.8 0%Sep‐08‐22 Sep‐09‐22 35.1 SPT‐1C‐214 Spoƫng 1C‐214 1.3 1.3 0%Aug‐09‐22 Aug‐10‐22 57.2 FDN‐1C‐214 FoundaƟons 1C‐214 0.9 0.9 0%Aug‐07‐22 Aug‐08‐22 57.6 ACC ‐1C‐214 Access 1C‐214 1.3 1.3 0%Aug‐06‐22 Aug‐07‐22 58.0 ERC‐1C‐214 Tower Erec Ɵon 1C‐214 0.8 0.8 0%Sep‐09‐22 Sep‐10‐22 75.3 Structure 1C-215Structure 1C-215 388.3 388.3 Aug‐03‐22 Jan‐17‐24 0.0 REC‐1C‐215 ReclamaƟon 1C‐215 0.8 0.8 0%Jan‐16‐24 Jan‐17‐24 0.0 CLR‐1C‐215 Clearing 1C‐215 1.3 1.3 0%Aug‐03‐22 Aug‐04‐22 14.3 ASY‐1C‐215 Tower Assembly 1C ‐215 1.2 1.2 0%Sep‐07‐22 Sep‐08‐22 35.1 FDN‐1C‐215 FoundaƟons 1C‐215 0.9 0.9 0%Aug‐07‐22 Aug‐07‐22 57.2 SPT‐1C‐215 Spoƫng 1C‐215 1.3 1.3 0%Aug‐07‐22 Aug‐09‐22 57.2 ACC ‐1C‐215 Access 1C‐215 1.3 1.3 0%Aug‐04‐22 Aug‐06‐22 58.0 ERC‐1C‐215 Tower Erec Ɵon 1C‐215 0.8 0.8 0%Sep‐08‐22 Sep‐09‐22 75.3 Pull Wire - Conduc tPull Wire - Conductor Stringing 351.7 351.7 Jul‐24‐22 Dec‐20‐23 0.0 PWC‐1APS047 Element A Conductor Pull Number 47 (Str 1C‐135 to 1C‐149)4.0 4.0 0%Nov‐26‐23 Nov‐30‐23 0.0 PWC‐1APS049 Element A Conductor Pull Number 49 (Str 1C‐164 to 1C‐180)10.3 10.3 0%Jul‐10‐23 Jul‐20‐23 0.0 PWC‐1APS052 Element A Conductor Pull Number 52 (Str 1C‐195 to 1C‐203)7.0 7.0 0%Dec‐13‐23 Dec‐20‐23 0.0 PWC‐1APS053 Element A Conductor Pull Number 53 (Str 1C‐203 to 1C‐211)7.0 7.0 0%Dec‐06‐23 Dec‐13‐23 0.0 PWC‐1APS054 Element A Conductor Pull Number 54 (Str 1C‐211 to 1C‐215)6.0 6.0 0%Nov‐30‐23 Dec‐06‐23 0.0 PWC‐1APS001 Element A Conductor Pull Number 1 (Str 1A‐001 to 1A‐002)4.0 4.0 0%Nov‐06‐23 Nov‐10‐23 0.1 PWC‐1APS002 Element A Conductor Pull Number 2 (Str 1A‐002 to 1A‐008)5.0 5.0 0%Nov‐01‐23 Nov‐06‐23 0.1 PWC‐1APS003 Element A Conductor Pull Number 3 (Str 1A‐008 to 1A‐021)4.0 4.0 0%Oct ‐28‐23 Nov‐01‐23 0.1 PWC‐1APS007 Element A Conductor Pull Number 7 (Str 1A‐047 to 1A‐061)6.4 6.4 0%Nov‐27‐23 Dec‐03‐23 0.1 PWC‐1APS008 Element A Conductor Pull Number 8 (Str 1A‐061 to 1A‐072)7.4 7.4 0%Nov‐17‐23 Nov‐27‐23 0.1 PWC‐1APS009 Element A Conductor Pull Number 9 (Str 1A‐072 to 1A‐089)7.4 7.4 0%Nov‐10‐23 Nov‐17‐23 0.1 PWC‐1APS010 Element A Conductor Pull Number 10 (Str 1A‐089 to 1A‐103)5.0 5.0 0%Oct ‐21‐23 Oct ‐26‐23 0.1 PWC‐1APS011 Element A Conductor Pull Number 11 (Str 1A‐103 to 1A‐119)12.0 12.0 0%Sep‐23‐23 Oct ‐05‐23 0.1 PWC‐1APS012 Element A Conductor Pull Number 