HomeMy WebLinkAbout20240823PAC to Bayer 55 Attachment - A4.Coyote.Initial.Baseline.pdf A4 - Coyote Full Detail Schedule Activity ID Activity Name Original Total Float Start Finish Predecess� Successors 2023 2024 2025 Duration ar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Project Major Milestones 714 0 09/22/22A 09/04/24 Project Major Milestones(Construction) Ex G.1.1, 714 � 0 09/22/22A 09/04/24 MS.SI.CON- Contract Effective Start Date 0 09/22/22A MS.SI.CN; MS.SI.CNSI Site Milestone-[1]Construction Start 0 02/15/23 A MS.SI.C1 CNST.TRA Milestone-[1]Construction Start MS.SI.FND.: Site Milestone-[6]Foundation Start 0 0 05/22/23 MS.SI.C1 MS.SI.FNE a Site Milestone-[6]Foundation Start MS.SI.DE.S' Site Milestone-[8]Dead End Steel Start 0 0 06/21/23 MS.SI.0 MS.SI.DE.: a Site Milestone-[8]Dead End Steel Start MS.SI.TLIN.2 Coyote-Clover 500kV Transmission Line Dead End Comp 0 0 06/30/23* CNST.SI MS.SI.ME( Coyote-Clover 500kV Transmission Line Dead End Complete MS.SI.SUB.; Site Milestone-[10]Substation Steel Start 0 7 07/18/23 MS.SI.C1 MS.SI.SUE a Site Milestone-[10]Substation Steel Start MS.SI.TLIN.1 Coyote-Little Snake 500kV Transmission Line Dead End( 0 7 07/24/23* CNST.SI MS.SI.ME( Coyote-Little Snake 500kV Transmission Line Dead End Complete MS.SI.FND.I Reactor Foundations Complete(ready for reactor installatl 0 3 07/28/23* CNST.Fh CNST.RC1 a Reactor Foundations Complete(ready for reactor installation) MS.SI.FND.1 Control House Foundation Complete 0 0 08/14/23* CNST.FIN CNST.CH Control House Foundation Complete MS.SI.EQP1 Site Milestone-[12]Equipment Install Start 0 7 08/15/23 MS.SI.C1 CNST.TRA a Site Milestone-[12]Equipment Install Start MS.SI.DE.S' Site Milestone-[9]Dead End Steel Complete 0 45 09/21/23 MS.SI.DI CNST.BUS a Site Milestone-[9]Dead End Steel Complete MS.SI.BUS.: Site Milestone-[14]Bus Installation Start 0 26 09/22/23 MS.SI.0 MS.SI.BUE a Site Milestone-[14]Bus Installation Start MS.SI.FND.1 Site Milestone-[7]Foundations Complete 0 20 10/02/23 MS.SI.FI' CNST.URE a Site Milestone-[7]Foundations Complete MS.SI.SUB.: Site Milestone-[11]Substation Steel Complete 0 5 10/19/23 CNST.SI CNST.INSI a Site Milestone-[11]Substation Steel Complete MS.SI.CH.0 Site Milestone-[17]Control House Complete 0 30 10/20/23 CNST.CH CNST.PNL a Site Milestone-[17]Control House Complete MS.SI.CH.S Site Milestone-[16]Control House Panel&Wiring Start 0 18 11/01/23 MS.SI.C1 CNST.BAT a Site Milestone-[16]Control House Panel&Wiring Start MS.SI.URD. Site Milestone-[4]Underground Conduits Complete 0 29 12/19/23 CNST.UF CNST.PNL a Site Milestone-[4]Underground Conduits Complete MS.SI.PIPE. Site Milestone-[3]Underground Piping Complete 0 30 01/15/24 CNST.PII COMMIS.1 a Site Milestone-[3]Underground Piping Complete MS.SI.URD. Site Milestone-[5]Underground Grounding Complete 0 1 01/30/24 CNST.GP CNST.JUM a Site Milestone-[5]Underground Grounding Complete MS.SI.BUS.1 Site Milestone-[15]Bus Installation Complete 0 43 02/06/24 MS.SI.BI CNST.JUM a Site Milestone-[15]Bus Installation Complete MS.SI.CBL.; Site Milestone-[18]Feld Cable Install Start 0 28 02/15/24 CNST.CP CNST.TRN Site Milestone-[18]Field Cable Install Start MS.SI.CIV.0 Site Milestone-[2]Civil Earthworks Complete 0 56 03/13/24 CNST.CI COMMIS.1 a Site Milestone-[2]Civil Earthworks Complete MS.SI.CBL.