HomeMy WebLinkAbout20240806IPC to Staff Response No. 31(d) - Attachment 2 - Status Reports - Construction - Combined.pdf IMCO Job No.4110
3 Week Look Ahead Schedule Oxbow Hatchery Renovation
Activity Subs 2-May 3-May 4-May 5-May 6-May 7-May 8-May 9-May 10-May 11-May 12-May 13-May 14-May 15-May 16-May 17-May 18-May 19-May 20-May 21-May 22-May
Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
OXBOW INTAKE CONSTRUCTION
CRITICAL DELIVERIES
Pipe Fittings,Valves,etc. IMCO X
Office Trailer(W/O 5/9) IMCO x X X X
Intake Roof Hatches IMCO X
Install Meter Base(s)for Temp Power(Tentative) Vale Electric X X
Mobilize Equipment
Mobilize Crane(110Ton) IMCO
Arrange Temp Storage/Conex(s) X X
EAGLE ISLAND LP-RV SITE IMPROVEMENTS
Site Visit X
Mobilize Mini-Exc/Backhoe Premier Agg X X
Install New Water connections/Frost-Free Hydrants IMCO X X X X X X X X
Install New Sewer Connections IMCO X X X X X X X X
RV Site Grading/Gravel IMCO X X X X
Clear Brush from Ext'g Slatted Fence IMCO
Site Fencing(need to confirm scope,6-8wks) Boise River Fence
EAGLE ISLAND-NEW ACCESS ROAD
Pending IPC acceptance
IMCO Job No.4110
3 Week Look Ahead Schedule Oxbow Hatchery Renovation
Activity Subs 9-May 10-May 11-May 12-May 13-May 14-May 15-May 16-May 17-May 18-May 19-May 20-May 21-May 22-May 23-May 24-May 25-May 26-May 27-May 28-May 29-May
Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
OXBOW INTAKE CONSTRUCTION
CRITICAL DELIVERIES
Pipe Fittings,Valves,etc. X
Storage Tent X
Office Trailer(TBD) IMCO
Intake Roof Hatches X
Install Meter Base(s)for Temp Power(Tentative) Vale Electric X
Vale Electric-Drop off 40'Conex Vale Electric X
Mobilize Equipment
Mobilize Crane(110Ton) IMCO
Arrange Temp Storage/Conex(s) X X
EAGLE ISLAND LP-RV SITE IMPROVEMENTS
Install Pedestals/Meter Bases-Lower sites Vale Electric
Mobilize Mini-Exc/Backhoe Premier Agg X
Install New Water connections/Frost-Free Hydrants IMCO X X X X X X X X
Install New Sewer Connections IMCO X X X X X X X X
RV Site Grading/Gravel IMCO X X X X
Clear Brush from Ext'g Slatted Fence IMCO
Site Fencing Boise River Fence
EAGLE ISLAND-NEW ACCESS ROAD
Pending IPC acceptance
Clearing,Grading, Install Culvert IMCO X X X X
IMCO Job No.4110
3 Week Look Ahead Schedule Oxbow Hatchery Renovation
Activity Subs 16-May 17-May 18-May 19-May 20-May 21-May 22-May 23-May 24-May 25-May 26-May 27-May 28-May 29-May 30-May 31-May 1-Jun 2-Jun 3-Jun 4-Jun 5-Jun
Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
OXBOW INTAKE CONSTRUCTION
CRITICAL DELIVERIES
Pipe Fittings,Valves,etc. X
Storage Tent X
Crane Mats X X
PVC Pipe/EIL Culvert Pipe X ^
Office Trailer IMCO X X
Vibratory Pile Hammer APE X
Temp Piles/Beams IMCO X X
Install Temp Power meter bases Vale Electric X X uO
Mobilize 225 Excavator Premier Agg X X
Mobilize/Setup Crane(110Ton) IMCO X X X X
Arrange Temp Storage/Conex(s) IMCO X X
Prep for Pile Driving IMCO X
Drive Temp Trestle Piles IMCO X
Erect Temp Crane Trestle IMCO X
Exc/Prep Trestle Shore Abutment IMCO X X
De-energize ext'g Intake Vale Electric X
Demo Ext'g Intake IMCO X
Divers Crux Diving
EAGLE ISLAND LP-RV SITE IMPROVEMENTS
Install Pedestals/Meter Bases-Lower sites Vale Electric Pending IPC energize meters/move RVs X X X X _
Install New Water/Sewer(Upper Loop) IMCO X X
Install Water/Sewer(Lower Loop) IMCO X X X X O
RV Site Grading/Gravel IMCO X X X X 5
Clear Brush from Ext'g Slatted Fence IMCO F-1
Site Fencing Boise River Fence W
EAGLE ISLAND-NEW ACCESS ROAD
Survey/Layout New Access Road ISG X
Clearing,Grading, Install Culvert IMCO X X X
IMCO Job No.4110
3 Week Look Ahead Schedule Oxbow Hatchery Renovation
Activity Subs 30-May 31-May 1-Jun 2-Jun 3-Jun 4-Jun 5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun
Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
OXBOW INTAKE CONSTRUCTION
CRITICAL DELIVERIES
Valves Delivery X
ADS Pipe Delivery X X
TESC:Silt Curtain/Silt Fence X X
Basalite-Retaining Wall Block(15 Loads) Basalite X X X
Vibratory Pile Hammer APE X X
Temp Piles/Beams IMCO X X X
Install TESC IMCO X
Arrange Temp Storage/Conex(s) IMCO X X
Prep for Pile Driving IMCO 101 X
Drive Temp Trestle Piles IMCO X
Erect Temp Crane Trestle IMCO X
Exc/Prep Trestle Shore Abutment IMCO X
De-energize ext'g Intake Vale Electric X
Demo Ext'g Intake IMCO
Divers Crux Diving
EAGLE ISLAND LP-RV SITE IMPROVEMENTS
IPC Install Meters(Upper Lp/De-engergize Lower LP IPC X X
Install Pedestals/Meter Bases-Lower sites Vale Electric X X X X
Expose Water Connections(Upper Loop) IMCO X
Install Water/Sewer(Lower Loop) IMCO X X
Clearing(Lower Loop) IMCO / X X
RV Site Grading/Gravel(Upper Loop) IMCO I� 1��1 X
RV Site Grading/Gravel(Lower Loop) IMCO O X X
Clear Brush from Ext'g Slatted Fence IMCO
Site Fencing Boise River Fence
I�
EAGLE ISLAND-NEW ACCESS ROAD
Clearing,Grading, Install Culvert IMCO X X
Place AGG Base IMCO FFF-�11 X X
AC Paving Durham Gravel
IMCO Job No.4110
3 Week Look Ahead Schedule Oxbow Hatchery Renovation
Activity Subs 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul 3-Jul
Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday
OXBOW INTAKE CONSTRUCTION
CRITICAL DELIVERIES
Fabricated Intake Mech Piping STAAB X
ADS Pipe Delivery X X
Vibratory Pile Hammer APE X X
Temp Piles/Beams IMCO X X
Install TESC IMCO X
Arrange Temp Storage/Conex(s) IMCO X X X
Fab Temp Trestle Piles MB Welding X X X
Prep for Pile Driving IMCO X X
Drive Temp Trestle Piles IMCO X X
Erect Temp Crane Trestle IMCO X X
Exc/Prep Trestle Shore Abutment IMCO X X
De-energize ext'g Intake Vale Electric X
Demo Ext'g Intake IMCO X X
Divers Crux Diving
EAGLE ISLAND LP-RV SITE IMPROVEMENTS
IPC Install Meters/Energize(Lower Loop) IPC ASAP
Complete Water/Sewer(Lower Loop) IMCO X
RV Site Fine-Grading/Gravel(Upper Loop) IMCO X
RV Site Fine-Grading/Gravel(Lower Loop) IMCO X
Clear Brush from Ext'g Slatted Fence IMCO X X
Site Fencing Boise River Fence X X X X X
EAGLE ISLAND-NEW ACCESS ROAD
Clearing,Grading, Install Culvert IMCO X X
Place AGG Base IMCO X X X
AC Paving IDurham Gravel I I I I I After the 4th of
IMCO Project 4110 IMCO General Construction
Oxbow Hatchery Renovation/Eagle Island Loop-Three Week Look Ahead Schedule
6/17/2022
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO N N N N N N N N N N N N Comments/Milestones
N N N N N N N N N N N N N N N N N N N N N
O O O O O O O O O O O O N N N N N N N N N
N N N N N N N N N N N N O O O O O O O O O
\ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N
O1 O '-I N rn V Ln ID N Co a) O \ \ \ \ \ \ \ \ \
.-I N N N N N N N N N N rn e-I N M 7 Ln W N Oo Dl
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
� ID � ID � ID � ID ID 'D 'D 'D n n n n n n n n n
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
CRITICAL DELIVERIES
Fabricated Intake Mech Piping STAAB D
Vibratory Pile Hammer APE D D Late Tuesday or Wednesday morning
Temp Piles/Beams IMCO D D
CONSTRUCTION ACTIVITIES
Install TESC/Silt Curtain IMCO X
Fab Temp Trestle Piles/Beams MB Welding X X X X X X
Prep for Pile Driving IMCO X X
Drive Temp Trestle Piles IMCO X X
Set Trestle Pile Cap PL/Beam IMCO X X
Erect Temp Crane Trestle IMCO X X X
Exc/Prep Trestle Shore Abutment IMCO X
Drive Template Piles/Erect Template IMCO X X
T
Drive Permanent H-Piles IMCO X X
De-Energize ext'g Intake Vale Electric X X O
DEMO Ext'g Intake IMCO X X X X
Divers Crux Diving X X X X
O
EAGLE ISLAND LOOP-RV SITE IMPROVEMENTS
a-+
IPC install meters/Energize(Lower Loop) IPC X Jeremy(IPC)scheduled for 6/23
Water/Sewer(Lower Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Upper Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Lower Loop)COMPLETED IMCO
Clear Brush from Ext'g Fence IMCO X
Site Fencing/Gates Boise River Fence X X X X X IPC to provide Gate Location
EAGLE ISLAND LOOP-NEW ACCESS ROAD
Clearing/Grading/Install Culvert IMCO X X
Place Agg Base IMCO X X X
AC Paving Durham Gravel X X X X Paving Tenative
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity tWeather
Delivery D
Earth Disturbing Activity Complete C
Hold Point W
*Schedule Subject to Change Page 1 of 1
IMCO Project 4110 IMCO General Construction
Oxbow Hatchery Renovation/Eagle Island Loop-Three Week Look Ahead Schedule
6/24/2022
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
N N N N N N N N N N N N
Activity Description Sub/IMCO N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
O O O O O N N N N N N N N N O O O O O O O
N N N N N O O O O O O O O O N N N N N N N N N
\ \ \ \ \ N N N N N N N \ \ \ \ \ \ \
O ^ 00 O O \ \ \ \ \ \ \ \ \ O 14 N M V Ln W
� � \ \ \ \ Go \
\ \ \ \ \ \ \ \ \ \ \r` N
N N Nn Nr`
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg X X
Electrical Meeting X
CRITICAL DELIVERIES
New Intake Structural Steel
CONSTRUCTION ACTIVITIES
Fab Temp Trestle Piles/Beams/Weld Trestle connections MB Welding X X X X
Drive Temp Trestle Piles IMCO
Set Trestle Pile Cap PL/Beam IMCO X
Erect Temp Crane Trestle IMCO X
Exc/Prep Trestle Shore Abutment IMCO X
