Loading...
HomeMy WebLinkAbout20240806IPC to Staff Response No. 31(d) - Attachment 3 - Status Reports - Construction Inspection.pdfOxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1 of 1851 Form detail Form detail report Created on Aug 1, 2024, 6:46 AM MDT Created by Zack Schaumburg (Idaho Power Company) Total items 339 Sorted by Form date (Descending) Filtered by Status (In progress|In review|Closed) Response to Staff Request No. 31d - Attachment 3 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 2 of 1851 Contents #385: Daily Report - Anderson ............................................................................................................................................9 #384: Daily Report -Standard ............................................................................................................................................15 #383: Daily Report -Standard ............................................................................................................................................20 #382: Daily Report - Anderson ..........................................................................................................................................26 #381: Daily Report - Anderson ..........................................................................................................................................32 #379: Daily Report -Standard ............................................................................................................................................37 #380: Daily Report - Anderson ..........................................................................................................................................40 #378: Daily Report -Standard ............................................................................................................................................45 #377: Daily Report -Standard ............................................................................................................................................51 #376: Daily Report -Standard ............................................................................................................................................56 #375: Daily Report -Standard ............................................................................................................................................60 #374: Daily Report -Standard ............................................................................................................................................66 #373: Daily Report -Standard ............................................................................................................................................71 #372: Daily Report -Standard ............................................................................................................................................77 #371: Daily Report -Standard ............................................................................................................................................82 #370: Daily Report - Anderson ..........................................................................................................................................85 #369: Daily Report - Anderson ..........................................................................................................................................90 #368: Daily Report -Standard ............................................................................................................................................96 #367: Daily Report -Standard ..........................................................................................................................................102 #366: Daily Report -Standard ..........................................................................................................................................107 #365: Daily Report -Standard ..........................................................................................................................................111 #364: Daily Report -Standard ..........................................................................................................................................116 #362: Daily Report - Anderson ........................................................................................................................................120 #360: Daily Report -Standard ..........................................................................................................................................127 #359: Daily Report - Anderson ........................................................................................................................................131 #358: Daily Report - Anderson ........................................................................................................................................138 #357: Daily Report -Standard ..........................................................................................................................................144 #356: Daily Report -Standard ..........................................................................................................................................150 #355: Daily Report -Standard ..........................................................................................................................................155 #354: Daily Report -Standard ..........................................................................................................................................159 #353: Daily Report -Standard ..........................................................................................................................................162 #352: Daily Report -Standard ..........................................................................................................................................167 #351: Daily Report -Standard ..........................................................................................................................................171 #350: Daily Report -Standard ..........................................................................................................................................177 #349: Daily Report - Anderson ........................................................................................................................................182 #348: Daily Report - Anderson ........................................................................................................................................188 #347: Daily Report -Standard ..........................................................................................................................................193 #346: Daily Report -Standard ..........................................................................................................................................198 #345: Daily Report -Standard ..........................................................................................................................................203 #344: Daily Report -Standard ..........................................................................................................................................208 #343: Daily Report -Standard ..........................................................................................................................................213 #342: Daily Report -Standard ..........................................................................................................................................218 #341: Daily Report - Anderson ........................................................................................................................................223 #340: Daily Report - Anderson ........................................................................................................................................229 #338: Daily Report -Standard ..........................................................................................................................................236 #339: Daily Report - Anderson ........................................................................................................................................241 #337: Daily Report -Standard ..........................................................................................................................................244 #336: Daily Report -Standard ..........................................................................................................................................249 #335: Daily Report -Standard ..........................................................................................................................................253 FORMS 328 - 385 WERE COMPLETED BY IDAHO POWER COMPANY FIELD ENGINEER AND CONSTRUCTION INSPECTOR. THEY HAVE BEEN REMOVED FROM THE REPORT. ZACK SCHAUMBURG IDAHO POWER COMPANY 2024.08.01 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 3 of 1851 #334: Daily Report -Standard ..........................................................................................................................................256 #333: Daily Report -Standard ..........................................................................................................................................259 #330: Daily Report -Standard ..........................................................................................................................................261 #329: Daily Report -Standard ..........................................................................................................................................263 #327: Daily Report -Standard ..........................................................................................................................................268 #326: Daily Report -Standard ..........................................................................................................................................273 #325: Daily Report -Standard ..........................................................................................................................................281 #324: Daily Report -Standard ..........................................................................................................................................286 #323: Daily Report -Standard ..........................................................................................................................................292 #322: Daily Report -Standard ..........................................................................................................................................297 #320: Daily Report -Standard ..........................................................................................................................................303 #321: Daily Report -Standard ..........................................................................................................................................309 #319: Daily Report -Standard ..........................................................................................................................................314 #318: Daily Report -Standard ..........................................................................................................................................321 #317: Daily Report -Standard ..........................................................................................................................................328 #316: Daily Report -Standard ..........................................................................................................................................334 #315: Daily Report -Standard ..........................................................................................................................................338 #314: Daily Report -Standard ..........................................................................................................................................344 #313: Daily Report -Standard ..........................................................................................................................................354 #312: Daily Report -Standard ..........................................................................................................................................357 #311: Daily Report -Standard ..........................................................................................................................................364 #310: Daily Report -Standard ..........................................................................................................................................374 #308: Daily Report -Standard ..........................................................................................................................................377 #307: Daily Report -Standard ..........................................................................................................................................383 #306: Daily Report -Standard ..........................................................................................................................................389 #305: Daily Report -Standard ..........................................................................................................................................397 #304: Daily Report -Standard ..........................................................................................................................................404 #303: Daily Report -Standard ..........................................................................................................................................408 #302: Daily Report -Standard ..........................................................................................................................................414 #300: Daily Report -Standard ..........................................................................................................................................421 #299: Daily Report -Standard ..........................................................................................................................................426 #297: Daily Report -Standard ..........................................................................................................................................433 #296: Daily Report -Standard ..........................................................................................................................................439 #294: Daily Report -Standard ..........................................................................................................................................450 #293: Daily Report -Standard ..........................................................................................................................................455 #292: Daily Report -Standard ..........................................................................................................................................463 #291: Daily Report -Standard ..........................................................................................................................................470 #290: Daily Report -Standard ..........................................................................................................................................475 #289: Daily Report -Standard ..........................................................................................................................................480 #288: Daily Report -Standard ..........................................................................................................................................484 #287: Daily Report -Standard ..........................................................................................................................................489 #286: Daily Report -Standard ..........................................................................................................................................493 #285: Daily Report -Standard ..........................................................................................................................................499 #284: Daily Report -Standard ..........................................................................................................................................504 #283: Daily Report -Standard ..........................................................................................................................................509 #282: Daily Report -Standard ..........................................................................................................................................515 #281: Daily Report -Standard ..........................................................................................................................................521 #280: Daily Report -Standard ..........................................................................................................................................531 #279: Daily Report -Standard ..........................................................................................................................................543 #278: Daily Report -Standard ..........................................................................................................................................546 #277: Daily Report -Standard ..........................................................................................................................................552 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 4 of 1851 #276: Daily Report -Standard ..........................................................................................................................................560 #275: Daily Report -Standard ..........................................................................................................................................566 #274: Daily Report -Standard ..........................................................................................................................................573 #273: Daily Report -Standard ..........................................................................................................................................584 #272: Daily Report -Standard ..........................................................................................................................................593 #271: Daily Report -Standard ..........................................................................................................................................604 #270: Daily Report -Standard ..........................................................................................................................................614 #269: Daily Report -Standard ..........................................................................................................................................625 #268: Daily Report -Standard ..........................................................................................................................................636 #267: Daily Report -Standard ..........................................................................................................................................644 #266: Daily Report -Standard ..........................................................................................................................................646 #265: Daily Report -Standard ..........................................................................................................................................654 #264: Daily Report -Standard ..........................................................................................................................................660 #263: Daily Report -Standard ..........................................................................................................................................666 #262: Daily Report -Standard ..........................................................................................................................................672 #261: Daily Report -Standard ..........................................................................................................................................679 #259: Daily Report -Standard ..........................................................................................................................................684 #260: Daily Report -Standard ..........................................................................................................................................688 #258: Daily Report -Standard ..........................................................................................................................................693 #257: Daily Report -Standard ..........................................................................................................................................696 #256: Daily Report -Standard ..........................................................................................................................................701 #255: Daily Report -Standard ..........................................................................................................................................709 #254: Daily Report -Standard ..........................................................................................................................................714 #253: Daily Report -Standard ..........................................................................................................................................719 #252: Daily Report -Standard ..........................................................................................................................................729 #251: Daily Report -Standard ..........................................................................................................................................735 #250: Daily Report -Standard ..........................................................................................................................................742 #249: Daily Report -Standard ..........................................................................................................................................748 #248: Daily Report -Standard ..........................................................................................................................................754 #247: Daily Report -Standard ..........................................................................................................................................759 #245: Daily Report -Standard ..........................................................................................................................................763 #244: Daily Report -Standard ..........................................................................................................................................767 #243: Daily Report -Standard ..........................................................................................................................................773 #242: Daily Report -Standard ..........................................................................................................................................777 #241: Daily Report -Standard ..........................................................................................................................................784 #240: Daily Report -Standard ..........................................................................................................................................788 #239: Daily Report -Standard ..........................................................................................................................................798 #238: Daily Report -Standard ..........................................................................................................................................807 #237: Daily Report -Standard ..........................................................................................................................................813 #236: Daily Report -Standard ..........................................................................................................................................819 #235: Daily Report -Standard ..........................................................................................................................................824 #234: Daily Report -Standard ..........................................................................................................................................837 #233: Daily Report -Standard ..........................................................................................................................................847 #232: Daily Report -Standard ..........................................................................................................................................854 #231: Daily Report -Standard ..........................................................................................................................................856 #229: Daily Report -Standard ..........................................................................................................................................866 #230: Daily Report -Standard ..........................................................................................................................................868 #228: Daily Report -Standard ..........................................................................................................................................877 #227: Daily Report -Standard ..........................................................................................................................................881 #226: Daily Report -Standard ..........................................................................................................................................885 #225: Daily Report -Standard ..........................................................................................................................................893 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 5 of 1851 #224: Daily Report -Standard ..........................................................................................................................................898 #223: Daily Report -Standard ..........................................................................................................................................908 #222: Daily Report -Standard ..........................................................................................................................................913 #221: Daily Report -Standard ..........................................................................................................................................920 #220: Daily Report -Standard ..........................................................................................................................................927 #219: Daily Report -Standard ..........................................................................................................................................932 #218: Daily Report -Standard ..........................................................................................................................................935 #217: Daily Report -Standard ..........................................................................................................................................944 #216: Daily Report -Standard ..........................................................................................................................................950 #215: Daily Report -Standard ..........................................................................................................................................960 #214: Daily Report -Standard ..........................................................................................................................................966 #213: Daily Report -Standard ..........................................................................................................................................969 #212: Daily Report -Standard ..........................................................................................................................................979 #211: Daily Report -Standard ..........................................................................................................................................987 #210: Daily Report -Standard .......................................................................................................................................1001 #209: Daily Report -Standard .......................................................................................................................................1004 #207: Daily Report -Standard .......................................................................................................................................1007 #206: Daily Report -Standard .......................................................................................................................................1012 #205: Daily Report -Standard .......................................................................................................................................1018 #204: Daily Report -Standard .......................................................................................................................................1023 #203: Daily Report -Standard .......................................................................................................................................1031 #202: Daily Report -Standard .......................................................................................................................................1033 #201: Daily Report -Standard .......................................................................................................................................1040 #200: Daily Report -Standard .......................................................................................................................................1051 #199: Daily Report -Standard .......................................................................................................................................1067 #198: Daily Report -Standard .......................................................................................................................................1070 #197: Daily Report -Standard .......................................................................................................................................1075 #196: Daily Report -Standard .......................................................................................................................................1081 #195: Daily Report -Standard .......................................................................................................................................1089 #194: Daily Report -Standard .......................................................................................................................................1101 #193: Daily Report -Standard .......................................................................................................................................1113 #192: Daily Report -Standard .......................................................................................................................................1115 #190: Daily Report -Standard .......................................................................................................................................1123 #191: Daily Report -Standard .......................................................................................................................................1127 #189: Daily Report -Standard .......................................................................................................................................1134 #188: Daily Report -Standard .......................................................................................................................................1136 #187: Daily Report -Standard .......................................................................................................................................1140 #185: Daily Report -Standard .......................................................................................................................................1146 #186: Daily Report -Standard .......................................................................................................................................1152 #184: Daily Report -Standard .......................................................................................................................................1159 #183: Daily Report -Standard .......................................................................................................................................1165 #182: Daily Report -Standard .......................................................................................................................................1172 #181: Daily Report -Standard .......................................................................................................................................1177 #180: Daily Report -Standard .......................................................................................................................................1182 #179: Daily Report -Standard .......................................................................................................................................1189 #178: Daily Report -Standard .......................................................................................................................................1193 #177: Daily Report -Standard .......................................................................................................................................1200 #176: Daily Report -Standard .......................................................................................................................................1202 #174: Daily Report -Standard .......................................................................................................................................1209 #175: Daily Report -Standard .......................................................................................................................................1215 #173: Daily Report -Standard .......................................................................................................................................1221 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 6 of 1851 #172: Daily Report -Standard .......................................................................................................................................1224 #171: Daily Report -Standard .......................................................................................................................................1232 #170: Daily Report -Standard .......................................................................................................................................1239 #169: Daily Report -Standard .......................................................................................................................................1244 #168: Daily Report -Standard .......................................................................................................................................1250 #167: Daily Report -Standard .......................................................................................................................................1258 #166: Daily Report -Standard .......................................................................................................................................1263 #165: Daily Report -Standard .......................................................................................................................................1274 #164: Daily Report -Standard .......................................................................................................................................1280 #163: Daily Report -Standard .......................................................................................................................................1286 #162: Daily Report -Standard .......................................................................................................................................1291 #161: Daily Report -Standard .......................................................................................................................................1296 #159: Daily Report -Standard .......................................................................................................................................1302 #158: Daily Report -Standard .......................................................................................................................................1308 #157: Daily Report -Standard .......................................................................................................................................1316 #156: Daily Report -Standard .......................................................................................................................................1321 #155: Daily Report -Standard .......................................................................................................................................1323 #154: Daily Report -Standard .......................................................................................................................................1334 #153: Daily Report -Standard .......................................................................................................................................1341 #152: Daily Report -Standard .......................................................................................................................................1351 #151: Daily Report -Standard .......................................................................................................................................1357 #150: Daily Report -Standard .......................................................................................................................................1367 #149: Daily Report -Standard .......................................................................................................................................1376 #148: Daily Report -Standard .......................................................................................................................................1390 #147: Daily Report -Standard .......................................................................................................................................1397 #146: Daily Report -Standard .......................................................................................................................................1403 #145: Daily Report -Standard .......................................................................................................................................1409 #144: Daily Report -Standard .......................................................................................................................................1413 #143: Daily Report -Standard .......................................................................................................................................1417 #142: Daily Report -Standard .......................................................................................................................................1423 #141: Daily Report -Standard .......................................................................................................................................1428 #140: Daily Report -Standard .......................................................................................................................................1434 #139: Daily Report -Standard .......................................................................................................................................1440 #138: Daily Report -Standard .......................................................................................................................................1445 #137: Daily Report -Standard .......................................................................................................................................1452 #135: Daily Report -Standard .......................................................................................................................................1456 #134: Daily Report -Standard .......................................................................................................................................1460 #133: Daily Report -Standard .......................................................................................................................................1467 #132: Daily Report -Standard .......................................................................................................................................1472 #131: Daily Report -Standard .......................................................................................................................................1478 #130: Daily Report -Standard .......................................................................................................................................1481 #129: Daily Report -Standard .......................................................................................................................................1489 #128: Daily Report -Standard .......................................................................................................................................1494 #127: Daily Report -Standard .......................................................................................................................................1502 #126: Daily Report -Standard .......................................................................................................................................1506 #125: Daily Report -Standard .......................................................................................................................................1512 #124: Daily Report -Standard .......................................................................................................................................1517 #123: Daily Report -Standard .......................................................................................................................................1522 #122: Daily Report -Standard .......................................................................................................................................1529 #121: Daily Report -Standard .......................................................................................................................................1534 #120: Daily Report -Standard .......................................................................................................................................1539 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 7 of 1851 #119: Daily Report -Standard .......................................................................................................................................1543 #118: Daily Report -Standard .......................................................................................................................................1547 #117: Daily Report -Standard .......................................................................................................................................1550 #114: Daily Report -Standard .......................................................................................................................................1555 #113: Daily Report -Standard .......................................................................................................................................1561 #111: Daily Report -Standard .......................................................................................................................................1564 #109: Daily Report -Standard .......................................................................................................................................1566 #108: Daily Report -Standard .......................................................................................................................................1568 #107: Daily Report -Standard .......................................................................................................................................1572 #106: Daily Report -Standard .......................................................................................................................................1576 #105: Daily Report -Standard .......................................................................................................................................1578 #104: Daily Report -Standard .......................................................................................................................................1581 #103: Daily Report -Standard .......................................................................................................................................1586 #102: Daily Report -Standard .......................................................................................................................................1592 #101: Daily Report -Standard .......................................................................................................................................1595 #100: Daily Report -Standard .......................................................................................................................................1598 #99: Daily Report -Standard ..........................................................................................................................................1601 #98: Daily Report -Standard ..........................................................................................................................................1606 #96: Daily Report -Standard ..........................................................................................................................................1611 #95: Daily Report -Standard ..........................................................................................................................................1613 #94: Daily Report -Standard ..........................................................................................................................................1617 #92: Daily Report -Standard ..........................................................................................................................................1622 #91: Daily Report -Standard ..........................................................................................................................................1626 #90: Daily Report -Standard ..........................................................................................................................................1634 #89: Daily Report -Standard ..........................................................................................................................................1638 #88: Daily Report -Standard ..........................................................................................................................................1642 #87: Daily Report -Standard ..........................................................................................................................................1647 #86: Daily Report -Standard ..........................................................................................................................................1652 #85: Daily Report -Standard ..........................................................................................................................................1656 #84: Daily Report -Standard ..........................................................................................................................................1660 #83: Daily Report -Standard ..........................................................................................................................................1664 #82: Daily Report -Standard ..........................................................................................................................................1668 #81: Daily Report -Standard ..........................................................................................................................................1673 #80: Daily Report -Standard ..........................................................................................................................................1677 #79: Daily Report -Standard ..........................................................................................................................................1680 #78: Daily Report -Standard ..........................................................................................................................................1683 #77: Daily Report -Standard ..........................................................................................................................................1686 #76: Daily Report -Standard ..........................................................................................................................................1689 #75: Daily Report -Standard ..........................................................................................................................................1692 #73: Daily Report -Standard ..........................................................................................................................................1695 #72: Daily Report -Standard ..........................................................................................................................................1699 #71: Daily Report -Standard ..........................................................................................................................................1703 #70: Daily Report -Standard ..........................................................................................................................................1707 #69: Daily Report -Standard ..........................................................................................................................................1710 #67: Daily Report -Standard ..........................................................................................................................................1714 #68: Daily Report -Standard ..........................................................................................................................................1718 #66: Daily Report -Standard ..........................................................................................................................................1722 #65: Daily Report -Standard ..........................................................................................................................................1726 #64: Daily Report -Standard ..........................................................................................................................................1730 #63: Daily Report -Standard ..........................................................................................................................................1733 #62: Daily Report -Standard ..........................................................................................................................................1735 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 8 of 1851 #59: Daily Report -Standard ..........................................................................................................................................1738 #58: Daily Report -Standard ..........................................................................................................................................1742 #57: Daily Report -Standard ..........................................................................................................................................1746 #55: Daily Report -Standard ..........................................................................................................................................1750 #53: Daily Report -Standard ..........................................................................................................................................1755 #54: Daily Report -Standard ..........................................................................................................................................1760 #52: Daily Report -Standard ..........................................................................................................................................1764 #51: Daily Report -Standard ..........................................................................................................................................1768 #50: Daily Report -Standard ..........................................................................................................................................1772 #49: Daily Report -Standard ..........................................................................................................................................1776 #48: Daily Report -Standard ..........................................................................................................................................1779 #47: Daily Report -Standard ..........................................................................................................................................1782 #46: Daily Report -Standard ..........................................................................................................................................1786 #45: Daily Report -Standard ..........................................................................................................................................1791 #44: Daily Report -Standard ..........................................................................................................................................1796 #42: Daily Report -Standard ..........................................................................................................................................1799 #41: Daily Report -Standard ..........................................................................................................................................1802 #39: Daily Report -Standard ..........................................................................................................................................1805 #37: Daily Report -Standard ..........................................................................................................................................1808 #40: Daily Report -Standard ..........................................................................................................................................1812 #36: Daily Report -Standard ..........................................................................................................................................1814 #34: Daily Report -Standard ..........................................................................................................................................1817 #33: Daily Report -Standard ..........................................................................................................................................1821 #32: Daily Report -Standard ..........................................................................................................................................1825 #31: Daily Report -Standard ..........................................................................................................................................1827 #30: Daily Report -Standard ..........................................................................................................................................1830 #28: Daily Report -Standard ..........................................................................................................................................1833 #29: Daily Report -Standard ..........................................................................................................................................1836 #27: Daily Report -Standard ..........................................................................................................................................1838 #24: Daily Report -Standard ..........................................................................................................................................1840 #21: Daily Report -Standard ..........................................................................................................................................1842 #26: Daily Report -Standard ..........................................................................................................................................1844 #25: Daily Report -Standard ..........................................................................................................................................1846 #22: Daily Report -Standard ..........................................................................................................................................1848 #23: Daily Report -Standard ..........................................................................................................................................1850 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 268 of 1851 Form detail #327: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 10, Strip Forms, set forms Area 40, Form Walls, Bulkheads Area 50, Set Structural Beams IMCO, General Crew 1 10 Area 10, Install site piping Area 40, Crowder Rails, Crowder Frame install Vale Electric, Electricians 3 10 Area 60, Electrical Room, pull wire Forms Location Form date Apr 4, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Apr 4, 2024, 12:01 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 269 of 1851 Crew # Workers # Total hours Work performed Basin Masonry 10 10 Area 50, place 2nd half the 3rd lift grout, set block Totals 22 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Site piping Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Site grading Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Area 50, Set Beams Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 50, Grout Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 270 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is getting ready to place the structural beams for the second floor of Area 50. Basin is onsite and starting to set block on the single story side of Area 50. 9:00 am IMCO tried setting a beam but the bolts were slightly out of plumb. IMCO is working on reaming the holes on the beams to slightly bigger so they will fit over the bolts. 10:00 am Vale is continuing to work in the electrical room along with the chiller room. They are installing raceways and pulling wire. 12:00 pm IMCO has set beams for the second story of Area 50. Basin is working on setting block at the single story side of Area 50. Left site to return cylinders, grout and unit prisms. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 271 of 1851 References Photos (3) 20240404_071629 Taken on Apr 4, 2024, 7:16 AM MDT Added on Apr 4, 2024, 11:27 AM MDT Added by Chris Johnson 20240404_111051 Taken on Apr 4, 2024, 11:10 AM MDT Added on Apr 4, 2024, 11:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 272 of 1851 20240404_084002 Taken on Apr 4, 2024, 8:40 AM MDT Added on Apr 4, 2024, 11:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 273 of 1851 Form detail #326: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls, Bulkheads IMCO, General Crew 1 10 Area 10, Install site piping Area 40, Crowder Rails, Crowder Frame install Vale Electric, Electricians 3 10 Area 50, Work with Masons on Box Placement Area 60, Electrical Room, pull wire Forms Location Form date Apr 3, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Apr 4, 2024, 6:32 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 274 of 1851 Crew # Workers # Total hours Work performed Basin Masonry 10 10 Area 50, place half the 3rd lift grout, set block Totals 22 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Site piping Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Site grading Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 50, Grout Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 275 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is starting to excavate for piping from the SS lift station along with storm lines in front of Area 60. They are continuing to work on getting piping installed around the building so they can backfill and get up to grade to begin the exterior slab placements. 9:00 am Attended weekly meeting. 10:00 am Basin is continuing to work on laying block. Ivan is waiting for his new line pump to arrive to grout what is installed. 11:00 am Basin is working on installing the bolted embeds for the second story beams that support the pan decking and second floor. They are cutting out the block and prepping for the plate installation. I spoke to Ivan regarding the grout placement. He plans to grout half the bond beam today but is waiting for the pump to arrive. They are getting a new pump delivered due to their current pump not working very well over the past two placements. 1:00 pm IMCO is working on installing piping around Area 60. The grout pump has arrived on site. Basin plans to grout in a few hours. 3:00 pm Basin has started placing grout. I took a sample for grout strength testing. 4:00 pm I met with Steve regarding the beam embeds in the CMU wall. They are checking them and adjusting them as they are placing grout. Steve and I double checked the beams that are onsite to ensure the embeds are getting placed in the correct locations. 5:00 pm Basin has completed the grout placement. They will place the rest of this bond beam tomorrow once the block that was laid today sets up. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 276 of 1851 References Photos (9) 20240403_150954 Taken on Apr 3, 2024, 3:09 PM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson 20240403_115825 Taken on Apr 3, 2024, 11:58 AM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 277 of 1851 20240403_105511 Taken on Apr 3, 2024, 10:55 AM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson 20240403_105047 Taken on Apr 3, 2024, 10:50 AM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 278 of 1851 20240403_105014 Taken on Apr 3, 2024, 10:50 AM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson 20240403_104943 Taken on Apr 3, 2024, 10:49 AM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 279 of 1851 20240403_161815 Taken on Apr 3, 2024, 4:18 PM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson 20240403_154432 Taken on Apr 3, 2024, 3:44 PM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 280 of 1851 20240403_131115 Taken on Apr 3, 2024, 1:11 PM MDT Added on Apr 4, 2024, 6:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 281 of 1851 Form detail #325: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 10, Place CIP Wall Area 40, Form Walls, Bulkheads, Place Concrete IMCO, General Crew 1 10 Area 10, Batch concrete Area 40, Crowder Rails, Crowder Frame install Vale Electric, Electricians 3 10 Area 50, Work with Masons on Box Placement Area 60, Electrical Room, pull wire Forms Location Form date Apr 2, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Apr 3, 2024, 6:55 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 282 of 1851 Crew # Workers # Total hours Work performed Basin Masonry 10 10 Area 50, set block Totals 22 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 40, Concrete Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 283 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am Pump truck is onsite and setting up. IMCO is starting to batch concrete. 9:00 am IMCO has batched concrete. Teddy Ertel, HMH Engineering, has taken the sample and tested. All passed with no issues. IMCO is starting to place the retaining wall sections. 10:00 am Basin is continuing to install block at Area 50. They are still planning to place grout tomorrow. 12:00 pm IMCO is continuing to place concrete. They are placing wall sections at Area 40. 1:00 pm Vale is onsite continuing to pull wire and run raceways at Area 60. 3:00 pm IMCO is continuing to assemble the raceway crowders. Sawtooth is onsite helping. 4:30 pm IMCO is continuing to work on forming walls and bulkheads at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 284 of 1851 References Photos (3) 20240402_124101 Taken on Apr 2, 2024, 12:41 PM MDT Added on Apr 3, 2024, 6:47 AM MDT Added by Chris Johnson 20240402_095701 Taken on Apr 2, 2024, 9:57 AM MDT Added on Apr 3, 2024, 6:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 285 of 1851 20240402_142438 Taken on Apr 2, 2024, 2:24 PM MDT Added on Apr 3, 2024, 6:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 286 of 1851 Form detail #324: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls, Bulkheads Area 60, Foundation Membrane IMCO, General Crew 1 10 Area 40, Crowder Rails, Crowder Frame install Vale Electric, Electricians 3 10 Area 50, Work with Masons on Box Placement Area 60, Electrical Room, pull wire Forms Location Form date Apr 1, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Apr 2, 2024, 7:20 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 287 of 1851 Crew # Workers # Total hours Work performed Basin Masonry 10 10 Area 50, place 2nd lift grout, set block Totals 22 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 50, Grout Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 288 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:30 am IMCO is continuing to work on forming walls and bulkheads at Area 40. Steve informed me they are still planning to have a concrete placement tomorrow. They are going to capture Area 40 walls along with Area 10 CIP Retaining walls. 9:30 am I spoke to Ivan from Basin Masonry. He has reached the next grout placement and plans to pour grout today. 12:00 pm Basin has batched a truck of grout for the next grout placement. 1:30 pm Basin had issues with their line pump. They are starting to place the grout in the block now. I have taken my second grout sample for compressive strength testing. Vale is onsite working on pulling wire at Area 60. 3:30 pm Basin had to batch a small load of grout to finish the grout placement. They are finishing up the placement now. Ivan casted 3 unit strength prims and filled them with grout. These are for the 8" block requirement. 4:30 pm Basin has resumed setting block. They are working towards the next bond beam that is at second floor level. IMCO has installed the waterproof membrane and drain fabric at the river side of Area 60. They plan to backfill this tomorrow after it cures. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 289 of 1851 References Photos (5) 20240401_144943 Taken on Apr 1, 2024, 2:49 PM MDT Added on Apr 2, 2024, 7:10 AM MDT Added by Chris Johnson 20240401_120622 Taken on Apr 1, 2024, 12:06 PM MDT Added on Apr 2, 2024, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 290 of 1851 20240401_094120 Taken on Apr 1, 2024, 9:41 AM MDT Added on Apr 2, 2024, 7:09 AM MDT Added by Chris Johnson 20240401_092848 Taken on Apr 1, 2024, 9:28 AM MDT Added on Apr 2, 2024, 7:09 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 291 of 1851 20240401_144947 Taken on Apr 1, 2024, 2:49 PM MDT Added on Apr 2, 2024, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 292 of 1851 Form detail #323: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls, Bulkheads, Place 2 Walls IMCO, General Crew 1 10 Area 10, Excavate and compact for mesa wall 3 Area 40, Crowder Rails, Crowder Frame install Vale Electric, Electricians 3 10 Area 50, Work with Masons on Box Placement Area 60, Electrical Room, pull wire Forms Location Form date Mar 28, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 29, 2024, 8:11 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 293 of 1851 Crew # Workers # Total hours Work performed Basin Masonry 10 10 Area 50, Setup for the 2nd lift Totals 22 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Mesa Wall Deere 644J Loader 1 5 Area 40, Batch Concrete Hitachi 85 Excavator 1 5 Area 10, Mesa Wall 2 excavation Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 40, Concrete Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 294 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is planning to place concrete today at Area 40. They are continuing to work on setting wall forms and bulkheads. 9:00 am IMCO has batched the first truck. They will only be able to capture 2 wall sections today due to the muddy conditions onsite. The pump truck does not want to take the risk of getting stuck in the mud to move to the other side of Area 40 to reach the other wall sections. I tested the first truck, it passed with no issues. 11:00 am IMCO has completed the concrete placement for the day. Basin is onsite. I spoke to Ivan regarding his schedule. He plans to setup scaffolding and layout block today. He wants to finish the grout placement that was not completed yesterday due to line pump plugging up. He plans to continue setting block tomorrow with the next grout placement on Monday. 2:00 pm IMCO is working on the foundation drain and backfilling along Area 60. Basin Masonry is mixing a small batch of grout to finish the placement from yesterday. They are batching it with their mortar mixer and dumping it in the wall with buckets. 4:00 pm IMCO is continuing to work on forming walls at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 295 of 1851 References Photos (4) 20240328_145232 Taken on Mar 28, 2024, 2:52 PM MDT Added on Mar 29, 2024, 8:10 AM MDT Added by Chris Johnson 20240328_142709 Taken on Mar 28, 2024, 2:27 PM MDT Added on Mar 29, 2024, 8:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 296 of 1851 20240328_074551 Taken on Mar 28, 2024, 7:45 AM MDT Added on Mar 29, 2024, 8:10 AM MDT Added by Chris Johnson 20240328_074549 Taken on Mar 28, 2024, 7:45 AM MDT Added on Mar 29, 2024, 8:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 297 of 1851 Form detail #322: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 10, CIP Wall Forming Area 40, Form Walls, Bulkheads IMCO, General Crew 1 10 Area 10, Excavate and compact for mesa wall 3 Area 40, Crowder Rails, Crowder Frame install Vale Electric, Electricians 3 10 Area 50, Work with Masons on Box Placement Area 60, Electrical Room, pull wire Forms Location Form date Mar 27, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 28, 2024, 6:33 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 298 of 1851 Crew # Workers # Total hours Work performed Basin Masonry 10 10 Area 50, Reinforced Masonry, First Grout placement - Did not complete entire placement Totals 22 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Mesa Wall Deere 644J Loader 1 10 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 50, Grout Mixing Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 299 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work dig out in front of Area 60 to exposed the foundation wall. They are doing this so they can install the waterproof membrane to the wall then the drainage fabric. They are taking care for this work to avoid the alarm line Vale installed after the foundation was poured. Basin Masonry is starting to arrive to begin work. They are getting ready to continue installing block walls. I asked Ivan if he planned to pour grout today. He informed me they will see how today goes. 9:00 am Attended weekly meeting. 11:00 am Basin Masonry is continuing to work on installing the block. They have most of the first lift installed. They are starting to batch grout using the batch plant and super sack bags of grout. It is starting to rain. 12:30 pm Basin has the first truck batched and starting to pump grout into the first lift. I have taken a sample and casted 4 grout prisms. Basin has laid and grouted 3 unit strength prisms for strength testing. It is continuing to rain. I had a discussion with Jeremey regarding the limits of rain and masonry work. He was unsure what the allowable rain was for masonry work. 1:00 pm Basin has ran out of grout and needed to batch more. It is continuing to rain. 3:00 pm Basin had a line pump issue. They were not able to finish the grout placement today. They got majority of the placement complete but was unable to finish. They are cleaning up for the day. IMCO Crews are continuing to work on forming wall panels for tomorrows concrete placement. The heavy rain is continuing. 4:00 pm IMCO is continuing to work on forming walls at Area 40. They have also set one of the crowder frames on the rails. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 300 of 1851 References Photos (5) 20240327_102833 Taken on Mar 27, 2024, 10:28 AM MDT Added on Mar 28, 2024, 6:31 AM MDT Added by Chris Johnson 20240327_124435 Taken on Mar 27, 2024, 12:44 PM MDT Added on Mar 28, 2024, 6:31 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 301 of 1851 20240327_124421 Taken on Mar 27, 2024, 12:44 PM MDT Added on Mar 28, 2024, 6:31 AM MDT Added by Chris Johnson 20240327_121700 Taken on Mar 27, 2024, 12:17 PM MDT Added on Mar 28, 2024, 6:31 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 302 of 1851 20240327_121655 Taken on Mar 27, 2024, 12:16 PM MDT Added on Mar 28, 2024, 6:31 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 303 of 1851 Form detail #320: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 10, CIP Wall Forming Area 40, Form Walls, Bulkheads IMCO, General Crew 1 10 Area 10, Mesa Wall 2 Area 40, Crowder Rails Vale Electric, Electricians 3 10 Area 50, Work with Masons on Box Placement Area 60, Electrical Room, pull wire Forms Location Form date Mar 26, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 26, 2024, 6:26 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 304 of 1851 Crew # Workers # Total hours Work performed Stucco Systems 2 10 Area 60, Stucco Ceiling in Incubation Basin Masonry 10 10 Area 50, Reinforced Masonry Totals 24 50 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Mesa Wall Deere 644J Loader 1 10 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 305 of 1851 Equipment Quantity Hours used Comment Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 2:00 pm Arrived on site. IMCO is working on forming walls at Area 40 and CIP at Area 10. The masons have started on Area 50. 3:00 pm I reviewed a bit of the plan with IMCO and the masons. They got a later start today than anticipated so they are pushing the first grout placement back to Wednesday at noon. It was originally scheduled for tomorrow (Tuesday) at 330. The masons are currently working on the corners and setting up scaffolding. 4:00 pm IMCO is continuing to work on the crowder rails at Area 50. The stucco ceiling is done in Area 60 Incubation Room. 5:00 pm IMCO is done for the day but the masons are continuing to work on laying block at Area 50. They are setting the 12" wide block. There was a small rain squall that came through. They worked through the weather and are continuing to work. 6:00 pm The masons are continuing to work on laying block. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 306 of 1851 References Photos (6) 20240325_153027 Taken on Mar 25, 2024, 3:30 PM MDT Added on Mar 26, 2024, 6:26 AM MDT Added by Chris Johnson 20240325_152753 Taken on Mar 25, 2024, 3:27 PM MDT Added on Mar 26, 2024, 6:26 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 307 of 1851 20240325_163738 Taken on Mar 25, 2024, 4:37 PM MDT Added on Mar 26, 2024, 6:26 AM MDT Added by Chris Johnson 20240325_163020 Taken on Mar 25, 2024, 4:30 PM MDT Added on Mar 26, 2024, 6:26 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 308 of 1851 20240325_152747 Taken on Mar 25, 2024, 3:27 PM MDT Added on Mar 26, 2024, 6:26 AM MDT Added by Chris Johnson 20240325_152739 Taken on Mar 25, 2024, 3:27 PM MDT Added on Mar 26, 2024, 6:26 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 309 of 1851 Form detail #321: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 10, CIP Wall Forming Area 40, Form Walls, Bulkheads IMCO, General Crew 1 10 Area 10, Complete Mesa Wall 2 Area 40, Crowder Rails Vale Electric, Electricians 3 10 Area 50, Work with Masons on Box Placement Area 60, Electrical Room, pull wire Basin Masonry 10 10 Area 50, Reinforced Masonry Forms Location Form date Mar 26, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 27, 2024, 6:18 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 310 of 1851 Crew # Workers # Total hours Work performed Totals 22 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Mesa Wall Deere 644J Loader 1 10 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 311 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am Basin Masonry is continuing to work on installing the block masonry at Area 50. IMCO is finishing up the Mesa block wall 2 while other crews are continuing forming. 10:00 am I met with Basin Masonry Foreman regarding a missing CJ in the wall. I brought it to his attention while the block layer started the first course so they did not have any rework to do. The crew is continuing to work on installing the block. IMCO is finishing the installation of Wall 2 of the Mesa retaining wall. They still need to work on the hand rail placement but the blocks and caps are set. 11:00 am IMCO carpenters are working on forming at Area 40 and Area 10 CIP wall. 1:00 pm Basin is continuing to install CMU block. I discussed the unit strength prisms with Kelly from Basin. He said he would make them tomorrow along with grouting them. 3:00 pm Vale Electric is continuing to work on Area 60 Electrical. 5:00 pm IMCO has started clearing the material around Area 60 foundation to install the waterproof membrane. They are done for the day. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 312 of 1851 References Photos (4) 20240326_094927 Taken on Mar 26, 2024, 9:49 AM MDT Added on Mar 27, 2024, 6:17 AM MDT Added by Chris Johnson 20240326_144316 Taken on Mar 26, 2024, 2:43 PM MDT Added on Mar 27, 2024, 6:17 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 313 of 1851 20240326_113643 Taken on Mar 26, 2024, 11:36 AM MDT Added on Mar 27, 2024, 6:17 AM MDT Added by Chris Johnson 20240326_080636 Taken on Mar 26, 2024, 8:06 AM MDT Added on Mar 27, 2024, 6:17 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 314 of 1851 Form detail #319: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls, Bulkheads Area 50, Place concrete slab IMCO, General Crew 1 10 Area 10, Mesa Wall 2 Area 50, Batch Concrete Vale Electric, Electricians 3 10 Area 60, Electrical Room, pull wire Stucco Systems 2 10 Area 60, Stucco Ceiling in Incubation Forms Location Form date Mar 21, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 22, 2024, 10:36 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 315 of 1851 Crew # Workers # Total hours Work performed Totals 14 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Concrete Placement, Mesa Wall Area 50, Concrete Placement Deere 644J Loader 1 10 Area 50, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 50, Concrete Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 316 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is prepping to place concrete for the formalin storage room. I asked Steve to clean out the thickened curb section to achieve clearance from ground to rebar. I also pointed out that the rebar dowels should be rechecked for layout prior to placing. 9:00 am IMCO has batched concrete and started placing using the concrete bucket. IPC has made the determination that the low quantity of concrete today did not require concrete testing. 10:00 am IMCO has completed the small slab placement, they also captured a thrust block. 11:00 am IMCO crew is continuing to work on installing the mesa block wall 2. 12:00 pm IMCO crew is starting to work on setting the door frames for Area 50. There is no detail for hollow metal door frames at Area 50. IMCO is going to use a mix of the Storefront door details along with manufacture standard installation recommendations. Left site to return cylinders from yesterdays placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 317 of 1851 References Photos (7) 20240321_102550 Taken on Mar 21, 2024, 10:25 AM MDT Added on Mar 22, 2024, 10:28 AM MDT Added by Chris Johnson 20240321_110012 Taken on Mar 21, 2024, 11:00 AM MDT Added on Mar 22, 2024, 10:28 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 318 of 1851 20240321_105958 Taken on Mar 21, 2024, 10:59 AM MDT Added on Mar 22, 2024, 10:28 AM MDT Added by Chris Johnson 20240321_103534 Taken on Mar 21, 2024, 10:35 AM MDT Added on Mar 22, 2024, 10:28 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 319 of 1851 20240321_082712 Taken on Mar 21, 2024, 8:27 AM MDT Added on Mar 22, 2024, 10:28 AM MDT Added by Chris Johnson 20240321_074623 Taken on Mar 21, 2024, 7:46 AM MDT Added on Mar 22, 2024, 10:28 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 320 of 1851 20240321_074607 Taken on Mar 21, 2024, 7:46 AM MDT Added on Mar 22, 2024, 10:28 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 321 of 1851 Form detail #318: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 10, CIP Footing Placement Area 40, Form Walls, Bulkheads Area 50, Form CJs, Place concrete slab IMCO, General Crew 1 10 Area 10, Mesa Wall 2 Area 50, Batch Concrete Vale Electric, Electricians 3 10 Area 60, Electrical Room, pull wire Forms Location Form date Mar 20, 2024 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 21, 2024, 6:23 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 322 of 1851 Crew # Workers # Total hours Work performed Stucco Systems 2 10 Area 60, Stucco Ceiling in Incubation Totals 14 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Concrete Placement, Mesa Wall Area 50, Concrete Placement Deere 644J Loader 1 10 Area 50, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 50, Concrete Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 323 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is making final checks for todays slab placement at Area 50. This will be the 3rd slab placement. 9:00 am IMCO has batched the concrete and I have taken my test. The concrete meets specifications and passed with no issues. IMCO is starting to place the concrete at Area 50 for the interior slab using the concrete bucket. 11:00 am IMCO has completed the slab placement, they are now working on the retaining wall footing placement behind Area 70. 1:00 pm IMCO has completed the concrete placement for today. IMCO general crew is working on installing Wall 2 of the Mesa retaining wall. 3:00 pm IMCO crews are continuing to work on setting wall panels at Area 40 for the next wall placement. They are also working on Area 50 slab prep. They plan to place the last of the slabs tomorrow, in the formalin room. 5:00 pm IMCO is done for the day. They are continued working on the mesa wall 2. They have approx. 50% of it done. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 324 of 1851 References Photos (7) 20240320_142649 Taken on Mar 20, 2024, 2:26 PM MDT Added on Mar 21, 2024, 6:21 AM MDT Added by Chris Johnson 20240320_131103 Taken on Mar 20, 2024, 1:11 PM MDT Added on Mar 21, 2024, 6:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 325 of 1851 20240320_104600 Taken on Mar 20, 2024, 10:46 AM MDT Added on Mar 21, 2024, 6:21 AM MDT Added by Chris Johnson 20240320_093027 Taken on Mar 20, 2024, 9:30 AM MDT Added on Mar 21, 2024, 6:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 326 of 1851 20240320_081302 Taken on Mar 20, 2024, 8:13 AM MDT Added on Mar 21, 2024, 6:21 AM MDT Added by Chris Johnson 20240320_105118 Taken on Mar 20, 2024, 10:51 AM MDT Added on Mar 21, 2024, 6:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 327 of 1851 20240320_092045 Taken on Mar 20, 2024, 9:20 AM MDT Added on Mar 21, 2024, 6:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 328 of 1851 Form detail #317: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 10, CIP Footing Placement Area 40, Form Walls, Bulkheads Area 50, Form CJs, Place concrete slab IMCO, General Crew 1 10 Area 10, Begin Mesa Wall 2 Area 50, Batch Concrete Vale Electric, Electricians 3 10 Area 50, Electrical Raceways MB Welding 1 10 Area 30, Handrail Forms Location Form date Mar 18, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 20, 2024, 6:45 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 329 of 1851 Crew # Workers # Total hours Work performed Totals 13 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Concrete Placement Area 50, Concrete Placement Deere 644J Loader 1 10 Area 50, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 50, Concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 330 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO plans to place the 2nd slab placement today at Area 50. They are also planning to capture the first footing placement on the CIP wall behind Area 70. 10:00 am IMCO crew is continuing to work on bulkheads and trench drain at Area 50 in prep for todays placement. The general crew has started to move Mesa block to Wall 2 to begin installing the retaining wall. 11:30 am IMCO has batched concrete. Today they are using the concrete bucket instead of a pump truck. I took my sample out of the truck and tested for air. It was too high at 8.2%. Kirt asked if I would test it again after the spin the truck for 20 mins. Which I did. The second test came high at 7.6%. The decided to reject this truck and batch a second one with less air. I tested that truck and all passed with no issues. The crew is starting to place the concrete at Area 50. 2:00 pm IMCO is placing concrete for the CIP wall footing near Area 70. IMCO crew is working on finishing the concrete at Area 50. I met with Larry to discuss the installation process of the Mesa wall. They are working on placing the first course of the block. He informed me of the process which matched the approved drawings. 3:00 pm IMCO is continuing to place concrete for the CIP wall footing. MB Welding is working on installing the handrail for Area 30. Leaving site. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 331 of 1851 References Photos (5) 20240318_131602 Taken on Mar 18, 2024, 1:16 PM MDT Added on Mar 20, 2024, 6:42 AM MDT Added by Chris Johnson 20240318_144530 Taken on Mar 18, 2024, 2:45 PM MDT Added on Mar 20, 2024, 6:42 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 332 of 1851 20240318_143510 Taken on Mar 18, 2024, 2:35 PM MDT Added on Mar 20, 2024, 6:42 AM MDT Added by Chris Johnson 20240318_132753 Taken on Mar 18, 2024, 1:27 PM MDT Added on Mar 20, 2024, 6:42 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 333 of 1851 20240318_131545 Taken on Mar 18, 2024, 1:15 PM MDT Added on Mar 20, 2024, 6:42 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 334 of 1851 Form detail #316: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 10, CIP Footing Bulkheads Area 40, Form Walls, Bulkheads Area 50, Form CJs, Place concrete IMCO, General Crew 1 10 Area 50, Batch Concrete Vale Electric, Electricians 3 10 Area 50, Electrical Raceways EOI 2 10 Area 10, Rebar Forms Location Form date Mar 15, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 15, 2024, 11:23 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 335 of 1851 Crew # Workers # Total hours Work performed Totals 14 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Clean up Deere 644J Loader 1 10 Area 50, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 5 Area 50, Concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 336 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is preparing to place concrete today at Area 50. They are going to place 2 squares of the CJs for the slab. 9:00 am Pump truck is onsite. IMCO has a truck batched and ready. 10:00 am I tested the first truck. It passed with no issues. IMCO is starting to place at Area 50. 11:00 am IMCO has completed the placement. They are working on finishing it now. 11:30 am EOI is working on installing the rebar for the CIP wall near Area 70. IMCO carpenters are working on template for EOI and will start on bulkheads after EOI is done. Left site to return cylinders from yesterdays placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 337 of 1851 References Photos (1) 20240315_095953 Taken on Mar 15, 2024, 9:59 AM MDT Added on Mar 15, 2024, 11:14 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 338 of 1851 Form detail #315: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls, Bulkheads, Place Concrete Area 50, Form CJs Area 60, Paint rooms IMCO, General Crew 1 10 Area 10, Well Water Supply line, CIP Wall Excavation Area 40, Batch Concrete Area 50, Backfill for Slab Vale Electric, Electricians 3 10 Area 50, Electrical Raceways Forms Location Form date Mar 14, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 15, 2024, 6:35 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 339 of 1851 Crew # Workers # Total hours Work performed EOI 2 10 Area 10, Rebar Area 40, Rebar Totals 14 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, CIP Wall Foundation Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, GW line Area 50, Slab grade Kobelco 1100G Crane 1 10 Area 40, Wall forms Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 340 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is preparing for todays concrete placement at Area 40. They have 6 wall sections ready to be placed today. 9:00 am The pump truck is onsite. The crew is working on batching concrete. 10:30 am IMCO has batched the first truck. They had a plug in the cement line at the batch plant but they got it cleared. I tested the first truck. It passed with no issues. The crew is starting to place in the wall forms. 1:30 pm IMCO is finishing up the concrete placement of the walls. They are going to move the pump truck over to place concrete for the mesa grade slab. This concrete is not required to be tested as its only 3000 psi requirement. 3:00 pm IMCO has completed the grade slab for the mesa wall. They are working on finishing the concrete for the sump at Area 50 along with the walls. 4:00 pm IMCO crew has been working on forming bulkheads at Area 50 for the slab. They plan to place concrete tomorrow at the slab. EOI has moved to installing rebar on the CIP wall near Area 70. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 341 of 1851 References Photos (6) 20240314_152818 Taken on Mar 14, 2024, 3:28 PM MDT Added on Mar 15, 2024, 6:34 AM MDT Added by Chris Johnson 20240314_152814 Taken on Mar 14, 2024, 3:28 PM MDT Added on Mar 15, 2024, 6:34 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 342 of 1851 20240314_135431 Taken on Mar 14, 2024, 1:54 PM MDT Added on Mar 15, 2024, 6:34 AM MDT Added by Chris Johnson 20240314_135424 Taken on Mar 14, 2024, 1:54 PM MDT Added on Mar 15, 2024, 6:34 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 343 of 1851 20240314_135117 Taken on Mar 14, 2024, 1:51 PM MDT Added on Mar 15, 2024, 6:34 AM MDT Added by Chris Johnson 20240314_112151 Taken on Mar 14, 2024, 11:21 AM MDT Added on Mar 15, 2024, 6:34 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 344 of 1851 Form detail #314: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Form Walls, Bulkheads Area 50, Backfill for slab Area 60, Paint rooms IMCO, General Crew 1 10 Area 10, Well Water Supply line, CIP Wall Excavation Area 50, Backfill for Slab Vale Electric, Electricians 3 10 Area 50, Electrical Raceways EOI 2 10 Area 50, Slab Rebar Forms Location Form date Mar 13, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 13, 2024, 5:51 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 345 of 1851 Crew # Workers # Total hours Work performed Totals 11 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, CIP Wall Foundation Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, GW line Area 50, Slab grade Kobelco 1100G Crane 1 10 Area 40, Wall forms Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 346 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am I walked the site noting what has been completed this week. The crews have backfilled portion of the Area 50 slab. I walked it, it feels firm and I could not find any issues with compaction. EOI is onsite to install the rebar in this location. IMCO crews are working on the rails for the raceway crowders. 9:00 am Attended weekly meeting. 11:00 am IMCO is continuing the painting operation inside Area 60. The carpenter crews are working on bulkheads and setting forms at Area 40. They are planning the placement for tomorrow. 1:00 pm IMCO is working on grouting the bottom of the raceway gates. EOI is continuing to work on rebar at Area 50 while IMCO works on grading for the slab. 3:00 pm Vale Electric is continuing to work on the electrical room re-install after the painting was complete. 5:00 pm EOI has majority of the rebar in the portion of Area 50 slab ready. IMCO needs to form up the trench drain and CJs. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 347 of 1851 References Photos (13) 20240313_140711 Taken on Mar 13, 2024, 2:07 PM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson 20240313_135936 Taken on Mar 13, 2024, 1:59 PM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 348 of 1851 20240313_134338 Taken on Mar 13, 2024, 1:43 PM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson 20240313_174123 Taken on Mar 13, 2024, 5:41 PM MDT Added on Mar 13, 2024, 5:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 349 of 1851 20240313_082112 Taken on Mar 13, 2024, 8:21 AM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson 20240313_082501 Taken on Mar 13, 2024, 8:25 AM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 350 of 1851 20240313_082102 Taken on Mar 13, 2024, 8:21 AM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson 20240313_081554 Taken on Mar 13, 2024, 8:15 AM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 351 of 1851 20240313_081545 Taken on Mar 13, 2024, 8:15 AM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson 20240313_081535 Taken on Mar 13, 2024, 8:15 AM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 352 of 1851 20240313_081529 Taken on Mar 13, 2024, 8:15 AM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson 20240313_081322 Taken on Mar 13, 2024, 8:13 AM MDT Added on Mar 13, 2024, 5:37 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 353 of 1851 20240313_174110 Taken on Mar 13, 2024, 5:41 PM MDT Added on Mar 13, 2024, 5:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 354 of 1851 Form detail #313: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Form Walls, Bulkheads Area 50, Backfill for slab Area 60, Paint rooms IMCO, General Crew 1 10 Area 50, Backfill for Slab Vale Electric, Electricians 3 10 Area 50, Electrical Raceways Totals 9 30 Forms Location Form date Mar 8, 2024 Description Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 8, 2024, 9:25 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 355 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 50, Backfill Slab Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO crews are working on backfilling Area 50 slab. I witnessed the crew placing material in large lifts. I spoke to Larry regarding the lift size and compaction effort. He informed me the large plate compactor is broke down so they will have to use the jumping jack compactor. I advised him he should be no more than 12" lifts. I also Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 356 of 1851 noted the material looked dry. He said he would spread the lifts out smaller and get the compactor on it. 9:30 am The crew is continuing to backfill the slab at Area 50. They are also working on painting the rooms at Area 60. References Photos (2) 20240308_080103 Taken on Mar 8, 2024, 8:01 AM MST Added on Mar 8, 2024, 8:39 AM MST Added by Chris Johnson 20240308_075654 Taken on Mar 8, 2024, 7:56 AM MST Added on Mar 8, 2024, 8:39 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 357 of 1851 Form detail #312: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls, Bulkheads Area 50, Form and Pour grout at electrical block outs in stem wall IMCO, General Crew 7 10 Area 10, Site piping, Backfilling, Mesa Wall excavation Vale Electric, Electricians 3 10 Area 50, Electrical Raceways MB Welding 1 10 Area 30, Handrail install Forms Location Form date Mar 7, 2024 Description Area 10, Area 30, Area 50, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 8, 2024, 6:19 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 358 of 1851 Crew # Workers # Total hours Work performed Totals 19 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10 - Mesa Wall excavation Deere 644J Loader 1 10 Area 10, Backfill Hitachi 85 Excavator 1 8 Area 10, Kobelco 1100G Crane 1 10 Area 40, Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 10, Place Material 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 359 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO general crew is working on excavating for the foundation of Wall 2 of the Mesa block wall. They are currently stockpiling the material near the wall. 9:00 am IMCO carpenters are working on forming up the electrical blockouts in the stem wall at Area 50. They plan to fill these blockouts with grout today. 11:00 am IMCO pipe crew is working on installing the sewer line from Area 50 to the sewer lift station. They are also working on installing the piping inside the lift station. 1:00 pm IMCO has excavated for the foundation for wall 2. They are going to start hauling the material across the river to the stockpile to make room onsite. 3:00 pm IMCO carpenters are continuing to work on forming and bulkheads at Area 40 while another crew is working on grouting the blockouts at Area 50. 4:00 pm IMCO is continuing to work on grouting the blockouts in the stem wall. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 360 of 1851 References Photos (8) 20240307_113841 Taken on Mar 7, 2024, 11:38 AM MST Added on Mar 7, 2024, 3:50 PM MST Added by Chris Johnson 20240307_150126 Taken on Mar 7, 2024, 3:01 PM MST Added on Mar 7, 2024, 3:50 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 361 of 1851 20240307_133338 Taken on Mar 7, 2024, 1:33 PM MST Added on Mar 7, 2024, 3:50 PM MST Added by Chris Johnson 20240307_133221 Taken on Mar 7, 2024, 1:32 PM MST Added on Mar 7, 2024, 3:50 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 362 of 1851 20240307_133053 Taken on Mar 7, 2024, 1:30 PM MST Added on Mar 7, 2024, 3:50 PM MST Added by Chris Johnson 20240307_113829 Taken on Mar 7, 2024, 11:38 AM MST Added on Mar 7, 2024, 3:50 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 363 of 1851 20240307_084551 Taken on Mar 7, 2024, 8:45 AM MST Added on Mar 7, 2024, 3:50 PM MST Added by Chris Johnson 20240307_084546 Taken on Mar 7, 2024, 8:45 AM MST Added on Mar 7, 2024, 3:50 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 364 of 1851 Form detail #311: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls, Bulkheads IMCO, General Crew 7 10 Area 10, Site piping, Backfilling, Mesa Wall excavation, SS Lift Station Vale Electric, Electricians 3 10 Area 50, Electrical Raceways Totals 18 30 Forms Location Form date Mar 6, 2024 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 7, 2024, 7:23 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 365 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10 - Mesa Wall excavation Deere 644J Loader 1 Hitachi 85 Excavator 1 8 Area 10, Pothole, Sewer install Kobelco 1100G Crane 1 10 Area 40, Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is prepping to start painting in the two rooms, Electrical and Generator, that the texture is complete. They have approved primer and paint. They have heaters running into each room. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 366 of 1851 9:00 am Attended weekly meeting. 11:00 am A crew is working on potholing the utilities near Mesa wall 2, along the Snake River. A locator is onsite locating while the crew searches for them carefully. Jeremey is then surveying the exposed utilities. Vale Electric is in area 50 installing the raceway conduit. I have been informed that the plumber has passed Baker County inspection. 1:00 pm IMCO crew is working on installing the sewer lift station. They set the structure. I seen they were backfilling in large lifts without compacting. I brought this to their attention. They were just getting material in there so the pipe crew could start installing the pumps. 2:00 pm The IMCO crew removed the material around the lift station structure and compacted it in lifts. They showed me photos of the operation and the material visually looked liked it had been compacted. The carpenter crew is continuing to work on forming walls at Area 40. They have canceled the concrete placement for this week. 3:00 pm MB Welding is onsite working on the stairs at Area 30. 4:00 pm IMCO crew is working on installing the sewer line from Area 60 to the sewer lift station. The mesa crew is back to excavating for the foundation of Wall 2. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 367 of 1851 References Photos (14) 20240306_132316 Taken on Mar 6, 2024, 1:23 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson 20240306_074040 Taken on Mar 6, 2024, 7:40 AM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 368 of 1851 20240306_162636 Taken on Mar 6, 2024, 4:26 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson 20240306_162146 Taken on Mar 6, 2024, 4:21 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 369 of 1851 20240306_162143 Taken on Mar 6, 2024, 4:21 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson 20240306_160439 Taken on Mar 6, 2024, 4:04 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 370 of 1851 20240306_133534 Taken on Mar 6, 2024, 1:35 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson 20240306_133445 Taken on Mar 6, 2024, 1:34 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 371 of 1851 20240306_133441 Taken on Mar 6, 2024, 1:34 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson 20240306_132543 Taken on Mar 6, 2024, 1:25 PM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 372 of 1851 20240306_113654 Taken on Mar 6, 2024, 11:36 AM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson 20240306_080652 Taken on Mar 6, 2024, 8:06 AM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 373 of 1851 20240306_080635 Taken on Mar 6, 2024, 8:06 AM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson 20240306_075203 Taken on Mar 6, 2024, 7:52 AM MST Added on Mar 7, 2024, 7:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 374 of 1851 Form detail #310: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls, Bulkheads IMCO, General Crew 7 10 Area 10, Site piping, Backfilling Area 30, Mechanical Piping and bracing Nations Roofing 6 5 Area 60, Roof Totals 21 25 Forms Location Form date Mar 1, 2024 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Mar 6, 2024, 6:17 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 375 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 8 Area 10, Load Fill Hitachi 85 Excavator 1 8 Area 10, Piping Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 8 Area 10, Import Fill 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on bulkheads and wall forming at Area 40 today. They also planned to do some site cleanup. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 376 of 1851 10:00 am IMCO general crew is continuing to work on piping and backfilling. They are starting to import material from the stockpile across the river. 11:00 am I have taken a sample of the general fill material to test the plastic and liquid limit of the material. This is required for the mesa retaining wall specifications. I also have picked up my cylinders and leaving the site. References Photos (1) 20240301_082459 Taken on Mar 1, 2024, 8:24 AM MST Added on Mar 6, 2024, 6:17 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 377 of 1851 Form detail #308: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Place Concrete, Form Walls IMCO, General Crew 7 10 Area 30, Mechanical Piping and bracing Area 40, Batch Concrete Vale Electric, Electricians 3 5 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Feb 29, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 29, 2024, 4:52 PM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 378 of 1851 Crew # Workers # Total hours Work performed Totals 24 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Excavate for Mesa Wall Deere 644J Loader 1 8 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 8 Area 40, Concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 379 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on batching concrete for todays placement. The crews are working on getting tents built in preparation for todays placement in the rain. 9:00 am Pump truck is setup and IMCO has batched concrete. I have taken my sample after the pump truck pumped approx. 1 cy into the eco pan. The test passed with no issues. While waiting for concrete I witnessed a near miss safety issue. The roofing sub contractor, Nations Roofing, appeared to hit a pole or wire behind the existing hatchery building. I notified IMCO, Jeremey, instantly as I witnessed it. He took action to stop the work then he notified Kirt of the issue. Nothing looks to be damaged. 10:00 am IMCO is continuing to place concrete. Kirt and I spoke about the safety issue. He is going to work through IMCO standard protocol regarding the near miss. 11:30 am IMCO has placed two wall sections. The pump truck cannot reach the other wall sections. The pump truck is moving now to reset up where it can reach the rest of the wall section. 2:00 pm IMCO has completed the concrete placement. They are working on finishing the concrete now. 4:30 pm IMCO worked on installing piping from Area 60 to Area 30 to the end of the day. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 380 of 1851 References Photos (5) 20240229_093613 Taken on Feb 29, 2024, 9:36 AM MST Added on Feb 29, 2024, 4:43 PM MST Added by Chris Johnson 20240229_160436 Taken on Feb 29, 2024, 4:04 PM MST Added on Feb 29, 2024, 4:43 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 381 of 1851 20240229_160344 Taken on Feb 29, 2024, 4:03 PM MST Added on Feb 29, 2024, 4:43 PM MST Added by Chris Johnson 20240229_113538 Taken on Feb 29, 2024, 11:35 AM MST Added on Feb 29, 2024, 4:43 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 382 of 1851 20240229_112827 Taken on Feb 29, 2024, 11:28 AM MST Added on Feb 29, 2024, 4:43 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 383 of 1851 Form detail #307: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls IMCO, General Crew 7 10 Area 30, Mechanical Piping and bracing Vale Electric, Electricians 3 5 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof YMC 2 8 Area 60, HVAC Forms Location Form date Feb 28, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 29, 2024, 6:19 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 384 of 1851 Crew # Workers # Total hours Work performed JC Drywall 4 10 Area 60, Tape drywall Totals 30 48 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Excavate for Mesa Wall Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 385 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am I met with IMCO regarding the Mesa retaining wall. We discussed the base layer slab along with requirements for the backfill material. They plan to pour a concrete foundation slab for the block. I also brought to their attention the plastic and liquid limit specification on the General Fill material they plan to use. This test is needed to verify the material can be used. 9:00 am Attended weekly meeting. 10:00 am IMCO is continuing to work on forming walls in preparation for tomorrows concrete placement at Area 40. Currently JC Drywall is taping the 3 rooms at Area 60 where the GWB was replaced. IMCO is also working on backfilling the interior of Area 50. This allows the plumber to get in there and start installing the drain and water piping. 12:00 pm Lacy Mechanical is onsite working on the plumbing at Area 50. IMCO is continuing to work on welding the spray bars at Area 40. Nations Roofing is onsite working on capping the roof along with soffit. 2:00 pm IMCO is continuing to work on forming walls at Area 40. All the carpenters are working on them. Vale Electric is working on installing the raceway conduit under the slab at Area 50. 4:00 pm JC Drywall is continuing to work on taping and mudding the seams and screw holes on the GWB in the three rooms. Lacy is continuing the plumbing at Area 50. I noticed a spot where the plumbing could interfere with compaction effort under the slab. I notified Jeremey of it and he said he would take a look. 5:00 pm IMCO is cleaning up for the day. They are ready to place walls tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 386 of 1851 References Photos (5) 20240228_095200 Taken on Feb 28, 2024, 9:52 AM MST Added on Feb 29, 2024, 6:13 AM MST Added by Chris Johnson 20240228_094202 Taken on Feb 28, 2024, 9:42 AM MST Added on Feb 29, 2024, 6:13 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 387 of 1851 20240228_094159 Taken on Feb 28, 2024, 9:41 AM MST Added on Feb 29, 2024, 6:13 AM MST Added by Chris Johnson 20240228_094032 Taken on Feb 28, 2024, 9:40 AM MST Added on Feb 29, 2024, 6:13 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 388 of 1851 20240228_142654 Taken on Feb 28, 2024, 2:26 PM MST Added on Feb 29, 2024, 6:13 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 389 of 1851 Form detail #306: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls Area 50, Strip Stem Wall IMCO, General Crew 7 10 Area 10, Backfill piping, Grout MH, Clean Site Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 5 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Feb 20, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 21, 2024, 9:30 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 390 of 1851 Crew # Workers # Total hours Work performed YMC 2 8 Area 60, HVAC Totals 26 38 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Backfill Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 391 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on forming walls at Area 40. The other crew is working on filling tie holes on Area 50 stem wall. 9:00 am IMCO dirt crew is working on installing the stem wall membrane behind the tie holes getting filled. JC Drywall is onsite working on removing the DensGlass in the Chiller room. MB Welding is onsite starting the stairs install of Area 30. 10:00 am IMCO is continuing to work on installing the underdrain for Area 50. After checking submittals on the product I noticed the membrane they are using is incomplete. A 60 mil paint on product is also needed per the Detail C 243 on GC-3. Its also stated in submittal 152. I have informed IMCO of this. They need to submit on this product. 12:00 pm MB Welding is adding 8" to the existing stair way supports on Area 30. This is needed to make up the difference for the metal siding that was added. 2:00 pm IMCO pipe crew is starting to install the under slab piping at Area 50. 3:00 pm Kirt informed me they will be installing the 60 mil membrane before proceeding any further. The crew is working on piping inside Area 50. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 392 of 1851 References Photos (10) 20240220_131301 Taken on Feb 20, 2024, 1:13 PM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson 20240220_110656 Taken on Feb 20, 2024, 11:06 AM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 393 of 1851 20240220_090038 Taken on Feb 20, 2024, 9:00 AM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson 20240220_090035 Taken on Feb 20, 2024, 9:00 AM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 394 of 1851 20240220_085941 Taken on Feb 20, 2024, 8:59 AM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson 20240220_084927 Taken on Feb 20, 2024, 8:49 AM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 395 of 1851 20240220_084922 Taken on Feb 20, 2024, 8:49 AM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson 20240220_084624 Taken on Feb 20, 2024, 8:46 AM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 396 of 1851 20240220_143148 Taken on Feb 20, 2024, 2:31 PM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson 20240220_111539 Taken on Feb 20, 2024, 11:15 AM MST Added on Feb 21, 2024, 9:28 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 397 of 1851 Form detail #305: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls Area 50, Strip Stem Wall IMCO, General Crew 7 10 Area 10, Backfill piping, Grout MH, Clean Site Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 5 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Feb 19, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 20, 2024, 6:34 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 398 of 1851 Crew # Workers # Total hours Work performed YMC 2 8 Area 60, HVAC Totals 26 38 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Backfill Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 399 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is planning to start stripping the forms from the stem wall placement last week. Another crew is going to start stripping walls at Area 40 as well. 10:00 am Nations Roofing is onsite continuing to install the roof on Area 60. 11:00 am JC Drywall is onsite. They are removing the DensGlass wall board from the electrical room, generator room. They also need to remove it from the chiller room. I noticed they cut through the vapor barrier in a few locations. This will need to be addressed prior to new GWB being installed. IMCO dirt crew is cleaning up the site and backfilling areas. I spoke to Jeremey about the condition of the material. Everything is very wet onsite and the material is not firm. I mentioned to him that if it is final compaction, they will need to perform a proof roll but how the material is now, it will not pass a proof roll. 1:00 pm YMC is onsite continuing to install the HVAC in Area 60. 3:00 pm IMCO carpenters are working on stripping the forms. From what I have seen, the stem wall looks well consolidated. 4:30 pm IMCO is continuing to form wall sections at Area 40. I am being told they are planning to make another placement on Thursday at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 400 of 1851 References Photos (7) 20240219_103041 Taken on Feb 19, 2024, 10:30 AM MST Added on Feb 20, 2024, 6:31 AM MST Added by Chris Johnson 20240219_101710 Taken on Feb 19, 2024, 10:17 AM MST Added on Feb 20, 2024, 6:31 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 401 of 1851 20240219_131718 Taken on Feb 19, 2024, 1:17 PM MST Added on Feb 20, 2024, 6:31 AM MST Added by Chris Johnson 20240219_134021 Taken on Feb 19, 2024, 1:40 PM MST Added on Feb 20, 2024, 6:31 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 402 of 1851 20240219_103034 Taken on Feb 19, 2024, 10:30 AM MST Added on Feb 20, 2024, 6:31 AM MST Added by Chris Johnson 20240219_101559 Taken on Feb 19, 2024, 10:15 AM MST Added on Feb 20, 2024, 6:31 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 403 of 1851 20240219_101341 Taken on Feb 19, 2024, 10:13 AM MST Added on Feb 20, 2024, 6:31 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 404 of 1851 Form detail #304: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Place Walls Area 50, Place Stem Wall IMCO, General Crew 7 10 Batch Concrete Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 5 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Feb 15, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 19, 2024, 9:51 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 405 of 1851 Crew # Workers # Total hours Work performed Totals 24 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 10 concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 406 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is batching concrete for todays placement. The pump truck has arrived and is setting up. IMCO crew is continuing to work on stem wall forms and dowel placement. They plan to pour the Area 40 walls first then switch to the Area 50 stem wall. 9:00 am I have taken my first test from the first truck. All passed in spec with the slump a little high. IMCO is going to proceed with placing the concrete considering the location in the forms will support better consolidation. They are going to reduce the water in the consecutive trucks. 9:30 am The second truck has been batched and started placing. I witnessed the slump from the truck was lower. The crew is continuing to place. 10:00 am IMCO crew is continuing to work on placing the dowels in the stem wall at Area 50. They are pushing hard to make the placement today. Nations roofing is onsite working on Area 60 roof. 12:00 pm The crew finished the placement of the Area 40 walls. I tested the first truck to be placed in the Area 50 Stem walls. It tested in spec with no issues. Crew is going to start placing now. 1:00 pm Crew is continuing to place concrete at Area 50. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 407 of 1851 References Photos (2) 20240215_111120 Taken on Feb 15, 2024, 11:11 AM MST Added on Feb 19, 2024, 9:51 AM MST Added by Chris Johnson 20240215_082927 Taken on Feb 15, 2024, 8:29 AM MST Added on Feb 19, 2024, 9:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 408 of 1851 Form detail #303: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls Area 50, Form Stem Wall IMCO, General Crew 7 10 Area 10, Storm Pipe, Catch Basin Install Area 40, Fly Wall Panels Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 5 Area 60, Electrical Forms Location Form date Feb 14, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 15, 2024, 7:40 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 409 of 1851 Crew # Workers # Total hours Work performed Nations Roofing 6 5 Area 60, Roof Totals 24 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Catch basin, Storm Pipe Install Deere 644J Loader 1 10 Area 10, Load material at stockpile Hitachi 85 Excavator 1 10 Area 10, Catch basin, Storm Pipe Install Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 10, Import Fill Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 410 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on stem wall forms at Area 50. The crew is pushing to make tomorrows concrete placement schedule. Another crew is working on Area 40 Wall forms. They are scheduled to place Area 40 walls and Area 50 stem wall tomorrow. 9:00 am Nations Roofing is onsite again to continue installing the roof on Area 60. Vale Electrical is also onsite continuing to install what electrical they can without correct wall board to be installed. They have removed the gear in the electrical room that will conflict with the wall board demo and reinstall. 11:00 am I met with Steve to go over some rebar issues I found at Area 50 Stem wall. Some clearances were not to spec. He said he would get them fixed. We also reviewed the dowel layout. I spoke to him and Kirt regarding the notes on the previous rebar submittal addressing MCJs proximity to the pan decking beams along with the MCJ location to the pipe penetrations. They are going to look into it and verify. 1:00 pm The crew is continuing to work on the dowels and closing up the forms for the stem wall at Area 50. 2:00 pm IMCO crew is working in the incubation room. They are waiting on a flowmeter to arrive to finish the piping but they are working on preliminary testing of the piping with water. They are plugging the saddles now so they can test the line with water. A full test will need to be witnessed and documented once they are complete. 4:00 pm IMCO is continuing to layout the dowels for tomorrows stem wall pour. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 411 of 1851 References Photos (6) 20240214_131527 Taken on Feb 14, 2024, 1:15 PM MST Added on Feb 15, 2024, 7:39 AM MST Added by Chris Johnson 20240214_131229 Taken on Feb 14, 2024, 1:12 PM MST Added on Feb 15, 2024, 7:39 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 412 of 1851 20240214_130527 Taken on Feb 14, 2024, 1:05 PM MST Added on Feb 15, 2024, 7:39 AM MST Added by Chris Johnson 20240214_130519 Taken on Feb 14, 2024, 1:05 PM MST Added on Feb 15, 2024, 7:39 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 413 of 1851 20240214_094812 Taken on Feb 14, 2024, 9:48 AM MST Added on Feb 15, 2024, 7:39 AM MST Added by Chris Johnson 20240214_131430 Taken on Feb 14, 2024, 1:14 PM MST Added on Feb 15, 2024, 7:39 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 414 of 1851 Form detail #302: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls Area 50, Form Stem Wall IMCO, General Crew 7 10 Area 10, Storm Pipe, Catch Basin Install Area 40, Fly Wall Panels Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 5 Area 60, Electrical Forms Location Form date Feb 13, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 14, 2024, 6:36 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 415 of 1851 Crew # Workers # Total hours Work performed Nations Roofing 6 5 Area 60, Roof Totals 24 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Catch basin, Storm Pipe Install Deere 644J Loader 1 10 Area 10, Load material at stockpile Hitachi 85 Excavator 1 10 Area 10, Catch basin, Storm Pipe Install Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 10, Import Fill Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 416 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:00 am IMCO is continuing to install stem wall forms at Area 50. I noticed they have closed up the forms where the electrical blockouts are. Steve walked me through the rebar they installed around the blockouts. I told him I would review the drawings and get back to him. They are continuing to install the stem wall forms. They are pushing to pour the stem wall Thursday of this week. 11:00 am Nations roofing is onsite continuing to install the roof on Area 60. IMCO has another carpenter crew working on Area 40 wall forming. They are continuing the moving of the forms and placing from cold joint to cold joint. They plan to place wall forms Thursday as well. 2:00 pm I met with Steve regarding the rebar at Area 50. It looks to be in accordance with the approved drawings along with RFI 114. I have taken photos for backup. I did point out some clearance issues I observed. His crew is going to get them fixed prior to the concrete placement on Thursday. 4:00 pm IMCO dirt crew has been working on installing Catch Basins and storm piping. They installed CB 11 this morning and is currently working on installing the storm pipe to CB 8. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 417 of 1851 References Photos (7) 20240213_151455 Taken on Feb 13, 2024, 3:14 PM MST Added on Feb 14, 2024, 6:35 AM MST Added by Chris Johnson 20240213_145201 Taken on Feb 13, 2024, 2:52 PM MST Added on Feb 14, 2024, 6:35 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 418 of 1851 20240213_152319 Taken on Feb 13, 2024, 3:23 PM MST Added on Feb 14, 2024, 6:35 AM MST Added by Chris Johnson 20240213_151521 Taken on Feb 13, 2024, 3:15 PM MST Added on Feb 14, 2024, 6:35 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 419 of 1851 20240213_151452 Taken on Feb 13, 2024, 3:14 PM MST Added on Feb 14, 2024, 6:35 AM MST Added by Chris Johnson 20240213_145210 Taken on Feb 13, 2024, 2:52 PM MST Added on Feb 14, 2024, 6:35 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 420 of 1851 20240213_145204 Taken on Feb 13, 2024, 2:52 PM MST Added on Feb 14, 2024, 6:35 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 421 of 1851 Form detail #300: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Place Walls Area 50, Form Stem Wall IMCO, General Crew 7 10 Area 40, Batch Concrete Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 5 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Feb 8, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 9, 2024, 7:27 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 422 of 1851 Crew # Workers # Total hours Work performed Totals 24 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 8 Area 40, Batch Concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 423 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is starting to batch concrete for todays placement. They are getting the trucks warmed up and warming the drums with hot water. 9:00 am The pump truck is setup and priming and the first truck is batched. 10:00 am The pump truck got clogged multiple times over the last hour. By the time it was cleared up there was ~1 CY left in the concrete truck. I performed an INFO ONLY air test on the mix to aid IMCO is batching the second truck. The air test proved the concrete was in spec. They are rejecting the rest of the truck due to quantity. 10:30 am I tested the second truck. It all tested and passed in spec. IMCO is starting the placement. 11:00 am IMCO is installing the incubation room table. Some of the plumbing in the room required the table to be installed. I have brought my concern to multiple IMCO management regarding installing more items that could get damaged during the stucco ceiling installation in the coming weeks. 1:30 pm IMCO has completed the wall placement. They were able to capture 6 wall sections from CJ to CJ at Area 40. 2:30 pm Nations Roofing is continuing to install the roof on Area 60. 4:00 pm IMCO is covering the walls they poured today with blankets. Some of the crew has left for the weekend while others are cleaning up around the site. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 424 of 1851 References Photos (4) 20240208_124610 Taken on Feb 8, 2024, 12:46 PM MST Added on Feb 9, 2024, 7:24 AM MST Added by Chris Johnson 20240208_123119 Taken on Feb 8, 2024, 12:31 PM MST Added on Feb 9, 2024, 7:24 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 425 of 1851 20240208_123047 Taken on Feb 8, 2024, 12:30 PM MST Added on Feb 9, 2024, 7:24 AM MST Added by Chris Johnson 20240208_124603 Taken on Feb 8, 2024, 12:46 PM MST Added on Feb 9, 2024, 7:24 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 426 of 1851 Form detail #299: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls Area 50, Form Stem Wall IMCO, General Crew 7 10 Area 10, Storm Lines Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 5 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Feb 7, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 8, 2024, 7:13 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 427 of 1851 Crew # Workers # Total hours Work performed Totals 24 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Storm Lines Deere 644J Loader 1 10 Area 10, Load Dump Truck Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Wall Panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 10, Import Fill 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 428 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am Attended weekly meeting. 9:00 am IMCO has stripped the footing forms and the wall forms from last weeks placement. They are currently working on forming the stem walls starting with the inside forms at Area 50. 10:00 am Nations roofing is onsite installing the metal roof on Area 60. 12:00 pm IMCO is continuing the piping inside the incubation room. They are installing the piping to the incubators. 1:00 pm YMC is onsite installing the HVAC for Area 60. 2:00 pm Yale Electric is onsite working on installing block outs in the stem wall for electrical conduit at Area 50. 4:00 pm IMCO has been installing piping lines around Area 30. They are currently working on installing Catch Basins and storm lines. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 429 of 1851 References Photos (7) 20240207_094312 Taken on Feb 7, 2024, 9:43 AM MST Added on Feb 8, 2024, 6:57 AM MST Added by Chris Johnson 20240207_100826 Taken on Feb 7, 2024, 10:08 AM MST Added on Feb 8, 2024, 6:57 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 430 of 1851 20240207_094647 Taken on Feb 7, 2024, 9:46 AM MST Added on Feb 8, 2024, 6:57 AM MST Added by Chris Johnson 20240207_094252 Taken on Feb 7, 2024, 9:42 AM MST Added on Feb 8, 2024, 6:57 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 431 of 1851 20240207_100749 Taken on Feb 7, 2024, 10:07 AM MST Added on Feb 8, 2024, 6:57 AM MST Added by Chris Johnson 20240207_094351 Taken on Feb 7, 2024, 9:43 AM MST Added on Feb 8, 2024, 6:57 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 432 of 1851 20240207_094323 Taken on Feb 7, 2024, 9:43 AM MST Added on Feb 8, 2024, 6:57 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 433 of 1851 Form detail #297: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Place Walls Area 50, Place Footing IMCO, General Crew 7 10 Area 40, Batch Concrete Area 50, Batch Concrete Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 5 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Feb 1, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 2, 2024, 6:24 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 434 of 1851 Crew # Workers # Total hours Work performed Totals 24 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40,50 Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 8 Area 40, 50 Concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 435 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is planning to place concrete today at Area 50 footing. If they have time they plan to also place at Area 40 raceway walls. They are working on getting the batch plant going now. 9:00 am IMCO has batched their first truck and I have tested it. All tested in spec with no issues. They are starting to place in the footings at Area 50. 12:00 am IMCO has finished the placement at Area 50. They are going to start placing at Area 40 Raceway walls now. I have tested the first truck after the pump truck moved. All tested in spec with no issues. 1:00 pm Nations roofing is onsite. They are working on the soffit on the gables. IMCO is continuing to place concrete on the walls at Area 40. 2:30 pm IMCO is finishing the top of the walls, most of the crew has taken off for the weekend. Nations roofing is onsite still working on siding and soffit. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 436 of 1851 References Photos (6) 20240201_101605 Taken on Feb 1, 2024, 10:16 AM MST Added on Feb 2, 2024, 6:23 AM MST Added by Chris Johnson 20240201_101132 Taken on Feb 1, 2024, 10:11 AM MST Added on Feb 2, 2024, 6:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 437 of 1851 20240201_141438 Taken on Feb 1, 2024, 2:14 PM MST Added on Feb 2, 2024, 6:23 AM MST Added by Chris Johnson 20240201_141419 Taken on Feb 1, 2024, 2:14 PM MST Added on Feb 2, 2024, 6:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 438 of 1851 20240201_101602 Taken on Feb 1, 2024, 10:16 AM MST Added on Feb 2, 2024, 6:23 AM MST Added by Chris Johnson 20240201_101501 Taken on Feb 1, 2024, 10:15 AM MST Added on Feb 2, 2024, 6:23 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 439 of 1851 Form detail #296: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls Area 50, Foundation Forming IMCO, General Crew 7 10 Area 60, Mechanical Piping in Chiller room, Underdrain and backfill behind building Vale Electric, Electricians 3 8 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Jan 31, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Feb 1, 2024, 9:51 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 440 of 1851 Crew # Workers # Total hours Work performed EOI 3 8 Area 40, Wall Rebar Area 50, Footing Rebar Totals 27 41 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 10, Backfill Hitachi 85 Excavator 1 10 Area 10, Electrical pipe install Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 441 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on forming walls at Area 40. They have formed all the footings for Area 50 and EOI is finishing the rebar install in preparation for tomorrows concrete placement. 9:00 am Attended weekly meeting. 10:00 am Nations Roofing is onsite working on Area 60 and Area 30. They are installing the siding and gutters on the two buildings. 11:00 am I met with Steve and walked the footing rebar and forms. He needed to adjust some rebar for some clearance issues but all is good and ready to place concrete tomorrow. 1:00 pm IMCO is installing piping in the incubation room. I met with Bryce and provided him information regarding clearance for the flow meters. The information came from Schnabel via email. 3:00 pm IMCO has been working on backfilling and installing the underdrain behind the building at Area 60. They are getting the area up to grade so the HVAC concrete pads can be poured. 4:00 pm The crew is ready for tomorrow concrete placement. EOI has been onsite installing rebar at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 442 of 1851 References Photos (15) 20240131_142754 Taken on Jan 31, 2024, 2:27 PM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson 20240131_093825 Taken on Jan 31, 2024, 9:38 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 443 of 1851 20240131_093818 Taken on Jan 31, 2024, 9:38 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson 20240131_093650 Taken on Jan 31, 2024, 9:36 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 444 of 1851 20240124_101834 Taken on Jan 24, 2024, 10:18 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson 20240131_103236 Taken on Jan 31, 2024, 10:32 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 445 of 1851 20240131_102200 Taken on Jan 31, 2024, 10:21 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson 20240131_102149 Taken on Jan 31, 2024, 10:21 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 446 of 1851 20240131_100631 Taken on Jan 31, 2024, 10:06 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson 20240131_093821 Taken on Jan 31, 2024, 9:38 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 447 of 1851 20240131_093746 Taken on Jan 31, 2024, 9:37 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson 20240131_093542 Taken on Jan 31, 2024, 9:35 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 448 of 1851 20240124_101830 Taken on Jan 24, 2024, 10:18 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson 20240124_100728 Taken on Jan 24, 2024, 10:07 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 449 of 1851 20240124_100353 Taken on Jan 24, 2024, 10:03 AM MST Added on Feb 1, 2024, 9:44 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 450 of 1851 Form detail #294: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls Area 50, Foundation Forming IMCO, General Crew 7 10 Area 10, Prepare for IPC line crew, Transformer pad Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Nations Roofing 6 5 Area 60, Roof Forms Location Form date Jan 24, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 26, 2024, 8:59 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 451 of 1851 Crew # Workers # Total hours Work performed YMC Mechanical 3 4 Area 60, HVAC EOI 2 8 Area 50, Footing Rebar Totals 29 45 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 10, Backfill Hitachi 85 Excavator 1 10 Area 10, Electrical pipe install Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 452 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on forming walls at Area 40. They are going to start hand setting forms where the large wall panels cannot be used. Last night they did not run heaters on the walls that were placed. Instead they covered with insulated blankets. 9:00 am Attended weekly meeting. 11:00 am I spoke to Steve about the concrete temperatures without running heaters. He hadn't checked the temperatures yet but he said he would. Later Kirt told me the temps were around 67 Degrees. He said he would have Jeremey start recording temperatures for record. The electricians are continuing to work in the electrical room on things that do not interfere with the wall sheeting. They are continuing to pull wire in the office area. IPC is onsite working on the install of the conduit for the Pine Creek feed. IMCO is excavating for the conduit. 1:00 pm IMCO is continuing to work on forming wall sections at Area 40. Nations roofing is installing siding, fascia and gutters on Area 60. EOI is onsite installing the rebar for the Area 50 Footing. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 453 of 1851 References Photos (4) 20240124_101834 Taken on Jan 24, 2024, 10:18 AM MST Added on Jan 26, 2024, 8:59 AM MST Added by Chris Johnson 20240124_101830 Taken on Jan 24, 2024, 10:18 AM MST Added on Jan 26, 2024, 8:59 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 454 of 1851 20240124_100728 Taken on Jan 24, 2024, 10:07 AM MST Added on Jan 26, 2024, 8:59 AM MST Added by Chris Johnson 20240124_100353 Taken on Jan 24, 2024, 10:03 AM MST Added on Jan 26, 2024, 8:59 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 455 of 1851 Form detail #293: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Place Concrete Area 50, Foundation Forming IMCO, General Crew 6 10 Area 40, Batch Concrete Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Nations Roofing 3 5 Area 60, Roof Forms Location Form date Jan 23, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 24, 2024, 7:24 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 456 of 1851 Crew # Workers # Total hours Work performed YMC Mechanical 2 4 Area 60, HVAC Totals 22 37 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 10, Electrical pipe install Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 10 Area 40, Concrete Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 457 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached concrete field report and IMCO batch tickets. 8:00 am IMCO is working on getting the batch plant up and going in preparation for todays concrete placement at Area 40. 9:00 am The pump truck is onsite and getting setup to pour. I checked in with the batch plant. The water line is froze and they are working to get it thawed. 10:00 am IMCO is still working on thawing the water line. They are using the water truck until then. They are getting the water heated up with the boiler and plan to start batching soon. 11:00 am IMCO has batched 4.5 CY for the first truck. I tested for air. It tested low. They dosed the truck. After dosing the truck I tested again. It barley made it at 5.1%. They started placing. 11:30 am I tested the second truck which had 9 CY on it. The air test came in at 6.9%. I informed Kirt, he said he would dial the air treatment back a little bit. I finished this test and casted cylinders. IMCO is continuing to place concrete in the 6 wall sections they have formed up. 12:30 pm IMCOs second carpenter crew is continuing to work on Area 50 foundation. I informed Jeremy that rebar dowels were missed in the fish lift walls that extend into the footing and stem wall of Area 50. He said they are looking into the depth and size of the bars so they can epoxy them in. 3:00 pm IMCO has completed the concrete placement. They plan to continue working on forming for the next placement. 4:00 pm IMCO is continuing to work on forming the footing for Area 50. Nations Roofing is continuing to work on installing the fascia and soffit trim. They have also been working in the breezeway trimming around the block and the doors. It was noted that Vale electric will stop working in the electrical room until the densglas material and the coatings are approved. 4:30 pm YMC is continuing to work on the office area HVAC. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 458 of 1851 References Photos (9) 20240123_143807 Taken on Jan 23, 2024, 2:38 PM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson 20240123_111534 Taken on Jan 23, 2024, 11:15 AM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 459 of 1851 20240123_090748 Taken on Jan 23, 2024, 9:07 AM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson 20240123_090736 Taken on Jan 23, 2024, 9:07 AM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 460 of 1851 20240123_144213 Taken on Jan 23, 2024, 2:42 PM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson 20240123_144056 Taken on Jan 23, 2024, 2:40 PM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 461 of 1851 20240123_144053 Taken on Jan 23, 2024, 2:40 PM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson 20240123_143843 Taken on Jan 23, 2024, 2:38 PM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 462 of 1851 20240123_133634 Taken on Jan 23, 2024, 1:36 PM MST Added on Jan 24, 2024, 7:19 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 463 of 1851 Form detail #292: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Form Walls Area 50, Begin Foundation Forming IMCO, General Crew 6 10 Area 10, Electrical Piping Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Nations Roofing 3 5 Area 60, Roof Forms Location Form date Jan 22, 2024 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 23, 2024, 7:28 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 464 of 1851 Crew # Workers # Total hours Work performed YMC Mechanical 2 4 Area 60, HVAC Totals 22 37 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Electrical pipe install Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 8 Area 10, Import General Fill Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 465 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 2:00 pm IMCO carpenter crew is continuing to work on forming walls at Area 40. The are placing concrete tomorrow with what they have done at end of today. They are closing up the 6th wall now. 3:00 pm IMCO has brough another carpenter crew onsite to start the foundation of Area 50. I met with Jeremey. He has been checking the elevation and dimensions of the foundation forming. 4:00 pm Nations roofing is onsite to start the roof of Area 60. Jake informed me the penetration YMC installed leaked over the weekend with the snow. They have fixed the issue and is drying the GWB out now. Jake informed me it was minimal. IMCO is continuing to install chiller piping in the chiller room. IMCO pipe crew is working on the incubation drain pipe from the building to MH-4. They informed me that the HDPE fuse machine has broke down and they are working on getting a replacement. 4:30 pm Vale electric is onsite working in the electrical room. He informed me they are almost complete with the raceway install in the room. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 466 of 1851 References Photos (7) 20240122_154247 Taken on Jan 22, 2024, 3:42 PM MST Added on Jan 23, 2024, 7:27 AM MST Added by Chris Johnson 20240122_153801 Taken on Jan 22, 2024, 3:38 PM MST Added on Jan 23, 2024, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 467 of 1851 20240122_153710 Taken on Jan 22, 2024, 3:37 PM MST Added on Jan 23, 2024, 7:27 AM MST Added by Chris Johnson 20240122_153707 Taken on Jan 22, 2024, 3:37 PM MST Added on Jan 23, 2024, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 468 of 1851 20240122_153247 Taken on Jan 22, 2024, 3:32 PM MST Added on Jan 23, 2024, 7:27 AM MST Added by Chris Johnson 20240122_153237 Taken on Jan 22, 2024, 3:32 PM MST Added on Jan 23, 2024, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 469 of 1851 20240122_152818 Taken on Jan 22, 2024, 3:28 PM MST Added on Jan 23, 2024, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 470 of 1851 Form detail #291: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 40, Form Walls IMCO, General Crew 6 10 Area 10, Electrical Piping Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Totals 15 28 Forms Location Form date Jan 18, 2024 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 19, 2024, 11:00 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 471 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Electrical pipe install Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on forming walls at Area 60. They plan on placing concrete next Tuesday. 10:00 am IMCO piping crew is continuing to work on installing Chiller piping inside the Chiller room of Area 60. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 472 of 1851 12:00 pm IMCO dirt crew has been working with Vale Electric on installing the raceway piping from the transformer to the electrical room. They are getting the raceways installed and backfilling with sand. 2:00 pm IMCO is continuing to fly panels with the crane and installing wall panels in preparation for next weeks concrete placement. References Photos (6) 20240118_110546 Taken on Jan 18, 2024, 11:05 AM MST Added on Jan 19, 2024, 10:51 AM MST Added by Chris Johnson 20240118_110535 Taken on Jan 18, 2024, 11:05 AM MST Added on Jan 19, 2024, 10:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 473 of 1851 20240118_140437 Taken on Jan 18, 2024, 2:04 PM MST Added on Jan 19, 2024, 10:51 AM MST Added by Chris Johnson 20240118_110526 Taken on Jan 18, 2024, 11:05 AM MST Added on Jan 19, 2024, 10:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 474 of 1851 20240118_110520 Taken on Jan 18, 2024, 11:05 AM MST Added on Jan 19, 2024, 10:51 AM MST Added by Chris Johnson 20240118_110515 Taken on Jan 18, 2024, 11:05 AM MST Added on Jan 19, 2024, 10:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 475 of 1851 Form detail #290: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 40, Form Walls IMCO, General Crew 6 10 Area 10, Electrical Piping Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Totals 15 28 Forms Location Form date Jan 17, 2024 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 18, 2024, 10:25 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 476 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Electrical pipe install Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am It is continuing to snow here which is slowing down production. IMCO is currently working on forming wall sections at Area 40. They have decided to cancel the concrete placement for this week that was scheduled for tomorrow. They will work through the week on forming wall sections to place next week. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 477 of 1851 9:00 am Attended weekly meeting. 10:00 am IPC was scheduled to be onsite today to install the feeder conduit from the Pine Creek Supply to the duct bank. They were called off to work on an emergency job somewhere else. IMCO has the ditch excavated. I suggested to IMCO they should set caution tape around the trench because the crew will not make it today. 12:00 pm IMCO is continuing to work on mechanical piping inside the chiller room. 2:00 pm IMCO is continuing to work on wall forms. Vale electric is onsite installing the secondary conduit and working inside the electrical room. References Photos (5) 20240117_105003 Taken on Jan 17, 2024, 10:50 AM MST Added on Jan 18, 2024, 10:25 AM MST Added by Chris Johnson 20240117_104958 Taken on Jan 17, 2024, 10:49 AM MST Added on Jan 18, 2024, 10:25 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 478 of 1851 20240117_103748 Taken on Jan 17, 2024, 10:37 AM MST Added on Jan 18, 2024, 10:25 AM MST Added by Chris Johnson 20240117_103519 Taken on Jan 17, 2024, 10:35 AM MST Added on Jan 18, 2024, 10:25 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 479 of 1851 20240117_102554 Taken on Jan 17, 2024, 10:25 AM MST Added on Jan 18, 2024, 10:25 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 480 of 1851 Form detail #289: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Form Walls, Place concrete IMCO, General Crew 6 10 Area 50, Batch Concrete Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Totals 14 28 Forms Location Form date Jan 11, 2024 Description Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 15, 2024, 8:42 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 481 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 8 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 50, Grading Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 8 Area 40, Concrete Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is getting the batch plant warmed up. Today they are putting hot water inside the drums of the concrete trucks and spinning them to warm the drums up. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 482 of 1851 9:30 am IMCO has batched its first truck. I tested the concrete from the pump. It all tested in spec. IMCO started to place concrete in the forms. 11:00 am IMCO is working on placing concrete. They are placing 3 wall panels sections today. 1:00 pm IMCO mechanical piping crew is continuing to install piping in the chiller room. 2:00 pm IMCO has completed the concrete placement. They are getting the heaters setup and covering the walls. 4:00 pm IMCO has the heaters setup and the walls covered. References Photos (3) 20240111_125842 Taken on Jan 11, 2024, 12:58 PM MST Added on Jan 15, 2024, 8:34 AM MST Added by Chris Johnson 20240111_100721 Taken on Jan 11, 2024, 10:07 AM MST Added on Jan 15, 2024, 8:34 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 483 of 1851 20240111_125850 Taken on Jan 11, 2024, 12:58 PM MST Added on Jan 15, 2024, 8:34 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 484 of 1851 Form detail #288: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Form Walls IMCO, General Crew 6 10 Area 50, Piping, Grading Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Totals 14 28 Forms Location Form date Jan 10, 2024 Description Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 11, 2024, 8:03 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 485 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 50, Grading Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on forming walls at Area 40. They have been moving walls from previous placements and getting new sections formed and ready for concrete. They have been using heaters to melt the snow prior to closing the wall up. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 486 of 1851 10:00 am IMCO crew is continuing to work on mechanical piping inside the chiller room. They set the buffer tank yesterday. I noted to the crew that the buffer tank was scratched up and will need to be recoated. 12:00 pm IMCO dirt crew is continuing to work on the piping for the false floor basins in at Area 50. I have met with Kirt to discuss the elevations of the pipes. He has informed me that the pipe elevations will conflict with the structure concrete of the basins. He is lowering the pipes as much as he can to get the them out of the rebar but there will be trim bar needed on some of them. 2:00 pm The crew is continuing to work on setting wall panels at Area 40. Steve informed me he will have 3 wall sections ready this week. The snow slowed down production. 4:00 pm Vale Electric continues to install raceways and gear inside the Electrical room. The more gear they get installed the more stuff that is in the way of the finishing of the room. It has not been textured nor painted yet. I have brought this to the attention of IMCO multiple times and also talked to Vale about it. I have been told they need to continue on with the schedule to meet the March milestone. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 487 of 1851 References Photos (3) 20240110_094139 Taken on Jan 10, 2024, 9:41 AM MST Added on Jan 11, 2024, 7:58 AM MST Added by Chris Johnson 20240110_144838 Taken on Jan 10, 2024, 2:48 PM MST Added on Jan 11, 2024, 7:58 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 488 of 1851 20240110_130755 Taken on Jan 10, 2024, 1:07 PM MST Added on Jan 11, 2024, 7:58 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 489 of 1851 Form detail #287: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Strip Forms, Form Walls Area 60, Fascia IMCO, General Crew 6 10 Area 50, Piping Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Totals 14 28 Forms Location Form date Jan 9, 2024 Description Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 10, 2024, 8:14 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 490 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 4 Area 50, Batch Concrete Hitachi 85 Excavator 1 10 Area 50, Grading Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 4 Area 40, Concrete Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on forming walls at Area 40. It snowed last night and is currently snowing. The crews are working on melting snow off the rebar in the wall sections they are working on. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 491 of 1851 10:00 am IMCO is continuing to work on the chiller room piping. Vale electric is also onsite working in the electrical room. 2:00 pm IMCO is starting to batch concrete for a pipe encasement. They are encasing the rest of the drain piping under Area 50. 4:00 pm IMCO continued to work on mechanical piping in the chiller room along with forming walls at Area 40. References Photos (4) 20240109_143041 Taken on Jan 9, 2024, 2:30 PM MST Added on Jan 10, 2024, 8:13 AM MST Added by Chris Johnson 20240109_141450 Taken on Jan 9, 2024, 2:14 PM MST Added on Jan 10, 2024, 8:13 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 492 of 1851 20240109_084204 Taken on Jan 9, 2024, 8:42 AM MST Added on Jan 10, 2024, 8:13 AM MST Added by Chris Johnson 20240109_084200 Taken on Jan 9, 2024, 8:42 AM MST Added on Jan 10, 2024, 8:13 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 493 of 1851 Form detail #286: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Strip Forms, Form Walls Area 60, Fascia IMCO, General Crew 6 10 Area 50, Piping Area 60, Mechanical Piping in Chiller room Vale Electric, Electricians 3 8 Area 60, Electrical Totals 14 28 Forms Location Form date Jan 8, 2024 Description Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 9, 2024, 10:32 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 494 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 4 Area 50, Batch Concrete Hitachi 85 Excavator 1 10 Area 50, Grading Kobelco 1100G Crane 1 10 Area 40, Fly Panels Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 4 Area 40, Concrete Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:00 am IMCO is working on striping forms at Area 40. The poured the center wall of the fish lift along with 2 wall sections last Friday. They are also working on forming new walls for placement later this week. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 495 of 1851 1:00 pm IMCO has installed the piping for under the 2 holding basins of Area 50. They have installed the reinforcement rebar for the pipe encasement. They plan on encasing this line in concrete today to lock it in so they can continue installing the piping without it moving. I checked with IMCO QC, Jeremy. He said he has double checked all locations and it is ready for placement. 3:00 pm IMCO has placed 2 CY of pipe encasement to lock in the Area 50 drain piping. IMCO carpenters are continuing to work on forming walls for a potential placement this Thursday. 4:00 pm IMCO has one carpenter installing the fascia on Area 60. Another crew is continuing to work on mechanical piping in the chiller room. Vale Electric is continuing to work on installing raceways in the electrical room. References Photos (7) 20240108_143824 Taken on Jan 8, 2024, 2:38 PM MST Added on Jan 9, 2024, 10:31 AM MST Added by Chris Johnson 20240108_143840 Taken on Jan 8, 2024, 2:38 PM MST Added on Jan 9, 2024, 10:31 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 496 of 1851 20240108_143831 Taken on Jan 8, 2024, 2:38 PM MST Added on Jan 9, 2024, 10:31 AM MST Added by Chris Johnson 20240108_143820 Taken on Jan 8, 2024, 2:38 PM MST Added on Jan 9, 2024, 10:31 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 497 of 1851 20240108_142757 Taken on Jan 8, 2024, 2:27 PM MST Added on Jan 9, 2024, 10:31 AM MST Added by Chris Johnson 20240108_141649 Taken on Jan 8, 2024, 2:16 PM MST Added on Jan 9, 2024, 10:31 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 498 of 1851 20240108_141642 Taken on Jan 8, 2024, 2:16 PM MST Added on Jan 9, 2024, 10:31 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 499 of 1851 Form detail #285: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Place Concrete Nations Roofing 5 8 Area 60, Unload Siding IMCO, General Crew 6 10 Area 40, Batch Concrete Area 60, Mechanical Piping in Chiller room Totals 16 28 Forms Location Form date Jan 5, 2024 Description Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 8, 2024, 12:38 PM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 500 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 8 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 50, Grading Kobelco 1100G Crane 1 Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 8 Area 40, Concrete Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:00 am IMCO is batching concrete for todays placement. 9:30 am I have taken the first test. It was low on air. IMCO dosed the truck with air treatment. I tested again and Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 501 of 1851 all was in spec. IMCO started placing concrete. 10:30 am IMCO is placing concrete. They are placing multiple locations including the center wall for the fish lift, and 3 separate CJ to CJ wall sections of Area 40. They are placing in lifts. Some metal siding has arrived and IMCO is unloading it. Nations Roofing is onsite to help with unloading. It also appears they are taking measurements for the siding of the Hatchery Building. 12:00 pm Jake informed me that Nations Roofing supplier sent the wrong material. They sent material for the roof but not the siding for Area 30. They plan to start installing the roofing material next week. 1:00 pm IMCO is has completed the concrete placement. References Photos (5) 20240105_102704 Taken on Jan 5, 2024, 10:27 AM MST Added on Jan 8, 2024, 11:53 AM MST Added by Chris Johnson 20240105_101314 Taken on Jan 5, 2024, 10:13 AM MST Added on Jan 8, 2024, 11:53 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 502 of 1851 20240105_101050 Taken on Jan 5, 2024, 10:10 AM MST Added on Jan 8, 2024, 11:53 AM MST Added by Chris Johnson 20240105_101017 Taken on Jan 5, 2024, 10:10 AM MST Added on Jan 8, 2024, 11:53 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 503 of 1851 20240105_101013 Taken on Jan 5, 2024, 10:10 AM MST Added on Jan 8, 2024, 11:53 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 504 of 1851 Form detail #284: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Area 50, Grading for foundation Area 60, Exterior Trim YMC HVAC 3 10 Area 60, HVAC Totals 6 20 2. Materials Forms Location Form date Jan 2, 2024 Description Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jan 2, 2024, 4:33 PM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 505 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 50, Grading Kobelco 1100G Crane 1 Bomag Roller 1 10 Area 50, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 50, Import Fill 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:30 am IMCO has a small crew onsite. They are working on grading the foundation for Area 50. Importing material from the stockpile across the river. 1:30 pm I walked the site checking on progress. They have started the siding around beams. I checked the one location that is ready for concrete placement. The corner wall at Area 40 in raceway 1. This has the blockout change per RFI 140. The form savers are installed as well. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 506 of 1851 References Photos (5) 20240102_124511 Taken on Jan 2, 2024, 12:45 PM MST Added on Jan 2, 2024, 4:08 PM MST Added by Chris Johnson 20240102_124439 Taken on Jan 2, 2024, 12:44 PM MST Added on Jan 2, 2024, 4:08 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 507 of 1851 20240102_124434 Taken on Jan 2, 2024, 12:44 PM MST Added on Jan 2, 2024, 4:08 PM MST Added by Chris Johnson 20240102_123132 Taken on Jan 2, 2024, 12:31 PM MST Added on Jan 2, 2024, 4:08 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 508 of 1851 20240102_123123 Taken on Jan 2, 2024, 12:31 PM MST Added on Jan 2, 2024, 4:08 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 509 of 1851 Form detail #283: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 7 Area 40, Wall Forms, Place Concrete Vale Electric 3 8 Area 60 Electrical IMCO, General Crew 8 10 Area 10, Piping, Pipe Encasement Area 40, Batch Concrete Area 60, Piping inside Incubation room, Fix Door frames YMC HVAC 3 10 Area 60, HVAC Forms Location Form date Dec 20, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 21, 2023, 8:24 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 510 of 1851 Crew # Workers # Total hours Work performed Totals 24 35 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 8 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 8 Area 40, concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 511 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is prepping the batch plant getting ready for concrete placement today. They plan on placing 5 wall sections at Area 40. The may also capture some pipe encasements. 9:00 am Pump truck is onsite and starting to place concrete. I tested the first truck. It was low on air at 4.5%. The concrete looked very stiff. They added water and also dosed it with more air. The crew decided to place concrete in the pipe encasement. After the dosing and adding water they poured out approx. 1.5 CY and I took my second test on the same truck. The air was good at 6.8%. There is only about 1 CY of concrete left in the truck so I informed the crew I would be testing the second truck. They placed the 1 CY in the pipe encasement. 10:45 am The second truck came out with 9 CY on. I tested after the crew placed ~1CY in the pipe encasement. The test was extreme low on air at 4%. They dosed the truck. I tested it again and got 5.6% air. They are going to start placing in the wall forms. 11:00 am IMCO has a crew working on the chiller room piping. 12:00 pm IMCO is continuing to place concrete. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 512 of 1851 References Photos (6) 20231220_114227 Taken on Dec 20, 2023, 11:42 AM MST Added on Dec 21, 2023, 8:22 AM MST Added by Chris Johnson 20231220_114110 Taken on Dec 20, 2023, 11:41 AM MST Added on Dec 21, 2023, 8:22 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 513 of 1851 20231220_114103 Taken on Dec 20, 2023, 11:41 AM MST Added on Dec 21, 2023, 8:22 AM MST Added by Chris Johnson 20231220_114056 Taken on Dec 20, 2023, 11:40 AM MST Added on Dec 21, 2023, 8:22 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 514 of 1851 20231220_113133 Taken on Dec 20, 2023, 11:31 AM MST Added on Dec 21, 2023, 8:22 AM MST Added by Chris Johnson 20231220_113123 Taken on Dec 20, 2023, 11:31 AM MST Added on Dec 21, 2023, 8:22 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 515 of 1851 Form detail #282: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 7 Area 40, Wall Forms Vale Electric 3 8 Area 60 Electrical IMCO, General Crew 8 10 Area 10, Piping, Pipe Encasement Area 60, Piping inside Incubation room, Fix Door frames YMC HVAC 3 10 Area 60, HVAC Forms Location Form date Dec 19, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 20, 2023, 6:21 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 516 of 1851 Crew # Workers # Total hours Work performed Totals 24 35 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, 12" cross crowder channel line Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 6 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 517 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO crew is continuing to work in the chiller room. The crew is starting the piping by laying out and installing the pumps on the housekeeping pads. 9:00 am IMCO carpenters are continuing to set wall forms and bulkheads for Area 40. 11:00 am ACORE is onsite to core drill manholes. IMCO is continuing to layout pumps and mechanical piping for the chiller room. 1:00 pm IMCO is working on installing the rebar around the 12" cross crowder channel pipe to be concrete encased. 4:00 pm IMCO is reinstalling the GWB around the doors in the office area after removing them to fix the doors. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 518 of 1851 References Photos (6) 20231219_143801 Taken on Dec 19, 2023, 2:38 PM MST Added on Dec 19, 2023, 3:37 PM MST Added by Chris Johnson 20231219_102652 Taken on Dec 19, 2023, 10:26 AM MST Added on Dec 19, 2023, 3:37 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 519 of 1851 20231219_102143 Taken on Dec 19, 2023, 10:21 AM MST Added on Dec 19, 2023, 3:37 PM MST Added by Chris Johnson 20231219_102148 Taken on Dec 19, 2023, 10:21 AM MST Added on Dec 19, 2023, 3:37 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 520 of 1851 20231219_100840 Taken on Dec 19, 2023, 10:08 AM MST Added on Dec 19, 2023, 3:37 PM MST Added by Chris Johnson 20231219_100834 Taken on Dec 19, 2023, 10:08 AM MST Added on Dec 19, 2023, 3:37 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 521 of 1851 Form detail #281: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 7 Area 40, Wall Forms Vale Electric 3 8 Area 60 Electrical IMCO, General Crew 8 10 Area 10, Piping, Pipe Encasement Area 60, Piping inside Incubation room, Set Chiller, Fix Door frames YMC HVAC 3 10 Area 60, HVAC Forms Location Form date Dec 18, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 19, 2023, 7:36 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 522 of 1851 Crew # Workers # Total hours Work performed Totals 24 35 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 2 Area 10, Batch Concrete, pipe encasement Hitachi 85 Excavator 1 10 Area 10, 12" cross crowder channel line Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 5 Area 40, Concrete Dump Truck 1 6 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 523 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am Arrived on site. I walked the site. At Area 60, IMCO has exposed the door frames by removing GWB, DenGlass and CMU block. See photos. It looks like the door frames were fixed and ready for doors to be hung. IMCO has a crew working on the 4" drain line from the Fish lift at Area 10. This line was backfilled last week but needed to have concrete pipe encasement. IMCO crew has exposed the line and is currently working on installing the rebar for the concrete. They plan to place this concrete today. 10:30 am IMCO is currently working on setting the chiller on the housekeeping pad in the chiller room of Area 60. 11:00 am IMCO carpenters are working on bulkheads and wall forms at Area 40. They have stripped some of the walls from last weeks placement. 1:00 pm IMCO is continuing to work on installing the chiller by anchoring it to the housekeeping pad. 4:00 pm The pipe crew has installed the rebar for the pipe encasement. They placed the concrete over the 4" pipe. They also captured a couple thrust blocks with the same batch. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 524 of 1851 References Photos (14) 20231218_142411 Taken on Dec 18, 2023, 2:24 PM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson 20231218_143446 Taken on Dec 18, 2023, 2:34 PM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 525 of 1851 20231218_141737 Taken on Dec 18, 2023, 2:17 PM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson 20231218_115956 Taken on Dec 18, 2023, 11:59 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 526 of 1851 20231218_115918 Taken on Dec 18, 2023, 11:59 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson 20231218_113744 Taken on Dec 18, 2023, 11:37 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 527 of 1851 20231218_113720 Taken on Dec 18, 2023, 11:37 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson 20231218_120925 Taken on Dec 18, 2023, 12:09 PM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 528 of 1851 20231218_143027 Taken on Dec 18, 2023, 2:30 PM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson 20231218_115952 Taken on Dec 18, 2023, 11:59 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 529 of 1851 20231218_113954 Taken on Dec 18, 2023, 11:39 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson 20231218_113951 Taken on Dec 18, 2023, 11:39 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 530 of 1851 20231218_113734 Taken on Dec 18, 2023, 11:37 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson 20231218_113726 Taken on Dec 18, 2023, 11:37 AM MST Added on Dec 19, 2023, 7:14 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 531 of 1851 Form detail #280: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 10 Area 40, Wall Forms, Place Concrete Vale Electric 3 8 Area 60 Electrical IMCO, General Crew 5 10 Area 10, Piping, Batch Concrete, 12" spray bar line Area 60, Piping inside Incubation room, Housekeeping equipment pads Forms Location Form date Dec 14, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 15, 2023, 7:20 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 532 of 1851 Crew # Workers # Total hours Work performed YMC HVAC 3 10 Area 60, HVAC EOI 2 8 Area 40, Rebar Totals 23 46 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 5 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 10, 12" cross crowder channel line Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 5 Area 40, Concrete Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 533 of 1851 Equipment Quantity Hours used Comment Dump Truck 1 6 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is batching concrete for todays placement of the wall sections at Area 40. They also plan to place housekeeping pads in the chiller room of Area 60. 9:00 am I have tested the first truck. All passed with no issues. They are starting to place concrete walls. 9:30 am IMCO is also placing housekeeping pads in the chiller room. 11:30 am IMCO is batching a clean up truck of 3 yards to complete the pour. I noticed two interior doors were installing in the hatchery building. Since they were installed after the GWB, tape and texture they had to cut holes in the sheet rock to install the doors. See photos. The doors are not very sturdy either. The sheet rock is not locked in behind the frames per the details on GA-6 of the project plans. 12:00 pm Vale Electric is installing the gear inside the electrical room of Area 60. I mentioned to them that it is going to be very difficult to finish the wall behind the gear (texture and paint). They said they need to continue installing the gear to stay on track for the March deadline to have the hatchery building complete. IMCO has completed the concrete placement for the day. 2:00 pm I spoke to Jeremiah from IMCO. He said he would be the one fixing the doors in the hatchery building. He was aware of my concerns and he is going to be working on fixing them. 4:30 pm IMCO pipe crew has been working on installing the 12" spray bar line from Area 30 to Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 534 of 1851 References Photos (18) 20231214_153124 Taken on Dec 14, 2023, 3:31 PM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_152127 Taken on Dec 14, 2023, 3:21 PM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 535 of 1851 20231214_151444 Taken on Dec 14, 2023, 3:14 PM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_150230 Taken on Dec 14, 2023, 3:02 PM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 536 of 1851 20231214_110437 Taken on Dec 14, 2023, 11:04 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_110431 Taken on Dec 14, 2023, 11:04 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 537 of 1851 20231214_110134 Taken on Dec 14, 2023, 11:01 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_092541 Taken on Dec 14, 2023, 9:25 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 538 of 1851 20231214_091617 Taken on Dec 14, 2023, 9:16 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_150314 Taken on Dec 14, 2023, 3:03 PM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 539 of 1851 20231214_150308 Taken on Dec 14, 2023, 3:03 PM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_110452 Taken on Dec 14, 2023, 11:04 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 540 of 1851 20231214_110443 Taken on Dec 14, 2023, 11:04 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_110427 Taken on Dec 14, 2023, 11:04 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 541 of 1851 20231214_110143 Taken on Dec 14, 2023, 11:01 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_092546 Taken on Dec 14, 2023, 9:25 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 542 of 1851 20231214_092532 Taken on Dec 14, 2023, 9:25 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson 20231214_091639 Taken on Dec 14, 2023, 9:16 AM MST Added on Dec 15, 2023, 7:15 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 543 of 1851 Form detail #279: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 10 Area 40, Wall Forms Vale Electric 3 8 Area 60 Electrical IMCO, General Crew 5 10 Area 10, Piping Area 60, Piping inside Incubation room, Housekeeping equipment pads YMC HVAC 3 10 Area 60, HVAC Forms Location Form date Dec 13, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 14, 2023, 10:04 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 544 of 1851 Crew # Workers # Total hours Work performed EOI 2 8 Area 40, Rebar Totals 23 46 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, 12" cross crowder channel line Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 5 Dump Truck 1 6 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 545 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on bulkheads and wall forms. They plan to place a few sections of walls tomorrow. A crew is working on the housekeeping pads in the chiller room. They plan to place those tomorrow as well. YMC is onsite working on HVAC lines at Area 60 and EOI is onsite working on rebar at Area 40. 9:00 am Left site to return concrete cylinders. References Photos (2) 20231213_090448 Taken on Dec 13, 2023, 9:04 AM MST Added on Dec 14, 2023, 9:59 AM MST Added by Chris Johnson 20231213_090356 Taken on Dec 13, 2023, 9:03 AM MST Added on Dec 14, 2023, 9:59 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 546 of 1851 Form detail #278: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 10 Area 40, Wall Forms, Place concrete Vale Electric 3 8 Area 60 Electrical IMCO, General Crew 5 10 Area 10, Piping Area 60, Piping inside Incubation room, Housekeeping equipment pads YMC HVAC 3 10 Area 60, HVAC Forms Location Form date Dec 12, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 13, 2023, 7:21 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 547 of 1851 Crew # Workers # Total hours Work performed Totals 21 38 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 10, 12" cross crowder channel line Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 5 Area 40, Concrete Dump Truck 1 6 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 548 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is prepping to place concrete today at Area 40. They have 4 wall sections ready for placement. 9:00 am IMCO has batched their first truck. I took my sample from the end of the pump after they pumped out approx. 1 CY. All passed with no issues. They are starting to place the concrete in the forms. 10:00 am Vale is onsite installing electrical gear in the electrical room of Area 60. IMCO is continuing to place concrete. They are also continuing to form walls and bulkheads. 11:30 am IMCO has completed the concrete placement for the day. They were able to capture 4 wall sections and a thrust block for the piping. They are going to continue working on bulkheads and wall forming for the next placement. 2:00 pm IMCO has a crew working on installing the incubation piping in the incubation room. I spoke to the crew about ensuring the pipes are clean on the inside before installing them. I wasnt sure how IMCO would clean them after install. There is another crew working on installing the housekeeping pads in the chiller room. The forming looks to be complete. They are now working on the rebar for the pads. 4:00 pm IMCO has installed another raceway gate. They are continuing to work on wall forming. The pipe crew has started to install the 12" cross crowder line from Area 30 to the valve vault. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 549 of 1851 References Photos (6) 20231212_110018 Taken on Dec 12, 2023, 11:00 AM MST Added on Dec 13, 2023, 7:11 AM MST Added by Chris Johnson 20231212_161218 Taken on Dec 12, 2023, 4:12 PM MST Added on Dec 13, 2023, 7:11 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 550 of 1851 20231212_161213 Taken on Dec 12, 2023, 4:12 PM MST Added on Dec 13, 2023, 7:11 AM MST Added by Chris Johnson 20231212_150312 Taken on Dec 12, 2023, 3:03 PM MST Added on Dec 13, 2023, 7:11 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 551 of 1851 20231212_144907 Taken on Dec 12, 2023, 2:49 PM MST Added on Dec 13, 2023, 7:11 AM MST Added by Chris Johnson 20231212_144634 Taken on Dec 12, 2023, 2:46 PM MST Added on Dec 13, 2023, 7:11 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 552 of 1851 Form detail #277: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 10 Area 40, Wall Forms Vale Electric 3 8 Area 60 Electrical IMCO, General Crew 5 10 Area 10, Piping Area 60, Piping inside Incubation room YMC HVAC 3 10 Area 60, HVAC Forms Location Form date Dec 11, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 12, 2023, 6:41 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 553 of 1851 Crew # Workers # Total hours Work performed Totals 21 38 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 10 Hitachi 85 Excavator 1 10 Area 10, 4" drain line Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 10 Dump Truck 1 6 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 554 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO is onsite working on wall forms at Area 40. Steve informed me he plans to place 4 maybe 5 wall sections on Tuesday. I reviewed the wall sections they placed last week. Some are covered up with plastic still but the sections I did see showed some areas that need attention. The areas were minor but I brought these to Steves attention. See photos. 11:00 am IMCO pipe crew is currently working on installing the 4 inch drain line from the fish lift to MH 2. 1:00 pm The drywall crew finished the texturing last week. They sprayed an orange peel texture on all the ceilings and the walls. IMCO has a crew in the chiller room laying out the housekeeping pads for the equipment. They informed me they hope to place these pads by end of the week. 2:00 pm IMCO has a crew inside the incubation room working on the piping. The CMU crew finished last week. The pipe crew is working on backfilling the 4" drain line from the fish lift to MH 2. I noticed they backfilled sections that will be under the building footprint of Area 50. I asked Jake if that should be incased in concrete like the other piping across the job. He said it probably should be and he will talk to Kirt about it. 4:00 pm IMCO is continuing to set bulkheads and wall forms at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 555 of 1851 References Photos (9) 20231211_112051 Taken on Dec 11, 2023, 11:20 AM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson 20231211_111001 Taken on Dec 11, 2023, 11:10 AM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 556 of 1851 20231211_110420 Taken on Dec 11, 2023, 11:04 AM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson 20231211_110406 Taken on Dec 11, 2023, 11:04 AM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 557 of 1851 20231211_110335 Taken on Dec 11, 2023, 11:03 AM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson 20231211_110138 Taken on Dec 11, 2023, 11:01 AM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 558 of 1851 20231211_110120 Taken on Dec 11, 2023, 11:01 AM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson 20231211_153121 Taken on Dec 11, 2023, 3:31 PM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 559 of 1851 20231211_110958 Taken on Dec 11, 2023, 11:09 AM MST Added on Dec 12, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 560 of 1851 Form detail #276: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 10 Area 40, Wall Forms Vale Electric 2 8 IMCO, General Crew 5 10 Area 10, Piping Area 60, Begin Piping inside Incubation room Basin Masonary 6 10 Area 60, CMU Masonry Forms Location Form date Dec 6, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 7, 2023, 6:44 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 561 of 1851 Crew # Workers # Total hours Work performed JC Drywall 6 10 Area 60, GWB, Taping EOI 3 10 Area 40, Wall Rebar Totals 32 58 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 10 Hitachi 85 Excavator 1 10 Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 10 Dump Truck 1 6 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 562 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on bulkheads for the next wall placements at Area 40. EOI is onsite continuing to install wall rebar ahead of the carpenters. 9:00 am The mason crew is working on the CMU install inside the incubation room at Area 60. JC Drywall is onsite to continue taping and mudding the seams of the GWB at Area 60. IMCO has been keeping heat blowing in the building to achieve above 50 degree temps per the manufacture recommendations for the drywall mud. They also have heat blowing in the incubation room for the masons. They are continuing to move heaters around to provide heat in the other rooms to keep up with JC Drywall. 11:00 am The carpenter crew is continuing to work on bulkheads and installing the spray bar penetrations. JC Drywall is continuing to tape the seams and screw holes on the DenGlass and GWB. Nations Roofing is onsite working on installing the rest of the ice shield on the roof of Area 60. IMCO pipe crew is working on some HDPE installation for the spray bar line. 12:00 pm Leaving site to return cylinders from yesterdays placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 563 of 1851 References Photos (5) 20231206_103534 Taken on Dec 6, 2023, 10:35 AM MST Added on Dec 7, 2023, 6:39 AM MST Added by Chris Johnson 20231206_102124 Taken on Dec 6, 2023, 10:21 AM MST Added on Dec 7, 2023, 6:39 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 564 of 1851 20231206_102122 Taken on Dec 6, 2023, 10:21 AM MST Added on Dec 7, 2023, 6:39 AM MST Added by Chris Johnson 20231206_080029 Taken on Dec 6, 2023, 8:00 AM MST Added on Dec 7, 2023, 6:39 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 565 of 1851 20231206_080027 Taken on Dec 6, 2023, 8:00 AM MST Added on Dec 7, 2023, 6:39 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 566 of 1851 Form detail #275: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 10 10 Area 40, Wall Forms, Place Concrete Vale Electric 2 8 IMCO, General Crew 5 10 Area 60, Install partition walls Area 40, Batch Concrete Basin Masonary 6 10 Area 60, CMU Masonry Forms Location Form date Dec 5, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 6, 2023, 7:26 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 567 of 1851 Crew # Workers # Total hours Work performed JC Drywall 6 10 Area 60, GWB, Taping EOI 3 10 Area 40, Wall Rebar Totals 32 58 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 10 Batch Concrete Dump Truck 1 6 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 568 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is prepping to place concrete today at Area 10 and Area 40. They plan to place two retaining wall sections near the hatchery building along with 4 raceway walls at Area 40. 8:00 am Pump truck is onsite. IMCO is starting to batch concrete. 9:00 am I have taken my first test. The concrete was low on air at 4.3%, by request I also tested the slump which was 7 1/4". They dosed the truck and mixed it longer. I took my second test from the same truck. It was at 5.5% air and 5 1/2" slump. They started to place concrete in the retaining walls behind Area 60. 10:00 am JC Drywall is onsite to tape the seams of the GWB in Area 60. They are installing ceiling GWB in the office area as well. IMCO crew is installing the partitions in the office area to be drywalled as well. The crew is continuing to place concrete in the retaining walls. 12:00 pm IMCO has started placing walls at Area 40. The masons have started placing CMU block inside the incubation room. They have one wall to finish. IMCO has taken the overhead door down so the door can mount to the CMU per plan. IMCO has heat running into the room for the mortar. 2:00 pm IMCO has completed the placement for today. All went well with no issues. EOI is onsite today installing wall rebar at Area 40. 4:00 pm IMCO is continuing to install bulkheads for the next wall placements. JC Drywall has been working on ceiling GWB in the office area along with mudding the seams and screw holes. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 569 of 1851 References Photos (7) 20231205_094903 Taken on Dec 5, 2023, 9:49 AM MST Added on Dec 6, 2023, 6:32 AM MST Added by Chris Johnson 20231205_133006 Taken on Dec 5, 2023, 1:30 PM MST Added on Dec 6, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 570 of 1851 20231205_130558 Taken on Dec 5, 2023, 1:05 PM MST Added on Dec 6, 2023, 6:32 AM MST Added by Chris Johnson 20231205_103247 Taken on Dec 5, 2023, 10:32 AM MST Added on Dec 6, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 571 of 1851 20231205_094243 Taken on Dec 5, 2023, 9:42 AM MST Added on Dec 6, 2023, 6:32 AM MST Added by Chris Johnson 20231205_150117 Taken on Dec 5, 2023, 3:01 PM MST Added on Dec 6, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 572 of 1851 20231205_094411 Taken on Dec 5, 2023, 9:44 AM MST Added on Dec 6, 2023, 6:32 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 573 of 1851 Form detail #274: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Wall Forms Vale Electric 2 8 IMCO, General Crew 5 10 Area 60, Finish HDs and anchor bolts, Build Soffit for cabinets Area 10, Irrigation Tank install Basin Masonary 6 10 Area 60, Exterior Masonry Forms Location Form date Dec 4, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 5, 2023, 12:27 PM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 574 of 1851 Crew # Workers # Total hours Work performed JC Drywall 6 10 Area 60, GWB, Taping Totals 27 48 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Hitachi 85 Excavator 1 10 Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 6 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 575 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am Arrived on site. Jake contacted me in route to check on my ETA. He is looking to get the hold downs approved for completion. The taping crew is here to start taping the drywall at Area 60. As I walked the building with Jake checking on the HDs we discovered a few that were not installed or were missing nuts and a few that were not tightened. They are working on fixing them as we find them. I noticed water on the concrete near the front door of the office area. I looked up and there was puddled water on the vapor barrier for the ceiling. I mentioned this to Jake as he was standing there with me. I voiced my concern with him regarding water ruining drywall or insulation. I told him I have a concern that if there is water damage it could be difficult to see its extent with the drywall being installed. I walked the incubation room where the CMU block has been completed. I pointed out to Jake a few issues I seen. The reveal around the interior doors changes from bottom of the door to top of the door. The clips to secure the door were not used, assuming because the door was installed post CMU installation. I also noticed some large notches in the block where electrical conduit penetrates the block. We then walked into the electrical room. As we were checking on HDs I noticed water inside the vapor barrier on the corner of the room. The 2x was wet to the touch. It was a small gap between the DensGlass sheathing that I am attempting to see through. See pictures. I notified Zack of these issues. 1:00 pm Jake informed me they are working on the hold downs. JC drywall is onsite prepping to tape the seams of the drywall. The masons are onsite working on the exterior stone. 2:00 pm IMCO general crew is continuing to get wall forms ready at Area 40. They plan on placing tomorrow. They have 2 retaining wall sections ready for placement near Area 60 that they will place tomorrow with the Area 40 wall placement. The crew is prepping to install a gate for raceway 3. 4:00 pm Walked the hatchery building with Jake to perform a final on the hold downs. They were all complete. JC Drywall is installing the drywall that was left off for the hold down installation. 4:30 pm IMCO installed the gate to raceway 3. They are continuing to work on wall forms at Area 40. I noticed IMCO has is placing plastic on the roof of Area 60. The build outs on the building did not have any ice shield on it. They are placing plastic where there is no ice shield. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 576 of 1851 References Photos (17) 20231204_153153 Taken on Dec 4, 2023, 3:31 PM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_135047 Taken on Dec 4, 2023, 1:50 PM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 577 of 1851 20231204_133734 Taken on Dec 4, 2023, 1:37 PM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_110626 Taken on Dec 4, 2023, 11:06 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 578 of 1851 20231204_110601 Taken on Dec 4, 2023, 11:04 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_105528 Taken on Dec 4, 2023, 10:55 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 579 of 1851 20231204_104435 Taken on Dec 4, 2023, 10:44 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_104429 Taken on Dec 4, 2023, 10:44 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 580 of 1851 20231204_104426 Taken on Dec 4, 2023, 10:44 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_103217 Taken on Dec 4, 2023, 10:32 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 581 of 1851 20231204_103158 Taken on Dec 4, 2023, 10:31 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_110456 Taken on Dec 4, 2023, 11:04 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 582 of 1851 20231204_105539 Taken on Dec 4, 2023, 10:55 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_104322 Taken on Dec 4, 2023, 10:43 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 583 of 1851 20231204_103926 Taken on Dec 4, 2023, 10:39 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_103919 Taken on Dec 4, 2023, 10:39 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson 20231204_103212 Taken on Dec 4, 2023, 10:32 AM MST Added on Dec 5, 2023, 7:30 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 584 of 1851 Form detail #273: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Wall Forms Vale Electric 2 8 Area 20, Conduit for river sensor Area 60, wiring IMCO, General Crew 5 10 Area 10, Retaining wall placement Basin Masonary 6 10 Area 60, Interior Masonry JC Drywall 4 10 Area 60, GWB Forms Location Form date Nov 30, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Dec 4, 2023, 11:26 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 585 of 1851 Crew # Workers # Total hours Work performed Totals 25 48 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 10, Backfill, load quarry spalls Hitachi 85 Excavator 1 10 Area 10, Backfill Retaining Wall Kobelco 1100G Crane 1 10 Area 40, fly wall panels, Set gate Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 6 Area 10, Import Quarry spalls 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 586 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO plans to continue setting wall forms today. In the morning meeting I was asked when they could strip the forms. I informed the crew, including Kirt and Jake, the requirement is 48 hours for stripping and 72 hours for cold weather protection which requires the surface of the concrete to be above 50 degrees. I also suggested that the temperature drop for the first 24 hours after the 72 hour protection should not drop dramatically (no more than 40 degrees) per ACI 306. 9:00 am I walked the site. I noticed the crews moving heaters around. Steve informed me he would be checking temperatures 3 times a day on the concrete surface. He also said he would be recording the temperatures. They are working on filling them up with diesel now. I was informed that the heater was removed from the incubation room last night to heat the retaining walls. I was told the 2 new heaters that were delivered yesterday were not setup correctly so they could not use them last night. This means the incubation room CMU that was installed yesterday when through the night without heat. I check the surface temperature of the mortar in the room. It showed 24 degrees. This is well below the specifications. I informed Jake of the deficiency and I informed Zack of the issue. 10:00 am IMCO is continuing to work on setting wall forms at Area 40. I also noticed they were setting up to install grout under the raceway gate that they set yesterday. I informed the crew the metal needs to be above freezing and the grout they mix needs to be within the specifications of the manufacture. There is a crew working on backfilling the retaining wall behind Area 60. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 587 of 1851 References Photos (12) 20231130_105417 Taken on Nov 30, 2023, 10:54 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson 20231130_103052 Taken on Nov 30, 2023, 10:30 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 588 of 1851 20231130_102939 Taken on Nov 30, 2023, 10:29 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson 20231130_084909 Taken on Nov 30, 2023, 8:49 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 589 of 1851 20231130_084648 Taken on Nov 30, 2023, 8:46 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson 20231130_084644 Taken on Nov 30, 2023, 8:46 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 590 of 1851 20231130_084632 Taken on Nov 30, 2023, 8:46 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson 20231130_084624 Taken on Nov 30, 2023, 8:46 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 591 of 1851 20231130_084620 Taken on Nov 30, 2023, 8:46 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson 20231130_084504 Taken on Nov 30, 2023, 8:45 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 592 of 1851 20231130_084455 Taken on Nov 30, 2023, 8:44 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson 20231130_083449 Taken on Nov 30, 2023, 8:34 AM MST Added on Dec 4, 2023, 11:24 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 593 of 1851 Form detail #272: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Wall Forms Vale Electric 2 8 Area 20, Conduit for river sensor Area 60, wiring IMCO, General Crew 5 10 Area 10, Retaining wall placement Basin Masonary 6 10 Area 60, Interior Masonry JC Drywall 4 10 Area 60, GWB Forms Location Form date Nov 29, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 29, 2023, 6:11 PM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 594 of 1851 Crew # Workers # Total hours Work performed Totals 25 48 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 10, Backfill, load quarry spalls Hitachi 85 Excavator 1 10 Area 10, Backfill Retaining Wall Kobelco 1100G Crane 1 10 Area 40, fly wall panels, Set gate Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 6 Area 10, Import Quarry spalls 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 595 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am Ryan informed me that he laid out the missing HDs in Area 60 ahead of the drywall crew. He said they worked on drilling some of them last night. After the sun comes up we will walk it together. 8:30 am After walking Area 60 Hold downs, Many were still missing along with some of the drywall being installed. They will have to remove drywall to finish the punch list items of the framing. I walked the site to check concrete temperatures from yesterdays placement. I noticed right away that the retaining wall placements were only partially covered last night with insulated blankets. This is a deficiency in the cold weather concrete placement. I checked the temperature of the outside of the forms. The average was ~32 degrees. It is unknown what the internal temperature of the concrete is due to lack of internal thermometers. 9:00 am The drywall crew installed the cement board ceiling inside the incubation room yesterday. The block sub contractor is starting to work on installing CMU block inside the incubation room. I informed IMCO they are still missing structural HDs inside this room. The overhead door also needs to be removed so the block can be installed. IMCO did run heaters on the Area 40 walls last night to prevent the concrete from dropping below 50 degrees. 1:00 pm IMCO is currently working on installing the second raceway gate at Area 40. IMCO has notified me that all the HDs are complete and ready for inspection. We walked Area 60 again. I found multiple HDs that were not installed or missing nuts. The block crew is continuing to install CMU blocking. I pointed out to IMCO that the CMU block is not sitting flush with the concrete curb and a small lip is visible in some locations. Ryan informed me he would talk to Kirt and come up with a solution. The drywall crew is also continuing to install GWB on the ceiling. They are staying away from the bottom to allow IMCO to fix the HDs. 2:00 pm IMCO has been working on backfilling the retaining wall behind Area 60. They are using drain rock around the perforated pipe. They are importing quarry spalls to the section above the pipe. 3:00 pm IMCO is getting a heater setup for the retaining wall sections. I checked the temperature of the outside forms to compare to earlier today. They averaged ~48 degrees. This have been ~28 hours of cold weather placement deficiency. 4:00 pm IMCO carpenters are continuing to install wall forms in preparation for the next Area 40 wall placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 596 of 1851 References Photos (15) 20231129_143152 Taken on Nov 29, 2023, 2:31 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson 20231129_142456 Taken on Nov 29, 2023, 2:24 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 597 of 1851 20231129_142446 Taken on Nov 29, 2023, 2:24 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson 20231129_140438 Taken on Nov 29, 2023, 2:04 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 598 of 1851 20231129_124407 Taken on Nov 29, 2023, 12:44 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson 20231129_124123 Taken on Nov 29, 2023, 12:41 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 599 of 1851 20231129_124111 Taken on Nov 29, 2023, 12:41 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson 20231129_123850 Taken on Nov 29, 2023, 12:38 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 600 of 1851 20231129_083840 Taken on Nov 29, 2023, 8:38 AM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson 20231129_083715 Taken on Nov 29, 2023, 8:37 AM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 601 of 1851 20231129_083711 Taken on Nov 29, 2023, 8:37 AM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson 20231129_081712 Taken on Nov 29, 2023, 8:17 AM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 602 of 1851 20231129_140448 Taken on Nov 29, 2023, 2:04 PM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson 20231129_083831 Taken on Nov 29, 2023, 8:38 AM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 603 of 1851 20231129_081719 Taken on Nov 29, 2023, 8:17 AM MST Added on Nov 29, 2023, 3:17 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 604 of 1851 Form detail #271: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Concrete placement Vale Electric 2 8 Area 20, Conduit for river sensor Area 60, wiring IMCO, General Crew 5 10 Area 40 Batch Concrete Basin Masonary 6 10 Area 60, Exterior Masonry JC Drywall 4 4 Area 60, Ceiling durarock Forms Location Form date Nov 28, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 29, 2023, 7:42 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 605 of 1851 Crew # Workers # Total hours Work performed Totals 25 42 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 10, Backfill Retaining Wall Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 10 Area 40, Concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 606 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is planning to place concrete today at 4 locations. Two retaining wall sections and 2 holding facility wall sections. The current temp outside is ~20 degrees. I did not see any heaters on the forms/ rebar. I asked Ryan if he could look into it. 8:30 am I noticed the pump truck onsite and getting setup. I still do not see any heaters on the forms/ rebar. I went and talked with IMCO regarding the heaters. I referenced the spec which refer to ACI 306. 9:30 am IMCO is batching concrete. The water lines are frozen and they are getting it all thawed out. They have placed a heater on the retaining wall sections to warm up the rebar and forms. 10:00 am IMCO has batched 4.5 CY. As they were priming the pump it was determined that the concrete was below the spec of temp at 50 degrees. The concrete was coming out of the truck at ~44 degrees. After some discussion with Zack and IMCO it was determined to adhere to the specifications of 50 degrees minimum. They are dumping the concrete in the washout. 11:00 am I have taken my second test. The air was low so they dosed the truck and I took a second test. The second test passed with no issues. The concrete temp was at 57 degrees. IMCO is starting to place concrete in the retaining wall forms. 12:00 pm IMCO is continuing to place concrete at the retaining wall. The block sub contractor is continuing to install the block to the exterior of the hatchery building. They are working under a tent with a heater. 12:30 pm IMCO has moved the heater to the holding facility wall forms after I checked the temperatures of the rebar and forms. They were ~25 degrees. They are heating the forms now. 1:00 pm IMCO is moving to placing the holding facility walls. They have completed the retaining wall placement. Attended weekly meeting. 2:00 pm While placing the wall sections at Area 40, a form started to blow out. I notified Steve who was on the scaffolding. He immediately stopped placing. They moved the pump to the other wall while the crew started working on reinforcing the forms where they started to fail. 3:00 pm IMCO crew was able to push the forms back in to within 3/4". Steve notified me they were not able to get it back in so they will be grinding it after they remove the forms. 3:30 pm IMCO has completed the placement. 4:30 pm While they were placing concrete the operator crew set the irrigation tank. They have it secured with a strap for now. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 607 of 1851 References Photos (14) 20231128_155542 Taken on Nov 28, 2023, 3:55 PM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson 20231128_143706 Taken on Nov 28, 2023, 2:37 PM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 608 of 1851 20231128_143656 Taken on Nov 28, 2023, 2:36 PM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson 20231128_140442 Taken on Nov 28, 2023, 2:04 PM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 609 of 1851 20231128_121239 Taken on Nov 28, 2023, 12:12 PM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson 20231128_113008 Taken on Nov 28, 2023, 11:30 AM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 610 of 1851 20231128_113004 Taken on Nov 28, 2023, 11:30 AM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson 20231128_112717 Taken on Nov 28, 2023, 11:27 AM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 611 of 1851 20231128_112714 Taken on Nov 28, 2023, 11:27 AM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson 20231128_112732 Taken on Nov 28, 2023, 11:27 AM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 612 of 1851 20231128_155531 Taken on Nov 28, 2023, 3:55 PM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson 20231128_141314 Taken on Nov 28, 2023, 2:13 PM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 613 of 1851 20231128_112409 Taken on Nov 28, 2023, 11:24 AM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson 20231128_112401 Taken on Nov 28, 2023, 11:24 AM MST Added on Nov 29, 2023, 7:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 614 of 1851 Form detail #270: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Set Wall Forms Vale Electric 2 8 Area 20, Conduit for river sensor Area 60, wiring IMCO, General Crew 5 10 Area 10 Backfill Retaining Wall Basin Masonary 6 10 Area 60, Exterior Masonry Totals 21 38 Forms Location Form date Nov 27, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 28, 2023, 7:46 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 615 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Backfill Retaining Wall Kobelco 1100G Crane 1 10 Area 40, fly wall panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 10, Import Quarry Spalls 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:00 am IMCO is continuing to place wall forms in preparation for a placement tomorrow at Area 40. 1:00 pm They have stripped the forms from last weeks wall placement. There are many deficiencies in the wall Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 616 of 1851 finish. They used a form liner (1/4 Masonite Panels) in an attempt to create a smooth finish. The panels swelled which created many dimples and lines in the concrete finish. See pictures. IMCO is no longer using the liner. I also noticed two areas of unconsolidated concrete. See pictures. 2:00 pm The masonry contractor has been onsite working. They are continuing to install block on the hatchery building. They are working under tented plastic with a heater running. Zack and I spoke to Jake regarding the deficiencies in the concrete walls. He said they would sack and patch the entire wall along with fixing any issues with it. Zack and I also expressed concern with the tolerance for the crowder. 4:00 pm IMCO is importing quarry spalls for the backfill of the retaining wall. The carpenter crew is continuing to close up the forms for tomorrows wall placement. References Photos (17) 20231127_125136 Taken on Nov 27, 2023, 12:51 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson 20231127_130034 Taken on Nov 27, 2023, 1:00 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 617 of 1851 20231127_125917 Taken on Nov 27, 2023, 12:59 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson 20231127_125715 Taken on Nov 27, 2023, 12:57 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 618 of 1851 20231127_125645 Taken on Nov 27, 2023, 12:56 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson 20231127_125637 Taken on Nov 27, 2023, 12:56 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 619 of 1851 20231127_125625 Taken on Nov 27, 2023, 12:56 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson 20231127_125620 Taken on Nov 27, 2023, 12:56 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 620 of 1851 20231127_125606 Taken on Nov 27, 2023, 12:56 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson 20231127_125558 Taken on Nov 27, 2023, 12:55 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 621 of 1851 20231127_125552 Taken on Nov 27, 2023, 12:55 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson 20231127_125445 Taken on Nov 27, 2023, 12:54 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 622 of 1851 20231127_125428 Taken on Nov 27, 2023, 12:54 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson 20231127_125132 Taken on Nov 27, 2023, 12:51 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 623 of 1851 20231127_124845 Taken on Nov 27, 2023, 12:48 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson 20231127_124831 Taken on Nov 27, 2023, 12:48 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 624 of 1851 20231127_124827 Taken on Nov 27, 2023, 12:48 PM MST Added on Nov 28, 2023, 7:45 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 625 of 1851 Form detail #269: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 2 8 Area 10, 40 Install Rebar IMCO, Carpenters 8 10 Area 10, 40, 60 Form CJs, Place concrete Vale Electric 2 8 Area 20, Conduit for river sensor Area 60, wiring IMCO, General Crew 5 10 Area 40 batch concrete Forms Location Form date Nov 21, 2023 Description Area, 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 22, 2023, 6:54 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 626 of 1851 Crew # Workers # Total hours Work performed Basin Masonary 6 10 Area 60, Exterior Masonry Totals 23 46 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 8 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, unload rebar, fly wall panels Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 8 Area 40, Concrete Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 627 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is getting the batch plant fired up and starting to batch concrete. 8:00 am IMCO plans to place 2 wall sections at Area 40. They also will place the 2nd fish lift wall and the irrigation tank pad. 8:30 am I have taken my first test. The air was too low. They dosed the truck and I tested again. It passed. 9:30 am The second truck is finally batched. I tested it. It was also low on air. They dosed it and I tested it again. It passed with the low of 5%. I advised Ryan to add more air to the future trucks. They are placing all three walls in lifts. 10:00 am The masons are onsite working on scratch coat at Area 60. I advised IMCO they should have the soffit material installed along with the gable end vents prior to the block being installed. Jake agreed. 11:00 am The masons have installed the scratch coat at multiple locations around the building. I noticed they were using a weed burner in an attempt to dry out the scratch coat so they could start installing the block. I notified IMCO of this action. Kirt and Jake both said they would go talk to them. 12:00 pm IMCO has completed the wall placements and is working on the Irrigation tank pad. 3:00 pm IMCO is starting to set more panels for the next wall placement at Area 40. Idaho Insulation is onsite installing insulation in Area 40. IMCO still has not installed all the HDs. I informed Jake Self, IMCO, that he will need to now remove insulation and vapor barrier to exposed the HDs to provide evidence that they are installed. Many of them still need to be installed and IMCO did not document which ones are still needed. 3:30 pm IMCO was about to close up some forms for the next area 40 wall placement. While the crane was about to set the forms I asked Steve if they got all the trim bar installed around the blockouts for the spray bars along with the shroud. Steve asked his crew and it was determined that they missed some. The crane put the wall forms back down and the team went to work on finding the proper bent bar to be installed. 4:30 pm The masons are still working. In review of the mortar they are using, it shall be protected from freezing and for best performance should not be used below 40 degrees. I advised IMCO they need to protect all mortar from getting below 40 degrees. They said they would tent it and get heaters over to them. IMCO has installed the proper bent trim bar around the blockout. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 628 of 1851 References Photos (15) 20231121_110618 Taken on Nov 21, 2023, 11:06 AM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson 20231121_100630 Taken on Nov 21, 2023, 10:06 AM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 629 of 1851 20231121_095842 Taken on Nov 21, 2023, 9:58 AM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson 20231121_160155 Taken on Nov 21, 2023, 4:01 PM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 630 of 1851 20231121_151156 Taken on Nov 21, 2023, 3:11 PM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson 20231121_150849 Taken on Nov 21, 2023, 3:08 PM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 631 of 1851 20231121_150748 Taken on Nov 21, 2023, 3:07 PM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson 20231121_150725 Taken on Nov 21, 2023, 3:07 PM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 632 of 1851 20231121_150712 Taken on Nov 21, 2023, 3:07 PM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson 20231121_145637 Taken on Nov 21, 2023, 2:56 PM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 633 of 1851 20231121_121311 Taken on Nov 21, 2023, 12:13 PM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson 20231121_100635 Taken on Nov 21, 2023, 10:06 AM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 634 of 1851 20231121_100018 Taken on Nov 21, 2023, 10:00 AM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson 20231121_095909 Taken on Nov 21, 2023, 9:59 AM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 635 of 1851 20231121_095839 Taken on Nov 21, 2023, 9:58 AM MST Added on Nov 22, 2023, 6:51 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 636 of 1851 Form detail #268: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 2 8 Area 10, 40 Install Rebar IMCO, Carpenters 8 10 Area 10, 40, 60 Form CJs, Form Retaining walls, Strip Forms Vale Electric 2 8 Area 40, Conduit for Gates IMCO, General Crew 5 10 Area 10 CDF Primary Power Basin Masonary 6 10 Area 60, Exterior Masonry Forms Location Form date Nov 20, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 21, 2023, 7:27 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 637 of 1851 Crew # Workers # Total hours Work performed Totals 23 46 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 8 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 8 Area 40, Concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 638 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO is continuing to work on wall forms at Area 40. Jake informed me they would like to accelerate their schedule and have a concrete placement tomorrow for the walls. They would also include the irrigation tank. 11:00 am IMCO is starting to place CDF over the feeder conduit from the new power supply's per IPC directive. 2:00 pm IMCO has placed the CDF for the primary power lines. Basin Masonry has been onsite today working on installing the block masonry to the exterior of Area 60. 3:00 pm EOI has been onsite installing rebar for the retaining wall behind Area 60. I am told the irrigation tank rebar is installed and ready for inspection. They plan to place the irrigation pad tomorrow. 4:30 pm IMCO is ready to place the fish lift, raceway walls and the irrigation tank foundation tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 639 of 1851 References Photos (10) 20231120_154535 Taken on Nov 20, 2023, 3:45 PM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson 20231120_144016 Taken on Nov 20, 2023, 2:40 PM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 640 of 1851 20231120_122050 Taken on Nov 20, 2023, 12:20 PM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson 20231120_112515 Taken on Nov 20, 2023, 11:25 AM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 641 of 1851 20231120_111748 Taken on Nov 20, 2023, 11:17 AM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson 20231120_111743 Taken on Nov 20, 2023, 11:17 AM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 642 of 1851 20231120_110200 Taken on Nov 20, 2023, 11:02 AM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson 20231120_110155 Taken on Nov 20, 2023, 11:01 AM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 643 of 1851 20231120_110150 Taken on Nov 20, 2023, 11:01 AM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson 20231120_105134 Taken on Nov 20, 2023, 10:51 AM MST Added on Nov 21, 2023, 7:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 644 of 1851 Form detail #267: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 40, Set Wall forms IMCO, General Crew 1 10 Area 40, Set wall forms Totals 9 20 2. Materials Material Quantity Unit Comment Forms Location Form date Nov 17, 2023 Description Area 40 Due date Submitted by Chris Johnson Status Closed Last update Nov 20, 2023, 10:46 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 645 of 1851 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site, Set Forms Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 12:00 pm IMCO is onsite working on wall forms at Area 40. Left site to return concrete cylinders. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 646 of 1851 Form detail #266: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 2 8 Area 10, 40 Install Rebar IMCO, Carpenters 8 10 Area 10, 40, 60 Form CJs, Form Retaining walls, Strip Forms, Install Windows and Doors Vale Electric 3 8 Area 60 IMCO, General Crew 5 10 Area 10 Excavation for Primary Power, Irrigation Tank Removal Forms Location Form date Nov 16, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 20, 2023, 10:43 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 647 of 1851 Crew # Workers # Total hours Work performed Totals 18 36 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Backfill Site Deere 644J Loader 1 8 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 10, Excavate trench for primary power Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 8 Area 40, Concrete Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 648 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is starting to batch concrete. They are going to place 2 retaining wall sections along with the first of the fish lift walls. 8:30 am I have taken my first test. It tested at 6.9% air. I informed Ryan and Kole they can place the concrete but need to make adjustments to do the proximity of being out of spec. I told them i would be testing the second truck as well. 9:00 am I have taken my second test. All passed with no issues. 12:00 pm IPC Line crew is working on finishing up the new pole install for the Oxbow feed. IMCO is finishing up the concrete placement and starting to work on wall forms at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 649 of 1851 References Photos (9) 20231116_120328 Taken on Nov 16, 2023, 12:03 PM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson 20231116_110816 Taken on Nov 16, 2023, 11:08 AM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 650 of 1851 20231116_110651 Taken on Nov 16, 2023, 11:06 AM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson 20231116_102139 Taken on Nov 16, 2023, 10:21 AM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 651 of 1851 20231116_075952 Taken on Nov 16, 2023, 7:59 AM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson 20231116_075948 Taken on Nov 16, 2023, 7:59 AM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 652 of 1851 20231116_075944 Taken on Nov 16, 2023, 7:59 AM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson 20231116_114408 Taken on Nov 16, 2023, 11:44 AM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 653 of 1851 20231116_100711 Taken on Nov 16, 2023, 10:07 AM MST Added on Nov 20, 2023, 10:38 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 654 of 1851 Form detail #265: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 2 8 Area 10, 40 Install Rebar IMCO, Carpenters 8 10 Area 10, 40, 60 Form CJs, Form Retaining walls, Strip Forms, Install Windows and Doors Vale Electric 3 8 Area 60 IMCO, General Crew 5 10 Area 10 Excavation for Primary Power, Irrigation Tank Removal Forms Location Form date Nov 15, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 16, 2023, 6:42 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 655 of 1851 Crew # Workers # Total hours Work performed Totals 18 36 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Backfill Site Deere 644J Loader 1 8 Area 10, Irrigation Tank Removal Hitachi 85 Excavator 1 10 Area 10, Excavate trench for primary power Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 656 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is prepping to remove the irrigation tank. They are waiting on IPC to arrive on site to being the power outage of the power lines. 9:00 am IPC is onsite and going to kill the power starting the outage. IMCO is continuing to work on excavating the trench for the power feed to the transformers. The IPC crew is onsite to install the conduit and poles. 11:00 am IMCO has removed the irrigation tank and hauled it down onsite. They will smash up the tank and load it in a metal bin to be recycled. IPC crew is starting to install conduit in the trench that is excavated. 12:00 pm IMCO carpenters are continuing to work on bulkheads and waterstop at Area 40. Another crew is working on the retaining wall behind Area 60. They have finished the forming of the fish lift. It is ready for a placement tomorrow. 2:00 pm EOI has been onsite working on wall rebar at Area 40. Vale is also onsite working inside Area 60. 4:00 pm IMCO is continuing to work on excavating the trench for the IPC crew. The IPC crew will be onsite again tomorrow to set the pole and install the rest of the conduit. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 657 of 1851 References Photos (6) 20231115_133727 Taken on Nov 15, 2023, 1:37 PM MST Added on Nov 16, 2023, 6:41 AM MST Added by Chris Johnson 20231115_100205 Taken on Nov 15, 2023, 10:02 AM MST Added on Nov 16, 2023, 6:41 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 658 of 1851 20231115_082251 Taken on Nov 15, 2023, 8:22 AM MST Added on Nov 16, 2023, 6:41 AM MST Added by Chris Johnson 20231115_135340 Taken on Nov 15, 2023, 1:53 PM MST Added on Nov 16, 2023, 6:41 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 659 of 1851 20231115_133139 Taken on Nov 15, 2023, 1:31 PM MST Added on Nov 16, 2023, 6:41 AM MST Added by Chris Johnson 20231115_092127 Taken on Nov 15, 2023, 9:21 AM MST Added on Nov 16, 2023, 6:41 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 660 of 1851 Form detail #264: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 3 8 Area 10, 40 Install Rebar IMCO, Carpenters 8 10 Area 10, 40, 60 Form CJs, Form Retaining walls, Strip Forms, Install Windows and Doors Vale Electric 5 8 Area 60 IMCO, General Crew 5 10 Area 10 Backfill Site, Start excavation for Primary Power Forms Location Form date Nov 14, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 15, 2023, 9:04 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 661 of 1851 Crew # Workers # Total hours Work performed Totals 21 36 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Backfill Site Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Excavate trench for primary power Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 10, Import Native fill 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 662 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is going to continue forming for the fish lift placement. They also have a crew working on the forming the retaining wall behind Area 60. I performed a rebar inspection on the retaining wall before they closed up the forms. All was per the approved submittal. 9:00 am Attended weekly meeting. 11:00 am IMCO is working on setting the first raceway gate. They need to get it installed before EOI can finish the rebar. 12:00 pm IMCO has set the gate and braced it off. Vale is onsite working on electrical at Area 60. 3:00 pm Baker Co. Building Inspector was onsite today. I am told he passed the electrical inspection. 4:00 pm EOI is continuing to install rebar for Area 40. They are continuing to wall rebar. IMCO is starting to put together wall forms. Steve hopes to start setting all forms tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 663 of 1851 References Photos (5) 20231114_123003 Taken on Nov 14, 2023, 12:30 PM MST Added on Nov 15, 2023, 9:04 AM MST Added by Chris Johnson 20231114_122953 Taken on Nov 14, 2023, 12:29 PM MST Added on Nov 15, 2023, 9:04 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 664 of 1851 20231114_104317 Taken on Nov 14, 2023, 10:43 AM MST Added on Nov 15, 2023, 9:04 AM MST Added by Chris Johnson 20231114_082433 Taken on Nov 14, 2023, 8:24 AM MST Added on Nov 15, 2023, 9:04 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 665 of 1851 20231114_080935 Taken on Nov 14, 2023, 8:09 AM MST Added on Nov 15, 2023, 9:04 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 666 of 1851 Form detail #263: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 3 8 Area 10, 40 Install Rebar IMCO, Carpenters 8 10 Area 10, 40, 60 Form CJs, Form Retaining walls, Strip Forms, Install Windows and Doors Vale Electric 5 8 Area 60 IMCO, General Crew 5 10 Area 10 Backfill Site, Start excavation for Primary Power Forms Location Form date Nov 13, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 14, 2023, 6:50 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 667 of 1851 Crew # Workers # Total hours Work performed Totals 21 36 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Backfill Site Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Excavate trench for primary power Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 10 Area 10, Compaction Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 10, Import Native fill 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 668 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO is excavating for the primary power duct bank. 11:00 am I spoke to Jake and Ryan. They informed me the concrete placement for tomorrow is canceled. They were unsure when they would be placing concrete this week. I informed them I will need 48 Hours notice per the contract prior to any concrete placements. 1:00 pm IMCO carpenters are working on stripping forms on the foundation of Area 40. They are also starting bulkheads at the CJs for the wall placement at Area 40. Another crew is working on the fish lift walls from CJ to CJ. And another crew is working on the retaining wall behind Area 60. They are stripping and moving the forms to get ready for another wall placement. 3:00 pm Vale electric is onsite working on the electrical inside Area 60. Jake, IMCO, is also working on Area 60 by installing windows. 4:30 pm IMCO is continuing to form bulkheads for the CJs along with finishing the wall forms for the fish lift. EOI has been onsite working on wall rebar at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 669 of 1851 References Photos (6) 20231113_135922 Taken on Nov 13, 2023, 1:59 PM MST Added on Nov 14, 2023, 6:50 AM MST Added by Chris Johnson 20231113_135752 Taken on Nov 13, 2023, 1:57 PM MST Added on Nov 14, 2023, 6:50 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 670 of 1851 20231113_135730 Taken on Nov 13, 2023, 1:57 PM MST Added on Nov 14, 2023, 6:50 AM MST Added by Chris Johnson 20231113_134600 Taken on Nov 13, 2023, 1:46 PM MST Added on Nov 14, 2023, 6:50 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 671 of 1851 20231113_134530 Taken on Nov 13, 2023, 1:45 PM MST Added on Nov 14, 2023, 6:50 AM MST Added by Chris Johnson 20231113_104741 Taken on Nov 13, 2023, 10:47 AM MST Added on Nov 14, 2023, 6:50 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 672 of 1851 Form detail #262: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 4 8 Area 10, 40 Install Rebar IMCO, Carpenters 8 10 Area 10, 40 Place Concrete Vale Electric 5 8 Area 60 IMCO, General Crew 5 10 Area 10, 40 Batch Concrete Totals 22 36 Forms Location Form date Nov 9, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 10, 2023, 9:24 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 673 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 10, 40 Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 10 Area 10, 40 Concrete Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is getting the batch plant up fired up. 8:00 am IMCO is ready for concrete. The batch plant crew is currently batching. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 674 of 1851 9:00 am I have taken my first test. All passed with no issues. The crew is continuing to place. 10:00 am Dusty B framing crew is onsite working on the punch list items. They informed me they will be done today. 11:00 am I have taken my second test. The air was too low. They dosed the truck and I pulled another sample from the truck. It passed. The crew is going to making adjustments to the rest of the trucks. They are almost done with the foundation at Area 40. They are going to move the pump truck and also place 2 wall sections and 2 footing sections of the retaining wall behind Area 60. 1:00 pm The crew has placed the two wall sections. They placed at a rate of 3 foot lifts. 2:00 pm I was asked to perform a walkthrough with the framing crew and IMCO. Jake and I walked with the framers. Most items were taken care of. Others will be performed by IMCO. Jake is tracking the items on the Issues tab of Build. 3:00 pm EOI has been onsite all day working on installing wall rebar at Area 40. The concrete crew is continuing to finish the concrete slabs. 4:30 pm Vale, Lacy Mechanical and YMC have been onsite today working on Area 60. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 675 of 1851 References Photos (7) 20231109_143047 Taken on Nov 9, 2023, 2:30 PM MST Added on Nov 10, 2023, 9:20 AM MST Added by Chris Johnson 20231109_124038 Taken on Nov 9, 2023, 12:40 PM MST Added on Nov 10, 2023, 9:20 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 676 of 1851 20231109_085411 Taken on Nov 9, 2023, 8:54 AM MST Added on Nov 10, 2023, 9:20 AM MST Added by Chris Johnson 20231109_085217 Taken on Nov 9, 2023, 8:52 AM MST Added on Nov 10, 2023, 9:20 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 677 of 1851 20231109_084906 Taken on Nov 9, 2023, 8:49 AM MST Added on Nov 10, 2023, 9:20 AM MST Added by Chris Johnson 20231109_143040 Taken on Nov 9, 2023, 2:30 PM MST Added on Nov 10, 2023, 9:20 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 678 of 1851 20231109_085954 Taken on Nov 9, 2023, 8:59 AM MST Added on Nov 10, 2023, 9:20 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 679 of 1851 Form detail #261: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 14 8 Area 10, 40 Install Rebar IMCO, Carpenters 8 10 Area 40 Bulkheads and Waterstop Vale Electric 5 8 Area 60 IMCO, General Crew 5 10 Area 20, River Sensor Crux Diving 3 8 Area 20, River Sensor Forms Location Form date Nov 8, 2023 Description Area 20, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 10, 2023, 9:00 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 680 of 1851 Crew # Workers # Total hours Work performed Totals 35 44 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 20, River Sensor Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 681 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 day compressive break reports for the 5th Foundation placement at Area 40. 8:00 am IMCO is working on installing bulkheads and waterstop for the last 2 squares of the foundation for Area 40. 9:00 am EOI is onsite and working on installing rebar at Area 40 for walls along with retaining wall. Dusty B is onsite working on the punch list items at Area 60. Attended weekly meeting. 10:00 am Crux is onsite and in the water working on the river sensor. They have one brace to weld in the water. 12:00 pm IMCO is continuing to work on the river sensor. MB Welding is performing the welding of the braces above water. 2:00 pm IMCO carpenters are continuing to work on bulkheads and waterstop. Left site to deliver cylinders. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 682 of 1851 References Photos (3) 20231108_112147 Taken on Nov 8, 2023, 11:21 AM MST Added on Nov 8, 2023, 1:53 PM MST Added by Chris Johnson 20231108_094404 Taken on Nov 8, 2023, 9:44 AM MST Added on Nov 8, 2023, 1:53 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 683 of 1851 20231108_085854 Taken on Nov 8, 2023, 8:58 AM MST Added on Nov 8, 2023, 1:53 PM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 684 of 1851 Form detail #259: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 1 8 Area 40 Install Rebar IMCO, Carpenters 5 10 Area 40 Forming, Waterstop Vale Electric 1 8 Area 60 IMCO, General Crew 5 10 Area 10, Backfill MH 5, Prep transformer pad Totals 12 36 Forms Location Form date Nov 7, 2023 Description Area 10, Area 40,Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 7, 2023, 7:21 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 685 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Backfill MH 5, Transformer pad Deere 644J Loader 1 10 Area 10, Load General Fill Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 10 Area 10, Backfill MH 5 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 10 Area 10, Haul General Fill 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:00 am IMCO is continuing to work on waterstop and bulkheads from CJ to CJ. They have installed the tail screen drain for the cross crowder channel. They had to modify the drain. I asked Sean what the process is to weld Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 686 of 1851 it back together. He said after they pour the walls they will anchor and weld the 2nd and third sides to the concrete. 12:00 pm Vale is onsite working on electrial conduit inside Area 60. 2:00 pm I walked the 3 squares at Area 40 that IMCO plans to place tomorrow. All rebar and clearances look good. They are still working on installing the waterstop and embeds on one of the squares. 4:00 pm IMCO is continuing to work on the embeds and water stop. Sam from EOI checked with me regarding the rebar. The best I can tell it is installed per the approved submittal and the contract drawings. References Photos (3) 20231106_153721 Taken on Nov 6, 2023, 3:37 PM MST Added on Nov 7, 2023, 7:20 AM MST Added by Chris Johnson 20231106_155133 Taken on Nov 6, 2023, 3:51 PM MST Added on Nov 7, 2023, 7:20 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 687 of 1851 20231106_130532 Taken on Nov 6, 2023, 1:05 PM MST Added on Nov 7, 2023, 7:20 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 688 of 1851 Form detail #260: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 1 8 Area 40 Install Rebar IMCO, Carpenters 8 10 Area 40 Concrete Placement Vale Electric 5 8 Area 60 IMCO, General Crew 5 10 Area 40, Batch Concrete Area 20, Begin River Sensor Totals 19 36 Forms Location Form date Nov 7, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 8, 2023, 10:19 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 689 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 20, River Sensor Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 10 Area 40, Concrete Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 day compressive break reports for the 4th Foundation placement at Area 40. Also attached is Concrete Field report from todays placement of the 6th foundation placement of Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 690 of 1851 7:00 am IMCO is starting to work on batching concrete for todays placement. They are going to place 3 squares of the foundation at Area 40. 8:00 am IMCO is ready for concrete. I have walked the 3 squares to verify. All waterstop is installed and the rebar is per the approved submittal. 8:30 am I have taken my first test. All passed with no issues. They are starting to place. 10:00 am Vale is onsite working on electrical at Area 60. They are continuing to install the conduit along with setting boxes for switches and lights. 11:30 am IMCO has reached 50 CY. I tested the concrete truck at 50 CY. The air did not pass. It was low at 4.2%. They dosed the truck with more air entrainment. I tested it again and it passed at 5.1%. I informed Sean of the results and he directed his crew to add more air to the next trucks. IMCO believes they need to add more air as the temp of the concrete goes up. This concrete was at 76 degrees. 1:00 pm IMCO has moved the crane over to Area 20. They are going to install the river sensor that was delivered today. 2:00 pm IMCO has reached 100 CY. They area currently placing on the third and last square. I took my 3rd sample for the day and tested it. The air was low again. I informed Sean. He dosed the truck. I tested it again and it was at 5.0%. The concrete temp was at 79 degrees. They continued to place. Ryan and I spoke about adding more air entrainment for future placements. 3:00 pm IMCO is done placing and is now finishing the concrete. They are experiencing some some rain showers. 4:00 pm Jake asked if I could walk through the punch list again for the framing at Area 60. 5:00 pm We walked Area 60 framing punchlist again. Jake took notes. Zack has requested Jake add each of the deficiencies to the issues tap on Build. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 691 of 1851 References Photos (4) 20231107_164348 Taken on Nov 7, 2023, 4:43 PM MST Added on Nov 8, 2023, 6:48 AM MST Added by Chris Johnson 20231107_124735 Taken on Nov 7, 2023, 12:47 PM MST Added on Nov 8, 2023, 6:48 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 692 of 1851 20231107_085438 Taken on Nov 7, 2023, 8:54 AM MST Added on Nov 8, 2023, 6:48 AM MST Added by Chris Johnson 20231107_093924 Taken on Nov 7, 2023, 9:39 AM MST Added on Nov 8, 2023, 6:48 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 693 of 1851 Form detail #258: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 1 8 Area 40 Install Rebar IMCO, Carpenters 5 10 Area 40 Forming Vale Electric 1 8 Area 60 IMCO, General Crew 5 10 Area 10, Backfill MH 5 Totals 12 36 Forms Location Form date Nov 2, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 6, 2023, 11:08 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 694 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Backfill MH 5 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 10 Area 10, Backfill MH 5 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on forming at Area 40. They are prepping for next weeks continued placement of the foundation at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 695 of 1851 12:00 pm Zack, John Anderson and myself performed a punch list walkthrough with Ryan and Jake from IMCO at Area 60 Hatchery Building. The punch list was for the framing of the building. Multiple deficiencies were found in the framing that did not match contract drawings. Ryan is going to compile all deficiencies in a document and send over for review. 1:30 pm Left site to return concrete cylinders. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 696 of 1851 Form detail #257: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 3 10 Area 40/Area 10, Install Rebar IMCO, Carpenters 5 10 Area 40 place concrete Dusty B Framers 8 10 Area 60 Vale Electric 1 8 Area 60 IMCO, General Crew 5 10 Area 40, Batch Concrete Forms Location Form date Nov 1, 2023 Description Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 2, 2023, 7:26 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 697 of 1851 Crew # Workers # Total hours Work performed Totals 22 48 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 698 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached concrete test report from todays Area 40 5th Foundation placement with IMCO batch tickets. 8:00 am IMCO is making final preparations for todays placement. They are finishing up the bulkheads and stripping forms to be poured up too. 9:00 am IMCO is starting to batch concrete. The temps are above 40 this morning. 10:00 am I have taken my first test on the first truck. It all passed with no issues. They are starting to place concrete for an Area 40 Square. They are placing from CJ to CJ in a checkerboard sequence. 11:00 am The framers are onsite. They have finished the roof sheeting along with soffit backers. 1:00 pm I have taken a second test on the concrete. It passed with no issues. The crew is about finished with the second and last square. Vale is onsite working on running conduit in the Hatchery Building. The framers have left. There is a punchlist walkthrough scheduled for tomorrow morning. I have pulled the temp recording device from the placement yesterday. I checked and at no point over the night did it record under 40 degrees. 3:00 pm The crew is continuing to work on finishing the concrete. They are also cleaning up the site. Jake is working on the retaining wall. He is hanging closing forms on the wall. EOI has been onsite tying rebar for the fish lift. 5:00 pm The crew informed me the concrete is too wet to get covered tonight. The weather shows above 40 degrees so the concern for blankets is not applicable. Sean informed me he plans to use the rain over the next few days as a curing plan. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 699 of 1851 References Photos (3) 20231101_153908 Taken on Nov 1, 2023, 3:39 PM MDT Added on Nov 2, 2023, 7:26 AM MDT Added by Chris Johnson 20231101_123544 Taken on Nov 1, 2023, 12:35 PM MDT Added on Nov 2, 2023, 7:26 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 700 of 1851 20231101_103451 Taken on Nov 1, 2023, 10:34 AM MDT Added on Nov 2, 2023, 7:26 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 701 of 1851 Form detail #256: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 3 10 Area 40/Area 10, Install Rebar IMCO, Carpenters 5 10 Area 40 place concrete Dusty B Framers 8 10 Area 60 Vale Electric 1 8 Area 60 Overhead Door Company 2 8 Area 60, Roll up doors Forms Location Form date Oct 31, 2023 Description Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Nov 1, 2023, 7:48 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 702 of 1851 Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Area 40, Batch Concrete Totals 24 56 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 703 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 day compressive break reports from the Area 40 2nd Foundation placement. Also concrete test report from todays Area 40 4th Foundation placement with IMCO batch tickets. 7:00 am IMCO is planning to place concrete today at area 40. They are wanting to place 2 "squares" from CJ to CJ. 8:00 am IMCO is batching concrete currently. It is very cold this morning at about 25 degrees. I requested to Sean and Steve to get the rebar covered and get heat going since the rebar is frozen. They both agreed that they needed to do this and got right on it. 9:00 am IMCO has batched their first truck. While priming the pump truck, the pump developed a clog. The little but of concrete that came out in the ECO pan I spot checked the temperature. It was around 46 degrees. This tells me the pump truck hoses are cold and is cooling the concrete through the pump. Kole informed me they have the burner fired up and heating the water to around 120 degrees. After they got the clog cleared and the pump was pumping concrete above 50 degrees there was hardly any concrete left in the truck. I told IMCO this would not be a fair represented sample of the concrete for my test. I did however check the air for them. It was at 7.3% which is high. They decided to ditch the last of that concrete and make a new 4.5 CY batch. 9:30 am The second truck tested all in spec. They are starting the placement. 11:00 am IMCO is continuing to place concrete for the foundation. The framing sub is onsite continuing to work on the hatchery building. I noticed the eaves on the Incubation room build out were a little short. I asked what dimension they said they used. It was under the 2'3" planned dimension. They asked if they could scab on to it to make it proper length. I advised not and it should be built per plan. They area going to get it fixed. 12:45 pm IMCO is continuing to place concrete. I have taken a second test at 50 CY. All passed with no issues. 1:00 pm Attended weekly meeting. 2:30 pm Walked the site with Zack, Jake and Kirt. IMCO has had Overhead door company onsite installing the two overhead doors in the hatchery building. The detail shows the doors to be mounted to the outside of the CMU. They did not do this. They mounted it to the framing. I pointed out several issues with trimming out the doors under the current install. I also noticed some dents and defects in the doors. They are going to think more on it. IMCO is continuing to place concrete. They have a 3rd square ready. Since it is ready they are going to place it today. 4:00 pm IMCO placed approx. 80 CY today. They are working on finishing it now. I have been asked to do a walkthrough for all the framing. This is scheduled for Thursday morning. I walked a little bit of it today and noticed a few things. Including a door header being cut and scapped with plywood. IMCO has also placed the manhole section for MH 5. 5:30 pm IMCO is still working on finishing the concrete. They informed me it is taking forever to setup. Sean asked about adding an accelerant to the concrete for future pours. I advised him to have a mix design drafted and submitted. I have placed a recording thermometer near the top of the slab. It will record temps through the night. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 704 of 1851 References Photos (9) 20231031_163409 Taken on Oct 31, 2023, 4:34 PM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson 20231031_161509 Taken on Oct 31, 2023, 4:15 PM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 705 of 1851 20231031_141833 Taken on Oct 31, 2023, 2:18 PM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson 20231031_124550 Taken on Oct 31, 2023, 12:45 PM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 706 of 1851 20231031_115219 Taken on Oct 31, 2023, 11:52 AM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson 20231031_105508 Taken on Oct 31, 2023, 10:55 AM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 707 of 1851 20231031_163412 Taken on Oct 31, 2023, 4:34 PM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson 20231031_143743 Taken on Oct 31, 2023, 2:37 PM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 708 of 1851 20231031_141829 Taken on Oct 31, 2023, 2:18 PM MDT Added on Nov 1, 2023, 7:45 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 709 of 1851 Form detail #255: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 3 10 Area 40/Area 10, Install Rebar IMCO, Carpenters 5 10 Area 40, Forms Area 10, Retaining Wall Forms Dusty B Framers 8 10 Area 60 Vale Electric 1 8 Area 60 Overhead Door Company 2 8 Area 60, Roll up doors Forms Location Form date Oct 30, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 31, 2023, 7:02 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 710 of 1851 Crew # Workers # Total hours Work performed Totals 19 46 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 3 Area 10, Unload MH Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 711 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 12:00 pm IMCO is continuing to work on bulkheads and waterstop at the CJs of Area 40 foundation slab. 1:00 pm Dusty B framers are continuing to work on area 60 framing. I noticed right away that the sub fascia on the roll up window build out did not look right. After reviewing the drawings it is not built per plan. The framers asked what I was seeing and I informed them what I was seeing. I told them I need to get with Sean and Kirt regarding the eave and they would direct accordingly. I also noticed that an interior wall between the mud room and the incubation room is a 2x6 framed wall. Per plan it should be a 2x4. With the 2x6, the framing is overhanging the concrete curb by approx. 2". 2:00 pm EOI is onsite working on rebar for the retaining wall. 3:00 pm I walked the framing issues with Kirt and Sean. Kirt and I talked in length regarding the interior wall and the overhang. He said he would like to leave the 2x6 wall and pour grout under the wood to provide a smooth finish for the GWB. I asked about the door frames and how they would wrap the larger wall. He said he was going to look into it. He said he also wants to check the finishes for the room. 5:00 pm I have walked the squares to be poured in tomorrows placement. All looks ready for concrete. Sean has informed me that he wants to move Thursdays pour to Wednesdays due to weather. 6:00 pm IMCO is ready for the placement tomorrow. They plan to start around 8am. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 712 of 1851 References Photos (4) 20231030_164946 Taken on Oct 30, 2023, 4:49 PM MDT Added on Oct 31, 2023, 6:59 AM MDT Added by Chris Johnson 20231030_171700 Taken on Oct 30, 2023, 5:16 PM MDT Added on Oct 31, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 713 of 1851 20231030_171655 Taken on Oct 30, 2023, 5:16 PM MDT Added on Oct 31, 2023, 6:59 AM MDT Added by Chris Johnson 20231030_164940 Taken on Oct 30, 2023, 4:49 PM MDT Added on Oct 31, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 714 of 1851 Form detail #254: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 3 10 Area 40/Area 10, Install Rebar IMCO, Carpenters 5 10 Area 40, Forms Area 10, Retaining Wall Forms Dusty B Framers 8 10 Area 60 Vale Electric 1 8 Area 60 Basin Masonry 4 5 Area 30, veneer siding Forms Location Form date Oct 27, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 27, 2023, 11:23 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 715 of 1851 Crew # Workers # Total hours Work performed Totals 21 43 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 6 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 IMCO Concrete Truck 3 Dump Truck 1 Bomag BW 124 PD SD Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 716 of 1851 Equipment Quantity Hours used Comment JLG G5-18A Boom Forklift (Basin Masonry Rental) 1 2 Move Material around the site 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:30 am Talked to Andrew about the heaters from yesterdays Pour (I looked under the tarp and didn't see/hear any heaters, Andrew said they were under the tarp on the far corner where I couldn't see). Andrew told me that the heaters had run out of propane overnight. I looked at the spec and told him they need to heat the Pour for 3 days and hold a temperature of 50 degrees. They do not have a way to check temps. Chris Johnson previously had a conversation with Sean about a cold weather plan (Sean was here for the pour today). Basin Masonry is grouting the stone work the wall on the Area 30 Aeration Tower. Framers/Vale Electric are working in Area 60. EOI working on installing rebar in Area 40 and Area 10 Retaining Wall. 10:30 am Pine Creek Weather Station (2 mi south of Oxbow) shows a current temperature of 36f. Andrew left to get more propane. He said there will be someone to keep the heaters running over the weekend. 11:00 am 1 Propane heater running on 1 on the squares poured yesterday. Talked to Jake about getting a heater on both sections poured yesterday. 11:30 am Picking up Cylinders to run them back to the Meridian Office. Basin Masonry Tarping the stone on the Aeration Tower Area 30. Cleaning up materials. Randy Inselman, HMH Engineering Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 717 of 1851 References Photos (5) TC_00312 Taken on Oct 27, 2023, 10:42 AM MDT Added on Oct 27, 2023, 11:21 AM MDT Added by Chris Johnson TC_00311 Taken on Oct 27, 2023, 10:42 AM MDT Added on Oct 27, 2023, 11:21 AM MDT Added by Chris Johnson TC_00309 Taken on Oct 27, 2023, 10:39 AM MDT Added on Oct 27, 2023, 11:21 AM MDT Added by Chris Johnson TC_00308 Taken on Oct 27, 2023, 10:27 AM MDT Added on Oct 27, 2023, 11:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 718 of 1851 TC_00310 Taken on Oct 27, 2023, 10:40 AM MDT Added on Oct 27, 2023, 11:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 719 of 1851 Form detail #253: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 3 10 Area 40, Install Rebar IMCO, Carpenters, Finishers 8 10 Area 40, Forms Area 10, Retaining Wall Forms Dusty B Framers 8 10 Area 60 Vale Electric 1 8 Area 60 Basin Masonry 4 10 Area 30, veneer siding Forms Location Form date Oct 26, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 30, 2023, 3:48 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 720 of 1851 Crew # Workers # Total hours Work performed Lacey Mechanical 1 8 Area 60, Plumbing Totals 25 56 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 6 Move material around the site Deere 210 Excavator 1 2 Area 10 Deere 644J Loader 1 2 Moved materials around the project site Hitachi 85 Excavator 1 Kobelco 1100G Crane 1 6 Area 40, Fly Rebar/Area 60, Fly Lumber Bomag Roller 1 Water Truck 1 2 Clean Concrete Trucks IMCO Concrete Truck 3 Area 40 Concrete Pour (3rd truck used for 1 load) Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 721 of 1851 Equipment Quantity Hours used Comment Bomag BW 124 PD SD Roller 1 JLG G5-18A Boom Forklift (Basin Masonry Rental) 1 4 Move Material around the site 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Concrete Testing Report along with IMCO Batch Tickets. Also Attached is 28 Day Compressive Break Report for the Tail Screen 1st Wall Placement and the 7 Day 1st upper foundation placement at Area 40. 8:00 am IMCO working on Area 40 Form work and batching concrete for pour today. EOI working on Area 40 rebar. Basin Masonry has 4 guys onsite to work on the veneer siding Area 30. Framers working in Area 60. Brundage Bone onsite for pour. 8:45 am 1st Concrete truck backed up to the pump to pour Area 40 Foundation (Pour #3) . I sampled the 1st truck, test was good 11:20 am I sampled the 6th truck, test was good 12:30 pm IMCO done batching. Finishing the pour. 4:00 pm Talked to Kirt about covering and heating todays Pour as it is forecast to be 36 degrees overnight. He said he would tarp it and use propane heaters. Basin Masonry is tarping the wall on the Area 30 Aeration Tower. Randy Inselman, HMH Engineering Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 722 of 1851 References Photos (13) TC_00307 Taken on Oct 26, 2023, 3:55 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson TC_00304 Taken on Oct 26, 2023, 12:50 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 723 of 1851 TC_00303 Taken on Oct 26, 2023, 12:50 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson TC_00302 Taken on Oct 26, 2023, 12:43 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 724 of 1851 TC_00301 Taken on Oct 26, 2023, 12:42 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson TC_00300 Taken on Oct 26, 2023, 12:42 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 725 of 1851 TC_00299 Taken on Oct 26, 2023, 12:41 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson TC_00298 Taken on Oct 26, 2023, 10:27 AM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 726 of 1851 TC_00297 Taken on Oct 26, 2023, 10:27 AM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson TC_00296 Taken on Oct 26, 2023, 10:27 AM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 727 of 1851 TC_00295 Taken on Oct 26, 2023, 9:55 AM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson TC_00306 Taken on Oct 26, 2023, 3:53 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 728 of 1851 TC_00305 Taken on Oct 26, 2023, 3:53 PM MDT Added on Oct 26, 2023, 4:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 729 of 1851 Form detail #252: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 4 10 Area 40, Install Rebar IMCO, Carpenters 8 10 Area 40, Forms Area 10, Retaining Wall Forms Dusty B Framers 8 10 Area 60 Vale Electric 1 8 Area 60 Basin Masonry 4 10 Area 30, veneer siding Forms Location Form date Oct 25, 2023 Description Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 30, 2023, 3:42 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 730 of 1851 Crew # Workers # Total hours Work performed Lacey Mechanical 1 8 Area 60, Plumbing Totals 26 56 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 8 Area 10 Deere 644J Loader 1 2 Moved materials around the project site Hitachi 85 Excavator 1 6 Area 10 Grading, Backfill, stockpiling concrete Aggs Kobelco 1100G Crane 1 6 Area 40, Fly Rebar Bomag Roller 1 Water Truck 1 4 Dust control, Area 10 Water for Compaction IMCO Concrete Truck 3 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 731 of 1851 Equipment Quantity Hours used Comment Bomag BW 124 PD SD Roller 1 JLG G5-18A Boom Forklift (Basin Masonry Rental) 1 8 Move Material around the site 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:00 am IMCO working on Area 40 Form work. EOI working on Area 40 rebar. Basin Masonry has 4 guys onsite to work on the veneer siding Area 30. Framers working in Area 60. 9:30 am Jake sent me the concrete batch tickets from yesterday. They only placed 67.5 cy, not 76.5 cy per yesterdays diary (i was told verbally the yardage placed yesterday). 4:30 pm Spoke to Sean about the truss detail for the Area 60 Hatchery Building. Framers worked on installing door frames, Rough Framing and the dormer for Area 60. Randy Inselman, HMH Engineering Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 732 of 1851 References Photos (5) TC_00294 Taken on Oct 25, 2023, 2:42 PM MDT Added on Oct 26, 2023, 1:02 PM MDT Added by Chris Johnson TC_00293 Taken on Oct 25, 2023, 2:42 PM MDT Added on Oct 26, 2023, 1:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 733 of 1851 TC_00292 Taken on Oct 25, 2023, 11:32 AM MDT Added on Oct 26, 2023, 1:02 PM MDT Added by Chris Johnson TC_00291 Taken on Oct 25, 2023, 10:02 AM MDT Added on Oct 26, 2023, 1:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 734 of 1851 TC_00290 Taken on Oct 25, 2023, 10:02 AM MDT Added on Oct 26, 2023, 1:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 735 of 1851 Form detail #251: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 4 10 Area 40, Install Rebar IMCO, Carpenters/Finishers 8 10 Area 40, Forms/Pour Dusty B Framers 8 10 Area 60 Vale Electric 1 8 Area 60 Basin Masonry 3 10 Area 30, veneer siding Forms Location Form date Oct 24, 2023 Description Area 10, Area 30, Area 60 Due date Oct 24, 2023 Submitted by Chris Johnson Status Closed Last update Oct 30, 2023, 3:40 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 736 of 1851 Crew # Workers # Total hours Work performed Lacey Mechanical 1 8 Area 60, Plumbing Totals 25 56 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 8 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 2 Moved materials around the project site Hitachi 85 Excavator 1 6 Area 10 Grading, Backfill, stockpiling concrete Aggs Kobelco 1100G Crane 1 6 Area 40, Fly Rebar Bomag Roller 1 Water Truck 1 4 Dust control, Area 10 Water for Compaction IMCO Concrete Truck 2 6 Area 40 Dump Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 737 of 1851 Equipment Quantity Hours used Comment Bomag BW 124 PD SD Roller 1 2 Area 10, Retaining wall Footing JLG G5-18A Boom Forklift (Basin Masonry Rental) 1 8 Move Material around the site 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Concrete Test Report along with IMCO Batch Tickets. 7:30 am IMCO working on Area 40 Form work. EOI working on Area 40 rebar. Vale Electric on-site. Basin Masonry has 3 guys onsite to work on the veneer siding Area 30. Framers working in Area 60. IMCO getting ready to place Area 40 Foundation. Welder on-site to work on columns for Area 60, Hatchery Building. 8:30 am IMCO placing concrete for Area 40 Foundation. 12:00 pm IMCO done placing concrete. 76.5 cy placed today. 2 sets of cylinders made. 4:00 pm I spoke to Kirt and Sean about covering the concrete from todays placement as it is supposed to rain from tonight-Thursday Morning. They said they planned to cover it with plastic. Randy Inselman, HMH Engineering Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 738 of 1851 References Photos (8) TC_00289 Taken on Oct 24, 2023, 3:15 PM MDT Added on Oct 25, 2023, 9:14 AM MDT Added by Chris Johnson TC_00285 Taken on Oct 24, 2023, 1:47 PM MDT Added on Oct 25, 2023, 9:14 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 739 of 1851 TC_00284 Taken on Oct 24, 2023, 9:40 AM MDT Added on Oct 25, 2023, 9:14 AM MDT Added by Chris Johnson TC_00283 Taken on Oct 24, 2023, 9:38 AM MDT Added on Oct 25, 2023, 9:14 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 740 of 1851 TC_00288 Taken on Oct 24, 2023, 3:15 PM MDT Added on Oct 25, 2023, 9:14 AM MDT Added by Chris Johnson TC_00287 Taken on Oct 24, 2023, 1:48 PM MDT Added on Oct 25, 2023, 9:14 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 741 of 1851 TC_00286 Taken on Oct 24, 2023, 1:48 PM MDT Added on Oct 25, 2023, 9:14 AM MDT Added by Chris Johnson TC_00282 Taken on Oct 24, 2023, 9:38 AM MDT Added on Oct 25, 2023, 9:14 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 742 of 1851 Form detail #250: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed EOI 4 10 Area 40, Install Rebar IMCO, Carpenters 4 Area 40, Forms Dusty B Framers 8 8 Area 60 Vale Electric 2 10 Area 10 Basin Masonry 4 10 Area 30, veneer siding Forms Location Form date Oct 23, 2023 Description Area, 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 24, 2023, 7:21 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 743 of 1851 Crew # Workers # Total hours Work performed Totals 22 38 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 8 Move material around the site Deere 210 Excavator 1 2 Area 10, Backfill between Area 40/60 Deere 644J Loader 1 4 Moved materials around the project site Hitachi 85 Excavator 1 6 Area 10 Grading, Backfill, stockpiling concrete Aggs Kobelco 1100G Crane 1 2 Area 40, Fly Rebar Bomag Roller 1 Water Truck 1 4 Dust control, Area 10 Water for Compaction IMCO Concrete Truck 3 Dump Truck 1 4 Hauled in Concrete Aggs Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 744 of 1851 Equipment Quantity Hours used Comment Bomag BW 124 PD SD Roller 1 2 Area 10, Retaining wall Footing JLG G5-18A Boom Forklift (Basin Masonry Rental) 1 8 Move Material around the site 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO working on Area 40 Form work. EOI working on Area 40 Top Mat and Verts. Vale Electric on-site. Delivery of colored grout and scaffolding from Basin Masonry. Basin Masonry has 4 guys onsite to work on the veneer siding Area 30. Delivery of Cement. 9:00 am IMCO had 2 guys working on the Area 10 backfill for the retaining wall. Framers not onsite. IMCO, getting forms and floor drains to grade in Area 40. 10:30 am Framers working on Area 60, Hatchery building. 11:00 am Welder showed up to rotate plates on the top of the columns Area 60, Hatchery building. 2:00 pm IMCO plans to pour at 8:00am tomorrow morning (70cy). 4:00 pm Ryan with IMCO doing his rebar inspection. I told him there were a couple clearance issues and some bar that needed to be tied for tomorrows pour. Randy Inselman, HMH Engineering Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 745 of 1851 References Photos (6) TC_00281 Taken on Oct 23, 2023, 3:19 PM MDT Added on Oct 24, 2023, 7:21 AM MDT Added by Chris Johnson TC_00280 Taken on Oct 23, 2023, 3:18 PM MDT Added on Oct 24, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 746 of 1851 TC_00279 Taken on Oct 23, 2023, 2:59 PM MDT Added on Oct 24, 2023, 7:21 AM MDT Added by Chris Johnson TC_00278 Taken on Oct 23, 2023, 2:58 PM MDT Added on Oct 24, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 747 of 1851 TC_00277 Taken on Oct 23, 2023, 2:38 PM MDT Added on Oct 24, 2023, 7:21 AM MDT Added by Chris Johnson TC_00276 Taken on Oct 23, 2023, 10:08 AM MDT Added on Oct 24, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 748 of 1851 Form detail #249: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 4 10 Area 40, Forming Dusty B Framers 8 8 Area 60, Framing, Roof sheathing on the South side of the Building EOI 4 10 Area 40, Install Rebar Totals 16 28 Forms Location Form date Oct 20, 2023 Description Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 20, 2023, 11:53 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 749 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 4 Area 10 Grading, Backfill Kobelco 1100G Crane 1 10 Area 30, Fly Piping/fittings/Area 40, Fly Rebar/Area 60 Fly Lumber Bomag Roller 1 Water Truck 1 4 Dust control IMCO Concrete Truck 3 Dump Truck 1 Bomag BW 124 PD SD Roller 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 750 of 1851 Notes 8:00 am IMCO working on Area 40 Form work. EOI working on Area 40 Top Mat and Verts. Crane moving material for the framers in Area 60. I noticed the contractor installed brackets and luminaire's to the handrail on the river intake Area 20 (work done yesterday sometime). 9:00 am 1 operator running Hitachi 85 Excavator grading around MH-4 Area 10 for 1 hour 10:30 am 8 sticks (20') of 12" SDR 17 HDPE delivered. IMCO working on piping inside of the Aeration Tower Area 30 11:45 am Spoke to James (EOI) about Area 40 rebar inspection. The rebar for the concrete pour on Tuesday 10/24 will be ready for inspection Monday. Randy Inselman, HMH Engineering Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 751 of 1851 References Photos (5) TC_00275 Taken on Oct 20, 2023, 11:09 AM MDT Added on Oct 20, 2023, 11:38 AM MDT Added by Chris Johnson TC_00274 Taken on Oct 20, 2023, 11:08 AM MDT Added on Oct 20, 2023, 11:38 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 752 of 1851 TC_00273 Taken on Oct 20, 2023, 10:18 AM MDT Added on Oct 20, 2023, 11:38 AM MDT Added by Chris Johnson TC_00272 Taken on Oct 20, 2023, 8:40 AM MDT Added on Oct 20, 2023, 11:38 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 753 of 1851 TC_00271 Taken on Oct 20, 2023, 8:40 AM MDT Added on Oct 20, 2023, 11:38 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 754 of 1851 Form detail #248: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Batch Concrete IMCO, Carpenters 7 10 Area 40, Concrete Placement, Forming Dusty B Framers 8 8 Area 60, Framing EOI 4 10 Area 40, Install Rebar Forms Location Form date Oct 19, 2023 Description Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 30, 2023, 3:53 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 755 of 1851 Crew # Workers # Total hours Work performed MB Welding 1 10 Area 30, Stair Install Area 60, Fix Columns Totals 25 48 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10 rip rap IMCO Concrete Truck 2 8 Area 40, Concrete Placement Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 4 Area 10 retaining wall footing Backfill, Rip Rap placement Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 Water Truck 1 4 Dust control Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 756 of 1851 4. Signature Chris Johnson, HMH Engineering Name - Date and time Oct 19, 2023 at 3:32 PM MDT 4.1 Notes See attached Concrete test report along with IMCO Batch Tickets. See attached Welding Inspection Reports for Area 30 and Area 40 work to date. 8:00 am IMCO is batching concrete for placement at Area 40. They plan to place 2 squares from CJ to CJ. 8:20 am I have tested the first truck. All tests passed with no issues. IMCO is continuing to place and batch. 11:15 am I tested the second truck. Test passed. IMCO continuing to place and batch. 1:oo pm Done placing concrete for the day. 1 operator on the Hitachi 85 excavator working on grading the area 10 retaining wall and grading the slope from the retaining wall to the bank of the river. Placed rip rap along the slope. Andrew, the welding inspector showed up. 2:00 pm Andrew done inspecting the welds inside of the aeration tower and the hatchery building. 2:30 pm 1 operator and the JD 210 excavator working on placing rip rap on the east side of the retaining wall. 3:30pm EOI working on the verts and top mat in area 40. IMCO crew finishing concrete from the placement today. Randy Inselman, HMH Engineering Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 757 of 1851 References Photos (4) 20231019_112557 Taken on Oct 19, 2023, 11:25 AM MDT Added on Oct 19, 2023, 12:07 PM MDT Added by Chris Johnson 20231019_112614 Taken on Oct 19, 2023, 11:26 AM MDT Added on Oct 19, 2023, 12:07 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 758 of 1851 20231019_091424 Taken on Oct 19, 2023, 9:14 AM MDT Added on Oct 19, 2023, 12:07 PM MDT Added by Chris Johnson 20231019_112621 Taken on Oct 19, 2023, 11:26 AM MDT Added on Oct 19, 2023, 12:07 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 759 of 1851 Form detail #247: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, MH 5 IMCO, Carpenters 7 10 Area 40, Forming Dusty B Framers 8 8 Area 60, Framing EOI 4 10 Area 40, Install Rebar Totals 24 38 Forms Location Form date Oct 18, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 19, 2023, 6:06 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 760 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, MH 5 discharge pipe IMCO Concrete Truck 3 Deere 644J Loader 1 10 Area 10, Access to Retaining wall Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached concrete compressive strength repot. 8:00 am IMCO is working on forming for foundation placements at Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 761 of 1851 9:00 am Attended weekly meeting. 10:00 am IMCO is continuing to work on CJs and bulkheads. The framing crew is sheeting the roof of Area 60. 1:00 pm I performed a walk through on the rebar for the 2 sections of foundation they plan to place tomorrow morning. Everything looked to be per plan and ready for placement. The pipe crew has completed the new discharge pipe to the river. They are backfilling it all now. 3:00 pm The pipe crew is continuing to backfill and compact around MH 5. EOI has been working on top mat of the rebar at Area 40. 4:00 pm IMCO crews are continuing to installing bulkheads at the CJs along with waterstop. References Photos (4) 20231018_151817 Taken on Oct 18, 2023, 3:18 PM MDT Added on Oct 19, 2023, 6:01 AM MDT Added by Chris Johnson 20231018_151748 Taken on Oct 18, 2023, 3:17 PM MDT Added on Oct 19, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 762 of 1851 20231018_134903 Taken on Oct 18, 2023, 1:49 PM MDT Added on Oct 19, 2023, 6:01 AM MDT Added by Chris Johnson 20231018_134856 Taken on Oct 18, 2023, 1:48 PM MDT Added on Oct 19, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 763 of 1851 Form detail #245: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, MH 5 IMCO, Carpenters 7 10 Area 40, Forming Dusty B Framers 8 8 Area 60, Framing EOI 4 10 Area 40, Install Rebar Totals 24 38 Forms Location Form date Oct 17, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 18, 2023, 6:47 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 764 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, MH 5 IMCO Concrete Truck 3 Deere 644J Loader 1 10 Area 10, MH 5 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly Rebar Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO carpenters are planning to continue the forming of the foundation sections at Area 40. They are also going to continue working on forming the fish lift walls. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 765 of 1851 10:00 am EOI is onsite. They are working on the top mat rebar for Area 40. 12:00 pm The framing crew has been working on sheeting the roof. I met with Bert from the crew. I noticed a few missing structural Simpson brackets. He said he would get someone working on them as he did miss them in the plans. IMCO has a crew working on setting MH 5. 2:00 pm IMCO has set MH 5 with the crane. They also made the connection to the old steel drain pipe along with the connection to MH 4. They are grouting it in now. 3:00 pm IMCO is continuing to form up the fish lift and the foundation section. They plan on pouring some of the foundations from CJ to CJ on Thursday. 5:00 pm IMCO is working on installing the discharge pipe out of MH 5 to the river. They are installing it per IPC direction to stay above the OHW elevation of 1692. References Photos (4) 20231017_092457 Taken on Oct 17, 2023, 9:24 AM MDT Added on Oct 18, 2023, 6:47 AM MDT Added by Chris Johnson 20231017_155139 Taken on Oct 17, 2023, 3:51 PM MDT Added on Oct 18, 2023, 6:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 766 of 1851 20231017_153506 Taken on Oct 17, 2023, 3:35 PM MDT Added on Oct 18, 2023, 6:47 AM MDT Added by Chris Johnson 20231017_110250 Taken on Oct 17, 2023, 11:02 AM MDT Added on Oct 18, 2023, 6:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 767 of 1851 Form detail #244: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, MH 5 IMCO, Carpenters 7 10 Area 40, Forming Dusty B Framers 8 8 Area 60, Framing Totals 20 28 2. Materials Forms Location Form date Oct 16, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 17, 2023, 6:47 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 768 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 3 Deere 644J Loader 1 10 Area 10, MH 5 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Concrete Break report from 10/12. 11:00 am IMCO pipe crew is working on installing MH 5. They have cut the existing pipe they need to tie into for the year square and will need to swing the manhole over it. 12:00 pm The framing crew is onsite. They have framed the outriggers on the gables per the direction provided Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 769 of 1851 in an email. See Correspondence. Schnabel is requiring a 2x4 on edge to stiffen the 2x4 laid flat. The framers are working on sheeting the roof now. 1:00 pm IMCO carpenters are working on forming the thickened edge of the raceways. They also have a crew working on the fish lift forming. 3:00 pm IMCO has set the base for MH 5. They are waiting for their crane operator to set the manhole sections of the structure. The framing crew is finishing up for the day. 5:00 pm IMCO is cleaning up for the day. They worked on forming for the next concrete placement all day. References Photos (8) 20231016_111029 Taken on Oct 16, 2023, 11:10 AM MDT Added on Oct 17, 2023, 6:39 AM MDT Added by Chris Johnson 20231016_153908 Taken on Oct 16, 2023, 3:39 PM MDT Added on Oct 17, 2023, 6:39 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 770 of 1851 20231016_111127 Taken on Oct 16, 2023, 11:11 AM MDT Added on Oct 17, 2023, 6:39 AM MDT Added by Chris Johnson 20231016_153959 Taken on Oct 16, 2023, 3:39 PM MDT Added on Oct 17, 2023, 6:39 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 771 of 1851 20231016_153856 Taken on Oct 16, 2023, 3:38 PM MDT Added on Oct 17, 2023, 6:39 AM MDT Added by Chris Johnson 20231016_114406 Taken on Oct 16, 2023, 11:44 AM MDT Added on Oct 17, 2023, 6:39 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 772 of 1851 20231016_114400 Taken on Oct 16, 2023, 11:44 AM MDT Added on Oct 17, 2023, 6:39 AM MDT Added by Chris Johnson 20231016_111033 Taken on Oct 16, 2023, 11:10 AM MDT Added on Oct 17, 2023, 6:39 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 773 of 1851 Form detail #243: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Batch Concrete IMCO, Carpenters 7 10 Area 40, Concrete Placement EOI 4 10 Area 40, Rebar Dusty B Framers 8 8 Area 60, Framing Totals 24 38 Forms Location Form date Oct 11, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 12, 2023, 7:50 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 774 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 8 Area 40, Batch Concrete IMCO Concrete Truck 1 8 Area 40, Batch Concrete Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 10, 12" D Line Dump Truck 1 10 Area 10, Import Structural Fill Kobelco 1100G Crane 1 10 Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 775 of 1851 Notes 7:00 am IMCO is working on batching concrete for todays placement. 8:30 am The pump truck is onsite and they are getting ready to start placing concrete. They are going to start with the footings for the retaining wall. 9:30 am IMCO has starting placing. I have taken a test and it passed with no issues. IMCO is starting to batch their second truck. 10:30 am IMCO has informed me the batch plant is plugged up and they are still working on making the second truck. 11:30 am It has been discussed that they will not be able to batch any more concrete today as the cement hopper is plugged up. IMCO is going to leave the concrete in the forms for the retaining wall. Sean, Zack and I discussed flatting the concrete in the forms to be between the two rebar matts. IMCO has already done this. The next placement is scheduled for Monday. 12:30 pm IMCO is going to work on fixing the batch plant. Left site. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 776 of 1851 References Photos (1) 20231011_095621 Taken on Oct 11, 2023, 9:56 AM MDT Added on Oct 12, 2023, 7:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 777 of 1851 Form detail #242: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, Weld HDPE piping, install 12 D to MH 7 IMCO, Carpenters 7 10 Area 40, Template for Rebar, CJ bulkheads Totals 12 20 2. Materials Forms Location Form date Oct 10, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 11, 2023, 6:56 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 778 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 8 IMCO Concrete Truck 1 8 Deere 644J Loader 1 10 Area 10, 12 D to MH 7 Hitachi 85 Excavator 1 10 Area 10, 12" D Line Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly trusses Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO plans to continue working on CJs bulkheads and water stop at Area 40. EOI will not be onsite today so they are going to continue working on CJs to stay ahead of them. EOI is scheduled to be onsite Wednesday now. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 779 of 1851 9:00 am The framing crew is continuing to install the trusses. 10:00 am IMCO pipe crew is working on bedding and backfilling the 12 D line to MH 7. 12:00 pm I have walked through the lower raceway drain foundation. All looks good and is ready to be poured. 2:00 pm I noticed the framers notched the top chord on the gable truss for the outrigger eaves. After looking through the submittal I confirmed this is correct per the submittal. This however does not match the details on GS-2. I have brought this to IMCOs attention and also composed an email to the engineer. It has started to rain onsite. The framing crew has left. 4:30 pm IMCO has continued to work on CJs at Area 40. References Photos (10) 20231010_143023 Taken on Oct 10, 2023, 2:30 PM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson 20231010_143018 Taken on Oct 10, 2023, 2:30 PM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 780 of 1851 20231010_143015 Taken on Oct 10, 2023, 2:30 PM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson 20231010_142118 Taken on Oct 10, 2023, 2:21 PM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 781 of 1851 20231010_142016 Taken on Oct 10, 2023, 2:20 PM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson 20231010_142008 Taken on Oct 10, 2023, 2:20 PM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 782 of 1851 20231010_122143 Taken on Oct 10, 2023, 12:21 PM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson 20231010_094412 Taken on Oct 10, 2023, 9:44 AM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 783 of 1851 20231010_092852 Taken on Oct 10, 2023, 9:28 AM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson 20231010_092845 Taken on Oct 10, 2023, 9:28 AM MDT Added on Oct 11, 2023, 6:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 784 of 1851 Form detail #241: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, Weld HDPE piping, install 12 D to MH 7 IMCO, Carpenters 7 10 Area 40, Template for Rebar, CJ bulkheads Totals 12 20 2. Materials Forms Location Form date Oct 9, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 10, 2023, 7:25 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 785 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 8 IMCO Concrete Truck 1 8 Deere 644J Loader 1 10 Area 10, 12 D to MH 7 Hitachi 85 Excavator 1 10 Area 10, 12" D Line Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly trusses Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached compressive strength report. 10:00 am Arrived on site. I noticed the framers are installing roof trusses with the help of the crane. I noticed Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 786 of 1851 right away that 4 trusses do not match the Structural and Architectural plans. The 4 trusses span near the breezeway. I brought this up the Kirt. 12:00 pm IMCO is working on the bulkheading the CJs along with laying out wall templates for EOI. IMCO also has a crew working on HDPE fusing for the 12" D line from the crowder drain to MH 7. 2:00 pm IMCO pipe crew is working on installing the 12 D line from the cross crowder drain to MH 7. The framers are currently working on moving the two window openings. One window was approx. 10" offset to the south and the other window was approx. 2" offset to the south. The HDs are in the wrong location which IMCO will need to submit a plan on how to drill and epoxy new HDs. 4:30 pm IMCO is continuing to work on bulkheading the CJs and install waterstop for Area 40. They have also been removing the bulkheads from last weeks placement. References Photos (4) 20231009_154354 Taken on Oct 9, 2023, 3:43 PM MDT Added on Oct 10, 2023, 7:10 AM MDT Added by Chris Johnson 20231009_111226 Taken on Oct 9, 2023, 11:12 AM MDT Added on Oct 10, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 787 of 1851 20231009_154402 Taken on Oct 9, 2023, 3:44 PM MDT Added on Oct 10, 2023, 7:10 AM MDT Added by Chris Johnson 20231009_111247 Taken on Oct 9, 2023, 11:12 AM MDT Added on Oct 10, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 788 of 1851 Form detail #240: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, Weld HDPE piping, Install 8" GW line into hatchery building Area 40 Batch Concrete IMCO, Carpenters 7 10 Area 30, Mechanical Piping Area 40, Place Concrete, Template for Rebar, CJ bulkheads EOI 4 10 Area 40 Install Top Mat Forms Location Form date Oct 5, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 6, 2023, 8:00 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 789 of 1851 Crew # Workers # Total hours Work performed MB Welding 1 10 Area 30, Welding pipe supports, Grating Framing Totals 17 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 8 Area 40,10, Concrete IMCO Concrete Truck 1 8 Area 40,10, Concrete Deere 644J Loader 1 8 Area 40,10, Concrete Hitachi 85 Excavator 1 10 Area 10, 8" GW Line Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly rebar Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 790 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached compressive strength reports, concrete field report and IMCO batch tickets. 7:00 am IMCO is prepping to batch concrete. 8:00 am IMCO is batching concrete. They are going to place two sections of the raceway drain channel foundation. 8:20 am First concrete truck is at the pump. They primed the pump and dumped approx. 1 CY in the washout. I took my sample and tested air. The air was low. IMCO is going to dose the truck. 8:40 am IMCO has dosed the truck for more air and I have taken my second test. This tested at 5% air. They are going to adjust the second truck. They started to place concrete. 9:45 am The second truck is batched and I have taken my sample. The air was low again at 4.6%. They dosed this truck as well. I took a second test and it passed with 5.2%. 11:00 am The crew is continuing to place and finish concrete. EOI is onsite working on top mat of rebar at Area 40. 11:20 am IMCO has completed the Area 40 placement and is moved to place a small pipe encasement and then the retaining wall foundation 3 sections. 11:50 am I tested the truck before they started placing for the retaining wall foundation. It tested a bit high on air at 7.2%. Due to the location of the placement we all decided to pour it out and make the adjustment on the next and last truck. 12:20 pm IMCOs last truck has backed up to the pump and starting placing. This will finish the 3rd section of the retaining wall foundation. 2:00 pm EOI is done for the day and leaving. IMCO is continuing to work on finishing the concrete. They are placing a U4 finish, Light Broom, on the finished slab per the specifications. 3:00 pm The framers have been working with a larger crew today. They are continuing to stand interior walls and also started on the beam pockets of the breezeway. IMCO has set the river pump aerator with the crane. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 791 of 1851 5:30 pm IMCO is done for the day. They have sprayed cure on the retaining wall foundation and will be placing water on the lower drain foundation. References Photos (14) 20231005_170528 Taken on Oct 5, 2023, 5:05 PM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson 20231005_113522 Taken on Oct 5, 2023, 11:35 AM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 792 of 1851 20231005_091844 Taken on Oct 5, 2023, 9:18 AM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson 20231005_145651 Taken on Oct 5, 2023, 2:56 PM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 793 of 1851 20231005_170627 Taken on Oct 5, 2023, 5:06 PM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson 20231005_170520 Taken on Oct 5, 2023, 5:05 PM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 794 of 1851 20231005_170502 Taken on Oct 5, 2023, 5:05 PM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson 20231005_122421 Taken on Oct 5, 2023, 12:24 PM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 795 of 1851 20231005_113519 Taken on Oct 5, 2023, 11:35 AM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson 20231005_111702 Taken on Oct 5, 2023, 11:17 AM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 796 of 1851 20231005_101331 Taken on Oct 5, 2023, 10:13 AM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson 20231005_083802 Taken on Oct 5, 2023, 8:38 AM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 797 of 1851 20231005_083753 Taken on Oct 5, 2023, 8:37 AM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson 20231005_083743 Taken on Oct 5, 2023, 8:37 AM MDT Added on Oct 6, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 798 of 1851 Form detail #239: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, Weld HDPE piping, Install 8" GW line into hatchery building IMCO, Carpenters 7 10 Area 30, Mechanical Piping Area 40, Template for Rebar, CJ bulkheads EOI 4 10 Area 40 Install Top Mat MB Welding 1 10 Area 30, Welding pipe supports Forms Location Form date Oct 4, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 5, 2023, 6:32 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 799 of 1851 Crew # Workers # Total hours Work performed Totals 17 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, 8" GW Line Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly rebar Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 800 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached compressive strength report 8:00 am IMCO is continuing to work on installing CJ bulkheads and waterstop at Area 40. They plan to place concrete tomorrow in the lower sections of the foundation slab. 10:00 am IMCO has formed up a small pipe encasement they plan to place tomorrow. It is the last section of pipe encasement for the 14 cross crowder drains. 12:00 pm EOI has been onsite installing the top matt for Area 40. IMCO has put a small crew on bulkheads at the retaining wall. They are following the approved rebar plan and installing CJs every 20'. 2:00 pm IMCO has pulled the lid off the large aerator. See attached photos of the media in bags. 4:00 pm The framers have been working on installing the generator room exterior walls along with interior walls. IMCO is working on a solution for the missing HD and large window location. 5:30 pm IMCO is ready for the placement tomorrow. The pump truck is scheduled to be onsite at 8am. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 801 of 1851 References Photos (11) 20231004_141158 Taken on Oct 4, 2023, 2:11 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson 20231004_082108 Taken on Oct 4, 2023, 8:21 AM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 802 of 1851 20231004_153032 Taken on Oct 4, 2023, 3:30 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson 20231004_164604 Taken on Oct 4, 2023, 4:46 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 803 of 1851 20231004_153348 Taken on Oct 4, 2023, 3:33 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson 20231004_153042 Taken on Oct 4, 2023, 3:30 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 804 of 1851 20231004_141322 Taken on Oct 4, 2023, 2:13 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson 20231004_141204 Taken on Oct 4, 2023, 2:12 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 805 of 1851 20231004_141149 Taken on Oct 4, 2023, 2:11 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson 20231004_141106 Taken on Oct 4, 2023, 2:11 PM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 806 of 1851 20231004_104124 Taken on Oct 4, 2023, 10:41 AM MDT Added on Oct 4, 2023, 5:29 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 807 of 1851 Form detail #238: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 3 10 Area 10, Weld HDPE piping Area 40, Backfill Cross Crowder Drain IMCO, Carpenters 7 10 Area 30, Mechanical Piping Area 40, Template for Rebar, CJ bulkheads EOI 4 10 Area 10 Install retaining wall rebar MB Welding 1 10 Area 30, Welding pipe supports Forms Location Form date Oct 3, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 4, 2023, 7:51 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 808 of 1851 Crew # Workers # Total hours Work performed Totals 15 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 40, Backfill around cross crowder tail screen Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly rebar Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 809 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on installing waterstop and bulkheads at all the CJs in the Area 40 slab. 9:00 am The framing crew is continuing to work on framing walls. EOI is onsite installing the rebar for the retaining wall behind Area 60. 11:00 am IMCO is continuing to work on installing mechanical piping inside Area 30. MB welding is also working on mechanical piping. 1:30 pm Attended weekly meeting. 3:00 pm The framing crew has lifted and set walls earlier today. I will perform an inspection of those walls once the crew is done for the day. EOI is continuing to work on retaining wall rebar. 5:30 pm All crews are done for the day. I walked the framing and checked for deficiencies. See list below. 9/28 -Breezeway Beam Pockets in wrong location, One not installed at all -Breezeway HD on single door, Seal plate is cut and missing bottom plate -Split wood in few locations -Door header is furred out due to header being installed at wrong elevation, IPC will Accept -Gaps in blocking -Nails missing studs, not per shear nailing patter -Holes in sheathing from picking the walls with crane 10/3 - Large door is missing SP6 brackets, plywood will need to be removed to install bracket -Large window is missing SPH6 brackets, plywood will need to be removed to install bracket -Nails missing studs, not per shear nailing pattern -Drilled holes in slab for bracing -Window on front wall missing HD -Window on front wall is approx. 2" offset to the South -Large window is approx. 10" offset to the South -Large door is approx. 2" offset to the South Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 810 of 1851 References Photos (5) 20231003_153123 Added on Oct 4, 2023, 7:04 AM MDT Added by Chris Johnson 20231003_091550 Added on Oct 4, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 811 of 1851 20231003_105418 Added on Oct 4, 2023, 7:04 AM MDT Added by Chris Johnson 20231003_091546 Added on Oct 4, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 812 of 1851 20231003_091641 Added on Oct 4, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 813 of 1851 Form detail #237: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 3 10 Area 10, Retaining wall Foundation Area 40, Backfill Cross Crowder Drain IMCO, Carpenters 7 10 Area 10, Retaining Wall Foundation Area 30, Mechanical Piping Area 40, Template for Rebar, CJ bulkheads EOI 4 10 Area 40 Install rebar Forms Location Form date Oct 2, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Oct 2, 2023, 5:33 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 814 of 1851 Crew # Workers # Total hours Work performed MB Welding 1 10 Area 30, Welding pipe supports Totals 15 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 40, Backfill around cross crowder tail screen Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly rebar Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 815 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:00 am IMCO is working on installing the waterstop for the CJ joints in Area 40. EOI is onsite installing rebar in the lower drain section of Area 40. IMCO is also working on installing the 36" drain pipe penetration for the lower drain section. The framers are continuing to work framing Area 60. 1:00 pm Kevin, EOI, had some questions regarding the pipe penetration rebar. After reviewing the approved submittal I located a detail showing what was approved for the rebar reinforcement around the large pipe penetration. He plans to install it per the detail. A team has moved over and started to form up the retaining wall foundation behind Area 60. 3:00 pm IMCO is working on installing the pipe penetrations for each raceway drain. These are set at ~4" below finished floor height. I spoke to Steve regarding the 1/5 slope to the drain. He was aware of it. 4:00 pm IMCO is continuing to work on the CJs at area 40. EOI has moved a couple of guys over to tie the rebar for the retaining wall foundation behind Area 60. 5:00 pm IMCO is done for the day. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 816 of 1851 References Photos (6) 20231002_112729 Added on Oct 2, 2023, 5:06 PM MDT Added by Chris Johnson 20231002_151943 Added on Oct 2, 2023, 5:06 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 817 of 1851 20231002_153709 Added on Oct 2, 2023, 5:06 PM MDT Added by Chris Johnson 20231002_112817 Added on Oct 2, 2023, 5:06 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 818 of 1851 20231002_112656 Added on Oct 2, 2023, 5:06 PM MDT Added by Chris Johnson 20231002_151938 Added on Oct 2, 2023, 5:06 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 819 of 1851 Form detail #236: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 3 10 Area 10, Retaining wall foundation IMCO, Carpenters 6 10 Area 30, Mechanical Piping Area 40, Template for Rebar, Forming of Fish lift walls EOI 4 10 Area 40 Install rebar Totals 13 30 Forms Location Form date Sep 29, 2023 Description Area 10, Area 30, Area 40 Due date Submitted by Chris Johnson Status Closed Last update Sep 29, 2023, 3:04 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 820 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 10, Excavate for Retaining Wall Dump Truck 1 Kobelco 1100G Crane 1 10 Area 40, Fly rebar Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 821 of 1851 Notes 9:00 am IMCO is working on installing a template for the back wall for the rebar guys to install the vertical bars. EOI is onsite working on top mat of the lower slab at Area 40 along with finishing the lower mat of the rest of Area 40. 11:00 am IMCO has a small operator crew working on retaining wall foundation behind Area 60. 12:00 pm Left site to return concrete cylinders to lab. References Photos (5) 20230929_105725 Added on Sep 29, 2023, 3:03 PM MDT Added by Chris Johnson 20230929_091826 Added on Sep 29, 2023, 3:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 822 of 1851 20230929_092018 Added on Sep 29, 2023, 3:03 PM MDT Added by Chris Johnson 20230929_092016 Added on Sep 29, 2023, 3:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 823 of 1851 20230929_105731 Added on Sep 29, 2023, 3:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 824 of 1851 Form detail #235: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, Retaining wall foundation Area 40, Batch Concrete IMCO, Carpenters 6 10 Area 30, Metal framing, Aerator install Area 40, Cross Crowder Tail Screen Wall placement, Forming of Fish lift walls Dusty B Framing 6 10 Area 60, Framing Forms Location Form date Sep 28, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 29, 2023, 8:51 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 825 of 1851 Crew # Workers # Total hours Work performed EOI 2 10 Area 40 Install rebar MB Welding 1 10 Area 30, Metal Framing Totals 20 50 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Retaining wall foundation IMCO Concrete Truck 1 4 Area 40, Concrete IMCO Concrete Truck 1 Deere 644J Loader 1 10 Area 10, Retaining wall foundation Area 40, Batch Concrete Hitachi 85 Excavator 1 10 Area 10, Excavate for Retaining Wall Dump Truck 1 10 Area 10, Retaining wall foundation Kobelco 1100G Crane 1 10 Area 40, Fly rebar Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 826 of 1851 Equipment Quantity Hours used Comment Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is prepping to start batching concrete. The framers are onsite to continue framing walls at Area 60. 9:00 am IMCO has batched 5 CY. I tested the truck and all was in spec with the exception of the slump. The slump was at 7". It was allowed to be placed due to the location of placement. They are placing the first lift of the tail screen for the cross crowder walls. This will bring the elevation of the concrete to the bottom of foundation to allow backfilling. Once backfilled they can finish the rebar for the foundation. 10:00 am IMCO has completed the placement. They are going to work on installing the water stop and finish the concrete. 11:00 am EOI is onsite continuing to install rebar for the foundation. They are starting to install the top mat on the lower foundation of Area 40. 1:00 pm The framing crew has left for the week. I have walked the work they have completed and compiled a list of deficiencies. I will add to the bottom of this report with photos. 3:00 pm EOI is continuing to install rebar at Area 40. 5:00 pm Most of the IMCO crew has left for the day. A small crew will be onsite tomorrow working on fish lift forming. Framing Deficiencies as of 9/28 -Breezeway Beam Pockets in wrong location, One not installed at all -Breezeway HD on single door, Seal plate is cut and missing bottom plate -Split wood in few locations -Door header is furred out due to header being installed at wrong elevation -Gaps in blocking -Nails missing studs, not per shear nailing patter -Holes in sheathing from picking the walls with crane Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 827 of 1851 References Photos (20) 20230928_135003 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_140107 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 828 of 1851 20230928_135139 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_135008 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 829 of 1851 20230928_091535 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_135005 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 830 of 1851 20230928_133945 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_134951 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 831 of 1851 20230928_135137 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_135232 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 832 of 1851 20230928_134919 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_154924 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 833 of 1851 20230928_135145 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_135213 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 834 of 1851 20230928_134317 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_134508 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 835 of 1851 20230928_140052 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_140358 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 836 of 1851 20230928_140019 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson 20230928_134313 Added on Sep 28, 2023, 4:05 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 837 of 1851 Form detail #234: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, Retaining wall foundation IMCO, Carpenters 6 10 Area 30, Metal framing, Aerator install Area 40, Cross Crowder Tail Screen Wall Forming Dusty B Framing 2 10 Area 60, Framing EOI 2 10 Area 40 Install rebar Forms Location Form date Sep 27, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 28, 2023, 9:39 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 838 of 1851 Crew # Workers # Total hours Work performed MB Welding 1 10 Area 30, Metal Framing Totals 16 50 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, MH 4 to MH5 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 10 Area 10, Retaining wall foundation Hitachi 85 Excavator 1 10 Area 10, Excavate for Retaining Wall Dump Truck 1 10 Area 10, MH 4 to MH 5 Kobelco 1100G Crane 1 10 Area 40, Fly rebar Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 839 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 day Compressive Break report from Area 60 Incubation Slab. 8:00 am IMCO is continuing to work on forming the tail screen 1st wall section for a placement tomorrow. This will bring the walls up to the bottom of foundation slab grade to allow them to backfill in preparation for the foundation placement. 9:00 am Attended weekly meeting. 10:00 am The framers are continuing to work on framing walls at Area 60. Yesterday they used the crane to pick and set exterior walls. 12:00 pm MB Welding is onsite and continuing to work on Area 30 support framing. 1:00 pm EOI is onsite working on installing the bottom mat foundation rebar for Area 40. Kevin and I spoke regarding Schnabel's response on the CJ detail and clearances. The detail calls for 4" of clearance but they have allowed up to 2". After laying out the rebar he will have to cut multiple bars a few inches to provide this clearance away from the CJs. See GCOR-1-1 for email correspondence. 2:00 pm IMCO is continuing to work on forming for the tail screen drain for the cross crowder. They have all the rebar including the trim bar installed. 4:00 pm IMCO is having to lift some of the rebar and set it with a laser level to ensure it is at the right elevation. They are using concrete blocks to keep the rebar at the right elevation. I have noticed a few locations where there is less than 3" of clearance between rebar and ground. I have asked Kole if he would walk it with me tomorrow after the concrete placement to discuss fixing this before more rebar is installed. 5:00 pm IMCO has filled the spray bar line with water for an initial informational only test to check for leaks. IMCO has placed the aerator for the well pumps on Area 30. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 840 of 1851 References Photos (14) 20230927_171926 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson 20230927_154216 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 841 of 1851 20230927_154229 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson 20230927_154213 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 842 of 1851 20230927_160331 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson 20230927_163848 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 843 of 1851 20230927_155636 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson 20230927_160335 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 844 of 1851 20230927_155702 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson 20230927_163909 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 845 of 1851 20230927_160455 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson 20230927_154218 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 846 of 1851 20230927_155639 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson 20230927_170908 Added on Sep 27, 2023, 6:10 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 847 of 1851 Form detail #233: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, MH 4 to MH 5 IMCO, Carpenters 6 10 Area 40, Cross Crowder Tail Screen Wall Forming Dusty B Framing 2 10 Area 60, Framing EOI 2 10 Area 40 Install rebar Totals 15 40 Forms Location Form date Sep 25, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 27, 2023, 6:56 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 848 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, MH 4 to MH5 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 10 Area 10, Retaining wall foundation Hitachi 85 Excavator 1 10 Area 10, Excavate for Retaining Wall Dump Truck 1 10 Area 10, MH 4 to MH 5 Kobelco 1100G Crane 1 10 Area 40, Fly rebar Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 849 of 1851 Notes 11:00 am IMCO is continuing to excavate for the run of pipe from MH 4 to MH 5. EOI is onsite working on installing the rebar for Area 40 foundation. 12:00 pm The framing crew is onsite and continuing to work on framing walls at Area 60. 1:00 pm IMCO is working on forming the walls of the tail screen for the cross crowder. While checking the clearances of the tail screen embed frame, I noticed there was no way to attach the back of it to the wall. I asked Jake Kreglo to check into it. We walked it and determined something will need to be done to attach it. 2:00 pm IMCO has a crew working on excavating for the foundation of the retaining wall. The carpenter crew is continuing to work on forming the first lift of the cross crowder tail screen walls. They are currently working on installing the piping through the walls. 3:00 pm IMCO is continuing to work on excavating for MH 5. They have found existing drainage steel pipe. Kirt said it was very corroded and broke very easy. He removed a section of it with ease. You can clearly see the steel is pitted with holes and very rusty. 4:30 pm IMCO is starting to clean up for the day. The crew will continuing forming for the first lift of the tail screen walls tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 850 of 1851 References Photos (7) 20230925_111434 Added on Sep 27, 2023, 6:51 AM MDT Added by Chris Johnson 20230925_140130 Added on Sep 27, 2023, 6:51 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 851 of 1851 20230925_140137 Added on Sep 27, 2023, 6:51 AM MDT Added by Chris Johnson 20230925_132011 Added on Sep 27, 2023, 6:51 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 852 of 1851 20230925_132016 Added on Sep 27, 2023, 6:51 AM MDT Added by Chris Johnson 20230925_135326 Added on Sep 27, 2023, 6:51 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 853 of 1851 20230925_135330 Added on Sep 27, 2023, 6:51 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 854 of 1851 Form detail #232: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Forms Location Form date Sep 22, 2023 Description Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 22, 2023, 12:31 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 855 of 1851 Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 Deere 210 Excavator 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Water Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 day Concrete compressive strength report for Area 60 Office Area Slab. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 856 of 1851 Form detail #231: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, MH 4 to MH 5 IMCO, Carpenters 6 10 Area 40, Weld Waterstop Dusty B Framing 2 10 Area 60, Framing EOI 2 10 Area 40 Install rebar Totals 15 40 Forms Location Form date Sep 21, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 22, 2023, 9:06 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 857 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, MH 4 to MH5 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 10 Area 10, Retaining wall foundation Hitachi 85 Excavator 1 10 Area 10, Excavate for Retaining Wall Dump Truck 1 10 Area 10, MH 4 to MH 5 Kobelco 1100G Crane 1 10 Area 40, Fly rebar Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 858 of 1851 Notes 8:00 am I noticed IMCO was starting to strip the forms from yesterdays placement. I informed Sean that the forms should not be stripped for 48 hours per the specifications. 9:00 am I spoke to the framing crew. They stood up a few of the walls and I noticed multiple exposed nails "shiners" on both the sheathing and framing. I informed them these shiners were will not be accepted. They said they will make it right. I then told them because these are shear walls they will need to remove the Tyvek they installed so a proper shear nailing inspection can be done. I also informed Kurt as well. 9:30 am I noticed IMCO has installed a few of the drains for the for cross crowder. IMCO was working on a solution to connect the 6" drains they submitted on to the 8" pipe, which was part of the submittal comments on approval. I noticed they used mastic to seal the gap between 8" and 6". I have sent an email to Bryant and Zack for comments on the use of this method. See attached photos. 10:00 am While doing some rebar inspection as EOI was installing the bottom mat for Area 40, I noticed they were not meeting the 4" clear space on splices from the CJs. I brought this up to Kevin. He said he would fix them. He is continuing to install rebar for both the cross crowder tail screen drain and the holding facility base slab. 12:00 pm The crews are starting to form up the small walls for the cross crowder tail screen drain. They want to pour the walls up the bottom of the base slab elevation. This will allow them to backfill and compact in preparation for the base slab rebar. 1:00 pm IPC troubleman is onsite to move the power for the existing hatchery building. This will allow IMCO to remove the pole that is in conflict with the retaining wall. Kurt informed me that nobody will be onsite tomorrow. I am leaving the site to return concrete cylinders from yesterdays placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 859 of 1851 References Photos (14) 20230921_092135 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson 20230921_084114 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 860 of 1851 20230921_082532 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson 20230921_092153 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 861 of 1851 20230921_084119 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson 20230921_083857 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 862 of 1851 20230921_084108 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson 20230921_092109 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 863 of 1851 20230921_091223 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson 20230921_122521 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 864 of 1851 20230921_083844 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson 20230921_092111 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 865 of 1851 20230921_092143 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson 20230921_091124 Added on Sep 21, 2023, 12:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 866 of 1851 Form detail #229: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Forms Location Form date Sep 20, 2023 Description Area 60, Area 40 Due date Submitted by Chris Johnson Status Closed Last update Sep 20, 2023, 6:42 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 867 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Concrete Compressive Strength report. Not on site today. I was informed that IMCO plans 3 separate placements tomorrow. They plan to place the generator room slab, the upper fish lift slab and the lower slab for the cross crowder drain. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 868 of 1851 Form detail #230: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10, MH 4 to MH 5 Area 40,60 Batch concrete IMCO, Carpenters 6 10 Area 40, 60 Place Concrete, Weld Waterstop Dusty B Framing 2 10 Area 60, Framing MB Welding 1 10 Area 30, Welding Platform Frame Forms Location Form date Sep 20, 2023 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 21, 2023, 8:12 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 869 of 1851 Crew # Workers # Total hours Work performed EOI 2 10 Area 40 Install rebar Totals 16 50 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, MH 4 to MH5 IMCO Concrete Truck 1 5 Area 40, 60 concrete IMCO Concrete Truck 1 5 Area 40, 60 concrete Deere 644J Loader 1 5 Area 40, 60 Batch concrete Hitachi 85 Excavator 1 Area 10, Excavate for Retaining Wall Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Platform Frame Area 40, Fly rebar Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 870 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Attached is Concrete testing report and IMCO batch tickets. 7:00 am IMCO plans to place the Generator room slab at Area 60 along with the Cross crowder drain slab and the upper fish lift slab at Area 40. The crews are still working on the drain slab and fish lift slab. I started my inspection of the rebar for the drain slab. I noticed some rebar was missing. I spoke to Kevin at EOI and he started to get working on it. IMCO is still working on the water stop install for the placement as well. 8:00 am The detailed drawings from the rebar submittal do not clearly show the slab rebar correctly. IMCO and EOI had to make some revisions to what they think it should be. After looking it over and speaking to them they added a few more bars as we did our best to interpret the plans the best we could. I have taken multiple photos for documentation. 9:00 am The crew is still working on the water stop for the upper fish lift slab. They have batched concrete for the generator room. 9:30 am I have tested the concrete for the generator room. The concrete tested in spec at the low end on air. It was a lower than allowed on temp as well. They started to place the concrete. Once I was done with my test I checked the temp of the concrete once it was placed. It was 62. I spoke to IMCO regarding the concrete temps for future pours. They informed me they are working on getting a boiler out here to warm the water. 11:00 am IMCO has placed the lower cross crowder slab and they are currently working on placing the upper fish lift slab. 12:00 pm IMCO came up approx. 2 cy short. They batched one additional truck to finish off the slab placement. 2:00 pm IMCO is working on finishing the concrete now. The framers are on site. They have stood some walls and continuing to frame others. EOI is working on installing rebar for Area 40 slab. They are working on the bottom mat now. IMCO has a small crew working on excavating for the pipe line from MH 4 to MH 5. They have also started to excavate for the retaining wall behind Area 60. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 871 of 1851 References Photos (12) 20230920_095451 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson 20230920_095503 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 872 of 1851 20230920_095347 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson 20230920_095338 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 873 of 1851 20230920_095516 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson 20230920_084136 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 874 of 1851 20230920_102751 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson 20230920_095422 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 875 of 1851 20230920_095410 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson 20230920_095402 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 876 of 1851 20230920_093127 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson 20230920_074513 Added on Sep 21, 2023, 7:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 877 of 1851 Form detail #228: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Excavate grade IMCO, Carpenters 6 10 Area 40, Form for foundation, Weld Waterstop Dusty B Framing 2 10 Area 60, Framing MB Welding 1 10 Area 30, Welding Platform Frame EOI 2 10 Area 40 - 60, Unload rebar Forms Location Form date Sep 18, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 18, 2023, 9:36 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 878 of 1851 Crew # Workers # Total hours Work performed Totals 16 50 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 40, Foundation Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Platform Frame Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 879 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See Attached HMH Compressive Strength Report. 9:30 am IMCO carpenters are working on welding waterstop for the Area 40 Construction Joints. EOI is onsite unloading rebar shipment. The rebar is for Area 40. 11:00 am IMCO operators are working on grading the upper fish lift slab. They completed the generator room fill, vapor barrier and sand. It is ready for rebar to be installed. 12:00 pm The framing crew is onsite continuing to work on framing walls at Area 60. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 880 of 1851 References Photos (2) 20230918_103700 Added on Sep 18, 2023, 9:26 PM MDT Added by Chris Johnson 20230918_093747 Added on Sep 18, 2023, 9:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 881 of 1851 Form detail #227: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Excavate grade, Pipe Encasement IMCO, Carpenters 6 10 Area 40, Form for foundation Dusty B Framing 2 10 Area 60, Framing MB Welding 1 10 Area 30, Welding Platform Frame Totals 14 40 Forms Location Form date Sep 14, 2023 Description Area 10, Area 30, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 15, 2023, 11:51 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 882 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 3 Area 40, Pipe Encasement IMCO Concrete Truck 1 Deere 644J Loader 1 3 Batch Concrete Hitachi 85 Excavator 1 10 Area 40, Foundation Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Platform Frame Bomag Roller 1 Water Truck 1 10 Dust Control, Compaction 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 883 of 1851 Notes See Attached HMH Compressive Strength Reports. 8:00 am The framing crew is continuing to work on framing walls for the hatchery building. 9:00 am IMCO is stripping forms from the piers at Area 60. The carpenter crews are cleaning up the site. IMCO dirt crew has batched 1 CY of concrete for a small pipe encasement for under the upper fish lift slab. Due to the small quantity the concrete was not tested. 11:30 pm IMCO is starting to backfill the generator room. Vale has completed the conduit install for the room. IMCO is placing general fill at 12" lifts and compacting. 1:00 pm A carpenter crew is continuing to work on forming the perimeter of Area 40 foundation. Another crew is installing rigid insulation on the interior stem wall of the generator room. 4:00 pm IMCO has been working on backfilling the generator room for the slab. References Photos (4) 20230914_081619 Added on Sep 15, 2023, 11:49 AM MDT Added by Chris Johnson 20230914_130039 Added on Sep 15, 2023, 11:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 884 of 1851 20230914_125513 Added on Sep 15, 2023, 11:49 AM MDT Added by Chris Johnson 20230914_095700 Added on Sep 15, 2023, 11:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 885 of 1851 Form detail #226: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, CDF Spray bar line, Excavate grade IMCO, Carpenters 6 10 Area 40, Form for foundation Dusty B Framing 2 10 Area 60, Framing MB Welding 1 10 Area 30, Welding Platform Frame Vale Electric, Electricians 1 10 Area 60, Generator Room Conduit Forms Location Form date Sep 13, 2023 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 14, 2023, 7:53 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 886 of 1851 Crew # Workers # Total hours Work performed Totals 15 50 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 40, Spray Bar line IMCO Concrete Truck 1 4 Area 40, CDF IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 40, Foundation Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Platform Frame Bomag Roller 1 Water Truck 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 887 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 Day compressive break report from Area 60 Incubation Drain 7:00 am IMCO is planning to continue forming for the foundation of Area 40. They are going to get the perimeter foundation in then have EOI onsite to tie the rebar. 10:00 am The frame crew is continuing to work on framing the walls of the office area at Area 60. Vale is onsite to install the conduit for the generator room. IMCO has backfilled to top of footing for the conduit grade. 12:00 pm IMCO has installed the two pipes to the upper fish lift slab. These pipes have been switched from SS to Sch 80 PVC. They are working on the rebar for the pipe encasement. 2:00 pm IMCO has started to place CDF for the pipe encasement of the spray bar line under Area 40. 4:30 pm IMCO has completed the CDF placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 888 of 1851 References Photos (9) 20230913_131755 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson 20230913_140747 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 889 of 1851 20230913_152625 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson 20230913_133345 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 890 of 1851 20230913_140739 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson 20230913_150234 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 891 of 1851 20230913_150325 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson 20230913_131749 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 892 of 1851 20230913_090202 Added on Sep 14, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 893 of 1851 Form detail #225: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Spray bar line IMCO, Carpenters 6 10 Area 40, Form for foundation Dusty B Framing 2 10 Area 60, Framing MB Welding 1 10 Area 30, Welding Platform Frame Totals 14 40 Forms Location Form date Sep 12, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 13, 2023, 7:55 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 894 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 40, Spray Bar line IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 40, Foundation Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Platform Frame Bomag Roller 1 Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 895 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 day compressive break report for the Incubation Drain Slab. 8:00 am IMCO is working on setting the spray bar line in place. They have informed me they plan to encase this line with CDF once they get it set and in final placement. IMCO is also working on setting the two pipes for the upper fish lift slab. 10:00 am The framing crew is continuing to work on the walls for the office side of the hatchery building. They are sheeting these walls per W2 shear wall on GS-3. MB Welding is onsite today to continue welding the platform framing to the embeds at Area 30. 1:00 pm IMCO carpenters have been working on forming the foundation for Area 40. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 896 of 1851 References Photos (4) 20230912_082726 Added on Sep 13, 2023, 7:54 AM MDT Added by Chris Johnson 20230912_093946 Added on Sep 13, 2023, 7:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 897 of 1851 20230912_113849 Added on Sep 13, 2023, 7:54 AM MDT Added by Chris Johnson 20230912_082721 Added on Sep 13, 2023, 7:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 898 of 1851 Form detail #224: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Spray bar line Area 60, Batch Concrete IMCO, Carpenters 6 10 Area 40, Form for foundation Area 60, Place Generator room stem wall, place piers Dusty B Framing 2 10 Area 60, Framing Totals 13 30 Forms Location Form date Sep 11, 2023 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 12, 2023, 7:34 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 899 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 40, Spray Bar line IMCO Concrete Truck 1 6 Area 60, Concrete IMCO Concrete Truck 1 6 Area 60, Concrete Deere 644J Loader 1 6 Area 60, Concrete Hitachi 85 Excavator 1 10 Area 40, Foundation Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 900 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached HMH Concrete Field Report and IMCO batch tickets from todays placement. 7:30 am Arrived on site. IMCO crew is making preparations for the concrete placement of the generator room stem wall and the piers at Area 60. They are also hoping to place pipe encasement of the last 3 drains of the cross crowder channel. They are starting to batch concrete now. 9:00 am I tested the first truck with everything in spec. The crew is continuing to place concrete. These were formed over the weekend. As they were pouring I tried to check measurements. They all seem to be per plan. 11:00 am IMCO was able to capture the stem wall, piers and the pipe encasement today. They are working on setting the embeds for the piers now. 1:00 pm IMCO is done with finishing the concrete. They are starting to work on forming for Area 40 slab foundation now. Meanwhile the framers are continuing to frame walls for the office side of the hatchery building. 2:00 pm Sean has informed me they want to start excavating for the retaining wall this week. I checked with Zack and the power pole is scheduled to be removed on Thursday of this week. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 901 of 1851 References Photos (14) 20230911_114838 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson 20230911_093933 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 902 of 1851 20230911_095740 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson 20230911_090842 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 903 of 1851 20230911_120026 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson 20230911_082220 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 904 of 1851 20230911_082304 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson 20230911_134118 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 905 of 1851 20230911_082306 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson 20230911_090743 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 906 of 1851 20230911_090812 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson 20230911_090823 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 907 of 1851 20230911_082228 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson 20230911_090837 Added on Sep 12, 2023, 7:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 908 of 1851 Form detail #223: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Spray bar line Area 50, Fish lift piping IMCO, Carpenters 6 10 Area 60, Form Piers, Form Stem wall Dusty B Framing 3 10 Area 60, Framing Totals 14 30 Forms Location Form date Sep 8, 2023 Description Area 10, Area 40, Area 50, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 11, 2023, 11:09 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 909 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 40, Spray Bar line IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 910 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am The framers are onsite and they are starting to frame exterior walls for Area 60. IMCO is going to work on drain piping for the cross crowder. They have discovered that the pipe encasement they placed Tuesday was set to high and interferes with the drain line. They will have to chip our concrete for the drain piping to clear. 9:00 am IMCO carpenters are working on laying out the piers at Area 60. They also are working on forming the stem wall for the generator room. I am told they will be here tomorrow as well prepping for the Monday pour. 11:00 am I spoke to Kirt regarding the green cutting of the slab. He said he would get someone working on it today. 1:00 pm Jake and Steve came and spoke to me regarding the locations they thought were good for the green cuts. We marked up a plan sheet and I asked them to make sure Kirt was ok with it before they started working on it. Left site to return concrete cylinders. I was informed a crew will be here tomorrow finishing the forming for Mondays concrete placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 911 of 1851 References Photos (3) 20230908_114806 Added on Sep 11, 2023, 11:09 AM MDT Added by Chris Johnson 20230908_095248 Added on Sep 11, 2023, 11:09 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 912 of 1851 20230908_095244 Added on Sep 11, 2023, 11:09 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 913 of 1851 Form detail #222: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Excavate cross drain channel Area 60, Batch Concrete IMCO, Carpenters 6 10 Area 30, Interior piping Area 60, Place slab, form piers Dusty B Framing 3 10 Area 60, Laying out walls Totals 14 30 Forms Location Form date Sep 7, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 8, 2023, 7:02 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 914 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 40, Excavate for Lower Cross Drain Channel IMCO Concrete Truck 1 5 Area 60, Batch Concrete IMCO Concrete Truck 1 5 Area 60, Batch Concrete Deere 644J Loader 1 10 Area 60, Batch Concrete Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Fly piping, Safety extraction standby Bomag Roller 1 Dynapac Roller 1 10 Compaction onsite Water Truck 1 10 Compaction onsite CAT D5 Dozer 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 915 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is going to be finishing the CJ, Checkerboard concrete slab at Area 60 today. They have one more for the generator room once they get the stem wall poured. Pump truck is onsite and they are going to start batching concrete. 9:00 am I have tested the first truck and it failed on slump. See concrete test form. 10:00 am After testing the second truck it failed on air. I tested the third truck and it was in spec so they poured it out. 11:00 am I spot checked the 4th and last truck. It tested in spec. IMCO is working on finishing the concrete now. The framing crew is onsite and working on laying out the walls. There was discussion this morning regarding the double seal plate at the bottom of the walls. I checked their stud length and I noticed it was 1.5" too long. The crew was unaware of the double plate at the bottom. It clearly shows the double plate on 60 S 1. The crew is going to make the adjustments to accommodate double bottom plates. 2:00 pm IMCO is continuing to work on piping inside Area 30. MB welding is onsite welding the brackets to the embeds for the suspended floor. 4:00 pm IMCO is starting to work on the layout for Area 40 foundation. 5:00 pm IMCO is done for the day. They have placed burlap over the concrete and sprayed it all with water for curing. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 916 of 1851 References Photos (8) 20230907_125557 Added on Sep 8, 2023, 7:02 AM MDT Added by Chris Johnson 20230907_100949 Added on Sep 8, 2023, 7:02 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 917 of 1851 20230907_154932 Added on Sep 8, 2023, 7:02 AM MDT Added by Chris Johnson 20230907_100940 Added on Sep 8, 2023, 7:02 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 918 of 1851 20230907_132543 Added on Sep 8, 2023, 7:02 AM MDT Added by Chris Johnson 20230907_132555 Added on Sep 8, 2023, 7:02 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 919 of 1851 20230907_132558 Added on Sep 8, 2023, 7:02 AM MDT Added by Chris Johnson 20230907_133150 Added on Sep 8, 2023, 7:02 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 920 of 1851 Form detail #221: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Fuse HDPE pipe for the Spray Bar line Area 60, Batch Concrete IMCO, Carpenters 6 10 Area 30, Interior piping Area 40, Excavate for Lower Cross Drain, Concrete pipe encasement Area 60, Place slab and footing Dusty B Framing 3 10 Area 60, Laying out walls Forms Location Form date Sep 6, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 7, 2023, 6:08 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 921 of 1851 Crew # Workers # Total hours Work performed Totals 14 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 40, Excavate for Lower Cross Drain Channel IMCO Concrete Truck 1 5 Area 60, Batch Concrete IMCO Concrete Truck 1 5 Area 60, Batch Concrete Deere 644J Loader 1 10 Area 60, Batch Concrete Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Fly piping, Safety extraction standby Bomag Roller 1 Dynapac Roller 1 10 Compaction onsite Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 922 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Compaction onsite CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 day compressive break report from Area 60 1st Incubation Slab placement. 7:30 am IMCO is getting ready for the concrete placement. Pump truck is onsite. 8:00 am IMCO is continuing to work on interior piping at Area 30. They area currently getting the 24" overflow box secured to the wall. 9:00 am IMCO has batched the first truck. I tested the truck and all passed. They are going to place concrete in the pipe encasement then start placing the slab. 11:00 am IMCO has completed the pour for today. They captured a pipe encasement at Area 40, Slab and Footing at Area 60. The footing is for the generator room. The framing crew is onsite to continue laying out walls. 1:00 pm IMCO is continuing to work on finishing the concrete. Another crew is working on excavating for the cross drain channel and stairs. 2:00 pm IMCO crew is continuing to install interior piping inside Area 30. 3:00 pm IMCO crew is completing the finish on the slab. They are going to start working on prepping for tomorrow concrete placement. They want to finish the slab tomorrow. They are also working on prepping the sonotube piers. Dusty B framers are working on laying out the walls and checking HD points. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 923 of 1851 References Photos (8) 20230906_081154 Added on Sep 7, 2023, 6:05 AM MDT Added by Chris Johnson 20230906_124350 Added on Sep 7, 2023, 6:05 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 924 of 1851 20230906_105628 Added on Sep 7, 2023, 6:05 AM MDT Added by Chris Johnson 20230906_105754 Added on Sep 7, 2023, 6:05 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 925 of 1851 20230906_104755 Added on Sep 7, 2023, 6:05 AM MDT Added by Chris Johnson 20230906_091743 Added on Sep 7, 2023, 6:05 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 926 of 1851 20230906_105625 Added on Sep 7, 2023, 6:05 AM MDT Added by Chris Johnson 20230906_101851 Added on Sep 7, 2023, 6:05 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 927 of 1851 Form detail #220: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 40, Fuse HDPE pipe for the Spray Bar line IMCO, Carpenters 6 10 Area 30, Interior piping Area 40, Slab Forming Area 60, Set Sonotubes for Piers MB Welding 1 10 Area 30, Pipe Supports Dusty B Framing 3 3 Area 60, Start laying out walls Forms Location Form date Sep 5, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 6, 2023, 6:38 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 928 of 1851 Crew # Workers # Total hours Work performed Totals 15 33 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Install piping IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 10 Area 40, Spray Bar Line Hitachi 85 Excavator 1 10 Area 40, Spray Bar Line Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Fly piping, Safety extraction standby Bomag Roller 1 Dynapac Roller 1 10 Compaction onsite Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 929 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Compaction onsite CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO is working on fusing the HDPE pipe for the spray bar lines. 11:00 am MB Welding is onsite. I spoke to him about keeping an eye on the embeds while he was welding the supports on them. We spoke about not overheating the embeds to prevent spalling and cracking of the concrete from the heat. IMCO is working inside Area 30 getting the overflow box set and installed. 1:00 pm IMCO carpenters are working on setting the sono tubes for the piers. I asked them if they set the grade elevation yet. They were not sure and thought they could cut the tubes. I informed them the drawings call for 48" of sono tube foundation so the grade will need to be excavated and the sono tubes not to be cut. 3:00 pm As IMCO was forming the foundation on the NE corner of Area 40, for the stairs, I noticed the valves were inside the foundation. This is not per plan IMCO is checking measurements. The framing sub contractor is onsite and is working on laying out walls on the foundation at Area 60 4:00 pm It was determined that the valves were not installed in the correct location. They are holding off on working at this location. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 930 of 1851 References Photos (4) 20230905_101643 Taken on Sep 5, 2023, 10:16 AM MDT Added on Sep 6, 2023, 6:35 AM MDT Added by Chris Johnson 20230905_144220 Taken on Sep 5, 2023, 2:42 PM MDT Added on Sep 6, 2023, 6:35 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 931 of 1851 20230905_144312 Taken on Sep 5, 2023, 2:43 PM MDT Added on Sep 6, 2023, 6:35 AM MDT Added by Chris Johnson 20230905_144306 Taken on Sep 5, 2023, 2:43 PM MDT Added on Sep 6, 2023, 6:35 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 932 of 1851 Form detail #219: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 10 2 Batch Attempt IMCO, Carpenters 6 2 Totals 16 4 2. Materials Material Quantity Unit Comment Forms Location Form date Sep 1, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 1, 2023, 9:28 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 933 of 1851 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 Deere 210 Excavator 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 934 of 1851 Notes Attached is the Area 60 Office Slab 7 day compressive break report. 7:00 am IMCO is prepping for concrete. Pump truck is onsite. 9:00 am IMCO was unable to fill the cement silo from the cement storage due to missing a fitting. They are cancelling the placement today. The crew is leaving for the weekend. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 935 of 1851 Form detail #218: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 10 10 Area 10, Install Piping from Fish lift to vault Area 40, Excavate for thickened sections IMCO, Carpenters 6 10 Area 30, Interior piping Area 40, Begin pipe encasement for fish lift piping Area 60, Install bulkheads at CJs, Form Curb Forms Location Form date Aug 31, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Sep 1, 2023, 5:59 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 936 of 1851 Crew # Workers # Total hours Work performed EOI 2 8 Area 60, Generator room footing and stem wall rebar Area 40, Pipe encasement, fish lift Totals 18 28 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Install piping IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 10 Area 40, Thickened edges excavation Hitachi 85 Excavator 1 Area 40, Thickened edges excavation Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Fly piping, Safety extraction standby Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 937 of 1851 Equipment Quantity Hours used Comment Bomag Roller 1 Dynapac Roller 1 10 Compaction onsite Water Truck 1 10 Compaction onsite CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is stripping the bulkheads from yesterdays concrete placement. They placed burlap and plastic over the concrete last night to cure. 8:30 am EOI is onsite to install the rebar for the generator room footing and stem wall. 10:00 am IMCO has a crew inside Area 30 continuing to install the piping. They are currently working on laying out and drilling the anchors for the 24" overflow box. 12:00 pm IMCO is continuing to work on curbs and bulkheads for tomorrow planned concrete placement at Area 60. 2:00 pm EOI is done for the day. They were able to also install the rebar for the pipe encasement for the supply like to the fish lift. IMCO crew is working on installing the weir piping as well. 4:00 pm IMCO is continuing to work on interior piping at Area 30. The holes are being drilled and prepped for epoxy set. IMCO carpenters are ready for tomorrows placement. They have moved over to start setting batter boards for Area 40. IMCO operators have started excavating for the spray bar line. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 938 of 1851 References Photos (12) 20230831_162018 Taken on Aug 31, 2023, 4:20 PM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson 20230831_162006 Taken on Aug 31, 2023, 4:20 PM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 939 of 1851 20230831_141156 Taken on Aug 31, 2023, 2:11 PM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson 20230831_090125 Taken on Aug 31, 2023, 9:01 AM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 940 of 1851 20230831_080506 Taken on Aug 31, 2023, 8:05 AM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson 20230831_161957 Taken on Aug 31, 2023, 4:19 PM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 941 of 1851 20230831_160101 Taken on Aug 31, 2023, 4:01 PM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson 20230831_160032 Taken on Aug 31, 2023, 4:00 PM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 942 of 1851 20230831_141152 Taken on Aug 31, 2023, 2:11 PM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson 20230831_131744 Taken on Aug 31, 2023, 1:17 PM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 943 of 1851 20230831_090128 Taken on Aug 31, 2023, 9:01 AM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson 20230831_080519 Taken on Aug 31, 2023, 8:05 AM MDT Added on Sep 1, 2023, 5:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 944 of 1851 Form detail #217: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 10 10 Area 10, Fuse HDPE drain piping from fish lift Area 40, Excavate for thickened sections Area 60, Batch concrete IMCO, Carpenters 6 10 Area 30, Interior piping Area 40, Form Cross Channel Trail Screen Slab Area 60, Form Generator room, Place Concrete Slab Forms Location Form date Aug 30, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 31, 2023, 7:54 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 945 of 1851 Crew # Workers # Total hours Work performed Totals 16 20 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Set Drain vault from Fish Lift Area 60, Backfill Generator Room Area IMCO Concrete Truck 1 5 Area 40 Slab Placement IMCO Concrete Truck 1 5 Area 40 Slab Placement Deere 644J Loader 1 10 Area 40, Batch Concrete Hitachi 85 Excavator 1 Dump Truck 1 10 Area 40, Import General Fill Kobelco 1100G Crane 1 10 Area 30, Fly piping, Safety extraction standby Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 946 of 1851 Equipment Quantity Hours used Comment Dynapac Roller 1 10 Compaction onsite Water Truck 1 10 Compaction onsite CAT D5 Dozer 1 8 Area 10, Grade subgrade 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Concrete Field Report and IMCO batch tickets from todays placement. 7:30 am IMCO is starting to batch concrete. They are going to place between CJs in the Incubation area and chiller room at Area 60. They will also capture half of the breezeway slab. 10:00 am IMCO is placing WRDA concrete now with a pump truck. 12:00 pm IMCO placed ~20 CY of concrete. The first test the air was to low. They dosed the truck and I tested again. The second test was in spec but at the low end. They poured it out. I tested the second truck to check for any modifications. The concrete air was in spec at 6%. They continued to place concrete. 1:30 pm IMCO has a crew inside Area 30 working on the overflow box install for the drain inside the river intake chamber. The crew is continuing to work on finishing the concrete they placed. 2:00 pm IMCO carpenter crew is continuing to work on forming the generator room footing. They are hoping to get it poured Friday when they place the other side of the CJs in the Area 60 slab. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 947 of 1851 References Photos (5) 20230830_110140 Taken on Aug 30, 2023, 11:01 AM MDT Added on Aug 31, 2023, 7:54 AM MDT Added by Chris Johnson 20230830_104058 Taken on Aug 30, 2023, 10:40 AM MDT Added on Aug 31, 2023, 7:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 948 of 1851 20230830_102107 Taken on Aug 30, 2023, 10:21 AM MDT Added on Aug 31, 2023, 7:54 AM MDT Added by Chris Johnson 20230830_082222 Taken on Aug 30, 2023, 8:22 AM MDT Added on Aug 31, 2023, 7:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 949 of 1851 20230830_133642 Taken on Aug 30, 2023, 1:36 PM MDT Added on Aug 31, 2023, 7:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 950 of 1851 Form detail #216: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 10 10 Area 10, Set Drain vault from fish lift Area 40, Excavate for thickened sections Area 60, Backfill for Generator room IMCO, Carpenters 6 10 Area 30, Chip Surface defects, Begin interior piping Area 40, Form Cross Channel Trail Screen Slab Area 60, Bulkhead for CJ in slab, Form Curbs Forms Location Form date Aug 29, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 30, 2023, 6:10 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 951 of 1851 Crew # Workers # Total hours Work performed Totals 16 20 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 10, Set Drain vault from Fish Lift Area 60, Backfill Generator Room Area IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 10 Area 40, Load General Fill Hitachi 85 Excavator 1 Dump Truck 1 10 Area 40, Import General Fill Kobelco 1100G Crane 1 10 Area 30, Fly piping, Safety extraction standby Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 952 of 1851 Equipment Quantity Hours used Comment Dynapac Roller 1 10 Compaction onsite Water Truck 1 10 Compaction onsite CAT D5 Dozer 1 8 Area 10, Grade subgrade 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 Day compressive break report from the Fish Lift Wall Pour at Area 40. 8:00 am IMCO is continuing to get ready for the slab placement at Area 60 which is scheduled for tomorrow. They area forming the interior curbs and installing bulkheads at the CJs. 10:00 am IMCO is starting to form up the lower tail screen slab for the cross channel. They are also excavating for the thickened concrete edges at Area 40. IMCO has a crew inside Area 30. They are chipping and repairing surface defects and another crew is working on installing the mechanical piping inside the structure. 12:00 pm IMCO has brought to my attention that the electrical lines under the Area 60 slab in the Electrical room were not installed in the correct location. They are 5" off from where they should be. It was stated a miscommunication to Vale with a dimension was the reason. IMCO is requestion to make the Chiller room 5" larger to accommodate for the electrical line locations that penetrate the slab. 3:00 pm IMCO is continuing to work on bulkheads at the CJs at Area 60. 4:30 pm IMCO is setting the valve vault from the drain and weir piping from the fish lift. 5:00 pm Sean informed me that the slab is ready for concrete and asked if I would perform my final check on the rebar and forms. Ryan, IMCO, is also checking. Everything looked to be per plan. IMCO is done for the day. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 953 of 1851 References Photos (14) 20230829_162938 Taken on Aug 29, 2023, 4:29 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson 20230829_161909 Taken on Aug 29, 2023, 4:19 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 954 of 1851 20230829_161843 Taken on Aug 29, 2023, 4:18 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson 20230829_135331 Taken on Aug 29, 2023, 1:53 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 955 of 1851 20230829_135329 Taken on Aug 29, 2023, 1:53 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson 20230829_135320 Taken on Aug 29, 2023, 1:53 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 956 of 1851 20230829_113037 Taken on Aug 29, 2023, 11:30 AM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson 20230829_113025 Taken on Aug 29, 2023, 11:30 AM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 957 of 1851 20230829_162852 Taken on Aug 29, 2023, 4:28 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson 20230829_162007 Taken on Aug 29, 2023, 4:20 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 958 of 1851 20230829_161848 Taken on Aug 29, 2023, 4:18 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson 20230829_161826 Taken on Aug 29, 2023, 4:18 PM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 959 of 1851 20230829_111825 Taken on Aug 29, 2023, 11:18 AM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson 20230829_083609 Taken on Aug 29, 2023, 8:36 AM MDT Added on Aug 30, 2023, 6:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 960 of 1851 Form detail #215: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 10 10 Area 40, Excavate for North Crowder slab Area 60, Backfill for Generator room IMCO, Carpenters 6 10 Area 30, Chip Surface defects, Begin interior piping Area 40, Form North Crowder Slab Area 60, Bulkhead for CJ in slab EOI 3 6 Area 60, Install Slab Rebar Forms Location Form date Aug 28, 2023 Description Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 29, 2023, 7:22 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 961 of 1851 Crew # Workers # Total hours Work performed Totals 19 26 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 60, Backfill Generator Room Area IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 10 Area 40, Load General Fill Hitachi 85 Excavator 1 Dump Truck 1 10 Area 40, Import General Fill Kobelco 1100G Crane 1 10 Area 30, Fly piping, Safety extraction standby Bomag Roller 1 Dynapac Roller 1 10 Compaction onsite Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 962 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Compaction onsite CAT D5 Dozer 1 8 Area 40, Grade subgrade 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 day compressive break report from Area 40 Diffuser Walls and fish lift slab. 11:30 am IMCO is working on laying out the north cross crowder slab. They have excavated down to the bottom of slab elevation at approx. -14.5. I have walked the compaction and the subgrade is firm and unyielding. 12:00 pm EOI is onsite and working on the rebar for the Area 60 slab. 2:00 pm IMCO is working on finishing the subgrade preparation for Area 40. They have been importing general fill to bring the grade up to subgrade. IMCO has a crew inside Area 30 Well side chipping on surface defects. I am told they are also flying in piping and beginning to install them. 4:30 pm IMCO has been working on backfilling and compacting the subgrade for the generator room. EOI has left the site. I noticed a few missing pieces of rebar and notified IMCO. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 963 of 1851 References Photos (5) 20230828_150513 Taken on Aug 28, 2023, 3:05 PM MDT Added on Aug 29, 2023, 7:09 AM MDT Added by Chris Johnson 20230828_144021 Taken on Aug 28, 2023, 2:40 PM MDT Added on Aug 29, 2023, 7:09 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 964 of 1851 20230828_144013 Taken on Aug 28, 2023, 2:40 PM MDT Added on Aug 29, 2023, 7:09 AM MDT Added by Chris Johnson 20230828_143931 Taken on Aug 28, 2023, 2:39 PM MDT Added on Aug 29, 2023, 7:09 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 965 of 1851 20230828_123656 Taken on Aug 28, 2023, 12:36 PM MDT Added on Aug 29, 2023, 7:09 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 966 of 1851 Form detail #214: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 10 10 Area 60, Slab Pour Vale Electric, Electricians 1 10 Area 10, Alarm Cable Totals 11 20 2. Materials Material Quantity Unit Comment Forms Location Form date Aug 25, 2023 Description Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 28, 2023, 1:22 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 967 of 1851 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 IMCO Concrete Truck 1 10 Area 60, concrete pour IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 Concrete Pump Truck 1 5 Area 60, concrete pour 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 968 of 1851 Notes 8:30am Matt Kovacs, HMH Engineering, arrived on site. The pump truck was already here and set up. The batch plant was getting ready to mix up the first load. 9:00am The first load came out from the batch plant 9:17am Pulled the first sample of concrete and proceeded to test. The test was unable to be fully completed because the air pot kept leaking. Tried 4 separate times to get it to seal but each time air bubbling from the side was visible. The problem is identified and will be fixed. All other portions of the concrete test were completed without issue. 11:30am Tester left the site Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 969 of 1851 Form detail #213: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 30, Grind, and Rock Chip surface defects, Continue patching Area 40, Strip Forms, Lay out area limits Area 60 Cut, Remove rebar, Fix interior wall thickened concrete locations, replace and splice rebar back IMCO, Operators and Labors 10 10 Area 60, Backfill and compact under slab, vapor barrier, sand Forms Location Form date Aug 24, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 25, 2023, 1:27 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 970 of 1851 Crew # Workers # Total hours Work performed Vale Electric, Electricians 1 10 Area 10, Alarm Cable Lacy Mechanical 1 10 Area 60, Install floor drains Totals 20 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 60, Place material for under slab backfill IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 60, Place material for underslab Dump Truck 1 10 Area 60, Import Structural fill Kobelco 1100G Crane 1 10 no operator onsite Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 971 of 1851 Equipment Quantity Hours used Comment Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Pipe Testing CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached IMCO pipe testing reports. 8:00 am IMCO is working on fixing the interior wall thickened slab locations. Yesterday it was discovered while the rebar was being installed that many of the thickened slab locations were not per plan and needed to be moved. The rebar sub elected to continue placing the bar in locations that were not prepped or in the wrong location. The crew is having to cut out the rebar in sections and fix the grade under the slab and excavate out areas where the thickened slab should be. They plan to fly the rebar sections back in and splice bars to form a continuous mat again. 10:00 am IMCO has tested the diffuser lines to Raceway 3 & 4. They both passed with no issues. They are going to start working on 2 and 1 next. The other crews are continuing to work on removing rebar and and excavating the thickened slab areas per plan. Sam, IPC, is onsite to check the alarm wires with Vale Elec. Vale has ran a new cable for the alarms. 12:00 pm IMCO crew is continuing to work on fixing the locations of the thickened slab. They have started to replace the rebar and install splice pieces for cutting the rebar in sections. They dirt crew is working on under slab grade on the incubation side of Area 60. 2:00 pm IMCO crew has started to excavate for the base slab at the end of the crowder per Section B on 40 S 7. Meanwhile IMCO crews continue to work on installing the rebar for the hatchery office slab. The pipe testing crew has started another test on Raceway lines 2 & 1. 3:30 pm The Raceway lines have passed test. This concludes all the diffuser lines passed. 4:30 pm A soft spot has presented itself under the utility room slab. As I walked on it the grade pumped up and down approx. 2". It was brought to Sean and Kirts attention. The crew is finishing up the rebar repairs and laying out the walls for the anchor bolts. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 972 of 1851 5:00 pm Sean has informed me they will make the call on pouring it or not tomorrow morning. Kirt also suggested blocking out the room and pouring it after the ground heals up. I have picked up my cylinders and leaving the site. Matt Kovacs, HMH, will be onsite tomorrow for the concrete testing. References Photos (14) 20230824_155347 Taken on Aug 24, 2023, 3:53 PM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson 20230824_154833 Taken on Aug 24, 2023, 3:48 PM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 973 of 1851 20230824_154337 Taken on Aug 24, 2023, 3:43 PM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson 20230824_154329 Taken on Aug 24, 2023, 3:43 PM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 974 of 1851 20230824_154316 Taken on Aug 24, 2023, 3:43 PM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson 20230824_132939 Taken on Aug 24, 2023, 1:29 PM MDT Added on Aug 24, 2023, 4:59 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 975 of 1851 20230824_104238 Taken on Aug 24, 2023, 10:42 AM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson 20230824_091407 Taken on Aug 24, 2023, 9:14 AM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 976 of 1851 20230824_082242 Taken on Aug 24, 2023, 8:22 AM MDT Added on Aug 24, 2023, 4:59 PM MDT Added by Chris Johnson 20230824_154832 Taken on Aug 24, 2023, 3:48 PM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 977 of 1851 20230824_142802 Taken on Aug 24, 2023, 2:28 PM MDT Added on Aug 24, 2023, 4:59 PM MDT Added by Chris Johnson 20230824_104750 Taken on Aug 24, 2023, 10:47 AM MDT Added on Aug 24, 2023, 4:59 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 978 of 1851 20230824_091438 Taken on Aug 24, 2023, 9:14 AM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson 20230824_091417 Taken on Aug 24, 2023, 9:14 AM MDT Added on Aug 24, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 979 of 1851 Form detail #212: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 30, Grind, and Rock Chip surface defects, Continue patching Area 40, Begin Stripping forms, Stopped after discussing the 48 Hour waiting period Area 60 Layout walls for dirt crew to backfill IMCO, Operators and Labors 10 10 Area 60, Backfill and compact under slab, vapor barrier, sand Chip on Concrete Trucks Forms Location Form date Aug 23, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 24, 2023, 7:46 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 980 of 1851 Crew # Workers # Total hours Work performed Vale Electric, Electricians 1 10 Area 10, Alarm Cable Lacy Mechanical 1 10 Area 60, Install plumbing lines, Trap Primers EOI 3 8 Area 60, Install slab rebar for office and breezeway Totals 23 48 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 60, Place material for under slab backfill IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 10 Area 60, Place material for underslab Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 981 of 1851 Equipment Quantity Hours used Comment Dump Truck 1 10 Area 60, Import Structural fill Kobelco 1100G Crane 1 10 no operator onsite Bomag Roller 1 Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached IMCO pipe testing reports. 8:00 am IMCO has started stripping the forms from yesterdays concrete placement at the fish lift. I notified Kirt that it has not been 48 hours and the forms should be full supported. He said the guys will stop. They informed me that they will reinstall the ties to support the forms. EOI is onsite to start installing rebar in the hatchery building office side. I was informed by them that the thickened concrete for the interior walls are not per plan. I reviewed the drawings with Steve and he agreed. They need to dig out some more in one location. In another location they dug out for thickened concrete where it is not needed. 9:00 am Attended meeting 10:30 am The crew is continuing to place fill under slab at Area 60. I noticed the rebar mat was being tied over the thickened edge area that is not needed. IMCO plans to pour that thickened area with no additional rebar. I also noticed there is not enough rebar thickened edge pieces to be installed through the doorway sections. The rebar submittal did not show any rebar where the doors are to be placed so they did not have enough pieces made (A4006 per the approved rebar submittal). They also plan to fill these areas in with concrete instead of grading the subgrade to match. 1:30 pm EOI has left the site. I checked the rebar they installed. I noticed multiple issues with the rebar. They were missing lap bars to extend the East West mat. They did not cut the trim bar according to the approved drawings. Instead they laid extra A4006 bars in near the pipe penetrations. The trim bar should be installed per Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 982 of 1851 S216 on GS-6. The clearances from ground to rebar shall be 3" per the standard drawings and approved submittal, Some places the rebar is touching the ground. I notified Steve, Kirt and Kole of these issues. It was also determined that they did not excavate out an area of the thickened concrete enough. They are going to get started on digging that out. Kelly has been testing the raceway supply lines. He has the line to Raceway 5 under test now. It was agreed on in the meeting to test the lines to 15 PSI. 2:30 pm The line to Raceway 5 has passed testing. The crew is going to prep line 4 for testing now. The dirt crew is working on excavating out the thickened slab area that was missed. 4:00 pm After the carpenters started laying out the anchor bolts for the interior walls it was discovered that more thickened areas were in the wrong location. The crew has chosen to cut the rebar and remove it in sections. They will splice the rebar back together once they fix the thickened slab locations. They are starting that now. 4:30 pm The crew is leaving for the day. They have rescheduled the concrete placement for Friday. References Photos (9) 20230823_160317 Taken on Aug 23, 2023, 4:03 PM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson 20230823_140440 Taken on Aug 23, 2023, 2:04 PM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 983 of 1851 20230823_133354 Taken on Aug 23, 2023, 1:33 PM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson 20230823_133351 Taken on Aug 23, 2023, 1:33 PM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 984 of 1851 20230823_085049 Taken on Aug 23, 2023, 8:50 AM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson 20230823_084045 Taken on Aug 23, 2023, 8:40 AM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 985 of 1851 20230823_140319 Taken on Aug 23, 2023, 2:03 PM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson 20230823_140314 Taken on Aug 23, 2023, 2:03 PM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 986 of 1851 20230823_140307 Taken on Aug 23, 2023, 2:03 PM MDT Added on Aug 24, 2023, 7:43 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 987 of 1851 Form detail #211: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 8 10 Area 30, Grind, and Rock Chip surface defects, Begin patching Area 40, Form and place concrete for lower fish lift walls Area 60 Layout walls for dirt crew to backfill IMCO, Operators and Labors 10 10 Area 40, Batch concrete Area 60, Backfill and compact under slab, vapor barrier, sand Vale Electric, Electricians 1 10 Area 10, Alarm Cable Forms Location Form date Aug 22, 2023 Description Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 22, 2023, 5:04 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 988 of 1851 Crew # Workers # Total hours Work performed Lacy Mechanical 1 10 Area 60, Install plumbing lines, Trap Primers Totals 20 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Move material around the site Deere 210 Excavator 1 10 Area 60, Place material for under slab backfill IMCO Concrete Truck 1 5 Area 40, Batch Concrete IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Safety Extraction Standby Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 989 of 1851 Equipment Quantity Hours used Comment Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Concrete Field Report, IMCO batch ticket and 7 day compressive strength report from Area 60 Incubation Drain slab. 8:00 am IMCO is working on forming up the lower fish lift walls. They plan to place concrete today. There has been discussion regarding what is needed for rebar. Discissions last week lead to the final approval of the rebar needed. This is documented in email correspondence and will be uploaded to Build. Rebar drawings markup from 8-9-23 R3. 9:00 am IMCO has asked if I would witness some pipe testing. I made them aware that the pipe testing plan has not been approved and all these tests they plan to do really could be a waste of time. They asked to gamble this time because of the time crunch they are under waiting for the approval. They are testing the diffuser box lines from Area 30 to Area 40. They are using a blind flange with a gauge on it on the high end ( Aeration Tower) and an inflatable test ball on the low end ( diffuser box). They are performing a hydrostatic test with water. They used the water truck to pressure the line to 20 psi. Note the current plans call for a 125 psi test. Per submittal 168 IMCO has asked to lower the test pressure. The first line to the Raceway #6 is under 20 psi pressure. The test needs to hold for 1 hour. 10:00 am The test has held for one hour with no issues. They area going to get line 5 ready for testing now. While I was inside the aeration tower I looked at the work that has been performed on the chipping of surface defects. I brought one area to concern that it looked like it needed to be chipped out more. I let Sean know and he directed his crew to chip on it more. The area still had voids. IMCO is getting ready to start batching concrete for the fish lift walls. 11:00 am The crew has pressured up the raceway 5 line. IMCO is batching concrete. 11:30 am I have test the concrete truck and the concrete had to high of air at 9%. They are letting it spin for 5 minutes and asked if I would test it again. The second test had even higher air at 9.5%. They are going to reject the truck and batch another load. 12:30 pm IMCO is working on batching another 5 CY for the fish lift. They are going to not put any air in this load Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 990 of 1851 to see what the concrete it without air. The pressure testing failed as the test ball blew out. 1:30 pm I have tested the second truck that they did not add any air too. The no air mix tested at 4.5% air. They decided to add 2 oz of Air Entrainment. I tested again after they mixed. It tested at 5.0%. The crew is starting to place the concrete in the forms. 2:00 pm The crew has set and compacted the general fill grade and dug out the thickened concrete at the interior walls. They placed the vapor barrier and currently are working on placing the 2" sand layer. 2:30 pm IMCO has completed the concrete placement. During the placement they added water to the concrete to help to get it down the concrete shoot. This was done without consolation with me. They also had to adjust the forms because the forms started to bow with lack of a whaler and ties at the top. 4:30 pm The crew is continuing to work on place sand over the vapor barrier. I am told EOI is scheduled to be onsite tomorrow to install the rebar with plan to place the hatchery building slab Thursday. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 991 of 1851 References Photos (20) 20230822_162234 Taken on Aug 22, 2023, 4:22 PM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_142455 Taken on Aug 22, 2023, 2:24 PM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 992 of 1851 20230822_141018 Taken on Aug 22, 2023, 2:10 PM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_105111 Taken on Aug 22, 2023, 10:51 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 993 of 1851 20230822_105042 Taken on Aug 22, 2023, 10:50 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_093632 Taken on Aug 22, 2023, 9:36 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 994 of 1851 20230822_093623 Taken on Aug 22, 2023, 9:36 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_093607 Taken on Aug 22, 2023, 9:36 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 995 of 1851 20230822_093539 Taken on Aug 22, 2023, 9:35 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_084320 Taken on Aug 22, 2023, 8:43 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 996 of 1851 20230822_084248 Taken on Aug 22, 2023, 8:42 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_084241 Taken on Aug 22, 2023, 8:42 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 997 of 1851 20230822_084333 Taken on Aug 22, 2023, 8:42 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_162219 Taken on Aug 22, 2023, 4:22 PM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 998 of 1851 20230822_142446 Taken on Aug 22, 2023, 2:24 PM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_142427 Taken on Aug 22, 2023, 2:24 PM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 999 of 1851 20230822_105113 Taken on Aug 22, 2023, 10:51 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_093610 Taken on Aug 22, 2023, 9:36 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1000 of 1851 20230822_084643 Taken on Aug 22, 2023, 8:46 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson 20230822_084402 Taken on Aug 22, 2023, 8:43 AM MDT Added on Aug 22, 2023, 4:52 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1001 of 1851 Form detail #210: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 4 Area 60, Finish Stripping forms IMCO, Operators and Labors 4 4 Area 60, Backfill and Compact General Fill Totals 9 8 2. Materials Forms Location Form date Aug 21, 2023 Description Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 22, 2023, 7:10 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1002 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 Deere 210 Excavator 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 Deere 644J Loader 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1003 of 1851 Notes 11:00 am IMCO is leaving for the day. They were working on backfilling inside Area 60 so EOI could get onsite and begin installing the rebar for the slab placement. There is heavy rain today and some lighting strikes were within 5 miles. This was enough for IMCO to call it a day and come back tomorrow. 3:00 pm Walked the site. I was informed my IMCO that the plumbing was tested and approved by Baker Co. Inspector. The crew has backfilled the lines with pipe bedding and backfilled everywhere else with general fill. They have a larger plate compactor on site and looks as if they were using it to achieve compaction. The crew References Photos (2) 20230821_135901 Taken on Aug 21, 2023, 1:59 PM MDT Added on Aug 21, 2023, 3:29 PM MDT Added by Chris Johnson 20230821_135753 Taken on Aug 21, 2023, 1:57 PM MDT Added on Aug 21, 2023, 3:29 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1004 of 1851 Form detail #209: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10 Search for Control Wire Area 60 Backfill IMCO, Carpenters 11 10 Area 60 Strip Forms Totals 16 20 2. Materials Forms Location Form date Aug 18, 2023 Description Area 10, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 18, 2023, 9:09 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1005 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Search for Control Wire Deere 644J Loader 1 10 Area 60, Load Fill IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 10 Area 60, Place Backfill Dump Truck 1 10 Area 60, Haul in Fill Kobelco 1100G Crane 1 10 Area 30 Standby for emergency extraction Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1006 of 1851 Notes 7:00 am Matt Kovacs, HMH Engineering, is taking over as Inspector again. IMCO is planning on stripping the forms from yesterday's pour. They have switched to hauling in the backfill material for Area 60 which they plan to place today. They also plan on continuing the preliminary pipe pressure tests which HMH will not witness. 9:30 am I am leaving the site to bring back the Cylinders from yesterday's pour. References Photos (1) IMG_0037 Taken on Aug 18, 2023, 8:50 AM MDT Added on Aug 18, 2023, 9:08 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1007 of 1851 Form detail #207: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 5 10 Area 10 Search for Control Wire IMCO, Carpenters 11 10 Area 60 Pour concrete for Incubation Drain Walls Totals 16 20 2. Materials Forms Location Form date Aug 17, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 21, 2023, 11:16 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1008 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Search for Control Wire Deere 644J Loader 1 10 Area 60, Batch Concrete IMCO Concrete Truck 1 5 Area 60, Concrete pour JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 10 Area 40, Bring in Fill for Subgrade Kobelco 1100G Crane 1 10 Area 30 Standby for emergency extraction, Area 60 Concrete Pour Bomag Roller 1 Dynapac Roller 1 10 Area 40 Compacting Subgrade Water Truck 1 10 Dust Control CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1009 of 1851 Notes See attached HMH Concrete Compressive Break Report from the Diffuser Base slabs 28 day. Also attached is Concrete Field report from todays placement and IMCO batch ticket. 7:00 am Matt Kovacs, HMH Engineering, is taking over as Inspector again. IMCO is placing the incubation drain and sumps walls this morning. They are going to continue placing and compacting fill for the Area 40 Subgrade. 8:00 am Concrete for the walls is being batched and will be placed soon. 10:00 am Incubation Drain and Sump walls are placed. They are continuing to place fill for Area 40 Subgrade. 1:00 pm IMCO is doing preliminary pressure tests on the pipes in the Aeration Tower, this was not witnessed by HMH. 3:00 pm Lift for Area 40 Subgrade is completed and compacted. Will be proof rolled. 3:30 pm IMCO proof rolled the first lift for the Area 40 Subgrade. Proof roll passed and they are continuing onto the next lift. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1010 of 1851 References Photos (3) IMG_0033 Taken on Aug 17, 2023, 9:42 AM MDT Added on Aug 17, 2023, 4:17 PM MDT Added by Chris Johnson IMG_0034 Taken on Aug 17, 2023, 12:37 PM MDT Added on Aug 17, 2023, 4:17 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1011 of 1851 IMG_0036 Taken on Aug 17, 2023, 3:33 PM MDT Added on Aug 17, 2023, 4:18 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1012 of 1851 Form detail #206: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 11 10 Area 60 Form for Incubation Walls IMCO, Operators and Labors 5 10 Area 10 Search for Control Wire Totals 16 20 2. Materials Material Quantity Unit Comment Forms Location Form date Aug 16, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 16, 2023, 5:19 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1013 of 1851 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Search for Control Wire Deere 644J Loader 1 10 Area 60, Batch Concrete IMCO Concrete Truck 1 5 Area 60, Concrete pour IMCO Concrete Truck 1 5 Area 60, Concrete pour JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30 Standby for emergency extraction Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1014 of 1851 Notes 7:00 am IMCO is working on forming the incubation drain walls. They plan to place this concrete tomorrow morning. 9:00 am Attended weekly meeting. 11:00 am Walked the site with Ryan and Jake. We discussed the fish lift rebar and what was not detailed in the drawings. Left site, Matt Kovacs, HMH Engineering, is taking over. 1:00 pm Checked rebar for the incubation drain walls. The lap for the corner bar was too short and was corrected. The dirt crew finished excavating the clay layer for Area 40 subgrade. 2:00 pm Granular fill from the stockpile is being placed and compacted for the Area 40 subgrade. 3:00 pm Incubation drain wall forms and rebar were finished and are ready to pour tomorrow. Ran out of fill and switched to a source across the river for Area 40 subgrade. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1015 of 1851 References Photos (6) 20230816_101501 Taken on Aug 16, 2023, 10:15 AM MDT Added on Aug 16, 2023, 10:43 AM MDT Added by Chris Johnson IMG_0022 Taken on Aug 16, 2023, 2:22 PM MDT Added on Aug 16, 2023, 5:08 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1016 of 1851 IMG_0024 Taken on Aug 16, 2023, 4:58 PM MDT Added on Aug 16, 2023, 5:08 PM MDT Added by Chris Johnson 20230816_101454 Taken on Aug 16, 2023, 10:14 AM MDT Added on Aug 16, 2023, 10:43 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1017 of 1851 20230816_080327 Taken on Aug 16, 2023, 8:03 AM MDT Added on Aug 16, 2023, 10:43 AM MDT Added by Chris Johnson IMG_0020 Taken on Aug 16, 2023, 1:33 PM MDT Added on Aug 16, 2023, 5:08 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1018 of 1851 Form detail #205: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 11 10 Area 30 Grind Walls, Surface Defects Area 40, Place Concrete for Diffuser Box Walls Area 60 Place Concrete for Incubation Drain IMCO, Operators and Labors 5 10 Area 10 Search for Control Wire Area 60 Batch Concrete Totals 16 20 Forms Location Form date Aug 15, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 16, 2023, 7:16 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1019 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Search for Control Wire Deere 644J Loader 1 10 Area 60, Batch Concrete IMCO Concrete Truck 1 5 Area 60, Concrete pour IMCO Concrete Truck 1 5 Area 60, Concrete pour JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30 Standby for emergency extraction Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control CAT D5 Dozer 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1020 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached Concrete Field Report and IMCO batch tickets. 7:00 am Pump truck is onsite and starting to setup. They are going to place the incubation drain and the last diffuser box walls. 8:30 am The first truck is batched. I let the pump truck prime out and dump some concrete in the washout. I took my sample and all tested in spec. They started to pour. 10:00 am IMCO batched a second truck and finished the placement. They are working on finishing it now. A crew is in Area 30 working on chipping surface defects. 12:00 pm IMCO is looking for the control wire that was cut during the excavation. They have one side exposed but they are looking for the other side so they can be repair it. 2:00 pm IMCO is starting to lay out the incubation drain walls for the next pour. They have informed me they plan to pour Thursday. 