Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20240814PAC to Staff 79.pdf
RECEIVED Wednesday, August 14, 2024 IDAHO PUBLIC UTILITIES COMMISSION _ ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP 1407 W North Temple, Suite 330 Salt Lake City, Utah 84116 August 14, 2024 Monica Barrios-Sanchez Commission Secretary Idaho Public Utilities Commission 11331 W. Chinden Blvd. Bldg. 8, Ste. 201-A Boise, ID 83714 monica.barrio ssanchez(apuc.Idaho.gov S ecretarygpuc.idaho.gov RE: ID PAC-E-24-04 IPUC Set 5 (58-81) Please find enclosed Rocky Mountain Power's Response to IPUC 5t1i Set Data Request 79. If you have any questions, please feel free to call me at(801)220-2313. Sincerely, /s/ Mark Alder Manager, Regulation Enclosures C.c.: Eric L. Olsen/IIPA elokechohawk.com(C) Lance Kaufman/IIPA lance cr,aegisinsi h�(C) Matthew Nykiel/ICL matthew.n. k�kgmail.com Brad Heusinkveld/ICL bheusinkveld&idahoconservation.org Thomas J. Budge/Bayer ti(a-)racineolson.com(C) Brian C. Collins/Bayer bcollins(&consultbai.com Greg Meyer/Bayer gme ergconsultbai.com Kevin Higgins/Bayer khigginskenergystrat.com(C) Neal Townsend/Bayer ntown send(&energystrat.com (C) Ronald L. Williams/PIIC rilliams( hawleytroxell.com Brandon Helgeson/PIIC bhel eg son(&hawleytroxell.com Bradley Mullins/PIIC brmullinskmwanalytics.com Val Steiner/PIIC val.steiner(&itafos.com Kyle Williams/PIIC williamsk(a-byui.edu PAC-E-24-04/Rocky Mountain Power August 14, 2024 IPUC Data Request 79 IPUC Data Request 79 Request: In the Company's Response to Production Request No. 15 — Attachment, "Field Ai-Field Asset Intelligence" has a total cost of$20,563,043. Please explain if that cost is Idaho allocated and at what percentage. If not, please provide Idaho allocated expenses. Additionally, please answer the following: (a) Please provide a detailed explanation for the need of the project, including the analysis justifying the need. (b) Please provide a list of all the potential alternatives the Company considered to fulfill the need and explain why the project was selected from among the alternatives supported by the Company's economic analysis (costs and benefits) comparing them. (c) If a RFP or RFQ was submitted, please provide the following: I. A copy of the RFP or RFQ that was submitted; II. A detailed explanation of the selection process including the scorecard and list of the criteria used to select the project; III. The short-list bidder scorecard; and IV. A copy of the winning bid. (d) Please provide the approved Project Plan including the: I. Initial and Actual project scope; a. Initial Scope: b. Actual Scope: II. Initial project budget; a. Initial Budget: III. Actual project cost; a. Actual Cost: IV. Initial and Actual schedule; a. Initial Schedule: b. Actual Schedule:. V. Evidence that the Initial Project Plan and budget were approved at the appropriate level; VI. Please explain any differences in budget to actual project costs; and VII. Please explain any slips in schedule from the baseline construction schedule. Response to IPUC Data Request 79 Field Ai is the title of a program comprised of multiple projects initiated to create workforce efficiencies and provide integrated asset information across systems in PAC-E-24-04/Rocky Mountain Power August 14, 2024 IPUC Data Request 79 the transmission & distribution (T&D) work and asset management space. One of the projects included in Field Ai program is `Maximo'. Maximo is a work and asset management solution. Note: When the Company refers to Maximo phase Ia, the Company also includes supporting applications that were implements to support the Maximo functionality (Powerbase, Splunk,App Dynamics). During the project lifecycle, Maximo was split out into different releases to accommodate project delivery needs. The Maximo Phase IA rollout for PacifiCorp was placed in-service July 18, 2022, enabling functionality for substation operations, including preventative maintenance scheduling and field inspection results collection. Note: The responses provided below are specific to the Maximo phase la project, which rolls up into the overall Field Ai program. The project Field Ai-Field Asset Intelligence is a system allocated project. The $20,563,043 reflects the amount in-service at the end of 2023. The Idaho allocated amount using an system overhead (SO) allocation factor of 5.3334 percent is $1,096,708. (a) The Maximo initiative is a key asset in the PacifiCorp technology roadmap. Updates