( Site Milestone-[19]Feld Cable Install Complete 0 0 03/13/24 CNST.CP CNST.TRN a Site Milestone-[19]Field Cable Install Complete MS.SI.EQP1 Site Milestone-[13]Equipment Install Complete 0 51 03/18/24 CNST.TF COMMIS.1 a Site Milestone-[13]Equipment Install Complete MS.SI.TERN Site Milestone-[20]Feld Cable Termination Start 0 0 05/09/24 CNST.TF MS.SI.TER a Site Milestone-[20]Field Cable Termination Start MS.SI.TERN Site Milestone-[21]Feld Cable Termination Complete 0 0 05/09/24 CNST.CP COMMIS.1 a Site Milestone-[21]Field Cable Termination Complete MS.SI.TEST. Site Milestone-[22]Contractor Testing Start 0 59 05/09/24 COMMIE MS.SI.TES a Site Milestone-[22]Contractor Testing Start MS.SI.MECI Coyote Substation Mechanical Completion 0 1 07/05/24* PM.PLAI MS.SI.SUE Coyote Substation Mechanical Completion MS.SI.TEST. Site Milestone-[23]Contractor Testing Complete 0 1 07/05/24 COMMIE MS.SI.ME( a Site Milestone-[23]Contractor Testing Complete MS.SI.FRM: Site Milestone-[24]Contractor Testing and Commissionir 0 61 07/05/24 COMMIE MS.SI.SUE a Site Milestone-[24]Contractor Testing and Commi MS.SI.SUB3 Coyote Substation Substantial Completion 0 0 09/04/24* COMMIE a A Coyote Substation Substantial Co Owner Milestones 13 06/01/23 11/15/23 MS.OWN.C( Owner Supplied Material-CCVTs 0 0 06/01/23* PROC.O CNST.CC� a Owner Supplied Material-CCVTs MS.OWN.SI Owner Supplied Material-Substation Steel 0 0 06/01/23* PROC.O CNST.STEI a Owner Supplied Material-Substation Steel MS.OWN.DI Owner Supplied Material-Dead End Steel 0 0 06/20/23* PROC.O CNST.STEI a Owner Supplied Material-Dead End Steel MS.OWN.Sb Owner Supplied Material-Disconnect Switches 0 0 08/15/23* PROC.O CNST.SW., a Owner Supplied Material-Disconnect Switches MS.OWN.13 Owner Supplied Material-138kV Neutral Reactor 0 0 09/01/23* PROC.O CNST.RC1 a Owner Supplied Material-138kV Neutral Reactor MS.OWN.52 Owner Supplied Material-Fixed Series Capacitors 525 kV 0 0 09/08/23* PROC.O CNST.CAF a Owner Supplied Material-Fixed Series Capacitors 525 kV milestones Primary Baseline �M Actual Work Current �� Fabricators Civil Neg Float Bar LD Float Date Date: 04/21/23 Actual Level of Effort 0 O Milestone Baseline G= Remaining Work ♦ ♦ Milestone � Electricians C=4D Line � LD Date Critical Remaining Work A4 - Coyote Full Detail Schedule Activity ID Activity Name Original Total Float Start Finish Predecessr Successors 2023 2024 2025 Duration ar Apr May Jun Jul Aug Sep Oct I Nov I Dec Jan Feb Mar Apr I May I Jun Jul I Aug Sep Oct Nov Dec Jan Feb Mar MS.OWN.52 Owner Supplied Material-Reactors 525 kV 0 74 09/15/23* PROC.O CNST.TRA Owner Supplied Material-Reactors 525 kV MS.OWN.SS Owner Supplied Material-Station Service VT 0 0 10/01/23* PROC.O CNST.SS a Owner Supplied Material-Station Service VT MS.OWN.CH Owner Supplied Material-Control House 0 0 10/15/23* PROC.O I CNST.CH a Owner Supplied Material-Control House MS.OWN.PP Owner Supplied Material-P&C Panels,Annunciators 0 0 11/15/23* PROC.O CNST.PNL a Owner Supplied Material-P&C Panels,Annunciators sect Management 89 10/01/22A * 08/11/23 Project Management 10/01/22A 02/14/23A 1 11 02/14/23A PM.PLAN Develop QAProgram Plan 15 10/01/22A 10/17/22A MS.SI.Cr PM.PLAN.j PM.PLAN Develop EAP 15 10/01/22A 12/09/22A MS.SI.Cr PM.PLAN.j PM.PLAh Develop Safety Plan 15 10/01/22A 12/16/22A MS.SI.Cr PM.PLAN.j Plan PM.PLAN Develop Emergency Response Plan 15 10/01/22A 01/04/23A MS.SI.Cr PM.PLAN.J ergenc Response Plan PM.PLAN Develop Environmental Training plan 15 10/01/22A 01/20/23A MS.SI.Cr PM.PLAN.) Enviro mental Training plan PM.PLAN Develop Biological Plant and Wildlife Plan 15 10/01/22A 01/31/23A MS.SI.Cr PM.PLAN.j p Biological Plant and Wildlife Plan PM.PLAN Develop SSEP 15 10/01/22A 02/14/23A MS.SI.Cr PM.PLAN.J elop S EP PM.PLAN All Required Plans Submitted and Approved 0 02/14/23A PM.PLAI MS.SI.ME( equire Plans Submitted and Approved Engineering Deliverables(by others) 89 