4:00 pm IMCO is still searching for the control wire. We have pulled up old photos in an attempt to find the wire location. The carpenters are continuing to lay out the walls and cut forms for the wall placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1021 of 1851 References Photos (4) 20230815_164209 Taken on Aug 15, 2023, 4:42 PM MDT Added on Aug 16, 2023, 7:02 AM MDT Added by Chris Johnson 20230815_084958 Taken on Aug 15, 2023, 8:49 AM MDT Added on Aug 16, 2023, 7:02 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1022 of 1851 20230815_164151 Taken on Aug 15, 2023, 4:41 PM MDT Added on Aug 16, 2023, 7:02 AM MDT Added by Chris Johnson 20230815_084949 Taken on Aug 15, 2023, 8:49 AM MDT Added on Aug 16, 2023, 7:02 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1023 of 1851 Form detail #204: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 11 10 Area 30 Grind Walls, Surface Defects Area 60 Attempt to pour concrete, could not get concrete in spec IMCO, Operators and Labors 5 10 Area 40 Excavate Clay layer Area 60 Batch Concrete Totals 16 20 Forms Location Form date Aug 14, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 15, 2023, 6:55 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1024 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate Clay material Deere 644J Loader 1 10 Area 60, Batch Concrete IMCO Concrete Truck 1 5 Area 60, Attempt Concrete pour IMCO Concrete Truck 1 5 Area 60, Attempt Concrete pour JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 10 Area 40, Haul Clay material, Stockpile onsite Kobelco 1100G Crane 1 10 Area 60, Place concrete with bucket Area 30 Standby for emergency extraction Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control CAT D5 Dozer 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1025 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am Arrived on site. Crew is prepping to pour the Incubation Drain, Formalin Sump and the last diffuser wall. I have looked at all three locations. I asked the crew to finish the trim bar around the drain in the incubation trench. He added a trim bar immediately. The crew is going to start batching concrete. 11:00 am Concrete has been batch. After filling the concrete bucket the crew started placing concrete in the forms for the incubation drain. I tested the concrete and the air was 8.5%, I notified IMCO and they stopped placing concrete. Sean directed his crew to remove the concrete from the forms. The crew went to batch another truck. 12:30 pm The second truck is batched and ready. They filled the concrete bucket and before they started placing any I tested the concrete. It was exactly the same at 8.5% air. Sean directed his crew to mix 1 CY of concrete with no air into the truck on top of the high air concrete. 1:30 pm They have added one CY to the truck with no air. As they were dumping the concrete in the bucket Sean noticed the slump was not right and he tested the temperature of the concrete. It was over 90 degrees. Before I tested it he rejected the truck and said they would pour tomorrow morning when its cooler. The crew is going to clean off the rebar and have it ready to pour tomorrow morning. 2:00 pm The crew is continuing to remove the concrete and clean off the rebar. The dirt crew has moved to excavating the clay layer out of the subgrade at Area 40. They are stockpiling it onsite for now. 4:00 pm The dirt crew is continuing to excavate out the clay material at Area 40. IMCO also has a small crew working on grinding and chipping surface defects at Area 30. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1026 of 1851 References Photos (9) 20230814_152252 Taken on Aug 14, 2023, 3:22 PM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson 20230814_113700 Taken on Aug 14, 2023, 11:37 AM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1027 of 1851 20230814_111053 Taken on Aug 14, 2023, 11:10 AM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson 20230814_111040 Taken on Aug 14, 2023, 11:10 AM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1028 of 1851 20230814_152937 Taken on Aug 14, 2023, 3:29 PM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson 20230814_152301 Taken on Aug 14, 2023, 3:23 PM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1029 of 1851 20230814_111338 Taken on Aug 14, 2023, 11:13 AM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson 20230814_111034 Taken on Aug 14, 2023, 11:10 AM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1030 of 1851 20230814_111029 Taken on Aug 14, 2023, 11:10 AM MDT Added on Aug 15, 2023, 6:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1031 of 1851 Form detail #203: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Forms Location Form date Aug 11, 2023 Description Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 11, 2023, 11:07 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1032 of 1851 Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See Attached Concrete Compressive Report from Area 60 Stem Wall Placement 28 day. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1033 of 1851 Form detail #202: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Grind Walls Area 60 Form incubation Drain IMCO, Operators and Labors 5 10 Area 10, Backfill MH4 Area 40, Excavate soft material Lacy Mechanical 1 10 Area 60, Lay out sewer and water plumbing Vale Electric, Electricians 1 10 Area 60, Raceway Install Forms Location Form date Aug 10, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 11, 2023, 9:31 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1034 of 1851 Crew # Workers # Total hours Work performed Totals 12 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate soft spot Deere 644J Loader 1 10 Area 60, Load General Fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 10 Area 60, Backfill under slab, Compact with Hoe Pack Dump Truck 1 10 Area 60, Import General Fill Kobelco 1100G Crane 1 10 Area 30, Standby for safety extraction Bomag Roller 1 Dynapac Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1035 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Dust Control CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on installing the rebar in the incubation trench drain. They plan to place this concrete tomorrow. 9:00 am IMCO dirt crew is working on placing and compacting material near MH 4. They also have a crew excavating out the soft clay material under Area 40. The clay seems to be in a vane through the subgrade. They are currently stockpiling the unsuitable material onsite. 11:00 am In review of the preliminary rebar detail sent over from Harris I noticed the rebar they installed is not correct. I also have noticed that the preliminary detailing is incomplete. I have composed an email to IPC and Schnabel to discuss the findings onsite. 1:00 pm The crew is continuing to excavate out the soft material under Area 40. 3:00 pm It was brought to my attention that the trench drain will not be ready for pouring tomorrow. They have moved the placement to Monday. The dirt crew is going to clean up what they have under Area 40. They are going to use the existing Pit Run material to level off what they have exposed and compact it and have it ready for a proof roll Monday. Left site. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1036 of 1851 References Photos (10) 20230810_130350 Taken on Aug 10, 2023, 1:03 PM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson 20230810_131510 Taken on Aug 10, 2023, 1:15 PM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1037 of 1851 20230810_085813 Taken on Aug 10, 2023, 8:58 AM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson 20230810_085829 Taken on Aug 10, 2023, 8:58 AM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson 20230810_085937 Taken on Aug 10, 2023, 8:59 AM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson 20230810_085924 Taken on Aug 10, 2023, 8:59 AM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1038 of 1851 20230810_085917 Taken on Aug 10, 2023, 8:59 AM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson 20230810_131508 Taken on Aug 10, 2023, 1:15 PM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1039 of 1851 20230810_090005 Taken on Aug 10, 2023, 9:00 AM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson 20230810_085848 Taken on Aug 10, 2023, 8:58 AM MDT Added on Aug 11, 2023, 9:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1040 of 1851 Form detail #201: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Grind Walls Area 40 Form Fish Lift, Install rebar Area 60 Form incubation Drain IMCO, Operators and Labors 5 10 Area 10, Backfill MH4 Area 40, Excavate soft material Area 60, Backfill under slab Lacy Mechanical 1 10 Area 60, Lay out sewer and water plumbing Forms Location Form date Aug 9, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 10, 2023, 6:59 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1041 of 1851 Crew # Workers # Total hours Work performed Vale Electric, Electricians 1 10 Area 60, Raceway Install Totals 12 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate soft spot Deere 644J Loader 1 10 Area 60, Load General Fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 10 Area 60, Backfill under slab, Compact with Hoe Pack Dump Truck 1 10 Area 60, Import General Fill Kobelco 1100G Crane 1 10 Area 30, Standby for safety extraction Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1042 of 1851 Equipment Quantity Hours used Comment Dynapac Roller 1 Water Truck 1 10 Dust Control CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO plans to continue grinding inside Area 30. The carpenters are starting to form Area 60 Incubation drain. 9:00 am IMCO crew has installed rebar in the lower fish lift walls. This rebar is not detailed on the shop drawings. The have been working with Harris to get the detail done and sent over for submittal. Attended weekly meeting 10:00 am Lacy has installed the domestic water line that goes under the slab. He has pressure tested it. 12:00 pm Vale has made the conduit fix to the 480V line near MH 4. 1:00 pm IMCO is continuing to work on the incubation trench at Area 60. 3:00 pm IMCO is rounding up all the rebar for the incubation trench. Some of it is way to rusty to install. The crew plans to replace it or remove the rust. 4:30 pm IMCO has all the forms up for the incubation trench. They have sloped them all to the trench drain. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1043 of 1851 References Photos (16) 20230809_163020 Taken on Aug 9, 2023, 4:30 PM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson 20230809_162710 Taken on Aug 9, 2023, 4:27 PM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1044 of 1851 20230809_083526 Taken on Aug 9, 2023, 8:35 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson 20230809_080636 Taken on Aug 9, 2023, 8:06 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1045 of 1851 20230809_080154 Taken on Aug 9, 2023, 8:01 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson 20230809_080050 Taken on Aug 9, 2023, 8:00 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1046 of 1851 20230809_083358 Taken on Aug 9, 2023, 8:33 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson 20230809_163011 Taken on Aug 9, 2023, 4:30 PM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1047 of 1851 20230809_162718 Taken on Aug 9, 2023, 4:27 PM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson 20230809_152948 Taken on Aug 9, 2023, 3:29 PM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1048 of 1851 20230809_151602 Taken on Aug 9, 2023, 3:16 PM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson 20230809_100250 Taken on Aug 9, 2023, 10:02 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1049 of 1851 20230809_080644 Taken on Aug 9, 2023, 8:06 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson 20230809_080629 Taken on Aug 9, 2023, 8:06 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1050 of 1851 20230809_080141 Taken on Aug 9, 2023, 8:01 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson 20230809_080016 Taken on Aug 9, 2023, 8:00 AM MDT Added on Aug 10, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1051 of 1851 Form detail #200: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Grind Walls Area 40 Form Fish Lift, Install rebar Area 60 Lay out incubation Drain IMCO, Operators and Labors 5 10 Area 10, Grout MH 4 Area 60, Grout holes in stem wall, backfill under slab Lacy Mechanical 1 10 Area 60, Lay out sewer and water plumbing Forms Location Form date Aug 8, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 9, 2023, 7:16 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1052 of 1851 Crew # Workers # Total hours Work performed Vale Electric, Electricians 1 10 Area 60, Raceway Install Totals 12 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate soft spot Area 10, Set trench box for grouting at MH 4, Grout MH4 Deere 644J Loader 1 10 Area 60, Load General Fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 10 Area 60, Backfill under slab, Compact with Hoe Pack Dump Truck 1 10 Area 60, Import General Fill Kobelco 1100G Crane 1 10 Area 30, Standby for safety extraction Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1053 of 1851 Equipment Quantity Hours used Comment Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 56 day Compressive Break Report from Area 30 1st Wall placement. The 28 Day breaks were low so we used the 3 holds to verify at 56 days. They met strength. 8:00 am IMCO plans to work on the grinding of fins on Area 30 walls. The plan is to let Zack and I take a look at the walls prior to any surface defect repairs are made. 9:00 am IMCO carpenters are working on laying out the incubation trench. The dirt crew needs to add material and compact it before they can begin installing the forms. 11:00 am IMCO is continuing to work on the Area 30 grinding. 1:00 pm There has been discussion on the rebar for the fish lift. It seems as if the supplier did not detail horizontal rebar on the lower fish lift walls. IMCO is working with their supplier to sort it out. 3:00 pm IMCO is going to be submitting a rebar detail regarding the lower fish lift walls. For now they have spoke to the supplier and they have given IMCO direction on what they need to install there. IMCO is working on cutting and bending the bar per their suppliers direction. I notified them I cannot inspect the rebar without approved drawings. I noticed some cracking in the stem wall at Area 60. See attached photos 4:00 pm Zack and I along with Sean have entered Area 30 River Intake side to inspect the inside finish of the concrete. Please see photos attached. There are multiple surface defects that need attention. Sean stated he agreed and he would get the crew working on exposing the defects. The plan is to allow Zack and I to see the exposed defects prior to any repairs being made. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1054 of 1851 References Photos (25) 20230808_130523 Taken on Aug 8, 2023, 1:05 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_145349 Taken on Aug 8, 2023, 2:53 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1055 of 1851 20230808_143336 Taken on Aug 8, 2023, 2:33 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_130611 Taken on Aug 8, 2023, 1:06 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1056 of 1851 20230808_130527 Taken on Aug 8, 2023, 1:05 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_130515 Taken on Aug 8, 2023, 1:05 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1057 of 1851 20230808_130122 Taken on Aug 8, 2023, 1:01 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_145942 Taken on Aug 8, 2023, 2:59 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1058 of 1851 20230808_145844 Taken on Aug 8, 2023, 2:58 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_145749 Taken on Aug 8, 2023, 2:57 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1059 of 1851 20230808_145507 Taken on Aug 8, 2023, 2:55 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_145439 Taken on Aug 8, 2023, 2:54 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1060 of 1851 20230808_145427 Taken on Aug 8, 2023, 2:54 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_145418 Taken on Aug 8, 2023, 2:54 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1061 of 1851 20230808_145331 Taken on Aug 8, 2023, 2:53 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_145323 Taken on Aug 8, 2023, 2:53 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1062 of 1851 20230808_145315 Taken on Aug 8, 2023, 2:53 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_145236 Taken on Aug 8, 2023, 2:52 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1063 of 1851 20230808_145230 Taken on Aug 8, 2023, 2:52 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_145227 Taken on Aug 8, 2023, 2:52 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1064 of 1851 20230808_130741 Taken on Aug 8, 2023, 1:07 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_130734 Taken on Aug 8, 2023, 1:07 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1065 of 1851 20230808_130643 Taken on Aug 8, 2023, 1:06 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson 20230808_130638 Taken on Aug 8, 2023, 1:06 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1066 of 1851 20230808_130615 Taken on Aug 8, 2023, 1:06 PM MDT Added on Aug 8, 2023, 3:31 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1067 of 1851 Form detail #199: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40 Install Waterstop and form Fish lift Area 60 Core drill for trench drain IMCO, Operators and Labors 5 10 Area 40, Excavate soft spot Area 10, Grout MH 4 Lacy Mechanical 1 10 Area 60, Lay out sewer and water plumbing Vale Electric, Electricians 1 10 Area 60, Raceway Install Forms Location Form date Aug 7, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 8, 2023, 7:45 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1068 of 1851 Crew # Workers # Total hours Work performed Totals 12 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate soft spot Area 10, Set trench box for grouting Deere 644J Loader 1 10 Area 60, Load General Fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1069 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Dust Control CAT D5 Dozer 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 Day compressive strength report from the Diffuser, Fish Lift Slab and pipe encasement placement. 10:00 am IMCO informed me they will not be placing concrete today. They are currently waiting on some materials to finish forming the the fish lift. 1:00 pm The dirt crew used the rippers on the dozer last week through the soft spot under Area 40. They hope it will aerate the material and allow it to dry out. 3:00 pm It was determined that the soft / wet spot under Area 40 will need further excavation. The material is very soft. I was able to probe it down to approx. 2.5' deep. The material I probed was very wet and of clay like material. Sean and I discussed actions on this. He said that area still needs to be excavated down to subgrade so we will take a look at it when they get to that. A lighting storm has came in and the crew is standing down. 4:00 pm The rain is picked up. The crew is leaving for the day. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1070 of 1851 Form detail #198: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 9 10 Area 40 Install Waterstop and form Fish lift Area 60 Core drill for trench drain IMCO, Operators and Labors 5 10 Area 40, Excavate for Raceways Area 60, Backfill inside Building Lacy Mechanical 1 10 Area 60, Lay out sewer and water plumbing Vale Electric, Electricians 1 10 Area 60, Raceway Install Forms Location Form date Aug 4, 2023 Description Area 10, Area 40 Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 7, 2023, 10:36 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1071 of 1851 Crew # Workers # Total hours Work performed Totals 16 40 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate for Raceways Deere 644J Loader 1 10 Area 60, Load General Fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 10 Area 60, Place and compact General Fill Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1072 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Dust Control CAT D5 Dozer 1 10 Area 40, Slab grading 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO planned to place concrete for the 6th diffuser box walls. They are unsure if they will be performing this work now. Currently they are working on water stop welding for the fish lift walls along with laying out the location for the core drill for the drain line at Area 60. 9:00 am There is concern of a soft spot in the grade under Area 40. Brett and I discussed ripping the native material up and letting it dry out over the weekend. We will see how it looks next week after it has time to dry out. 10:00 am IMCO has decided not to place concrete. They plan to place on Monday. I was informed next week they plan to make the repairs to the 480 conduit line. Left Site. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1073 of 1851 References Photos (3) 20230804_082332 Taken on Aug 4, 2023, 8:23 AM MDT Added on Aug 7, 2023, 10:36 AM MDT Added by Chris Johnson 20230804_082540 Taken on Aug 4, 2023, 8:25 AM MDT Added on Aug 7, 2023, 10:36 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1074 of 1851 20230804_082343 Taken on Aug 4, 2023, 8:23 AM MDT Added on Aug 7, 2023, 10:35 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1075 of 1851 Form detail #197: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 9 10 Area 40 Backfill and Compact around diffuser boxes Area 60 Form Column Piers IMCO, Operators and Labors 5 10 Area 60, Import, Place and Compact General fill under slab Area 40, Excavate for Raceways, Fuse spray bar line Lacy Mechanical 1 10 Area 60, Lay out sewer and water plumbing Forms Location Form date Aug 3, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 4, 2023, 7:06 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1076 of 1851 Crew # Workers # Total hours Work performed Totals 15 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate for Raceways Deere 644J Loader 1 10 Area 60, Load General Fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 10 Area 60, Place and compact General Fill Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1077 of 1851 Equipment Quantity Hours used Comment Water Truck 1 10 Dust Control CAT D5 Dozer 1 10 Area 40, Slab grading 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 Day Compressive Report for Area 30 2nd Wall Placement. 8:00 am IMCO is continuing to place general fill under area 40. They are using a jumping jack compactor and the two rollers to achieve compaction. They are continuing to place the material in 12" lifts and adding water. 10:00 am Lacy Mechanical is onsite working on the waste lines in Area 60. Vale Electric is also working on the raceway conduit in Area 60. 12:00 pm IMCO is continuing to work on grading around the diffuser boxes and Area 40 base slab grade. 2:00 pm A crew is starting to work on the drain inside the trench for the incubation room. They will need to core a new hole through the stem wall for the drain location. 4:00 pm A crew pulled layout on the raceways and determined the dirt crew needs to excavate out farther. They are moving material around so they can finish the excavation. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1078 of 1851 References Photos (5) 20230803_162525 Taken on Aug 3, 2023, 4:25 PM MDT Added on Aug 4, 2023, 7:00 AM MDT Added by Chris Johnson 20230803_162623 Taken on Aug 3, 2023, 4:26 PM MDT Added on Aug 4, 2023, 7:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1079 of 1851 20230803_162547 Taken on Aug 3, 2023, 4:25 PM MDT Added on Aug 4, 2023, 7:00 AM MDT Added by Chris Johnson 20230803_162452 Taken on Aug 3, 2023, 4:24 PM MDT Added on Aug 4, 2023, 7:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1080 of 1851 20230803_124330 Taken on Aug 3, 2023, 12:43 PM MDT Added on Aug 4, 2023, 7:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1081 of 1851 Form detail #196: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 9 10 Area 40 Form Last diffuser box walls, Install Grade Embeds, Form fish lift walls Area 60 Layout and core drill holes for the Plumber, Grout back stem wall blockouts IMCO, Operators and Labors 5 10 Area 60, Import, Place and Compact General fill under slab Area 40, Excavate for Raceways, Begin Welding spray bar line Forms Location Form date Aug 2, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 3, 2023, 7:36 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1082 of 1851 Crew # Workers # Total hours Work performed Lacy Mechanical 1 10 Area 60, Lay out sewer and water plumbing Totals 15 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate for Raceways Deere 644J Loader 1 10 Area 60, Load General Fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 10 Area 60, Place and compact General Fill Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1083 of 1851 Equipment Quantity Hours used Comment Dynapac Roller 1 Water Truck 1 10 Dust Control CAT Dozer 1 10 Area 40, Slab grading 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am Zack, Sean and I went inside the well intake side of Area 30 to discuss the finish on the walls. It was determined that the larger surface defects needed to be chipped out and inspected prior to any repairs being done. 9:00 am Attended weekly meeting. 10:00 am IMCO crews are working on setting the diffuser grate embeds to grade on the forms to be casted into the next concrete placement. They have a couple guys working on core drilling holes for the plumber as well. 11:00 am A crew is continuing to work on forming the fish lift walls. There was discussion regarding the wall rebar in this fish lift. 12:00 pm Lacy Mechanical is continuing to install waste pipe at Area 60 under slab. 1:00 pm Vale Electric is also onsite today. They are working on raceway conduit under slab in Area 60. 2:00 pm IMCO pipe crew is beginning to weld the HDPE pipe for the spray bar feed to be casted under Area 40. 4:00 pm IMCO grade crew has been continuing to cut the raceway slab grade. They have a dozer onsite now to perform this work. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1084 of 1851 References Photos (9) 20230802_162943 Taken on Aug 2, 2023, 4:29 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson 20230802_161909 Taken on Aug 2, 2023, 4:19 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1085 of 1851 20230802_145522 Taken on Aug 2, 2023, 2:55 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson 20230802_140154 Taken on Aug 2, 2023, 2:01 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1086 of 1851 20230802_135923 Taken on Aug 2, 2023, 1:59 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson 20230802_135833 Taken on Aug 2, 2023, 1:58 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1087 of 1851 20230802_135824 Taken on Aug 2, 2023, 1:58 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson 20230802_135816 Taken on Aug 2, 2023, 1:58 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1088 of 1851 20230802_145532 Taken on Aug 2, 2023, 2:55 PM MDT Added on Aug 3, 2023, 7:35 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1089 of 1851 Form detail #195: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 9 10 Area 30, Grind Wall fins, Begin Sacking Area 40 Form Last diffuser box walls, Weld water stop at the fish lift Area 60 Layout and core drill holes for the Plumber IMCO, Operators and Labors 5 10 Area 60, Import, Place and Compact General fill under slab Area 40, Excavate for Raceways Forms Location Form date Aug 1, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 2, 2023, 7:16 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1090 of 1851 Crew # Workers # Total hours Work performed Lacy Mechanical 1 10 Area 60, Lay out sewer and water plumbing Totals 15 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate for Raceways Deere 644J Loader 1 10 Area 60, Load General Fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 10 Area 60, Place and compact General Fill Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1091 of 1851 Equipment Quantity Hours used Comment Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to work on excavating native material for the 6 raceways. They are loading trucks up and dumping onsite to stockpile the material. 10:00 am IMCO missed installing vertical water stop at the fish lift bottom slab. They are going to cut and install the vertical Ts to meet their concrete pour sequence. Another crew has started to core drill holes for the plumber to install waste piping through the stem walls. 11:00 am It has been determined that at Area 60 the water line and sewer line penetrations will not meet plumbing code. Lacy informed IPC and myself of the plumbing code violation to have the pipes encased and not having them sleeved through the concrete stem wall. Lacy has proposed to use the sewer line as the water line sleeve and to core drill a new hole for a water line sleeve. He intends to use link seal to seal the ends of the sleeves around the new piping. A direction was given to from IPC to IMCO to proceed with meeting the building code requirements. 2:00 pm IMCO is continuing to work on installing the vertical water stop that was missed in the first fish lift placement per their placement sequence. They are also starting to build forms for the fish lift walls. 3:00 pm IMCO is continuing to work on excavating for the raceways and stockpiling the material onsite. They have been also placing general fill under slab at Area 60. They are using the hoepack attachment and a jumping jack to compact the material. Lacy is laying out the waste lines for them to excavate too. 4:30 pm Zack, IPC, and I went into Area 30 to inspect the finish of the walls. We were only able to access the Well pump chamber side. A crew has been in there grinding and sacking. Zack and I noticed multiple surface defects. The crew was currently attempting to repair an area that was approx. 15" by 13" in size with spots as deep as 2.25" deep. They were attempting to fix the defect with a sacking mixture of cement, sand and water. The mixture was not sticking very well. Other areas they attempted to sack the sacking mixture was able to be rubbed off easily. Multiple deviations in the surface finish was seen with one particular spot extruding over 1/2". See photos for photo documentation. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1092 of 1851 References Photos (18) 20230801_161508 Taken on Aug 1, 2023, 4:15 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_161456 Taken on Aug 1, 2023, 4:14 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1093 of 1851 20230801_161324 Taken on Aug 1, 2023, 4:13 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_132142 Taken on Aug 1, 2023, 1:21 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1094 of 1851 20230801_102538 Taken on Aug 1, 2023, 10:25 AM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_102532 Taken on Aug 1, 2023, 10:25 AM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1095 of 1851 20230801_161857 Taken on Aug 1, 2023, 4:18 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_161516 Taken on Aug 1, 2023, 4:15 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1096 of 1851 20230801_161500 Taken on Aug 1, 2023, 4:15 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_161451 Taken on Aug 1, 2023, 4:14 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1097 of 1851 20230801_161419 Taken on Aug 1, 2023, 4:14 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_160902 Taken on Aug 1, 2023, 4:09 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1098 of 1851 20230801_160859 Taken on Aug 1, 2023, 4:09 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_134623 Taken on Aug 1, 2023, 1:46 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1099 of 1851 20230801_134612 Taken on Aug 1, 2023, 1:46 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_134548 Taken on Aug 1, 2023, 1:45 PM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1100 of 1851 20230801_095743 Taken on Aug 1, 2023, 9:57 AM MDT Added on Aug 2, 2023, 7:10 AM MDT Added by Chris Johnson 20230801_134602 Taken on Aug 1, 2023, 1:46 PM MDT Added on Aug 2, 2023, 7:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1101 of 1851 Form detail #194: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 30, Grind Wall fins Area 40, Concrete Placement 5 dif. box walls, 1 slab, lower fish lift slab Area 60 Pipe encasement IMCO, Operators and Labors 5 10 Area 40, 60, Batch Concrete Area 40, Excavate for Raceways Totals 11 20 Forms Location Form date Jul 31, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Aug 1, 2023, 7:29 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1102 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, Excavate for Raceways Deere 644J Loader 1 10 Area 40, Batch Concrete, Excavate for Raceways IMCO Concrete Truck 1 5 Area 40, Concrete placement IMCO Concrete Truck 1 5 Area 40, Concrete placement JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1103 of 1851 - Notes IMCO has made the adjustments to the 36" pipe from MH 2 to MH 4. The pipe had a belly in it and was not straight. I was informed they did not have to remove it, they just exposed the pipe and lifted it with a strap. The crews have also imported material inside Area 60 for under slab fill. They are using general fill. It looks to be compacted well. 8:00 am Pump truck is onsite and setting up. IMCO plans to place concrete at multiple locations. They area planning to place 5 diffuser box walls, 1 diffuser box slab, lower fish lift slab and pipe encasements at Area 60. 9:00 am I have tested the first truck, All passed. IMCO is continuing to pour pipe encasement of the 14 drains. 12:00 pm IMCO has completed the placements. The crew is working on finishing the concrete. They placed 22.5 CY today. 2:00 pm IMCO has started to excavate for the raceways. They are stockpiling the material near holding ponds. The crew is also working on laying out the drains inside Area 60 to begin installing that pipe. 4:00 pm IMCO has sprinklers going to cure the concrete from todays placement. A crew is inside Area 30 grinding the concrete fins and imperfections. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1104 of 1851 References Photos (18) 20230731_164745 Taken on Jul 31, 2023, 4:47 PM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_164718 Taken on Jul 31, 2023, 4:47 PM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1105 of 1851 20230731_164654 Taken on Jul 31, 2023, 4:46 PM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_144756 Taken on Jul 31, 2023, 2:47 PM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1106 of 1851 20230731_144751 Taken on Jul 31, 2023, 2:47 PM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_144715 Taken on Jul 31, 2023, 2:47 PM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1107 of 1851 20230731_103318 Taken on Jul 31, 2023, 10:33 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_093504 Taken on Jul 31, 2023, 9:35 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1108 of 1851 20230731_092716 Taken on Jul 31, 2023, 9:27 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_092712 Taken on Jul 31, 2023, 9:27 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1109 of 1851 20230731_083207 Taken on Jul 31, 2023, 8:32 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_083131 Taken on Jul 31, 2023, 8:31 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1110 of 1851 20230731_082400 Taken on Jul 31, 2023, 8:24 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_082336 Taken on Jul 31, 2023, 8:23 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1111 of 1851 20230731_144708 Taken on Jul 31, 2023, 2:47 PM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_093447 Taken on Jul 31, 2023, 9:34 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1112 of 1851 20230731_092756 Taken on Jul 31, 2023, 9:27 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson 20230731_092725 Taken on Jul 31, 2023, 9:27 AM MDT Added on Aug 1, 2023, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1113 of 1851 Form detail #193: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Forms Location Form date Jul 27, 2023 Description Area 40 Due date Submitted by Chris Johnson Status Closed Last update Jul 27, 2023, 1:42 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1114 of 1851 Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 day HMH Concrete Compressive Report from the Area 40 5 Diffuser Box Placements. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1115 of 1851 Form detail #192: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Form Diffuser Boxes, Install Water stop IMCO, Operators and Labors 3 10 Area 10, MH 4 grout, Fix backfall in pipe Area 60, Chiller Room Piping and Encasement Rebar Totals 8 20 Forms Location Form date Jul 26, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 27, 2023, 7:32 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1116 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, MH 4, 36" pipe backfall repair Deere 644J Loader 1 10 Area 10, MH 4 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 10, Stack MH 2 and MH 4 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1117 of 1851 - Notes 8:00 am IMCO was scheduled to pour the fish lift slab along with the 6th diffuser box but it is still missing water stop and the rebar needs to be cleaned up. Most of it is not plumb. I noticed the main 480 feed conduit was broken. The crew informed me it happened yesterday while backfilling the 36" pipe at MH 4. 8:30 am Mitch and Rick, IPC, were onsite to review the broken main feed conduit. 9:00 am Attended weekly meeting. 10:00 am IMCO will not be placing the fish lift slab today. IMCO crew is also working on the pipe encasement inside Area 60. In todays meeting Ray reviewed the pipe encasement and it was determined no vertical encasement is needed. IMCO has grouted tie holes on the interior stem wall at Area 60. 11:00 am I was informed that the 36" drain pipe has backfall in it. I have taken a picture from MH 4 looking to MH 2. You can see the water backed up in the pipe about halfway down the pipe run. It also has an angle point in the line that should not be there. Kirt is starting to excavate around the pipe so he can remove it and replace it. 1:00 pm IMCO has submitted a new material for Structural Fill. I drove to the pit in Halfway and taken a sample for a Gradation and Proctor. I spoke to IMCO regarding how they plan to place the concrete in the fish lift. They cannot dump it from a truck because the rebar is in the way and the concrete will fall to far from the shoot. They are working on a plan to place the concrete. 3:00 pm IMCO is starting to work on the water stop in the fish lift. The overhead doors were delivered and IMCO unloaded them. 5:00 pm IMCO has canceled the concrete placement for tomorrow. They are going to place on Monday with hopes they can get a pump truck and place multiple small pours using the pump truck. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1118 of 1851 References Photos (10) 20230726_143432 Taken on Jul 26, 2023, 2:34 PM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson 20230726_143347 Taken on Jul 26, 2023, 2:33 PM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1119 of 1851 20230726_143332 Taken on Jul 26, 2023, 2:33 PM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson 20230726_143045 Taken on Jul 26, 2023, 2:30 PM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1120 of 1851 20230726_104912 Taken on Jul 26, 2023, 10:49 AM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson 20230726_102539 Taken on Jul 26, 2023, 10:25 AM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1121 of 1851 20230726_163215 Taken on Jul 26, 2023, 4:32 PM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson 20230726_152807 Taken on Jul 26, 2023, 3:28 PM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1122 of 1851 20230726_143338 Taken on Jul 26, 2023, 2:33 PM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson 20230726_073630 Taken on Jul 26, 2023, 7:36 AM MDT Added on Jul 27, 2023, 7:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1123 of 1851 Form detail #190: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30, Remove Wall Forms, Begin installing Plugs at tie holes IMCO, Operators and Labors 3 10 Area 10, 24" overflow drain Totals 6 20 2. Materials Forms Location Form date Jul 25, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 25, 2023, 7:46 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1124 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, 24" Overflow Drain Deere 644J Loader 1 10 Area 10, 24" Overflow drain IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30 Strip Forms Bomag Roller 1 8 Area 10, 24" Overflow Drain Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1125 of 1851 Notes 10:30 am IMCO is continuing to remove forms on the inside of Area 30. The crane is being used to pick items from the inside. 12:00 pm IMCO pipe crew is working on finishing the 24" overflow pipe run from Area 30 to MH 2. This run was changed from the original design per RFI #053. 2:00 pm IMCO is backfilling the 24" pipe with pipe bedding. They are leaving space for a thrust block on the 45 bend. 4:00 pm IMCO is working on setting the riser section on the intake valve vault. They intend to start backfilling around Area 30. References Photos (3) 20230724_164358 Taken on Jul 24, 2023, 4:43 PM MDT Added on Jul 25, 2023, 7:46 AM MDT Added by Chris Johnson 20230724_124617 Taken on Jul 24, 2023, 12:46 PM MDT Added on Jul 25, 2023, 7:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1126 of 1851 20230724_151522 Taken on Jul 24, 2023, 3:15 PM MDT Added on Jul 25, 2023, 7:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1127 of 1851 Form detail #191: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 40, Form Diffuser Boxes IMCO, Operators and Labors 8 10 Area 10, MH 4 Area 60, Chiller Room Piping Totals 13 20 2. Materials Forms Location Form date Jul 25, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 26, 2023, 6:55 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1128 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, MH 4 Deere 644J Loader 1 10 Area 10, MH 4 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 10, MH 4 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1129 of 1851 Notes 8:00 am IMCO is working on moving the MH 4 base that was previously installed per plan. The move is to allow room for clearance from the retaining wall and MH 4. They moved it approx. 4 feet. It has been asked to As Built it once complete. 10:00 am IMCO carpenters are working on forming the vertical walls of the diffuser boxes. 12:00 pm IMCO has placed MH 4 base at the new location. Another pipe crew has been working on the chiller piping at Area 60. 2:00 pm The pipe crew has installed the 36" drain pipe to MH 4. They are now working on setting the manhole sections. 3:00 pm I have reviewed with the IMCO crew the pipe encasement details for the chiller room piping. 4:30 pm IMCO carpenters have continued to work on installing the vertical walls for the diffuser boxes. IMCO was able to place MH 4 sections. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1130 of 1851 References Photos (7) 20230725_153521 Taken on Jul 25, 2023, 3:35 PM MDT Added on Jul 26, 2023, 6:55 AM MDT Added by Chris Johnson 20230725_144155 Taken on Jul 25, 2023, 2:41 PM MDT Added on Jul 26, 2023, 6:55 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1131 of 1851 20230725_144148 Taken on Jul 25, 2023, 2:41 PM MDT Added on Jul 26, 2023, 6:55 AM MDT Added by Chris Johnson 20230725_125122 Taken on Jul 25, 2023, 12:51 PM MDT Added on Jul 26, 2023, 6:55 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1132 of 1851 20230725_124356 Taken on Jul 25, 2023, 12:43 PM MDT Added on Jul 26, 2023, 6:55 AM MDT Added by Chris Johnson 20230725_153617 Taken on Jul 25, 2023, 3:36 PM MDT Added on Jul 26, 2023, 6:55 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1133 of 1851 20230725_144203 Taken on Jul 25, 2023, 2:42 PM MDT Added on Jul 26, 2023, 6:55 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1134 of 1851 Form detail #189: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Forms Location Form date Jul 21, 2023 Description Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 21, 2023, 1:34 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1135 of 1851 Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 day HMH Concrete Compressive Report from the Area 60 Stem Wall Placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1136 of 1851 Form detail #188: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 60 Strip Stem Walls Area 30 Strip Wall Forms Area 40, Weld Waterstop, Place 5 Diffuser Box Slabs IMCO, Operators and Labors 3 10 Area 10, Yard piping Area 40, Batch Concrete Vale Electric, Electricians 3 10 Area 60, Under Slab Raceways Totals 12 30 Forms Location Form date Jul 20, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 21, 2023, 1:31 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1137 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, MH 4 Deere 644J Loader 1 5 Area 40, Batch Concrete IMCO Concrete Truck 1 3 Area 40, Batch Concrete IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30 Strip Forms Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1138 of 1851 Notes See attached 28 day HMH Concrete Compressive Report from the Area 60 Footing Placement. 8:00 am IMCO is continuing to work on the waterstop for the diffuser boxes and the bottom fish lift slab. There is rebar that needs to be adjusted and some rebar that needs to be added before they can place the fish lift slab. They are still planning to place concrete today. 10:00 am Vale Electric is continuing to install raceway piping at Area 60 while IMCO continues to strip the forms off Area 60 and Area 30. IMCO planned to install a inserta T for the 6" drain line outside Area 30. I asked Jake Kreglo to ensure this was submitted. It was not so he sent it in this morning. I have a concern it will not meet the test pressures per the specification. 12:00 pm IMCO is continuing to work on removing forms at Area 30 and Area 60. 1:00 pm Jake informed me they are getting ready to start batching concrete to pour the 6 diffuser box slabs. 2:00 pm I have tested the concrete and all was in spec. The crew is pouring the diffuser slabs now. 4:00 pm IMCO has completed the pour and is working on finishing the slabs now. They ran out of concrete so they did not place the 6th slab on the North End of the raceways Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1139 of 1851 References Photos (2) 20230720_143334 Taken on Jul 20, 2023, 2:33 PM MDT Added on Jul 21, 2023, 7:19 AM MDT Added by Chris Johnson 20230720_143327 Taken on Jul 20, 2023, 2:33 PM MDT Added on Jul 21, 2023, 7:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1140 of 1851 Form detail #187: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 60 Strip Stem Walls Area 30 Strip Wall Forms Area 40, Weld Waterstop IMCO, Operators and Labors 3 10 Area 10, Yard piping Area 60, Under Slab piping Vale Electric, Electricians 3 10 Area 60, Under Slab Raceways Totals 12 30 Forms Location Form date Jul 19, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 20, 2023, 7:04 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1141 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, MH 2 to MH 4 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30 Strip Forms Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1142 of 1851 Notes 8:00 am IMCO is continuing to work on the 36" drain line from MH 2 to MH 4. They are currently setting grade for MH 4. 9:00 am IMCO is continuing stripping the forms off the stem wall at Area 60. Vale Electric is onsite to install the raceway conduit under the slab/ through the stem wall. Attended weekly meeting. 10:00 am IMCO carpenters are continuing stripping the wall forms from the interior of Area 30. IMCO has set the base section for MH 4. 12:00 pm A small crew is working on the water stop for the diffuser boxes. In the meeting it was discussed that they would be placing that concrete tomorrow. IMCO is waiting for the crane to free up so they can set the manhole sections at MH 4. 2:00 pm IMCO is still waiting for the crane to free up to set the rest of MH4. The other crews are continuing to work on stripping wall forms at both Area 30 and Area 60. 4:00 pm IMCO has removed the stump from the tree that was in conflict with MH 4. IMCO had survey onsite checking locations and scanning the site to ensure location compliance. He notified everyone that MH 4 will be in conflict with the retaining wall footing. IMCO has submitted an RFI looking for direction. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1143 of 1851 References Photos (6) 20230719_161656 Taken on Jul 19, 2023, 4:16 PM MDT Added on Jul 20, 2023, 7:04 AM MDT Added by Chris Johnson 20230719_161512 Taken on Jul 19, 2023, 4:15 PM MDT Added on Jul 20, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1144 of 1851 20230719_125316 Taken on Jul 19, 2023, 12:53 PM MDT Added on Jul 20, 2023, 7:04 AM MDT Added by Chris Johnson 20230719_161606 Taken on Jul 19, 2023, 4:16 PM MDT Added on Jul 20, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1145 of 1851 20230719_125320 Taken on Jul 19, 2023, 12:53 PM MDT Added on Jul 20, 2023, 7:04 AM MDT Added by Chris Johnson 20230719_125313 Taken on Jul 19, 2023, 12:53 PM MDT Added on Jul 20, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1146 of 1851 Form detail #185: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 60 Strip Stem Walls Area 30 Strip Wall Forms IMCO, Operators and Labors 3 10 Area 10, Yard piping Totals 9 20 2. Materials Forms Location Form date Jul 18, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 18, 2023, 7:13 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1147 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Area 30 to MH 2 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30 Strip Forms Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1148 of 1851 Notes 10:00 am IMCO is working on removing the stem wall forms at Area 60 and the the wall forms at Area 30. 12:00 pm I am continuing to check the surface as they remove forms. I have not seen any rock pockets or unconsolidated concrete yet. 2:00 pm IMCO pipe crew is working on installing romac fittings and pipe leaving Area 30. The carpenters are continuing to strip forms. 5:00 pm IMCO was able to strip the exterior wall forms from Ara References Photos (8) 20230717_154932 Taken on Jul 17, 2023, 3:49 PM MDT Added on Jul 18, 2023, 7:13 AM MDT Added by Chris Johnson 20230717_140816 Taken on Jul 17, 2023, 2:08 PM MDT Added on Jul 18, 2023, 7:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1149 of 1851 20230717_140525 Taken on Jul 17, 2023, 2:05 PM MDT Added on Jul 18, 2023, 7:13 AM MDT Added by Chris Johnson 20230717_155715 Taken on Jul 17, 2023, 3:57 PM MDT Added on Jul 18, 2023, 7:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1150 of 1851 20230717_155042 Taken on Jul 17, 2023, 3:50 PM MDT Added on Jul 18, 2023, 7:13 AM MDT Added by Chris Johnson 20230717_140717 Taken on Jul 17, 2023, 2:07 PM MDT Added on Jul 18, 2023, 7:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1151 of 1851 20230717_140639 Taken on Jul 17, 2023, 2:06 PM MDT Added on Jul 18, 2023, 7:13 AM MDT Added by Chris Johnson 20230717_140540 Taken on Jul 17, 2023, 2:05 PM MDT Added on Jul 18, 2023, 7:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1152 of 1851 Form detail #186: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 60 Strip Stem Walls Area 30 Strip Wall Forms Area 40, Weld Waterstop IMCO, Operators and Labors 3 10 Area 10, Yard piping Area 60, Under Slab piping Totals 9 20 2. Materials Forms Location Form date Jul 18, 2023 Description Area 10, Area 30, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 19, 2023, 7:01 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1153 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Area 30 to MH 2 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30 Strip Forms Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1154 of 1851 Notes 8:00 am IMCO is continuing to strip the forms on Area 30 and Area 60. The pipe crew is continuing to excavate for the drain line from MH 2 to MH 4. 9:00 am IPC was onsite to notify IMCO that the alarms have been going off at the shop. IMCO must of hit the alarm line while installing the drain pipe to MH 4. I asked IMCO to make sure and mark the location of lines to be spliced back together before the hatchery operations start up again. 12:00 pm IMCO is continuing to work on stripping the forms on both Area 60 and Area 30. 2:00 pm IMCO crew has started to weld water stop for the diffuser boxes. 4:00 pm IMCO is continuing to work on excavating for MH 4 and the pipe run to it. They have exposed all the utilities in the trench. They have hit ground water as well. 5:00 pm IMCO informed me they plan to place concrete for the diffuser boxes and the fish lift along with pipe encasement Thursday. The crew has been working on the interior piping in the incubation room at Area 60. Vale Electrical has also been installing the conduit through the block outs in the stem wall. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1155 of 1851 References Photos (7) 20230718_165009 Taken on Jul 18, 2023, 4:50 PM MDT Added on Jul 19, 2023, 7:00 AM MDT Added by Chris Johnson 20230718_164947 Taken on Jul 18, 2023, 4:49 PM MDT Added on Jul 19, 2023, 7:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1156 of 1851 20230718_164943 Taken on Jul 18, 2023, 4:49 PM MDT Added on Jul 19, 2023, 7:00 AM MDT Added by Chris Johnson 20230718_151327 Taken on Jul 18, 2023, 3:13 PM MDT Added on Jul 19, 2023, 7:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1157 of 1851 20230718_151208 Taken on Jul 18, 2023, 3:12 PM MDT Added on Jul 19, 2023, 7:00 AM MDT Added by Chris Johnson 20230718_151155 Taken on Jul 18, 2023, 3:11 PM MDT Added on Jul 19, 2023, 7:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1158 of 1851 20230718_164937 Taken on Jul 18, 2023, 4:49 PM MDT Added on Jul 19, 2023, 7:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1159 of 1851 Form detail #184: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 60 Form stem walls IMCO, Operators and Labors 5 10 Area 60, Batch Concrete Totals 11 20 2. Materials Material Quantity Unit Comment Forms Location Form date Jul 14, 2023 Description Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 15, 2023, 10:59 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1160 of 1851 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Area 30 to MH 2 Deere 644J Loader 1 10 Area 60, Batch Concrete IMCO Concrete Truck 1 10 Area 60, Batch Concrete IMCO Concrete Truck 1 10 Area 60, Batch Concrete JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is making final preparations for the stem wall placement today. 8:00 am Pump truck is onsite and the crew is starting to batch concrete. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1161 of 1851 9:00 am The first truck is batched. They primed the pump and placed ~1 CY in the forms. I took my sample and tested the air. The air was too high at 7.9%. Sean used the 4 CY truck in a pipe encasement for the cross crowder floor drains. They are pouring the concrete in piles over the drain pipe to hold it down and prevent it from floating. They will come back later and pour the entire encasement. 10:00 am The second truck has started to pour out. I took my sample and the concrete tested all in spec. They continued to place in the stem walls. 12:30 pm. IMCO has finished the placement of the stem walls. The crew is now working on finishing the concrete to grade. References Photos (7) 20230714_122719 Taken on Jul 14, 2023, 12:27 PM MDT Added on Jul 14, 2023, 12:40 PM MDT Added by Chris Johnson 20230714_093602 Taken on Jul 14, 2023, 9:36 AM MDT Added on Jul 14, 2023, 12:40 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1162 of 1851 20230714_122514 Taken on Jul 14, 2023, 12:25 PM MDT Added on Jul 14, 2023, 12:40 PM MDT Added by Chris Johnson 20230714_122446 Taken on Jul 14, 2023, 12:24 PM MDT Added on Jul 14, 2023, 12:40 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1163 of 1851 20230714_085402 Taken on Jul 14, 2023, 8:54 AM MDT Added on Jul 14, 2023, 12:40 PM MDT Added by Chris Johnson 20230714_075610 Taken on Jul 14, 2023, 7:56 AM MDT Added on Jul 14, 2023, 12:40 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1164 of 1851 20230714_075607 Taken on Jul 14, 2023, 7:56 AM MDT Added on Jul 14, 2023, 12:40 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1165 of 1851 Form detail #183: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 7 10 Area 60 Form stem walls IMCO, Operators and Labors 5 10 Area 10, Piping from Area 30 to MH 2 Totals 12 20 2. Materials Forms Location Form date Jul 13, 2023 Description Area 10, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 14, 2023, 6:53 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1166 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Area 30 to MH 2 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 10 Trench Compaction Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1167 of 1851 Notes See attached HMH Compressive Strength Report from the 7 day 2nd Wall placement. 8:00 am IMCO is continuing to work on installing the stem wall forms. The crew has started to lay out the hold downs and the anchor bolts and installing them. 9:00 am IMCO has removed most of the tree that is in conflict with MH4. The stump is still there but the rest is gone. They are waiting on pins for the stacker trench box before they can continue installing the pipe and manhole. They have exposed the power and is waiting for IPC to deenergize the line. 11:00 am RFI 114 has been answered and the crew is going to work on blocking out for the electrical conduit at Area 60. The RFI included rebar modifications. 2:00 pm IMCO has made the rebar modifications per RFI 114. Photos are attached. The crew is continuing to work on closing up the forms and preparing to place the stem wall concrete tomorrow. 3:00 pm IMCO is working on installing the 24" drain pipe from Area 30 to MH2. 5:00 pm IMCO has installed the Romac coupler and one bell piece for the double joint connection outside a strucuture on the drain pipe from Area 30 to MH 2. The carpenter crew is finishing up the forming and prepping for the placement tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1168 of 1851 References Photos (7) 20230713_155912 Taken on Jul 13, 2023, 3:59 PM MDT Added on Jul 14, 2023, 6:53 AM MDT Added by Chris Johnson 20230713_135246 Taken on Jul 13, 2023, 1:52 PM MDT Added on Jul 14, 2023, 6:53 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1169 of 1851 20230713_111043 Taken on Jul 13, 2023, 11:10 AM MDT Added on Jul 14, 2023, 6:53 AM MDT Added by Chris Johnson 20230713_135257 Taken on Jul 13, 2023, 1:52 PM MDT Added on Jul 14, 2023, 6:53 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1170 of 1851 20230713_135250 Taken on Jul 13, 2023, 1:52 PM MDT Added on Jul 14, 2023, 6:53 AM MDT Added by Chris Johnson 20230713_125151 Taken on Jul 13, 2023, 12:51 PM MDT Added on Jul 14, 2023, 6:53 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1171 of 1851 20230713_111034 Taken on Jul 13, 2023, 11:10 AM MDT Added on Jul 14, 2023, 6:53 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1172 of 1851 Form detail #182: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 7 10 Area 60 Form stem walls IMCO, Operators and Labors 5 10 Area 10, Piping from MH 2 to MH 4 EOI 2 10 Area 40, Tie Rebar for fish lift slab Totals 14 30 2. Materials Forms Location Form date Jul 12, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 12, 2023, 5:00 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1173 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, MH 2 to MH 4 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control, Fill Irrigation tank 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1174 of 1851 Notes 8:00 am IMCO is backfilling the drain pipe now. They are using the water truck to apply water to the pipe bedding and native fill. The carpenter crew is continuing to work on the stem wall at Area 60. 9:00 am Attended weekly meeting. 11:00 am Sean and I reviewed the locations and clearances for the HDs on Area 60. They are currently laying them out now. The pipe crew is starting to excavate for existing utilities near MH 4. 1:00 pm EOI is onsite to tie the bar for the fish lift. 4:00 pm IMCO has located some utilities. They are now working on removing the tree that is encroaching on the retaining wall and MH 4. IMCO carpenters are continuing to work on the stem wall forming. Part of the pipe crew has started to weld HDPE fittings together for the spray bars. 4:30 pm EOI is continuing to install the rebar for the fish lift. As I make periodic spot checks I noticed they had the IF and OF dowel bars reversed. They agreed and is starting to fix it now. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1175 of 1851 References Photos (4) 20230712_161116 Taken on Jul 12, 2023, 4:11 PM MDT Added on Jul 12, 2023, 4:59 PM MDT Added by Chris Johnson 20230712_161021 Taken on Jul 12, 2023, 4:10 PM MDT Added on Jul 12, 2023, 4:59 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1176 of 1851 20230712_161012 Taken on Jul 12, 2023, 4:10 PM MDT Added on Jul 12, 2023, 4:59 PM MDT Added by Chris Johnson 20230712_111415 Taken on Jul 12, 2023, 11:14 AM MDT Added on Jul 12, 2023, 4:59 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1177 of 1851 Form detail #181: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 7 10 Area 60 Form stem walls Area 40, Form fish lift slab IMCO, Operators and Labors 4 10 Area 10, Piping from MH 2 to MH 4 Area 20, Pull irrigation pump, Reinstall Totals 11 20 2. Materials Forms Location Form date Jul 11, 2023 Description Area 10, Area 40, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 12, 2023, 7:10 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1178 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, MH 2 to MH 4 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 5 Area 20 Irrigation Pump Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control, Fill Irrigation tank 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1179 of 1851 Notes See attached HMH Compressive Strength Test Report from the 28 Day 1st Wall Placement at Area 30. 8:00 am IMCO is continuing to work on the stem walls at the Hatchery Building. They also are working on the slab for the fish lift. EOI is onsite today to tie rebar for the fish lift slab along with piers for the hatchery building. 9:00 am IMCO pipe crew is going to continue to install the drain pipe from MH 2 to MH 4. They are using a trench box. 11:00 pm IMCO has installed 1 stick of pipe from MH 2 to MH 4. The wall crew is continuing to work on bracing the stem wall forms. I have noticed a few locations where the rebar is in need of attention. I spoke to the 2 foreman, Tyler and Jake, about fixing some of them. They got right on it and fixed the rebar per DC16A. EOI is working on tying rebar for the post piers at Area 60. 2:00 pm IMCO has reinstalled the irrigation pump. They are working on plumbing it together now. 4:30 pm IMCO has excavated and installed a stick of pipe from MH 2 to MH4. The wall crew continues to install the stem wall forms. They are still planning to place that Friday. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1180 of 1851 References Photos (4) 20230711_154708 Taken on Jul 11, 2023, 3:47 PM MDT Added on Jul 12, 2023, 7:08 AM MDT Added by Chris Johnson 20230711_105737 Taken on Jul 11, 2023, 10:57 AM MDT Added on Jul 12, 2023, 7:08 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1181 of 1851 20230711_135129 Taken on Jul 11, 2023, 1:51 PM MDT Added on Jul 12, 2023, 7:08 AM MDT Added by Chris Johnson 20230711_095637 Taken on Jul 11, 2023, 9:56 AM MDT Added on Jul 12, 2023, 7:08 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1182 of 1851 Form detail #180: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 6 10 Area 60 Form stem walls IMCO, Operators and Labors 4 10 Area 10, Begin piping from MH 2 to MH 4 Area 20, Pull irrigation pump Area 50, Excavate for fish lift platform Totals 10 20 Forms Location Form date Jul 10, 2023 Description Area 10, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 11, 2023, 7:57 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1183 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 50, Fish Lift Floor Excavation Area 10, MH 2 to MH 4 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 110 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 5 Area 20 Irrigation Pump Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control, Fill Irrigation tank Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1184 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:30 am IMCO is continuing to work on form the stem walls at Area 60, Hatchery Building. They are starting to close up the walls. I noticed the a foam block out mid wall that they had to cut a vertical rebar for. I did not see any trim bar around the block out. I showed Jake, Foreman, the detail in the drawings and he installed rebar per the detail and continued closing up the walls. The crew is also pulling the irrigation pump again. I was informed that over the weekend the pump stopped working. They are pulling it now to see what the issue is. 12:00 pm IMCO is waiting for some ladders before they begin removing the forms from the Area 30 placement from last week. Once the forms are down they have no way to climb the wall to access the inside. A runner went to town to pick up some longer extension ladders. Jake Kreglo informed me EOI will be onsite tomorrow to fix the rebar that was tied for the 14 drains pipe encasement. The rebar was tied to high above the top of pipe and it protruding into the slab of the structure. 1:00 pm IMCO performed a safety demonstration and practice for using the safety man basket with the crane. 2:00 pm IMCO is continuing to work on forming the stem walls. The operators are excavating for the bottom of the fish lift 4:00 pm IMCO has placed structural fill to grade for the fish lift base slab. They are now working on excavating for the drain pipe from MH 2 to MH 4. They are working on setting a trench box. Rick and Casey, IPC, were onsite to discuss killing the power from the main feeds to allow a safer excavation while installing the drain line and MH 4. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1185 of 1851 References Photos (7) 20230710_155558 Taken on Jul 10, 2023, 3:55 PM MDT Added on Jul 11, 2023, 7:57 AM MDT Added by Chris Johnson 20230710_155547 Taken on Jul 10, 2023, 3:55 PM MDT Added on Jul 11, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1186 of 1851 20230710_155441 Taken on Jul 10, 2023, 3:54 PM MDT Added on Jul 11, 2023, 7:57 AM MDT Added by Chris Johnson 20230710_110334 Taken on Jul 10, 2023, 11:03 AM MDT Added on Jul 11, 2023, 7:56 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1187 of 1851 20230710_155848 Taken on Jul 10, 2023, 3:58 PM MDT Added on Jul 11, 2023, 7:57 AM MDT Added by Chris Johnson 20230710_155608 Taken on Jul 10, 2023, 3:56 PM MDT Added on Jul 11, 2023, 7:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1188 of 1851 20230710_132043 Taken on Jul 10, 2023, 1:20 PM MDT Added on Jul 11, 2023, 7:56 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1189 of 1851 Form detail #179: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 9 10 Area 60 Form stem walls IMCO, Operators and Labors 4 10 Area 20 Reinstall Irrigation Pump Totals 13 20 2. Materials Material Quantity Unit Comment Forms Location Form date Jul 7, 2023 Description Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 10, 2023, 11:00 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1190 of 1851 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 5 Area 20 Irrigation Pump Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control, Fill Irrigation tank 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1191 of 1851 Notes 8:00 am IMCO is continuing to work on the Irrigation pump at Area 20. The carpenters are forming stem walls at Area 60. 10:00 am IMCO has the pump installer onsite to fix the irrigation pump. I have been told it was a wire that got exposed during the install last summer. 12:00 pm IMCO has reset the irrigation pump and was able to turn it back on. The fittings were leaking so they are working on tightening up now. 1:30 pm IMCO is breaking down the wall scaffolding and prepping to remove the forms Monday. They are also continuing to set the stem wall forms for the Hatchery building. References Photos (3) 20230707_115758 Taken on Jul 7, 2023, 11:57 AM MDT Added on Jul 10, 2023, 10:59 AM MDT Added by Chris Johnson 20230707_103428 Taken on Jul 7, 2023, 10:34 AM MDT Added on Jul 10, 2023, 10:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1192 of 1851 20230707_094049 Taken on Jul 7, 2023, 9:40 AM MDT Added on Jul 10, 2023, 10:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1193 of 1851 Form detail #178: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 9 10 Area 30 Concrete placement Area 60 Form stem walls IMCO, Operators and Labors 4 10 Area 30 Batch concrete Totals 13 20 2. Materials Forms Location Form date Jul 6, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jul 7, 2023, 9:24 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1194 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 30 Batch Concrete IMCO Concrete Truck 1 10 Area 30 Batch Concrete IMCO Concrete Truck 1 10 Area 30 Batch Concrete JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 60 Excavate for under slab piping Dump Truck 1 Kobelco 1100G Crane 1 5 Area 20 Pull Irrigation Pump Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control, Fill Irrigation tank 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1195 of 1851 - Notes See attached HMH Concrete Field Report. 8:00 am The pump truck is onsite and setting up. IMCO is going to place concrete for the second wall pour at the Aeration tower. I was informed that the irrigation pump at Area 20 is not working. IMCO has been working with Heath, IPC, to check for issues in the control panel. IMCO is has decided to pull the pump from the intake structure. 9:00 am IMCO is starting to place WRDA concrete at Area 30. IMCO has the crane pulling the pump from the intake structure. 9:30 am I have taken a test on the first concrete truck. All passed. The slump was low so they are going to adjust at the plant. 11:00 am IMCO is continuing to place concrete. They are placing at 2 foot lifts with a stinger for consolidation. They are also using wall vibrators for the first few lifts. IMCO has a second crew working on forming the stem walls at Area 60. They have cut the rebar per DC 16A. They have installed the extra vertical bar in the 6" curb as well. 12:00 pm I noticed the diffuser boxes at Area 40 along with the drains for the cross crowder have the rebar installed. I noticed the rebar on the drains was 12" over the pipe. The detail calls for 6". I asked IMCO to double check that. They informed me that it should be 6" and they will have it fixed. 1:00 pm I have performed a second concrete test on the wall placement. Slump was high at 7". Sean is going to adjust at the plant. 2:30 pm IMCO has completed the placement. They will not work on finishing the top. 3:30 pm I noticed that IMCO carpenters blocked out the door thresholds at Area 60 only top of slab, 6". I asked IMCO if that was the intent because I was under the impression that it should be blocked out to 12" or bottom of slab, and the slab will wrap over the stem wall for a nice clean finish. After discussing with Kurt, Sean and Jake. It was determined that they need to re build the block outs to 12". 5:00 pm IMCO is done for the day. They have placed curing compound on top of the wall. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1196 of 1851 References Photos (7) 20230706_084647 Taken on Jul 6, 2023, 8:46 AM MDT Added on Jul 7, 2023, 8:15 AM MDT Added by Chris Johnson 20230706_110749 Taken on Jul 6, 2023, 11:07 AM MDT Added on Jul 7, 2023, 8:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1197 of 1851 20230706_154504 Taken on Jul 6, 2023, 3:45 PM MDT Added on Jul 7, 2023, 8:15 AM MDT Added by Chris Johnson 20230706_091238 Taken on Jul 6, 2023, 9:12 AM MDT Added on Jul 7, 2023, 8:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1198 of 1851 20230706_111749 Taken on Jul 6, 2023, 11:17 AM MDT Added on Jul 7, 2023, 8:15 AM MDT Added by Chris Johnson 20230706_085517 Taken on Jul 6, 2023, 8:55 AM MDT Added on Jul 7, 2023, 8:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1199 of 1851 20230706_110720 Taken on Jul 6, 2023, 11:07 AM MDT Added on Jul 7, 2023, 8:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1200 of 1851 Form detail #177: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Forms Location Form date Jun 29, 2023 Description Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 29, 2023, 9:04 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1201 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 day Concrete Compressive Strength report from Area 60 footing placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1202 of 1851 Form detail #176: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 7 10 Area 30 Continue installing forms, blockouts, sleeves Area 60 Form stem walls IMCO, Operators and Labors 5 10 Area 10 Lay out drain piping for cross crowder Totals 12 20 2. Materials Forms Location Form date Jun 28, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 29, 2023, 6:20 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1203 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Drains for cross crowder Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 60 Excavate for under slab piping Dump Truck 1 Kobelco 1100G Crane 1 Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1204 of 1851 - Notes 8:00 am IMCO is continuing to set the 14 drains for the cross crowder channel. They are continuing to block it up to allow 6 inches below for concrete encasement. 9:00 am IMCO has the rest of the crew back from vacation. They area working on finishing the forming for Area 30. The plan is to pour this tomorrow. Attended weekly meeting. 10:00 am Sean informed me during the meeting that they will not be ready for the wall placement tomorrow. He is pushing it to Wednesday of the holiday. Schnabel has issued a Design Clarification for Area 60. The DC changes the stem wall to support a 6" wide 6" tall curb to allow for the floor slab to be installed to the framing, for a better finished product. 12:00 pm IMCO has is continuing to work on stem wall forming. They are getting a game plan together to being cutting the rebar for the DC. The Area 30 crew is working on bracing and finishing the forming of the walls. 1:00 pm Jake has emailed me a change in the pour date for Area 30. They were unable to get a pump truck for Wednesday of next week so they will pour on Thursday of next week now. 2:00 pm Lighting has been detected within 5 miles so the crew is shutting down until the storm goes away. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1205 of 1851 References Photos (8) 20230628_125815 Taken on Jun 28, 2023, 12:58 PM MDT Added on Jun 29, 2023, 6:19 AM MDT Added by Chris Johnson 20230628_125758 Taken on Jun 28, 2023, 12:57 PM MDT Added on Jun 29, 2023, 6:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1206 of 1851 20230628_125309 Taken on Jun 28, 2023, 12:53 PM MDT Added on Jun 29, 2023, 6:19 AM MDT Added by Chris Johnson 20230628_125257 Taken on Jun 28, 2023, 12:52 PM MDT Added on Jun 29, 2023, 6:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1207 of 1851 20230628_124746 Taken on Jun 28, 2023, 12:47 PM MDT Added on Jun 29, 2023, 6:19 AM MDT Added by Chris Johnson 20230628_124742 Taken on Jun 28, 2023, 12:47 PM MDT Added on Jun 29, 2023, 6:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1208 of 1851 20230628_124737 Taken on Jun 28, 2023, 12:47 PM MDT Added on Jun 29, 2023, 6:19 AM MDT Added by Chris Johnson 20230628_124733 Taken on Jun 28, 2023, 12:47 PM MDT Added on Jun 29, 2023, 6:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1209 of 1851 Form detail #174: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Continue installing forms, blockouts, sleeves Area 60 Strip footings IMCO, Operators and Labors 5 10 Area 10 Pour pipe encasements for drains Totals 8 20 2. Materials Forms Location Form date Jun 27, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 27, 2023, 7:04 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1210 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 10 Batch Concrete IMCO Concrete Truck 1 10 Area 10 Pipe Encasement IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 60 Excavate for under slab piping Dump Truck 1 Kobelco 1100G Crane 1 8 Area 10 Place Concrete Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1211 of 1851 - Notes 10:00 am IMCO is prepping to place concrete for the pipe encasements of the drains from the diffuser box to MH 7. 11:00 am I pointed out to IMCO that the rebar was not per plan for the pipe encasements. They needed to extend the rebar to the limits of the concrete to be place. They area going to start working on adding rebar to meet the plan detail. 12:00 pm IMCO has batched concrete and is starting to place with the crane and concrete bucket. I spoke to Zack, IPC, and it was decided not to test the concrete today. 2:00 pm IMCO has placed the pipe encasements. They also encased the fish lift drain as well. They held the concrete down on all placements to allow forming for the structures themselves. These elevations were determined my IMCO. 3:00 pm IMCO is continuing to work on Area 30 in preparation for a concrete placement Wednesday. I noticed an embed not installed. I asked Jake Kreglo about it. He informed me an embed was missed on the first placement. They are still working on a plan to submit as a fix for the missed embed. 5:00 pm IMCO has been working on stripping Area 60 forms from last weeks footing placement. They have also picked the mini excavator and placed it inside the footings to begin excavating for the under slab piping. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1212 of 1851 References Photos (6) 20230626_152256 Taken on Jun 26, 2023, 3:22 PM MDT Added on Jun 27, 2023, 7:04 AM MDT Added by Chris Johnson 20230626_152249 Taken on Jun 26, 2023, 3:22 PM MDT Added on Jun 27, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1213 of 1851 20230626_152344 Taken on Jun 26, 2023, 3:22 PM MDT Added on Jun 27, 2023, 7:04 AM MDT Added by Chris Johnson 20230626_131921 Taken on Jun 26, 2023, 1:19 PM MDT Added on Jun 27, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1214 of 1851 20230626_115438 Taken on Jun 26, 2023, 11:54 AM MDT Added on Jun 27, 2023, 7:04 AM MDT Added by Chris Johnson 20230626_105146 Taken on Jun 26, 2023, 10:51 AM MDT Added on Jun 27, 2023, 7:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1215 of 1851 Form detail #175: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Continue installing forms, blockouts, sleeves Area 60 begin forming stem walls IMCO, Operators and Labors 5 10 Area 10 Lay out drain piping for cross crowder Totals 10 20 2. Materials Forms Location Form date Jun 27, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 28, 2023, 7:20 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1216 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Drains for cross crowder Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 60 Excavate for under slab piping Dump Truck 1 Kobelco 1100G Crane 1 Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 10 Dust Control 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1217 of 1851 - Notes 8:30 am IMCO is laying out the drain piping for the cross crowder channel. I noticed them backfilling some exposed rebar from the pipe encasements yesterday. I informed them the rebar needs to be fully encased in concrete and not in contact with the ground. They are going to begin removing the material they placed to expose the rebar. 10:30 am IMCO is laying out the stem wall at Area 60. Sean and I reviewed the drawings and I pointed out to him that the breezeway framing walls are on the center of the stem walls. He is going to inform his crew of that. They have snapped lines on the concrete and starting to pin down forms. 12:00 pm IMCO has anchored down a 2x4 and they are ripping form boards to add to a full sheet of form board to make up the wall height of 4'2" for the stem wall. The pipe crew is working on grading for the 14 cross crowder drains. 1:30 pm I have reviewed the raceway wall penetrations with Vale and Jake. It seems that some of the vertical rebar needs to be cut out of the way. Unfortunately the elevation of the conduits is right on top of the footing. This does not allow room for trim bar to be installed because the footing is already poured. Jake is going to RFI this issue to see how they can address it. 4:00 pm IMCO is continuing to set up forms for the the stem walls. The pipe crew has set the grade for the drains including the pipe encasement. They area setting the drain pipe to elevation now and blocking up with concrete Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1218 of 1851 References Photos (5) 20230627_164401 Taken on Jun 27, 2023, 4:44 PM MDT Added on Jun 28, 2023, 7:19 AM MDT Added by Chris Johnson 20230627_164314 Taken on Jun 27, 2023, 4:43 PM MDT Added on Jun 28, 2023, 7:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1219 of 1851 20230627_164303 Taken on Jun 27, 2023, 4:43 PM MDT Added on Jun 28, 2023, 7:19 AM MDT Added by Chris Johnson 20230627_130527 Taken on Jun 27, 2023, 1:05 PM MDT Added on Jun 28, 2023, 7:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1220 of 1851 20230627_130521 Taken on Jun 27, 2023, 1:05 PM MDT Added on Jun 28, 2023, 7:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1221 of 1851 Form detail #173: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Operators and Labors 3 10 Area 10 Backfill pipe encasements, Import General fill Totals 3 10 2. Materials Material Quantity Unit Comment Forms Location Form date Jun 23, 2023 Description Area 10 Due date Submitted by Chris Johnson Status Closed Last update Jun 23, 2023, 10:52 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1222 of 1851 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Backfill Deere 644J Loader 1 10 Area 10 Load General fill IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 Hitachi 85 Excavator 1 10 Area 10 Hoepack Compaction Dump Truck 1 10 Area 10 Import general fill Kobelco 1100G Crane 1 Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 3 Area 10, Compaction moisture, Dust Control 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1223 of 1851 Notes 8:00 am IMCO is going to work on backfilling the pipe encasements, They have a small crew onsite today. 9:30 am IMCO is also moving sprinklers around for the curing of the footings from yesterdays placement. I talked to Berny regarding the dust control as they are hauling material onsite from the stockpile across the river. 10:00 am Berny asked me about backfilling near the drains for the diffuser boxes. I advised him that entire pipe should be encased in concrete and he will need the limits of the diffuser box to determine the height of the pipe encasement. He said he would wait for Kirt to be here on Monday to provide the limits and elevations. 11:00 am Left site to return concrete cylinders from yesterdays placement. References Photos (2) 20230623_104457 Taken on Jun 23, 2023, 10:44 AM MDT Added on Jun 23, 2023, 10:51 AM MDT Added by Chris Johnson 20230623_104446 Taken on Jun 23, 2023, 10:44 AM MDT Added on Jun 23, 2023, 10:51 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1224 of 1851 Form detail #172: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 60 Pour concrete footings IMCO, Operators and Labors 5 10 Area 10 Pour pipe encasements for drains Area 60 Pour footings Totals 8 20 2. Materials Forms Location Form date Jun 22, 2023 Description Area 10, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 22, 2023, 4:42 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1225 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 10 Area 10, 60 Batch Concrete IMCO Concrete Truck 1 10 Area 60 Footing placement IMCO Concrete Truck 1 10 Area 60 Footing Placement JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1226 of 1851 Notes See attached IMCO batch tickets and HMH Concrete Field Report. 7:30 am IMCO is working on the last preparations for the footing placement today at Area 60. They also plan to place concrete for the pipe encasements on Area 10 drains from the diffuser boxes to MH7. 10:00 am The pump truck is onsite and IMCO is batching concrete. 11:00 am IMCO has started to place concrete at Area 60 Footings. I have tested the first truck and all was in spec. I casted 9 cylinders for compressive testing. 1:30 pm IMCO has completed the footing placement and is now working for the pipe encasements of the 6 diffuser drain lines. They also are placing concrete behind the 12" manifold as a thrust block. 2:30 pm IMCO has completed the placing of concrete for the day. 4:30 pm IMCO is going to keep sprinklers running on the footings as a curing method. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1227 of 1851 References Photos (9) 20230622_134651 Taken on Jun 22, 2023, 1:46 PM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson 20230622_122444 Taken on Jun 22, 2023, 12:24 PM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1228 of 1851 20230622_103719 Taken on Jun 22, 2023, 10:37 AM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson 20230622_101523 Taken on Jun 22, 2023, 10:15 AM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1229 of 1851 20230622_100113 Taken on Jun 22, 2023, 10:01 AM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson 20230622_100049 Taken on Jun 22, 2023, 10:00 AM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1230 of 1851 20230622_100035 Taken on Jun 22, 2023, 10:00 AM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson 20230622_100009 Taken on Jun 22, 2023, 10:00 AM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1231 of 1851 20230622_100000 Taken on Jun 22, 2023, 10:00 AM MDT Added on Jun 22, 2023, 4:25 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1232 of 1851 Form detail #171: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 2 10 Area 60 Form pipe encasements IMCO, Operators and Labors 5 10 Area 10 Continue installing drain piping from diffuser floor inlet to MH 7 Totals 7 20 2. Materials Forms Location Form date Jun 21, 2023 Description Area 10, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 21, 2023, 5:03 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1233 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Drain piping Deere 644J Loader 1 10 Area 10 Backfilling IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Drain Pipe install Dump Truck 1 8 Area 10 Import pipe bedding Kobelco 1100G Crane 1 Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1234 of 1851 Notes 8:00 am IMCO is making the final pipe encasement forms for Area 60 footing pour tomorrow. 9:00 am Attended weekly meeting. 10:00 am IMCO pipe crew is finishing up the drain piping from the diffuser boxes to MH 7. 12:00 pm I received an email from Schnabel regarding some clarifications at Area 60. I went over the clarifications with Kirt and Jake. They included no curb in the office area at all, including exterior walls. They also said IMCO may lap the slap over the stem wall at door thresholds and at the walkway. These are shown in the Architectural drawings. They also addressed sawcutting the control joints in the office building. They stated IMCO can do this by sawcutting at a depth of 1 1/2 deep and filling it with a good caulk. 1:00 pm IMCO is continuing to work on pipe encasements at Area 60. The pipe crew is completing the drain piping and they plan to prepare some rebar cages for the encasement of the drain piping. Vale electric has installed the grounding loop in the footing along the rebar. Please see photos. 4:00 pm IMCO and I have checked the dimensions of Area 60 footings. Only a couple minor adjustments were needed. They are making the adjustments now. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1235 of 1851 References Photos (8) 20230621_163701 Taken on Jun 21, 2023, 4:37 PM MDT Added on Jun 21, 2023, 5:00 PM MDT Added by Chris Johnson 20230621_163731 Taken on Jun 21, 2023, 4:37 PM MDT Added on Jun 21, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1236 of 1851 20230621_163720 Taken on Jun 21, 2023, 4:37 PM MDT Added on Jun 21, 2023, 5:00 PM MDT Added by Chris Johnson 20230621_163651 Taken on Jun 21, 2023, 4:36 PM MDT Added on Jun 21, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1237 of 1851 20230621_110710 Taken on Jun 21, 2023, 11:07 AM MDT Added on Jun 21, 2023, 5:00 PM MDT Added by Chris Johnson 20230621_110701 Taken on Jun 21, 2023, 11:07 AM MDT Added on Jun 21, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1238 of 1851 20230621_110648 Taken on Jun 21, 2023, 11:06 AM MDT Added on Jun 21, 2023, 5:00 PM MDT Added by Chris Johnson 20230621_110641 Taken on Jun 21, 2023, 11:06 AM MDT Added on Jun 21, 2023, 5:00 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1239 of 1851 Form detail #170: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Prep for wall placement Area 60 Form pipe encasements IMCO, Operators and Labors 5 10 Area 10 Continue installing drain piping from diffuser floor inlet to MH 7 Totals 10 20 2. Materials Forms Location Form date Jun 20, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 21, 2023, 7:54 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1240 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Drain piping Deere 644J Loader 1 10 Area 10 Backfilling IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Drain Pipe install Dump Truck 1 8 Area 10 Import pipe bedding Kobelco 1100G Crane 1 10 Area 30 Fly in forms for the wall placement, Standby for safety rescue from inside the forms Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1241 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is going to continue prepping the walls for the next wall placement. They have embeds and pipe sleeves to finish along with some bracing. They still plan to pour these sections of the wall next Wednesday. 10:00 am IMCO pipe crew is continuing the drain piping from the diffusers boxes to the 12" manifold to MH 7. 12:00 pm IMCO is also working on the pipe encasements for Area 60. Because the pipes are encased in the footing they are having to pour them at the same time as the footing pour. They are still planning to pour Thursday of this week. 2:00 pm IMCO is continuing to work on drain piping to MH 7. 4:00 pm IMCO is continuing to get the pipe penetrations through the footings and forming around them. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1242 of 1851 References Photos (4) 20230620_090831 Taken on Jun 20, 2023, 9:08 AM MDT Added on Jun 21, 2023, 7:20 AM MDT Added by Chris Johnson 20230620_161021 Taken on Jun 20, 2023, 4:10 PM MDT Added on Jun 21, 2023, 7:20 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1243 of 1851 20230620_144007 Taken on Jun 20, 2023, 2:40 PM MDT Added on Jun 21, 2023, 7:20 AM MDT Added by Chris Johnson 20230620_143956 Taken on Jun 20, 2023, 2:39 PM MDT Added on Jun 21, 2023, 7:20 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1244 of 1851 Form detail #169: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Prep for wall placement Area 60 Lay out doors for EOI, Finish framing footing forms IMCO, Operators and Labors 7 10 Area 10 Begin installing drain piping from diffuser floor inlet to MH 7 EOI 3 10 Area 60, Tie Rebar Totals 15 30 Forms Location Form date Jun 19, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 20, 2023, 7:05 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1245 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Drain Pipe install Dump Truck 1 Kobelco 1100G Crane 1 Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 Water Truck 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1246 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 9:30 am IMCO is working on forming the footings at Area 60. EOI is onsite working on the rebar for Area 60. They are installing all the bar for the stem wall now as well. 11:00 am IMCO carpenters are working on Area 30 walls. They worked this weekend hanging forms and getting it ready for placement. Sean informed me they will not be ready to pour tomorrow and he is losing a couple a guys to vacation time so he is pushing the pour back to next Wednesday. He informed me he still plans on placing the footings at Area 60 on Thursday. 2:00 pm IMCO is continuing to work on prepping the wall forms at Area 30. The IMCO pipe crew is working on installing the 4" drain pipes from the inlet floor diffusers to MH7. They are setting the stainless pipe to grade and installing the butterfly valve. From the butterfly valve it switches to SDR pipe. 4:00 pm Jake Self and I checked some dimensions on the hatchery building. All checked per plan. EOI is continuing to install the rebar for the hatchery building as well. IMCO laid out the door locations so EOI could install the higher vertical bars and the lower vertical bars where needed per the approved rebar submittal. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1247 of 1851 References Photos (6) 20230619_155928 Taken on Jun 19, 2023, 3:59 PM MDT Added on Jun 20, 2023, 7:03 AM MDT Added by Chris Johnson 20230619_155904 Taken on Jun 19, 2023, 3:59 PM MDT Added on Jun 20, 2023, 7:03 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1248 of 1851 20230619_155853 Taken on Jun 19, 2023, 3:58 PM MDT Added on Jun 20, 2023, 7:03 AM MDT Added by Chris Johnson 20230619_155548 Taken on Jun 19, 2023, 3:55 PM MDT Added on Jun 20, 2023, 7:03 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1249 of 1851 20230619_110613 Taken on Jun 19, 2023, 11:06 AM MDT Added on Jun 20, 2023, 7:03 AM MDT Added by Chris Johnson 20230619_110601 Taken on Jun 19, 2023, 11:06 AM MDT Added on Jun 20, 2023, 7:03 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1250 of 1851 Form detail #168: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Strip wall forms Area 60 Footing Forms IMCO, Operators and Labors 7 10 Area 10 Place thrust blocking and CDF encasement of raceway piping EOI 3 10 Area 60, Tie Rebar Totals 15 30 Forms Location Form date Jun 15, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 15, 2023, 4:39 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1251 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Place CDF and Thrust Blocking Deere 644J Loader 1 10 Area 10, Batch Concrete IMCO Concrete Truck 1 10 Area 10 Batch Concrete IMCO Concrete Truck 1 10 Area 10, Batch Concrete JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 5 Area 30, Remove Wall forms Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1252 of 1851 - Notes 9:00 am IMCO is continuing to work on forming at Area 60 wall footings. EOI is onsite to tie the rebar. 10:00 am I noticed the rebar drawings show a curb in the office area. A note in the drawings call out for no curb in the office area. The rebar was cut and bent to curb height so IMCO will need to cut the rebar to make it per plan. I notified Zack of the issue. 