Drive Intake-Template Piles/Erect Template IMCO X X
Drive Permanent H-Piles IMCO X X X
c�
DEMO Ext'g Intake-Superstructure IMCO O X X
DEMO Ext'g Intake-Below Water' IMCO ,
X X X X X
Remove Ext'g Tee Screen IMCO X
0 Divers Crux Diving O X X X X X
EAGLE ISLAND LOOP-RV SITE IMPROVEMENTS
IPC install meters/Energize(Lower Loop) IPC X Jeremy(IPC)scheduled for 6/23
Water/Sewer(Lower Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Upper Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Lower Loop)COMPLETED IMCO
Complete Site Fencing/Gates Boise River Fence X X X
Final Cleanup X
EAGLE ISLAND LOOP-NEW ACCESS ROAD
Clearing/Grading/Install Culvert COMPLETED IMCO
Place Agg Base/Fine Grade IMCO X X
AC Paving Durham Gravel X
Brush Clearing-Access Road X Evaluate site lines after clearing
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity tweather
Delivery D
Earth Disturbing Activity Complete C
Hold Point W
*Schedule Subject to Change Page 1 of 1
IMCO Project 4110 IMCO General Construction
Oxbow Hatchery Renovation/Eagle Island Loop-Three Week Look Ahead Schedule
6/30/2022
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
N N N N N N N N N N N N N N N N N N N N N
O O O O O O O O O O O O O O
N N N N N N N N N N N N N N N N N N N N N
M a M ID ^ M Q\1 \ \ \ \ \ \ \ \ \ \ \ \ \ \
O rl N M l!1 l0 r` W Ql O rl N M
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M
CRITICAL DELIVERIES
New Intake Structural Steel(2nd Delivery) Sawtooth
SS Pipe STAAB D
Intake/IRR Pump Cans CH Spencer D
Intake SW Pumps CH Spencer D
Check Valves&BFVs HD Fowler
CONSTRUCTION ACTIVITIES
Drive Permanent H-Piles IMCO X X X X
Setup Permanent Pile Templates IMCO X
Weld/Fab Templates/Supports MB Welding X X X X X
IMCO
Irrigation Pump Relocation IMCO X X
DEMO Ext'g Intake-Superstructure IMCO X
DEMO Ext'g Intake-Below Water IMCO X X X X X
Remove Ext'g Tee Screen/Mud Valve IMCO O X X
2
Divers Crux Diving ] X X X X X X X X
Install Bridge Structure underwater X-Bracing Crux Diving O X X X
Drive Pump-Can support Piles/Erect support IMCO p X X
Erect Pump-Can Template IMCO X X
EAGLE ISLAND LOOP-RV SITE IMPROVEMENTS
IPC install meters/Energize(Lower Loop) IPC Jeremy(IPC)scheduled for 6/30/22
Water/Sewer(Lower Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Upper Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Lower Loop)COMPLETED IMCO
Complete Site Fencing/Gates Boise River Fence X
Final Cleanup X
EAGLE ISLAND LOOP-NEW ACCESS ROAD
Clearing/Grading/Install Culvert COMPLETED IMCO
Place Agg Base/Fine Grade COMPLETED IMCO
AC Paving COMPLETED Durham Gravel Pave Thursday 6/30/2022
Brush Clearing-Access Road COMPLETED IMCO Evaluate site lines after clearing
LEGEND
Holiday-No Work Meeting M
Day Activity tWeather
Pour P
Night Activity Delivery D
Earth Disturbing Activity Complete C
Hold Point W
*Schedule Subject to Change Page 1 of 1
IMCO Project 4110 IMCO General Construction
Oxbow Hatchery Renovation/Eagle Island Loop-Three Week Look Ahead Schedule
7/9/2022
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO N N N N N N N N N N N N N N N N N N N N N
N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N N N N N N N N N N N N N N N N N N N N N
ON N M Ln to n 0000 M O N N M Ln %DD N 0000 Ch O
0 14 eq
n n n n n n n n n n n n n n n n n n n n n
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
CRITICAL DELIVERIES
New Intake Structural Steel(2nd Delivery) Sawtooth
SS Pipe STAAB D
Intake/IRR Pump Cans CH Spencer D
Intake SW Pumps CH Spencer D
Check Valves&BFVs HD Fowler
CONSTRUCTION ACTIVITIES
Drive Permanent H-Piles IMCO X X X X
Weld Intake Structural Steel MB Welding X X X X X
IMCO
DEMO Ext'g Intake-Below Water IMCO X X X X X
Remove Ext'g Tee Screen/Mud Valve IMCO X X
Divers Crux Diving X X X X X
Install Bridge Structure underwater X-Bracing Crux Diving X X X
Drive Pump-Can support Piles/Erect support IMCO X X
Erect Pump-Can Template IMCO X X
Erect New Intake Structural Steel IMCO X X X X X
EAGLE ISLAND LOOP-RV SITE IMPROVEMENTS
Water/Sewer(Lower Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Upper Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Lower Loop)COMPLETED IMCO
Site Fencing/Gates COMPLETED Boise River Fence
Final Cleanup
EAGLE ISLAND LOOP-NEW ACCESS ROAD
Clearing/Grading/Install Culvert COMPLETED IMCO
Place Agg Base/Fine Grade COMPLETED IMCO
AC Paving COMPLETED Durham Gravel
Brush Clearing-Access Road IMCO X X Evaluate site lines after clearing
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity tWeather
Delivery D
Earth Disturbing Activity Complete C
Hold Point W
*Schedule Subject to Change Page 1 of 1
IMCO Project 4110 IMCO General Construction
Oxbow Hatchery Renovation/Eagle Island Loop-Three Week Look Ahead Schedule
7/15/2022
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
ActivitySub IMCO N N N N N N N N N N NNNN N N N N N N N N N N N N N N N N N N N N Comments/Milestones
O O O O O O O O O O O O O O O O O O O O O
N N N N N N N N N N N N N N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 14 N M V V\1 tD
I4 00 Ql O N M V N W n 00 M O M
ci c-I c-I N rq N N N N N N N N N M M 00 00 00 00 00 W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
n n n n n n n n n n n n n n n
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
CRITICAL DELIVERIES
New Intake Structural Steel(2nd Delivery) Sawtooth D D
SS Pipe STAAB D
Intake/IRR Pump Cans CH Spencer D
Intake SW Pumps CH Spencer D
CONSTRUCTION ACTIVITIES
Drive Permanent H-Piles(Bents 1&2) IMCO X X
Weld Intake Structural Steel MB Welding X X X X X X X X X
Divers:Install Bridge Structure underwater X-Bracing Crux Diving X X X X X
Drive Pump-Can support Piles/Erect support IMCO X X
Erect Pump-Can Template IMCO X X
Install Pump Cans/Piiping/Tee Screen IMCO X X
Erect New Intake Structural Steel IMCO X X X X X
Erect new Intake Mech Piping/Supports IMCO X X X
EAGLE ISLAND LOOP-RV SITE IMPROVEMENTS
Water/Sewer(Lower Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Upper Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Lower Loop)COMPLETED IMCO
Site Fencing/Gates COMPLETED Boise River Fence
Final Cleanup
EAGLE ISLAND LOOP-NEW ACCESS ROAD
Clearing/Grading/Install Culvert COMPLETED IMCO
Place Agg Base/Fine Grade COMPLETED IMCO
AC Paving COMPLETED Durham Gravel
Brush Clearing-Access Road IMCO X X Evaluate site lines after clearing
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity N Delivery D
Earth Disturbing Activity Complete C
Hold Point EWeather W
*Schedule Subject to Change Page 1 of 1
IMCO Project 4110 IMCO General Construction
Oxbow Hatchery Renovation/Eagle Island Loop-Three Week Look Ahead Schedule
7/21/2022
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
N N N N N N N N N N N N
Activity Description Sub/IMCO N N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
O O O O O O O O N N N N N N N N O O O O
N N N N N N N N O O O O O O O O O\ \ \ \ \ \ \ \ N N N N N N N N N N N N N\ \ \ \
rq rq O ^ W O O M \ \ \ \ \ \ \ \ \ O rl N M
N N N N N NM M r4 rn � Ln LO r, 00 0)00 00 00 00 00 00 00 00 00
rl rl rl rl
n n n n n n n n 00 00 00 00
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
CRITICAL DELIVERIES
Rebar Harris D
Flange Bolt Kits/Gaskets/Misc Piping C&M D
Intake/IRR Pump Cans CH Spencer D
Intake SW Pumps CH Spencer D
CONSTRUCTION ACTIVITIES
Weld Intake Structural Steel MB Welding X X X X X X X X X X
Pile Cut-Off MB Welding X
Drive Pump-Can Support Pile IMCO X
Erect Pump-Can Tern Support IMCO X X
Erect New Intake Structural Steel IMCO X X X X X
Erect new Intake Mech Piping/Supports(SHORE) IMCO X X X
Install Adult Holding(Ext't)Temp Wall IMCO X X X X X
Install Tee Screen/Pump Cans/Mech Piping IMCO X X X X X
Divers:Install Tee Screen/Mechanical Piping/Mud Valve Crux Diving X X X X X X X X X X
Install Valves/Upper Header Pipe/River water pipe IMCO X X X
Erect New Intake Channels/Decking IMCO X X
EAGLE ISLAND LOOP-RV SITE IMPROVEMENTS
Water/Sewer(Lower Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Upper Loop)COMPLETED IMCO
RV Site Fine-Grading/Gravel(Lower Loop)COMPLETED IMCO
Site Fencing/Gates COMPLETED Boise River Fence
Final Cleanup
EAGLE ISLAND LOOP-NEW ACCESS ROAD
Clearing/Grading/Install Culvert COMPLETED IMCO
Place Agg Base/Fine Grade COMPLETED IMCO
AC Paving COMPLETED Durham Gravel
Brush Clearing-Access Road COMPLETED IMCO Evaluate site lines after clearing
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity tWeather
Delivery D
Earth Disturbing Activity Complete C
Hold Point W
*Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
C�J N N N N Activity Description Sub/IMCO Comments/Milestones
0 O O O O O O O O O 0 O 0 O 0 O 0 0 O 0 O
N N N N N N N N N N N N
\ N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \
N rn � Ln �D n 00 M 0 i--I N M Ln W r` 00 01 O
M \ \ \ \ \ \ \ \ \ a-i c-I a--I c-I a--I c-I a--I c-I a--I c-I N
\ 00 00 00 00 00 00 00 00 00 \ \ \ \ \ \ \ \ \ \ \
r` 00 co 00 00 00 00 00 00 00 00 00