10/01/22 A ENG.IFC.CI` Design-CivilIFC 94 10/01/22A 12/06/22A MS.SI.Cr CNST.CIV., ENG.PEMB. PEMB-Anchor bold and reaction drawings 4 12/16/22A 03/10/23A MS.SI.Cr ENG.IFC.P PEMB-Anchor bold and reaction drawings ENG.IFC.FN Design IFC-Foundations 4 21 10/01/22A 04/21/23 MS.SI.Cr CNST.FND Design IFC-Foundations ENG.IFC.EL Design IFC-Electrical 4 0 10/01/22A 04/21/23 MS.SI.Cr PROC.ORI Design IFC-Electrical ENG.IFC.PC Design IFC-P&C 4 20 10/01/22A 04/21/23 MS.SI.0 CNST.PNL Design IFC-P&C ENG.IFC.ST DesignlFC-Structural 37 65 10/01/22A 04/21/23 MS.Sl.0 CNST.STEI DesignlFC-Structural ENG.IFC.ST Design IFC-Structural-Deadends 37 78 10/01/22A 04/21/23 CNST.STEI Design IFC-Structural-Deadends ENG.IFC.PE PEMB-Full set of drawings 4 89 12/16/22 A 08/11/23 MS.SI.Cr CNST.PEW PEMB-Full set of drawings Permitting 10/01/22A 9r 02/14/23A State/Local 10/01/22A 02/14/23 A "w PERM.BIO Bio Clearance 4 11/14/22 A 11/15/22 A MS.SI.Cr PERM.ALL PERM.FE Black Footed Ferret Variance 42 12/01/22A 02/10/23A MS.SI.Cr PERM.ALL <Footed Ferret Variance PERM.C/ Uintah Basin Hookless Cactus Variance 42 12/01/22A 02/10/23A MS.SI.Cr PERM.ALL ih Basin Hookless Cactus Variance PERM.W White Tail Praire Dog Buffer Variance 42 12/01/22A 02/10/23A MS.SI.Cr PERM.ALL e Tail P aire Dog Buffer Variance PERM.S� Obtain WaterQualty(SWPPIP)Permit 4 10/01/22A 02/14/23A MS.SI.Cr PERM.ALL ain Water Quality(SWPPP) Permit PERM.AL All permits obtained to allow civil work to proceed 0 02/14/23A PERMS CNST.CIV.' ermits btained to allow civil work to proceed 51 09/22/22 A 02/19 Contractor Furnished Materials 51 10/15/22 A 02/19/24 PROC.Of Order Placed-Aluminum Strain Bus 4 10/15/22 A 10/15/22 A MS.SI.Cr PROC.MAI in Bus PROC.OI Order Placed-Bare Copper 4 10/15/22 A 10/15/22 A MS.SI.Cr PROC.MAI PROC.Mj Manufacture-Bare Copper 45 78 10/15/22 A 07/18/23 PROC.O PROC.DEL Manufacture-Bare Copper PROC.DI Delivery-Bare Copper 4 78 07/19/23 07/22/23 PROC.M CNST.GNC 8 Delivery-Bare Copper PROC.Mj Manufacture-Aluminum Strain Bus 67 78 10/15/22A 08/15/23 PROC.O PROC.DEL Manufacture-Aluminum Strain Bus PROC.DI Delivery-Aluminum Strain Bus 4 78 08/16/23 08/19/23 PROC.M CNST.BUS I) Delivery-Aluminum Strain Bus milestones - Primary Baseline Actual Work Current llt=� Fabricators [D==4E1 Civil � Neg Float Bar LID Float Date Date: 04/21/23 Actual Level of Effort 0 0 Milestone Baseline Remaining Work ♦ ♦ Milestone [__� Electricians G--10 Line � LID Date Critical Remaining Work A4 - Coyote Full Detail Schedule Activity ID Activity Name Original Total Float Start Finish Predecess Successors 2023 2024 2025 Duration ar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar PROC.OI Order Placed-Control Cable 1 77 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-Control Cable PROC.Of Order Placed-Power Cable 1 77 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-Power Cable PROC.Mj Manufacture-Control Cable 190 77 04/22/23 10/28/23 PROC.O PROC.DEI Manufacture-Control Cable PROC.Mj Manufacture-Power Cable 190 77 04/22/23 10/28/23 PROC.O PROC.DEI Manufacture-Power Cable PROC.DI Delivery-Control Cable 4 77 10/29/23 11/01/23 PROC.M CNST.CNT B Delivery-Control Cable PROC.DI Delivery-Power Cable 4 77 10/29/23 11/01/23 PROC.M CNST.CN1 8 Delivery-Power Cable 1l IPA 09/12/23 PROC.Of Order Placed-PVC Conduit 1 66 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-PVC Conduit PROC.Of Order Placed-GRC Conduit 1 40 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-GRC Conduit PROC.Mj Manufacture-PVC Conduit 140 66 04/22/23 09/08/23 PROC.O PROC.DEI Manufacture-PVC Conduit PROC.Mj Manufacture-GRC Conduit 140 40 