12:00 pm IMCO is continuing to work on footings. They have also started placing concrete for thrust blocking behind the raceway piping. They are going to switch to CDF soon. 3:00 pm IMCO has been placing CDF to encase the raceway pipes. They also have started to remove the wall forms on Area 30. 4:30 pm IMCO has removed two wall forms. They are going to cure the walls with a sprinkler running. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1253 of 1851 References Photos (10) 20230615_163132 Taken on Jun 15, 2023, 4:31 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson 20230615_163129 Taken on Jun 15, 2023, 4:31 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1254 of 1851 20230615_163119 Taken on Jun 15, 2023, 4:31 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson 20230615_163106 Taken on Jun 15, 2023, 4:31 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1255 of 1851 20230615_163101 Taken on Jun 15, 2023, 4:31 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson 20230615_161152 Taken on Jun 15, 2023, 4:11 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1256 of 1851 20230615_152107 Taken on Jun 15, 2023, 3:21 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson 20230615_152100 Taken on Jun 15, 2023, 3:21 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1257 of 1851 20230615_132952 Taken on Jun 15, 2023, 1:29 PM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson 20230615_102531 Taken on Jun 15, 2023, 10:25 AM MDT Added on Jun 15, 2023, 4:38 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1258 of 1851 Form detail #167: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 prep walls for stripping forms, cure top of the wall with soaker hose Area 60 Start forming footings IMCO, Operators and Labors 7 10 Area 10 Continue forming thrust blocking for raceway piping Totals 12 20 Forms Location Form date Jun 14, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update Jun 15, 2023, 8:40 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1259 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Prep for Thrust Block pours on raceway piping Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 no operator onsite Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1260 of 1851 - Notes See attached 28 Day compressive strength report for the Area 30 North Half Slab Placement. 7:00 am I was informed that IMCO was here until around 930pm last night getting a finish on the top of the wall. 8:00 am IMCO is starting to form the hatchery building footings. They are tearing down what they can off the wall forms without removing the forms. They will wait until tomorrow to start removing forms. 10:00 am IMCO is continuing to work on forming trust blocking for the raceway piping. 12:00 pm IMCO has been curing the top of the wall with a soaker hose. 2:30 pm IMCO is continuing to work on footings at Area 60 and forming the thrust blocking for the raceway piping. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1261 of 1851 References Photos (3) 20230614_143759 Taken on Jun 14, 2023, 2:38 PM MDT Added on Jun 15, 2023, 8:39 AM MDT Added by Chris Johnson 20230614_143903 Taken on Jun 14, 2023, 2:39 PM MDT Added on Jun 15, 2023, 8:39 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1262 of 1851 20230614_124200 Taken on Jun 14, 2023, 12:42 PM MDT Added on Jun 15, 2023, 8:39 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1263 of 1851 Form detail #166: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Place WRDA concrete for 2 of 4 sections of walls IMCO, Operators and Labors 7 10 Area 10 Pour trust blocking, Prep for next thrust block pour on raceway piping Totals 12 20 2. Materials Forms Location Form date Jun 13, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Jun 14, 2023, 7:53 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1264 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Prep for Thrust Block pours on raceway piping Deere 644J Loader 1 10 Area 10 Load general fill at dump site IMCO Concrete Truck 1 10 Area 30, Wall Placement IMCO Concrete Truck 1 10 Area 30, Wall Placement JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 no operator onsite Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 4 Area 10, Compact native fill 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1265 of 1851 Notes 7:00 am IMCO is prepping for the wall placement. They are also working on forming for thrust blocking on the raceway piping. 9:00 am I have checked the top of the wall. As much as I can see everything is installed per plan and is ready for concrete. 9:30 am The pump truck is onsite and getting ready. IMCO is starting to batch concrete. 10:30 am IMCO is batching 4.5 CY trucks for now. The first truck came out extremely dry. Luke, Connect Engineering, is onsite and helping IMCO through the issue. 11:00 am IMCO found an error in the spreadsheet and is adding the water in that is needed. They have decided to put this concrete in the trust blocking instead of the walls to ensure good concrete is going into the walls. 12:00 pm I have tested IMCOs first truck for the walls, second truck on the day. All tested in spec. After testing and cleaning up I climbed the wall to witness the lift determination and consolidating effort. They are dropping a tape measure down the forms to ensure they are getting a 2' lift. Then they are stinging the concrete behind the concrete pump. They have a piece of tape on the stinger and the operator is wearing a headlamp to see when the tape is at the proper level in the concrete. After the lift is brought up they are also turning the wall vibrators on for approx. 10 seconds. 2:00 pm IMCO is continuing to place concrete in the walls at 2' lifts. The IMCO pipe crew is working on the 4" drain pipe from the fish lift to the drainage to MH 7. Jake Self, IMCO Foreman, and I walked around the forms using the laser to check plumbness of the walls. He is making adjustments with the ties to get the wall plumb. 3:00 pm IMCO is continuing to place concrete. I have tested a second truck at approx. 45 CY. The concrete was in spec and they are continuing to place. 5:00 pm IMCO is finishing the placement. They are using the left over concrete for thrust blocking at the raceway piping. 6:00 pm IMCO is done for the day. The concrete crew is going to put a broom finish on top of the wall. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1266 of 1851 References Photos (15) 20230613_170555 Taken on Jun 13, 2023, 5:05 PM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson 20230613_104958 Taken on Jun 13, 2023, 10:49 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1267 of 1851 20230613_095913 Taken on Jun 13, 2023, 9:59 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson 20230613_091707 Taken on Jun 13, 2023, 9:17 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1268 of 1851 20230613_091645 Taken on Jun 13, 2023, 9:16 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson 20230613_091638 Taken on Jun 13, 2023, 9:16 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1269 of 1851 20230613_091307 Taken on Jun 13, 2023, 9:13 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson 20230613_091255 Taken on Jun 13, 2023, 9:12 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1270 of 1851 20230613_091251 Taken on Jun 13, 2023, 9:12 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson 20230613_091245 Taken on Jun 13, 2023, 9:12 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1271 of 1851 20230613_091240 Taken on Jun 13, 2023, 9:12 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson 20230613_170559 Taken on Jun 13, 2023, 5:06 PM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1272 of 1851 20230613_120431 Taken on Jun 13, 2023, 12:04 PM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson 20230613_091650 Taken on Jun 13, 2023, 9:16 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1273 of 1851 20230613_091236 Taken on Jun 13, 2023, 9:12 AM MDT Added on Jun 14, 2023, 7:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1274 of 1851 Form detail #165: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 4 10 Area 30 Continue Forming for Wall Placement, Install Embeds, prep sleeves for handrail IMCO, Operators and Labors 7 10 Area 10 Prep for next thrust block pour on raceway piping Totals 11 20 2. Materials Forms Location Form date Jun 12, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Jun 13, 2023, 6:40 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1275 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Prep for Thrust Block pours on raceway piping Deere 644J Loader 1 10 Area 10 Load general fill at dump site IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 10 Area 10, Haul General fill to the site Kobelco 1100G Crane 1 10 Area 30, Hang wall forms Deere 470 Excavator 1 Bomag Roller 1 10 Area 10, Compact native material Dynapac Roller 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1276 of 1851 Notes 10:00 am Arrived on site. The crew is continuing to finish up the wall forms for Area 30. They all all the wall forms closed up and are working on the final preparations of bracing and ensuring forms are tight. I was informed the crew worked all weekend. They set the embeds on the closing forms and flew them into place. The crew is currently working on setting the pipe sleeves. 11:00 am IMCO operators have finished the install of the 12" drain line from MH 7 to MH 2. ACORE was onsite Thursday core drilling the hole in the correct location. 2:00 pm Attended weekly pre pour meeting. 4:00 pm IMCO is continuing to work on the wall forms on Area 30. They are also working on forming for more trust blocking on the raceway piping. They are continuing to fill the lines with water to check for leaks at the couplers. References Photos (8) 20230612_132503 Taken on Jun 12, 2023, 1:25 PM MDT Added on Jun 13, 2023, 6:37 AM MDT Added by Chris Johnson 20230612_162218 Taken on Jun 12, 2023, 4:22 PM MDT Added on Jun 13, 2023, 6:37 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1277 of 1851 20230612_132508 Taken on Jun 12, 2023, 1:25 PM MDT Added on Jun 13, 2023, 6:37 AM MDT Added by Chris Johnson 20230612_132416 Taken on Jun 12, 2023, 1:24 PM MDT Added on Jun 13, 2023, 6:37 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1278 of 1851 20230612_132408 Taken on Jun 12, 2023, 1:24 PM MDT Added on Jun 13, 2023, 6:37 AM MDT Added by Chris Johnson 20230612_132332 Taken on Jun 12, 2023, 1:23 PM MDT Added on Jun 13, 2023, 6:37 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1279 of 1851 20230612_131717 Taken on Jun 12, 2023, 1:17 PM MDT Added on Jun 13, 2023, 6:37 AM MDT Added by Chris Johnson 20230612_102224 Taken on Jun 12, 2023, 10:22 AM MDT Added on Jun 13, 2023, 6:37 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1280 of 1851 Form detail #164: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Continue Forming for Wall Placement, Install Embeds, prep sleeves for handrail IMCO, Operators and Labors 9 10 Area 10 Pour CDF Encasement Totals 14 20 2. Materials Forms Location Form date Jun 8, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Jun 12, 2023, 10:18 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1281 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, CDF pipe encasement Deere 644J Loader 1 10 Area 10, CDF Batching IMCO Concrete Truck 1 10 Area 10, CDF Placement IMCO Concrete Truck 1 10 Area 10, CDF Placement JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 0 Kobelco 1100G Crane 1 10 Area 30, Hang wall forms Area 10, CDF placement Deere 470 Excavator 1 Bomag Roller 1 Dynapac Roller 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1282 of 1851 Notes 8:00 am IMCO is continuing to work on hanging wall forms and preparing for the wall placement next week. The excavation crew is prepping to begin CDF pipe encasement and thrust blocking. 9:00 am IMCO is starting to batch concrete for the thrust blocking behind two of the raceway piping 90s. 11:00 am IMCO has placed concrete for the trust blocking. They are switching to CDF batching to encase the pipes near Area 30. The first load is 4 CY. 12:30 pm IMCO is continuing to batch CDF. They are currently at 20 CY. They are going to continue placing to encase the pipes. The carpenters are working on closing up the wall forms. References Photos (7) 20230608_120936 Taken on Jun 8, 2023, 12:09 PM MDT Added on Jun 12, 2023, 10:17 AM MDT Added by Chris Johnson 20230608_113930 Taken on Jun 8, 2023, 11:39 AM MDT Added on Jun 12, 2023, 10:17 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1283 of 1851 20230608_092839 Taken on Jun 8, 2023, 9:28 AM MDT Added on Jun 12, 2023, 10:17 AM MDT Added by Chris Johnson 20230608_125026 Taken on Jun 8, 2023, 12:50 PM MDT Added on Jun 12, 2023, 10:17 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1284 of 1851 20230608_121618 Taken on Jun 8, 2023, 12:16 PM MDT Added on Jun 12, 2023, 10:17 AM MDT Added by Chris Johnson 20230608_110926 Taken on Jun 8, 2023, 11:09 AM MDT Added on Jun 12, 2023, 10:17 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1285 of 1851 20230608_094737 Taken on Jun 8, 2023, 9:47 AM MDT Added on Jun 12, 2023, 10:17 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1286 of 1851 Form detail #163: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Continue Forming for Wall Placement, Install Embeds, prep sleeves for handrail IMCO, Operators and Labors 9 10 Area 10 Install 4" drain pipe from Area 50 to MH7, Backfill pipe and manhole, work on forming for CDF encasement Totals 14 20 Forms Location Form date Jun 7, 2023 Description Area 10, Area 30, Area 50 Due date Submitted by Chris Johnson Status Closed Last update Jun 8, 2023, 7:47 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1287 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, CDF pipe encasement prep Deere 644J Loader 1 0 IMCO Concrete Truck 1 5 Area 10, CDF pipe encasement attempt IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10, Compact material with hoe pack Dump Truck 1 0 Kobelco 1100G Crane 1 10 Area 30, Hang wall forms Deere 470 Excavator 1 10 Area 10, 4" drain pipe bedding Bomag Roller 1 Dynapac Roller 1 Area 10, compact around manhole 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1288 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached Concrete Strength report for the Area 30 South Half Slab 28 day. 8:00 am IMCO is working on the wall forms at Area 30. 9:00 am Attended weekly meeting 10:00 am Jake and I checked the embeds that are on the inside face of the walls. They all look to be per plan or submittal. IMCO is continuing to work on the wall forms and bulkheads for the placement. Pipe crew is working on finalizing the thrust block and pipe encasement for the raceway pipe. 1:00 pm IMCO is prepping to begin batching CDF. 4:00 pm IMCO batched two loads of CDF. Neither of the loads were flowable. The CDF was very thick. They worked on adding more water but it did not help much. Jake is going to talk to the mix designer and they will try again tomorrow. 5:00 pm IMCO was able to start closing up forms on Area 30 and they will continue to work on that tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1289 of 1851 References Photos (4) 20230607_165634 Taken on Jun 7, 2023, 4:56 PM MDT Added on Jun 8, 2023, 6:57 AM MDT Added by Chris Johnson 20230607_165523 Taken on Jun 7, 2023, 4:55 PM MDT Added on Jun 8, 2023, 6:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1290 of 1851 20230607_165547 Taken on Jun 7, 2023, 4:55 PM MDT Added on Jun 8, 2023, 6:57 AM MDT Added by Chris Johnson 20230607_131314 Taken on Jun 7, 2023, 1:13 PM MDT Added on Jun 8, 2023, 6:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1291 of 1851 Form detail #162: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Continue Forming for Wall Placement, Install Embeds, prep sleeves for handrail IMCO, Operators and Labors 9 10 Area 10 Install 4" drain pipe from Area 50 to MH7, Backfill pipe and manhole, work on forming for CDF encasement Vale Electric, Electricians 3 10 Area 30, Install raceways and boxes for lights and switches in the Forms Location Form date Jun 6, 2023 Description Area 10, Area 30, Area 40 Due date Submitted by Chris Johnson Status Closed Last update Jun 7, 2023, 7:03 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1292 of 1851 Crew # Workers # Total hours Work performed walls, Install low water alarm for the holding ponds Totals 17 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 40, CDF pipe encasement prep Deere 644J Loader 1 10 Area 10 Backfill manhole IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10, Compact material with hoe pack Dump Truck 1 10 Area 10. Import structural fill / pipe bedding Kobelco 1100G Crane 1 no operator onsite Deere 470 Excavator 1 10 Area 10, 4" drain pipe bedding Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1293 of 1851 Equipment Quantity Hours used Comment Bomag Roller 1 Dynapac Roller 1 Area 10, compact around manhole 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Density Test Report for the 4" drain pipe bedding. 8:00 am IMCO is continuing to work on Area 30 forming and embeds. 9:00 am IMCO informed me they would be ready for a compaction test on the 4" drain pipe bedding soon. The crew has been working on backfilling and compacting the bedding. 11:00 am I have taken a density shot on the pipe bedding for the 4" drain near MH 7. It passed with no issues. The crew is going to continuing backfilling the manhole and the pipe. 12:00 pm IMCO carpenters are continuing to install the bulk heads at the CJs in Area 30. 3:00 pm I have climbed the wall and checked the embeds on the East wall. They all look to be per plan and per the approved submittals. 4:00 pm IMCO operators and labors are working in a thrust block CDF form to encase one of the raceway pipes. The HDPE pipe continues to move throughout the day with the heat expansion of the pipe. They are looking to lock it in with a CDF placement. 5:00 pm IMCO continued to work on bulkheads and wall forms for Area 30. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1294 of 1851 References Photos (4) 20230606_164123 Taken on Jun 6, 2023, 4:41 PM MDT Added on Jun 7, 2023, 6:56 AM MDT Added by Chris Johnson 20230606_164032 Taken on Jun 6, 2023, 4:40 PM MDT Added on Jun 7, 2023, 6:56 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1295 of 1851 20230606_163843 Taken on Jun 6, 2023, 4:38 PM MDT Added on Jun 7, 2023, 6:56 AM MDT Added by Chris Johnson 20230606_130258 Taken on Jun 6, 2023, 1:02 PM MDT Added on Jun 7, 2023, 6:56 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1296 of 1851 Form detail #161: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 4 10 Area 30 Continue Forming for Wall Placement, Install Embeds, prep sleeves for handrail IMCO, Operators and Labors 9 10 Area 10 Install 4" drain pipe from Area 50 to MH7, Move and compact native material onsite Vale Electric, Electricians 3 10 Area 30, Install raceways and boxes for lights and switches in the walls Forms Location Form date Jun 5, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Jun 6, 2023, 7:23 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1297 of 1851 Crew # Workers # Total hours Work performed Totals 16 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Move native material Deere 644J Loader 1 10 Area 10 Place native material IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10, Install 4" drain pipe Dump Truck 1 Kobelco 1100G Crane 1 no operator onsite Deere 470 Excavator 1 10 Area 10, 4" drain pipe bedding Bomag Roller 1 Dynapac Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1298 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am Arrived on site. IMCO set MH7 on Friday 6/2. They have installed the 12" pipe from MH 2 into MH 7. They mudded the opening around the pipe this morning. They are currently working on installing the 4" drain pipe from MH7 to Area 50 under the lift system. 11:00 am IMCO carpenters are continuing to install the bulkheads at the CJs in the walls. They are also working on laying out the embeds. Vale Electric has 3 electricians onsite working on installing raceway conduit in the walls for lights and switches. 2:00 pm IMCO is continuing to work on the 4" drain pipe. Jake informed Vale per RFI 94 and email with Zack that a light that was in conflict with the stair landing will be moved to the North side. 4:00 pm IMCO carpenters are continuing to work on installing the waterstop and the bulkheads. They are also making the sleeves for the handrail that will be set in the top of the wall. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1299 of 1851 References Photos (6) 20230605_162623 Taken on Jun 5, 2023, 4:26 PM MDT Added on Jun 6, 2023, 7:23 AM MDT Added by Chris Johnson 20230605_162608 Taken on Jun 5, 2023, 4:26 PM MDT Added on Jun 6, 2023, 7:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1300 of 1851 20230605_162557 Taken on Jun 5, 2023, 4:25 PM MDT Added on Jun 6, 2023, 7:23 AM MDT Added by Chris Johnson 20230605_161637 Taken on Jun 5, 2023, 4:16 PM MDT Added on Jun 6, 2023, 7:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1301 of 1851 20230605_112208 Taken on Jun 5, 2023, 11:22 AM MDT Added on Jun 6, 2023, 7:23 AM MDT Added by Chris Johnson 20230605_111716 Taken on Jun 5, 2023, 11:17 AM MDT Added on Jun 6, 2023, 7:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1302 of 1851 Form detail #159: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Continue Forming for Wall Placement IMCO, Operators and Labors 8 10 Area 10 Excavate and continue installing HDPE pipe from Area 30 to Area 40, begin excavating for 12" drain line from MH7 to MH 2 Totals 11 20 Forms Location Form date Jun 1, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Jun 1, 2023, 4:58 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1303 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Excavate from MH2 to MH7 Deere 644J Loader 1 10 Area 10 Load Pipe Bedding from Stockpile IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 10 Area 10 Import Pipe Bedding Kobelco 1100G Crane 1 10 Area 30 Fly in Rebar and Wall Forms Deere 470 Excavator 1 10 Area 10, Set HDPE piping Bomag Roller 1 Dynapac Roller 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1304 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached Density Field Report. 8:00 am IMCO is continuing to work on the 12" drain line from MH 7 to MH 2. The water in the trench is down and hardly noticeable. They have removed the pipe and is working on regrading the subgrade and compacting it without the water in the trench. 10:30 am IMCO is continuing to fly in wall forms for Area 30. The pipe crew has placed 40 LF of pipe. They are going to make the connection to MH 2 once ACORE cores the hole at the correct elevation. They are currently holding the pipe back from the manhole. I have take two density shots on the pipe bedding. They were low. I informed the crew the water percentage was well below optimum. They sprayed the bedding down and recompacted it with a jumping jack compactor. After some effort the tests passed both above required 92%. I discussed with the crew to introduce water to the material before compaction. 1:00 pm IMCO is continuing to fly in the wall forms and place them. The pipe crew has pipe installed up to manhole 7. They are starting to excavate for it now. 4:00 pm The water has risen in the trench. They have decided to try and set the manhole tomorrow morning in hopes the water will go down. They have the hole excavated but need to work on the final grade. IMCO carpenters are working on welding the water stop together on the CJs. Vale Electric is onsite. He has been installing the boxes in the walls of Area 30. They informed me of a conflict with the location of one of the lights. Jake was going to respond to the RFI 94 that provided direction on where to place the lights. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1305 of 1851 References Photos (5) 20230601_160650 Taken on Jun 1, 2023, 4:06 PM MDT Added on Jun 1, 2023, 4:26 PM MDT Added by Chris Johnson 20230601_112044 Taken on Jun 1, 2023, 11:20 AM MDT Added on Jun 1, 2023, 4:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1306 of 1851 20230601_095221 Taken on Jun 1, 2023, 9:52 AM MDT Added on Jun 1, 2023, 4:26 PM MDT Added by Chris Johnson 20230601_160824 Taken on Jun 1, 2023, 4:08 PM MDT Added on Jun 1, 2023, 4:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1307 of 1851 20230601_143036 Taken on Jun 1, 2023, 2:30 PM MDT Added on Jun 1, 2023, 4:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1308 of 1851 Form detail #158: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Continue Forming for Wall Placement IMCO, Operators and Labors 8 10 Area 10 Excavate and continue installing HDPE pipe from Area 30 to Area 40, begin excavating for 12" drain line from MH7 to MH 2 EOI 3 10 Area 30, Install Rebar Totals 14 30 Forms Location Form date May 31, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Jun 1, 2023, 8:25 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1309 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Excavate from MH2 to MH7 Deere 644J Loader 1 10 Area 10 Load Pipe Bedding from Stockpile IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 10 Area 10 Import Pipe Bedding Kobelco 1100G Crane 1 10 Area 30 Fly in Rebar and Wall Forms Deere 470 Excavator 1 10 Area 10, Set HDPE piping Bomag Roller 1 Dynapac Roller 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1310 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is continuing to prep Area 30 for the wall placement. They are shooting to pour next Wednesday. EOI is onsite and they are going to fly in the rebar mats that they tied yesterday. IMCO has a crane operator onsite today to fly in the mats and wall forms. I noticed the pipe crew is starting to prep the grade to install pipe. They are working on the pipe run from MH 2 to MH7. There is about 1.5' of water in the trench. I witness the crew place structural fill / pipe bedding for subbase grade. It looked to me to be very soft. 9:00 am Attended weekly meeting. Discussed laying pipe in the water with high clay materials. Concluded Zack, Jake and I would walk the site after the meeting. 11:00 am Zack, Jake and I walked the site after the meeting and discussed the process for laying the pipe in the water. The subgrade under the pipe was very soft. I was able to push a probe through it fairly easy. Jake said he would revaluate the process for installing the pipe run. I was informed that the core in the manhole was performed at the wrong elevation. I was told the plan was to bring ACORE back onsite to core the hole and the proper elevation but they are going to continue installing pipe and make the connection later. 1:00 pm EOI has been flying in the rebar that they tied on the ground. IMCO carpenters have been working on installing embeds and getting the bulkheads for the CJs in the walls. I noticed an embed was missing. After checking with the crew they were not aware of the embed needing to be installed for the L4 bracket of the distribution box. I spoke to Sean regarding the embed. He said he would review it. 4:00 pm IMCO carpenters are continuing to work on wall forms. The L4 embeds were located and I discussed with IMCO foreman the location of the embeds. All rebar has been installed. I walked Area 30 with Kevin, EOI, to review any rebar that was missing. There were a few areas that needed adjustment, his crew got right on it and fixed them. The rebar looks to be per the recent submittal dated 3/16/23. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1311 of 1851 References Photos (9) 20230531_141350 Taken on May 31, 2023, 2:13 PM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson 20230531_135043 Taken on May 31, 2023, 1:50 PM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1312 of 1851 20230531_101301 Taken on May 31, 2023, 10:13 AM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson 20230531_141307 Taken on May 31, 2023, 2:13 PM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1313 of 1851 20230531_141241 Taken on May 31, 2023, 2:12 PM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson 20230531_135025 Taken on May 31, 2023, 1:50 PM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1314 of 1851 20230531_102437 Taken on May 31, 2023, 10:24 AM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson 20230531_101231 Taken on May 31, 2023, 10:12 AM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1315 of 1851 20230531_075425 Taken on May 31, 2023, 7:54 AM MDT Added on Jun 1, 2023, 8:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1316 of 1851 Form detail #157: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Continue Forming for Wall Placement IMCO, Operators and Labors 8 10 Area 10 Excavate and continue installing HDPE pipe from Area 30 to Area 40, begin excavating for 12" drain line from MH7 to MH 2 EOI 3 10 Area 30, Install Rebar Totals 14 30 Forms Location Form date May 30, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 31, 2023, 7:15 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1317 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Excavate from MH2 to MH7 Deere 644J Loader 1 IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 No Operator onsite Deere 470 Excavator 1 10 Area 10, Set HDPE piping Bomag Roller 1 Dynapac Roller 1 4. Signature Chris Johnson, HMH Engineering4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1318 of 1851 - Notes 10:00 am Arrived on site. IMCO is continuing to work on wall forms for Area 30. EOI is onsite tying rebar. 11:00 am I was informed there is no crane operator onsite today. He called in. EOI cannot fly in and rebar so they are going to continue tying bar on the ground and fly them in when a crane operator is onsite. IMCO wall crew is continuing to work on wall forms. They are placing waterstop and getting the nelson stud embeds screwed to the wall forms. 1:00 pm IMCO pipe crew is working on placing the 90 bends that discharge inside each of the 6 raceways. 2:00 pm IMCO has another pipe crew working on excavating for the 12" drain line from MH7 to MH2. They are not setting the pipe yet, they are just excavating for the pipe run. They are encountering ground water on this run. 4:00 pm IMCO is continuing to work on prepping for the wall pour at Area 30. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1319 of 1851 References Photos (4) 20230530_153545 Taken on May 30, 2023, 3:35 PM MDT Added on May 31, 2023, 7:13 AM MDT Added by Chris Johnson 20230530_153518 Taken on May 30, 2023, 3:35 PM MDT Added on May 31, 2023, 7:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1320 of 1851 20230530_153454 Taken on May 30, 2023, 3:34 PM MDT Added on May 31, 2023, 7:13 AM MDT Added by Chris Johnson 20230530_153433 Taken on May 30, 2023, 3:34 PM MDT Added on May 31, 2023, 7:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1321 of 1851 Form detail #156: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Forms Location Form date May 24, 2023 Description Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 24, 2023, 2:11 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1322 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See Attached Concrete Compressive 7 Day report for the North Half Slab Pour at Area 30. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1323 of 1851 Form detail #155: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Continue Forming for Wall Placement IMCO, Operators and Labors 8 10 Area 10 Excavate and continue installing HDPE pipe from Area 30 to Area 40, Area 60 Import General Fill, Place and Compact General Fill EOI 3 10 Area 30, Install Rebar Forms Location Form date May 23, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update May 24, 2023, 8:52 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1324 of 1851 Crew # Workers # Total hours Work performed Totals 14 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Grizzly native material at pit Deere 644J Loader 1 IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 60, Place General Fill Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, Set wall forms Deere 470 Excavator 1 10 Area 10, Excavate for HDPE piping Bomag Roller 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1325 of 1851 Equipment Quantity Hours used Comment Dynapac Roller 1 10 Area 10, Compact Native Fill Area 60, Compact General Fill 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO crews are working on setting wall forms. They are treating the forms with form seal then planning to fly them into place and begin setting them. 9:00 am EOI is onsite to continue installing the rebar at Area 30. IMCO grade crew is working on placing general fill at Area 60. They are placing and compacting near the existing hatchery building. 10:00 am IMCO pipe crew is working on installing the HDPE pipe from the valves to the 6 raceways. The carpenters have set the first half wall panel at Area 30. 12:00 pm IMCO is continuing to work on grading at Area 60. They are grading to the bottom of the footing for now. 1:00 pm The carpenters are continuing to build wall forms and fly them in place. EOI has set a mat of bar as well. 2:00 pm Attended weekly meeting. 4:00 pm IMCO has set to walls. They are working on building more walls to fly into place. The pipe crew has moved to working on the 36" drain pipe to MH 2. 5:00 pm IMCO is cleaning up for the day. EOI has set another matt of rebar for the walls. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1326 of 1851 References Photos (15) 20230523_110116 Taken on May 23, 2023, 11:01 AM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson 20230523_142826 Taken on May 23, 2023, 2:28 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1327 of 1851 20230523_135210 Taken on May 23, 2023, 1:52 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson 20230523_133247 Taken on May 23, 2023, 1:32 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1328 of 1851 20230523_110822 Taken on May 23, 2023, 11:08 AM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson 20230523_105006 Taken on May 23, 2023, 10:50 AM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1329 of 1851 20230523_163521 Taken on May 23, 2023, 4:35 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson 20230523_110717 Taken on May 23, 2023, 11:07 AM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1330 of 1851 20230523_151330 Taken on May 23, 2023, 3:13 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson 20230523_094524 Taken on May 23, 2023, 9:45 AM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1331 of 1851 20230523_145650 Taken on May 23, 2023, 2:56 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson 20230523_164817 Taken on May 23, 2023, 4:48 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1332 of 1851 20230523_164439 Taken on May 23, 2023, 4:44 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson 20230523_153110 Taken on May 23, 2023, 3:31 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1333 of 1851 20230523_134832 Taken on May 23, 2023, 1:48 PM MDT Added on May 24, 2023, 8:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1334 of 1851 Form detail #154: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Grout back chipped concrete, Begin forming for walls, prep wall forms IMCO, Operators and Labors 8 10 Area 10 Excavate and continue installing HDPE pipe from Area 30 to Area 40, Area 60 Import General Fill Totals 11 20 Forms Location Form date May 22, 2023 Description Area 10, Area 30, Area 60, Area 20 Due date Submitted by Chris Johnson Status Closed Last update May 23, 2023, 7:00 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1335 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Grizzly native material at pit Deere 644J Loader 1 10 Area 10, Grizzly native material at pit Area 60, Load general fill in dump truck IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10, Excavate for Raceway piping Dump Truck 1 Kobelco 1100G Crane 1 10 Area 10, Set HDPE pipes Deere 470 Excavator 1 10 Area 10, Excavate for HDPE piping Bomag Roller 1 Dynapac Roller 1 10 Area 10, Compact Native Fill Area 60, Compact General Fill Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1336 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Exterior Foundation issue at Area 60, Attached 28 Day compressive strength report from the Well pump pipe encasement. 10:00 am Arrived on site. I noticed IMCO crew was working on Area 30. They are grouting back the chipped out areas. They informed me they took pictures of the bad spots before placing the grout because I did not verify they extents of the unconsolidated concrete. I asked if they chipped on it after I left Thursday afternoon. They said yes. 11:00 am IMCO is working on placing general fill at Area 60 to building up to footing subgrade. They have two operators at the pit across the river generating and screening native material. IMCO is also working on excavating for the 6 raceway piping runs. They are using the mini excavator for now because the 470 excavator is being serviced. 12:00 pm IMCO has potholed the foundation of the existing hatchery building. This allows us to see and verify if there is a conflict with the new hatchery building foundation. The two foundations are approx. 5' different in elevation but only ~1 foot apart north south. I spoke to Kirt regarding my concerns with undermining the new foundation when they demo the old one. Another concern we discussed was the North face of the new retaining wall and foundation will not be able to be backfilled. I said its worth asking if the wall can withstand only having one side backfilled as they build the building. 1:00 pm I spoke to Jeff, IDFG, regarding the schedule to water up the ponds for chinook. He said they want to turn the pump on on June 2nd and water up the ponds. They plan to be trapping June 5. 2:00 pm IMCO is continuing to work on the wall forms for Area 30. They are having to build custom forms around the pipe penetrations. 4:00 pm The crew is continuing to work on fusing HDPE pipe for the raceways. They are excavating for the install. 5:00 pm The roofers were onsite working on Area 20. They were able to finish trimming around the hatches and the last of the roofing was installed. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1337 of 1851 References Photos (8) 20230522_155106 Taken on May 22, 2023, 3:51 PM MDT Added on May 23, 2023, 6:59 AM MDT Added by Chris Johnson 20230522_155054 Taken on May 22, 2023, 3:50 PM MDT Added on May 23, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1338 of 1851 20230522_152324 Taken on May 22, 2023, 3:23 PM MDT Added on May 23, 2023, 6:59 AM MDT Added by Chris Johnson 20230522_152319 Taken on May 22, 2023, 3:23 PM MDT Added on May 23, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1339 of 1851 20230522_152317 Taken on May 22, 2023, 3:23 PM MDT Added on May 23, 2023, 6:59 AM MDT Added by Chris Johnson 20230522_115226 Taken on May 22, 2023, 11:52 AM MDT Added on May 23, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1340 of 1851 20230522_103902 Taken on May 22, 2023, 10:39 AM MDT Added on May 23, 2023, 6:59 AM MDT Added by Chris Johnson 20230522_103853 Taken on May 22, 2023, 10:38 AM MDT Added on May 23, 2023, 6:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1341 of 1851 Form detail #153: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Strip Forms, Chip concrete IMCO, Operators and Labors 7 10 Area 10 Excavate and continue installing HDPE pipe from Area 30 to Area 40, Area 60 Import, Grade and compact general fill to bottom of footing Totals 10 20 Forms Location Form date May 18, 2023 Description Area 10, Area 30, Area 60 Due date Submitted by Chris Johnson Status Closed Last update May 19, 2023, 3:39 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1342 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10, Grizzly native material at pit Deere 644J Loader 1 10 Area 10, Grizzly native material at pit Area 60, Load general fill in dump truck IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 60, Place general fill Dump Truck 1 Kobelco 1100G Crane 1 10 Area 10, Set HDPE pipes Deere 470 Excavator 1 10 Area 10, Excavate for HDPE piping Bomag Roller 1 Dynapac Roller 1 10 Area 10, Compact Native Fill Area 60, Compact General Fill Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1343 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is stripping forms from Area 30. They placed cure on the slab last night before the left. 9:00 am IMCO is continuing to work on installing the HDPE piping to Area 50. They have started to import general fill to build the subgrade up for Area 60. 10:30 am I worked with the IMCO crew on what is expected for compaction of the subgrade fill material at Area 60. They are adding water to the material and compacting. I asked for 4 to 5 passes of the roller to achieve adequate compaction. This material is to granular to test compaction with a nuclear densometer. I do continue to witness proof rolling from the loaded dump truck backing over the material. The fill looks to be firm. 12:00 pm IMCO is continuing to import, place and compact general fill for Area 60. 2:00 pm IMCO has stripped the forms from Area 30 Slab placement. I spoke to Kirt regarding areas than need attention. We also discussed curing methods. They did place cure on the slab last night. He said he would like to put a sprinkler on the slab for the weekend. Because of all the rebar they are unable to achieve a good seal with plastic which is why he wants to have a sprinkler run all weekend keeping it wet. I asked him and Jake to submit the plan per the specifications. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1344 of 1851 References Photos (16) 20230518_122508 Taken on May 18, 2023, 12:25 PM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_122241 Taken on May 18, 2023, 12:22 PM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1345 of 1851 20230518_122049 Taken on May 18, 2023, 12:20 PM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_122040 Taken on May 18, 2023, 12:20 PM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1346 of 1851 20230518_121815 Taken on May 18, 2023, 12:18 PM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_121741 Taken on May 18, 2023, 12:17 PM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1347 of 1851 20230518_121729 Taken on May 18, 2023, 12:17 PM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_121601 Taken on May 18, 2023, 12:16 PM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1348 of 1851 20230518_100450 Taken on May 18, 2023, 10:04 AM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_092613 Taken on May 18, 2023, 9:26 AM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1349 of 1851 20230518_091257 Taken on May 18, 2023, 9:12 AM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_091139 Taken on May 18, 2023, 9:11 AM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_091124 Taken on May 18, 2023, 9:11 AM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_091057 Taken on May 18, 2023, 9:10 AM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1350 of 1851 20230518_091047 Taken on May 18, 2023, 9:10 AM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson 20230518_091029 Taken on May 18, 2023, 9:10 AM MDT Added on May 19, 2023, 3:33 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1351 of 1851 Form detail #152: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Pour North Slab, chip out unconsolidated concrete IMCO, Operators and Labors 7 10 Area 10 Excavate and continue installing HDPE pipe from Area 30 to Area 40, Help with wall forms Vale Electric, Electricians 1 10 Area 10, Temp Power Totals 11 30 Forms Location Form date May 17, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 18, 2023, 8:55 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1352 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 8 Area 30, North Slab Placement IMCO Concrete Truck 1 8 Area 30, North Slab Placement JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Excavate and install HDPE pipe to raceways Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, On standby for man retrieval from inside aeration tower, Help with HDPE fusing Deere 470 Excavator 1 10 Area 30, Batch Concrete Bomag Roller 1 Dynapac Roller 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1353 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached HMH Concrete Field Report along with 7 Day breaks from the Area 30 South Slab placement and the 28 day breaks from the 12" river intake pipe encasement. 7:30 am IMCO is making the final preparations for the concrete placement today. 9:00 am I have done a final check on the rebar. All looks to be per the submittal and ready for placement. IMCO is continuing to work on installing the HDPE pipe from Area 30 to Area 40. 11:00 am IMCO has started to batch concrete. The pump truck is onsite and ready for the placement. 12:00 pm I have tested the first truck and all was in spec. While pumping the first truck the mix seemed to be very stiff. The slump on my test was 5". The crew had to bring out a larger concrete vibrater to consolidate the concrete around the rebar. They placed this concrete around the deep pipe on the NE corner of the slab. Sean relayed this info to the batch plant and they increased the water for the next batch. 12:30 pm The second truck batched had 8 CY on it. This truck tested low on air at 3.8%. Connect Engineer is onsite testing as well. He had very similar numbers. IMCO decided to dose the truck with more air. I tested a second time and the truck was on the fringe of being in spec. After some discussion IMCO decided to pour the truck. The slump was much better on this truck and the concrete flowed well in the forms. 1:30 pm The third truck is batched. I have taken my sample and all was in spec. I casted my cylinders from this truck. 3:00 pm IMCO has poured out ~27 CY. They are finishing the concrete now. IMCO is continuing to work on installing the HDPE piping. 5:00 pm I spoke to the crew regarding placing cure on the finished slab when they are done working it. They still need to trowel it one more time then they will place the cure. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1354 of 1851 References Photos (5) 20230517_170800 Taken on May 17, 2023, 5:08 PM MDT Added on May 18, 2023, 8:15 AM MDT Added by Chris Johnson 20230517_170508 Taken on May 17, 2023, 5:05 PM MDT Added on May 18, 2023, 8:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1355 of 1851 20230517_170319 Taken on May 17, 2023, 5:03 PM MDT Added on May 18, 2023, 8:15 AM MDT Added by Chris Johnson 20230517_082155 Taken on May 17, 2023, 8:21 AM MDT Added on May 18, 2023, 8:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1356 of 1851 20230517_080513 Taken on May 17, 2023, 8:05 AM MDT Added on May 18, 2023, 8:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1357 of 1851 Form detail #151: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Form curb for North slab placement, Remove forms to fix rebar, adjust pipe, Replace Forms, final prep for slab placement, chip out unconsolidated concrete, Begin building wall forms IMCO, Operators and Labors 7 10 Area 10 Excavate and begin installing HDPE pipe from Area 30 to Area 40, Help with wall forms Vale Electric, Electricians 1 10 Area 10, Temp Power Forms Location Form date May 16, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 16, 2023, 5:02 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1358 of 1851 Crew # Workers # Total hours Work performed Totals 11 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Excavate and install HDPE pipe to raceways Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, On standby for man retrieval from inside aeration tower, Help with HDPE fusing Deere 470 Excavator 1 10 Area 10, Excavate for raceway piping, Help with HDPE fusing Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1359 of 1851 Equipment Quantity Hours used Comment Bomag Roller 1 10 Area 10, Compact trench Dynapac Roller 1 3 Area 10, Compact trench from 18" pipe removal 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO plans to continue working on forming for the next slab placement. They are also going to start working on chipping out the unconciliated concrete pockets from the first placement. 9:00 am I have reviewed the areas of concern with Sean. He is going to get the crew to start working on chipping the areas. EOI is onsite to aid in moving the rebar that is in conflict with a pipe. 10:30 am EOI has moved the rebar and IMCO has moved the pipe back up to where it needs to be. IMCO will close up the forms. IMCO is continuing to work on forming for the slab placement. I have brought to their attention they need to address the unconsolidated concrete that is on along the CJ of the slab. They want to pour the slab tomorrow. These areas need to be addressed prior to the pour. 12:00 pm IMCO has chipped out the CJ areas of concern. There has been discussion on what should be used to fill the void. After discussing with Zack and Bill it is determined that non shrink grout is the best solution for this. IMCO is going to start that work now. 1:00 pm IMCO is working on grading and installing the HDPE pipes for the raceways. 2:00 pm Attended weekly meeting. 3:00 pm IMCO has grouted back the two areas of concern on the CJ. It looks as they are ready for the pour tomorrow. They are continuing to work on building the wall forms. Idaho Survey Group was onsite laying out the Area 60. There is concern that the building is to close to the existing hatchery building. 4:00 pm IMCO is done for the day. There is lighting in the area so they shut down. I have laid out areas that still need chipping with paint. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1360 of 1851 References Photos (15) 20230516_164305 Taken on May 16, 2023, 4:42 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson 20230516_093753 Taken on May 16, 2023, 9:37 AM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1361 of 1851 20230516_164356 Taken on May 16, 2023, 4:43 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson 20230516_164342 Taken on May 16, 2023, 4:43 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1362 of 1851 20230516_164247 Taken on May 16, 2023, 4:42 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson 20230516_164243 Taken on May 16, 2023, 4:42 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson 20230516_164310 Taken on May 16, 2023, 4:42 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson 20230516_164317 Taken on May 16, 2023, 4:42 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1363 of 1851 20230516_164325 Taken on May 16, 2023, 4:42 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson 20230516_144031 Taken on May 16, 2023, 2:40 PM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1364 of 1851 20230516_114244 Taken on May 16, 2023, 11:42 AM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson 20230516_114252 Taken on May 16, 2023, 11:42 AM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1365 of 1851 20230516_114218 Taken on May 16, 2023, 11:42 AM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson 20230516_114150 Taken on May 16, 2023, 11:41 AM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1366 of 1851 20230516_093742 Taken on May 16, 2023, 9:37 AM MDT Added on May 16, 2023, 5:01 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1367 of 1851 Form detail #150: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 2 10 Area 30 Form curb for North slab placement, Remove forms to fix rebar, adjust pipe IMCO, Operators and Labors 7 10 Area 10 Remove 18" PVC pipes from under proposed hatchery building, Expose septic pump tank, begin removal Vale Electric, Electricians 1 10 Area 10, Temp Power Forms Location Form date May 15, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 16, 2023, 7:26 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1368 of 1851 Crew # Workers # Total hours Work performed Totals 10 30 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Remove 18" PVC lines, Backfill Trench, Expose sewer pump tank, begin removal Dump Truck 1 Kobelco 1100G Crane 1 10 Area 30, On standby for man retrieval from inside aeration tower Deere 470 Excavator 1 10 Area 10, Excavate for raceway piping, Help with HDPE fusing Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1369 of 1851 Equipment Quantity Hours used Comment Bomag Roller 1 10 Area 10, Compact trench 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached Compressive Break Report from Area 30 South Half Slab Placement 5 day breaks. An early break was requested from IMCO. 10:00 am Arrived on site. IMCO is working at Area 30 on forming for the next slab placement. They are currently forming the curb around pipes. 11:00 am Sean and I spoke about the pockets of unconsolidated concrete. He will be submitting a procedure today. He would like to chip out the pockets of honeycomb concrete to a limit of 1.5" inches into confident concrete. He then plans to pour this back with the next pour which will be a wall pour. 12:00 pm I spoke to Sean and Kirt regarding the areas of honeycomb that needs to be addressed prior to the next slab placement. These areas will be poured into the slab so they will need to be addressed prior to the placement. They were both aware of them. I have attached photos. 1:00 pm IMCO crews are working on removing the 2 18" PVC pipes that run under the proposed hatchery building Area 60. They have most of it removed from the weir box to the spawning shed. That is as far as they are going to go for now. They are going to start working on the septic pump tank now. 2:00 pm A crew is working on the the raceway piping. These pipes have changed per RFI 92. The valves have been moved. The crew is working on fusing the HDPE pipe for these runs. Kole laid them out with the GPS. I noticed a slight skew in the runs. I have asked him to double check this before he gets to far into the install. 3:00 pm IMCO crew has brought to my attention a rebar conflict issue. While prepping the 2 pipes, raceway 1 and cross crowder, they noticed they were to low. They tried to raise them but the rebar was in the way. The crew is having to remove forms fix the rebar issue. Sean informed me this might push the pour back to next week. 4:30 pm IMCO continued to prep for the slab placement along with fusing HDPE pipe and removing the septic pump tank. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1370 of 1851 References Photos (12) 20230515_163248 Taken on May 15, 2023, 4:32 PM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson 20230515_163223 Taken on May 15, 2023, 4:32 PM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1371 of 1851 20230515_145704 Taken on May 15, 2023, 2:57 PM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson 20230515_114505 Taken on May 15, 2023, 11:45 AM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1372 of 1851 20230515_111857 Taken on May 15, 2023, 11:18 AM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson 20230515_111829 Taken on May 15, 2023, 11:18 AM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1373 of 1851 20230515_125203 Taken on May 15, 2023, 12:52 PM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson 20230515_112142 Taken on May 15, 2023, 11:21 AM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1374 of 1851 20230515_112125 Taken on May 15, 2023, 11:21 AM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson 20230515_112123 Taken on May 15, 2023, 11:21 AM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1375 of 1851 20230515_112058 Taken on May 15, 2023, 11:20 AM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson 20230515_111808 Taken on May 15, 2023, 11:18 AM MDT Added on May 16, 2023, 6:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1376 of 1851 Form detail #149: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Strip Forms from curb IMCO, Operators and Labors 6 10 Area 10 Expose 2 18" PVC pipes at Weir box location, Grizzly native material at pit Vale Electric, Electricians 1 10 Area 10, Temp Power Totals 10 30 Forms Location Form date May 11, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 12, 2023, 8:36 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1377 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Excavate native material at pit Deere 644J Loader 1 10 Area 10 Grizzly material at pit IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Expose 18" PVC lines near weir box Dump Truck 1 Kobelco 1100G Crane 1 Deere 470 Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1378 of 1851 Notes See attached 28 day Compressive Strength Report from the River Intake Pipe Encasement Placement. 7:00 am IMCO placed Area 30 South Half Foundation Slab yesterday. They stayed late to finish the concrete. I was informed a rain storm came in as they were finishing and standing water was on the new slab. They told me the crew let the rain pass by and they came back and finished the concrete. When I arrived this morning they had plastic sheeting over top the vertical rebar. There was no plastic on the concrete itself. 8:00 am IMCO started stripping the curb forms. I noticed right away on the outside curb pockets of unconsolidated concrete. I spoke to Kirt and Jake regarding their plan to cure the concrete. They have not placed any curing compound on the concrete. I also noticed the smooth steel trowel finish on the slab. 10:00 am After reviewing the specifications I spoke to Jake regarding the curing of the concrete. I reviewed spec section 03310 with him. He was going to review it as well. I also brought to his attention that the finish in the specifications call out for a broom finish. I notified Zack of the deficiencies. 11:00 am Jake informed me they plan to place water and plastic to cure the concrete. I informed him that is not what the specifications call out and if he would like to use a different method he needs to submit to engineer for approval. The crew is still working on stripping the curb and center control joint bulkhead. 1:00 pm Kirt is continuing to expose the 18" PVC pipes to be removed. He has not removed any yet. They are continuing to excavate to the top of pipe carefully. They have exposed the sewer line along with some phone line. 2:30 pm IMCO is working on generating material at the pit across the river. They have a grizzly screen setup to screen material 8" and under. They are stockpiling the material generated. The carpenters are continuing to work on stripping the forms. More locations are visible of unconsolidated concrete. They are starting to spray water on the concrete as the temperatures continue to rise. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1379 of 1851 References Photos (22) 20230511_130924 Taken on May 11, 2023, 1:09 PM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_112016 Taken on May 11, 2023, 11:20 AM MDT Added on May 12, 2023, 8:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1380 of 1851 20230511_111425 Taken on May 11, 2023, 11:14 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_141415 Taken on May 11, 2023, 2:14 PM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1381 of 1851 20230511_132945 Taken on May 11, 2023, 1:29 PM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_131443 Taken on May 11, 2023, 1:14 PM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1382 of 1851 20230511_131134 Taken on May 11, 2023, 1:11 PM MDT Added on May 12, 2023, 8:29 AM MDT Added by Chris Johnson 20230511_130934 Taken on May 11, 2023, 1:09 PM MDT Added on May 12, 2023, 8:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1383 of 1851 20230511_130907 Taken on May 11, 2023, 1:09 PM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_113223 Taken on May 11, 2023, 11:32 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1384 of 1851 20230511_113218 Taken on May 11, 2023, 11:32 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_112132 Taken on May 11, 2023, 11:21 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1385 of 1851 20230511_111917 Taken on May 11, 2023, 11:19 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_111524 Taken on May 11, 2023, 11:15 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1386 of 1851 20230511_111447 Taken on May 11, 2023, 11:14 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_092958 Taken on May 11, 2023, 9:29 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1387 of 1851 20230511_090410 Taken on May 11, 2023, 9:04 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_085921 Taken on May 11, 2023, 8:59 AM MDT Added on May 12, 2023, 8:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1388 of 1851 20230511_085701 Taken on May 11, 2023, 8:57 AM MDT Added on May 12, 2023, 8:30 AM MDT Added by Chris Johnson 20230511_085357 Taken on May 11, 2023, 8:53 AM MDT Added on May 12, 2023, 8:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1389 of 1851 20230511_085352 Taken on May 11, 2023, 8:53 AM MDT Added on May 12, 2023, 8:29 AM MDT Added by Chris Johnson 20230511_085343 Taken on May 11, 2023, 8:53 AM MDT Added on May 12, 2023, 8:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1390 of 1851 Form detail #148: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Place South half of concrete slab and curbs IMCO, Operators and Labors 6 10 Area 10 Pothole and excavate 2 18" steel pipes from weir box, Backfill and compact trench from 18" steel pipe removal Vale Electric, Electricians 1 10 Area 10, Temp Power ACORE 1 5 Area 10 Core MH1 and MH2 Forms Location Form date May 10, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 11, 2023, 6:49 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1391 of 1851 Crew # Workers # Total hours Work performed Totals 13 35 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Prep material for import Deere 644J Loader 1 10 Area 10 place backfill, proof roll IMCO Concrete Truck 1 8 Area 30 Pour South side of slab IMCO Concrete Truck 1 8 Area 30 Pour South side of slab JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Remove 18" pipe, Backfill Dump Truck 1 Kobelco 1100G Crane 1 Deere 470 Excavator 1 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1392 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached HMH Concrete Field Report and IMCO batch tickets from todays placement. 7:00 am Attended IMCO morning safety brief and stretch and flex. 8:00 am Sean and I discussed the testing frequency and plan for todays placement. We agreed that he would prime the pump then I could sample for my test and they would wait on results before placing any concrete in the forms. 9:00 am The pump truck is onsite and getting setup. 10:00 am IMCO is working on batching 8 CY in the first truck. They are using the WRDA mix. 10:30 am IMCO has started to pour our the first truck. After the pump was primed and a small amount is discharged in the forms I took my sample from the truck. Testing results were out of spec on air, it was too high at 11.5%. The decided to spin the drum for ~10 mins. I took a second sample from the truck. The air was still too high at 9%. Sean, IMCO, asked if would take a third sample but he requested I take the sample from the end of the pump truck. I agreed but told him if it passes I will be taking my sample from the end of the pump from here on out. He agreed. I took my third sample from the pump truck. The concrete was in spec. My assumption is that the pump truck knocked some air out of it and the concrete sat for long enough to loose air as well. Because of this I decided to not take concrete cylinders from this truck and to test the second truck. IMCO started to pour out the truck. 12:00 pm IMCO has batched a second truck. I let them pour out approx. 1/2 yard then I took my sample from the end of the pump. The concrete was in spec on air at 6%. The slump was way under at 2". I notified Kirt and Sean. This truck I casted 12 Cylinders. 3 for 3 day, 7 Day, 28 Day and holds. 12:45 pm IMCO has batched a third truck. I decided to test this truck as well to check the air and slump. They were both in spec at 5.5" and 5.7%. 2:30 pm IMCO has batched two more trucks for a total of 5 on the day. They are estimating the pour took 22 yards total. This matches my calculations. 3:30 pm IMCO is working on finishing the concrete. Area 10 IMCO has been working on backfilling the 18" steel pipe trench. Kirt informed me they are doing this to allow room to excavate for the 2 18" PVC pipes that also need to be removed. 4:00 pm ACORE was onsite today coring MH1 and MH 2. MH1 had a grade bust that needed to be fixed. MH 2 and a bust in the precast that needed to be fixed. 4:30 pm IMCO has picked up the grizzly screen from IPC. Zack has taken photos of the screen to document the condition of it before IMCO starts using it. IMCO needs to remove some bars off the screen to allow up to 8" rock. They are continuing to work on finishing the concrete. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1393 of 1851 References Photos (7) 20230510_093157 Taken on May 10, 2023, 9:31 AM MDT Added on May 10, 2023, 4:51 PM MDT Added by Chris Johnson 20230510_141700 Taken on May 10, 2023, 2:17 PM MDT Added on May 10, 2023, 4:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1394 of 1851 20230510_093137 Taken on May 10, 2023, 9:31 AM MDT Added on May 10, 2023, 4:51 PM MDT Added by Chris Johnson 20230510_093133 Taken on May 10, 2023, 9:31 AM MDT Added on May 10, 2023, 4:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1395 of 1851 20230510_093129 Taken on May 10, 2023, 9:31 AM MDT Added on May 10, 2023, 4:51 PM MDT Added by Chris Johnson 20230510_104854 Taken on May 10, 2023, 10:48 AM MDT Added on May 10, 2023, 4:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1396 of 1851 20230510_141706 Taken on May 10, 2023, 2:17 PM MDT Added on May 10, 2023, 4:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1397 of 1851 Form detail #147: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 5 10 Area 30 Form for slab placement, Install Water stop, set pipe penetrations IMCO, Operators and Labors 6 10 Area 10 Import and place general fill, Pothole and excavate 2 18" steel pipes from weir box, Locate 18" PVC pipes and utilities Totals 11 20 Forms Location Form date May 9, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 10, 2023, 7:47 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1398 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Load General fill Deere 644J Loader 1 10 Area 10 place backfill, proof roll IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Remove 18" pipe, Pot Hole Dump Truck 1 10 Area 10 Import General Fill Kobelco 1100G Crane 1 Deere 470 Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is planning on continuing the curb forming and water stop install in preparation for the slab placement tomorrow. They also plan to start on potholing and possibly removing the 18" lines that run under the new hatchery building. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1399 of 1851 8:00 am IMCO has started to pothole the 18" lines. Kurt is running the 85 excavator. 9:00 am Kurt has discovered multiple utilities in the trench. One cable was direct bury and very shallow. He kicked it. They have notified IPC. 12:00 pm IMCO is continuing to work on forming for the curb and getting the water stop set for tomorrows placement. Kurt is continuing to excavate for the 18" steel line demo. 2:00 pm Attended weekly meeting. It was determined that only one layer of trim bar is needed in the center wall around the pipe penetrations. 4:00 pm IMCO is making final adjustments for the concrete placement tomorrow. There is 2 more carpenters onsite to help out. Kurt has exposed 2 18" PVC lines. He has notified me and Zack that he believes its extra work. I have asked him to track his time to discuss it further. 5:00 pm IMCO hauled general native fill from the pit all day. They are placing the material in the location of the north holding ponds. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1400 of 1851 References Photos (6) 20230509_172530 Taken on May 9, 2023, 5:25 PM MDT Added on May 10, 2023, 7:47 AM MDT Added by Chris Johnson 20230509_172522 Taken on May 9, 2023, 5:25 PM MDT Added on May 10, 2023, 7:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1401 of 1851 20230509_123722 Taken on May 9, 2023, 12:37 PM MDT Added on May 10, 2023, 7:47 AM MDT Added by Chris Johnson 20230509_081337 Taken on May 9, 2023, 8:13 AM MDT Added on May 10, 2023, 7:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1402 of 1851 20230509_172622 Taken on May 9, 2023, 5:26 PM MDT Added on May 10, 2023, 7:47 AM MDT Added by Chris Johnson 20230509_172611 Taken on May 9, 2023, 5:26 PM MDT Added on May 10, 2023, 7:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1403 of 1851 Form detail #146: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Form for slab placement, Install Water stop, set pipe penetrations IMCO, Operators and Labors 6 10 Area 10 Import and place general fill Vale Electric, Electricians 1 10 Area 10, Work on Temp Power Totals 10 30 Forms Location Form date May 8, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 9, 2023, 7:50 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1404 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Load General fill Deere 644J Loader 1 10 Area 10 place backfill, proof roll IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 Remove 18" pipe, Pot Hole Dump Truck 1 10 Area 10 Import General Fill Kobelco 1100G Crane 1 Deere 470 Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 Concrete Compressive Strength Report from the 6" drain Placement. 11:00 am IMCO is working on installing water stop in the curb along with installing the pre fabricated pipe pieces Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1405 of 1851 through the wall penetrations. They have removed the cured concrete from the concrete wash out and replaced the plastic. 12:00 pm Jake, Kurt, Zack and I spoke to Jeff about switching to the Pine Creek Well feed to prevent any issues with disturbing the power while removing the 18" pipes that run parallel to the Oxbow Power Feed. 1:00 pm Jeff has decided to turn both wells on to prevent any issues with hitting lines and running out of water. 4:00 pm IMCO is starting to excavate for the 18" pipes. He is starting at the weir box. He located the two pipes and is now working on exposing them so they can be removed. 5:00 pm Kirt is done for the day. He has exposed the 18" pipes for approx. 30'. He has found 3 separate unmarked utilities but has not damaged any of them. He plans to continue tomorrow. References Photos (8) 20230508_164857 Taken on May 8, 2023, 4:48 PM MDT Added on May 9, 2023, 7:48 AM MDT Added by Chris Johnson 20230508_163858 Taken on May 8, 2023, 4:38 PM MDT Added on May 9, 2023, 7:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1406 of 1851 20230508_163918 Taken on May 8, 2023, 4:38 PM MDT Added on May 9, 2023, 7:48 AM MDT Added by Chris Johnson 20230508_163850 Taken on May 8, 2023, 4:38 PM MDT Added on May 9, 2023, 7:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1407 of 1851 20230508_154411 Taken on May 8, 2023, 3:44 PM MDT Added on May 9, 2023, 7:48 AM MDT Added by Chris Johnson 20230508_154401 Taken on May 8, 2023, 3:44 PM MDT Added on May 9, 2023, 7:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1408 of 1851 20230508_140947 Taken on May 8, 2023, 2:09 PM MDT Added on May 9, 2023, 7:48 AM MDT Added by Chris Johnson 20230508_124203 Taken on May 8, 2023, 12:42 PM MDT Added on May 9, 2023, 7:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1409 of 1851 Form detail #145: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Form for slab placement IMCO, Operators and Labors 2 10 Area 10 clean up around job, help EOI EOI 3 10 Area 30 Tie Rebar for the slab placement Totals 8 30 Forms Location Form date May 5, 2023 Description Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 5, 2023, 3:03 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1410 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 Kobelco 1100G Crane 1 Deere 470 Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am EOI and a small IMCO crew are onsite. EOI is going to continue to tie the rebar for the slab placement. IMCO is here to build and set forms for the slab placement. They are currently working on getting the pipe penetrations to correct elevation so EOI can get their rebar tied around it. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1411 of 1851 12:00 pm EOI brought a conflict to my attention. The center wall is 12" thick and it does not provide enough room for all the rebar and the seepage ring of the pipe. I have checked the measurements and confirmed that there is not enough room. I notified Zack of the conflict. 2:00 pm Zack has sent an RFI regarding the rebar in the center wall. 3:00 pm EOI is continuing to install rebar. IMCO is done for the day. References Photos (3) 20230505_145342 Taken on May 5, 2023, 2:53 PM MDT Added on May 5, 2023, 3:03 PM MDT Added by Chris Johnson 20230505_145152 Taken on May 5, 2023, 2:51 PM MDT Added on May 5, 2023, 3:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1412 of 1851 20230505_145139 Taken on May 5, 2023, 2:51 PM MDT Added on May 5, 2023, 3:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1413 of 1851 Form detail #144: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 2 10 Area 30 Build rebar stands for vertical bars IMCO, Operators and Labors 6 50 Area 10 clean up site, build level pad for wall forms, prep grade for pipe install EOI 3 10 Area 30 Tie Rebar for the slab placement Totals 11 70 Forms Location Form date May 4, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 5, 2023, 7:16 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1414 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Clean up site, load concrete debris Deere 644J Loader 1 10 Area 10 Load Concrete Debris IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 grade for level pad Dump Truck 1 10 Area 10 Export concrete debris Kobelco 1100G Crane 1 Deere 470 Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 day Compressive Strength Report from the 4" Hydrant Line Concrete Placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1415 of 1851 7:30 am EOI is onsite and starting to work on the vertical bars for the walls. IMCO is working on laying out the curbs so EOI can begin laying out and installing the vertical dowels. 8:00 am IMCO operators are continuing to load and haul off the concrete demo debris. They are also working on grading and compacting the native material at the base of the holding ponds after demo. 12:00 pm EOI is continuing to install the vertical dowels. IMCO has been working on build braces so ensue the vertical dowels are sturdy and in the correct location. 3:00 pm EOI is continuing to work on the rebar. IMCO has been grading for the 36" pipe from MH 1 to MH 2. They do not have the pipe onsite so they are just prepping the grade. The pipe is due onsite tomorrow. 5:00 pm EOI will come back tomorrow to finish the dowel bars. IMCO will have a small crew onsite to help out and to start forming the curbs. References Photos (4) 20230504_154048 Taken on May 4, 2023, 3:40 PM MDT Added on May 5, 2023, 7:16 AM MDT Added by Chris Johnson 20230504_153957 Taken on May 4, 2023, 3:39 PM MDT Added on May 5, 2023, 7:16 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1416 of 1851 20230504_101336 Taken on May 4, 2023, 10:13 AM MDT Added on May 5, 2023, 7:16 AM MDT Added by Chris Johnson 20230504_101355 Taken on May 4, 2023, 10:13 AM MDT Added on May 5, 2023, 7:16 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1417 of 1851 Form detail #143: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Build and set forms for Slab Placement IMCO, Operators and Labors 6 50 Area 10 Set MH 2 EOI 3 10 Area 30 Tie Rebar for the slab placement Totals 12 70 Forms Location Form date May 3, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 3, 2023, 5:04 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1418 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Excavate for MH 2 Deere 644J Loader 1 10 Area 10 Load Concrete Debris IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 3 Area 10 Excavate for MH 2 Dump Truck 1 10 Area 10 Export concrete debris Kobelco 1100G Crane 1 10 Area 10 Set MH 2 Deere 470 Excavator 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am MH 2 is onsite. IMCO plans to set MH 2 today. The grade is under water and they will have to set the MH with approx. 2' of water. The water is river influenced and IPC does not intended to lower the reservoir for over a month. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1419 of 1851 8:00 am EOI is continuing to work on installing the rebar for Area 30 slab placement. IMCO is continuing to work on excavating for MH 2. 10:00 am I have double checked the numbers with Kole for MH 2. They are working on setting the base now. They are using the crane to set it. 12:00 pm IMCO has set the base for MH2. They are going to take lunch then continue stacking the manhole after. 1:30 pm EOI is working on the top mat of rebar now. 2:00 pm IMCO has set the second section of MH 2. I asked the crew to check the elevations of the holes. The 36" outfall pipe is per plan. The 24" inlet and the 36" inlet are both approximately 0.80' low. I double checked the submittal with IMCO. It does not show this change. 3:30 pm Kole checked the invert of the holes and confirmed with his GPS that the two holes are low and the outfall is per plan. EOI is continuing to work on installing the top mat of rebar. 5:00 pm EOI has completed the rebar install. Tomorrow they will work on the vertical bar for the curbs and walls. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1420 of 1851 References Photos (6) 20230503_165436 Taken on May 3, 2023, 4:54 PM MDT Added on May 3, 2023, 5:03 PM MDT Added by Chris Johnson 20230503_115657 Taken on May 3, 2023, 11:56 AM MDT Added on May 3, 2023, 5:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1421 of 1851 20230503_115641 Taken on May 3, 2023, 11:56 AM MDT Added on May 3, 2023, 5:03 PM MDT Added by Chris Johnson 20230503_165524 Taken on May 3, 2023, 4:55 PM MDT Added on May 3, 2023, 5:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1422 of 1851 20230503_165454 Taken on May 3, 2023, 4:54 PM MDT Added on May 3, 2023, 5:03 PM MDT Added by Chris Johnson 20230503_134222 Taken on May 3, 2023, 1:42 PM MDT Added on May 3, 2023, 5:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1423 of 1851 Form detail #142: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Build and set forms for Slab Placement IMCO, Operators and Labors 6 50 Area 10 Demo North holding ponds, Backfill and compact Vale Electric, Electricians 1 10 Area 10 Temp Power EOI 2 10 Area 30 Tie Rebar for the slab placement Forms Location Form date May 2, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 3, 2023, 6:58 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1424 of 1851 Crew # Workers # Total hours Work performed Totals 12 80 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Demo Deere 644J Loader 1 10 Area 10 Load Concrete Debris IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 3 Area 30, Compact general fill Dump Truck 1 10 Area 10 Export concrete debris Kobelco 1100G Crane 1 Deere 470 Excavator 1 10 Area 10 Demo 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1425 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 day Concrete Compressive Strength Report for the 24" Discharge Pipe Encasement Placement. 7:00 am Attended IMCO morning safety brief. 8:00 am IMCO is going to continue to work on demoing the north holding ponds. EOI is onsite to begin installing rebar for Area 30. 12:00 pm IMCO has encountered water in the bottom of the holding ponds. They are continuing to demo and remove all concrete. EOI has found that some of the bars do not fit around the pipe with the seepage ring. Jake has sent an RFI regarding this. 1:00 pm Schnabel has given direction to cut the bars in conflict with the pipe. EOI is continuing to work on installing the rebar. 4:00 pm EOI is continuing to work on installing the bottom mat of rebar for the slab placement. IMCO is helping by cutting the rebar per Schnabel direction. 5:00 pm The crews are cleaning up for the day. They will continue working on rebar and curb forming tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1426 of 1851 References Photos (4) 20230502_124622 Taken on May 2, 2023, 12:46 PM MDT Added on May 3, 2023, 6:56 AM MDT Added by Chris Johnson 20230502_124556 Taken on May 2, 2023, 12:45 PM MDT Added on May 3, 2023, 6:57 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1427 of 1851 20230502_162354 Taken on May 2, 2023, 4:23 PM MDT Added on May 3, 2023, 6:56 AM MDT Added by Chris Johnson 20230502_162347 Taken on May 2, 2023, 4:23 PM MDT Added on May 3, 2023, 6:56 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1428 of 1851 Form detail #141: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Build and set forms for Slab Placement IMCO, Operators and Labors 5 50 Area 10 Demo North holding ponds Area 30 Backfill and compact fill around pipe encasements, Bolt on couplers and valves Vale Electric, Electricians 1 10 Area 10, Temp power to the crowders to demo could continue Forms Location Form date May 1, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 2, 2023, 7:20 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1429 of 1851 Crew # Workers # Total hours Work performed Totals 9 70 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Demo Deere 644J Loader 1 10 Area 10 Load General fill at stockpile IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 3 Area 30, Compact general fill Dump Truck 1 10 Area 10 Export concrete debris Kobelco 1100G Crane 1 Deere 470 Excavator 1 0 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1430 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes See attached 28 day Concrete Compressive Strength Report for the Raceway Pipe Encasement Placement and 7 day Well Pump Pipe Encasement. 10:00 am IMCO is working on demoing the north holding ponds. They are using a hammer attachment on the excavator to break up the concrete and the loader is loading the concrete debris in the dump truck and hauling it offsite. Vale is onsite to disconnect the power to the crowders which run through the center wall. They are also setting slab forms for Area 30. 12:00 pm IMCO is working on bolting up the butterfly valves and couplers for the raceway pipes leaving area 30. While checking the pipes it was determined that the butterfly valves will not fit in the current configuration. The valves are V 10.20 through V 10.25. I have sent Zack and Bryant an email regarding these valves. 2:00 pm Bryant is looking at solutions for the valves, IMCO has sent an RFI regarding the conflict. IMCO is continuing to work on demoing the north holding ponds. Vale has removed the power and they are working on the center wall as well now. 4:30 pm IMCO is setting the pipe to the cross crowder channel through the slab forms. This pipe encasement will be part of the slab pour. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1431 of 1851 References Photos (6) 20230501_152415 Taken on May 1, 2023, 3:24 PM MDT Added on May 1, 2023, 4:20 PM MDT Added by Chris Johnson 20230501_103750 Taken on May 1, 2023, 10:37 AM MDT Added on May 1, 2023, 4:20 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1432 of 1851 20230501_160948 Taken on May 1, 2023, 4:09 PM MDT Added on May 1, 2023, 4:20 PM MDT Added by Chris Johnson 20230501_160926 Taken on May 1, 2023, 4:09 PM MDT Added on May 1, 2023, 4:20 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1433 of 1851 20230501_152437 Taken on May 1, 2023, 3:24 PM MDT Added on May 1, 2023, 4:20 PM MDT Added by Chris Johnson 20230501_134354 Taken on May 1, 2023, 1:43 PM MDT Added on May 1, 2023, 4:20 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1434 of 1851 Form detail #140: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Pre fabricate water stop, weld water stop IMCO, Operators and Labors 5 50 Area 10 Demo North holding ponds Area 30 Backfill and compact fill around pipe encasements Steel Building Systems 4 10 Area 20 Install flashing around hatches Forms Location Form date Apr 27, 2023 Description Area 10, Area 20, Area 30 Due date Submitted by Chris Johnson Status Closed Last update May 1, 2023, 10:14 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1435 of 1851 Crew # Workers # Total hours Work performed Totals 12 70 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Demo Deere 644J Loader 1 10 Area 10 Load General fill at stockpile IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 3 Area 30, Compact general fill Dump Truck 1 10 Area 10 Import general fill from stockpile Kobelco 1100G Crane 1 Deere 470 Excavator 1 10 Area 10 Backfill Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1436 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on backfilling around Area 30. They are prepping to begin forming for the slab placement. Heath, IPC, is onsite to start the irrigation pump. 10:00 am The irrigation pump was tripping a reset. Heath checked the amps and determined the set point was set to low for the new pump. IMCO had some leaks on the irrigation pump line so they are going to get those tightened up before Heath turns the irrigation pump back on for the season. 12:00 pm IMCO is continuing to work on demoing the north hold ponds, mainly near the weir box. The roofers are finishing up for the day. They have one flashing that needs to be added but they did not have it with them. They also need to finish a few small pieces in the vented soffit. They plan to finish this next week. 1:00 pm Kirt informed me that he may have a couple guys work tomorrow demoing the north holding ponds. Left site. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1437 of 1851 References Photos (6) 20230427_110419 Taken on Apr 27, 2023, 11:04 AM MDT Added on May 1, 2023, 10:13 AM MDT Added by Chris Johnson 20230427_082716 Taken on Apr 27, 2023, 8:27 AM MDT Added on May 1, 2023, 10:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1438 of 1851 20230427_082647 Taken on Apr 27, 2023, 8:26 AM MDT Added on May 1, 2023, 10:13 AM MDT Added by Chris Johnson 20230427_110408 Taken on Apr 27, 2023, 11:04 AM MDT Added on May 1, 2023, 10:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1439 of 1851 20230427_111309 Taken on Apr 27, 2023, 11:13 AM MDT Added on May 1, 2023, 10:13 AM MDT Added by Chris Johnson 20230427_082532 Taken on Apr 27, 2023, 8:25 AM MDT Added on May 1, 2023, 10:13 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1440 of 1851 Form detail #139: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 form pipe encasement for 6" formalin carrier pipe, Pour encasement IMCO, Operators and Labors 5 50 Area 10 Install Fused pipe from MH 1 to drain at area 30, Backfill fused pipe Area 30 Backfill and compact fill around pipe encasements Steel Building Systems 4 10 Area 20, Install soffit on Intake Structure Forms Location Form date Apr 26, 2023 Description Area 10, Area 20, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 27, 2023, 7:08 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1441 of 1851 Crew # Workers # Total hours Work performed Vale Electric, Electricians 2 Onsite for temp power plan Totals 14 70 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Backfill Deere 644J Loader 1 10 Area 10 Load truck with native material at stockpile IMCO Concrete Truck 1 IMCO Concrete Truck 1 1 Area 30 pipe encasement JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 3 Area 30, Compact general fill Dump Truck 1 10 Area 10 Import native material from stockpile Kobelco 1100G Crane 1 3 Area 20, Pick roof for soffit could be installed Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1442 of 1851 Equipment Quantity Hours used Comment Deere 470 Excavator 1 10 Area 10 Install Yard piping, Drains to MH 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Attached is IMCO Batch Ticket and 7 day Compressive Strength Report for the 12" River Intake Placement. 7:30 am IMCO is going to work on backfilling around the pipe encasements. They also plan to form for the 6" conduit pipe that is for the formalin lines to be pulled through. 10:00 am The roofing company is working on installing the vented soffit. IMCO is continuing to work on placing and compacting around the concrete pipe encasements. 12:00 pm IMCO has installed the HDPE pipe from the well pump drain and overflow to MH 1. They are working on backfilling it now. 2:00 pm IMCO is continuing to work on forming for the 6" formalin pipe encasement. 3:00 pm IMCO made a last minute decision to place concrete to encase the 6" Formalin conduit. I did not test the concrete. See attached batch ticket. 5:00 pm The roofing company plans to be back tomorrow to finish the soffit. IMCO is going to place the roof back on the structure tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1443 of 1851 References Photos (3) 20230426_145404 Taken on Apr 26, 2023, 2:54 PM MDT Added on Apr 27, 2023, 7:08 AM MDT Added by Chris Johnson 20230426_111257 Taken on Apr 26, 2023, 11:12 AM MDT Added on Apr 27, 2023, 7:08 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1444 of 1851 20230426_090933 Taken on Apr 26, 2023, 9:09 AM MDT Added on Apr 27, 2023, 7:08 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1445 of 1851 Form detail #138: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 form grout placement around pipes in river intake vault, remove forms from yesterdays placement IMCO, Operators and Labors 5 50 Area 10 Begin demo on 1/3 of the holding ponds, Area 30 Backfill and compact fill around pipe encasements, Fuse HDPE pipe to MH 1 Forms Location Form date Apr 25, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 26, 2023, 7:16 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1446 of 1851 Crew # Workers # Total hours Work performed Steel Building Systems 4 10 Area 20, Install roof on Intake Structure Totals 12 70 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Demo North Holding ponds, Area 30 Backfill Deere 644J Loader 1 10 Area 10 Load concrete debris and Metal Debris IMCO Concrete Truck 1 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 3 Area 30, Compact general fill Dump Truck 1 4 Area 10 Export concrete debris Kobelco 1100G Crane 1 3 Area 20, Remove roof for roofers to install metal roofing Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1447 of 1851 Equipment Quantity Hours used Comment Deere 470 Excavator 1 10 Area 10 Install Yard piping, Drains to MH 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO plans to form and place grout around 12" river intake pipes that penetrate the valve vault. They are going build forms to hold the grout in. Usually this is done by hand but the holes were oversized to fit the flange end of the spools. They are going to wait until 24 hrs from the placement to strip the forms from yesterdays pipe encasement placement. 9:00 am Steel Building Structures is onsite working on the roofing for Area 20 Intake Structure. 11:00 am IMCO has started to demo the holding ponds. I confirmed with the operator that he needs to stay away from the center wall along with the 2/3rds of the holding ponds adjacent to the ponds that are holding fish. He was aware of this. While demoing he found a power conduit and broke it. I contacted Reid, IDFG, who is onsite in Jeffs place. He checked the hatchery building and everything is working and fine. The wires are most likely going to the breaker panel that runs the crowders. The crowders were locked out tagged out yesterday by IPC. 12:00 pm IMCO will have Vale Electric onsite tomorrow to fix the hit power so the fish hatchery can operate as usual on Thursday. IMCO is continuing to place grout. They are getting set up to start installing the drain line to MH 1. This is HDPE pipe that is fused. 1:00 pm IMCO is placing structural fill over the river intake pipes that will be under Area 30 slab. Using a nuclear gauge I tested the material. First test was 93%, I advised them to add more water and compact again. The second test was average of 96%. 2:00 pm Attended weekly meeting. 3:00 pm Steel Building Systems is continuing to work on the metal roofing for the intake structure. IMCO is working on fusing the HDPE pipe for the drain piping. 4:30 pm IMCO is continuing to work on stripping the forms from yesterdays placement. They are also backfilling and compacting around the pipe encasements. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1448 of 1851 References Photos (7) 20230425_160514 Taken on Apr 25, 2023, 4:05 PM MDT Added on Apr 25, 2023, 4:26 PM MDT Added by Chris Johnson 20230425_160411 Taken on Apr 25, 2023, 4:04 PM MDT Added on Apr 25, 2023, 4:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1449 of 1851 20230425_144038 Taken on Apr 25, 2023, 2:40 PM MDT Added on Apr 25, 2023, 4:26 PM MDT Added by Chris Johnson 20230425_133408 Taken on Apr 25, 2023, 1:34 PM MDT Added on Apr 25, 2023, 4:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1450 of 1851 20230425_100024 Taken on Apr 25, 2023, 10:00 AM MDT Added on Apr 25, 2023, 4:26 PM MDT Added by Chris Johnson 20230425_095628 Taken on Apr 25, 2023, 9:56 AM MDT Added on Apr 25, 2023, 4:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1451 of 1851 20230425_092428 Taken on Apr 25, 2023, 9:24 AM MDT Added on Apr 25, 2023, 4:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1452 of 1851 Form detail #137: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Finish forming for the well pump and drain encasement, Place concrete for pipe encasement IMCO, Operators and Labors 5 50 Area 10 Demo Head Box and haul offsite, Area 30 Backfill and compact fill around pipe encasements, Import general fill to site Totals 8 60 Forms Location Form date Apr 24, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 24, 2023, 5:17 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1453 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 demo head box, Area 30 Backfill Deere 644J Loader 1 10 Area 30, Load general fill for import IMCO Concrete Truck 1 4 Area 30, Pipe encasement placement IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 3 Area 30, Compact general fill Dump Truck 1 10 Area 10 Export concrete debris Kobelco 1100G Crane 1 3 Area 20, Remove roof for roofers to install metal roofing Deere 470 Excavator 1 10 Area 30 Batch Concrete 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1454 of 1851 Notes Attached HMH Concrete Field Report for 6" well pumps, 12" drain, 6" drain Pipe encasement placement, IMCO Batch Tickets. 10:00 am Arrived on site. IMCO is prepping to place concrete for the pipe encasement of the 2 6" well pump pipes along with the 12" drain and 6" drain. Last Thursday they installed the river intake manifold in the ground and connected the 4 12" river intake pipes with couplers to the manifold outside the valve vault. 