12 (Str 1A‐119 to 1B‐016)13.0 13.0 0%Oct ‐05‐23 Oct ‐18‐23 0.1 PWC‐1APS040 Element A Conductor Pull Number 40 (Str 1C‐048 to 1C‐060)4.0 4.0 0%Sep‐15‐23 Sep‐19‐23 0.1 PWC‐1APS046 Element A Conductor Pull Number 46 (Str 1C‐120 to 1C‐135)4.0 4.0 0%Nov‐20‐23 Nov‐26‐23 0.4 PWC‐1APS039 Element A Conductor Pull Number 39 (Str 1C‐037 to 1C‐048)4.0 4.0 0%Sep‐03‐23 Sep‐08‐23 6.6 PWC‐1APS006 Element A Conductor Pull Number 6 (Str 1A‐042 to 1A‐047)6.4 6.4 0%Dec‐03‐23 Dec‐09‐23 9.2 PWC‐1APS045 Element A Conductor Pull Number 45 (Str 1C‐112 to 1C‐120)4.0 4.0 0%Nov‐07‐23 Nov‐11‐23 9.4 PWC‐1APS038 Element A Conductor Pull Number 38 (Str 1C‐025 to 1C‐037)4.0 4.0 0%Aug‐25‐23 Aug‐29‐23 12.1 PWC‐1APS044 Element A Conductor Pull Number 44 (Str 1C‐100 to 1C‐112)4.0 4.0 0%Oct ‐31‐23 Nov‐04‐23 12.4 PWC‐1APS037 Element A Conductor Pull Number 37 (Str 1C‐014 to 1C‐025)4.0 4.0 0%Aug‐14‐23 Aug‐18‐23 18.6 PWC‐1APS043 Element A Conductor Pull Number 43 (Str 1C‐087 to 1C‐100)4.0 4.0 0%Oct ‐20‐23 Oct ‐24‐23 18.8 PWC‐1APS004 Element A Conductor Pull Number 4 (Str 1A‐021 to 1A‐032)9.0 9.0 0%Aug‐08‐23 Aug‐17‐23 21.0 PWC‐1APS005 Element A Conductor Pull Number 5 (Str 1A‐032 to 1A‐042)9.0 9.0 0%Jul‐30‐23 Aug‐08‐23 21.0 PWC‐1APS048 Element A Conductor Pull Number 48 (Str 1C‐149 to 1C‐164)10.0 10.0 0%Jul‐20‐23 Jul‐30‐23 21.0 PWC‐1APS036 Element A Conductor Pull Number 36 (Str 1B‐234 to 1C‐014)7.0 7.0 0%Aug‐04‐23 Aug‐11‐23 22.0 PWC‐1APS015 Element A Conductor Pull Number 15 (Str 1B‐033 to 1B‐035)6.0 6.0 0%Aug‐04‐23 Aug‐10‐23 25.4 PWC‐1APS042 Element A Conductor Pull Number 42 (Str 1C‐075 to 1C‐087)4.0 4.0 0%Oct ‐09‐23 Oct ‐13‐23 26.1 PWC‐1APS050 Element A Conductor Pull Number 50 (Str 1C‐180 to 1C‐188)4.0 4.0 0%Jun ‐05‐23 Jun‐08‐23 30.0 PWC‐1APS051 Element A Conductor Pull Number 51 (Str 1C‐188 to 1C‐195)4.0 4.0 0%Jun ‐01‐23 Jun‐04‐23 30.0 PWC‐1APS041 Element A Conductor Pull Number 41 (Str 1C‐060 to 1C‐075)4.0 4.0 0%Sep‐27‐23 Oct ‐01‐23 34.3 PWC‐1APS013 Element A Conductor Pull Number 13 (Str 1B‐016 to 1B‐019)6.0 6.0 0%Aug‐20‐23 Aug‐26‐23 38.9 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Clearing 1C‐214 Tower Assembly 1C ‐214 Spoƫng 1C‐214 FoundaƟons 1C‐214 Access 1C‐214 Tower Erec Ɵon 1C‐214 Jan ‐17‐24, Structure 1C‐215 ReclamaƟon 1C‐215 Clearing 1C‐215 