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
CRITICAL DELIVERIES
SW Pump Shipping CH Spencer X Delivery by 8/22/22
CONSTRUCTION ACTIVITIES
Weld Intake Structural Steel MB Welding X X X X X X X X X
Erect Pump-Can Temp Support IMCO X X
Bolt 22.5 Elbow to T-Screen X X
Set Pump Can&Temporarily Support IMCO X
Set Pump Cans to Elevation,Supported off Steel Decking&Brackets IMCO/Crux X X
Install 22.5 Elbow&Screen IMCO/Crux X X
Install Additional Bracing Underwater Connections Crux X X
Install SS Mechanical Piping to Manifold Crux X X X
Install Under Deck Piping and Manifold IMCO X X X X
Erect New Intake Channels/Decking IMCO/MB Welding X X
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity tWeather
Delivery D
Earth Disturbing Activity Complete C
Hold Point W
*Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F I S
Activity Description Sub/IMCO N N N N N N N N N N N N N N N N N N
N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
0 0 o O o O o 0 0 0 0 0 0 0 o O o O
N N N N N N N N N N N N N N N N N N N N N N N N
n 00 01 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
N M � LA lD r` 00 m O a-i N M V Vf lD r`
W 00 00 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
CRITICAL DELIVERIES
SW Pump Cans Hunnicutt D
SW Pumps CH Spencer I I D I Shipping the 17th
Irrigation Pump CH Spencer D
CONSTRUCTION ACTIVITIES
Unbolt&Load Pump Cans To Send For Coatings IMCO X
Install Steel Plates To Split Existing Raceways IMCO X X
Blast&Paint Pump Cans At Shop Hunnicutt X X X
Organize Yard&Laydown Area IMCO X
Bolt 22.5 Elbow To T-Screen IMCO X
Bolt Pump Can&Manifold Together IMCO X X
Set Pump Cans&Temporarily Support IMCO X
Set Steel Deck For Platform IMCO X
Set Pump Cans To Elevation,Supported off Steel Decking&Brackets IMCO/Crux X X
Install 22.5 Elbow&Screen IMCO/Crux X X
Install SS Mechanical Piping to Manifold Crux X
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity tWeather
Delivery D
Earth Disturbing Activity Complete C
Hold Point W
*Schedule Subject to Change Page 1 of 1
Week 1: Current Week Week 2: Look Ahead Week 3: Look Ahead Week 4: Current Week
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description SUb/IMCO N N N N N N N N N N N N N N N N N N N
N N N N N N N N N N N N N N N N N N N N N N N N N N N 0 0 0 0 0 0 0 0 0 N Comments/Milestones
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N N N N N N N N N N N N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N \
q* Ln %D 11% 00 M O ri N M q* Ln lD N 00 M O rrq N M q* M l\D N 00 01 O
ri r-1 ri ri ri ri N N N N N N N N N N M M
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 Q1
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M M
CRITICAL DELIVERIES
SW Pump Cans Hunnicutt D
24" Steel Pipe Staab D
SW Pumps CH Spencer
Irrigation Pump CH Spencer D
CONSTRUCTION ACTIVITIES
Rebolt Manifold to Pump Cans IMCO X
Bolt 22.5 Elbow To T-Screen Upland IMCO X
Set Pump Cans &Temporarily Support IMCO/Crux X
Set Steel Deck For Platform IMCO X
Set Pump Cans To Elevation, Supported off Steel Decking& Brackets IMCO/Crux X X
Install 22.5 Elbow & Screen IMCO/Crux X
Install SS Mechanical Piping to Manifold & Irrigation Pump Cans IMCO/Crux X X
Install UW Cross Bracing Crux X X X X
Install Final Intake Walkway Section IMCO/MB Welding X X
Install Channels for Pipe Openings MB Welding X X X X X
Install 24" Fab Steel Pipe Under Walkway IMCO X X X
Install 4" Air Pipe IMCO X X
Install 2" Irrigation Piping IMCO X X
Install Electrical Conduit Vale Electric X X
Install VFD's In Airburst Building Vale Electric X
Begin Digging and Installing Temp 24" Piping for Intake IMCO
Install Pumps IMCO
Install Vavles, and Make Final Connection to Discharge Head IMCO
Run Wire & Hook-up Pumps Vale Electric
LEGEND
Holiday- No Work Meeting M
Day Activity Pour P
Night Activity N Delivery D
Earth Disturbing Activity Complete Ed
Hold Point r—lWeather
* Schedule Subject to Change Page 1 of 1
Week 1: Current Week Week 2: Look Ahead Week 3: Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
N N N N N N N
Activity Description SUb/IMCO N N N N N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N N N N N N N N N N N N N N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \
ri N M R* Ln ko N 00 M O �q r\-I N M � l\lf � n 0\0 MO
N N N N N N N N N M M \
00 00 00 00 00 00 00 00 00 00 00 Ol
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
CRITICAL DELIVERIES
SW Pump Cans Hunnicutt
24" Steel Pipe Staab
SW Pumps CH Spencer
Irrigation Pump CH Spencer D
CONSTRUCTION ACTIVITIES
Rebolt Manifold to Pump Cans IMCO X
Bolt 22.5 Elbow To T-Screen Upland IMCO X
Set Pump Cans &Temporarily Support IMCO/Crux X
Set Steel Deck For Platform IMCO X
Set Pump Cans To Elevation, Supported off Steel Decking & Brackets IMCO/Crux X X
Install 22.5 Elbow &Screen IMCO/Crux X
Install SS Mechanical Piping to Manifold & Irrigation Pump Cans IMCO/Crux X X
Install UW Cross Bracing Crux X X X
Install Final Intake Walkway Section IMCO/MB Welding X X
Install Channels for Pipe Openings MB Welding X X X X X
Install 24" Fab Steel Pipe Under Walkway IMCO X X X
Install 4" Air Pipe IMCO X X
Install 2" Irrigation Piping IMCO X X
Install Electrical Conduit Vale Electric X X
Install VFD's In Airburst Building Vale Electric X
Begin Digging and Installing Temp 24" Piping for Intake IMCO
Install Pumps IMCO
Install Vavles, and Make Final Connection to Discharge Head IMCO
Run Wire & Hook-up Pumps Vale Electric
LEGEND
Holiday- No Work Meeting M
Day Activity Pour P
Night Activity N Delivery D
Earth Disturbing Activity Complete C
Hold Point I iWeather W
* Schedule Subject to Change Page 1 of 1
Week 1: Current Week Week 2: Look Ahead Week 3: Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
N N N N N
Activity Description SUb/IMCO N N N N N N N N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
O O O p N N N N N N N N N O O O O O O O O
N N N N O O O O O O O O O N N N N N N N N
\ \ \ \ N N N N N N N N N \ \ \ \ \ \ \ \
00 M O �"� r\I N M t* if tDD n 00 0) O r-I N M Ln lD N
\ \ \ \ M 01 M 01 0) 01 0) 01 0) \ \ \ \ \ \ \ \
00 00 00 00 M 0) M 0) 0) 0) 0) 0)
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M
CRITICAL DELIVERIES
SW Pumps CH Spencer
Irrigation Pump CH Spencer D
VFD's Vale Electric D
CONSTRUCTION ACTIVITIES
Set Pump Cans &Temporarily Support IMCO/Crux X
Set Pump Cans To Elevation, Supported off Steel Decking& Brackets IMCO/Crux X X
Install SS Mechanical Piping to Manifold & Irrigation Pump Cans IMCO/Crux X X
Install UW Cross Bracing Crux X X X
Install T-Screen IMCO/Crux X
Install Channels for Pipe Openings MB Welding X X X X X X X
Install 24" Fab Steel Pipe Under Walkway IMCO X X
Install 4" Air Pipe Under Walkway IMCO X
Install 4" Air Pipe IMCO X X X
Install 2" Irrigation Piping IMCO X X X
Install Electrical Conduit Vale Electric X X
Install VFD's In Airburst Building Vale Electric X X
Begin Digging and Installing Temp 24" Piping for Intake IMCO X
Install Irrigation Pump
Install SW Pumps IMCO
Install Vavles, and Make Final Connection to Discharge Head IMCO
Run Wire & Hook-up Pumps Vale Electric
LEGEND
Holiday- No Work Meeting M
Day Activity Pour P
Night Activity N Delivery D
Earth Disturbing Activity Complete C
Hold Point Weather W
* Schedule Subject to Change Page 1 of 1
Week 1: Current Week Week 2: Look Ahead Week 3: Look Ahead Week 4: Current Week
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
N N N N N N N N N N N N N N N N N N N N N N
Activity Description Sub/IMCO N N N N N N N N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
O O O O O O O O O O O O O O O O O O O O O O N N N N N N
N N N N N N N N N N N N N N N N N N N N N N \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ O r-1 N M -tr Ln
00 C1 O ri N M 1::T Ln t0 I, 00 C1 O ri N M Ln tC N 00 M r-I ri ri ri ri ri
ri ri N N N N N N N N N N M \ \ \ \ \ \ \ \ \ O O O O O O
\ \ \ \ \ \ \ \ \ \ \ \ \ O O O O O O O O O
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 ri ri ri ri ri ri ri ri r'1 r-I ri r 1 ri r 1 r-1
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
CRITICAL DELIVERIES
1st Discharge head CH Spencer D
2nd Discharge Head CH Spencer D
VFD's Vale Electric D
SW Pumps CH Spencer D
CONSTRUCTION ACTIVITIES
Install Metal Decking on Pump Deck IMCO X X X X
Weld Shear Studs on Walkway MB Welding X X
Roof Framing IMCO/Crux X X X Waiting on metal roof material for final install.
Install Discharge Head & Line Up Vales & Discharge Pipe IMCO X X X X
Rebar on Walkway IMCO X X X
Electrical Rough-in Vale X X X
Pour Walkway IMCO P
Install Temp Discharge Pipe to Raceways IMCO X X X
Assemble Pumps (to be ready for install se we are ready after we pour deck) CH Spencer X Need CH Spencer to Assemble Pumps to make sure
everything needed is onsite.
Pump Deck Rebar IMCO X X
Pour Pump Deck IMCO P
Install Irrigation Piping IMCO X X
Install Pumps IMCO/CH Spencer X X X CH Spencer back onsite to install pumps. After concrete
poured.
