Loading...
HomeMy WebLinkAbout20240823PAC to Bayer 55 Attachment - Boswell project schedule.pdf ID Task Task Name Duration Start Finish Qtr 2,2024 Qtr 3,2024 Qtr 4,2024 Qtr 1,2025 Mode Mar Am May Jun Jul Auci Se Oct Nov Dec Jan 1 W Boswell project 170 days Thu 4/18/24 Wed 12/11/e 2 W Contract award 0 days Wed 5/1/24 Wed 5/1/24 3 W IFC available 0 days Wed 5/15/24 Wed 5/15/24 5/15 4 W Freezeout substation 151 days Wed 5/15/2z Wed 12/11/e 5 Material 150 days Wed 5/15/VTue 12/10/2j 6 Transmission structure anchor bolts- Owner furnished 0 days Wed Wed 5/15/24 5/15/24 7 Dead end anchor bolts-owner furnished 0 days Wed 5/15/24 Wed 5/15/24 8 Dead end steel available-owner furnished 0 days Wed 5/15/24 Wed 5/15/24 5/15 9 Control cable available - owner furnished 0 days Wed 5/15/24 Wed 5/15/24 10 Insulators available-owner furnished 0 days Wed 5/15/24 Wed 5/15/24 11 Switches available-owner furnished 0 days Wed 5/15/24 Wed 5/15/24 12 Breakers available-owner furnished 0 days Wed 5/15/24 Wed 5/15/24 13 Metering units available-owner furnished 0 days Wed 5/15/24 Wed 5/15/24 14 W4Surge Arresters available-owner furnished 0 days Wed 5/15/24 Wed 5/15/24 15 Transmission material available-owner furnished 0 days Wed Wed 5/15/24 5/15/24 16 Steel order 10 wks Wed 5/15/24Tue 7/23/24 17 Conductor and fittings material order 14 wks Wed 5/15/24Tue 8/20/24 18 Bus and fittings material order 14 wks Wed 5/15/24Tue 8/20/24 19 order rebar for foundations 2 wks Wed 5/15/24Tue 5/28/24 MIT 20 Jumper material for BFO detail 30 wks Wed 5/15/24Tue 12/10/2z 21 Deadend for BXL detail 28 wks Wed 5/15/24Tue 11/26/2z 22 Construction 151 days Wed 5/15/2z Wed 12/11/i 23 W Mobilize 10 days Wed 5/15/24Tue 5/28/24 24 W Take outage to remove Freezeout/Standpipe line 8 days Wed 5/29/2z Fri 6/7/24 25 W Demo substation deadend 2 days Wed 5/29/24Thu 5/30/24 26 W Demo substation deadend foundations 2 days Fri 5/31/24 Mon 6/3/24 27 Drill and pour 3 pole foundation for transmission str 3 days Wed Fri 5/31/24 5/29/24 28 Drill and pour single pole foundation for 2 days Mon 6/3/24 Tue 6/4/24 transmission str. 29 W Pour new substation Deadend foundations 3 days Wed 6/5/24 Fri 6/7/24 30 W Possible installation of Shoo-fly if outage cannot be 2 days Thu 6/6/24 Fri 6/7/24 extended, addition to contract 31 Pour remaining foundations 10 days Mon 6/10/24 Fri 6/21/24 32 Foundation cure time 21 days Mon 6/24/24 Mon 7/22/24 33 Install conduit 10 days Mon 6/24/24 Fri 7/5/24 34 Install Substation dead end steel 3 days Mon 7/8/24 Wed 7/10/24 Task Project Summary 0 0 Manual Task I Start-only C Deadline b Project: Boswell project schedu Split ................. Inactive Task Duration-only Finish-only 7 Progress Date: Fri 4/19/24 Milestone ♦ Inactive Milestone Manual Summary Rollup External Tasks Manual Progress Summary Inactive Summary Manual Summary External Milestone Page 1 ID Task Task Name Duration Start Finish Qtr 2,2024 Qtr 3,2024 Qtr 4,2024 Qtr 1,2025 Mode Mar Am May Jun Jul AugSep Oct Nov Dec Jan 35 W Install steel structures 10 days Wed 7/24/24Tue 8/6/24 36 Pull Contol and Power cable 10 days Wed 8/7/24 Tue 8/20/24 37 Install Bus 10 days Wed 8/21/24Tue 9/3/24 38 Install Strain bus 2 days Wed 11/27/2Thu 11/28/2z 39 Install switches 15 days Wed 8/7/24 Tue 8/27/24 40 Install breaker 3 days Wed 8/28/24 Fri 8/30/24 41 Install Arresters 1 day Mon 9/2/24 Mon 9/2/24 42 Install Metering units 1 day Tue 9/3/24 Tue 9/3/24 43 Relocate CCVT 1 day Wed 9/4/24 Wed 9/4/24 44 Install most jumpers 10 days Wed 9/4/24 Tue 9/17/24 45 Install jumpers to Breaker with BFO detail 1 day Wed 12/11/2 Wed 12/11/2 46 Install jumpers off strain bus 2 days Wed 11/27/2Thu 11/28/2z 47 Testing and Commissioning 15 days Wed 9/18/24Tue 10/8/24 48 Transmission 75 days Wed 5/29/2zTue 9/10/24 49 Remove Transmission conductor into substation 2 days Wed 5/29/24Thu 5/30/24 50 Relocate Single pole on new foundation 1 day Wed 7/3/24 Wed 7/3/24 PF 51 Relocate Three pole on new foundations 5 days Mon 7/1/24 Fri 7/5/24 52 If no shoo-fly span transmission line back into substation 5 days Wed 9/4/24 Tue 9/10/24 53 Energize 0 days Wed 12/11/2 Wed 12/11/2 12/11 54 55 56 Collector 80 days Thu 4/18/24 Wed 8/7/24 G 57 IFC available 0 days Thu 4/18/24 Thu 4/18/24 4 4/18 58 Mobilize 20 days Thu 4/18/24 Wed 5/15/24 59 Material 0 days Mon 6/17/2z Mon 6/17/21 a 6/17 60 Control house foundation available 0 days Mon 6/17/24 Mon 6/17/24 1/17 61 Control house available 0 days Mon 6/17/24 Mon 6/17/24 17 62 Line and Metering panels available 0 days Mon 6/17/24 Mon 6/17/24 e 17 63 Install pre poured foundation 2 days Mon 6/24/24Tue 6/25/24 64 Install Control House 1 day Wed 6/26/24 Wed 6/26/24 65 Install Fence 10 days Thu 6/27/24 Wed 7/10/24 66 Install conduit 10 days Thu 6/27/24 Wed 7/10/24 67 Install grounding 5 days Thu 7/11/24 Wed 7/17/24 68 Dress control house 10 days Thu 7/18/24 Wed 7/31/24 69 Finish yard 5 days Thu 8/1/24 Wed 8/7/24 Task Project Summary F Manual Task Y 0 Start-only C Deadline b Project: Boswell project schedu Split Inactive Task Duration-only Finish-only 7 Progress Date: Fri 4/19/24 Milestone ♦ Inactive Milestone Manual Summary Rollup External Tasks Manual Progress Summary Inactive Summary 0 J Manual Summary I I External Milestone <t> Page 2