Tower Assembly 1C‐215 FoundaƟons 1C‐215 Spoƫng 1C‐215 Access 1C‐215 Tower Erec Ɵon 1C‐215 Dec‐20‐23, Pull Wire ‐ Conductor Stringing Element A Conductor Pull Number 47 (Str 1C‐135 to 1C‐149) Element A Conductor Pull Number 49 (Str 1C‐164 to 1C‐180) Element A Conductor Pull Number 52 (Str 1C ‐195 to 1C‐203) Element A Conductor Pull Number 53 (Str 1C‐203 to 1C‐211) Element A Conductor Pull Number 54 (Str 1C‐211 to 1C‐215) Element A Conductor Pull Number 1 (Str 1A‐001 to 1A‐002) Element A Conductor Pull Number 2 (Str 1A‐002 to 1A‐008) Element A Conductor Pull Number 3 (Str 1A‐008 to 1A‐021) Element A Conductor Pull Number 7 (Str 1A‐047 to 1A‐061) Element A Conductor Pull Number 8 (Str 1A‐061 to 1A‐072) Element A Conductor Pull Number 9 (Str 1A‐072 to 1A‐089) Element A Conductor Pull Number 10 (Str 1A‐089 to 1A‐103) Element A Conductor Pull Number 11 (Str 1A‐103 to 1A‐119) Element A Conductor Pull Number 12 (Str 1A‐119 to 1B‐016) Element A Conductor Pull Number 40 (Str 1C‐048 to 1C‐060) Element A Conductor Pull Number 46 (Str 1C‐120 to 1C‐135) Element A Conductor Pull Number 39 (Str 1C‐037 to 1C‐048) Element A Conductor Pull Number 6 (Str 1A‐042 to 1A‐047) Element A Conductor Pull Number 45 (Str 1C‐112 to 1C‐120) Element A Conductor Pull Number 38 (Str 1C‐025 to 1C‐037) Element A Conductor Pull Number 44 (Str 1C‐100 to 1C‐112) Element A Conductor Pull Number 37 (Str 1C‐014 to 1C‐025) Element A Conductor Pull Number 43 (Str 1C‐087 to 1C‐100) Element A Conductor Pull Number 4 (Str 1A‐021 to 1A‐032) Element A Conductor Pull Number 5 (Str 1A‐032 to 1A‐042) Element A Conductor Pull Number 48 (Str 1C‐149 to 1C‐164) Element A Conductor Pull Number 36 (Str 1B‐234 to 1C‐014) Element A Conductor Pull Number 15 (Str 1B‐033 to 1B‐035) Element A Conductor Pull Number 42 (Str 1C‐075 to 1C‐087) Element A Conductor Pull Number 50 (Str 1C‐180 to 1C‐188) Element A Conductor Pull Number 51 (Str 1C‐188 to 1C‐195) Element A Conductor Pull Number 41 (Str 1C‐060 to 1C‐075) Element A Conductor Pull Number 13 (Str 1B‐016 to 1B‐019) Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 100 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float PWC‐1APS014 Element A Conductor Pull Number 14 (Str 1B‐019 to 1B‐033)6.0 6.0 0%Aug‐14‐23 Aug‐20‐23 38.9 PWC‐1APS016 