Wire Pumps Vale Electric X X
Test Pumps IMCO/CH Spencer X X
MILESTONE 1 X
LEGEND
Holiday- No Work Meeting M
Day Activity Pour P
Night Activity N Delivery D
Earth Disturbing Activity Complete C
Hold Point iWeather W
* Schedule Subject to Change Page 1 of 1
Week 1: Current Week Week 2: Look Ahead Week 3: Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
N N N N N N N N N N N N N
Activity Description Sub/IMCO N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N N N N N N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \ \
N M Il t\O n 0\0 M M Ln w N 00 M O r q N
\ \ \ \ \ \ \ \ \ \ \ \ \
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
CRITICAL DELIVERIES
SW Pumps CH Spencer D
CONSTRUCTION ACTIVITIES
Install Discharge Head & Line Up Vales & Discharge Pipe on 2nd Head IMCO X
Rebar on Pump Deck IMCO X
Electrical Rough-in Vale X X
Raceway Modifications IMCO X
Pour Pump Deck IMCO P
Install Roof Hatches IMCO X
Install Pumps CH Pencer/IMCO X X
Form & Pour House Keeping Pad IMCO X P
Pump House Grout Pads IMCO X
Pump Start-up IMCO/CH Spencer/Vale X X X
Wire Pumps Vale X X
MILESTONE 1 X
Install Irrigation Piping IMCO X X
Clean-up Yard & Get Ready for Winter IMCO X X X X
Complete Raceway Modifications IMCO X X X X
Punch List Items IMCO X X X X
LEGEND
Holiday- No Work Meeting M
Day Activity Pour P
Night Activity N Delivery D
Earth Disturbing Activity Complete C
Hold Point I Weather W
* Schedule Subject to Change Page 1 of 1
Week 1: Current Week Week 2: Look Ahead Week 3: Look Ahead Week 4: Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO M M M M M M M M M M M M M M M M M M M /
M M M M M N N N N N N N N N N N N N N N N N N N M M M M Comments Milestones
O O O O O O O O O O O O O O O O O O O O O O O
N N N N N N N N N N N N N N N N N N N
I1 tD N 0000 00) O ri N M q* Ln to N 00 M O ri N M � Ln tD N 00 M
ri ri ri ri ri ri ri ri ri ri N N N N N N N N N
N N N N N M M M M
N N N N N N N N N N N N N N N N N N N
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M M
CONSTRUCTION ACTIVITIES
Install Silt Fence & Other BMP's IMCO X X
Grade Out Area for Batch Plant IMCO X X
Organize Connex's (Build Shelves, etc..) IMCO X X X X
Organize Pipe/Material in Yard IMCO X X X X
Batch Plant Delivery IMCO X X
Pothole Existing Water Line & get list of parts needed for connection. IMCO X
Set-up Batch Plant IMCO I I X X X X X
Dig, Install Saddle, & Run Pipe for Water Line for Plant IMCO X X
Set-up Admixture Tanks & Dosing Equipment IMCO/BASF X
Begin Aggregate Deliveries &Storage IMCO/Summers Quarry X X X X
Cement & Fly Ash Deliveries Handy X X X
Set-up Survey Equipment/Stake Out Aeration Tower IMCO X X X
Wire Batch Plant Vale X X
Get Scales on Plant Certified Scales NW X
NTP X
Begin Excavation for Aeration Tower IMCO X X X
Begin Trial Batches IMCO X X
LEGEND
Holiday- No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activity N Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather I W Weather W
* Schedule Subject to Change Page 1 of 1
Week 1: Current Week Week 2: Look Ahead Week 3: Look Ahead Week 4: Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO M M M M M M M M M Comments Milestones
N N N N N
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N N N N N N N N N N N N N N N N N N N N N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N O n 00 O 00 N N N M LLn tDD n 0000
M � I.f1 t0 I� Ql r-I M In� t0 G1 rl
rl ri r-I r-I i--I r-I r-I i--I N N N N N N N N N N M M
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
M M M M M M M M M M M M M M M M M M M M
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M M
CONSTRUCTION ACTIVITIES
Getting Scales Certified on Plant IMCO/Scales NW X
Final Batch Plant Set-up &Testing IMCO X
Cement Delivery IMCO X
Concrete Agg Deliveries IMCO X X X
Remove Chain Link Fence Along Snake River Side IMCO X
Install Silt Fence & Other BMP's IMCO X X X
Install Final Connection to Irrigation Line - Intake Structure IMCO X
Installing Toe Kick on Intake Structure Sawtooth Welding X
Building Inspection on Intake Structure IMCO/Baker County X
Trial Batching IMCO X
Aeration Tower Excavation IMCO X X X X
Install Under slab Piping for Aeration Tower IMCO X X X X X X X
LEGEND
Holiday- No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activity N Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point I lWeather W Weather W
* Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
M M M M M M M M M M M M M
Activity Description Sub/IMCO N N N N N N N N N N N N N M M M M M M M M Comments/Milestones
0 0 0 0 0 0 0 N N N N N N 0 0 0 0 0 0 0 0
N N N N N N N N N N N N N
-1N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \
Ol N N N M N N N N N N O en i\-1 N M C 0 l\O n 0000
i--I N N N N N N N N N N M M \ \ \ \ \ \ \ \
\ \ \ \ \ \ \ \ \ \ \ \ \ a a a a a v a v
M M M M M M M M M M M M M
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
MEETINGS
Weekly Progress Mtg M M M
Deliveries
Aeration Tower Rebar X X
Misc.CONSTRUCTION ACTIVITIES
Trial Batching-NWRA 4,000 Mix IMCO X
Install Silt Fence&Other BMP's IMCO X
Safety Training-No Work Onsite IMCO X X
Demo
Misc Site Demo-Cutting Metal out of Existing Raceways&Weir IMCO X X
Begin Demo Of Fall Chinook Raceways IMCO X X X X
Demo Abandoned Raceways IMCO X X X X
Aeration Tower
Aeration Tower Excavation IMCO X X X
Install Under slab Piping for Aeration Tower IMCO X X X X X X X
Form Pipe Encasements&Install Rebar IMCO X X X
Pour Pipe Encasements IMCO X X
Backfill to Subgrade IMCO X X X
Begin Installing Forms For Foundation IMCO X X
Hatchery Facility
Excavate for Under Slab Pipe IMCO X X X
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity N Delivery D
Earth Disturbing Activity Complete C
Hold Point Weather W
*Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S
ActivitySub M M M M M M M M M M M M M M M M M M M rn rn
Description IMCO tion p / N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
O O O O O O O O O O O O O O O O O O O O O
N N N N N N N N N N N N N N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \
N N N eq O e� e\i N N O Ln t\6 n 0000 O\1 O rl N M R v1
N N N N M M rl rl rl rl rl rl
\ \ \ \ \ \ a a a v v v v a v \ \ \ \ \ \
M M M M M M v v v v v v
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
Intake Window *Tentatively April 24th through May 22nd
Incubation Outage *Tentatively Begins May 11th
Misc.CONSTRUCTION ACTIVITIES
Locates IPC X X
Install MH 1 to MH2
Demo
Misc Site Demo-Cutting Metal out of Existing Raceways&Weir IMCO X X
Demo Abandoned Raceways IMCO X X X X
Demo Fall Chinook Raceways IMCO X X X X
Demo North Raceways IMCO
Aeration Tower
Aeration Tower Excavation IMCO
Install 12"SW Piping for Aeration Tower IMCO X X X X X
Form Pipe Encasements&Install Rebar IMCO/EOI X X X
Pour Pipe Encasements IMCO X X
Install OF Pipe&Misc Pipe Under slab IMCO X X X X X
Backfill to Subgrade IMCO X X X
Install Foundation Forms IMCO
Install rebar EOI
Pour Slab IMCO
Hatchery Facility
Excavate for Under slab Piping IMCO X X X X X
Install Under slab Pipe IMCO
Encase Pipe IMCO
H-1
LEGEND
Holiday-No Work Meeting M
Day Activity Pour P
Night Activity N Delivery D
Earth Disturbing Activity Complete C
Hold Point Weather W
*Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
ActivityDescriptionSub IMCO M M M M M M M M rn rn M M rn M rn rn rn rn rn rn M rn rn M M M M M
/ N N N N N N N N N N N N N N N N N N N N N N N N N N N N Comments/Milestones
O O O O O O O O O O O O O O O O O O O O
N N N N N N N N N N N N N N N N N N N N
\ \ N \ \ \ \ \ \ \ \ \ rn \ \ \ \ \ \
O rl N M IA V t0 n W TN O rl N M IA t0 n O O1
ei ei ei ei ei rl ei ei ei ei N N N N N N N N N N
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
tInlakedow *Tentatively April 24th through May 22nd
Incubation Outage *Tentatively Begins May 11th
Misc.CONSTRUCTION ACTIVITIES
Install MH 1 to MH2
Demo
Misc Site Demo-Cutting Metal out of Existing Raceways&Weir IMCO
Demo Abandoned Raceways IMCO X X X X X
Demo Fall Chinook Raceways IMCO X X X X X
Demo North Raceways IMCO X X X X X
Aeration Tower
Aeration Tower Excavation IMCO
Pour 12"SW pipe on North Side IMCO X
Pour 24"OF Pipe X
Install 4"Hydrant Line X X X
Strip Pipe Encasements X X
Backfill Pipe Encasements X X
Install 12"SW pipe South Side&12"Pipe for Spary Line IMCO X X X X X X X X
Backfill to Subgrade IMCO X X
Erect Foundation Forms IMCO X X X
Install rebar EOI X X X
Pour Slab IMCO
Hatchery Facility
Excavate for Under slab Piping IMCO X X
Install Under slab Pipe IMCO X X X
Adult Holding
IMCO
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour p
Night Activity N Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W lWeather W
*Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO M M M M M M M M M M rn rn rn rn rn rn rn rn rn M M
M N N N N N N N N N N N N N N N N N N N N N M M M M M M Comments/Milestones
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N N N N N N N N N N N N N N N N N N N N N
N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N
O rl N M R I!1 tD n W T O rl N M 1!1 t0 n 00 01 O N N M a Ln W
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
tInlakedow X X X X X X X X X X *Tentatively April 24th through May 22nd