04/22/23 09/08/23 PROC.O PROC.DEI Manufacture-GRC Conduit PROC.DI Delivery-PVC Conduit 4 66 09/09/23 09/12/23 PROC.M CNST.URE Delivery-PVC Conduit PROC.DI Delivery-GRC Conduit 4 40 09/09/23 09/12/23 PROC.M CNST.ABC B Delivery-GRC Conduit PROC.OI Order Placed-Ground Grid System Material 4 10/15/22 A 10/15/22A MS.SI.C1 PROC.MAI 3ystem Material PROC.Mj Manufacture-Ground Grid System Material 75 79 10/15/22 A 07/17/23 PROC.O PROC.DEI Manufacture-Ground Grid System Material PROC.DI Delivery-Ground Grid System Material 4 79 07/18/23 07/21/23 PROC.M CNST.GNE Delivery-Ground Grid System Material 1 1 08/04/23 PROC.OI Order Placed-Rigid Aluminum Bus 4 10/15/22 A 10/15/22 A MS.SI.C1 PROC.MAI m Bus PROC.Mj Manufacture-Rigid Aluminum Bus 168 74 10/15/22A 07/01/23 PROC.O PROC.DEI Manufacture-Rigid Aluminum Bus PROC.DI Delivery-Rigid Aluminum Bus 34 74 07/02/23 08/04/23 PROC.M CNST.BUS Delivery-Rigid Aluminum Bus PROC.Of Order Placed-525 kV Surge Arrestors 4 10/15/22A 10/15/22A MS.SI.C1 PROC.MAI Arrestc rs PROC.Of Order Placed-Station post Insulators 4 10/15/22A 10/15/22A MS.SI.C1 PROC.MAI isulators PROC.Of Order Placed-Suspension Insulators 4 10/15/22A 10/15/22A MS.SI.C1 PROC.MAI isulatois PROC.Of Order Placed-Station Service Generator 4 11/29/22 A 11/29/22 A MS.SI.0 PROC.MAI on Service Generator PROC.Of Order Placed-storage building steel 4 12/16/22A 12/16/22A PROC.MAI torage building steel PROC.Of Order Placed-Cable Trench 1 40 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-Cable Trench PROC.Of Order Placed-AC Panel Boards 1 28 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-AC Panel Boards PROC.Of Order Placed-Battery Bank/Rack/Charger 1 77 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-Battery Bank/Rack/Charger PROC.Of Order Placed-Junction Boxes 1 0 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-Junction Boxes PROC.Of Order Placed-Yard Lights 1 48 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-Yard Lights PROC.Of Order Placed-Station Service Xfiners 1 51 04/21/23 04/21/23 ENG.IFC PROC.MAI Order Placed-Station Service Xfiners PROC.Mj Manufacture-Station post Insulators 156 97 10/15/22A 05/12/23 PROC.O PROC.DEI Manufacture-Station post Insulators PROC.DI Delivery-Station post Insulators 4 97 05/13/23 05/16/23 PROC.M CNST.INSI Delivery-Station post Insulators PROC.Mj Manufacture-Suspension Insulators 156 52 10/15/22A 06/26/23 PROC.O PROC.DEI Manufacture-Suspension Insulators PROC.DI Delivery-Suspension Insulators 4 52 06/27/23 06/30/23 PROC.M CNST.INSI 0 Delivery-Suspension Insulators PROC.Mj Manufacture-Cable Trench 112 40 04/22/23 08/11/23 PROC.O PROC.DEI Manufacture-Cable Trench PROC.DI Delivery-Cable Trench 4 40 08/12/23 08/15/23 PROC.M CNST.CBL Delivery-Cable Trench PROC.Mj Manufacture-525 kV Surge Arrestors 67 96 10/15/22A 09/25/23 PROC.O PROC.DEI Manufacture-525 kV Surge Arrestors PROC.DI Delivery-525 kV Surge Arrestors 4 96 09/26/23 09/29/23 PROC.M CNST.SAR 8 Delivery-525 kV Surge Arrestors milestones Primary Baseline Actual Work Current ED===] Fabricators ED=-IEI Civil � Neg Float Bar LD Float Date Date: 04/21/23 Actual Level of Effort O O Milestone Baseline Remaining Work ♦ ♦ Milestone � Electricians C=4D Line � LD Date Critical Remaining Work A4 - Coyote Full Detail Schedule Activity ID Activity Name Original Total Float Start Finish Predecess Successors 2023 2024 2025 Duration ar Apr May Jun Jul Aug Sep Oct I Nov Dec Jan Feb Mar Apr I May I Jun Jul Aug Sep Oct Nov Dec Jan Feb TMar Pi Manufacture-storage building steel 2 75 12/16/22 A 10/01/23 PROC.O PROC.DEt Manufacture-storage building steel PROC.DE