Element A Conductor Pull Number 16 (Str 1B‐035 to 1B‐044)18.6 18.6 0%Nov‐15‐22 Dec‐06‐22 39.1 PWC‐1APS031 Element A Conductor Pull Number 31 (Str 1B‐184 to 1B‐193)8.2 8.2 0%Dec‐06‐22 Dec‐14‐22 39.1 PWC‐1APS032 Element A Conductor Pull Number 32 (Str 1B‐193 to 1B‐194)8.2 8.2 0%Dec‐14‐22 Dec‐22‐22 39.1 PWC‐1APS033 Element A Conductor Pull Number 33 (Str 1B‐194 to 1B‐209)8.2 8.2 0%Dec‐22‐22 Jan‐04‐23 39.1 PWC‐1APS034 Element A Conductor Pull Number 34 (Str 1B‐209 to 1B‐220)8.2 8.2 0%Jan‐04‐23 Jan‐12‐23 39.1 PWC‐1APS035 Element A Conductor Pull Number 35 (Str 1B‐220 to 1B‐234)8.2 8.2 0%Jan‐12‐23 Jan‐21‐23 39.1 PWC‐1APS017 Element A Conductor Pull Number 17 (Str 1B‐044 to 1B‐058)8.2 8.2 0%Nov‐07‐22 Nov‐15‐22 39.3 PWC‐1APS018 Element A Conductor Pull Number 18 (Str 1B‐058 to 1B‐071)8.2 8.2 0%Oct ‐24‐22 Nov‐01‐22 45.2 PWC‐1APS019 Element A Conductor Pull Number 19 (Str 1B‐071 to 1B‐075)8.2 8.2 0%Oct ‐16‐22 Oct ‐24‐22 45.2 PWC‐1APS028 Element A Conductor Pull Number 28 (Str 1B‐144 to 1B‐155)8.0 8.0 0%Oct ‐08‐22 Oct ‐16‐22 45.2 PWC‐1APS030 Element A Conductor Pull Number 30 (Str 1B‐169 to 1B‐184)1.3 1.3 0%Oct ‐06‐22 Oct ‐08‐22 45.2 PWC‐1APS022 Element A Conductor Pull Number 22 (Str 1B‐075 to 1B‐089)8.2 8.2 0%Oct ‐05‐22 Oct ‐13‐22 47.9 PWC‐1APS029 Element A Conductor Pull Number 29 (Str 1B‐155 to 1B‐169)1.3 1.3 0%Sep‐20‐22 Sep‐21‐22 60.6 PWC‐1APS027 Element A Conductor Pull Number 27 (Str 1B‐131 to 1B‐144)6.0 6.0 0%Sep‐02‐22 Sep‐09‐22 71.4 PWC‐1APS025 Element A Conductor Pull Number 25 (Str 1B‐110 to 1B‐122)12.0 12.0 0%Aug‐13‐22 Aug‐25‐22 74.4 PWC‐1APS026 Element A Conductor Pull Number 26 (Str 1B‐122 to 1B‐131)5.0 5.0 0%Aug‐25‐22 Aug‐30‐22 74.4 PWC‐1APS024 Element A Conductor Pull Number 24 (Str 1B‐100 to 1B‐110)2.5 2.5 0%Aug‐01‐22 Aug‐04‐22 83.4 PWC‐1APS023 Element A Conductor Pull Number 23 (Str 1B‐089 to 1B‐100)4.2 4.2 0%Jul‐24‐22 Jul‐28‐22 85.7 OPGW Wire StringiOPGW Wire Stringing 346.0 346.0 Aug‐04‐22 Jan‐02‐24 0.0 OPGW‐1APS04 Element A OPGW Pull Number 4 (Str 1A‐033 to 1A‐043)1.3 1.3 0%Aug‐30‐23 Aug‐31‐23 0.0 OPGW‐1APS42 Element A OPGW Pull Number 42 (Str 1C‐150 to 1C‐165)1.3 1.3 0%Aug‐28‐23 Aug‐30‐23 0.0 OPGW‐1APS43 Element A OPGW Pull Number 43 (Str 1C‐165 to 1C‐181)14.4 14.4 0%Jul‐20‐23 Aug‐28‐23 0.0 OPGW‐1APS46 Element A OPGW