Incubation Outage I *Tentatively Begins May 11th
Misc.CONSTRUCTION ACTIVITIES
Install MH 1 to MH2 IMCO X X X
Demo
Misc Site Demo-Cutting Metal out of Existing Raceways&Weir IMCO
Demo Abandoned Raceways IMCO X X X X X
Demo Fall Chinook Raceways IMCO X X X X X
Demo North Raceways IMCO X X X X X
Aeration Tower
Pour 6"SW Drain IMCO X
Set&Pour 12"Spraybar Line IMCO X X X
Set&Pour 12"SW on South Side IMCO X X X
Set&Pour 6"GW&Drain Lines on West Side IMCO X X X X
Backfill to Subgrade IMCO X X
Erect Foundation Forms IMCO X X X X X
Install rebar E01 X X
Pour Slab IMCO
Hatchery Facility
Excavate for Under slab Piping IMCO X X
Install Under slab Pipe IMCO X X X
Adult Holding
IMCO
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activity Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W lWeather W
*Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
5 M T W Th F 5 5 M T W Th F 5 S M T W Th F S S M T W Th FLai.`
Activity Description Sub/IMCO S S S "r] "r] S "r] 'r7 ^rf ^ef ^rf ^e] ^rf ^rf ^rf ^ef ^rf "r] r� "r] Comments/Mestones
4110 OXBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
Intake Window X X X X X X X X X X X X "Tentatively April 27th through May 22nd
Incubation Outage -Tentatively Begins May 11th
Min.CONSTRUCTION ACTIVITIES
Install MH 1 to MH2 IMCO X X
Install MH4 IMCO X X
Demo
Min Site Demo-Cutting Metal out of Existing Raceways&Weir IMCO X X
Demo North Raceways IMCO X X X X X
Aeration Tower
Final Pour 12"SW on South Side IMCO X
Set&Pour6"GW&Drain Lines on West Side IMCO X X X X X
Backfill to Subgrade IMCO X X
Erect Foundation Forms IMCO X X X X X
Install rcWr E01 X X X X
Pour Slab IMCO X
Hatchery Facility
Excavate for Under slab Piping IMCO X X
Install Under slab Pipe IMCO X X
Adult Holding
IMCO
LEGEND
Holiday-No Work I IM.eting I M Meeting M
Day Activity pour 1
P Pour P
Night Activity Delivery D Delivery D
Earth Disturbing Activity I Complete I C Complete C
Hold Point Weather I W jWeothcr W
•Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F 5
Activity Description Sub/IMCO "„j ;3 ;3 ;3 ;3 ;3 ;3 1 ;3 ^� '�' ^ef ^e] "„j ^„j "„j "„j ^„j g Commems/Milestones
4110 OXB0W HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
Intake Window X X X X x X X X X X X X X X
Incubation Outage 'Tentatively Begins May 1Sth
Mist.CONSTRUCTION ACTIVITIES
Install MH 1 to MH2 IMCO
Install MH 4 IMCO
Demo
Misc.Site Demo-Cutting Metal out of Existing Raceways&Weir IMCO X
Demo North Raceways IMCO X X X X X X X
Pump our Hatchery Septic&Demo IMCO X x
Aeration Tower
Install 6"Conduit Pipe Going to Sorting Facility IMCO X
Backfill to Subgrade IMCO X X
Erect Foundation Forms IMCO X X X X
Install rebar EOI X X x
Install 6"Curb&Install Waterstop IMCO X X
Pour 1st Slab Section IMCO P
Pour 2nd Slab Section IMCO P
Strip Forms IMCO I X X
Hatchery Facility
Pothole to Demo 18"Pipes Under Hatchery Building&Begin Demo IMCO X X X
Build up Subgrade for Hatchery IMCO x X X X Start on North Side Until MH 4 Can Be Installed
Install Underslab Piping IMCO X X X X
Install Underslab Pipe IMCO
Adult Holding
Begin 3.5'Cut IMCO
LEGEND
Holida-No Work Meeting M 1M.eting M
Day Activity Pour P Pour P
Ni ht Activi Delive D Oelive D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Commen./Milestones
4110 OXB0W HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
Intake Window x x x x x x X X X x x X X X x x x x x x
Incubation Outage x X X x x x x x x x x X X X x
Mist.CONSTRUCTION ACTIVITIES
Install 36"Pipe from MH 1 to MH2 IMCC,
Install MH 4 IMCO
Install 12"SW Pipe from Aeration Tower to Holding Fac. IMCO X X X X X X X
Demo
Fill North Raceways X X X x
Aeration Tower
Install rebar EOI x
Install 6"Curb&Install Waterstop IMCC, x x
Pour 1st Slab Section IMCC, P
Pour 2nd Slab Section IMCC, P
Strip Forms IMCC, X X x
Fab Wall Forms IMCC, X X X X X X
Install Wall Rebar EOI X x x x
Install Wall Forms IMCC, x X X X X X X X X x
Pour 1st Wall Section IMCC,
Pour 2nd Wall Section IMCC,
Hatchery Facility
Demo 18"Pipe Under Hatchery Building IMCC, x x x
Build up Subg,de for Hatchery IMCC, x x x X x Start on North Side Until MH 4 Can Be Installed
Install Underslab Piping IMCC, X x x x x x
Erect Stem Wall Forms IMCO X X X X X
Adult Holding
Begin 3.5'Cut IMCO
LEGEND
Holiday-No Work I IM-tingM Imeating M
Day Activity Paur P Pour P
Ni ht ActiW1 D Oelive D
Earth Disturbing Activity Complete C lCo.plete C
Hold Point Weather W lWeather W
"Schedule Subject to Change Page 1 of 1
Week l:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
Intake Window x X X x x x X X X X X x X X X Tentatively end of May hatchery will be holding chinook.
Incubation Outage x X X X x x X X X X X X X X X X X X X X
Misc.CONSTRUCTION ACTIVITIES
Install 36"Pipe from MH 1 to MH2 IMCO
Install MH 4 IMCO
Install 12"SW Pipe from Aeration Tower to Holding Fac. IMCO x x x x x x x
Demo
Fill North Raceways x x X x
Aeration Tower
Install rebar E01
Install6"Curb&Install Waterstop-2nd Pour WCO x x x
Pour 2nd Slab Section IMCO P
Strip Forms IMCO x
Fab Wall Forms IMCO x X x x x x
Ins tall Wall Rebar EOI x x x x
Install Wall Forms IMCC, x x x X
Pour 1st Wall Section IMCC, P
Strip Bulkhead&Prep for Second Pour IMCC, X X
Pour 2nd Wall Section IMCC, P
Strip Forms IMCC, X X X
Hatchery Facility
Demo 18"Pipe Under Hatchery Building IMCC, x
Build up Subgrade for Hatchery IMCO X X X Start on North Side Until MH 4 Can Be Installed
Stub Out Under slab Piping IMCO X X X
Erect Stem Wall Forms IMCO X X X X
Install Rebar E01 X X
Pour lst Stem Wall IMCO P
Adult Holding
Begin 3.5'Cut IMCO
LEGEND
Holiday-No Work I Meeting M Meeting dDD
Day Activity P Pour
Night Activ'dy Delivery O Delivery Earth DisturbingActivity Cmplete C Complete Hold Point Weather W Weather
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO A AComments/Milestones
41100XBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
Intake Window X X X X X X X X X Tentatively lure 2nd Ponds Will be Filled
Incubation Outage X X X X X X X X X X X % % % X X X X X X
Misc.CONSTRUCTION ACTIVITIES
Install 36"Pipe from MH 1 to MH2 IMCO X
Install MH 4 IMCO
1-1112"SW Pipe from Aeration Tower to Holding Fac. IMCO X X X
Spray Bar IMCO X X X X
Diffuser Box Drains&MH] IMCO X % % % X X X X
Demo
Remove East End of North Wall X X
Fill North Raceways X X X
Aeration Tower
Sack&Patch 6"Curb IMCO X
Fab Wall Forms IMCO X X X X X X X X I %
nrta11 Wall Reba, E01 X X X X X
Pour 1.Wall Section IMCO p
Strip Bulkhead&Prep for Second Pour IMCO % %
Pour 2nd Wall Section IMCO I p
Strip Forms IMCO I X X X
Sack&Patch Wa11s IMCO
X X X
Hatchery Facility
Build up Subgrade for Hatchery IMCO X X Sta rt on North Side Until M H 4 Can Be lrsta l led
Erect Stem Wall Forms IMCO X X X % %
Insall Reba, EOI % %
Pour Foundation-North Half IMCO P
Fab Walls&Install Bar-North Half IMCO % % % %
Pour Walk IMCO P
Adult Holding 1E
Begin 3.S'Cut IMCO
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activlty Pour P Pour P
Night Activlty Delivery D Delivery D
Earth Disturbing Activlty I Complete I C lComplete C
Hold Point Weather I W IWeath.r W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 6:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
Intake Window x X X iTentativelyJune 12th Ponds Will be Filled
Incubation Outage x X X X X x X X X X X X X X X X X X X X
Misc.CONSTRUCTION ACTIVITIES
Install 12"SW Pipe from Aeration Tower to Holding Fac. IMCO
Spray Bar IMCO X X X X
Install Drain From Fish Lift of MH T&Backfill IMCO X X X X X X X
Diffuser Box Drains&MH] IMCO
Demo
Aeo lon Tower
Fab Wall Forms IMCO x X X X X x
Pour 1st Wall Section IMCO P
Strip Bulkhead&Prep for Second Pour IMCO x X
Pour 2nd Wall Section IMCO P
Strip Forms IMCO x X x
Sack&Patch Walls IMCO X x x
Install Mechanical Pipe&Support Beams IMCO x X X X
Hatchery Facility
Erect Footing Forms-North Half IMCO X X x
Install Sewer&Water Pipes IMCO X X x x x
Install Reber E01 X X x
Install Pipes Entering&Leaving Incubation&Chiller Rooms WCO x x x x x
Pour Foundation-North Half IMCO P
Fab Walls&Install Bar-North Half IMCO x X X
Pour Walls IMCO P
Erect Footing Forms-South Half IMCO X X X
Install Pipes Entering&Leaving Incubation&Chiller Rooms IMCO X X X
Install Rebar E01
Adult Holding
Begin 3.5'Cut IMCO
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activity Delivery O our
D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week l:Current Week ..it 2:Look Ahead Week 3:Look Ahead Week 6:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY RENOVATION
OXBOW INTAKE CONSTRUCTION
Hatchery Operations
Intake Window
Incubation Outage x X X X X x X X X X X X X X X X X X X X
Misc.CONSTRUCTION ACTIVITIES
Line Up 12"SW Pipes&Pour CDF WCO x X X
Backfill 12"SW Pipes WCO X
Install Drain From Fish Lift to MH 7&Backfill WCO
Diffuser Box Drains&MH7 WCO x x x
Form Diffuser Boxes&In casements for Drains WCO x x
Install 12"Spray Bar Line WCO X X X X
Demo
Aeration Tower
Fab Wall Forms IMCO x
Pourlst Wall Section IMCO P
Strip Bulkhead&Prep for Second Pour IMCO X X X x
Pour 2nd Wall Section IMCO P
Strip Forms IMCO x x
Sack&Patch Walls IMCO X X X X X X x
Install Mechanical Pipe&Support Reams IMCO x
Hatchery Facility
Erect Footing Forms-North Half IMCO X x x
Install Sewer&Water Pipe Penetrations IMCO X X x x x
