Loading...
HomeMy WebLinkAbout20240823PAC to Bayer 55 Attachment - Cedar Springs Preliminary Schedule.pdf PAC-Cedar Springs Wind Classic Schedule Layout 07-Jun-24 14:45 Activity Name Start Finish Driginal maining M J J J J J J J J J A A A A S S S S S O O O O N N N N D D D D D J J J J F F F F M M M M M A A A A M M M M J J J J J J J J - . , • . 16-Apr-25, PAC - Cedar Spri .&Da 311VIay-24 13-Dec-24 135 13 13-Dec-24, Key Dates IN EL Project Start Date 31-May-24 0 0 Project:Start Date Notice to Proceed 14-Jun-24* 0 0 Notice to Proceed Sage Grouse Restriction Over 01-Jul-24* 0 0 Sag a Grouse Restriction Over ..:..................:.... Project Completion 13-Dec-24* 0 0 ♦ Project Completion Material 10-Jun-24 116-Apr-25 214 214 16-Apr-25, Material OFM 10-Jun-24 30-Sep-24 77 77 30 Sep=24, OFM Breakers, 10-Jun-24* 0 0 • Br Akers, ,242KV,3000A,40KA,:125 DC,-500 C,H S New Activity ,242KV,3000A,40KA,125VD C,-50°C,HS New Activity Arrester, Surge, 230KV 01-Jul-24* 0 0 Arrester, Surge, 230KV Control House 20-Sep-24* 0 0 • Control House Switch, Group Operated, 230kV,2000A,VB, GS 30-Sep-24* 0 0 S itch,:Group Operated, 230kV,2000A, VB, GS Switch, Motor Operator, 125 VDC 30-Sep-24* 0 0 + Switch, Motor Operator, 125 VDC Arrester, Surge, 230KV 30-Sep-24* 0 0 An ester, Surge, 230KV Group Operated Switches 30-Sep-24* 0 0 Group Operated:Switches: Steel Package 30-Sep-24* 0 0Package cFM 14-Jun-24 16-Apr-25 0 210 16Apr-25, CFM Steel 14-Jun-24 26-Aug-24 50 50 Steel Conduit 14-Jun-24 _ 26-Aug-24 50 50 Conduit Gounding 14-Jun-24 26-Aug-24 50 50 Gounding Insulators 14-Jun-24 26-Aug-24 50 50 Insulators Bus & Fittings 14-Jun-24 26-Aug-24 50 50 Bus & Fitting Long Lead Time Items (yoke plate) 14-Jun-24 16-Apr-25 210 210 Long Lead Time Items (yoke Long Lead Time Clevis Y534D, Bronze Terminal 14-Jun-24 26-Mar-25 195 195 :Long Lead Time Clevis Y534D, Bro E522N Flood Light Bracket 14-Jun-24 10-Sep-24 60 60 Flood Li ht Bracket Poly Insulators 14-Jun-24 19-Dec-24 130 130 Poly Insulators Transmission Line Material 0 Construction Activiti 21-Aug-24 13-Dec-24 13-Dec-24, QonstructionActivities Electrical Crew Mobilization 21-Aug-24 21-Aug-24 1 1 Electrical Crew Mobilization Install Cable Trench 22-Aug-24 09-Sep-24 12 12 Install C ble Trench Install Below Grade Conduit 10-Sep-24 13-Sep-24 4 4 Conduit Install elow Grade Below Grade Ground Grid 16-Sep-24 25-Sep-24 8 8 �o Bel w Grade Ground Grid Install Substation Steel 26-Sep-24 03-Oct-24 6 6 Install Substation Steel Install Electrical Equipment 04-Oct-24 14-Oct-24 7 7 Install Electrical Equipment Install Control Building Batteries & Relay Bracing 15-Oct-24 16-Oct-24 2 2 Install Control Building Batteries & Relay Bracing Above Grade Conduit&Grounding 17-Oct-24 21-Oct-24 3 3 Above Grade Conduit&Grounding Actual Work Critical Remaining Work Vmmm�I Summary Page 1 of 2 TASK filter:All Activities O Remaining Work ♦ ♦ Milestone ©Oracle Corporation PAC-Cedar Springs Wind Classic Schedule Layout 07-Jun-24 14:45 Activity Name Start Finish Driginal maining M J J J J J J J J J I A A AlAlS S I S1 S1 S O O O O N N I N I N I DI DI D D D J J J J F F F F M M M M M A A A A M M M M J J J J J J J J Project Removals 22-Oct-24 23-Oct-24 2 2 71 Project Removals Cable Installation 24-Oct-24 04-Nov-24 8 8 C able'Installation Terminate Cable 05-Nov-24 12-Nov-24 6 6 Terminate Cable Install Overhead Bus And Jumpers 12-Nov-24 11-Dec-24 20 20 Install Overhead Bus And Jumpers Final Punch List and Demob 12-Dec-24 13-Dec-24 2 2 Final Punch List and Demob Subcontractor Con lion Activities Jul-24 AS 11-Dec-24 RE 11-Dec-24, Subcontractor Con structionActivities' Clearing&Grubbing 01-Jul-24 09-Jul-24 5 5 Clewing &Grubbing Cut& Fill 10-Jul-24 30-Jul-24 15 15 C t& Fill Fence Installation 31-Jul-24 13-Aug-24 10 10 Fence Installatio — ---- -- ---- Foundations 31-Jul-24 _ 27-Aug-24 20 20 Foundations Testing Activities 13-Nov-24 26-Nov-24 10 10 Testing Activities Install Finish Rock 13-Nov-24 25-Nov-24 9 9 Install Finish Rock Transmission Lineal 22-Oct-24 11-Dec-24 35 35 11-Dec-24, Transmission Line OPGW Replacement 22-Oct-24 18-Nov-24 20 20 OpGW Replacement Windstar to Yellowcake Line Outage 22-Oct-24 11-Dec-24 35 35 Vindstar to Yellowcale Line Outage T line Cut in 19-Nov-24 11-Dec-24 15 15 T line Cut in Actual Work Critical Remaining Work V0000�I Summary Page 2 of 2 TASK filter:All Activities O Remaining Work ♦ ♦ Milestone ©Oracle Corporation