Delivery-storage building steel 4 75 10/02/23 10/05/23 PROC.M CNST.PEN 8 Delivery-storage building steel Pi Manufacture-AC Panel Boards 180 28 04/22/23 10/18/23 PROC.O PROC.DEt Manufacture-AC Panel Boards Pi Manufacture-Junction Boxes 180 0 04/22/23 10/18/23 PROC.O PROC.DEt Manufacture-Junction Boxes PROC.DE Delivery-AC Panel Boards 4 28 10/19/23 10/22/23 PROC.M CNST.PNL 8 Delivery-AC Panel Boards PROC.DE Delivery-Junction Boxes 4 0 10/19/23 10/22/23 PROC.M CNST.ABC Delivery-Junction Boxes Pi Manufacture-Battery Bank/Rack/Charger 190 77 04/22/23 10/28/23 PROC.O PROC.DEt Manufacture-Battery Bank/Rack/Charger Pi Manufacture-Yard Lights 190 48 04/22/23 10/28/23 PROC.O PROC.DE1 Manufacture-Yard Lights PROC.DE Delivery-Battery Bank/Rack/Charger 4 77 10/29/23 11/01/23 PROC.M CNST.BAT 8 Delivery-Battery Bank/Rack/Charger PROC.DE Delivery-Yard Lights 4 48 10/29/23 11/01/23 PROC.M CNST.LIGF 8 Delivery-Yard Lights Pi Manufacture-Station Service Generator 291 33 11/29/22 A 12/11/23 PROC.O PROC.DEt Manufacture-Station Service Generator PROC.DE Delivery-Station Service Generator 4 33 12/12/23 12/15/23 PROC.M CNST.Gi Delivery-Station Service Generator Pi Manufacture-Station Service Xfiners 300 51 04/22/23 02/15/24 PROC.O PROC.DE1 Manufacture-Station Service Xfiners PROC.DE Delivery-Station Service Xfiners 4 51 02/16/24 02/19/24 PROC.M CNST.SS A Delivery-Station Service Xfiners Owner Supplied Material W 13 09/22/22 A 11/15/23 PROC.OWN Owner Supplied Material-CCVJ 45 0 09/22/22 A 06/01/23 MS.OWN.( Owner Supplied Material-CCVTs PROC.OWN Owner Supplied Material-Substation Steel 45 0 09/22/22 A 06/01/23 MS.OWJ Owner Supplied Material-Substation Steel PROC.OWN Owner Supplied Material-Dead End Steel 45 0 09/22/22 A 06/20/23 MS.OWN.1 Owner Supplied Material-Dead End Steel PROC.OWN Owner Supplied Material-Disconnect Switches 45 0 09/22/22 A 08/15/23 MS.OWJ Owner Supplied Material-Disconnect Switches PROC.OWN Owner Supplied Material-1381 Neutral Reactor 45 0 09/22/22 A 09/01/23 MS.OWN.1 Owner Supplied Material-1381 Neutral Reactor PROC.OWN Owner Supplied Material-Fixed Series Capacitors 525 1 45 0 09/22/22 A 09/08/23 MS.OWJ Owner Supplied Material-Fixed Series Capacitors 525 kV PROC.OWN Owner Supplied Material-Reactors 525 kV 45 74 09/22/22 A 09/15/23 MS.OWJ Owner Supplied Material-Reactors 525 kV PROC.OWN Owner Supplied Material-Station Service VT 45 0 09/22/22 A 10/01/23 MS.OWJ Owner Supplied Material-Station Service VT PROC.OWN Owner Supplied Material-Control House 45 0 09/22/22 A 10/15/23 MS.OWN.( Owner Supplied Material-Control House PROC.OWN Owner Supplied Material-P&C Panels,Annunciators 45 0 09/22/22 A 11/15/23 MS.OWN.F Owner Supplied Material-P&C Panels,Annunciators Construction 05/08/24 Substation 3151 0 02/15/23 A 05/08/24 ppp_ CNST Setup job trailers 4 57 05/16/23 05/19/23 CNSTCI CNSTCIV 8 Setup job trailers CNST. setup concrete batch plant 4 0 05/16/23 05/19/23 1 MS.SI.Ci CNST.FND 8 setup concrete batch plant CNST.CI\ Clear and Grub-Phase 1 10 0 02/15/23 A 04/21/23 PERM.A CNST.CIV Clear and Grub-Phase 1 CNST.CI\ Mass Excavation-Phase 1 17 0 04/21/23 05/15/23 CNST.CI CNST.CIV., Mass Excavation-Phase 1 CNST.CI\ Import Road Base-Phase 1 15 0 05/16/23 06/06/23 CNST.CI CNST.CIV., Import Road Base-Phase 1 CNST.CI\ Clear and Grub-Phase 2 20 1 06/07/23 07/05/23 CNST.CI CNST.CIV.I Clear and Grub-Phase 2 CNST.CI\ Mass Excavation-Phase 2 15 1 07/06/23 07/26/23 CNST.CI CNST.CIV.I ;;Q Mass Excavation-Phase 2 CNST.CI\ Import Road Base-Phase 2 1 10 1 07/27/23 08/09/23 CNST.CI CNST.GNE 8 Import Road Base-Phase 2 CNST.CI\ Install finish rock(1 of 2) 20 