Install Rebar E01 x x x X
Pour Foundation-North Half IMCO P
Install Pipes Entering&Leaving Incubation&Chiller Rooms IMCO X x
Fab Walls&Install Bar-North Half IMCO X X X X X X
Pour Walls IMCO P
Erect Footing Forms-South Half IMCO X X X
Insta ll Pipes Entering&Leaving Incubation&Chiller Rooms IMCO X X X
Install Rebar E01
Adult Holding
Begin 3.5'Cut IMCO
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activity Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 6:Look Ahead
S M T W Th F S S M T W Th F S S I M I T W Th F S S M T W Th F S
Activity Description Sub/IMCO m m Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window
Incubation Outage x x X x x x X X x x X X X X X X X X X X
Misc.Yard Pipe
Diffuser Be,Drains&MH7 IMCO x x X x
Form Diffuser Boxes&Encasements for Drains Iwo X x
Install Cross Crowder Drain to MH T x X x
In stall Cross Crowder Supply Line From Aeration Tower X x x
Install Spray Bar Line X X X X X
Demo
Aeration Tower
Strip Bulkhead&Prep for Second Pour IMCO x x
Pour 2nd Wall Section IMCO P
Strip Forms IMCO x x
Sack&Patch Walls IMCO x x x X
Install Mechanical Pipe&Support Reams IMCO x X X X x
Hatchery Facility
Erect Footing Forms IMCO x
Install Rebar E01 x
Install Pipe Penetrations IMCO x x
Pour Footings IMCO P
Fab&Install Stem Wall Forms IMCO x x x x
Pour Walls IMCO P
Install RIO Insulation IMCO x x
Place Structural Fill Inside Foundation IMCO x x x
Install Below Slab Plumbing Lacy Mechanical X X X X x
E01
Adult Holding
Install Diffuser Boxes IMCO X X X P
Begin 3.5'Cut IMCO
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activity Delivery O Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W IWeather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO m IComments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window x x x x x x x x x x x x x x x x X X X X
Incubation Outage x x X X X x X X X X X X X X X x X X X X
Yard Piping
Install MH 4&36"Drain from MH2 x x X x
Aeration Tower
Strip Forms IMCO x x x x x x x Ongoing activity while we are not working on hatchery
Sack&Patch Walls IMCO X X X X X
Install Mechanical Pipe&Support Beams IMCO x X X X X
Hatchery Facility
Fab&Install Stem Wall Forms IMCO x X X X
Stem Wall Modifications DC16 IMCO x X X x
Pour Walls IMCO F
Strip Forms IMCO x
Mechanical Pipe Below Slab x x x
Install R10 Insulation IMCO X X x
Place Structural Fill Inside Foundation IMCO X x
Inst Below Slab Plumcy Mechanical X x x X X
Installall Electrical in Slabbing La Vale Electric X x x X X
Encase Below Slab Pipe IMCO X X X
Install Drain In Incubation Room IMCO X X X x x
Adult Holding
Fab&Erect Fish Lift Forms-Bottom Slab IMCO x x
Insta ll Reber-Fish Lift Bottom Slab ECI x
Pour Diffuser Box Slabs,Fish Lift Bottom Slab,&X Channel D,alns IMCO F
Form Fish Lift Walls&Install Mechanical Pipe Stub-outs IMCO x X X X X X
Form Diffuser Box Walls IMCO X X
Install Reba-Diffuser Walls&Fish Lift EOI X X
Pour First Section of Fish Lift Walls IMCO P
Form Upper Fish Lift Slab&Install Mechanical Pipe IMCO X X X X X
LEGEND
Holiday-No Work Meeting M [Delivery
ng M
Day ARIYIty our P P
Night Activhy N Delivery D D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO o o oComments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window x x x x x x x x x x x x x x x x X X X X
Incubation Outage x x X X X x X X X X X X X X x x X X X X
Yard Piping
Install MH 4&36"Drain from MH2 IMCO x x X x
Install 24"OF From Aeration Tower to MH2 WCO X x
Install 12"Spray Header from Aeration Tower WCO X X X X
Aeration Tower
Strip Forms WCO x X X X
Sack&Patch Walls IMCO x X X X X x X
Install Mechanical Pipe&Support Beams WCO X X x x X X X X
Hatchery Facility
Mechanical Pipe Below Slab IMCO X X
Patch Walls IMCO X x x x
Place Structural Fill Inside Foundation WCO x X x
Install Below Slab Plumbing Lacy Mechanical x X x x x x
Install Electrical in Slab Vale Electric x X x x x x
Encase Below Slab Pipe WCO x x x
Install Drain In Incubation Room WCO x X x X
Install Reber for Slab E01 x X
Pour Drain&Sump IMCO P
Pour Slab IMCO P
Adult Holding
Pour Diffuser Box Slabs,Fish Lift Bottom Slab,&X Channel Drains IMCO P
Form Fish Lift Walls&Install Mechanical Pipe Stub-outs IMCO x x X
Cut Holding Facility to Grade WCO x x x
Form Diffuser Box Walls WCO X x
Insta ll Rebar-Diffuser Walls&Fish Lift E01 X X X
Pour First Section of Fish Lift Walls IMCO P
Form Upper Fish Lift Slab&I nstall Mechanical Pipe WCO X X X X X
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activlty Pour P Pour P
Night Activhy N Delivery D Dellvery D
Earth Disturbing Activity Complete C Complete C
Hold Point M Weather W lWeather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window x x x x x x x x x x x x x x x x X X X X
Incubation Outage x x X X X x X X X X X X X X X x X X X X
Yard Piping
Install MH 4&36"Drain from MH2 IMCO x X X X
Install 24"OF From Aeration Tower to MH2 IMCO x
Install 12"Spray Header from Aeration Tower IMCO X X X x X
Aeration Tower
Strip Forms IMCO x
Sack&Patch Walls IMCO x X X X X x X X
Install Mechanical Pipe,Support Beams,&Stairs IMCO X X X X X X X X x X X X X
Hatchery Facility
Patch Interior Walls IMCO x
Install Mechanical Pipe Below Slab&Install Rebar/Form IMCO X X X
Place Structural Fill Inside Foundation IMCO x x X
Encase Mechanical Pipe IMCO P
Install Below Slab Plumbing Lacy Mechanical X X x x X X X
Install Below Slab Electrical Conduit Vale Electric X X X x X X X
Encase Below Slab Plumbing IMCO X X
Install Drain In Incubation Room IMCO X X x X
Install Rebar for Slab EOI X X x
Pour Drain&Sump IMCO
Pour Slab IMCO
Adult Holding
Pour Diffuser Box Slabs,Fish Lift Bottom Slab,&X Channel Drains IMCO
Form Diffuser Box Walls IMCO X X X X
Pour Fish Lift Foundation IMCO P
Cut Holding Facility to Grade IMCO X X X X X
Form Fist Section of Fish Lift Walls IMCO X X X X X
Pour First Section of Fish Lift Walls&Diffuse Box Walls IMCO P
Form Upper Fish Lift Slab&I nstall Mechanical Pipe IMCO X X XFM.eing
X X
Pour Upper Fish Lift Slab IMCO P
LEGEND
Holiday-No Work Meeting M
Day Activity Pour PightActivhyDelivery O
Earth Disturbing Activlty Complete C Complete
Hold Point Weather W Weather awd
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 6:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window x x X % x x X X X x x % % % % x X X X X
Incubation Outage x x X X x x X X X X X X X X X % X X X X
Yard Piping
Install 12"Spray Header from Aeration Tower IMCO X X X x X X
Install 12"Fish Lift SW Line from Aeration Tower IMCO X X % X X
Aeration Tower
Sack&Patch Walls IMCO x X X X x x X X X X
Install Mechanical Pipe,Support Beams,&Stairs IMCO X X X X X x X X X X
Hatchery Facility
Place Structural Fill Inside Foundation IMCO x X
Encase Mechanical Pipe IMCO P
Install Below Slab Plumbing Lacy Mechanical X x X X X x X X X X
Install Below Slab Electrical Conduit Vale Electric X X X x
Encase Below Slab Plumbing IMCO
Tench Slab Form&Pour IMCO X X P x X X X x
Trench Walls Form&Pour IMCO x X P
Install Reber for Slab E01 x x x X X
Pour Slab IMCO P
Begin Hatchery Framing Framing Dust,B X X x
Adult Holding
Fish Lift Bottom Slab,&X Channel Drains IMCO P
Cut Holding Facility to Grade IMCO X X X X x x X X
Form Fist Section of Fish Lift Walls IMCO x x x x
Pour First Section of Fish Lift Walls IMCO P Construction Joint in Walls Will Be Two Pours
Form U pper Fish Lift Slab&I nstall M echa nical Pipe IMCO x x x X X X X X X
Pour Second Section of Fish Lift Walls IMCO P
Pour Upper Fish Lift Slab IMCO P P
Install Edge Forms Holding Facility IMCO X X X X X X X X
Install Rebar For Mat Slab E01 X X X X
rVE
LEGEND
Holiday-No Work Meeting M Meeting M
Day ActIlIty Pour P Pour P
Night ActivRy Delhtery O Delivery D
Earth Disturbing Activity Complete I C Complete C
Hold Point Mweather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 6:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window x x X x x x X X x x x X X X X x X X X X
Incubation Outage x x X X x x X X X X
Yard Piping
Install 12"Spray Header from Aeration Tower IMCO x X X X X x X X
Install 12"Fish Lift SW Line from Aeration Tower PACO X X x X X
Install Man Hole 5 IMCO
Aeration To—
Sack&Patch Walls IMCO x x X X x
Install Mechanical Pipe,Support Beams,&Stairs IMCO x X X X X x X X X X x X X X X
Hatchery Facility
Place Structural Fill Inside Foundation IMCO
Install Below Slab Plumbing Lacy Mechanical x x X X X
Install Below Slab Electrical Conduit Vale Electric x
Tench Slab Form&Pour IMCO x x X P
Install Rebar for Slab EOI x X x x
Pour Slab IMCO P
Cure Slab&Cut Cis IMCO X X
Begin Hatchery Framing Framing DustyB x X X X x
Adult Holding
Cut Holding Facility to Grade IMCO x X X x X X
Form Fist Section of Fish Lift Walls IMCO x x x
Pour First Section of Fish Lift Walls IMCO P Construction Joint in Walls Will Be Two Pours
Form Up per Fish Lift Slab&Install Mechanical Pipe IMCO x x x X X x
Pour Second Section of Fish Lift Walls IMCO P
Form&Pour Upper Flsh Litt Slab IMCO P
Install Edge Forms Holding Facility IMCO X X X X X X X X
Install Rebar For Mat Slab IX X X X
LEGEND
Holiday-No Work Meeting M Meeting M
Day AcVylty Pour P Pour P
Night Activity Delivery O Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 6:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window x x x x x x x x x x x x x x x x x x x x