11:00 pm I have checked all rebar and clearances. IMCO is batching concrete now for the pipe encasement. The crane has lifted the roof off of Area 20 Intake Structure. The roofers are onsite to begin installing the metal roofing. They are doing this on the ground in a effort to increase efficiency and safety. 2:00 pm IMCO has placed 10 CY of concrete for pipe encasement. I tested the first truck and all tested in spec. See concrete field report. There was discussion regarding the elevation of the 6" floor drain. The drain is was too low and had negative fall that would cause water to be backed up in the pipe. Bill and Zack, IPC, are onsite. They requested to raise to pipe to ensure positive flow to prevent water from backing up. 4:00 pm IMCO is importing material from the stockpile. They have started backfilling in the center of Area 30 and compacting with the hoepack. Another crew is working on grouting the 12" intake pipes in the valve vault. 4:30 pm IMCO is continuing to work on grouting the holes around the vault. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1455 of 1851 References Photos (2) 20230424_131350 Taken on Apr 24, 2023, 1:13 PM MDT Added on Apr 24, 2023, 4:54 PM MDT Added by Chris Johnson 20230424_131628 Taken on Apr 24, 2023, 1:16 PM MDT Added on Apr 24, 2023, 4:54 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1456 of 1851 Form detail #135: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Prep and Form for pipe encasement of 2 6" well pump pipes IMCO, Operators and Labors 6 60 Area 10 Demo Head Box Totals 9 70 2. Materials Forms Location Form date Apr 20, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 21, 2023, 9:42 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1457 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 demo head box Deere 644J Loader 1 10 Area 10, Clean up dumpsite IMCO Concrete Truck 1 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 Dump Truck 1 10 Area 10 Export concrete debris Kobelco 1100G Crane 1 0 Deere 470 Excavator 1 10 Area 30 Set Pipes into the vault 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Attached is the 7 day compressive strength report from the 12" river intake, and 12" spray bar concrete placement. 7:30 am IMCO is starting to work on setting the couplers and pipes into the valve vault for the river intake piping. 9:30 am IMCO is continuing to work on demoing the head box. They are breaking up the concrete and hauling it Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1458 of 1851 offsite. IMCO is also working on installing the Romac 501 couplings and the stainless pipe spools into the valve vault. I talked to the crew about the torque requirements needed for the couplings. They are using dissimilar metal isolation kits for the flange valve to flange spool connections. We talked about using anti seize on all stainless bolts. 12:00 pm IMCO is continuing to work on demoing the weir box. The pipe crew is continuing to bolt up the fittings and the valves in the vault. While checking the the vault lid it was determined that the round lids for the valve key stems do not line up with the butterfly valves. I have asked IMCO to provide a solution for the issue. Jake and Kirt are working on this. 1:00 pm Left site to deliver concrete cylinders to the lab. John Anderson arrived onsite. References Photos (4) 20230420_110007 Taken on Apr 20, 2023, 11:00 AM MDT Added on Apr 21, 2023, 9:36 AM MDT Added by Chris Johnson 20230420_105851 Taken on Apr 20, 2023, 10:58 AM MDT Added on Apr 21, 2023, 9:36 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1459 of 1851 20230420_105838 Taken on Apr 20, 2023, 10:58 AM MDT Added on Apr 21, 2023, 9:36 AM MDT Added by Chris Johnson 20230420_105815 Taken on Apr 20, 2023, 10:58 AM MDT Added on Apr 21, 2023, 9:36 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1460 of 1851 Form detail #134: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Prep to pour 12" river intake encasements, Place 8 CY of concrete for pipe encasement IMCO, Operators and Labors 6 60 Area 10 Place and compact fill near Area 70 Area 30 Batch concrete Totals 9 70 Forms Location Form date Apr 19, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 19, 2023, 4:53 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1461 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 backfill abandoned raceways, demo head box Deere 644J Loader 1 10 Area 10, Backfill chinook raceways IMCO Concrete Truck 1 4 Area 30, Place pipe encasement IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 Move material around site Hitachi 85 Excavator 1 10 Area 10 backfill and compact with hoe pack attachment Dump Truck 1 10 Area 10 Export concrete debris Kobelco 1100G Crane 1 0 Deere 470 Excavator 1 10 Area 30 Batch concrete 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1462 of 1851 Notes 7:30 am IMCO is prepping to place concrete for the rest of the 12" river intake pipe encasement. They are also going to place and compact fill near area 70. They are using native material for fill. 10:00 am IMCO is starting to batch concrete. I have checked the rebar and forms. I asked Jake to make a few adjustments to the rebar to match the rebar submittal. 12:00 pm IMCO placed 8 CY of concrete. They used the .40 WRDA mix design. This design is a higher slump with the admixture for water reducing. The first truck had 6.5 CY batched. I tested the truck for air and it came back high at 10.5%. They decided to let the concrete sit before placing in hopes some air would come out of it. After letting it sit I tested the truck again and got 9%. IMCO decided to continue pouring the truck out so I finished my test and casted 9 cylinders. They ran out of concrete and batched 1.5 CY to finish the placement. 1:30 pm Jake informed me that the roofers will be onsite Monday to install the roof on Area 20, River intake. They are going to pick the roof off put on the ground so the roofers do not have to work over the water. Jake and I put our fall protection on and got on the roof to inspect the condition of the plywood. I used my pocket knife to check for any soft wood and or rotting. All the sheeting looked sun beaten but was still very firm and no rotting was observed. The fasteners did not show any rusting either. Jake showed the photos to Zack who also agreed that they could proceed with roofing without further attention need to the sheeting. 3:00 pm IMCO is working on demoing the head box. They are also getting the string lines up again at Area 30 to start installing the pipes to the well pumps. 4:30 pm IMCO is setting forms for the well pump pipe encasement. They are continuing to demo the head box and hauling concrete debris offsite. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1463 of 1851 References Photos (8) 20230419_115709 Taken on Apr 19, 2023, 11:57 AM MDT Added on Apr 19, 2023, 4:11 PM MDT Added by Chris Johnson 20230419_141048 Taken on Apr 19, 2023, 2:10 PM MDT Added on Apr 19, 2023, 4:44 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1464 of 1851 20230419_102132 Taken on Apr 19, 2023, 10:21 AM MDT Added on Apr 19, 2023, 4:44 PM MDT Added by Chris Johnson 20230419_115724 Taken on Apr 19, 2023, 11:57 AM MDT Added on Apr 19, 2023, 4:11 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1465 of 1851 20230419_115712 Taken on Apr 19, 2023, 11:57 AM MDT Added on Apr 19, 2023, 4:11 PM MDT Added by Chris Johnson 20230419_163152 Taken on Apr 19, 2023, 4:31 PM MDT Added on Apr 19, 2023, 4:44 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1466 of 1851 20230419_140959 Taken on Apr 19, 2023, 2:09 PM MDT Added on Apr 19, 2023, 4:44 PM MDT Added by Chris Johnson 20230419_140425 Taken on Apr 19, 2023, 2:04 PM MDT Added on Apr 19, 2023, 4:44 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1467 of 1851 Form detail #133: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Form for pipe encasement of the 12" river intake pipes IMCO, Operators and Labors 6 60 Area 10 Install 36" drain pipe from MH 1 to MH 2, Area 30 Set river intake vault Totals 9 70 2. Materials Forms Location Form date Apr 18, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 19, 2023, 7:14 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1468 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 8 Area 10 Excavate and install 36" drain pipe from MH 1 to MH 2 Deere 644J Loader 1 8 Area 10, Backfill chinook raceways, load general fill in dump truck IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 8 Area 30 set pipes Hitachi 85 Excavator 1 8 Area 10 backfill and compact with hoe pack attachment Dump Truck 1 8 Area 10 Haul structural fill and general fill from stockpile Kobelco 1100G Crane 1 0 Deere 470 Excavator 1 8 Area 10, Excavate and install 36" drain pipe from MH1 Area 30 Excavate and set river intake vault 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1469 of 1851 Notes 8:00 am The large vault for the 4 river intake pipes is onsite. IMCO plans to set this vault today. Area 10 crew is continuing to work on excavating and setting 36" drain pipe from MH1 to MH2. They will install the pipe to the wall of the holding ponds and stop until they can demo the walls next week. Area 30 crew is working on forming the 12" intake pipes for a placement later today. 10:00 am I have confirmed with IMCO that the Rim Elevation of the vault has not changed and they are going to install the vault to that elevation. Kirt informed me they checked the invert elevation of the 4 river intake pipes and they were good so the vault should line up correctly. 1:00 pm IMCO has set 2 sticks of 20' 36" drain pipe towards MH 2. They cannot install any more without demoing the North holding ponds. They have set the river intake valve vault and they are double checking the elevations and placement location. 2:00 pm Attended weekly meeting. 3:00 pm IMCO is importing General Fill from the stockpile. They are placing and compacting the general fill over the 36" drain pipe from MH 1 to MH 2. 3:30 pm IMCO is done for the day. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1470 of 1851 References Photos (4) 20230418_144329 Taken on Apr 18, 2023, 2:43 PM MDT Added on Apr 18, 2023, 3:26 PM MDT Added by Chris Johnson 20230418_131139 Taken on Apr 18, 2023, 1:11 PM MDT Added on Apr 18, 2023, 3:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1471 of 1851 20230418_125941 Taken on Apr 18, 2023, 12:59 PM MDT Added on Apr 18, 2023, 3:26 PM MDT Added by Chris Johnson 20230418_105307 Taken on Apr 18, 2023, 10:53 AM MDT Added on Apr 18, 2023, 3:26 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1472 of 1851 Form detail #132: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Remove forms from Thursdays concrete placement, Form pipe encasement for the 2 well pipes, Form pipe encasement for the river intake pipes, tie rebar IMCO, Operators and Labors 6 60 Area 10 Demo abandoned raceways and haul concrete offsite, Install 36" drain pipe from MH 1, Area 20 install air vac on irrigation line Forms Location Form date Apr 17, 2023 Description Area 10, Area 20, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 17, 2023, 4:59 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1473 of 1851 Crew # Workers # Total hours Work performed Totals 9 70 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Abandoned raceway demo, Backfill Deere 644J Loader 1 10 Area 10, Backfill chinook raceways, Load pipe bedding IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 set pipes Hitachi 85 Excavator 1 10 Area 10 backfill and compact with hoe pack attachment Dump Truck 1 10 Area 10 haul concrete debris offsite, haul pipe bedding onsite Kobelco 1100G Crane 1 0 Deere 470 Excavator 1 8 Area 10, Excavate and install 36" drain pipe from MH1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1474 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached 7 day compressive break report from the 6" drain pipe encasement and the 28 day break report from the Trial Batch. 9:00 am Arrived on site. IMCO carpenters are working on removing the forms from Thursdays concrete placement, others are working on moving material around the site. Another crew is working on mudding the outfall pipe in MH1. 12:00 pm IMCO is backfilling the abandoned raceways with native material. They are placing the material in 12" lifts and compacting with a hoe pack attachment. They are continuing to tie the rebar and form for the next pipe encasement placement. IMCO as installed the air vac on the irrigation line on Area 20. IMCO needs to complete the plumbing. I contacted Heath Phelps, IPC, regarding turning the irrigation line on. He said he wants to wait another week due to the temps this week. 2:00 pm IMCO is excavating to continue installing 36" drain pipe from MH 1. 4:30 pm We have double checked the numbers of the 36" pipe elevation. The crew is setting the pipe to grade now. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1475 of 1851 References Photos (5) 20230417_140802 Taken on Apr 17, 2023, 2:08 PM MDT Added on Apr 17, 2023, 4:53 PM MDT Added by Chris Johnson 20230417_135752 Taken on Apr 17, 2023, 1:57 PM MDT Added on Apr 17, 2023, 4:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1476 of 1851 20230417_133023 Taken on Apr 17, 2023, 1:30 PM MDT Added on Apr 17, 2023, 4:53 PM MDT Added by Chris Johnson 20230417_131002 Taken on Apr 17, 2023, 1:10 PM MDT Added on Apr 17, 2023, 4:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1477 of 1851 20230417_152346 Taken on Apr 17, 2023, 3:23 PM MDT Added on Apr 17, 2023, 4:53 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1478 of 1851 Form detail #131: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 0 IMCO, Operators and Labors 1 10 Area 10, Demo and export abandoned raceways Totals 1 10 2. Materials Forms Location Form date Apr 14, 2023 Description Area 10 Due date Submitted by Chris Johnson Status Closed Last update Apr 17, 2023, 10:44 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1479 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 0 Deere 644J Loader 1 IMCO Concrete Truck 1 IMCO Concrete Truck 1 JCB 510 Boom Forklift 1 Hitachi 85 Excavator 1 Dump Truck 1 10 Area 10 haul concrete debris offsite Kobelco 1100G Crane 1 0 Deere 470 Excavator 1 8 Area 10, Abandoned Raceway Demo 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO has one operator onsite working on demoing the the abandoned raceway. He is loading the truck and hauling it off site. 12:30 pm I have picked up the concrete cylinders, the one operator is still working on demo and hauling off site. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1480 of 1851 References Photos (2) 20230414_121506 Taken on Apr 14, 2023, 12:15 PM MDT Added on Apr 17, 2023, 10:44 AM MDT Added by Chris Johnson 20230414_121521 Taken on Apr 14, 2023, 12:15 PM MDT Added on Apr 17, 2023, 10:44 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1481 of 1851 Form detail #130: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Micro adjust pipes prior to placing concrete, Place concrete pipe encasement for the 4 river intake 12" pipes, place concrete for pipe encasement for the 12" spray bar pipe and rest of 4" hydrant line IMCO, Operators and Labors 6 60 Area 10 Demo chinook raceways, load out concrete, backfill and compact chinook raceways, Install one 20' 36" stick of pipe from the outfall of MH 1 Forms Location Form date Apr 13, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 14, 2023, 11:50 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1482 of 1851 Crew # Workers # Total hours Work performed Totals 9 70 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Abandoned raceway demo Deere 644J Loader 1 10 Area 10, Backfill chinook raceways IMCO Concrete Truck 1 5 Area 30, Pipe encasement placement IMCO Concrete Truck 1 5 Area 30, Pipe encasement placement JCB 510 Boom Forklift 1 10 Area 30 set pipes Hitachi 85 Excavator 1 10 Area 10 backfill and compact with hoe pack attachment Dump Truck 1 10 Area 10 haul concrete debris offsite Kobelco 1100G Crane 1 0 Deere 470 Excavator 1 8 Area 30, Batch concrete Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1483 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached HMH Concrete Field Report, IMCO batch tickets and 7 day compressive break report from the 4" hydrant line placement. 8:00 am IMCO is going to make the final preparations for the concrete placement today. They will be placing approx. 20 CY for pipe encasement of the 4 12" river intake pipes along with the 12" spray bar pipe and the rest of the 4" hydrant line pipe. They are fine tuning the pipes and bracing the forms. 9:00 am IMCO is continuing to work on Area 10 demo of the abandoned raceways. They are hauling that material off site. They are also working on backfilling the chinook raceway hole. They are placing native material in 12" lifts and compacting with the hoe pack attachment. 10:00 am IMCO is prepping to start batching concrete. 12:00 pm IMCO has place one 4 yard load. They are batching the second load at 8 yards. 12:30 pm I have taken my concrete sample out of the second truck. See concrete field report. They crew is still fine tuning the mix to meet the slump requirement. They are having a hard time getting the 3" slump mix down the shoot of the truck. I have suggest they may need to switch to the water reducing admixture where a 7" slump is allowed. They are using a stinger to consolidate the concrete around the pipes and rebar. 2:00 pm IMCO has placed 20 CY of concrete. They top of the placement is approx. bottom of our structure slab. IMCO is going to start working on forming for the next placement. They have been continuing to work on demoing Area 10 abandoned raceways and hauling the concrete off site. 4:00 pm IMCO has been working on cleaning up the site for the weekend and laying out for the next pipe install and concrete placement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1484 of 1851 References Photos (10) 20230413_160205 Taken on Apr 13, 2023, 4:02 PM MDT Added on Apr 14, 2023, 8:59 AM MDT Added by Chris Johnson 20230413_134049 Taken on Apr 13, 2023, 1:40 PM MDT Added on Apr 14, 2023, 8:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1485 of 1851 20230413_124557 Taken on Apr 13, 2023, 12:45 PM MDT Added on Apr 14, 2023, 8:58 AM MDT Added by Chris Johnson 20230413_104402 Taken on Apr 13, 2023, 10:44 AM MDT Added on Apr 14, 2023, 8:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1486 of 1851 20230413_095156 Taken on Apr 13, 2023, 9:51 AM MDT Added on Apr 14, 2023, 8:58 AM MDT Added by Chris Johnson 20230413_091208 Taken on Apr 13, 2023, 9:12 AM MDT Added on Apr 14, 2023, 8:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1487 of 1851 20230413_091155 Taken on Apr 13, 2023, 9:11 AM MDT Added on Apr 14, 2023, 8:59 AM MDT Added by Chris Johnson 20230413_160224 Taken on Apr 13, 2023, 4:02 PM MDT Added on Apr 14, 2023, 8:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1488 of 1851 20230413_160100 Taken on Apr 13, 2023, 4:01 PM MDT Added on Apr 14, 2023, 8:59 AM MDT Added by Chris Johnson 20230413_095208 Taken on Apr 13, 2023, 9:52 AM MDT Added on Apr 14, 2023, 8:58 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1489 of 1851 Form detail #129: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Install 12" pipe for spray bars, Form 12" encasement for spray bars, Install 4 12" pipes from river intake, form for pipe encasement IMCO, Operators and Labors 6 60 Area 10 Demo chinook raceways, load out concrete, backfill and compact chinook raceways, Install one 20' 36" stick of pipe from the outfall of MH 1 Forms Location Form date Apr 12, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 13, 2023, 7:34 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1490 of 1851 Crew # Workers # Total hours Work performed EOI 2 5 Area 30 Tie rebar for pipe encasements Totals 11 75 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 Abandoned raceway demo Deere 644J Loader 1 10 Area 10, Backfill chinook raceways IMCO Concrete Truck 1 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Area 30 set pipes Hitachi 85 Excavator 1 10 Area 10 backfill and compact with hoe pack attachment Dump Truck 1 10 Area 10 haul concrete debris offsite, Import pipe bedding to site Kobelco 1100G Crane 1 0 Deere 470 Excavator 1 0 Area 10, Install pipe from MH 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1491 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:00 am IMCO is working on forming for the 4 river intake pipe encasement placement. 12:00 pm EOI is onsite to tie the rebar for the river intake pipe encasement. IMCO has the forms up and is starting to set the river intake pipes. IMCO is also working on setting the outfall pipe from MH 1. It is a 36" pipe. The crew is using pipe bedding under the pipe that they compacted with a jumping jack. 3:00 pm EOI is done for the day. They installed the rebar form the first placement of the pipe encasement for the 4 river intake pipes. IMCO plans to pour this tomorrow. 4:00 pm IMCO is fine tuning the pipes and bracing the forms in preparation for the pipe encasement placement tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1492 of 1851 References Photos (4) 20230412_150824 Taken on Apr 12, 2023, 3:08 PM MDT Added on Apr 13, 2023, 7:33 AM MDT Added by Chris Johnson 20230412_142853 Taken on Apr 12, 2023, 2:28 PM MDT Added on Apr 13, 2023, 7:33 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1493 of 1851 20230412_134625 Taken on Apr 12, 2023, 1:46 PM MDT Added on Apr 13, 2023, 7:33 AM MDT Added by Chris Johnson 20230412_134444 Taken on Apr 12, 2023, 1:44 PM MDT Added on Apr 13, 2023, 7:33 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1494 of 1851 Form detail #128: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 3 10 Area 30 Install 12" pipe for spray bars, Form 12" encasement for spray bars IMCO, Operators and Labors 6 60 Area 10 Demo chinook raceways, load out concrete, backfill and compact chinook raceways Excavate and install MH1 Area 30 Install 12" pipe to spray bars Forms Location Form date Apr 11, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 12, 2023, 9:20 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1495 of 1851 Crew # Workers # Total hours Work performed EOI 2 5 Area 30 Tie rebar for pipe encasements Totals 11 75 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 raceway demo with hammer attachment, Load out concrete debris Deere 644J Loader 1 10 Area 10, Backfill chinook raceways IMCO Concrete Truck 1 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Moving material around the site Hitachi 85 Excavator 1 10 Area 10 backfill and compact with hoe pack attachment Dump Truck 1 10 Area 10 haul concrete debris offsite, Import general fill to site Kobelco 1100G Crane 1 4 Area 10, set MH 1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1496 of 1851 Equipment Quantity Hours used Comment Deere 470 Excavator 1 0 Area 10, Excavate for MH 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Attached is the 7 day compressive break report for the 4/4 24" discharge pipe encasement placement. 8:00 am IMCO is prepping to continue work on Area 10 and Area 30. Area 10 they are going to continue working on the chinook raceway demo. They also plan to use the native spoils from the excavation of MH 1 to backfill the chinook raceways. Area 30 they will continue working on installing the 12" pipe to the spray bars and form for the pipe encasement. EOI is onsite to tie the rebar for the pipe encasement. 10:00 am IMCO has started excavating for MH 1. They have been hauling concrete debris offsite from the chinook raceway demo. They are going to take the native spoils from the excavation of MH 1 and install in 12" lifts to fill the hole in from the chinook raceway demo. They are using the hoepack attachment to compact the 12" lifts. 12:00 pm IMCO has set the grade for MH 1. I have probed the subgrade after compaction. Soil was firm and unyielding. The native material has been good looking mix of rocks and fine material. At the bottom of the excavation of MH 1 a clay material layer was observed. We checked the elevation and it was determined they did not need to go any deeper. 2:00 pm IMCO has placed MH 1. They are going to backfill around part of the structure to provide more room for Jeff, IDFG, to access his house safely. Attended weekly meeting. 4:00 pm IMCO has backfilled around MH 1 where they could. They have set the 12" pipe for the spray bars and micro adjusting it now. 4:30 pm IMCO has continued working on demoing the abandoned raceways. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1497 of 1851 References Photos (9) 20230411_162256 Taken on Apr 11, 2023, 4:22 PM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson 20230411_162209 Taken on Apr 11, 2023, 4:22 PM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1498 of 1851 20230411_162104 Taken on Apr 11, 2023, 4:21 PM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson 20230411_124301 Taken on Apr 11, 2023, 12:43 PM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1499 of 1851 20230411_123201 Taken on Apr 11, 2023, 12:32 PM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson 20230411_123122 Taken on Apr 11, 2023, 12:31 PM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1500 of 1851 20230411_110904 Taken on Apr 11, 2023, 11:09 AM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson 20230411_104341 Taken on Apr 11, 2023, 10:43 AM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1501 of 1851 20230411_162134 Taken on Apr 11, 2023, 4:21 PM MDT Added on Apr 11, 2023, 4:30 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1502 of 1851 Form detail #127: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 Area 30 Finish bracing form for 6" drain line pipe encasement, pour 1 CY pipe encasement. IMCO, Operators and Labors 6 60 Area 30 Demo area 10 raceways / chinook raceways Export broken concrete, compact and proof roll Area 30, Pour pipe encasement, set backfill and compact, start working on 12" pipe encasement for raceway spray bars. Forms Location Form date Apr 10, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 11, 2023, 11:46 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1503 of 1851 Crew # Workers # Total hours Work performed Totals 7 70 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 raceway demo with hammer attachement Deere 644J Loader 1 0 IMCO Concrete Truck 1 3 Area 30 pipe encasement placement IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Hitachi 85 Excavator 1 10 Area 30 backfill and compact with hoe pack attachment Dump Truck 1 10 Area 10 haul concrete debris offsite Kobelco 1100G Crane 1 0 Deere 470 Excavator 1 0 Area 30, Batch concrete Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1504 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes See attached IMCO batch ticket, HMH Concrete Field Report, HMH Compressive break report for the Trial Batching 21 day and Raceway pipe encasement 7 day. 9:30 am Arrived on site. IMCO is working on the final preparation for the 6" drain line pipe encasement pour. They are also continuing the work on demoing area 10 chinook raceways. 11:00 am IMCO is ready for the pipe encasement pour. They are prepping to start batching concrete. 12:00 pm IMCO has batched 1 CY of concrete. Looking at the slump from the truck it looked way to wet. I asked Kole to check with Kirt but I recommended they try another batch of concrete. They agreed. They used the 1 CY for eco blocks. 2:00 pm IMCO batched another 1 CY of concrete. I tested it and everything was in spec. See attached report. They poured the 6" drain pipe encasement. 4:00 pm IMCO is working on forming for the 12" pipe encasement of the spray bars. This will also include a section of the 4" hydrant line. The crew also worked on putting the crane together. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1505 of 1851 References Photos (2) 20230410_120021 Taken on Apr 10, 2023, 12:00 PM MDT Added on Apr 11, 2023, 10:00 AM MDT Added by Chris Johnson 20230410_151739 Taken on Apr 10, 2023, 3:17 PM MDT Added on Apr 11, 2023, 10:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1506 of 1851 Form detail #126: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 Area 30 Place concrete encasement for 4" hydrant line, form 6" drain line IMCO, Operators and Labors 6 60 Area 30 Form for 4" hydrant line, Set 4" hydrant line place concrete for 4" hydrant line encasement. Demo area 10 raceways / chinook raceways Export broken concrete, compact and proof roll Totals 7 70 Forms Location Form date Apr 6, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 6, 2023, 4:52 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1507 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 raceway demo, Area 30 Batch Concrete Deere 644J Loader 1 10 Area 10 Backfill and proof roll abandoned raceways IMCO Concrete Truck 1 3 Area 30 pipe encasement placement IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 10 Set up crane JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 Area 30 install 4" hydrant line, aid with placing concrete for 4" pipe encasement Dump Truck 1 10 Area 10 haul concrete debris offsite Kobelco 1100G Crane 1 0 Mobilized on site Deer 470 Excavator 1 0 Mobilized to site 4. Signature Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1508 of 1851 Chris Johnson, HMH Engineering - 4.1 Notes Attached is IMCO Batch Ticket and Concrete Field Report. 8:00 am IMCO is working on setting the 4" hydrant line. They have used restraint mechanical joints with C900 pipe to connect to the ductile iron T. The vertical pipe out of the ductile iron tee is a flange to stainless steel stand pipe that will penetrate the slab floor. Kirt needs to block out a section of this pour to accommodate for the 12" pipe to raceway spray bars. 9:00 am I asked the IMCO crew to proof roll the second lift of native material at the abandoned raceways. I watch the rubber tire loader with a bucket of material drive over the lift. The lift was firm and unyielding. 11:00 am IMCO is prepping to batch 3 CY of concrete for the 4" hydrant line encasement placement. 1:00 pm IMCO has placed 3 CY. See attached concrete field report. 2:00 pm IMCO is starting to work on the 6" drain line. They are hoping to pour this one today as well. 3:30 pm Manhole #1 has been delivered onsite. 4:30 pm Jake informed me they will not make the second placement today. The crew is working on grading for the raceway spray bar pipe and demoing the chinook raceways. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1509 of 1851 References Photos (6) 20230406_154352 Taken on Apr 6, 2023, 3:43 PM MDT Added on Apr 6, 2023, 4:30 PM MDT Added by Chris Johnson 20230406_143542 Taken on Apr 6, 2023, 2:35 PM MDT Added on Apr 6, 2023, 4:30 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1510 of 1851 20230406_142317 Taken on Apr 6, 2023, 2:23 PM MDT Added on Apr 6, 2023, 4:30 PM MDT Added by Chris Johnson 20230406_141941 Taken on Apr 6, 2023, 2:19 PM MDT Added on Apr 6, 2023, 4:30 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1511 of 1851 20230406_095059 Taken on Apr 6, 2023, 9:50 AM MDT Added on Apr 6, 2023, 4:30 PM MDT Added by Chris Johnson 20230406_095037 Taken on Apr 6, 2023, 9:50 AM MDT Added on Apr 6, 2023, 4:30 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1512 of 1851 Form detail #125: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 Area 30 Set and Form 4" hydrant line, Strip 24" encasement forms IMCO, Operators and Labors 6 60 Area 30 Remove 24" encasement forms, Form for 4" hydrant line, Set 4" hydrant line. Demo area 10 raceways / chinook raceways Export broken concrete, compact and proof roll Totals 7 70 Forms Location Form date Apr 5, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 6, 2023, 7:23 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1513 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Area 10 raceway demo Deere 644J Loader 1 10 Area 10 Backfill and proof roll abandoned raceways IMCO Concrete Truck 1 0 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 Area 30 excavate for 4" hydrant line, Area 10 hoe pack native material in 12" lifts Dump Truck 1 10 Area 10 haul concrete debris offsite Kobelco 1100G Crane 1 0 Mobilized on site 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1514 of 1851 Notes 8:00 am IMCO is working on the 4" hydrant line. They were able to get it bolted together yesterday. They used an dielectric isolation kit to bolt the ductile iron T to the stainless steel stand pipe that penetrates the slab floor. 10:00 am IMCO has the hammer attachment on the excavator and is currently working on breaking up the abandoned raceways. They are loading the concrete debris in the dump truck and hauling offsite. 12:00 pm IMCO is working on backfilling the hole that was created from the abandoned raceways. I have asked to meet the native backfill requirements of screening 8" and larger rocks out and compacting. 2:00 pm IMCO is continuing to work on installing and forming the 4" hydrant line and the rebar cage around it. 3:30 pm IMCO has placed one 12" lift at the abandoned raceways and compacted it with the hoepack. I asked to proof roll the material. They used the rubber tire loader with a full bucket of material. I witnessed a firm and unyielding proof roll. They are going to start working on the second lift. References Photos (5) 20230405_152631 Taken on Apr 5, 2023, 3:26 PM MDT Added on Apr 5, 2023, 3:42 PM MDT Added by Chris Johnson 20230405_151201 Taken on Apr 5, 2023, 3:12 PM MDT Added on Apr 5, 2023, 3:42 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1515 of 1851 20230405_134100 Taken on Apr 5, 2023, 1:41 PM MDT Added on Apr 5, 2023, 3:42 PM MDT Added by Chris Johnson 20230405_133405 Taken on Apr 5, 2023, 1:34 PM MDT Added on Apr 5, 2023, 3:42 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1516 of 1851 20230405_133353 Taken on Apr 5, 2023, 1:33 PM MDT Added on Apr 5, 2023, 3:42 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1517 of 1851 Form detail #124: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 Area 30 Pour Pipe Encasement of 24" Discharge Pipe, help set 4" hydrant line IMCO, Operators and Labors 6 60 Area 30 Pour Pipe Encasement of 24" Discharge pipe, Excavate for 4" hydrant line , Demo area 10 raceways / chinook raceways Export broken concrete Totals 7 70 Forms Location Form date Apr 4, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 4, 2023, 4:59 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1518 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Batch Concrete, Area 10 raceway demo Deere 644J Loader 1 IMCO Concrete Truck 1 5 Area 30, Pour pipe encasement IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 Area 30 excavate for 4" hydrant line Dump Truck 1 10 Area 10 haul concrete debris offsite 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Attached Todays concrete placement field report and IMCO batch tickets. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1519 of 1851 7:30 am IMCO is prepping to pour the pipe encasement for the 24" discharge pipe. They need to complete the forming and bracing and micro adjust the pipe. 9:30 am IMCO has the pipe and forms ready, they are batching concrete now. 12:30 pm IMCO has placed 9 CYs with 3 loads. I tested the first truck for air only. It was at 6.5%. I then tested the second truck for acceptance. Air was at 7%. See attached concrete field report. They had to batch a third load to finish the placement. 2:00 pm Attended weekly meeting. 3:00 pm One IMCO crew is working on Area 10 demo and export of concrete debris. The other has started to excavate for the 4" hydrant line. 5:00 pm IMCO is finishing up for the day. The got the 4" line excavated and ready to set for tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1520 of 1851 References Photos (5) 20230404_164109 Taken on Apr 4, 2023, 4:41 PM MDT Added on Apr 4, 2023, 4:58 PM MDT Added by Chris Johnson 20230404_130607 Taken on Apr 4, 2023, 1:06 PM MDT Added on Apr 4, 2023, 4:58 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1521 of 1851 20230404_105418 Taken on Apr 4, 2023, 10:54 AM MDT Added on Apr 4, 2023, 4:58 PM MDT Added by Chris Johnson 20230404_164124 Taken on Apr 4, 2023, 4:41 PM MDT Added on Apr 4, 2023, 4:58 PM MDT Added by Chris Johnson 20230404_130557 Taken on Apr 4, 2023, 1:05 PM MDT Added on Apr 4, 2023, 4:58 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1522 of 1851 Form detail #123: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 Area 30 Pour Pipe Encasement of 6 Raceway Pipes, brace forming for 24" discharge pipe encasement, Micro adjust pipe IMCO, Operators and Labors 6 60 Area 30 Pour Pipe Encasement of 6 Raceway pipes, Demo area 10 raceways / chinook raceways Export broken concrete Totals 7 70 Forms Location Form date Apr 3, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Apr 3, 2023, 4:52 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1523 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Batch Concrete, Area 10 raceway demo Deere 644J Loader 1 IMCO Concrete Truck 1 5 Area 30, Pour pipe encasement IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 Area 10 Break and load concrete debris Dump Truck 1 10 Area 10 haul concrete debris offsite 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Attached Todays concrete placement field report, IMCO batch tickets and 14 compressive breaks from the Trial batch Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1524 of 1851 8:30 am Arrived on site. IMCO is prepping for the concrete placement for pipe encasement at Area 30. The pipe encasement is for the 6 Raceway pipes. 9:30 am IMCO is getting ready to batch 4 CY. They are going to batch the rest on a second load. 11:30 am IMCO has batched 4 CY. I took a sample after approx. 1 CY was placed. The air tested at 3%. They dosed the truck. They then poured out approx. 1/2 CY and I took a second sample. The air was at 6%. They proceeded to pour and I proceeded with the testing. I casted 12 4x8 cylinders. See Field Report. A second crew is working on demoing and hauling off concrete from Area 10 abandoned raceways. They are hauling the concrete debris to a dump site. 2:00 pm IMCO has stated to break up the Chinook Raceways with the Excavator. Per previously discussed they are taking care not to affect the water or power lines to the hatchery building. 4:30 pm IMCO is working on setting the 24" discharge pipe to grade. IMCO and I discussed RFI 53 that changed the pipe invert and also changed its direction. We verified those changes were updated in IMCOs GPS model and they are setting the pipe per the RFI. 4:45 pm IMCO informed me they plan to place concrete tomorrow. They are going to encase the 24" discharge pipe. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1525 of 1851 References Photos (7) 20230403_160605 Taken on Apr 3, 2023, 4:06 PM MDT Added on Apr 3, 2023, 4:43 PM MDT Added by Chris Johnson 20230403_125830 Taken on Apr 3, 2023, 12:58 PM MDT Added on Apr 3, 2023, 4:43 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1526 of 1851 20230403_125601 Taken on Apr 3, 2023, 12:56 PM MDT Added on Apr 3, 2023, 4:43 PM MDT Added by Chris Johnson 20230403_111845 Taken on Apr 3, 2023, 11:18 AM MDT Added on Apr 3, 2023, 4:43 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1527 of 1851 20230403_101719 Taken on Apr 3, 2023, 10:17 AM MDT Added on Apr 3, 2023, 4:43 PM MDT Added by Chris Johnson 20230403_094733 Taken on Apr 3, 2023, 9:47 AM MDT Added on Apr 3, 2023, 4:43 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1528 of 1851 20230403_094640 Taken on Apr 3, 2023, 9:46 AM MDT Added on Apr 3, 2023, 4:43 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1529 of 1851 Form detail #122: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 Area 30 form for pipe encasement pour of 6 12" raceway pipes, Form encasements for 1 24" discharge pipe IMCO, Operators and Labors 6 60 Area 30 excavate for discharge pipe, set grade for discharge pipe, help with forms and setting pipe, Demo area 10 with excavator hammer attachement Totals 7 70 Forms Location Form date Mar 30, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Mar 30, 2023, 1:59 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1530 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 area 10 demo Deere 644J Loader 1 IMCO Concrete Truck 1 5 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 Dump Truck 1 0 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:00 am IMCO informed me no pour today and they will not be working tomorrow. They are planning on pouring the encasements on Monday morning. They are currently reinforcing the forms and micro adjusting the pipes and bracing them off. 11:00 am Kirt is working with the crew to get the pipes set per plan and braced off so they will not move during the pour. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1531 of 1851 12:00 pm The crew is continuing to work on bracing forms for the pour Monday. IMCO has installed the hammer attachment to the excavator and is starting to demo the floor of the abandoned raceways. The slab looks to be about 6" thick with wire mesh. 2:00 pm I noticed some rebar missing from the 24" discharge pipe. The crew added the bar needed and now it is per the submitted plan. The are continuing to work on bracing forms and micro adjusting the 24" pipe per plan. References Photos (6) 20230330_132941 Taken on Mar 30, 2023, 1:29 PM MDT Added on Mar 30, 2023, 1:51 PM MDT Added by Chris Johnson 20230330_132652 Taken on Mar 30, 2023, 1:26 PM MDT Added on Mar 30, 2023, 1:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1532 of 1851 20230330_132553 Taken on Mar 30, 2023, 1:25 PM MDT Added on Mar 30, 2023, 1:51 PM MDT Added by Chris Johnson 20230330_132541 Taken on Mar 30, 2023, 1:25 PM MDT Added on Mar 30, 2023, 1:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1533 of 1851 20230330_132521 Taken on Mar 30, 2023, 1:25 PM MDT Added on Mar 30, 2023, 1:51 PM MDT Added by Chris Johnson 20230330_132516 Taken on Mar 30, 2023, 1:25 PM MDT Added on Mar 30, 2023, 1:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1534 of 1851 Form detail #121: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 Area 30 form for pipe encasement pour of 6 12" raceway pipes, Form encasements for 1 24" discharge pipe IMCO, Operators and Labors 6 60 Area 30 excavate for discharge pipe, set grade for discharge pipe, help with forms and setting pipe EOI 2 8 Tie Rebar for Pipe Encasements, 6 12" Raceway pipes, 1 24" discharge pipe Forms Location Form date Mar 29, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Mar 30, 2023, 9:49 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1535 of 1851 Crew # Workers # Total hours Work performed Totals 9 78 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Excavate for Area 30 Deere 644J Loader 1 10 Excavate for Area 30 IMCO Concrete Truck 1 5 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 Set new office Trailer Dump Truck 1 0 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1536 of 1851 Notes 8:00 am IMCO is planning to set the 24" discharge pipe today. EOI is onsite to tie the rebar around the pipe encasements. 10:00 am IMCO is working on verifying the dimensions of the batter board strings. I asked if Cole, IMCO, could verify the corners with the GPS. 11:30 am IMCO has the strings correct and square. They are going to continue working on the 24" discharge pipe. 2:30 pm EOI has tied the rebar for the raceway pipes. IMCO is wanting to pour this tomorrow. I checked the rebar and all looks good and ready to pour. They need to close up the forms and brace it off. They are setting the 24" discharge pipe now. 4:30 pm IMCO is working on setting up the new office trailer. They are also getting the 24" discharge pipe to grade and building the forms around it. EOI has tired the rebar for it and has left the site. They also pre tied the bar for the 6" line. 5:30 pm IMCO is done for the day. They are still hoping to pour concrete tomorrow but they will make the final call tomorrow morning. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1537 of 1851 References Photos (4) 20230329_172858 Taken on Mar 29, 2023, 5:28 PM MDT Added on Mar 30, 2023, 9:48 AM MDT Added by Chris Johnson 20230329_172840 Taken on Mar 29, 2023, 5:28 PM MDT Added on Mar 30, 2023, 9:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1538 of 1851 20230329_172912 Taken on Mar 29, 2023, 5:29 PM MDT Added on Mar 30, 2023, 9:48 AM MDT Added by Chris Johnson 20230329_172829 Taken on Mar 29, 2023, 5:28 PM MDT Added on Mar 30, 2023, 9:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1539 of 1851 Form detail #120: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 Area 30 form for pipe encasement pour of 6 raceway pipes IMCO, Operators and Labors 6 60 Area 30 excavate for discharge pipe, set grade for discharge pipe, help with forms and setting pipe Totals 7 70 2. Materials Forms Location Form date Mar 28, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Mar 29, 2023, 7:23 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1540 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Excavate for Area 30 Deere 644J Loader 1 10 Excavate for Area 30 IMCO Concrete Truck 1 5 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 area 10 demo abandoned raceway demo, hoe pack native and general fill for area 30 Dump Truck 1 0 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is going to continue to work on Area 30 pipe encasements. They also have a crew working on Area 10 demo. They are breaking up the abandoned raceways behind the hatchery building. 12:00 pm Area 30 they are working on excavating and grading for the 24" discharge pipe. The demo crew is continuing to work on the abandoned raceways. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1541 of 1851 2:00 pm Attended weekly meeting. 3:00 pm Sam, IPC, has been onsite locating the power feeds to the hatchery building. He is unable to find the water line since there is no way to locate it. He has cut power to the chinook raceways to allow IMCO to start demoing it. He has located the power near the raceway. IMCO will need to stay away from the end of the raceway near pump 2, which Kirt had planned to do anyways until the hatchery operations was complete for the year. Jeff estimates this to be around the second week of May. 5:00 pm The crew has hoe packed the native material under the discharge pipe. They placed approximately 6" of general fill over the native. I took a compaction shot on this lift. The numbers looked good. I took a sample of the material and determined that it had approx. 32% retained on the 3/4 sieve. This is considered to course for testing. The material is firm and compacted well. 5:30 pm IMCO is done and plans to set the 24" discharge pipe tomorrow. References Photos (4) 20230328_151547 Taken on Mar 28, 2023, 3:15 PM MDT Added on Mar 29, 2023, 7:22 AM MDT Added by Chris Johnson 20230328_151517 Taken on Mar 28, 2023, 3:15 PM MDT Added on Mar 29, 2023, 7:22 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1542 of 1851 20230328_151539 Taken on Mar 28, 2023, 3:15 PM MDT Added on Mar 29, 2023, 7:22 AM MDT Added by Chris Johnson 20230328_151504 Taken on Mar 28, 2023, 3:15 PM MDT Added on Mar 29, 2023, 7:22 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1543 of 1851 Form detail #119: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 1 10 set up batter boards for area 30, set concrete forms for raceway pipe encasements IMCO, Operators and Labors 6 60 Totals 7 70 2. Materials Forms Location Form date Mar 27, 2023 Description Area 10, Area 30 Due date Submitted by Chris Johnson Status Closed Last update Mar 28, 2023, 9:24 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1544 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Excavate for Area 30 Deere 644J Loader 1 10 Excavate for Area 30 IMCO Concrete Truck 1 5 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 5 set raceway pipes JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 silt fence for Area 10 Dump Truck 1 0 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Attached is 7 Day Compressive Strength Report from the Trial Batching. The average of 3 cylinders is 3480 psi. 10:00 am Arrived on site. IMCO is working on area 30 and area 10. The crew working on Area 10 is installing silt fence to the limits of the walkway up the intake structure. The crew working on area 30 is pulling strings from the batter boards. They are checking to make sure it is square and right. 11:30 am IMCO has started working on setting the forms for the 6 raceway pipes. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1545 of 1851 1:00 pm IMCO and I have worked together to set the forms per the plans. We noticed a large change in the floor slab for the 7th pipe, for the raceway sprinklers. The pipe required a thickened slab with extra reinforcement. This was noticed on the rebar submittal #59 Aeration Tower Rebar Drawings. Kurt is having to rethink how he will form and pour this. 3:00 pm IMCO is continuing to work on the 6 raceway pipe encasements. They are going to pour the 5 northwestern pipes in one pour, then the 6th and 7th pipes will be in the slab pour. 4:30 pm I have been double checking the dimensions of the pipes in reference to IMCO supplied hubs for elevation, and IMCO supplied batter boards and string lines. All is looking per plan. References Photos (4) 20230327_140040 Taken on Mar 27, 2023, 2:00 PM MDT Added on Mar 28, 2023, 8:19 AM MDT Added by Chris Johnson 20230327_114316 Taken on Mar 27, 2023, 11:43 AM MDT Added on Mar 28, 2023, 8:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1546 of 1851 20230327_162405 Taken on Mar 27, 2023, 4:24 PM MDT Added on Mar 28, 2023, 8:19 AM MDT Added by Chris Johnson 20230327_140050 Taken on Mar 27, 2023, 2:00 PM MDT Added on Mar 28, 2023, 8:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1547 of 1851 Form detail #118: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 2 20 Concrete Forms, set batter boards for area 30 IMCO, Operators and Labors 6 60 Excavate area 30 Piping, Demo area 10 Concrete Totals 8 80 2. Materials Forms Location Form date Mar 23, 2023 Description Area 10 Demo, Area 30 excavation Due date Submitted by Chris Johnson Status Closed Last update Mar 23, 2023, 1:05 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1548 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Excavate for Area 30 Deere 644J Loader 1 10 Excavate for Area 30 IMCO Concrete Truck 1 5 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 0 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 Demo for Area 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO crews are going to continue working on area 30 and area 10 today. Kirt plans on having the area 30 batter boards set and start checking measurements. He would like to have the pipe encasement forms up for the 7 raceway pipes. 10:00 am IMCO has placed some general fill to fine grade under the pipe encasements for the 7 raceway pipes. They are compacting it with a plate compactor. After a few passes I shot it with my nuke gauge to check. The number seemed low compared to the 3 proctors I have on the material. The moisture was also low compared to the 3 proctors I have. I took a sample of the material under my gauge. I sieved that material out over the 3/4 sieve here onsite. I calculated 36% retained. Per ASTM D6938 any material over 30% cannot be tested with a nuclear gauge. This material will need to be documented by compaction effort. The crew continued to compact it with a plate compactor and they added water. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1549 of 1851 11:30 am I have taken a second shot on the material to document compaction effort. The numbers have gone up. I have taken a sample of the shot once again and I will take this sample back to the lab to sieve out over the 3/4. IMCO is done for the day. They have discovered an issue with their GPS or an issue with the coordinates on the plans. Jake is working on submitting an RFI to the Engineer. 1:00 pm Left site. References Photos (1) 20230323_094628 Taken on Mar 23, 2023, 9:46 AM MDT Added on Mar 23, 2023, 1:03 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1550 of 1851 Form detail #117: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 2 20 Concrete Forms IMCO, Operators and Labors 6 60 Excavate Fac. 30 Piping, Demo Fac. 10 Concrete Totals 8 80 2. Materials Forms Location Form date Mar 22, 2023 Description Facility 10, Facility 30 Due date Submitted by Chris Johnson Status Closed Last update Mar 23, 2023, 11:19 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1551 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Excavate for Fac. 30 Deere 644J Loader 1 10 Excavate for Fac. 30 IMCO Concrete Truck 1 5 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 0 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 Demo for Fac. 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO crew is going to continue to excavate for the Fac. 30 piping. They are going to continue to stockpile the native material onsite to be used as fill later. They are also going to continue to work on exposing the abandoned raceways behind the hatchery building so they can demo the concrete. 11:00 am Ryan and I drove over to the stockpile material site on the other side of the river. Ryan took a sample of the structural fill material. They are going to drop the material off to have the electrical resistivity and pH of the soil tested to determine its potential corrosivity. Jake informed me that Allwest will be performing this work. The IMCO crews are continuing to work on excavation and demo work. 2:00 pm The Fac. 10 IMCO crew is switching gears and working on removing the rest of the chain link fence along the Snake river so they can finish the silt fence per John Andersons comments. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1552 of 1851 4:30 pm IMCO crews are cleaning up for the day. Some of the required silt fence got installed. References Photos (5) 20230322_162252 Taken on Mar 22, 2023, 4:22 PM MDT Added on Mar 23, 2023, 11:18 AM MDT Added by Chris Johnson 20230322_152938 Taken on Mar 22, 2023, 3:29 PM MDT Added on Mar 23, 2023, 11:18 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1553 of 1851 20230322_115429 Taken on Mar 22, 2023, 11:54 AM MDT Added on Mar 23, 2023, 11:18 AM MDT Added by Chris Johnson 20230322_115236 Taken on Mar 22, 2023, 11:52 AM MDT Added on Mar 23, 2023, 11:18 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1554 of 1851 20230322_115219 Taken on Mar 22, 2023, 11:52 AM MDT Added on Mar 23, 2023, 11:18 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1555 of 1851 Form detail #114: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 2 20 Concrete Forms IMCO, Operators and Labors 6 60 Excavate Fac. 30 Piping, Demo Fac. 10 Concrete Totals 8 80 2. Materials Forms Location Form date Mar 21, 2023 Description Facility 10, Facility 30 Due date Submitted by Chris Johnson Status Closed Last update Mar 21, 2023, 4:51 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1556 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 10 Excavate for Fac. 30 Deere 644J Loader 1 10 Excavate for Fac. 30 IMCO Concrete Truck 1 5 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 0 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 Demo for Fac. 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO plans to excavate for Fac. 30 piping. They are setting up the laser for grade. They are going to store the native spoils onsite for now with the intent to use onsite for fill. They are also working on building forms for building foundations. Another crew is working on excavating and demoing concrete near the hatchery building. 10:30 am I was notified that IMCO has found some buried wires while excavating for Fac. 30 discharge pipe. One wire is cut and has been cut for awhile. The crew stopped excavating until it gets figured out. 11:30 am Itsy and Caleb are onsite working on confirming the wire and its purpose. The crew is going to start working on excavating for other pipes at Fac. 30. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1557 of 1851 1:00 pm It was determined that the wire that was damaged is dead and is unknow, IPC was able to determine that there are live wires that feed the crowders are in the same vicinity. IMCO crew has agreed to proceed carefully. 1:30 pm IMCO crew quickly found the second set of wires and IPC was able to determine they are live and in use for the crowders. IMCO will have to work around these wires to keep the hatchery operational. 2:00 pm Attended weekly meeting. 3:00 pm Kurt has informed me both excavation crews have found wires and or conduit that is not marked or shown. One wire and one conduit was found while excavating for the piping at Fac. 30. Another was found while demoing the abandoned raceways behind the hatchery building. I informed Kurt that Sam will not be able to locate anything until Monday of next week so Kurt is having his crews work on other areas until Sam is available. 4:30 pm The crews were able to continue working on excavation and demoing. Kurt has a truck coming at the end of the week to load out concrete so he is trying to get enough demo concrete for a full load. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1558 of 1851 References Photos (5) 20230321_111157 Taken on Mar 21, 2023, 11:11 AM MDT Added on Mar 21, 2023, 4:41 PM MDT Added by Chris Johnson 20230321_161043 Taken on Mar 21, 2023, 4:10 PM MDT Added on Mar 21, 2023, 4:41 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1559 of 1851 20230321_152314 Taken on Mar 21, 2023, 3:23 PM MDT Added on Mar 21, 2023, 4:41 PM MDT Added by Chris Johnson 20230321_150432 Taken on Mar 21, 2023, 3:04 PM MDT Added on Mar 21, 2023, 4:41 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1560 of 1851 20230321_150356 Taken on Mar 21, 2023, 3:03 PM MDT Added on Mar 21, 2023, 4:41 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1561 of 1851 Form detail #113: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, Carpenters 2 20 Concrete Forms, Pour Concrete IMCO, Operators and Labors 6 60 Help with Trail Batching, install BMPs, Pour Concrete Totals 8 80 2. Materials Forms Location Form date Mar 20, 2023 Description Facility 10, Facility 30, Trail Batching Due date Submitted by Chris Johnson Status Closed Last update Mar 21, 2023, 4:14 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1562 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Deere 210 Excavator 1 0 Deere 644J Loader 1 0 IMCO Concrete Truck 1 5 IMCO Concrete Truck 1 0 JCB 510 Boom Forklift 1 0 JCB 510 Boom Forklift 1 0 Hitachi 85 Excavator 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:00 am Arrived on site. I set up for the concrete trial batching pour. IMCO is going to use the trial batching concrete for eco blocks. They plan to make 3 CY at a time. 10:00 am Connect Engineering is onsite to perform concrete testing on behalf of IMCO. 11:00 am IMCO has produced the first batch. Connect and I both sampled. We both tested air and slump. Air was at 5.0 for both of us and slump was at 8.5 which is out of spec. IMCO decided to make another batch so I did not cast cylinders for the first pour. Connect decided to cast cylinders to see how strong the concrete would be at 8" slump. 12:00 pm IMCO has batched another 3 CY and I sampled and tested the mix. See concrete test report. The slump Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1563 of 1851 and air was in so I casted 12 4x8 cylinders. I plan to have our lab break cylinders at 7, 14, 21 and 28 days. 3:00 pm IMCO is working on cleaning the site and setting up to start excavating for facility 30. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1564 of 1851 Form detail #111: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Forms Location Form date Dec 5, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Dec 5, 2022, 8:53 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1565 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 56 day compressive report for the platform pour on 10/5/22. The 28 Day breaks were under the spec of 4000 psi. The 3 holds were used to break and verify at 56 days. They are within spec. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1566 of 1851 Form detail #109: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Forms Location Form date Nov 21, 2022 Description Facility 20, Hatchery Intake, 28 day compressive strength Due date Submitted by Chris Johnson Status Closed Last update Nov 21, 2022, 9:42 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1567 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Attached are the 28 day compressive day reports on the walkway and platform concrete pours. The platform pour compressive strength average was 3910 PSI. This is 98% of the 4000 PSI required. We will break the 3 holds at 56 days to verify they meet the 4000 PSI requirement. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1568 of 1851 Form detail #108: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Install Security Gate Sawtooth Welding 1 8 Cut handrail, reinstall around security gate Totals 3 18 2. Materials Forms Location Form date Nov 16, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Nov 21, 2022, 9:28 AM MST Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1569 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:30 am Arrived on site. Jake, IMCO, informed me they were going to be setting the security gate today. Sawtooth is onsite cutting the handrail to allow the gate to be installed on the walkway. 11:00 am Sawtooth has the wrong 90 bends to weld to the handrail. He brought 1 1/4" but the hand rail is 1 1/2". Sawtooth is sending someone out with the proper 90 bends. 2:30 pm Sawtooth is still working on welding the handrail together. Jake informed me instead of me waiting he would send me a photo of the final product install. We went over the dimensions of the install and I left the site. 5:00 pm I spoke to Jake after he sent me a photo of the final install. He said he was not able to get all the anchors in to secure the plates to the concrete. They ran into issues with the outriggers being in the way. He plans to discuss this with Bill. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1570 of 1851 References Photos (4) 20221116_142050.jpg Taken on Nov 16, 2022, 2:20 PM MST Added on Nov 21, 2022, 9:27 AM MST Added by Chris Johnson 20221116_094727.jpg Taken on Nov 16, 2022, 9:47 AM MST Added on Nov 21, 2022, 9:27 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1571 of 1851 Resized_20221116_144658.jpeg Added on Nov 21, 2022, 9:28 AM MST Added by Chris Johnson Resized_20221116_144704.jpeg Added on Nov 21, 2022, 9:28 AM MST Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1572 of 1851 Form detail #107: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 install irrigation line, clean up site, install roof on posts Totals 3 10 2. Materials Material Quantity Unit Comment Forms Location Form date Oct 25, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 26, 2022, 8:41 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1573 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on installing the roof on the posts. They are prepping to fly it in. 9:30 am IMCO has installed the roof on the posts and are bolting it on. A couple of the bolts are not lining up. They will need to drill them out. 12:00 pm IMCO is working on cleaning up the site. 2:00 pm Attended weekly meeting. Jake is still waiting on a design for the gate to prevent access to the structure. 3:00 pm IMCO is pulling the silt curtain out of the river. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1574 of 1851 References Photos (4) 20221025_085753.jpg Taken on Oct 25, 2022, 8:57 AM MDT Added on Oct 25, 2022, 2:20 PM MDT Added by Chris Johnson 20221025_124240.jpg Taken on Oct 25, 2022, 12:42 PM MDT Added on Oct 25, 2022, 2:20 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1575 of 1851 20221025_124303.jpg Taken on Oct 25, 2022, 12:43 PM MDT Added on Oct 25, 2022, 2:20 PM MDT Added by Chris Johnson 20221025_124611.jpg Taken on Oct 25, 2022, 12:46 PM MDT Added on Oct 25, 2022, 2:21 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1576 of 1851 Form detail #106: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 install irrigation line, install roof posts, load pile hammer, clean up site MB Welding 1 10 modify roof posts Totals 4 20 2. Materials Forms Location Form date Oct 24, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 25, 2022, 1:13 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1577 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 3:00 pm IMCO is working on the roof posts. The post foot plate are not welded on correctly. MB Welding is cutting and re welding the plate on the correct direction. They are also working on cleaning up the site and preparing for the winter shut down. 5:00 pm The crew has installed all 4 posts for the roof. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1578 of 1851 Form detail #105: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Weld last beam, install irrigation line MB Welding 1 10 weld last support beam Totals 4 20 2. Materials Forms Location Form date Oct 20, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 24, 2022, 3:02 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1579 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO is working on installing the irrigation line. They will finish the core drill for the penetration through the slab. They are waiting on another core bit. 12:00 pm IMCO is going to set the roof next week. They are waiting on a crane operator availability. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1580 of 1851 References Photos (1) 20221020_093829.jpg Taken on Oct 20, 2022, 9:38 AM MDT Added on Oct 24, 2022, 3:01 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1581 of 1851 Form detail #104: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Irrigation pump install, Remove temp piles, fly last beam to be welded MB Welding 1 10 dismantling crane pad, weld last support beam Vale Electric, Electricians 2 8 wire and turn on irrigation pump Totals 8 28 Forms Location Form date Oct 19, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 20, 2022, 8:50 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1582 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is prepping a level crane pad to being removing the temp piles. 11:00 am IMCO is setup and is starting to remove the temp piles. 2:00 pm The temp piles have been removed. They have set the irrigation pump and Vale is onsite to wire it in. 3:30 pm After switching the wires Vale has confirmed the pump is spinning the correct way. 5:00 pm IMCO and MB have place the last support now that the piles are out of the way. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1583 of 1851 References Photos (6) 20221019_155435.jpg Taken on Oct 19, 2022, 3:54 PM MDT Added on Oct 20, 2022, 8:48 AM MDT Added by Chris Johnson 20221019_111832.jpg Taken on Oct 19, 2022, 11:18 AM MDT Added on Oct 20, 2022, 8:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1584 of 1851 20221019_120022.jpg Taken on Oct 19, 2022, 12:00 PM MDT Added on Oct 20, 2022, 8:47 AM MDT Added by Chris Johnson 20221019_130700.jpg Taken on Oct 19, 2022, 1:07 PM MDT Added on Oct 20, 2022, 8:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1585 of 1851 20221019_134310.jpg Taken on Oct 19, 2022, 1:43 PM MDT Added on Oct 20, 2022, 8:48 AM MDT Added by Chris Johnson 20221019_152841_video Taken on Oct 19, 2022, 9:28 PM MDT Added on Oct 20, 2022, 8:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1586 of 1851 Form detail #103: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 temp renovations for Jeff, remove crane pad, place rip rap, prepare irrigation pump MB Welding 1 10 dismantling crane pad Totals 6 20 2. Materials Forms Location Form date Oct 18, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 20, 2022, 8:27 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1587 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO plans to remove the rest of the crane pad today. The hammer is scheduled to be onsite today to remove the piles. They might get to it today or tomorrow. 11:00 am Kirt has removed most of the crane pad and backfilled and placed rip rap along the shore. Sam, IPC, was onsite and turned the pump on. The ponds are filling up and plan to keep the pump running for rest of the season. 2:00 pm Attended weekly meeting. The pile hammer is onsite to remove the temp piles. They will perform this work tomorrow. 5:00 pm Motor Works has put together the column, motor, pump and shroud for the irrigation can. They plan to set this tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1588 of 1851 References Photos (8) 20221018_144657.jpg Taken on Oct 18, 2022, 2:46 PM MDT Added on Oct 19, 2022, 9:15 AM MDT Added by Chris Johnson 20221018_123619.jpg Taken on Oct 18, 2022, 12:36 PM MDT Added on Oct 19, 2022, 9:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1589 of 1851 20221018_123631.jpg Taken on Oct 18, 2022, 12:36 PM MDT Added on Oct 19, 2022, 9:15 AM MDT Added by Chris Johnson 20221018_150452.jpg Taken on Oct 18, 2022, 3:04 PM MDT Added on Oct 19, 2022, 9:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1590 of 1851 20221018_085955.jpg Taken on Oct 18, 2022, 8:59 AM MDT Added on Oct 19, 2022, 9:14 AM MDT Added by Chris Johnson 20221018_105250.jpg Taken on Oct 18, 2022, 10:52 AM MDT Added on Oct 19, 2022, 9:14 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1591 of 1851 20221018_123647.jpg Taken on Oct 18, 2022, 12:36 PM MDT Added on Oct 19, 2022, 9:15 AM MDT Added by Chris Johnson 20221018_144650.jpg Taken on Oct 18, 2022, 2:46 PM MDT Added on Oct 19, 2022, 9:15 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1592 of 1851 Form detail #102: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Install pond transducer, temp renovations for Jeff, being dismantling crane pad Vale Electric, Electricians 3 8 work on pump panels, installing switch MB Welding 1 10 dismantling crane pad Totals 7 28 Forms Location Form date Oct 17, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 19, 2022, 9:07 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1593 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 12:00 pm IMCO is working on the transducer for the ponds. Vale has wired it up and IMCO is installing it in the pond with the direction of Jeff. Attached is the grout cube breaks for the 48 hour Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1594 of 1851 References Photos (1) 20221017_152142.jpg Taken on Oct 17, 2022, 3:21 PM MDT Added on Oct 19, 2022, 9:06 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1595 of 1851 Form detail #101: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Work on pond renovations for Jeff Vale Electric, Electricians 3 8 Run pumps for start up Totals 5 18 2. Materials Material Quantity Unit Comment Forms Location Form date Oct 13, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 18, 2022, 9:33 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1596 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am Vale is onsite to check the motors before running them and testing. 12:00 pm Bill, Kelby and CH Spencer have been onsite working on running the pumps and testing. Attached is the grout cube breaks for the 48 hour Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1597 of 1851 References Photos (2) 20221013_085827.jpg Taken on Oct 13, 2022, 8:58 AM MDT Added on Oct 18, 2022, 9:32 AM MDT Added by Chris Johnson 20221013_085837.jpg Taken on Oct 13, 2022, 8:58 AM MDT Added on Oct 18, 2022, 9:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1598 of 1851 Form detail #100: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Grout pump can base, clean up around platform and walkway, install airvac piping, MB Welding 1 10 welding stilling well brackets, weld nut for mud valve, clean up Sawtooth Welding 2 8 Re drill kick plate holes, install airburst line brackets Forms Location Form date Oct 12, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 18, 2022, 9:29 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1599 of 1851 Crew # Workers # Total hours Work performed Vale Electric, Electricians 5 8 land wires in motors, bump motors for rotation Totals 13 36 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am Sawtooth is onsite to work on the kick plates and air bust line brackets. The kick plates need to be re drilled because they pre drilled the holes for a 12" concrete deck instead of the walkway 6" deck. 9:00 am IMCO is working on grouting the pump can base that they did not have time to do yesterday. 12:00 pm MB Welding is working on welding various brackets for the stilling well and the mud valve. 3:00 pm Vale has landed the wires for the motors. Attached is the grout cube breaks for the 24 hour Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1600 of 1851 References Photos (2) 20221012_105953.jpg Taken on Oct 12, 2022, 10:59 AM MDT Added on Oct 18, 2022, 9:26 AM MDT Added by Chris Johnson 20221012_110019.jpg Taken on Oct 12, 2022, 11:00 AM MDT Added on Oct 18, 2022, 9:26 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1601 of 1851 Form detail #99: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Grout pump can base, clean up around platform and walkway, install airvac piping, MB Welding 1 10 welding stilling well brackets, weld nut for mud valve, clean up Totals 6 20 2. Materials Forms Location Form date Oct 11, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 12, 2022, 7:19 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1602 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on grouting the second pump can base. MB Welding is working on welding the brackets for the stilling well and the level sensor. 12:00 pm Kirt, Jake and I met with Jeff to go over what all is need for the hatchery to operate this year. Kirt has a plan to get water to the sorting room along with drains and pipe to get the fish to the far pond. IMCO is working on cleaning the concrete and grease off the pieces under the walkway. They are also working on the piping for the air vacs. 2:00 pm Attended meeting 3:00 pm IMCO is continuing to clean and double check bolts are tight. Attached is the 24 hour grout cube compressive strength report. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1603 of 1851 References Photos (5) 20221011_102303.jpg Taken on Oct 11, 2022, 10:23 AM MDT Added on Oct 12, 2022, 7:16 AM MDT Added by Chris Johnson 20221011_132707.jpg Taken on Oct 11, 2022, 1:27 PM MDT Added on Oct 12, 2022, 7:16 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1604 of 1851 20221011_132712.jpg Taken on Oct 11, 2022, 1:27 PM MDT Added on Oct 12, 2022, 7:16 AM MDT Added by Chris Johnson 20221011_132723.jpg Taken on Oct 11, 2022, 1:27 PM MDT Added on Oct 12, 2022, 7:16 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1605 of 1851 20221011_132745.jpg Taken on Oct 11, 2022, 1:27 PM MDT Added on Oct 12, 2022, 7:16 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1606 of 1851 Form detail #98: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Grout pump can base, bolt up valves help MB Welding MB Welding 1 10 Weld Pipe Braces back on Vale Electric, Electricians 5 8 Pull wire for pumps Totals 11 28 Forms Location Form date Oct 10, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 11, 2022, 7:32 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1607 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 2:00 pm Arrived on site. The pumps have been installed and one motor is installed. The other motor is missing a bushing that should be here tomorrow. 2:30 pm I noticed that the DMJ (Dismantling joints) on both heads did not have the restraint bolts installed. I spoke to Jake and Kirt about this. They told me that both the 90 bend and the discharge head are restraint so the bolts were not needed. 3:00 pm The crew is starting to mix grout for under the pump cans. They are mixing it in a bucket but the consistency is dry packing. I have taken 6 cubes for compressive strength breaking. 4:30 pm The crew was not able to get to the other grout pad today. They will do it first thing tomorrow morning. MB welding has been working on the pipe brackets under the walkway. Now that everything is solid and in place he can weld the brackets back on. Vale Electric has been onsite. They are working on pulling wires and installing boxes to power the pumps. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1608 of 1851 References Photos (5) 20221010_135951.jpg Taken on Oct 10, 2022, 1:59 PM MDT Added on Oct 11, 2022, 7:30 AM MDT Added by Chris Johnson 20221010_135958.jpg Taken on Oct 10, 2022, 1:59 PM MDT Added on Oct 11, 2022, 7:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1609 of 1851 20221010_140006.jpg Taken on Oct 10, 2022, 2:00 PM MDT Added on Oct 11, 2022, 7:30 AM MDT Added by Chris Johnson 20221010_145339.jpg Taken on Oct 10, 2022, 2:53 PM MDT Added on Oct 11, 2022, 7:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1610 of 1851 20221010_154438.jpg Taken on Oct 10, 2022, 3:44 PM MDT Added on Oct 11, 2022, 7:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1611 of 1851 Form detail #96: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Forms Location Form date Oct 8, 2022 Description Facility 20, Hatchery Intake, Compressive Strength Report Due date Submitted by Chris Johnson Status Closed Last update Oct 10, 2022, 3:20 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1612 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Compressive Strength Report for 3 day break on the Platform Concrete Pour Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1613 of 1851 Form detail #95: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 6 10 Pour housekeeping pad, help pump installers, store material in connexs Totals 6 10 2. Materials Material Quantity Unit Comment Forms Location Form date Oct 7, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 10, 2022, 2:21 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1614 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is onsite and getting ready for the concrete pour for the housekeeping pad. 8:00 am IMC concrete is onsite. 9:00 am I tested the truck when it arrived for air. The air was 3.2%. Jake dosed it with master air. I took a second test and it was 5%. They are starting to pour. 9:30 am The crew has completed the pour and are now working on finishing it. 10:00 am The pump installers are onsite. 12:00 pm The pump installers are working on installing the pump columns in the pump cans now. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1615 of 1851 References Photos (4) 20221007_082501.jpg Taken on Oct 7, 2022, 8:25 AM MDT Added on Oct 10, 2022, 2:18 PM MDT Added by Chris Johnson 20221007_112156.jpg Taken on Oct 7, 2022, 11:21 AM MDT Added on Oct 10, 2022, 2:19 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1616 of 1851 20221007_120747.jpg Taken on Oct 7, 2022, 12:07 PM MDT Added on Oct 10, 2022, 2:19 PM MDT Added by Chris Johnson 20221007_115956.jpg Taken on Oct 7, 2022, 11:59 AM MDT Added on Oct 10, 2022, 2:19 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1617 of 1851 Form detail #94: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 6 10 Clean up platfrom from concrete pour, remove discharge heads for pump install, form housekeeping pad, grout temp pond for water seal Idaho Testing and Inspection 1 2 Inspect Welds Totals 7 12 Forms Location Form date Oct 6, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 7, 2022, 7:22 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1618 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am Crew is onsite and starting to clean up after yesterdays pour. 8:00 am Idaho Testing and Inspection is onsite to perform the structural weld inspection on the welds for the platform and walkway. 9:00 am IMCO has removed both discharge heads from the pump cans. This is so they can install the pumps when the pump sub arrives. 10:00 am Jake informed me that the pump guys called and will not be here today. They plan to install the pumps Friday and Saturday. The weld inspection is complete. He did not find any deficiencies. 12:00 pm IMC called and they had a cancelation for tomorrow. Jake and Kirt have ordered concrete for tomorrow to pour the housekeeping pad. The pour is at 8am. 3:00 pm IMCO is working on forming the housekeeping pad along with pouring the grout in the seam to make a watertight seal in the holding ponds. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1619 of 1851 References Photos (6) 20221006_121946.jpg Taken on Oct 6, 2022, 12:19 PM MDT Added on Oct 7, 2022, 7:21 AM MDT Added by Chris Johnson 20221006_121957.jpg Taken on Oct 6, 2022, 12:19 PM MDT Added on Oct 7, 2022, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1620 of 1851 20221006_094058.jpg Taken on Oct 6, 2022, 9:40 AM MDT Added on Oct 7, 2022, 7:20 AM MDT Added by Chris Johnson 20221006_094107.jpg Taken on Oct 6, 2022, 9:41 AM MDT Added on Oct 7, 2022, 7:20 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1621 of 1851 20221006_121940.jpg Taken on Oct 6, 2022, 12:19 PM MDT Added on Oct 7, 2022, 7:20 AM MDT Added by Chris Johnson 20221006_134118.jpg Taken on Oct 6, 2022, 1:41 PM MDT Added on Oct 7, 2022, 7:21 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1622 of 1851 Form detail #92: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 7 10 Pour Platform Concrete Totals 7 10 2. Materials Material Quantity Unit Comment Forms Location Form date Oct 5, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 6, 2022, 8:32 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1623 of 1851 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is making the final preparation for the concrete pour. 9:30 am I have checked all the rebar again along with the penetrations and conduit. I believe everything is ready for concrete. 10:00 am The pump truck and first truck are onsite. IMC QC is working on dosing the mud for air. 10:30 am I have tested the concrete. Air is in spec. Slump was high. I notified the QC. 11:00 am The second truck is poured out. The platform is full so the third truck is not needed. They are going to use the third truck to pour the walls in the holding ponds. I have casted 3 extra cylinders for a field cure 3 day break. They will cure on the walkway. 1:00 pm IMCO is continuing to work on finishing the concrete. 5:00 pm IMCO has opened up the hatches and has set them on the roof to check the fit. I have asked Jake and Kirt if they are to be set at the 1/12 angle or sit level on the roof. They did not see anything in the plans regarding sitting the hatches level. It did raise the question of the hatches are large enough to pull the discharge head out. After checking dimensions it looks like it will fit. Attached is the 7 day Compressive Field Report for the 9/28/22 walkway pour Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1624 of 1851 References Photos (3) 20221005_110626.jpg Taken on Oct 5, 2022, 11:06 AM MDT Added on Oct 6, 2022, 8:32 AM MDT Added by Chris Johnson 20221005_120828.jpg Taken on Oct 5, 2022, 12:08 PM MDT Added on Oct 6, 2022, 8:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1625 of 1851 20221005_111640.jpg Taken on Oct 5, 2022, 11:16 AM MDT Added on Oct 6, 2022, 8:32 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1626 of 1851 Form detail #91: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Prep for concrete pour tomorrow. MB Welding 1 10 roof welding Vale Electric, Electricians 5 8 Raceway install, control room install EOI, Iron workers 3 10 Tie platform rebar Totals 14 38 Forms Location Form date Oct 4, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 5, 2022, 12:36 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1627 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am MB Welding is onsite working on welding the picking eyes on the platform roof. IMCO is working on sealing up the pan decking before the rebar guys arrive. 10:00 am EOI is onsite to install the rebar. I went over the approved submittal plans with them. 12:00 pm EOI has installed the bottom matt of the platform. After checking measurements, it is not possible to fit all the rebar in vertically and provide the clearance for top and bottom to concrete. Jake has sent an email to Sarah Dolin regarding moving the rebar trim bars around the penetrations to the bottom mat. This will gain 1.75” of vertical clearance. 1:00 pm It has been approved to move the trim bars to the bottom mat only. EOI is continuing to tie the bar. Vale is onsite running the conduit. They are running it in between the two mats. IMCO is working on forming a wall pour in the holding ponds for the temp structure. They plan to pour this tomorrow. 4:30 pm EOI is done with the rebar. I have checked it and asked to make a couple corrections. The pumps are onsite. 5:30 pm The rebar is ready for tomorrows pour. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1628 of 1851 References Photos (12) 20221004_121623.jpg Taken on Oct 4, 2022, 12:16 PM MDT Added on Oct 5, 2022, 11:49 AM MDT Added by Chris Johnson 20221004_145702.jpg Taken on Oct 4, 2022, 2:57 PM MDT Added on Oct 5, 2022, 12:02 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1629 of 1851 20221004_164418.jpg Taken on Oct 4, 2022, 10:44 PM MDT Added on Oct 5, 2022, 12:01 PM MDT Added by Chris Johnson 20221004_164430.jpg Taken on Oct 4, 2022, 4:44 PM MDT Added on Oct 5, 2022, 12:04 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1630 of 1851 20221004_164442.jpg Taken on Oct 4, 2022, 4:44 PM MDT Added on Oct 5, 2022, 12:08 PM MDT Added by Chris Johnson 20221004_164527.jpg Taken on Oct 4, 2022, 4:45 PM MDT Added on Oct 5, 2022, 12:13 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1631 of 1851 20221004_081202.jpg Taken on Oct 4, 2022, 8:12 AM MDT Added on Oct 5, 2022, 11:45 AM MDT Added by Chris Johnson 20221004_121635.jpg Taken on Oct 4, 2022, 12:16 PM MDT Added on Oct 5, 2022, 11:52 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1632 of 1851 20221004_132145.jpg Taken on Oct 4, 2022, 1:21 PM MDT Added on Oct 5, 2022, 11:53 AM MDT Added by Chris Johnson 20221004_145647.jpg Taken on Oct 4, 2022, 2:56 PM MDT Added on Oct 5, 2022, 11:55 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1633 of 1851 20221004_164448.jpg Taken on Oct 4, 2022, 4:44 PM MDT Added on Oct 5, 2022, 12:11 PM MDT Added by Chris Johnson 20221004_164614.jpg Taken on Oct 4, 2022, 4:46 PM MDT Added on Oct 5, 2022, 12:15 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1634 of 1851 Form detail #90: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Install discharge head, valves and DMJ, Sawcut walkway control joints MB Welding 1 10 roof welding Vale Electric, Electricians 5 8 Raceway install, control room install Totals 10 28 Forms Location Form date Oct 3, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Oct 4, 2022, 8:45 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1635 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:00 am IMCO is working on lining up the 90 bends to match the discharge heads. They are working on getting the valve bolt holes to line up. MB Welding is welding the roof steel framing on along with the picking eyes that were moved. 12:00 pm Kurt and I spoke about the picking eyes. He asked if he could leave them on. As previously spoke about with Bill, the eyes will need to be removed because they are not galvanized. 2:00 pm Vale is working on running the conduit for the platform. Tomorrow the rebar guys will be onsite to tie the bar for the platform. Vale will then tie their raceways to the bar to allow for proper clearance. 4:00 pm IMCO has installed the valves for the second discharge head. They are going to work on sawcutting the walkway control joints now. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1636 of 1851 References Photos (4) 20221003_122913.jpg Taken on Oct 3, 2022, 12:29 PM MDT Added on Oct 4, 2022, 8:29 AM MDT Added by Chris Johnson 20221003_123446.jpg Taken on Oct 3, 2022, 12:34 PM MDT Added on Oct 4, 2022, 8:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1637 of 1851 20221003_105051.jpg Taken on Oct 3, 2022, 4:50 PM MDT Added on Oct 4, 2022, 8:30 AM MDT Added by Chris Johnson 20221003_104746.jpg Taken on Oct 3, 2022, 10:47 AM MDT Added on Oct 4, 2022, 8:30 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1638 of 1851 Form detail #89: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 fuse temp pipe, clean up walkway from pour MB Welding 1 10 platform welding Vale Electric, Electricians 5 8 Raceway install, control room install Totals 10 28 Forms Location Form date Sep 29, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 30, 2022, 9:44 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1639 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO and MB Welding are onsite. IMCO is going to continue working on fusing the HDPE pipe today. MB is going to continue finishing welding the platform. 11:00 am Vale is onsite. They are installing conduit in the slab. They screwed it to the pandecking. I mentioned that was not per spec. Jake and I reviewed pan decking details. There are some questions regarding the welding schedule so Jake setup a meeting with Bryant and Sarah. 12:00 pm Attended meeting regarding the pandecking details. I also mentioned the raceway install in the slab. Bryant agreed the conduit should be off the pandecking and tied to the rebar. They are going to get back to Jake regarding the pandecking welding schedule. 3:00 pm IMCO has finished fusing the pipe and is working on installing it in the ground and bolting it to the piping. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1640 of 1851 References Photos (3) 20220929_134943.jpg Taken on Sep 29, 2022, 1:49 PM MDT Added on Sep 30, 2022, 9:44 AM MDT Added by Chris Johnson 20220929_141638.jpg Taken on Sep 29, 2022, 2:16 PM MDT Added on Sep 30, 2022, 9:44 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1641 of 1851 20220929_142121.jpg Taken on Sep 29, 2022, 2:21 PM MDT Added on Sep 30, 2022, 9:44 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1642 of 1851 Form detail #88: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 pour walkway, fuse temp pipe MB Welding 1 10 Roof welding Vale Electric, Electricians 5 8 Raceway install Totals 10 28 2. Materials Forms Location Form date Sep 28, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 29, 2022, 7:35 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1643 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am Concrete pump truck is onsite and setting up. 8:00 am Concrete truck is onsite. IMC also has a QC here. The mix code matches the approved mix design. The QC is dosing the concrete with superplasticizer. He tested the air at 5%. He added 4 oz of master air. They are going to start pouring. 8:30 am After the pump truck was primed I took my sample. Air was at 5.5%, they started pouring. I casted 9 cylinders. See attached test report. 9:30 am They have finished the pour and IMCO is working on finishing the concrete. IMCO is also continuing to work on fusing the HDPE pipe. 11:00 am Vale is onsite to continue working on raceway install. The second discharge head is onsite. They plan to install it tomorrow. 2:00 pm IMCO is continuing to work on fusing the HDPE pipe. 3:00 pm MB Welding is working on welding the last members of the roof structure. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1644 of 1851 References Photos (5) 20220928_073811.jpg Taken on Sep 28, 2022, 7:38 AM MDT Added on Sep 29, 2022, 7:18 AM MDT Added by Chris Johnson 20220928_073817.jpg Taken on Sep 28, 2022, 7:38 AM MDT Added on Sep 29, 2022, 7:18 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1645 of 1851 20220928_091844.jpg Taken on Sep 28, 2022, 9:18 AM MDT Added on Sep 29, 2022, 7:18 AM MDT Added by Chris Johnson 20220928_140648.jpg Taken on Sep 28, 2022, 2:06 PM MDT Added on Sep 29, 2022, 7:18 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1646 of 1851 20220928_102712.jpg Taken on Sep 28, 2022, 10:27 AM MDT Added on Sep 29, 2022, 7:18 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1647 of 1851 Form detail #87: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 sheet roof, fuse temp pipe MB Welding 1 10 Temp structure for ponds Vale Electric, Electricians 5 8 Raceway install Totals 10 28 2. Materials Forms Location Form date Sep 27, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 28, 2022, 10:24 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1648 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is still waiting on the discharge head to arrive. The HDPE fusion machine will be delivered soon so they plan to start on that today. 10:00 am IMCO crew has started on sheeting the roof. They installed the blocking last week. Jake informed me they will also install the metal roofing on the ground before they fly it in place. 12:00 pm IMCO is working on fusing the HDPE pipe. 3:00 pm Everything is ready for tomorrows concrete pour. IMCO is continuing to work on sheeting the roof and welding the HDPE pipe. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1649 of 1851 References Photos (6) 20220927_123032.jpg Taken on Sep 27, 2022, 12:30 PM MDT Added on Sep 28, 2022, 10:23 AM MDT Added by Chris Johnson 20220927_142507.jpg Taken on Sep 27, 2022, 2:25 PM MDT Added on Sep 28, 2022, 10:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1650 of 1851 20220927_083830.jpg Taken on Sep 27, 2022, 8:38 AM MDT Added on Sep 28, 2022, 10:22 AM MDT Added by Chris Johnson 20220927_123058.jpg Taken on Sep 27, 2022, 12:30 PM MDT Added on Sep 28, 2022, 10:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1651 of 1851 20220927_123105.jpg Taken on Sep 27, 2022, 12:31 PM MDT Added on Sep 28, 2022, 10:23 AM MDT Added by Chris Johnson 20220927_153321.jpg Taken on Sep 27, 2022, 3:33 PM MDT Added on Sep 28, 2022, 10:23 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1652 of 1851 Form detail #86: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 prep for temp pipe install, clean up yard MB Welding 1 10 Install nelson studs Totals 3 20 2. Materials Forms Location Form date Sep 26, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 27, 2022, 8:11 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1653 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:00 am IMCO and MB Welding are onsite. IMCO is working on cleaning up the yard. Friday they worked on excavating the trench for the temp pipe. They found the phone line and did not hit it. They did however find a cable line and went through it. Sam is onsite taking a look. Sam has determined that it is just an abandoned cable. 2:00 pm MB Welding is continuing to work on the nelson studs for the platform. IMCO is cleaning up the area in preparation for the concrete pour Wednesday. 4:00 pm IMCO is waiting on the discharge head to arrive. It was scheduled to be here today but has not shown up yet. Over the weekend they tied the rebar for the walkway. I noticed it was laying on the decking with no clearance. I notified Jake the rebar needed to be lifted up to approx. 