Loading...
HomeMy WebLinkAbout20240816Staff 69-73 to IPC.pdf RECEIVED Friday, August 16, 2024 10:29:57 AM IDAHO PUBLIC UTILITIES COMMISSION CHRIS BURDIN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO 83720-0074 (208) 334-0314 IDAHO BAR NO. 9810 Street Address for Express Mail: 11331 W CHINDEN BLVD, BLDG 8, SUITE 201-A BOISE, ID 83714 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE APPLICATION ) OF IDAHO POWER COMPANY TO ) CASE NO. IPC-E-24-07 INCREASE RATES FOR ELECTRIC ) SERVICE TO RECOVER COSTS ) ASSOCIATED WITH INCREMENTAL ) REDACTED TENTH CAPITAL INVESTMENTS AND CERTAIN ) PRODUCTION REQUEST OF ONGOING OPERATIONS AND ) THE COMMISSION STAFF TO MAINTENANCE EXPENSES ) IDAHO POWER COMPANY Staff of the Idaho Public Utilities Commission, by and through its attorney of record, Chris Burdin, Deputy Attorney General, requests that Idaho Power Company ("Company") provide the following documents and information as soon as possible, but no later than FRIDAY, SEPTEMBER 6, 2024. This Production Request is to be considered as continuing, and the Company is requested to provide,by way of supplementary responses, additional documents that it, or any person acting on its behalf, may later obtain that will augment the documents or information produced. Please provide answers to each question, supporting workpapers that provide detail or are the source of information used in calculations, and the name,job title, and telephone number of the person preparing the documents. Please also identify the name,job title, location, and telephone number of the record holder. TENTH PRODUCTION REQUEST TO IDAHO POWER COMPANY 1 AUGUST 16, 2024 In addition to the written copies provided as response to the requests,please provide all Excel spreadsheets and electronic files with formulas intact and enabled. REQUEST NO. 69: Please provide an excel spreadsheet with formulas intact listing all buyer construction costs incurred to date for the Franklin BESS project. This information should include date, amount, purpose, and payee. REQUEST NO. 70: Please provide a copy of the Interconnection Agreement for the Franklin BESS project. REQUEST NO. 71: Please provide the following for each of the BESS projects listed in Larkin workpaper 3 —incremental plant determination at 11. a. Please provide the AURORA long-term capacity expansion model results showing the cost-effectiveness of the Company's BESS resource compared to the resource Staff used to establish the soft cap, as described in Hackett Direct at 13. b. Please provide the forecasted portfolio capacity positions for the life of each project at time of the associated CPCN filing. c. Please indicate if the system is stand-alone or if it is paired with a renewable generation facility. For any system paired with renewable generation, please explain if the BESS resource is connected in series or in parallel to the generation facility. d. Please provide the actual build capacity excluding any overbuild or augmentation. e. Please provide any overbuild capacity, associated costs, and describe if the overbuild costs were included in the resource bid. f. Please provide a timeline showing planned augmentation, associated cost, and the augmentation amount. g. Please indicate the battery technology type, the associated maximum depth-of- discharge specification, the amount of reserved capacity, the assumed degradation for each year of plant life, the rated number of discharge cycles per year, and the source for each of these metrics (i.e. Company assumption, manufacturer warranty, etc.) TENTH PRODUCTION REQUEST TO IDAHO POWER COMPANY 2 AUGUST 16, 2024 h. Please explain the effect that the additional overbuild capacity will have on battery degradation