Incubation Outage x x x x x
Yard Piping
Install 12"Spray Header from Aeration Tower IMCO x x x x x x x x
Install 12"Fish Lift SW Line from Aeration Tower WCO x x x x x
Install Man Hole 5 IMCO
Aeration Tower
Sack&Patch Walls IMCO x x x x x
Install Mechanical Pipe,Support Beams,&Stairs IMCO x x x x x x x x x x x x x x x x x x
Hatchery Facility
Install Insulation IMCO x x
Tench Slab Form&Pour IMCO x P
Plumbing Inspection Lacy Mechanical x
Place Remaining Structural Fill Inside Foundation IMCO x x x
Trench Walls Fab&Pour IMCO x x P
Backfill Exterior Stem Wall x x x
Install Reber for Slab E01 x x x x
Pour Slab IMCO P
Cure Slab&Cut Cls IMCO X X X
Begin Hatchery Framing Framing DustyB x x x x x
Adult Holding
Removing Clay&Fill IMCO x x x x
Pour First Section of Fish Lift Walls IMCO P Construction Joint in Walls Will Be Two Pours
Form Up per Fish Lift Slab&Install Mechanical Pipe IMCO x x x x x x
Pour Second Section of Flsh Lift Walls IMCO P
Form&Pour Upper Fish Lift Slab IMCO P
Install Edge Forms Holding Facility IMCO X X X X ix
lxkt
Install Rebar For Mat Slab E01 X
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activity Delivery O Delivery D
Earth Dishilrbing Activity I lCo.plete C Complete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window X X X X X X X X X X X X % % X X X X X X
Incubation Outage X X X X
Yard Piping
Insall 12"Spray Header from Aeration Tower IMCO X X X X X % % Has been put on hold due to clay removal
In.1112"Fish Lift SW Line from Aeration Tower IMCO X X X X X
Install Man Hole 5 IMCO
Aeration Tower
Sack&Patch Walls IMCO W X X X X
Pipe Terting IMCO W X X X X
Install Mechanical Pipe,Support Beams,&Stan IMCO X X X X X X X X % % % X X X X X X
Hatchery Facility
Place Remaining Structural Fill lnside Foundation IMCO W X X
1-11 Reba,for Slab E01 X X
Pour Slab-Office Section IMCO P
Pour Slab-1st Pour P P P
Cure Slab&Cut Us IMCO X X
Begin Hatchery Framing Framing DustyB I I I X X X X X X X % % X % I X X X %
Backfll for Generator Room IMCO X X
Form Generator Room Foundation IMCO X X X
Install Reba,Generator Room Foundation EOI X
Pour Generator Room Foundation IMCO P
Form Generator Room Stem Wall IMCO % I X X
Pour Generator Room Stem Wall IMCO P
Strip Generator Room Forms&Backfill IMCO % X
Run Electrical In Generator Room IMCO %
Reba,in Generator Room E01 X
Pour Generator Room Slab IMCO P
Adult Holding
Fill Holding Facility From Clay Removal IMCO W W X X X Rain held us up from continuing on bringing fill in
Pour First Section of Fish Lift Walls IMCO P
Form Upper Fish Lift 51ab&Install Mechanical Pipe IMCO X X X % % %
Pour Second Section of Fish Lift Walls IMCO P
Form&Pour Upper Fish Lift 51ab IMCO P
Install Edge Forms Holding Facility IMCO X X X X % X X X
Install Reba,For Mat5lab EOI X X X X
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activlty Pour P Pour P
Night Activky N Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather I W JWe.th.r W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window X X X X X % % % % X X % % X X X X X X
Incubation Outage X X X X
Yard Piping
Install 12"Spray Header from Aeration Tower IMCO X X X X X X X Has been put on hold due to clay removal
Install 12"Fish LiflSW Line from Aeration Tower IMCO X % % X X
st Inall Man Hole 5 IMCO
Aemtion Tower
Sack&Patch Walls IMCO W X I X X X
Pipe Testing IMCO W X X X X
Install Mechanical Pipe,Support Beams,&Stan IMCO X X % % % % X X % % X X X X X X
Hatchery Facility
Place Remaining Structural Fill Inside Foundation IMCO W X X
Insall Reba,for Slab-Office Section E01 X X
Pour Slab-Office Section IMCO P
Pour Slab-1st Pour IMCO P P 3
1-11 Reba,For Remaining Section E01 X X
Cure Slab&Cut Us IMCO X X
Begin Hatchery Framing Framing DustyB % X % % X X X X %
Backfll for Generator Room IMCO X X
Form Generator Room Foundation IMCO X X X
Install Reba,Generator Room Foundation EOI X
Pour Generator Room Foundation IMCO I I P
Form Generator Room Stem Wall IMCO % I %
Pour Generator Room Stem Wall IMCO P
Strip Generator Room Forms&Backfill IMCO % X
Run Electrical In Generator Room IMCO %
Reba,in Generator Room EOI X
Pour Generator Room Slab IMCO P
Adult Holding
Fill Holding Facility From Clay Removal IMCO W W X X % Rain held us up from continuing on bringing fill in
Pour First Section of Fish Lift Walls IMCO P
Form Upper Fish Lift 51ab&Install Mechanical Pipe IMCO X X X X X %
Pour Second Section of Fish Lift Walls IMCO P
Form&Pour Upper Fish Lift 51ab IMCO X X P
Insall Edge Forms Holding Facility IMCO #=
X X X X X X X
Install Reba,
For Mat Slab EOI X X X X X X X
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour p Pour p
Night Activky N Delivery D Delivery D
Earth Disturbing Activity I 1C..Plete C Complete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window X X X X X X X X X X X X X X X X X X X
Incubation Outage
Yard Piping
Inrtal112"Spray Header from Aeration Tower IMCO X X X
I-bill 12"Fish Lift SW Line from Aeration Tower IMCO X X X
Install Man Hole 5 IMCO
Aeration Tower
Sack&Patch Walls IMCO X X X
Pipe Terting IMCO
Install Mechanical Pipe,Support Beams,&Stairs IMCO X X X X X X X X X X X X X X
Hatchery Facility
Insall Reba,for Slab-Incubation/Chiller/Electrical Section E01 X
Insall Bulkheads for Cls IMCO X X
Pour Slab-1st Pour IMCO P P
Cure Slab&Cut Us IMCO X X c
Hatchery Framing D-VB X X X X X X X X X X X X X %
eackfll for Generator Room IMCO X
Form Generator Room Foundation IMCO X X
Ins all Reba,Generator Room Foundation IMCO X
Pour Generator Room Foundation IMCO P
Form Generator Room Stem Wall IMCO X X
Pour Generator Room Stem Wall IMCO P
Strip Generator Room Forms&Ba&MI IMCO % % X
Run Electrical In Generator Room IMCO I X
Reba,in Generator Room E01 X
Pour Generator Room Slab IMCO I P
Adult Holding
Fill to Final Grade IMCO X
Cut Thickened Edges IMCO X %
Form Lower Drain Slab@ NE Side IMCO X X X
Erect Edge Forms IMCO % X X
Form Upper Fish Lift Slab&Install Mechanical Pipe IMCO X X X % % X X
Pour Second Section of Fish Lift Walls IMCO P
Form&Pour Upper Fish Lift 51ab IMCO X X X P
Install Reba,For Mat Slab EOI X X X I X X X X X X X
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activlty Pour P Pour p
Night Activky N Delivery D ID.li D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W JWe.thur W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO m m m mComments/Milestones
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window X X X X X X X X X % % % % X % % X X %
Incubation Outage
Yard Piping/Site Improvements
Inrta1112"Spray Header from Aeration Tower IMCO X X
CDF 12"Spray Header X X
Sewer&Water Co.ing off Hatchery Building IMCO X X X X X
Re-route Electrical From Pole Behind Hatchery Building PC X
Excavate for Retaining Wall Behind Hatchery Building IMCO I X X %
Inrta11 Retaining Wall Foundation IMCO % % %
Inrta11 Retaining Wall Reba, E01 % X
Pour Retaining Wa11 Foundation IMCO P
Inrta11 Wall Forms Retaining Wall IMCO X X X %
Aeration Tower
Pipe Terting IMCO
Inrtall Mechanical Pipe,Support Beams,&Stairs IMCO X X X X X X X X X % % % % X
Hatchery Facility
Inrtall Reba,for Slab-Incubation/Chiller/Electrical Section EOI
In.11 Bulkheads for Us IMCO X
Pour Slab-2nd&3,d Pour IMCO P P
Cure Slab&Cut Us IMCO X X
Hatchery Framing DustyB X X X X X X X X X % % % % X % I X X X %
Pour Generator Room Foundation IMCO P
For Generator Room Stem Wall IMCO X X
Pour Generator Room Stem Wall IMCO P
Strip Generator Room Forms&Backfill IMCO X X
Run Electrical In Generator Room IMCO X
Reba,in Generator Room EOI X
Pour Generator Room Slab IMCO IP
Rough In Electrical Vale X X X X X
Rough In Plumbing Lacey X X X X X
Adult Holding
Cut Thickened Edges IMCO X %
Form Lower Drain Slab @ NE Side IMCO
Erect Edge Forms IMCO % X X X
Form Upper Fish Lift Slab&Install Mechanical Pipe IMCO X X X X P
Pour Second Section of Fish Lift Walls IMCO % % % % X P
Install Reba,For Mat Slab EOI % X % % % X X X X X ELax X
LEGEND
Holiday-No Work I iMeating M Meeting M
Day Activity Pour P Pour P
Night Act!Aty Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weath W Weer ather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F 5
Activity Description Sub/IMCO Comments/Milestones
-10
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window X X X X X X X X X X X X X X X X X X X X
Incubation Outage
Yard Piping/Site Improvements
Inrtalling MH5 IMCO X X X X X X
Re-route Electrical From Pole Behind Hatchery Building IPC/Vale X
Excavate for CIP Retaining Wall Behind Hatchery Building IMCO X X X X X X X
InrtaII Cl P Retaining Wall Foundation IMCO X X X
InrtaII Cl P Retaining Wall Reba, E01 X X
Pour CIP Retaining Wall Foundation IMCO I I I I P
InrtaII Wa II Forms CIP Retaining Wa l l IMCO X X X X
Aeration Tower
Pipe Terting IMCO
Insall Mechanical Pipe,Su pport Beams,&Stan IMCO X X X X X X X X
Insall Aerators IMCO X I X I X
Hatchery Facility
Hatchery Framing D-VB X X X X X X X X X X X X X X X
Truss lnrtall D-VB % X X X %
Reba,Generator Room Slab EOI X
Pour Generator Room Slab IMCO P
Rough In Electrical Vale % X X X X
Rough In Plumbing Lacey % X X X %
Adult Holding
Insall Reba,for NW Drain Pit EOI X X