Pull Number 46 (Str 1C‐196 to 1C‐211)1.7 1.7 0%Dec‐20‐23 Jan‐02‐24 0.0 OPGW‐1APS06 Element A OPGW Pull Number 6 (Str 1A‐047 to 1A‐062)1.3 1.3 0%Dec‐03‐23 Dec‐04‐23 0.1 OPGW‐1APS41 Element A OPGW Pull Number 41 (Str 1C‐136 to 1C‐150)1.3 1.3 0%Nov‐30‐23 Dec‐02‐23 1.5 OPGW‐1APS07 Element A OPGW Pull Number 7 (Str 1A‐062 to 1A‐073)1.3 1.3 0%Nov‐27‐23 Nov‐29‐23 3.2 OPGW‐1APS40 Element A OPGW Pull Number 40 (Str 1C‐121 to 1C‐136)1.3 1.3 0%Nov‐26‐23 Nov‐27‐23 3.2 OPGW‐1APS03 Element A OPGW Pull Number 3 (Str 1A‐022 to 1A‐033)1.3 1.3 0%Sep‐03‐23 Sep‐05‐23 4.3 OPGW‐1APS14 Element A OPGW Pull Number 14 (Str 1B‐034 to 1B‐036)1.3 1.3 0%Aug‐31‐23 Sep‐01‐23 4.3 OPGW‐1APS31 Element A OPGW Pull Number 31 (Str 1C‐002 to 1C‐015)1.3 1.3 0%Sep‐01‐23 Sep‐03‐23 4.3 OPGW‐1APS32 Element A OPGW Pull Number 32 (Str 1C‐015 to 1C‐026)1.3 1.3 0%Sep‐05‐23 Sep‐06‐23 4.3 OPGW‐1APS08 Element A OPGW Pull Number 8 (Str 1A‐073 to 1A‐090)1.3 1.3 0%Nov‐17‐23 Nov‐18‐23 8.6 OPGW‐1APS05 Element A OPGW Pull Number 5 (Str 1A‐043 to 1A‐047)1.7 1.7 0%Dec‐09‐23 Dec‐11‐23 9.2 OPGW‐1APS47 Element A OPGW Pull Number 47 (Str 1C‐211 to 1C‐215)1.3 1.3 0%Dec‐06‐23 Dec‐07‐23 11.0 OPGW‐1APS01 Element A OPGW Pull Number 1 (Str 1A‐001 to 1A‐003)1.3 1.3 0%Nov‐10‐23 Nov‐11‐23 13.3 OPGW‐1APS39 Element A OPGW Pull Number 39 (Str 1C‐113 to 1C‐121)1.3 1.3 0%Nov‐11‐23 Nov‐12‐23 13.3 OPGW‐1APS02 Element A OPGW Pull Number 2 (Str 1A‐003 to 1A‐022)1.3 1.3 0%Nov‐06‐23 Nov‐07‐23 16.0 OPGW‐1APS38 Element A OPGW Pull Number 38 (Str 1C‐101 to 1C‐113)1.3 1.3 0%Nov‐04‐23 Nov‐05‐23 16.6 OPGW‐1APS09 Element A OPGW Pull Number 9 (Str 1A‐090 to 1A‐104)1.3 1.3 0%Oct ‐26‐23 Oct ‐27‐23 24.3 OPGW‐1APS37 Element A OPGW Pull Number 37 (Str 1C‐088 to 1C‐101)1.3 1.3 0%Oct ‐24‐23 Oct ‐26‐23 24.3 OPGW‐1APS11 Element A OPGW Pull Number 11 (Str 1B‐002 to 1B‐017)1.3 1.3 0%Oct ‐18‐23 Oct ‐19‐23 29.7 OPGW‐1APS36 Element A OPGW Pull Number 36 (Str 1C‐076 to 1C‐088)1.3 1.3 0%Oct ‐13‐23 Oct ‐14‐23 33.0 OPGW‐1APS44 Element A OPGW Pull Number 44 (Str 1C‐181 to 1C‐189)1.3 1.3 0%Jun ‐09‐23 Jun‐10‐23 39.0 OPGW‐1APS30 Element A OPGW Pull Number 30 (Str 1B‐220 to 1B‐234)1.3 1.3 0%Jan‐21‐23 Jan‐22‐23 39.1 OPGW‐1APS10 Element A OPGW Pull Number 10 (Str 1A‐104 to 1B‐002)1.3 1.3 0%Oct ‐05‐23 Oct ‐06‐23 40.0 OPGW‐1APS45 Element A OPGW