and maximum dispatch time. i. Please provide a total project cost breakdown showing total project budget, total current spend, amounts already being recovered, ITC amounts received, and total budget previously closed. Please separate these project costs by AFUDC, overhead, and customer contribution categories. REQUEST NO. 72: Paragraphs 31 and 32 of the Company's Application explain the method used to estimate the incremental costs of the hypothetical distribution line approved in the 2017 CPCN. Application at 12. Please explain the following: a. Please explain why the Company removed "most of the distribution poles," rather than all the poles; and b. Please explain why the Company added the following two items: i. The replacement of a portion of the existing wood poles with taller, steel poles; and ii. Distribution intersect poles. REQUEST NO. 73: Please provide invoices for the sample selected in the confidential attachment titled "Jan-May Capital Project Invoice Sample". For selections not linked to specific invoices, please explain the accounting method used to determine the amount and provide calculations that determine the amount in Excel format. DATED at Boise, Idaho, this 16th day of August 2024. �4 �A Chris Burdin Deputy Attorney General 1:\Utility\UMISC\PRDREQ\IPC-E-24-07 PR#l0.docx TENTH PRODUCTION REQUEST TO IDAHO POWER COMPANY 3 AUGUST 16, 2024 Confidential Attachment No. 1 Jan-May Capital Project Invoice Sample Case No.IPC-E-24-07 Production Request No. 10 August 16,2024 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 16TH DAY OF AUGUST 2024, SERVED THE FOREGOING REDACTED TENTH PRODUCTION REQUEST OF THE COMMISSION STAFF TO IDAHO POWER COMPANY, IN CASE NO. IPC-E-24-07, BY E-MAILING A COPY THEREOF TO THE FOLLOWING: LISA D. NORDSTROM TIMOTHY TATUM DONOVAN E WALKER CONNIE ASCHENBRENNER MEGAN GOICOECHEA ALLEN MATT LARKIN IDAHO POWER COMPANY IDAHO POWER COMPANY PO BOX 70 PO BOX 70 BOISE ID 83707-0070 BOISE ID 83707-0070 E-MAIL: lnordstromcidahopower.com E-MAIL: ttatum(�vidahopower.com dwalkercidahopower.com caschenbrenner,c idahopower.com mgoicoecheaallencidahopower.coin mlarkin2,ldahopower.com docketscidahopower.com ERIC L OLSEN LANCE KAUFMAN PhD ECHO HAWK& OLSEN PLLC 2623 NW BLUEBELL PLACE PO BOX 6119 CORVALLIS OR 97330 POCATELLO ID 83205 E-MAIL: lance c aegi sins ight.com E-MAIL: elocechohawk.com PETER J RICHARDSON DR DON READING RICARDSON ADAMS PLLC 280 S SILVERWOOD WAY 515 N 27TH STREET EAGLE ID 83616 BOISE ID 83702 E-MAIL: dreading mindspring.com E-MAIL: peter;trichardsonadams.com MATTHEW NYKIEL BRAD HEUSINKVELD ID CONSERVATION LEAGUE ID CONSERVATION LEAGUE 710 N 6TH STREET 710 N 6TH STREET BOISE ID 83702 BOISE ID 83702 E-MAIL: matthew.nykiel(d,�gmail.com E-MAIL: heus ink veld(&idahoconsery ation.org PETER MEIER EMILY W MEDLYN US DEPT OF ENERGY US DEPT OF ENERGY 1000 INDEPENDENCE AVE SW 1000 INDEPENDENCE AVE SW WASHINGTON DC 20585 WASHINGTON DC 20585 E-MAIL: peter.meier(Cthq.doe.go`v' E-MAIL: Emil y.medlvn<c�hp doe.gov CERTIFICATE OF SERVICE JIM SWIER AUSTIN RUESCHHOFF MICRON TECHNOLOGY INC THORVALD A NELSON 8000 S FEDERAL WAY AUSTIN W JENSEN BOISE ID 83707 KRISTINE A.K. ROACH E-MAIL: iswier(-d,,micron.com HOLLAND & HART LLP 555 17TH ST STE 3200 DENVER CO 80202 E-MAIL: darueschhoff ihoollandhart.corgi tnelsonLr hollandhart.com awjensencholl andhart.corn karoachLt.,hollandhart.com acleeCahollandhart.corn mamemillew,'Lthollandhart.com ED JEWELL STEVEN HUBBLE DEPUTY CITY ATTORNEY BOISE CITY DEPT OF PUBLIC WORKS BOISE CITY ATTORNEY'S PO BOX 500 PO BOX 500 BOISE ID 83701-0500 BOISE ID 83701-0500 E-MAIL: shubbleLacityotboise.or.p, E-MAIL: ejewellLtcitvotboise.org boisecitvattorne_y c citvofboise.ort= PATRICIA JORDA , SECRETARY CERTIFICATE OF SERVICE