40 01/18/24 02/14/24 CNST.UF MS.SI.CIV. Install finish rock(1 of 2) CNST.CI\ Install finish rock(2 of 2) 20 40 02/15/24 03/13/24 CNST.UF MS.SI.CIV. Install finish rock(2 of 2) 10111 • 40 1 1: 110/05/23 milestones o Primary Baseline 11-111110 Actual Work Current J Fabricators JED=== Civil Neg Float Bar LID Float Date Date: 04/21/23 Actual Level of Effort 0 0 Milestone Baseline G= Remaining Work ♦ ♦ Milestone � Electricians JED=== Line � LID Date Critical Remaining Work A4 - Coyote Full Detail Schedule Activity ID Activity Name Original Total Float Start Finish Predecess Successors 2023 2024 2025 Duration ar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb IMar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb TMar CNST.FEI Install fencing&signage 20 1 08/10/23 09/07/23 CNST.CI CNST.GAT Install fencing&signage CNST.GA Gate Aprons&Bollards 20 1 09/08/23 10/05/23 CNST.FE CNST.GNC Gate Aprons&Bollards :1 1 1. 01/30/24 01/30/24 CNST. Ground Grid Open Areas(1 of 2) 20 1 10/06/23 11/02/23 CNST.FE CNST.GNE ® Ground Grid Open Areas(1 of 2) CNST. Ground Grid Open Areas(2 of 2) 20 1 11/03/23 12/04/23 CNST.G1 CNST.GNE ® Ground Grid Open Areas(2 of 2) CNST. Ground Grid Phase 1 20 1 12/05/23 01/02/24 CNST.FE CNST.GNE ® Ground Grid Phase 1 CNST. Ground Grid Phase 2 20 1 01/03/24 01/30/24 CNST.CI MS.SI.UR1 ® Ground Grid Phase 2 05/22/23 1 1 1 . . .- • 1110/02/23 Reactor Foundations 1 05/22/23 07/28/23 CU Reactor#1 FoundationA 12 0 05/22/23 06/07/23 ENG.IFC MS.SI.FNC Reactor#1 FoundationA CU Reactor#1 Foundation B 12 25 06/08/23 06/23/23 CNST.CI CNST.RC1 Reactor#1 Foundation B CU Reactor#1 Foundation C 12 0 06/08/23 06/23/23 CNST.CI CNST.RC1 ® Reactor#1 Foundation C CU Reactor#2 Foundation C 12 0 06/26/23 07/12/23 ENG.IFC MS.SI.FNC ® Reactor#2 Foundation C CU Reactor#2 Foundation B 12 1 07/13/23 07/28/23 ENG.IFC MS.SI.FNC ® Reactor#2 Foundation B CU Reactor#2 FoundationA 12 0 07/13/23 07/28/23 CNST.CI CNST.RC1 ® Reactor#2 FoundationA Cap Bank Foundations 4 08/15/23 09/18/23 CN Cap Bank Foundations(1 of 2) 12 4 08/15/23 08/30/23 CNST.CI CNST.CIV. ® Cap Bank Foundations(1 of 2) CU Cap Bank Foundations(2 of 2) 12 4 08/31/23 09/18/23 CNST.CI CNST.CIV. B Cap Bank Foundations(2 of 2) 54 07/31/23 10/02/23 CN Control House Foundation 11 0 07/31/23 08/14/23 ENG.IFC MS.SI.FNC 8 Control House Foundation CU Storage Building Foundation 11 77 08/15/23 08/29/23 ENG.IFC CNST.PEiV Storage Building Foundation CU Generator Foundation 10 14 09/19/23 10/02/23 ENG.IFC CNST.CIV. B Generator Foundation Im I rT.1 WN 09/21/23 CNST. Substation Piers Deadend Steel-Phase 1 19 2 05/22/23 06/16/23 MS.SI.Ci CNSTURC ® Substation Piers Deadend Steel-Phase 1 CNST. Substation Piers structural Steel-Phase 1 20 5 06/19/23 07/17/23 CNST.FlN CNST.STEI ® Substation Piers structural Steel-Phase 1 CNST. Substation Piers Deadend Steel-Phase 2 20 3 07/27/23 08/23/23 MS.SI.0 CNST.FND ® Substation Piers Deadend Steel-Phase 2 CNST. Substation Piers structural Steel-Phase 2 20 3 08/24/23 09/21/23 CNST.F� CNST.CBL ® Substation Piers structural Steel-Phase 2 : /re I , /1/17/24 CNST. Install above grade conduit 20 0 12/20/23 01/17/24 ICNSTUF I CNST.CN1 Install above grade conduit . .. 1. . CNST. Install Cable Trench-Phase 1 20 4 09/19/23 10/16/23 CNST.Ft CNSTURC ® Install Cable Trench-Phase 1 CNST. Install Cable Trench-Phase 2 20 24 10/17/23 11/13/23 CNST.FlN CNST.CN1 Install Cable Trench-Phase 2 CNST. Install Conduit-Phase 1 20 0 10/23/23 11/17/23 CNST.F� MS.SI.UR1 ® Install Conduit-Phase 1 CNST. Install Conduit-Phase 2 20 0 11/20/23 12/19/23 CNST.UF CNST.CN1 ® Install Conduit-Phase 2 • 1. 