are being conducted in alignment with peer Berkshire Hathaway Energy Company(BHE) affiliates to take advantage of economies of scale in security, licensing and maintenance for systems supporting similar business functions. As a part of the work and asset management assessment the Maximo solution was identified to meet the needs of PacifiCorp. PacifiCorp receives the benefits of enhanced data security, regulatory compliance and business scalability as BHE implements the new system infrastructure. Additionally, with the implementation a new work and asset management solution at PacifiCorp, Maximo will replace the existing mainframe-based Retail Construction Management System (RCMS). RCMS has become increasingly difficult to maintain and enhance, partially due to its antiquated architecture and its outdated programming language. (b) The identification of the new work and asset management system was conducted through a joint assessment with PacifiCorp and other BHE affiliates. The alternatives explored by the Company consisted of CGI, Oracle, and International Business Machine (IBM). The outcome of the evaluations showed that CGI and Oracle were unable to meet the technical evaluation criteria set-forth in the request for proposals (RFP). (c) Please refer to the Company's responses to subparts I. through IV. below: I. An RFP for the work management solution was facilitated by a BHE affiliate. Through that in-depth process IBM Maximo was the chosen PAC-E-24-04/Rocky Mountain Power August 14, 2024 IPUC Data Request 79 solution for work management at the BHE level, alongside Accenture as the chosen implementation partner. Post-RFP, Accenture spent time with PacifiCorp to confirm understanding of the PacifiCorp specific requirements and scoping for the Maximo implementation. II. Not available. III. Not available. IV.Not available. (d) Please refer to the Company's responses to subpart I. through VII. below: I. Initial Scope: Work Management capability using Maximo to document and schedule asset inspections, compliance, replacement, refurbishment, measurement, and records repository. Replace functionality currently provided by PacifiCorp's mainframe Facility Point Inspection system.* WHAT'S CHANGING: Overall The Asset and Work Management Implementation will deploy Maximo across PacifiCorp's T&D wires and substation businesses, simplifying processes across two releases.The diagrams below outlines the changes for each step in the work execution process that will occur in phase 1A and 1B.Maximo will be replacing and integrating the asset management functions that currently exist for work orders.Wires work will be performed how it is today,but the results will be stored in Maximo. INITIATE PLAN SCHEDULE/DISPATCH EXECUTE CLOSE ANALYSIS 0. Use of Work Orden Work Orders and Work Packages will be Work completion details Preventative Madmo Reports can be (Prevenlauva Material Reservabons electronic and available will be recorded in maintenance. set up by Work Order Maintenance. will be created in to field personnel via the Oracle's Field Services operations,corrective Charactersn-(such as Operations. Maximo,the remainder future mobility tool Forms and inspection maintenance and dates,owners,types. and ConecWe of the supply chain information will be capital Work Orders status.etc.) Maintenance)will move process will take place Maximo will auto- brought into Maximo will be marked as from SAP to Maximo in Oracle generate preventive completed in the future PAC will retain its maintenance work Capital work will be mobility tool,which will current geographical FPI'AFPR will be Task Lists wil become orders and streamline designed in BHE'S new automatically send the organizational structure, eliminated,and future Job Plans in Mawmo the creation of graphical work design completion information however.operations facility prints will be to designate the craft operations and toot AUD_Updated and data from districts will be referred placed Into Ai GIS associated win the corrective maintenance work order statuses will completed fors to to as service areas and work Zders be delivered with Maximo sub-districts will become Inspections and construction compaube sub areas in Maxim conditions will be x T&D Wires am Sub OPTIC will be replaced units to Maximo recorded via the future Ops instruction input is with Oracle Field mobility tool and needed.this would Sd,—s Scheduling Export design change conditions will be take