Pull Number 45 (Str 1C‐189 to 1C‐196)1.3 1.3 0%Jun ‐05‐23 Jun‐06‐23 41.7 OPGW‐1APS35 Element A OPGW Pull Number 35 (Str 1C‐061 to 1C‐076)1.3 1.3 0%Oct ‐01‐23 Oct ‐02‐23 42.5 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Element A Conductor Pull Number 14 (Str 1B‐019 to 1B‐033) Element A Conductor Pull Number 16 (Str 1B‐035 to 1B‐044) Element A Conductor Pull Number 31 (Str 1B‐184 to 1B‐193) Element A Conductor Pull Number 32 (Str 1B ‐193 to 1B‐194) Element A Conductor Pull Number 33 (Str 1B‐194 to 1B‐209) Element A Conductor Pull Number 34 (Str 1B‐209 to 1B‐220) Element A Conductor Pull Number 35 (Str 1B‐220 to 1B‐234) Element A Conductor Pull Number 17 (Str 1B‐044 to 1B‐058) Element A Conductor Pull Number 18 (Str 1B‐058 to 1B‐071) Element A Conductor Pull Number 19 (Str 1B‐071 to 1B‐075) Element A Conductor Pull Number 28 (Str 1B‐144 to 1B‐155) Element A Conductor Pull Number 30 (Str 1B‐169 to 1B‐184) Element A Conductor Pull Number 22 (Str 1B‐075 to 1B‐089) Element A Conductor Pull Number 29 (Str 1B‐155 to 1B‐169) Element A Conductor Pull Number 27 (Str 1B‐131 to 1B‐144) Element A Conductor Pull Number 25 (Str 1B‐110 to 1B‐122) Element A Conductor Pull Number 26 (Str 1B‐122 to 1B‐131) Element A Conductor Pull Number 24 (Str 1B‐100 to 1B‐110) Element A Conductor Pull Number 23 (Str 1B‐089 to 1B‐100) Jan ‐02‐24, OPGW Wire Stringing Element A OPGW Pull Number 4 (Str 1A‐033 to 1A‐043) Element A OPGW Pull Number 42 (Str 1C‐150 to 1C‐165) Element A OPGW Pull Number 43 (Str 1C ‐165 to 1C‐181) Element A OPGW Pull Number 46 (Str 1C‐196 to 1C‐211) Element A OPGW Pull Number 6 (Str 1A‐047 to 1A‐062) Element A OPGW Pull Number 41 (Str 1C‐136 to 1C‐150) Element A OPGW Pull Number 7 (Str 1A‐062 to 1A‐073) Element A OPGW Pull Number 40 (Str 1C‐121 to 1C‐136) Element A OPGW Pull Number 3 (Str 1A‐022 to 1A‐033) Element A OPGW Pull Number 14 (Str 1B‐034 to 1B‐036) Element A OPGW Pull Number 31 (Str 1C‐002 to 1C‐015) Element A OPGW Pull Number 32 (Str 1C ‐015 to 1C‐026) Element A OPGW Pull Number 8 (Str 1A‐073 to 1A‐090) Element A OPGW Pull Number 5 (Str 1A‐043 to 1A‐047) Element A OPGW Pull Number 47 (Str 1C ‐211 to 1C‐215) Element A OPGW Pull Number 1 (Str 1A‐001 to 1A‐003) Element A OPGW Pull Number 39 (Str 1C‐113 to 1C‐121) Element