1 .. . . WJINKINU l• CNST. Install Coyote-Clover Line Dead-End 8 0 06/21/23 06/30/23 CNST.F� MS.SLTLI� 8 Install Coyote-Clover Line Dead-End CNST. Install substation dead-Ends-Phase 1 (1 of 2) 20 36 06/21/23 07/19/23 CNST.FlN CNST.STEI = Install substation dead-Ends-Phase 1 (1 of 2) CNST. Install Coyote-Little Snake Line Dead-End 15 5 07/03/23 07/24/23 CNST.FlN CNST.BUS Install Coyote-Little Snake Line Dead-End CNST. Install substation dead-Ends-Phase 1 (2 of 2) 20 36 07/20/23 08/16/23 CNST.SI MS.SI.DE.: Install substation dead-Ends-Phase 1 (2 of 2) CNST. Install substation dead-Ends-Phase 2 20 31 08/24/23 09/21/23 CNST.F� CNST.LIGF Install substation dead-Ends-Phase 2 milestones Primary Baseline Actual Work Current 11W= � Fabricators [D=-ME] Civil � Neg Float Bar LD Float Date Date: 04/21/23 Actual Level of Effort O O Milestone Baseline Remaining Work ♦ ♦ Milestone [__� Electricians G--ME] Line � LD Date Critical Remaining Work A4 - Coyote Full Detail Schedule Activity ID Activity Name Original Total Float Start Finish Predecess Successors 2023 2024 2025 Duration ar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar CNST Substation Structural Steel-Phase 1 20 5 07/18/23 08/14/23 CNST.FN MS.SI.SUE Substation Structural Steel-Phase 1 CNST. Substation Structural Steel-Phase 2 20 3 09/22/23 10/19/23 CNST.FF CNST.BUS Substation Structural Steel-Phase 2 CNST. Storage Building Steel Assembly 20 51 10/06/23 11/02/23 CNST.FF CNST.CN1 I� Storage Building Steel Assembly .1 1• R 1 1 CNST. Install Bus and Connectors-Phase 1 (1 of 2) 20 5 10/11/23 11/07/23 MS.SI.BI CNST.BUS ® Install Bus and Connectors-Phase 1 (1 of 2) CNST. Install Bus and Connectors-Phase 1 (2 of 2) 20 5 11/08/23 12/07/23 CNST.BI MS.SI.BUE ® Install Bus and Connectors-Phase 1 (2 of 2) CNST. Install Bus and Connectors-Phase 2(1 of 2) 20 3 12/12/23 01/09/24 CNST.SI CNST.BUS ® Install Bus and Connectors-Phase 2(1 of 2) CNST. Install Bus and Connectors-Phase 2(2 of 2) 20 3 01/10/24 02/06/24 CNST.BI CNST.SW.: ® Install Bus and Connectors-Phase 2(2 of 2) CNST. Install Jumpers-Phase 1 (1 of 2) 20 1 01/31/24 02/27/24 CNSTBI CNSTJUM Install Jumpers-Phase 1 (1 of 2) CNST. Install Jumpers-Phase 1 (2 of 2) 15 1 02/28/24 03/19/24 CNST.JL COMMIS.1 B Install Jumpers-Phase 1 (2 of 2) CNST. Install Jumpers-Phase 2(1 of 2) 20 1 03/20/24 04/16/24 CNST.BI CNST.JUM ;ZQ Install Jumpers-Phase 2(1 of 2) CNST. Install Jumpers-Phase 2(2 of 2) 15 1 04/17/24 05/07/24 CNST.JL COMMIS.1 IQ Install Jumpers-Phase 2(2 of 2) CNST. Install Strain Bus(1 of 2) 20 31 09/22/23 10/19/23 CNST.SI CNST.BUS Install Strain Bus(1 of 2) CNST. Install Strain Bus(2 of 2) 20 31 10/20/23 11/16/23 1 CNST.BI CNST.JUM Install Strain Bus(2 of 2) 1: 03/18/24 CNST.IN: Install insulators Phase 1 (1 of 2) 20 5 08/15/23 09/12/23 ICNSTFN CNST.INSI Install insulators Phase 1 (1 of 2) CNST.RC Install Reactors 20 74 09/05/23 10/02/23 CNST.FF MS.SI.EQF F-= Install Reactors CNST.TR Transport Reactors to Site(by others) 15 50 09/18/23 10/06/23 CNST.FF CNST.DRE Transport Reactors to Site(by others) CNST.IN; Install insulators Phase 1 (2 of 2) 20 5 09/13/23 10/10/23 CNST.IN CNST.BUS ® Install insulators Phase 1 (2 of 2) CNST.DF Dress Reactors(by others) 20 50 10/09/23 11/03/23 CNST.TF MS.SI.EQF Dress Reactors(by others) CNST.IN; Install insulators Phase 2(1 of 2) 20 3 10/20/23 11/16/23 CNST.SI CNST.INSI Install insulators Phase 2(1 of 2) CNST.LIC Yard Lighting 20 32 11/02/23 12/01/23 CNST.SI MS.SI.EQF Yard Lighting CNST.IN: Install insulators Phase 2(2 of 2) 15 3 11/17/23 12/11/23 CNST.IN CNST.BUS ® Install insulators Phase 2(2 of 