Loading...
HomeMy WebLinkAbout20240823PAC to Bayer 55 Attachment - PAC - Riverton Preliminary Baseline Schedule.pdf PC-Riverton Classic Schedule Layout 15-May-24 08:11 Activity Name Start Finish original maining A M M M M J J J J J J J J J A A A A S S S S S O O O O N N N N D D D D D J V 27-Sep-24, PC -'Riverton .&Da 22-May-24 27-Sep-24 8 88 27-Sep-24, Key Dates PreliminiaryAward Notification 22-May-24* 01 0 • Pre;liminiary Award'Notification Notice to Proceed 23-May-24* 0 0 Notice to Proceed Contract Award 29-May-24* 0 0 •:Contract Award Mobililation Date 03-Jun-24* 0 0 Mobililation Date Substantial Completetion Date 09-Sep-24* 0 0 ♦ Substantial Completetion Date Final Completion Date 27-Sep-24* 0 0 ♦ Final Completion Date Material 01-May-24 03-Sep-24 03-Sep-24, Material Owner Furnished 01-May-24 03-Sep-24 03-Sep-24, Owner Furnished Capacitor Bank (On Site 2/13) 01-May-24 0 0 Capaci r Bank (On Sit 2/13) Group Operated Switches (On Site 4/1) 01-May-24 0 0 Group Operated Switches (On Site 4/1) Static Mast and Cage (Onsite 4/8) 01-May-24 0 0 Static ast and Cage ( nsite 4/8) Control Cable(On-Site 311) 01-May-24 0 0 Control Cable(On-Site /1) Insulators 13-May-24* 0 0 • Insulators Cable Trench 23-Jul-24* 01 01 _Cable Trench Breaker 03-Sep-24* 0 0 Breaker Contractor Furnished 23-May-24 12-Aug-24 v 12-Aug 24, Contractor Furnished Bus &Grounding Conductor 23-May-24 15-Jul-24 35 35 ;Bus & Grounding Conductor Flood Lights 23-May-24 22-Jul-24 40 40 Flood Lights Bus Fittings 23-May-24 12-Aug-24 55 55 Bus Fittings 19-Sep-24, Construction Activites South Bus Outage 03-Jul-24 19-Sep-24 54 54 South Bus Outage Intstall Below Grade Grounding and Conduit 22-Jul-24 02-Aug-24 10 10 Intstall Belo :Grade Grounding and Conduit Install Cable Trench 05-Aug-24 09-Aug-24 5 5 Install Cable Trench Install Substation Steel 12-Aug-24 13-Aug-24 2 2 Install ubstation Steel Install Substation Equipment (Switches, Capacitor 14-Aug-24 22-Aug-24 7 7 In tall Substation Equipment(Switches, Capacitor;Bank) Bank) Above Grade Grounding and Conduit 23-Aug-24 27-Aug-24 3 3 Above Grade Grounding and Conduit Install and Terminate Cable 28-Aug-24 10-Sep-24 9 9 Install and Terminate Cable Install Breaker, Cables Jumpers etc. 03-Sep-24 10-Sep-24 6 6 Install Breaker, Cables Jumpers etc. Install Overhead Jumpers and Bus Work 11-Sep-24 17-Sep-24 5 5 Install Overhead Jumpers and Bus Work Sucontractor Construction Activities 24-Jun-24 16-Sep-24 58 5 16-Sep-24, Sucontractor Construction Activities Civil Activities 24-Jun-24 02-Jul-24 7 7 Civil Activities • Fence Installation 03-Jul-24 09-Jul-24 3 3 Fe ice Installation Foundation Installation 03-Jul-24 16-Jul-24 8 8 Foundation Installation: Hydro Vac Excavations for Conduit&Ground Gi 10-Jul-24 18-Jul-24 7 7 Hydro Vac Excavations r Conduit& Ground Grid Testing 11-Sep-24 16-Sep-24 4 4 Testing Actual Work Critical Remaining Work Vmmm�I Summary Page 1 of 1 TASK filter:All Activities O Remaining Work ♦ ♦ Milestone ©Oracle Corporation