A OPGW Pull Number 2 (Str 1A‐003 to 1A‐022) Element A OPGW Pull Number 38 (Str 1C‐101 to 1C‐113) Element A OPGW Pull Number 9 (Str 1A‐090 to 1A‐104) Element A OPGW Pull Number 37 (Str 1C‐088 to 1C‐101) Element A OPGW Pull Number 11 (Str 1B ‐002 to 1B‐017) Element A OPGW Pull Number 36 (Str 1C‐076 to 1C‐088) Element A OPGW Pull Number 44 (Str 1C ‐181 to 1C‐189) Element A OPGW Pull Number 30 (Str 1B ‐220 to 1B‐234) Element A OPGW Pull Number 10 (Str 1A‐104 to 1B‐002) Element A OPGW Pull Number 45 (Str 1C ‐189 to 1C‐196) Element A OPGW Pull Number 35 (Str 1C‐061 to 1C‐076) Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 101 of 102 Date Revision Checked Approved May-10-22 00 AcƟvity ID Device Name Original Dura Ɵon Remaining Dura Ɵon AcƟvity % Complete Start Finish Total Float OPGW‐1APS29 Element A OPGW Pull Number 29 (Str 1B‐209 to 1B‐220)1.3 1.3 0%Jan‐12‐23 Jan‐13‐23 46.0 OPGW‐1APS27 Element A OPGW Pull Number 27 (Str 1B‐184 to 1B‐193)1.3 1.3 0%Dec‐14‐22 Dec‐16‐22 46.9 OPGW‐1APS28 Element A OPGW Pull Number 28 (Str 1B‐193 to 1B‐209)1.3 1.3 0%Jan‐04‐23 Jan‐05‐23 52.9 OPGW‐1APS34 Element A OPGW Pull Number 34 (Str 1C‐049 to 1C‐061)1.3 1.3 0%Sep‐19‐23 Sep‐20‐23 53.3 OPGW‐1APS15 Element A OPGW Pull Number 15 (Str 1B‐036 to 1B‐045)1.3 1.3 0%Dec‐06‐22 Dec‐07‐22 53.8 OPGW‐1APS19 Element A OPGW Pull Number 19 (Str 1B‐075 to 1B‐088)1.3 1.3 0%Oct ‐13‐22 Oct ‐14‐22 58.8 OPGW‐1APS12 Element A OPGW Pull Number 12 (Str 1B‐017 to 1B‐020)1.3 1.3 0%Sep‐08‐23 Sep‐09‐23 61.9 OPGW‐1APS13 Element A OPGW Pull Number 13 (Str 1B‐020 to 1B‐034)1.3 1.3 0%Sep‐06‐23 Sep‐08‐23 61.9 OPGW‐1APS33 Element A OPGW Pull Number 33 (Str 1C‐026 to 1C‐049)1.3 1.3 0%Sep‐09‐23 Sep‐10‐23 61.9 OPGW‐1APS26 Element A OPGW Pull Number 26 (Str 1B‐169 to 1B‐184)1.3 1.3 0%Oct ‐08‐22 Oct ‐09‐22 62.8 OPGW‐1APS16 Element A OPGW Pull Number 16 (Str 1B‐045 to 1B‐059)1.3 1.3 0%Nov‐15‐22 Nov‐17‐22 71.1 OPGW‐1APS25 Element A OPGW Pull Number 25 (Str 1B‐155 to 1B‐169)1.3 1.3 0%Sep‐21‐22 Sep‐22‐22 78.1 OPGW‐1APS17 Element A OPGW Pull Number 17 (Str 1B‐059 to 1B‐072)1.3 1.3 0%Nov‐01‐22 Nov‐03‐22 83.8 OPGW‐1APS20 Element A OPGW Pull Number 20 (Str 1B‐088 to 1B‐100)1.3 1.3 0%Aug‐04‐22 Aug‐05‐22 85.7 OPGW‐1APS23 Element A OPGW Pull Number 23 (Str 1B‐131 to 1B‐144)1.3 1.3 0%Sep‐09‐22 Sep‐10‐22 