2) CNST.CC Install CCVTs 20 48 12/08/23 01/05/24 CNST.BI MS.SI.EQF R!!M Install CCVTs CNST.SA Install Surge Arrestors 20 16 12/12/23 01/09/24 CNST.SI MS.SI.EQF Install Surge Arrestors CNST.PIF Install underground piping for generator 20 22 12/18/23 01/15/24 PROC.D MS.SI.PIPI Install underground piping for generator CNST.GE Install Backup Generator 20 22 01/16/24 02/12/24 CNST.FF MS.SI.EQF ® Install Backup Generator CNST.SS Install Station Service Transformers 20 37 02/20/24 03/18/24 MS.SI.E( MS.SI.EQF Install Station Service Transformers CNST. Install Switches-Phase 1 (1 of 2) 15 15 12/08/23 12/29/23 CNST.SI CNST.SW.' Install Switches-Phase 1 (1 of 2) CNST. Install Switches-Phase 1 (2 of 2) 1151 15 01/01/24 01/19/24 CNST.S� CNST.SW.: Install Switches-Phase 1 (2 of 2) CNST. Install Switches-Phase 2(1 of 2) 14 3 02/07/24 02/26/24 CNST.S� CNST.SW.: ® Install Switches-Phase 2(1 of 2) CNST. Install Switches-Phase 2(2 of 2) 14 3 02/27/24 03/15/24 CNST.S� MS.SI.EQF B Install Switches-Phase 2(2 of 2) CNST. Install fixed series capacitor(1 of 3) 20 24 09/19/23 10/16/23 CNST.FN CNST.CAP Install fixed series capacitor(1 of 3) CNST. Install fixed series capacitor(2 of 3) 20 24 10/17/23 11/13/23 CNST.C/ CNST.CAP Install fixed series capacitor(2 of 3) CNST. Install fixed series capacitor(3 of 3) 20 24 11/14/23 12/13/23 CNST.C/ MS.SI.EQF Install fixed series capacitor(3 of 3) milestones o Primary Baseline Actual Work Current [D===] Fabricators ED=-IEI Civil � Neg Float Bar LD Float Date Date: 04/21/23 Actual Level of Effort 0 0 Milestone Baseline Remaining Work ♦ ♦ Milestone Ea� Electricians C=4D Line � LD Date Critical Remaining Work A4 - Coyote Full Detail Schedule Activity ID Activity Name Original Total Float Start Finish Predecess Successors 2023 2024 2025 Duration ar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb TiMar Erection 33 52 10/16/23 12/01/23 CN Control House setting 5 20 10/16/23 10/20/23 CNST.FF CNST.CNT Control House setting CU Install Battery Bank&Charger 20 52 11/02/23 12/01/23 CNST.C1 MS.SI.EQF Install Battery Bank&Charger Panel 2 11/16/23 CN, Install P&C Panels(1 of 2) 20 2 11/16/23 12/15/23 ENG.IFC CNST.PNL ® Install P&C Panels(1 of 2) CN Install P&C Panels(2 of 2) 20 2 12/18/23 01/15/24 CNST.PP MS.SI.EQF ® Install P&C Panels(2 of 2) . . SI wn-F..Ira CNST Terminate Control Cable-Field 20 0 03/14/24 04/10/24 CNST Cf MS.SI.TER ® Terminate Control Cable-Field CNST. Install Control Cable-Control House 20 0 02/15/24 03/13/24 CNST.Ui MS.SI.CBL ® Install Control Cable-Control House . . ,. . 1 1, 1 1' CNST. Terminate Control Cable-Control House 201 0 04/11/24 05/08/24 CNST.CP ;MS.Si.;CBL ® Terminate Control Cable-Control House . . - . 1 1 1 1 CNST. Install Control Cable-Feld 20 0 01/18/24 02/14/24 CNST.UI` Install Control Cable-Field Testing &Commissioning 82 0 05/09/24 09/04/24 Substation 0 05/09/24 09/04/24 . . . S 1 1 1• 09/04/24 COMMIS Testing(1 of 2) 20 0 05/09/24 06/06/24 CNST.TF MS.SI.TES ® Testing(1 of 2) COMMIS Testing(2 of 2) 20 0 06/07/24 07/05/24 COMMIS MS.SI.TES ® Testing(2 of 2) COMMIS Final Walk Through 2 0 07/08/24 07/09/24 COMMI: COMMIS.F B Final WalkThrough COMMIS Punchlist 20 0 07/10/24 08/06/24 COMMI: COMMIS.1 ® Punchlist COMMIS I Pacificorp Testing&Commissioning support 20 0 08/07/24 09/04/24 1 COMMIS MS.SI.SUE ® Pac'rficorp Testing& Commissioning su milestones o Primary Baseline Actual Work Current ED===] Fabricators ED=== Civil Neg Float Bar LD Float Date Date: 04/21/23 Actual Level of Effort 0 0 Milestone Baseline Remaining Work ♦ ♦ Milestone � Electricians ED=== Line �L LID Date Critical Remaining Work