1” from the top of concrete. He said they planed on it Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1654 of 1851 References Photos (3) 20220926_134640.jpg Taken on Sep 26, 2022, 1:46 PM MDT Added on Sep 27, 2022, 8:00 AM MDT Added by Chris Johnson 20220927_074926.jpg Taken on Sep 27, 2022, 7:49 AM MDT Added on Sep 27, 2022, 8:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1655 of 1851 20220927_075001.jpg Taken on Sep 27, 2022, 7:49 AM MDT Added on Sep 27, 2022, 8:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1656 of 1851 Form detail #85: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 install mechanical piping MB Welding 1 10 Install nelson studs Totals 4 20 2. Materials Material Quantity Unit Comment Forms Location Form date Sep 22, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 27, 2022, 7:28 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1657 of 1851 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is going to continue to work on bolting the piping to the 90s and discharge head. MB welding is continuing to work on the nelson studs along the platform. 12:00 pm IMCO has installed the second 90 bend on the manifold. They are working on bolting them tight. 2:00 pm IMCO is continuing to work on bolting the valves to the 90s. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1658 of 1851 References Photos (4) 20220922_132249.jpg Taken on Sep 22, 2022, 1:22 PM MDT Added on Sep 27, 2022, 7:28 AM MDT Added by Chris Johnson 20220922_133355.jpg Taken on Sep 22, 2022, 1:33 PM MDT Added on Sep 27, 2022, 7:28 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1659 of 1851 20220922_081105.jpg Taken on Sep 22, 2022, 8:11 AM MDT Added on Sep 27, 2022, 7:27 AM MDT Added by Chris Johnson 20220922_091131.jpg Taken on Sep 22, 2022, 9:11 AM MDT Added on Sep 27, 2022, 7:27 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1660 of 1851 Form detail #84: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 prep 90 bends for coatings, coat 90s, install mechanical piping MB Welding 1 10 Install nelson studs Totals 4 20 2. Materials Forms Location Form date Sep 21, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 22, 2022, 8:05 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1661 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO and MB are onsite working on the walkway. MB is continuing to weld the nelson studs to the walkway beams. 9:00 am IMCO is working on prepping the 90s for coatings. They need to prep and recoat where the seep ring was welded. The heat from the welding ruined the coatings near the ring. 10:00 am IMCO is working on installing the check valve, butterfly valve and the DMJ. These all bolt up between the discharge head and the 90 bend. They are getting these installed to ensure the 90 bends line up correctly and they can re attach the pipe supports under the walkway. 2:00 pm IMCO has coated the interior of the 90 bends where the heat from welding damaged them. They plan to install the 90 once it is setup. 6:00 pm IMCO is done. They have installed the 90 on the manifold are braced it off. They will continue to the next 90 tomorrow and work on lining everything up. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1662 of 1851 References Photos (3) 20220921_091806.jpg Taken on Sep 21, 2022, 9:18 AM MDT Added on Sep 22, 2022, 7:56 AM MDT Added by Chris Johnson 20220921_145837.jpg Taken on Sep 21, 2022, 2:58 PM MDT Added on Sep 22, 2022, 7:56 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1663 of 1851 20220921_164220.jpg Taken on Sep 21, 2022, 4:42 PM MDT Added on Sep 22, 2022, 7:56 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1664 of 1851 Form detail #83: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Framing, metal decking install, prep 90 bends for coatings MB Welding 1 10 Install nelson studs Totals 4 20 2. Materials Forms Location Form date Sep 20, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 21, 2022, 10:00 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1665 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am MB Welding plans on continuing to work on installing the nelson studs on the walkway. 9:00 am IMCO is working on cutting and placing the metal decking on the platform. They are going to cut out for the 90 bends later. For now they want to get the decking up and in place. 12:00 pm IMCO and MB are continuing to work on the studs and metal decking. 1:30 pm IMCO has cut the final piece of the decking. The bearing surface is less than 1.5 inches. I notified Jake that per the detail S 404 a flat plate needs to be added and welded to support the edge. 2:00 pm Attended meeting. 3:00 pm MB is continuing to work on the studs. IMCO is going to prep the 90 bends for coating. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1666 of 1851 References Photos (3) 20220920_083610.jpg Taken on Sep 20, 2022, 8:36 AM MDT Added on Sep 21, 2022, 10:00 AM MDT Added by Chris Johnson 20220920_083651.jpg Taken on Sep 20, 2022, 8:36 AM MDT Added on Sep 21, 2022, 10:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1667 of 1851 20220920_083616.jpg Taken on Sep 20, 2022, 8:36 AM MDT Added on Sep 21, 2022, 10:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1668 of 1851 Form detail #82: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 8 Framing MB Welding 1 10 Install nelson studs, 12" Channel for concrete pour Totals 3 18 2. Materials Forms Location Form date Sep 19, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 20, 2022, 10:33 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1669 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:30 am IMCO and MB Welding are onsite. IMCO is working on framing the roof and hatches while MB is working on the supports for the platform concrete pour. One of the discharge heads has arrived. 12:00 pm IMCO is continuing to work on the roof framing. I have sent Bryant a message regarding the roof blocking but have not heard back yet. 3:00 pm MB Welding is continuing to work on the 12” c channel for the concrete pour. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1670 of 1851 References Photos (5) 20220919_103813.jpg Taken on Sep 19, 2022, 10:38 AM MDT Added on Sep 20, 2022, 9:40 AM MDT Added by Chris Johnson 20220919_103829.jpg Taken on Sep 19, 2022, 10:38 AM MDT Added on Sep 20, 2022, 9:41 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1671 of 1851 20220919_103923.jpg Taken on Sep 19, 2022, 10:39 AM MDT Added on Sep 20, 2022, 9:41 AM MDT Added by Chris Johnson 20220919_103837.jpg Taken on Sep 19, 2022, 10:38 AM MDT Added on Sep 20, 2022, 9:41 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1672 of 1851 20220919_125657.jpg Taken on Sep 19, 2022, 12:56 PM MDT Added on Sep 20, 2022, 9:41 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1673 of 1851 Form detail #81: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 8 Framing and layout MB Welding 1 10 Install nelson studs, weld seepage ring on 90 Totals 3 18 2. Materials Forms Location Form date Sep 15, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 16, 2022, 7:44 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1674 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am MB Welding is starting to work on the nelson studs and puddle welds for the walkway decking. He is able to blow a hole though the decking then weld the stud the metal beam then puddle weld around the stud to lock in the metal decking. 9:00 am IMCO has been helping MB layout the studs. They are now going to work on the roof framing. 12:00 pm IMCO is continuing to work on the roof framing, MB is continuing on the studs. 4:00 pm IMCO is done for the day but MB is going to work on welding the seepage ring on the 90 bends. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1675 of 1851 References Photos (4) 20220915_150245.jpg Taken on Sep 15, 2022, 3:02 PM MDT Added on Sep 15, 2022, 3:37 PM MDT Added by Chris Johnson 20220915_115838.jpg Taken on Sep 15, 2022, 11:58 AM MDT Added on Sep 15, 2022, 3:37 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1676 of 1851 20220915_150237.jpg Taken on Sep 15, 2022, 3:02 PM MDT Added on Sep 15, 2022, 3:37 PM MDT Added by Chris Johnson 20220915_150851.jpg Taken on Sep 15, 2022, 3:08 PM MDT Added on Sep 15, 2022, 3:37 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1677 of 1851 Form detail #80: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Help MB Welding, check measurements to pump can MB Welding 1 10 Weld pile bracing, Weld Pile Caps, remove pump clamps Totals 3 20 2. Materials Forms Location Form date Sep 13, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 15, 2022, 7:48 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1678 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am MB welding and IMCO are onsite. MB is going to continue working on welding on the platform. 11:00 am MB Welding has removed the pipe clamps under the walkway. Once they have the discharge head in place they can accurately adjust the elevation of the pipe clamps to support the pipe. MB will reweld it once that has been determined. 1:00 pm Kirt has talked to me about using grout to seal the bottom of the temp structure in the fish ponds. I have taken photos for the meeting. 2:00 pm Attended weekly meeting. 4:00 pm Kirt and I have gone over the nelson stud layout for the metal decking. MB and IMCO are working on the irrigation pump can stiffeners for the metal decking. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1679 of 1851 References Photos (2) 20220913_131928.jpg Taken on Sep 13, 2022, 1:19 PM MDT Added on Sep 15, 2022, 7:48 AM MDT Added by Chris Johnson 20220913_113401.jpg Taken on Sep 13, 2022, 11:34 AM MDT Added on Sep 15, 2022, 7:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1680 of 1851 Form detail #79: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Help MB Welding MB Welding 1 10 Weld pile bracing, Weld Pile Caps Totals 3 20 2. Materials Material Quantity Unit Comment Forms Location Form date Sep 12, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 13, 2022, 7:46 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1681 of 1851 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 0 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:00 am MB Welding is onsite along with a short crew with IMCO. MB is working on welding the pile caps and the pile bracing. 1:00 pm I spoke to Kirt. He informed me that this week will be a short crew of guys. He wants to get caught up with the welding and try to adjust the pipe bracing under the walkway. Currently the 90 bends that connect to the valves are 2" low. Since the pipe bracing is not adjustable, he needs to cut the bracing and reweld them to the supports. 4:00 pm MB Welding is continuing to work on welding the bracing. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1682 of 1851 References Photos (2) 20220912_123905.jpg Taken on Sep 12, 2022, 12:39 PM MDT Added on Sep 13, 2022, 7:43 AM MDT Added by Chris Johnson 20220912_113420.jpg Taken on Sep 12, 2022, 11:34 AM MDT Added on Sep 13, 2022, 7:43 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1683 of 1851 Form detail #78: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Help MB Welding, Fly in braces to be welded, work on pan decking MB Welding 1 10 Weld pile bracing Totals 6 20 2. Materials Forms Location Form date Sep 9, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 12, 2022, 10:55 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1684 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is going to continue working on pile bracing. MB is here to continue welding the bracing. 12:00 pm Kirt and I have discussed the irrigation line along with the pan decking. We reviewed the submittal and the layout plan in the submittal. He has MB Welding working on the bracing for the pipe support to connects to the submerged manifold. He said the holes did not line up so he is having MB Welding weld the cross members for the bracing instead of bolting it per plan. 1:00 pm IMCO is continuing to work on pile bracing. They are also laying out the pan decking for the platform. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1685 of 1851 References Photos (2) 20220909_075741.jpg Taken on Sep 9, 2022, 7:57 AM MDT Added on Sep 12, 2022, 10:54 AM MDT Added by Chris Johnson 20220909_121243.jpg Taken on Sep 9, 2022, 12:12 PM MDT Added on Sep 12, 2022, 10:54 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1686 of 1851 Form detail #77: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Help MB Welding, Fly in braces to be welded, Work on airbust line, frame roof MB Welding 1 10 Weld pile bracing Totals 6 20 2. Materials Forms Location Form date Sep 8, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 9, 2022, 8:11 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1687 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 1:00 pm IMCO and MB Welding are working on the pile bracing. IMCO is also working on the rough carpentry for the roof. They are putting the 2x12s on roof frame. 3:00 pm IMCO is working on installing the 4” air burst line under the walkway. They are just going to get the pipe in place and lose bolted until they get all pieces together. They will tighten all flanges once they have it all in place. 5:00 pm MB Welding has one more brace to get tacked in, then he needs to fully weld a few locations and he will be done with the pile bracing. He is hoping to have it welded out by tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1688 of 1851 References Photos (2) 20220908_143635.jpg Taken on Sep 8, 2022, 2:36 PM MDT Added on Sep 9, 2022, 8:11 AM MDT Added by Chris Johnson 20220908_163908.jpg Taken on Sep 8, 2022, 4:39 PM MDT Added on Sep 9, 2022, 8:11 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1689 of 1851 Form detail #76: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Help MB Welding, Fly in braces to be welded, temp support pump cans with all thread MB Welding 1 10 Weld pile bracing Totals 6 20 2. Materials Forms Location Form date Sep 7, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 8, 2022, 3:38 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1690 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is helping MB Welding with the stiffeners around the pipes. 11:00 am Sam, IPC, is onsite to locate the power around the air burst building. IMCO will have to excavate around here to temp pipe in for this years fish season. 1:00 pm Sam was not able to locate the power very well. He was going to continue doing more digging and see if he could find a plan. IMCO has added all thread to the pump cans to support it so they can remove the temp bracing. I spoke to Jake about what was needed to support the pump cans per the pump manufacture. The detail on the drawings (20 S 4) call out 4 holes on the pump cans to coordinate anchors with pump. I have checked all submittals and have come up empty. Jake is going to find out what is expected. Kirt is going to use the all thread for now so he can continue working on building the platform. 5:00 pm IMCO and MB welding have been working Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1691 of 1851 References Photos (2) 20220907_091205.jpg Taken on Sep 7, 2022, 9:12 AM MDT Added on Sep 8, 2022, 3:38 PM MDT Added by Chris Johnson 20220907_125027.jpg Taken on Sep 7, 2022, 12:50 PM MDT Added on Sep 8, 2022, 3:38 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1692 of 1851 Form detail #75: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Install handrails, lay out pan decking, help welder MB Welding 1 10 Weld stiffeners around pipes, weld pile caps Totals 4 20 2. Materials Forms Location Form date Sep 6, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 7, 2022, 8:06 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1693 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO has a small crew today. MB Welding is onsite and working on the various welding including the pile caps. IMCO is working on getting the handrail in place. 12:00 pm IMCO is working on the pan decking. They are getting it in place along the walkway so you can walk out to the platform. 1:00 pm Kirt and Jake are taking measurements to ensure the pipes will line up with the discharge head. They need to make some adjustments. 2:00 pm Attended meeting. 5:00 pm MB has been working on welding the stiffeners around Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1694 of 1851 References Photos (2) 20220907_072837.jpg Taken on Sep 7, 2022, 7:28 AM MDT Added on Sep 7, 2022, 8:05 AM MDT Added by Chris Johnson 20220906_152347.jpg Taken on Sep 6, 2022, 3:23 PM MDT Added on Sep 7, 2022, 8:06 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1695 of 1851 Form detail #73: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Fly bracing and pipe in for divers and welders MB Welding 1 10 Weld bracing on pile, weld walkway Crux Diving 3 10 Weld and Splash Zone welds, final cleanup, video document Totals 7 30 Forms Location Form date Sep 1, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 6, 2022, 10:35 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1696 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is working on the manifold and 90s. They need to unbolt and flip the 90s so the long side points down, through the deck of the platform. They will also need to fix the coatings around the bolt heads that were damaged due to lack of washers. 10:30 am Crux is working on finishing all the underwater welding. I spoke to them about video documenting all work they have done underwater for future reference. Ken said he would get that done for us today because today is the last day they will be onsite. IMCO has bolted the upper manifold to the pipe under the walkway. 1:00 pm Jake and I worked on the dimensions for the 2 valves and DMJ so they can set the 24” pipe to the correct location. The crew is working on moving the pipe into place. 3:00 pm Crux is done with all underwater work. They have video documented everything. Jake said he would submit the video as a submittal for everyone to watch. MB Welding is working on welding the end cap for the stairs to bolt too. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1697 of 1851 References Photos (5) 20220901_073753.jpg Taken on Sep 1, 2022, 7:37 AM MDT Added on Sep 1, 2022, 3:11 PM MDT Added by Chris Johnson 20220901_074627.jpg Taken on Sep 1, 2022, 7:46 AM MDT Added on Sep 1, 2022, 3:11 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1698 of 1851 20220901_084629.jpg Taken on Sep 1, 2022, 8:46 AM MDT Added on Sep 1, 2022, 3:11 PM MDT Added by Chris Johnson 20220901_090716.jpg Taken on Sep 1, 2022, 9:07 AM MDT Added on Sep 1, 2022, 3:11 PM MDT Added by Chris Johnson 20220901_100100.jpg Taken on Sep 1, 2022, 10:01 AM MDT Added on Sep 1, 2022, 3:11 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1699 of 1851 Form detail #72: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Fly bracing and pipe in for divers and welders MB Welding 1 10 Weld bracing on pile Crux Diving 3 10 Weld underwater bracing, bolt 22 bend/ T Screen to manifold, bolt airburst, irrigation and stilling well Totals 7 30 Forms Location Form date Aug 31, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Sep 1, 2022, 9:47 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1700 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO and Crux are working on installing the 22 bend with T Screen. It is currently in the water and the divers are working on installing the bolts. 9:00 am IMCO is flying in the SS pipe for the airburst. MB Welding is working on welding the bracing to the pile. 12:00 pm MB Welding is continuing to work on the X Bracing for the pile. Crux is working on welding out all bracing under water. IMCO has been working on laying the 24” water pipe under the platform. 2:00 pm IMCO is continuing to fly in all pieces needed for the divers. This includes the stilling well, irrigation pump can and airburst lines. Crux is bolting them up under water. 5:00 pm IMCO bolted the 90 bends to the manifold without washers on the bolt side. The coatings around the bolts got damaged. They will need to unbolt, re coat then re bolt the 90s to the manifold and use washers on both sides. They plan on doing this tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1701 of 1851 References Photos (4) 20220831_075023.jpg Taken on Aug 31, 2022, 7:50 AM MDT Added on Sep 1, 2022, 9:46 AM MDT Added by Chris Johnson 20220831_095942.jpg Taken on Aug 31, 2022, 9:59 AM MDT Added on Sep 1, 2022, 9:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1702 of 1851 20220831_110530.jpg Taken on Aug 31, 2022, 11:05 AM MDT Added on Sep 1, 2022, 9:46 AM MDT Added by Chris Johnson 20220831_125335.jpg Taken on Aug 31, 2022, 12:53 PM MDT Added on Sep 1, 2022, 9:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1703 of 1851 Form detail #71: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Fly bracing in for welders, prep flanges on pipe, repair coatings MB Welding 1 10 Weld bracing on pile, Modify braces for manifold Crux Diving 3 10 Weld underwater bracing Totals 8 30 Forms Location Form date Aug 30, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 31, 2022, 8:56 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1704 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO has 2 more guys onsite today. They are going to work on the prepping the pipe to be installed under the walkway. 8:30 am Crux is in the water working on welding the bracing to the piles. They also need to weld the bracing to the pump cans. Sawtooth welding is onsite. He is going to help MB with all the welding that is needed. 11:00 am IMCO is starting to fly in the pipe under the walkway. Jake and I walked and checked the coatings on the pipe. The DFT gauge was all over 30 mils. They knocked down an overrun area that Bill had a concern with. They need to touch up a couple of locations. These locations are not on the pipes that are being installed. MB Welding has cut and shortened the other tube brace. The divers are continuing to work on welding underwater. 1:00 pm MB Welding has finished shortening the other brace for the manifold. IMCO is flying it in for the divers to bolt up now. 2:00 pm IMCO is continuing to work on pile bracing. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1705 of 1851 References Photos (3) 20220830_091422.jpg Taken on Aug 30, 2022, 9:14 AM MDT Added on Aug 31, 2022, 8:55 AM MDT Added by Chris Johnson 20220830_095152.jpg Taken on Aug 30, 2022, 9:51 AM MDT Added on Aug 31, 2022, 8:55 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1706 of 1851 20220830_122710.jpg Taken on Aug 30, 2022, 12:27 PM MDT Added on Aug 31, 2022, 8:55 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1707 of 1851 Form detail #70: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Fly frame in for Crux to Weld, Set pump cans to elevation MB Welding 1 10 Weld bracing on pile, Modify braces for manifold Crux Diving 3 10 Weld underwater bracing, help set pump cans Totals 6 30 Forms Location Form date Aug 29, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 31, 2022, 8:53 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1708 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 12:00 pm IMCO is onsite with MB Welding and Crux Diving. They have set the pump cans to elevation using the pump deck to support the cans. Crux is in the water working on the bracing to the flange on the cans that support from the middle pile. They will be welding this connection then covering the welds with splash zone. 1:30 pm IMCO has tried to set the tube bracing to the manifold. They were way to long. They took a measurement and are brainstorming ideas on how to modify the brace length. 4:00 pm Jake contacted Bryant regarding the tube bracing. He was asking if they could have a welded connection to the deck instead of a bolted one. Bryant has asked to modify the tube bracing to meet the plans. MB Welding is starting that now. 5:00 pm MB has cut the bracing and will finish it tomorrow. Crux has tacked the flange bracing in place and will continue to weld on it tomorrow Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1709 of 1851 References Photos (2) 20220829_160609.jpg Taken on Aug 29, 2022, 4:06 PM MDT Added on Aug 30, 2022, 8:24 AM MDT Added by Chris Johnson 20220829_160007.jpg Taken on Aug 29, 2022, 4:00 PM MDT Added on Aug 30, 2022, 8:24 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1710 of 1851 Form detail #69: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 5 Help Crux MB Welding 1 5 Weld temp structure in holding ponds Crux Diving 3 4 Anchor picking eye to grout bags Totals 6 14 Forms Location Form date Aug 26, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 29, 2022, 2:55 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1711 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am Crux and IMCO have removed 3 bags so far this morning. They think they have 2 more to go and they should get their elevation needed. Jake and Kirt checked the bottom elevation by dipping a grade rod. 10:00 am Crux has removed all grout bags they think are in the way. I spoke to Jake about checking elevation with a grade rod and the using the diver to find the high spots. They are going to work on that now. 11:00 am IMCO has confirmed they have the proper clearance to install the pump cans now. Crux is leaving for the week. IMCO is now going to work on setting the middle walkway. 12:00 pm IMCO has set the middle walkway. Bill Lynch and I walked the site. Bill noticed some deficiencies in the coatings from Stabb / Cobelco. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1712 of 1851 References Photos (4) 20220826_075950.jpg Taken on Aug 26, 2022, 7:59 AM MDT Added on Aug 29, 2022, 2:50 PM MDT Added by Chris Johnson 20220826_083209.jpg Taken on Aug 26, 2022, 8:32 AM MDT Added on Aug 29, 2022, 2:50 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1713 of 1851 20220826_113322.jpg Taken on Aug 26, 2022, 11:33 AM MDT Added on Aug 29, 2022, 2:51 PM MDT Added by Chris Johnson 20220826_114311.jpg Taken on Aug 26, 2022, 11:43 AM MDT Added on Aug 29, 2022, 2:51 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1714 of 1851 Form detail #67: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 bolt 22 to t screen, help Crux MB Welding 1 10 temp structure in holding ponds Crux Diving 3 10 chip grout Totals 7 30 Forms Location Form date Aug 25, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 25, 2022, 8:45 AM MDT Last updated by Chris Johnson Included references Photos Comments Chris Johnson Aug 26, 2022, 7:37 AM MDT This report is for Aug 24th.C Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1715 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO and Crux have setup the air compressor for the chipping gun. They plan to start chipping on the grout bags that are in the way of the pump cans and pump manifold. 9:00 am Crux has a diver in the water and he is working on chipping. They informed me it is going pretty slow because the grout is not flaking off. IMCO is working on bolting the 22 bend to the T screen. They are using insulating kit that is causing them trouble. The sleeves are not wanting to fit nicely in the flange holes. Rocky, IMCO, is making it work but it is taking extra effort. 12:00 pm I checked in with Crux. I asked for an update on how much was done. It sounded like it was about 0.1 cubic feet had been chipped out in 3 hours. That rate of production will not work. I have informed Jake of the progress. We both agreed a new method is needed. 1:00 pm Jake and I double checked the elevations of the piles, pumps cans, deck and Invert. Everything was done per plan and all numbers match. 2:00 pm Crux got their video feed fixed and recorded a video of the issues with the grout bags. It was determined that anchoring a 18” x 18” plate with a picking eye to a grout bag, then lifting with the crane was the best method. 4:00 pm Crux informed me that the anchor bolts and drill will be here tomorrow. They informed me they think 4 bags need to be removed. They hope that will get the pump cans low enough. MB Welding has been working on Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1716 of 1851 the temp structure for the holding ponds. References Photos (4) 20220824_151016.jpg Taken on Aug 24, 2022, 3:10 PM MDT Added on Aug 25, 2022, 8:04 AM MDT Added by Chris Johnson 20220824_151036.jpg Taken on Aug 24, 2022, 3:10 PM MDT Added on Aug 25, 2022, 8:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1717 of 1851 20220824_151258.jpg Taken on Aug 24, 2022, 3:12 PM MDT Added on Aug 25, 2022, 8:04 AM MDT Added by Chris Johnson 20220824135722_1 Added on Aug 25, 2022, 8:42 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1718 of 1851 Form detail #68: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Help Crux MB Welding 1 10 Weld Pile Caps, Weld temp structure in holding ponds Crux Diving 3 10 Anchor picking eye to grout bags Totals 6 30 Forms Location Form date Aug 25, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 26, 2022, 7:42 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1719 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO and Crux are waiting on the rock drills and anchor bolts to arrive so Crux and start working on removing the grout bags. In the meantime, IMCO and MB Welding are going to work on welding the pile cap plates for the platform. First they need to secure the pump cans. 10:00 am IMCO has bolted the platform to the pile cap plates and MB Welding is not working on welding the plates to the piles. 2:00 pm Crux has received the anchor bolts and rock drills. They are entering the water to install them in the grout bags. 3:30 pm They were able to move one bag about 5’ before it broke. They lifted the broken section out of the water and have it on shore. They are going to install the plate in the other part of the bag that broke now. 5:00 pm The crews were able to remove 2 full bags. The last bag came out in one piece. They will continue tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1720 of 1851 References Photos (4) 20220825_151232.jpg Taken on Aug 25, 2022, 3:12 PM MDT Added on Aug 26, 2022, 7:40 AM MDT Added by Chris Johnson 20220825_163130.jpg Taken on Aug 25, 2022, 4:31 PM MDT Added on Aug 26, 2022, 7:40 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1721 of 1851 20220825_151157.jpg Taken on Aug 25, 2022, 3:11 PM MDT Added on Aug 26, 2022, 7:39 AM MDT Added by Chris Johnson 20220825_160353.jpg Taken on Aug 25, 2022, 4:03 PM MDT Added on Aug 26, 2022, 7:40 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1722 of 1851 Form detail #66: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Help MB Welding, Install bracing, Set Pump Cans, Set platform MB Welding 1 10 Weld Bracing Crux Diving 3 10 Weld Bracing Totals 7 30 Forms Location Form date Aug 23, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 24, 2022, 8:07 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1723 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO, MB Welding and Crux diving are onsite. The plan today is to set the pump cans in the water at approx. location then install the platform. They plan to use the platform to brace the pumps to proper location and elevation. 11:30 am IMCO has picked and set the pump cans. They are now going to work on picking and setting the platform. 12:30 pm IMCO has picked and set the platform. After checking measurements, the pump cans are sitting to high. The divers are going to investigate. 1:00 pm Crux has confirmed that the pump cans are sitting on the grout bags previously placed with the last project. Jake is going to get a chipping gun out here for them to chip out the grout to make way for the pump cans. 2:00 pm Attended weekly meeting. 4:00 pm MB welding is working on welding the platform to the piles. Crux has left for the day. They need the chipping gun to continue work. IMCO is going to work on bolting the 22 bend to the t screen. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1724 of 1851 References Photos (4) 20220823_110439.jpg Taken on Aug 23, 2022, 11:04 AM MDT Added on Aug 24, 2022, 8:04 AM MDT Added by Chris Johnson 20220823_111330.jpg Taken on Aug 23, 2022, 11:13 AM MDT Added on Aug 24, 2022, 8:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1725 of 1851 20220823_120749.jpg Taken on Aug 23, 2022, 12:07 PM MDT Added on Aug 24, 2022, 8:04 AM MDT Added by Chris Johnson 20220823_121243.jpg Taken on Aug 23, 2022, 12:12 PM MDT Added on Aug 24, 2022, 8:05 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1726 of 1851 Form detail #65: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Re-bolt intake piping, walkway install MB Welding 1 10 Weld walkway Totals 4 20 2. Materials Forms Location Form date Aug 22, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 23, 2022, 8:20 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1727 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 10 Kobelco 1100G Crane 1 10 Manlift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 3:00 pm IMCO has bolted the manifold to the pump cans. The pump cans had to get recoated with the proper coating. This was done last week and they were delivered Thursday. IMCO has torqued the fasteners. They are now working on the walkway. MB Welding is here working on the walkway platform. 5:00 pm While installing the walkway it was found that a field weld piece of the walkway was cut and coped to be bolted. After some research, Jake informed me that the piece was never revised from a previous revision of the submittal. It was sized to be a bolt on. This leaves a large gap around all sides of the channel iron. This could be extremely difficult to weld / fill. Jake and I spoke about having the corner clips fabricated and galvanized and bolt it on. He is going to check with Bryant on that. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1728 of 1851 References Photos (3) 20220822_155337.jpg Taken on Aug 22, 2022, 3:53 PM MDT Added on Aug 23, 2022, 8:18 AM MDT Added by Chris Johnson 20220822_155253.jpg Taken on Aug 22, 2022, 3:52 PM MDT Added on Aug 23, 2022, 8:18 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1729 of 1851 20220823_081909_photo Taken on Aug 23, 2022, 8:18 AM MDT Added on Aug 23, 2022, 8:19 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1730 of 1851 Form detail #64: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 1 3 Unload Pipe Totals 1 3 2. Materials Material Quantity Unit Comment Forms Location Form date Aug 16, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 17, 2022, 8:41 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1731 of 1851 3. Equipment Equipment Quantity Hours used Comment JCB 510 Boom Forklift 1 2 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 2:00 pm Attended weekly meeting. 3:00 pm Jake is here to unload the pipe that was sent off because of insufficient coating DFT. I have spot checked the pipe with my DFT instrument. All locations are over 30 mils DFT. Jake has unloaded the pipe. I also noticed that they finished the temporary steel structure to separate the holding ponds. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1732 of 1851 References Photos (2) 20220816_132831.jpg Taken on Aug 16, 2022, 1:28 PM MDT Added on Aug 16, 2022, 1:59 PM MDT Added by Chris Johnson 20220816_133336.jpg Taken on Aug 16, 2022, 1:33 PM MDT Added on Aug 16, 2022, 1:59 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1733 of 1851 Form detail #63: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Holding pond steel dam Totals 3 10 2. Materials Material Quantity Unit Comment Forms Location Form date Aug 9, 2022 Description Facility 40, temporary steel dam for holding ponds Due date Submitted by Chris Johnson Status Closed Last update Aug 15, 2022, 10:23 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1734 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 0 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on the steel temporary dam structure that will separate the holding ponds in half. This will allow IMCO to demo half the ponds while allowing hatchery operations to continue in the other half. 12:00 pm IMCO is continuing to work on the temporary steel structure. 2:00 pm Attended weekly meeting. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1735 of 1851 Form detail #62: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 1 10 Load up pipe to get recoated Totals 1 10 2. Materials Material Quantity Unit Comment Forms Location Form date Aug 8, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 9, 2022, 8:18 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1736 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 0 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am Arrived on site. Talked with Jake. They have a slow day today. They are going to work on loading up the pipe as trucks arrive. 5:00 pm All pipe has been loaded on trucks and is getting hauled to coatings shops to have either the proper thickness applied or the proper product applied. The pump cans were not coated with proper coatings. the off white pipe was not thick enough. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1737 of 1851 References Photos (2) 20220808_122014.jpg Taken on Aug 8, 2022, 12:20 PM MDT Added on Aug 9, 2022, 7:48 AM MDT Added by Chris Johnson 20220808_163920.jpg Taken on Aug 8, 2022, 4:39 PM MDT Added on Aug 9, 2022, 7:48 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1738 of 1851 Form detail #59: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Clean up flanges on Irrigation pump can, Load pipe Totals 2 10 2. Materials Material Quantity Unit Comment Forms Location Form date Aug 4, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 5, 2022, 10:13 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1739 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 0 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO has a short crew today. They are working on cleaning up the flanges on the irrigation pump can now. They plan to work on bolting some of it together today and do site clean up. 9:00 am Jake informed me that Cobelco is picking up the off white pipe that has insufficient DFT. They are going to take it to their shop and get it recoated to the proper thickness of 30 mils. Yesterday the 22 bend arrived freshly coated and ready to be installed. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1740 of 1851 References Photos (3) 20220804_082039.jpg Taken on Aug 4, 2022, 8:20 AM MDT Added on Aug 5, 2022, 10:12 AM MDT Added by Chris Johnson 20220804_082048.jpg Taken on Aug 4, 2022, 8:20 AM MDT Added on Aug 5, 2022, 10:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1741 of 1851 20220804_081923.jpg Taken on Aug 4, 2022, 8:19 AM MDT Added on Aug 5, 2022, 10:12 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1742 of 1851 Form detail #58: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Pile Bracing, Piping prep, walkway prep MB Welding 1 10 Welding Bracing Totals 5 20 2. Materials Forms Location Form date Aug 3, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 4, 2022, 7:58 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1743 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 0 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is continuing to work on the channel on the platform. MB Welding is welding the channel to the platform beams. 11:00 am IMCO is working on torquing the walkway platform and pipe support bolts. 2:00 pm MB Welding has completed the channel welding on the platform. 3:00 pm IMCO has set the first walkway section on the piles. They are just strapping it down for now and waiting until they have the other platform and walkway on the piles to ensure everything is square before welding the plates to the piles. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1744 of 1851 References Photos (4) 20220803_113402.jpg Taken on Aug 3, 2022, 11:34 AM MDT Added on Aug 4, 2022, 7:51 AM MDT Added by Chris Johnson 20220803_113412.jpg Taken on Aug 3, 2022, 11:34 AM MDT Added on Aug 4, 2022, 7:51 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1745 of 1851 20220803_123855.jpg Taken on Aug 3, 2022, 12:38 PM MDT Added on Aug 4, 2022, 7:51 AM MDT Added by Chris Johnson 20220803_141906.jpg Taken on Aug 3, 2022, 2:19 PM MDT Added on Aug 4, 2022, 7:51 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1746 of 1851 Form detail #57: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Pile Bracing, Piping prep, walkway prep MB Welding 1 10 Welding Bracing Totals 5 20 2. Materials Forms Location Form date Aug 2, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 3, 2022, 9:55 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1747 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is working with MB welding to continue getting the pile bracing installed. 9:00 am MB Welding is continuing to weld pile bracing. IMCO is working installing the bolts for the Manifold to pump cans. The are using SS hardware with anti-seize. They are torquing them to 436 ft lbs per the chart on GM1. They are marking them as they go so they don’t forget any. 1:00 pm MB Welding and IMCO has started to work on installing the channel to supports the concrete on the platform. IMCO is also working on installing the mud valve. The mud valve bolt pattern is the same as the flange with the exception of two bolt holes are missing. See attached photos. 2:00 pm Attended meeting. 4:00 pm IMCO and MB Welding is continuing to work on the channel on the platform. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1748 of 1851 References Photos (4) 20220802_122129.jpg Taken on Aug 2, 2022, 12:21 PM MDT Added on Aug 3, 2022, 8:33 AM MDT Added by Chris Johnson 20220802_122119.jpg Taken on Aug 2, 2022, 12:21 PM MDT Added on Aug 3, 2022, 8:33 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1749 of 1851 20220802_123041.jpg Taken on Aug 2, 2022, 12:30 PM MDT Added on Aug 3, 2022, 8:33 AM MDT Added by Chris Johnson 20220802_161852.jpg Taken on Aug 2, 2022, 4:18 PM MDT Added on Aug 3, 2022, 8:33 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1750 of 1851 Form detail #55: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Pile Bracing, Piping prep, walkway prep MB Welding 1 10 Welding Bracing Idaho Testing & Inspection 1 10 Weld Inspector, Platform and Pile Bracing Weld Inspection Totals 6 30 Forms Location Form date Aug 1, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Aug 2, 2022, 1:45 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1751 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:30 am IMCO is working on bolting up the walkway platform. MB is onsite continuing to weld the pile bracing. 10:30 am Idaho Testing and Inspection is onsite to perform the welding inspection on the platform and pile bracing. Not all the bracing is done on the piles so we are going to get what we can done today and they will need to make another trip at a later date. 1:00 pm Idaho Testing has completed the welding inspection. He found a few issues with the platform welds. Jake had MB Welding go back and fix them right away. Idaho Testing then reinspected them and approved them. This marks all field welding to date is tested and approved. IMCO has gotten the SS washers onsite for the intake manifold. They are working on installing those along with a picking plan to lift the pump cans and manifold. 4:00 pm MB Welding is continuing to work on welding the pile bracing. IMCO is also working on bolting up the walkway and pipe supports. I noticed a few bolts missing washers. I asked the guys if they would please inspect all bolts and washers and let me know before they start torquing them to spec. I said once torqued, they should mark the bolt head to document that the bolt was torqued. This will prevent them from missing any. See Attached Weld Inspection Reports Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1752 of 1851 References Photos (5) 20220801_161254.jpg Taken on Aug 1, 2022, 4:12 PM MDT Added on Aug 2, 2022, 7:46 AM MDT Added by Chris Johnson 20220801_104433.jpg Taken on Aug 1, 2022, 10:44 AM MDT Added on Aug 2, 2022, 7:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1753 of 1851 20220801_094744.jpg Taken on Aug 1, 2022, 9:47 AM MDT Added on Aug 2, 2022, 7:46 AM MDT Added by Chris Johnson 20220801_113918.jpg Taken on Aug 1, 2022, 11:39 AM MDT Added on Aug 2, 2022, 7:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1754 of 1851 20220801_094719.jpg Taken on Aug 1, 2022, 9:47 AM MDT Added on Aug 2, 2022, 7:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1755 of 1851 Form detail #53: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Pile Bracing, Demo, drive last pile MB Welding 1 10 Welding Bracing, Cut Piles Sawtooth Welding 2 8 Weld Platform together Totals 7 28 2. Materials Forms Location Form date Jul 28, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 28, 2022, 9:05 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1756 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO is going to work on installing the last pile. This pile is for the pump column support. Sawtooth is onsite again to continue welding on the platform. 12:00 pm IMCO has removed the last pile of the temp structure and drove the last pile for the pump can support. This pile was driven 20’ per the drawings. Sawtooth is continuing to work on welding the platform together and MB is going to continue welding the bracing together to the piles. 5:00 There has been lots of discussion regarding the coatings on the piping. The off white pipe coatings inspection showed insufficient DFT. Bryant is working on a response to the coatings inspection submittal. It was also discussed that IMCO needs to sandblast and coat the salvaged 22 bend that bolts to the T Screen. A coatings inspection report is still needed for the pump cans, Jake is continuing to work on that. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1757 of 1851 References Photos (6) 20220727_105418.jpg Taken on Jul 27, 2022, 10:54 AM MDT Added on Jul 28, 2022, 8:59 AM MDT Added by Chris Johnson 20220727_093601.jpg Taken on Jul 27, 2022, 9:36 AM MDT Added on Jul 28, 2022, 8:59 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1758 of 1851 20220727_105427.jpg Taken on Jul 27, 2022, 10:54 AM MDT Added on Jul 28, 2022, 8:59 AM MDT Added by Chris Johnson 20220727_131432.jpg Taken on Jul 27, 2022, 1:14 PM MDT Added on Jul 28, 2022, 9:04 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1759 of 1851 20220727_140928.jpg Taken on Jul 27, 2022, 2:09 PM MDT Added on Jul 28, 2022, 9:04 AM MDT Added by Chris Johnson 20220727_140905.jpg Taken on Jul 27, 2022, 2:09 PM MDT Added on Jul 28, 2022, 9:05 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1760 of 1851 Form detail #54: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Pile Bracing, Demo, layout new piping MB Welding 1 10 Welding Bracing Sawtooth Welding 2 8 Weld Platform together, Weld Bracing Totals 7 28 Forms Location Form date Jul 28, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 29, 2022, 9:03 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1761 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am I spoke to Jake regarding the coatings, Bryant responded to the coatings inspection. It is required coat the insufficient DFT pieces. Jake is going to start looking for a local coatings company to either spray onsite or they will have to ship it to a shop to be done. I reminded him to check the temperature requirements for the coatings if they plan to do it onsite. He is also working on getting the coatings inspection report for the pump cans and the irrigation can. This will determine if a recoat is needed for these pieces as well, also he is working on getting the submittal for the pump can and irrigation can to check the type of product that was used so they can touch up the spots that were damaged during shipment. MB welding is going to continue welding on bracing and sawtooth is onsite and plans to finish welding the platform together today. 12:00 pm I have been discussing with Bryant and Bill regarding the 22 bend that IMCO is going to reuse. They are going to have it sand blasted and recoated. The existing condition was the bend had a clamp and frame on it that was welded to 2 piles underwater. I have asked Bryant if this is needed. He requested asbuilts so they can check to see if the additional bracing is needed. Sawtooth has finished welding up the platform and is now working on welding the bracing on the piles. MB is continuing to work on welding on the piles. Some discussion regarding connecting the mechanical piping flanges together has come up the question has been if washers are needed. 2:00 pm After talking to Bryant it is determined that washers should be provided to protect the coatings. All anchor hardware should be stainless steel. Jake is working on getting SS washers onsite. They have loaded the 22 bend up to have it sand blasted and coated. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1762 of 1851 4:30 pm I received an email from Bryant regarding the clamp on the 22 bend. He ran the numbers and they recommended not to use the clamp. I called Bill and verified with him that we should not use the clamp. He agreed. I called Jake and notified him that the clamp was not needed. References Photos (3) 20220728_091609.jpg Taken on Jul 28, 2022, 9:16 AM MDT Added on Jul 29, 2022, 9:00 AM MDT Added by Chris Johnson 20220728_132342.jpg Taken on Jul 28, 2022, 1:23 PM MDT Added on Jul 29, 2022, 9:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1763 of 1851 20220728_134514.jpg Taken on Jul 28, 2022, 1:45 PM MDT Added on Jul 29, 2022, 9:00 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1764 of 1851 Form detail #52: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Pile Bracing, Demo MB Welding 1 10 Welding Bracing, Cut Piles Sawtooth Welding 2 8 Weld Platform together Totals 7 28 2. Materials Forms Location Form date Jul 26, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 27, 2022, 8:33 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1765 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 Deere 225D Excavator 1 5 JCB 510 Boom Forklift 1 10 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am MB Welding is onsite and continuing to weld braces on the piles. 9:00 am Sawtooth is onsite. They are also working on welding members together. They have two welders. They are working on the platform and also the pile bracing. IMCO took delivery of the irrigation pump can. 12:00 pm MB Welding is working on cutting the piles to proper height. Sawtooth is still working on welding the platform together. 2:00 pm Attended weekly meeting. Bryant provided some insight on the needed additional bracing for the piles. 4:00 pm MB has cut all piles to height and they are working on removing the temp structure used to guide the piles during driving Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1766 of 1851 References Photos (3) 20220726_151711.jpg Taken on Jul 26, 2022, 3:17 PM MDT Added on Jul 27, 2022, 8:33 AM MDT Added by Chris Johnson 20220726_093434.jpg Taken on Jul 26, 2022, 9:34 AM MDT Added on Jul 27, 2022, 8:33 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1767 of 1851 20220726_123825.jpg Taken on Jul 26, 2022, 12:38 PM MDT Added on Jul 27, 2022, 8:33 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1768 of 1851 Form detail #51: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Lay out walkway pieces MB Welding 1 10 Weld bracing on pile Totals 3 20 2. Materials Material Quantity Unit Comment Forms Location Form date Jul 25, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 26, 2022, 7:46 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1769 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 9:30 am IMCO is onsite along with MB Welding. MB is working on welding brackets to the H piles for the support beams. 11:00 am The Intake pump cans arrived on site. They have some scuff marks from shipping that need to be touched up. I asked Jake if he could find the coatings inspection report for the pump cans and also verify what coating needs to be used to touch up the markings left from the shipping straps. 12:00 pm Jake, Kirt and I discussed the elevation of the river bottom where the pump cans sit. They came up with a plan to check the bottom elevation without divers to get an estimate of the clearance the pump cans would have. They are working on a plan to suspend the pump cans until they can be secured in place. 4:00 pm MB Welding is continuing to work on welding brackets to the piles. IMCO has two labors onsite that are working on laying out the walkway and also cleaning up flanges on the water pipe. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1770 of 1851 References Photos (4) IMG_0045 Taken on Jul 25, 2022, 11:17 AM MDT Added on Jul 26, 2022, 7:46 AM MDT Added by Chris Johnson IMG_0043 Taken on Jul 25, 2022, 11:17 AM MDT Added on Jul 26, 2022, 7:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1771 of 1851 IMG_0042 Taken on Jul 25, 2022, 11:16 AM MDT Added on Jul 26, 2022, 7:46 AM MDT Added by Chris Johnson IMG_0046 Taken on Jul 25, 2022, 11:20 AM MDT Added on Jul 26, 2022, 7:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1772 of 1851 Form detail #50: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Bracing for platform structure MB Welding 1 10 Weld bracing on pile Totals 5 20 2. Materials Material Quantity Unit Comment Forms Location Form date Jul 20, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 21, 2022, 2:56 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1773 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO and MB Welding are onsite. They plan to start installing the bracing for the platform. 10:00 am Jake, Kevin and I shot in the pile trip elevations using a rotary laser and the benchmark provided onsite. I have provided that information to Bill and Bryant. IMCO and MB are continuing to work on bracing the structure per the drawings. 12:00 pm IMCO is marking out the pile cut off heights and working with MB Welding. They are continuing to work on welding the plates to the piles. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1774 of 1851 References Photos (4) 20220720_103406.jpg Taken on Jul 20, 2022, 10:34 AM MDT Added on Jul 21, 2022, 2:55 PM MDT Added by Chris Johnson 20220720_103455.jpg Taken on Jul 20, 2022, 10:34 AM MDT Added on Jul 21, 2022, 2:55 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1775 of 1851 20220720_103521.jpg Taken on Jul 20, 2022, 10:35 AM MDT Added on Jul 21, 2022, 2:55 PM MDT Added by Chris Johnson 20220720_111504.jpg Taken on Jul 20, 2022, 11:15 AM MDT Added on Jul 21, 2022, 2:56 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1776 of 1851 Form detail #49: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 help divers, Prep bracing, Drive Pile Crux Diving 3 10 Weld bracing clips MB Welding 1 10 Weld Platform Steel Totals 7 30 Forms Location Form date Jul 19, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 20, 2022, 8:02 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1777 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am The divers are in the water installing the bracing for the structure. IMCO is flying the pieces in with the crane and a diver is tack welding them in place. 9:00 am MB Welding is onsite working on welding the platform frame together. The divers are continuing to work on installing the bracing. 12:30 pm IMCO is going to drive the offshore walkway pile downstream. 2:00 pm Attended the weekly meeting. IMCO was able to drive the pile to 32’ depth. Crux is done welding the beams and is packing up. They will be back in a couple weeks. 4:00 pm IMCO was able to drive the onshore downstream pile to 30 depth. They are going to work on the onshore upstream one now. 5:30 pm IMCO has driven the onshore downstream pile to a 30’ depth as well. Don, crane operator, reported to me that he had a significant amount of weight on it, relaying to me that it is at a reasonable refusal. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1778 of 1851 References Photos (2) 20220719_163255.jpg Taken on Jul 19, 2022, 4:32 PM MDT Added on Jul 20, 2022, 7:56 AM MDT Added by Chris Johnson IMG_0040 Taken on Jul 19, 2022, 10:34 AM MDT Added on Jul 20, 2022, 8:01 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1779 of 1851 Form detail #48: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 help divers, Prep bracing Crux Diving 3 10 Weld bracing clips Totals 6 20 2. Materials Material Quantity Unit Comment Forms Location Form date Jul 18, 2022 Description Facility 20, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 19, 2022, 8:29 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1780 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO and Crux are onsite working on welding the clips to the piles underwater. They used a laser level to set the elevation of the top clip bracket then the divers are using a tape underwater to measure the other two. 2:00 pm Crux is continuing to work on welding the brackets underwater. Watching on the screen in the dive shack, it looks they are achieving all welds per the drawings. IMCO is prepping the beams that will be welded to these brackets to make up the supports. 5:00 pm Crux and IMCO are done for the day. They were able to get all brackets welded to the 4 piles that make up the platform. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1781 of 1851 References Photos (1) 20220718_141102.jpg Taken on Jul 18, 2022, 2:11 PM MDT Added on Jul 19, 2022, 8:29 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1782 of 1851 Form detail #47: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Recycle Metal, help divers, drive pile Crux Diving 3 10 Torch steel members Totals 6 20 2. Materials Forms Location Form date Jul 14, 2022 Description Facility 20, Hatchery Intake Removal, Pile Driving Due date Submitted by Chris Johnson Status Closed Last update Jul 15, 2022, 9:02 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1783 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am IMCO and Crux are working on removing the rest of the existing intake structure. 9:30 am IMCO has driven the Off shore upstream platform pile to 20’ depth before it started to bounce. 12:00 pm Bill, IPC, was onsite to discuss the pile driving. A meeting is setup for 430 pm today to discuss the pile driving pile tip embedment. 1:00 pm IMCO and Crux has remove the last of the structure. The last piece was the intake box and piping. 2:00 pm IMCO has driven the shore side upstream pile to 20’ embedment. 3:00 pm IMCO attempted to drive the platform piles again to see if they can get any more out of them. They all reacted about same. They bounce hard once the full weight of the hammer is on them but the piles do not go down any further. They then went to the walkway off shore pile downstream. This pile was only down about 8’ embedment. They let the hammer go slack and it broke through whatever was stopping it. It went down easy and got hard again around 32’ embedment. They were able to achieve 34’ embedment. They checked the plumpness and it was out about 1.5” over 6’. They attempted to fix it but was not able to achieve plumb. They pulled the pile out. They decided to move this pile to the walkway off shore upstream side. They drove it to 34.5’ embedment. 4:30 pm Attended Pile drive meeting, where it was discussed to add additional bracing to support the piles without the 30’ embedment. 6:00 pm I was notified that they are not working tomorrow. Everyone will be back Monday. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1784 of 1851 References Photos (4) 20220714_124019.jpg Taken on Jul 14, 2022, 12:40 PM MDT Added on Jul 15, 2022, 8:46 AM MDT Added by Chris Johnson 20220714_122116.jpg Taken on Jul 14, 2022, 12:21 PM MDT Added on Jul 15, 2022, 8:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1785 of 1851 20220714_131742.jpg Taken on Jul 14, 2022, 1:17 PM MDT Added on Jul 15, 2022, 8:46 AM MDT Added by Chris Johnson 20220714_161214.jpg Taken on Jul 14, 2022, 4:12 PM MDT Added on Jul 15, 2022, 8:46 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1786 of 1851 Form detail #46: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Recycle Metal, help divers, drive pile Crux Diving 3 10 Torch steel members Totals 6 20 2. Materials Forms Location Form date Jul 13, 2022 Description Facility 20, Hatchery Intake Removal Due date Submitted by Chris Johnson Status Closed Last update Jul 14, 2022, 7:31 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1787 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am Divers are prepping to enter the water to finishing cutting off braces to remove the downstream, shore side leg of the existing structure. This will allow IMCO to install that pile. 11:00 am IMCO noticed the irrigation pump was not running. We checked Jeffs yard and the sprinklers were not running but the valve was open. I contacted Heath, IPC, to make him aware that the pump was continuing to trip. IMCO tried running it in HAND and AUTO and the motor logic continued to trip. Heath arrived and checked the amps on all three legs. They were between 14 and 15.5 amps. The motor logic is set to trip around 15 which makes sense. IMCO shut it all down and will diagnose the issue once the crane is free. They suspect the pump screen has some kind of debris blocking it. 2:00 pm IMCO was able to drive the shore side, downstream pile for the platform to 20’ embedment. They are going to remove the off shore leg now. 3:00 pm IMCO drove the offshore downstream pile for the platform to 18’. Both piles today drove until they started to bounce up and down hard. IMCO is going to now pull the irrigation pump to check and see what the issue is. 3:30 pm Heath is onsite to check on the progress of the pump. IMCO has pulled the pump and inspected the screen, all looks fine. It was decided to switch two legs of the pump to make sure it is spinning in the correct direction. It was not. After the wires were flipped the amps were back to normal and the pump is running fine now. 5:00 pm Crux and IMCO was able to remove more the structure before calling it a day. They will go after the rest Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1788 of 1851 of the structure tomorrow and continue with the pile driving. References Photos (5) 20220713_132633.jpg Taken on Jul 13, 2022, 1:26 PM MDT Added on Jul 13, 2022, 4:20 PM MDT Added by Chris Johnson 20220713_135523.jpg Taken on Jul 13, 2022, 1:55 PM MDT Added on Jul 13, 2022, 4:20 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1789 of 1851 20220713_115408.jpg Taken on Jul 13, 2022, 11:54 AM MDT Added on Jul 13, 2022, 4:21 PM MDT Added by Chris Johnson 20220713_143145.jpg Taken on Jul 13, 2022, 2:31 PM MDT Added on Jul 13, 2022, 4:21 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1790 of 1851 20220713_111112.jpg Taken on Jul 13, 2022, 11:11 AM MDT Added on Jul 13, 2022, 4:22 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1791 of 1851 Form detail #45: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Recycle Metal, help divers Crux Diving 3 10 Torch steel members Totals 6 20 2. Materials Material Quantity Unit Comment Forms Location Form date Jul 12, 2022 Description Facility 20, Hatchery Intake Removal Due date Submitted by Chris Johnson Status Closed Last update Jul 13, 2022, 7:46 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1792 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:30 am The Divers and IMCO are working on demo of the existing structure. 11:00 am Heath, IPC, was onsite regarding the irrigation pump not running. We checked and the breakers were off. After checking with IMCO he turned the pump back on. It tripped twice. Kevin had the divers swim over to the pump and check the screen. It seemed a little dirty but not bad. Heath turned the pump on again and it seems to be running fine. Kevin and I spoke about checking to make sure its running every hour or so. 1:00 pm IDFG power washed the T screen so we could inspect the coating on it. It seems to have rubbed off on a couple of spots but overall not bad at all. I have taken photos and so has Jeff. 2:00 pm Attended weekly meeting. 4:00 pm The divers are retrieving cut off pieces. IMCO is continuing to work on removing pieces of the structure Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1793 of 1851 References Photos (5) 20220712_093214.jpg Taken on Jul 12, 2022, 9:32 AM MDT Added on Jul 12, 2022, 1:16 PM MDT Added by Chris Johnson 20220712_112808.jpg Taken on Jul 12, 2022, 11:28 AM MDT Added on Jul 12, 2022, 1:16 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1794 of 1851 20220712_130503.jpg Taken on Jul 12, 2022, 1:05 PM MDT Added on Jul 12, 2022, 1:16 PM MDT Added by Chris Johnson 20220712_131137.jpg Taken on Jul 12, 2022, 1:11 PM MDT Added on Jul 12, 2022, 1:17 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1795 of 1851 20220712_131202.jpg Taken on Jul 12, 2022, 1:12 PM MDT Added on Jul 12, 2022, 1:17 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1796 of 1851 Form detail #44: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 Recycle Metal, help divers Crux Diving 3 10 Remove T Screen, Torch steel members IMCO, General Crew 1 10 Eagle Island Loop brush clearing Totals 7 30 Forms Location Form date Jul 11, 2022 Description Facility 20, Hatchery Intake Removal, Eagle Island Loop Due date Submitted by Chris Johnson Status Closed Last update Jul 12, 2022, 7:57 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1797 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO is working on taking apart the existing structure that is removed and recycling the metal. Crux Diving is onsite and prepping to enter the water. 12:00 pm Crux has a diver in the water who is looking at the structure and developing a game plan. Jayden, IMCO, is at EIL working on rocking the shoulders of the access road and plans to clear brush for sight distance. 2:00 pm The diver has came out and informed all of us of his findings, IMCO is having him start to torch off pieces of the structure around the pipe so they can start to remove pieces. 5:00 pm IMCO had Crux unbolt the T Screen and they removed it, it is on the bank. They also dropped a plumb bob to check the location of the outside upstream pile. The worry is it will hit the existing pile that is encased in concrete. The frame of the structure is in the way to get an exact location but it looks like it will be in the concrete but not in conflict with the pile. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1798 of 1851 References Photos (2) 20220711_114908.jpg Taken on Jul 11, 2022, 11:49 AM MDT Added on Jul 12, 2022, 7:52 AM MDT Added by Chris Johnson 20220711_160832.jpg Taken on Jul 11, 2022, 4:08 PM MDT Added on Jul 12, 2022, 7:52 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1799 of 1851 Form detail #42: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Drive Pile Vale Electric, Electricians 2 5 Disconnect and reconnect irrigation pump Totals 6 15 2. Materials Forms Location Form date Jul 8, 2022 Description Drive Pile, Temp bracing Due date Submitted by Chris Johnson Status Closed Last update Jul 11, 2022, 10:47 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1800 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am Arrived on site. Crew is prepping to drive the pile on the North West corner, down stream. 8:00 am After placing the pile in the temp jig, Kirt realizes that the pile is making contact with the existing structure at the very bottom. Its kicking the pile out about 4”. They will not be able to drive this pile. Vale electric is onsite and is working on shutting down the irrigation pump. 9:00 am They decided they need to work on bracing the existing structure. Once its braced they will start removing the pieces of the structure that is in the way of the pile driving. All piles are going to make contact with the existing structure, since they have built their template or jig on the existing structure, they will need to keep it intact while driving the permanent piles. The divers are due onsite next week and they will utilize them to remove the members that are in conflict with the new piles. 10:00 am The crew has pulled the second pile installed yesterday and attempting to reset it. It twisted on them while driving it yesterday so they are attempting to fix it. 10:30 am Attended meeting for pile driving. 12:00 pm IMCO has reset the irrigation pump. They used fine metal mesh as a screen. The plan is to continue working on bracing the structure in preparation for the divers to be onsite Monday. 2:00 pm IMCO is planning to work on installing some more temp piles to brace off the temp jig so the divers can start cutting apart the existing structure. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1801 of 1851 References Photos (1) 20220708_122227.jpg Taken on Jul 8, 2022, 12:22 PM MDT Added on Jul 11, 2022, 10:47 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1802 of 1851 Form detail #41: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Drive Pile MB Welding 1 10 Drive Pile Totals 5 20 2. Materials Material Quantity Unit Comment Forms Location Form date Jul 7, 2022 Description Facility 20 Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 7, 2022, 5:08 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1803 of 1851 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO is prepping to start installing permanent piles. They have the clips in place to guide the pile in the location that they surveyed. 8:00 am IMCO has the first pile in the clips and is starting to use the APE 200 vibratory hammer to install it. 9:30 am The pile made it to 15’ of bury. They have been hammering on it for around 20 minutes and it has moved maybe 6 inches. They are going to move to the next one. 11:00 am IMCO has placed the second pile and it has buried to 7.5’. They have been hitting on it for over 20 minutes and it is not going any deeper. They both have seemed to hit the same layer of hard ground as they both are at approx. same pile tip elevation (Approx. 1680.5) . They are going to work on building the rest of their jig to guide the piles. They want to drive a pile out in the water father before making any adjustments. 3:00 pm They are still working on the pile jig, MB welding is working on welding the temp braces for the jig. 5:00 pm The crew has installed the rest of the jig. They are done for the day and will be back tomorrow to continue driving pile. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1804 of 1851 References Photos (2) IMG_0037 Taken on Jul 7, 2022, 8:00 AM MDT Added on Jul 7, 2022, 4:47 PM MDT Added by Chris Johnson IMG_0035 Taken on Jul 7, 2022, 7:55 AM MDT Added on Jul 7, 2022, 4:47 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1805 of 1851 Form detail #39: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 10 Prep for Pile Driving, Clean up site, recycle existing iron MB Welding 1 10 Recycle Iron, weld on guides for new piles Boise River Fence 2 Install Gates and fabric Totals 7 20 Forms Location Form date Jul 6, 2022 Description Hatchery Intake, EIL Fencing Due date Submitted by Chris Johnson Status Closed Last update Jul 7, 2022, 9:11 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1806 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 10 JCB 510 Boom Forklift 1 10 Deere 225D Excavator 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am Boise River Fence is onsite installing the fabric and gates at EIL. 11:00 am IMCO is continuing to work on disassembling the existing intake structure. They hope to be driving piles today. 1:00 pm IMCO is waiting on the most updated pile locations. They have made some changes because of the location of the screen piles. They are waiting on the updated coordinates and the surveyor will shoot them in. Meantime they are breaking down the pieces of the existing structure to fit it into the recycle bin. 4:30 pm The updated coordinates are uploaded and the surveyor is marking them now. They are welding on the guides to help Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1807 of 1851 References Photos (2) 20220706_162614.jpg Taken on Jul 6, 2022, 4:26 PM MDT Added on Jul 7, 2022, 9:09 AM MDT Added by Chris Johnson 20220706_162603.jpg Taken on Jul 6, 2022, 4:26 PM MDT Added on Jul 7, 2022, 9:09 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1808 of 1851 Form detail #37: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 IMCO, General Crew 5 10 temp crane pad MB Welding 1 10 Temp crane pad Durham Gravel, Paving 7 6 Paved Access Road Totals 16 36 Forms Location Form date Jun 30, 2022 Description Eagle Island Loop, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jul 1, 2022, 9:49 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1809 of 1851 2. Materials Material Quantity Unit Comment 1/2" Superpave SP3 HMA 98 tons 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 Deere 225D Excavator 1 JCB 510 Boom Forklift 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am IMCO and I have checked the grade one more time on the EIL Access road. All looks good and is ready for paving. They are currently saw cutting the existing edges now. 8:00 am Pavers are onsite. Mix is due onsite at 9am. 9:00 am I have laid out the edge of pavement with Durham. Kevin Z. is here and he agreed with the limits. Mix is onsite. 1:00 pm The crew is done with paving. The total was 98 tons. IPC has been onsite at EIL to install the meters on the lower loop. He has it all installed and energized. 3:30 pm The mat has cooled enough for me to take the two density cores. I will put these in the oven tonight and run them tomorrow. I have also taken a sample for Rice determination. I was not able to get to the hatchery today. Kevin informed me that the IMCO crew completed the temp crane pad today. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1810 of 1851 References Photos (3) 20220630_083827.jpg Taken on Jun 30, 2022, 8:38 AM MDT Added on Jul 1, 2022, 9:49 AM MDT Added by Chris Johnson 20220630_095105.jpg Taken on Jun 30, 2022, 9:51 AM MDT Added on Jul 1, 2022, 9:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1811 of 1851 20220630_092719.jpg Taken on Jun 30, 2022, 9:27 AM MDT Added on Jul 1, 2022, 9:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1812 of 1851 Form detail #40: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Forms Location Form date Jun 30, 2022 Description Eagle Island Loop Access Road HMA Density Report Due date Submitted by Chris Johnson Status Closed Last update Jul 6, 2022, 1:48 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1813 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes Density Report from the the 2 cores taken from the access road. Rice Snip to show how the Rice was determined for calculating density. Rice sample was taken from the auger. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1814 of 1851 Form detail #36: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 grading road base, clearing sight distance IMCO, General Crew 5 10 temp crane pad MB Welding 1 10 Temp crane pad Totals 9 30 Forms Location Form date Jun 29, 2022 Description Temp Crane pad, EIL Access Road grading Due date Submitted by Chris Johnson Status Closed Last update Jun 30, 2022, 7:11 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1815 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Kobelco 1100G Crane 1 Deere 225D Excavator 1 JCB 510 Boom Forklift 1 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:30 am IMCO is working on grading the access road. The pavers are scheduled for tomorrow. I discussed with Kevin and his crew about sawcutting the existing asphalt to have clean lines to pave too. They plan on doing that. 9:00 am IMCO has placed the three stringers for the temp crane pad. MB Welding is currently welding these stringers. They plan to get the temp crane pad done today and start removing more of the intake structure. 12:00 pm IMCO is continuing to work on setting up the temp crane pad. Kevin and I spoke about the asphalt quantity for tomorrows paving. I have concerns they will not be brining enough mix considering the limits of the paving have extended to match wings. 3:00 pm I have checked in at EIL where Jayden and the crew are still working on grading and prepping the edges of existing for tomorrows paving. Since he is still working on grading we agreed to meet at 4pm to paint out the limits of the paving, approve grade and perform a asphalt take off for quantity. 5:00 pm I recalculated the tonnage HMA. I came up with 93 tons. I notified Kevin H. with the notion that he should also do a take off and compare to mine. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1816 of 1851 References Photos (2) IMG_0033 Taken on Jun 29, 2022, 8:33 AM MDT Added on Jun 30, 2022, 7:05 AM MDT Added by Chris Johnson IMG_0034 Taken on Jun 29, 2022, 3:36 PM MDT Added on Jun 30, 2022, 7:05 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1817 of 1851 Form detail #34: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 3 10 grading road base, clearing sight distance IMCO, General Crew 5 10 temp crane pad Vale Electric, Electricians 4 5 hook up job trailer MB Welding 2 10 Temp crane pad Totals 14 35 Forms Location Form date Jun 28, 2022 Description Temp crane pad, EIL access road Due date Submitted by Chris Johnson Status Closed Last update Jun 28, 2022, 6:45 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1818 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on the access road grading. I checked in with Jayden and we discussed taking the density test. 9:00 am I performed two density tests on the road grade by direct transmission with nuclear density gauge (see external report). Both tests passed. The crew is going to continue to get the grade set and also start trimming the trees for the sight distance. 10:00 am IMCO is working on the temp crane pad. Kirt is starting to excavate into the side of the bank for the stringers to span to the temp piles. MB Welding is onsite working on the temp crane pad as well. Vale Electric arrived on site. They plan to get the office trailer powered up and also be here for the meeting at 1230 to go over the primary feeds. 12:30 pm A conduit was found during excavation for the crane pad. It was determined that the conduit had been drilled through by sub contractor prior to construction starting. Bentonite chips were used to backfill the exploratory bore. This was done many months ago so it is assumed that it is an old conduit. Attended primary feed meeting. 1:30 pm The meeting went over the new locations of the transformers for both primary power feeds. It was also discussed to add spare conduits, this request from Derrek VanderMeer. Sam (IPC) is going to be onsite in next week to locate the existing power locations. 3:00 pm At EIL, IMCO has brushed out the extents of what they can, without major tree falling. Bill and I met with Jayden and asked him to clean up the bank on the North side a little more and call it good. If IPC needs to do more we will reapproach it then. 4:00 pm IMCO has started to set the stringer beams for the temp crane pad. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1819 of 1851 References Photos (3) 20220628_083809.jpg Taken on Jun 28, 2022, 8:38 AM MDT Added on Jun 28, 2022, 6:40 PM MDT Added by Chris Johnson IMG_0031 Taken on Jun 28, 2022, 10:43 AM MDT Added on Jun 28, 2022, 11:06 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1820 of 1851 IMG_0032 Taken on Jun 28, 2022, 3:20 PM MDT Added on Jun 28, 2022, 6:40 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1821 of 1851 Form detail #33: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 EIL Access Road Grading, compacting IMCO, General Crew 5 10 Setup Temp Crane Pad on piles MB Welding 2 10 Weld on Temp crane pad Totals 9 30 Forms Location Form date Jun 27, 2022 Description Temp crane pad, EIL access road Due date Submitted by Chris Johnson Status Closed Last update Jun 28, 2022, 7:51 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1822 of 1851 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am IMCO is working on EIL access road. They are placing the gravel for the base and grading it to slope to one side. The plans call for a crown but after discussing with Bill, it was decided to grade to one side to produce a better product so the paver can make one 14’ wide pull. 11:00 pm IMCO is working at the hatchery. Last week they were able to drive 4 temp piles. MB is onsite and welding caps on them now. This is the start of the temp crane pad. 2:00 pm I spoke with Jayden regarding the access road grading. I showed him the proctor sheet on the material he is grading. It calls for 8.1% moisture. They had not applied any water to the base yet. After a short talk he started placing water on the grade. We spoke about testing the grade prior to paving. He is going to continue to apply water and start rolling the material for compaction. 3:00 pm I noticed the Intake Mechanical piping was onsite. This piping has a protective coating on it in “off white”. I dug through the submittals and could not find the coatings inspection report. I did however find in the coatings submittal that the inspection would be submitted at a later date. I spoke to Kevin H. regarding this. He said he would get the inspection report and get it submitted before they install it. MB Welding is working on reinforcing the crane pad stringer beam. 4:00 pm Jayden is continuing to work on applying water and compacting the EIL access road. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1823 of 1851 References Photos (5) 20220627_115358.jpg Taken on Jun 27, 2022, 11:53 AM MDT Added on Jun 28, 2022, 7:48 AM MDT Added by Chris Johnson 20220627_120450.jpg Taken on Jun 27, 2022, 12:04 PM MDT Added on Jun 28, 2022, 7:49 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1824 of 1851 20220627_120501.jpg Taken on Jun 27, 2022, 12:05 PM MDT Added on Jun 28, 2022, 7:50 AM MDT Added by Chris Johnson 20220627_153142.jpg Taken on Jun 27, 2022, 3:31 PM MDT Added on Jun 28, 2022, 7:50 AM MDT Added by Chris Johnson 20220627_153156.jpg Taken on Jun 27, 2022, 3:31 PM MDT Added on Jun 28, 2022, 7:50 AM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1825 of 1851 Form detail #32: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment Forms Location Form date Jun 22, 2022 Description Sawtooth Welding Crowder Mock up Due date Submitted by Chris Johnson Status Closed Last update Jun 27, 2022, 2:09 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1826 of 1851 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 12:00 pm Attended mockup crowder demo at Sawtooth Welding. Schnabel representatives are onsite. Randy, SW, operated the crowder multiple times while Schnabel witnessed and went over concerns. References Photos (1) IMG_0030 Taken on Jun 22, 2022, 12:28 PM MDT Added on Jun 27, 2022, 2:09 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1827 of 1851 Form detail #31: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 10 Installing Silt Curtain, Prep Crane pad Vale Electric, Electricians 2 5 Deenergize intake, remove disconnect and cables IMCO, General Crew 2 10 Eagle Island Loop access road, clearing for fence MB Welding 1 10 Weld temp crane pad Forms Location Form date Jun 21, 2022 Description Eagle Island Loop, Hatchery Intake Due date Submitted by Chris Johnson Status Closed Last update Jun 27, 2022, 1:59 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1828 of 1851 Crew # Workers # Total hours Work performed Boise River Fence 3 10 EIL Fence Totals 13 45 2. Materials Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO crew is working at EIL on grading the access road along with prepping for Boise River Fence to be onsite. They are working on clearing for the new fence. 9:00 am Boise River fence is onsite. I spoke with Heath regarding the gate locations. I laid out the gate locations from Heaths direction. We also discussed the clearing for sight distance for the access road. Kevin and I discussed last night to clear as much as they could with the tools they have. If more clearing is needed it would discussed and a quantity would be generated accordingly. Itsy is asking to make the corner safe to be used. 10:00 am IMCO is working at the hatchery site. Vale Electric is onsite and working on deenergizing the intake structure. 12:00 pm The crew is continuing to work on installing the silt curtain. Vale is done for the day. They were able to pull the cable out of conduit. Bill Lynch is onsite and went over the salvage and recycle of the existing material. Rick also made a stop. We discussed the irrigation pump. Kevin H. is going to work on a plan for the irrigation pump. 2:00 pm Attended weekly meeting. I spoke to BRF and Heath regarding switching the gates to a single gate instead of the double. Heath agreed it was a good idea. BRF did not care either way. So a single gate was decided. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1829 of 1851 3:00 pm IMCO is going to work on getting the silt curtain installed. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1830 of 1851 Form detail #30: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Eagle Island loop access road IMCO, General Crew 3 10 Inventory material MB Welding 1 10 Weld temp crane pad Totals 6 30 2. Materials Forms Location Form date Jun 20, 2022 Description Eagle Island Loop, Hatchery Inventory Due date Submitted by Chris Johnson Status Closed Last update Jun 21, 2022, 1:41 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1831 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 11:00 am IMCO crew is working at EIL on the access road. They are currently installing the culvert and getting it backfilled. I spoke to Jayden about clearing out more brush to help with the sight distance. 12:00 pm IMCO at the hatchery is working on moving the rest of the materials under the tent. They have been issued NTP for the intake work. They plan to install the silt curtain tomorrow once their crane operator is onsite. 3:00 pm IMCO is continuing to work on EIL. The crew has been shifted to clear out the brush around the trees along the fence. Boise River Fence is due to be onsite tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1832 of 1851 References Photos (1) 20220620_113535.jpg Taken on Jun 20, 2022, 11:35 AM MDT Added on Jun 20, 2022, 12:16 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1833 of 1851 Form detail #28: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed MB Welding 2 10 Fabricating crane pad IMCO, General Crew 3 10 Material tent IMCO, General Crew 2 10 Eagle Island access road Totals 7 30 2. Materials Forms Location Form date Jun 15, 2022 Description Eagle Island Loop, Hatchery Inventory, Crane Pad Due date Submitted by Chris Johnson Status Closed Last update Jun 17, 2022, 7:59 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1834 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on the access road. Jayden plans to knock the tree down that is in the proposed shoulder today. 12:00 pm At the hatchery, MB welding is onsite working on the temp crane pad. They are welding the frame together now. IMCO is working on installing their GPS base station along with putting the inventory tent up. 3:00 pm IMCO is still working on the access road. They are using the mini and the backhoe to load and haul woody debris to the dump site. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1835 of 1851 References Photos (2) 20220615_100801_photo Taken on Jun 15, 2022, 10:07 AM MDT Added on Jun 15, 2022, 10:08 AM MDT Added by Chris Johnson 20220615_123929_photo Taken on Jun 15, 2022, 12:38 PM MDT Added on Jun 15, 2022, 12:41 PM MDT Added by Chris Johnson Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1836 of 1851 Form detail #29: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Access Road IMCO, General Crew 3 10 Inventory, Lay out for MB Welding, Tent Totals 5 20 2. Materials Forms Location Form date Jun 14, 2022 Description Eagle Island Loop, Hatchery Inventory Due date Submitted by Chris Johnson Status Closed Last update Jun 15, 2022, 11:00 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1837 of 1851 Material Quantity Unit Comment 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 8:00 am IMCO is working on the access road at EIL. Jayden has started cutting to subgrade. It looks to me that a few trees need to be removed. I will talk to Heath about those. 9:00 am IMCO is working on laying out the tent to cover the material. They are also working on setting up the office trailer. Vale is dropping off their office trailer and hooking up power to both. 12:00 pm Kirt has laid out two beams to be welded. These beams are for the crane structure to install the piles. MB Welding will be onsite tomorrow to start welding. 1:00 pm It was discussed to remove the trees in the way for the access road at EIL. Jayden is continuing to cut to subgrade. Heath and I discussed the gate locations. He is running on the assumption for Itsy, IPC, that the fence is wrapping around the corner. I told him I would discuss this all in the meeting. 2:00 pm Attended weekly meeting. 5:00 pm The crew has mobilized the backhoe back to EIL and using it to transport woody debris to the dump pile. They will continue the access road tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1838 of 1851 Form detail #27: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 2 10 Access Road IMCO, General Crew 3 10 Tent Setup, Inventory, Office Setup Totals 5 20 2. Materials Material Quantity Unit Comment Forms Location Form date Jun 13, 2022 Description Eagle Island Loop, Hatchery Inventory Due date Submitted by Chris Johnson Status Closed Last update Jun 14, 2022, 4:35 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1839 of 1851 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:30 am Arrived at Eagle Island Loop. Crew is working on trimming trees and getting ready to start the access road. They have been compacting the rock placed at the sites. 12:00 pm The crew is setting up the office at the hatchery. They have been working on setting containers and leveling out a place for the tent. They plan to import rock starting tomorrow. 5:00 pm The crew started on the access road. It looks like the existing asphalt is less than 1” thick. They will continue working on it tomorrow. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1840 of 1851 Form detail #24: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 5 50 Grading, Inventory Totals 5 50 2. Materials Material Quantity Unit Comment Forms Location Form date Jun 7, 2022 Description Eagle Island Loop, Hatchery Inventory Due date Submitted by Chris Johnson Status Closed Last update Jun 7, 2022, 5:17 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1841 of 1851 3. Equipment Equipment Quantity Hours used Comment Mini Excavator Backhoe 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 7:00 am The crew is starting to work at Eagle Island Loop. Today they plan to work on clearing the rest of the sites and backfilling around all the hydrants. 12:00 pm IMCO has one laborer and one operator at the hatchery working on inventorying material that has been delivered. They are also working on taking material that is being delivered. There has been multiple loads of keystone retaining wall blocks delivered. 5:00 pm IMCO has had a truck hauling rock from Brownlee most of the day. The rock is for the bottom sites. The truck has been dumping in place and IMCO has been using the mini to spread the rock. The crew is done for the day. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1842 of 1851 Form detail #21: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed IMCO, General Crew 4 44 Water Tie-Ins, New Hydrants installed Totals 4 44 2. Materials Material Quantity Unit Comment Forms Location Form date Jun 6, 2022 Description Eagle Island Loop Due date Submitted by Chris Johnson Status Closed Last update Jun 7, 2022, 9:16 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1843 of 1851 3. Equipment Equipment Quantity Hours used Comment Mini Excavator Backhoe 4. Signature Chris Johnson, HMH Engineering - 4.1 Notes 10:00 am Arrived on site. IMCO crew is shutting off the water to make the multiple tie ins. Derrick, IPC, has moved his motorhome to the upper loop to allow the crew to work on his site. Today they plan to just get the water hydrants installed, cap the irrigation line, and make the tie in for the last two spots on the upper loop. 3:00 pm The crew is still working on making the tie in at the upper last two spots. They have installed all the hydrants and capped the couple of saddles that did not need new hydrants. 5:00 pm The crew is working on capping the irrigation and the water line. They did not have the correct gaskets so they are having to use the ones they have and will need to replace them once they get the new ones which should be Thursday. 6:00 pm The crew has capped the line and is now working on getting the water back on. Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1844 of 1851 Form detail #26: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed Sawtooth Welding Totals 0 0 2. Materials Material Quantity Unit Comment Forms Location Form date Jun 6, 2022 Description Sawtooth Welding, Welding Inspection Due date Submitted by Chris Johnson Status Closed Last update Jun 9, 2022, 9:00 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1845 of 1851 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1846 of 1851 Form detail #25: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed Sawtooth Welding Totals 0 0 2. Materials Material Quantity Unit Comment Forms Location Form date May 31, 2022 Description Sawtooth Welding, Welding Inspection Due date Submitted by Chris Johnson Status Closed Last update Jun 9, 2022, 8:59 AM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1847 of 1851 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1848 of 1851 Form detail #22: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed Sawtooth Welding Welding Inspection Totals 0 0 2. Materials Material Quantity Unit Comment Forms Location Form date May 16, 2022 Description Sawtooth Welding, Welding Inspection Report Due date Submitted by Chris Johnson Status Closed Last update Jun 7, 2022, 1:46 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1849 of 1851 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1 Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1850 of 1851 Form detail #23: Daily Report -Standard 1. Work Log Crew # Workers # Total hours Work performed Sawtooth Welding Welding Inspection Totals 0 0 2. Materials Material Quantity Unit Comment Forms Location Form date May 9, 2022 Description Sawtooth Welding, Welding Inspection Due date Submitted by Chris Johnson Status Closed Last update Jun 7, 2022, 1:47 PM MDT Last updated by Chris Johnson Included references Photos Oxbow Hatchery Renovation Form detail report Created by Zack Schaumburg with Autodesk® Construction Cloud™ on Aug 1, 2024 at 6:47 AM MDT Page 1851 of 1851 3. Equipment Equipment Quantity Hours used Comment 4. Signature Chris Johnson, HMH Engineering - 4.1