89.0 OPGW‐1APS18 Element A OPGW Pull Number 18 (Str 1B‐072 to 1B‐075)1.3 1.3 0%Oct ‐24‐22 Oct ‐25‐22 90.8 OPGW‐1APS24 Element A OPGW Pull Number 24 (Str 1B‐144 to 1B‐155)1.3 1.3 0%Oct ‐16‐22 Oct ‐17‐22 95.0 OPGW‐1APS22 Element A OPGW Pull Number 22 (Str 1B‐122 to 1B‐131)1.3 1.3 0%Aug‐30‐22 Aug‐31‐22 96.6 OPGW‐1APS21 Element A OPGW Pull Number 21 (Str 1B‐100 to 1B‐122)3.1 3.1 0%Aug‐25‐22 Aug‐28‐22 98.5 T‐ Line CommissioningT‐ Line Commissioning 80.6 80.6 Jan‐02‐24 Mar‐23‐24 0.0 Element A ‐ ( Aeolus  tElement A ‐ ( Aeolus  to LiƩle Snake )    148 miles 500kV 80.6 80.6 Jan‐02‐24 Mar‐23‐24 0.0 TCA1000 Tes Ɵng and Commissioning Support ( Aeolus to LiƩle Snake )30.0 30.0 0%Jan‐02‐24 Feb‐02‐24 0.0 TCA1020 Environmental RestricƟons 50.6 50.6 0%Feb‐02‐24 Mar‐23‐24 0.0 J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul 2022 2023 2024 2025 Element A OPGW Pull Number 29 (Str 1B‐209 to 1B‐220) Element A OPGW Pull Number 27 (Str 1B‐184 to 1B‐193) Element A OPGW Pull Number 28 (Str 1B‐193 to 1B‐209) Element A OPGW Pull Number 34 (Str 1C‐049 to 1C‐061) Element A OPGW Pull Number 15 (Str 1B ‐036 to 1B‐045) Element A OPGW Pull Number 19 (Str 1B‐075 to 1B‐088) Element A OPGW Pull Number 12 (Str 1B ‐017 to 1B‐020) Element A OPGW Pull Number 13 (Str 1B ‐020 to 1B‐034) Element A OPGW Pull Number 33 (Str 1C ‐026 to 1C‐049) Element A OPGW Pull Number 26 (Str 1B‐169 to 1B‐184) Element A OPGW Pull Number 16 (Str 1B‐045 to 1B‐059) Element A OPGW Pull Number 25 (Str 1B‐155 to 1B‐169) Element A OPGW Pull Number 17 (Str 1B‐059 to 1B‐072) Element A OPGW Pull Number 20 (Str 1B‐088 to 1B‐100) Element A OPGW Pull Number 23 (Str 1B ‐131 to 1B‐144) Element A OPGW Pull Number 18 (Str 1B ‐072 to 1B‐075) Element A OPGW Pull Number 24 (Str 1B‐144 to 1B‐155) Element A OPGW Pull Number 22 (Str 1B‐122 to 1B‐131) Element A OPGW Pull Number 21 (Str 1B‐100 to 1B‐122) Mar‐23‐24, T‐ Line Commissioning Mar‐23‐24, Element A ‐ ( Aeolus to LiƩle Snake ) 148 mile Tes Ɵng and Commissioning Support ( Aeolus to LiƩle Snake ) Environmental RestricƟons Pacificorp: Gateway South Element A ‐ Aeolus to Little Snake 1 500kV Overall Project Schedule Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work Mil... Su... Element A 102 of 102 Date Revision Checked Approved May-10-22 00