place within along with the future data will integrate with tracked against Maximo mobility fool,which will AncGIS and Maximo Individual locations and interface with Maximo —1,in Ma[Imn Actual Scope: The Maximo Phase IA rollout for PacifiCorp enabled functionality for substation operations, including preventative maintenance scheduling and field inspection results collection. PAC-E-24-04/Rocky Mountain Power August 14, 2024 IPUC Data Request 79 WHAT'S CHANGING: Substation Operations Will impact-261employees in Phase3A INITIATE PLAN SCHEDULE/DISPATCH EXECUTE CLOSE ANALYSIS Use of W ork Orders Work Orders and Work Packages will be Work completion details Preventable Maximo Reports can be (Preventative Material Reservations available to field will be recorded in maintenance, set up by w oil.0,11• Maintenance, will be created in personnel dxough the Oracle's Field Services operations and Cnaractenst e (such as Operations 8 Corrective Maximo:although the existing dsmb t on Forms and inspection corrective maintenance dates.owners,types. Maintenance)will move remainder of the processes information wi be Work Orders will be status.etc.) from SAP to Maximo supply than process bought into Maximo completed,and will take place in SAP Maximo will auto- Oracle's Field Sewn PAC will retain as All locations and assets generate preventive Follow up work(that Forms will current geographical will be stored in Maximo Task Llata will become maintenance work turns capital)is not pan automatically send the organizational structure. Job Plats in Maximo orders of Phase 1A for Sub completion information however operations All relay firmware and to designate the craft Ops and will use and data from dtsblcis will be referred CIP data will migrate associated with the OPTIC will be replaced exonng work processes completed forms to to as service areas and Iran SAP to P,v:c 6— work with Oracle Field Maximo sub-districts wi become Services Scheduling. sub areas in Maximo If Sub Ops inawaion which will interface with mput is reeded,this Maximo would take place within Maximo II. $28,095,952* III. $20,563,043 IV.The initial schedule for Maximo T&D was to implement full functionality in early Q3 2022. Field Ai ©®®mmmmm000®®o�® Project Evo(Wave l): ✓Maximo(WAM,Joint Use) Note:Not dependent on Oracle decision,and Backbone Deployment ✓Asset Accounting/Custom SAP code technically could be a stand alone solution. ✓Integration work on PacifiCorp side Project Evo(Wave 2): ✓Project Evo(Scheduling,Mobility) Note:Solutions are dependent on Oracle decision, Full Track Deployment ✓for Graphical Work Design and requires backbone deployment. .NVE Gen ♦MEC T&D ♦PAC T&D Actual Schedule: The Maximo Phase lA rollout for PacifiCorp was placed in- service July 18, 2022. V. William J Fehrman signed a delegation of authority for his approval, not documented in-line in the image below, but represented with the overall "approved" status. Please refer to the table below: PAC-E-24-04/Rocky Mountain Power August 14, 2024 IPUC Data Request 79 APR Routing Status Report APR Number: 18002200 APR Tree Result Approver Name L. APR Description r vLT5 Approved 14 1SM2200 Field Ai-Field Asset Intelligence Program Q Approved Denise Holloway 1BW2200 0• Approved Allen Berreth 1BW2200 Q Approved Mark Paul 1SM2200 �► Approved Ernest Knudsen 18002200 ❑i Approved Matthew Weems 1BW2200 Q Approved Nikki Kobliha 1BW2200 ❑i Approved Nancy K Lahti 1BW2200 Q Approved Stefan Bird 1BW2200 �. Approved Nikki Kobliha 18002200 Q William J Fehrman 1BW2200 VI. Project costs were impacted due to the scope and schedule shift of the effort. VII. Due to limitations with the proposed mobility solution that would integrate with Maximo the decision was made to modify the PacifiCorp Maximo implementation schedule to realign transmission and distribution wires corrective and preventative maintenance scheduling with a Phase 1B rollout. a. Phase 1A rollout included substation operations: preventative maintenance scheduling and field inspection results collection. b. Phase 1B rollout will include T&D wires: corrective and preventative maintenance scheduling and field inspection results collection, along with construction and the appropriate mobility *Note the initial scope and budgets included a full Maximo T&D Implementation. The actual scope and budget reflect the implementation of functionality for a portion of that scope. Recordholder: Amanda Lindsay/Drew Smith Sponsor: To Be Determined