Pour NW Drain Pit Foundation IMCO P
Insall Reba,Mat Slab EOI X X X X X X X X X X X X % X X
Foundation Pour IMCO P P P P
Sort/Spawn Facility
Cut Sort/Spawn to Grade IMCO X X X
Install Drain Lines Under False Floor Foundation IMCO X % X
Form False Floor Foundation IMCO X I X X
Install Reba,False Floor EOI X X
Pour False Floor Foundation IMCO P
Form False Floor Walls IMCO X X X
Fish Lift
Form Slab EA Side IMCO X X
Install Reba,For EA&X Channel Sides EOI X P
Form Fish Lift Center Wall&Insall Additional Reba, IMCO X % % % %
Pour First Center Wall Up to False Weir IMCO P
Form Remaining Center Wall IMCO
Pour Remaining Center Wall IMCO P
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activ'Ay N Delivery D Delivery D
Earth Dirturbing Activity I Complete C Complete C
Hold Point Weather W JWcather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F 5
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window % % % % % % % % % % X X % % % X X X X X
Incubation Outage
Yard Piping/Site Improvements
Installing MH5 IMCO X X X X
Excavatefor ClPRetaining Wall Behind Hatchery Building IMCO % % %
InstaIICIPRetaining Wall Foundation IMCO % % %
InstaIICIPRetaining Wall Reba, EOI % %
Pour CIP Retaining Wall Foundation IMCO P
1,A,IIW,IIForms ClPRetaining Wall IMCO % % % %
Pour Retiaing Wall IMCO P P
Aeation Tower
Pipe Testing IMCO
Install Mechanial Pipe,Su pport Beams,&Stan IMCO X % % % % % % %
Install Aerators IMCO % % %
Hatchery Facility
Hatchery Framing DustyB X % % % X
Truss Install DustyB % % % % %
Frame Roof DustyB % % % % %
Install Doors&Windows IMCO/Fast Glass X I % X X X X
Rough In Electrical Vale % X X X X
Rough In Plumbing Lacey % X X X %
Adult Holding
Form Wall&Place Pipe@ NW Drain Pit to Bottom of Slab IMCO X % %
Pour Wall to Bottom Slab @ NW Drain Pit IMCo P
Install Reba, EOI X % % % % % % % % %
Install eulkheads/W.te,Stop IMCO % % % % % % % %
Foundation Pour IMCO P P P P P I P P
Sort/Spawn Facility
Cut Sort/Spawn to Grade IMCO X X X
Install Drain Lines Under False Floor Foundation IMCO X X X
Form False Floor Foundation IMCO X X X
Install Reba,False Floor EOI X X
Pour False Floor Foundation IMCO P
Form False Floor Walls IMCO X X X
Fish Lift
Form Fish Lift Center Wall&Install Additional Reba, IMCO X X X X X X
Pour First Center Wall Up to False Weir IMCO P
Form Remaining Fish Lift Walls IMCO X X X X X ::::]-Pour Fish Lift Walls IMCO P P
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour p
Night Activity Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window X X X X X X X X X X % % % % X % X X X %
Incubation Outage % % % % X % X X X %
Yard Piping/Site Improvements
Installing MH5 IMCO X X X X
I—IICIPRetaining Wall Reba, E01 X
Pour CIP Retaining Wall Foundation IMCO P P
1,A,II W,II Forms CIP Retaining Wall IMCO X X X X
Pour Retiaing Wall IMCO I I I P P
Install B"GW Line From Aeration Tower to Hatchery X X X
Install NW Drain to MH T X X X
Aeration Tower
Pipe Testing IMCO
Install Mechanical Pipe,Support Beams,&Stairs I— X X X X X X X X
Install Aerators I— X X %
Hatchery Facility
Hatchery Framing DustyB X X I X X X
Truss Install DustyB X X X X X
Frame Roof DustyB X X % % X
Install Doors&Windows IMCO/Fast Glass % X I X I X I %
Rough In Electrical Vale % X X X %
Rough In Plumbing Lacey % X X X %
Adult Holding
E01
Install Reba, E01 X X X X X X X X X X
Install eulkheads/W,t,,Stop IMCO % % % % % % % % % X
Foundation Pour Lower Drain up To Thickned Edge IMCO P P
Foundation Pours IMCO P P P P
Install Wall Reba, EOI X X X X X
Install Wall Forms IMCO X X
Sort/Spawn Facility
Cut Sort/Spawn to Grade IMCO X X %
Install Drain Lines Under False Floor Foundation IMCO X % X
Form False Floor Foundation IMCO X X X
Install Reba,False Floor EOI X X
Pour False Floor Foundation IMCO P
Form False Floor Walls IMCO X X X
Fish Lift
Form Fish Lift Center Wall&Install Additional Reba, IMCO X X X X X X
Pour First Center Wall Up to False Weir IMCO P
For,Remaining Fish Lift Walls IMCO X X X X %
Pour Fish Lift We lls IMCO P P
LEGEND
Holiday-No Work I lm—img I M Meeting I M
Day Activity Pour P Pour P
Night Activ'Ay Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 6:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
1110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window % % % % % % % % % % % % % % %
Incubation Outage % % % % % % % % % % % % % % %
Yard Piping/Site Improvements
Installing MH5 IMCO % % %
Pour CIP Retaining Wall Foundation IMCO P
Install CIP Retaining Wall Reba, EOI %
Ins tall Wall Forms CIP Retaining Wall IMCO % % %
Pour Retiaing Wall IMCO P
Aeation Tower
Install Brick Veneer Basin Masonry % % % % %
Hatchery Facility
Truss lnrtall/Roof Sheeting DustyB % % % % % % % %
Misc.Interior Framing DustyB % % % % %
Insall Doors&Wind— IMCO/Fart Glass % % % % % % X X % %
Rough In Electrical Vale % % % % % % % % % X X % %
Rough In Plumbing Lacey % % % % % % X X % %
Adult Holding
Insall Reba,Top Mat/Wall Dowels EOI % % % % % % % % % % % % %
Insall Bulkheads/Wate,Stop IMCO % % % % % % % % % %
Foundation Pour Lower Drain up To Thickned Edge IMCO P
Foundation Pours IMCO P P P P P
Insall Wall Reba, EOI % % % % X % %
Insall Wall Forms IMCO % %
Fish Lift
Form Fish Lift Center Wall&Install Additional Reba, IMCO % % %
Pour First Center Wall Up[o False Weir IMCO P
Form Remaining Fish Lift Walls IMCO % % %
Pour Fish Lift Walls IMCO P P
LEGEND
Holida-No Work Meet in M MeetingM
Da Activit Pour P Pour P
Night Activi N Delive D Delivery D
Earth Dirturbin Activi Complete C Com fete C
Hold Point Weather W Weather W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week I Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F 5 5 M T W Th F 5 5 M T W Th F 5 S M T W Th F S mmen Activity Description Sub/IMCO ^r,] ^r,] ^rf ^� ^� ^� ^� 'r,f' 'r,f' Cots/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window x X X X x x X X X x X X
Incubation Outage x X X X x X X X X x X X X X X x X X X X
Intake Velocimeter
Delivery of Materials X
Prep for Divers % X
Welding %
Yard Piping/Site Improvements
Installing MH5 IMCO X X X
Install CIP Retaining Wall Rebar E01 X
Install Wall Forms CIP Retaining Wall IMCO X X X X
Pour Retiaing Wall IMCO P P
Aeration Tower
Install Brick Veneer Basin Mason % X X X X X X X X X
Install Metal Siding Nations
Hatchery Facility
Truss Install/Roof Sheeting DustyB % % X X %
Misc.Interior Framing Dusty8 X X X
Install Doors&Windows IMCO/Fast Glass X X X X X X X X
Rough In Electrical Vale X X X X X X X X X X % X X X X
Rough In Plumbing Lacey X X X X X X X X X X % X X
11VAC Install YMC X X X X X % X X X X
OH Doors OH Door Co. X X X X X
Sorting/Spawning
Install Mechanical Piping Below Footings IMCO x X X X X
Fill to Grade IMCO
Form False Floor&Footing IMCO
Reber for Footing/False Floor E01
Pour Footing IMCO
Adult Holding
Install Rebar Tap Mat/Wall Dowels E01 % % X X X X X X X X X X X
Install Bulkheads/Water Stop IMCO X X X X X X X X X I X
Foundation Pours IMCO P P P P P P P
Install Wall Reber E01 X X X X X X %
Install Wall Forms IMCO X %
Setting Slide Gates IMCO
Fish HR
Form Fish Lift Center Wall&Install Additional Behar IMCO % [�t
Wall Pour IMCO P P
Center Wall Pour IMCO P
LEGEND
Holida -No Work MeetingM Meatin M
Day Activity Pour P L. P
Nigh ActivityN Delive 0 Dewlive D
Earth Disturbing Activity I Complete I C lComplete C
Hold Point Weather I W lWeather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead I Week 4:Look Ahead
S M T W Th F S S M T W Th MSS M T W ThLFS S M T W Th F S
Activity Description Sub/IMCO "� 'r.j' 'a R Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window x X x X x X x
Incubation Outage x x x X x x x X X X x X x X X X X X x x
Intake Velocimeter
Delivery of Materials !PC X
Prep for Divers IMCO x X
Install Meter With Divers Crux IMCO x
Misc Touch-up&Electrical Hookup Vale/IMCO X x
Yard Piping/Site Improvements
Installing MH 5 Final Riser IMCO
Install Wall Forms CIP Retaining Wall IMCO x X x X
Install CIP Retaining Wall Rebar E01 X x
Pour Redoing Wall IMCO P P
Aeration Tower
Install Brick Veneer Basin Masonry x X X X x
Install Metal Siding Nations
Install Stairs&Siding IMCO
HatcheryFacility
Misc.Interior Framing Dusty X X X X X X I x
Install Buildout Sections W/Trusses Dusty x X x
Rough In Electrical Vale X X X X X X X X X x X x X x X x X x x
Rough In Plumbing Lacey X x X X X x X x X x X x X x
Install Doors&Windows IMCO X X X X X X X X
ON Doors OH Door Co. X X X
HVAC Install YMC x X x X x X x X x x
Install Storefront Door Fast Glass X x
Sor0ngitsta ping
Install Mechanical Piping Below Footings&Eir— IMCO X X X X X X X X
Fill to Grade IMCO
Form False Floor&Footing IMCO
Reber for Foo[ing/False Floor EOI
Pour Footing IMCO
Adult Holding
Install Reber Top Mat/Wall Dowels EOI x X x X x
Insall Bulkheads/Water Stop IMCO X X X X X x X X X x
Foundation Pours IMCO P P P P P P P
Install Well Rebar EOI x X x X x X x X X X
Install Wall Forms IMCO X X X X X
Setting Slide Gates IMCO
Fish Lift
Form Fish Lift Center Well&Install Additional Rebar IMCO X X
Wall Pour IMCO P P P
Center Wall Pour IMCO P
LEGEND
HO -No Work MeetingM Meetin dw�c
Da Activit Pour P Pour
Ni ht Activi N Delive D Delive Earth Disturbin Activit Com lete C Com leteHold Point Weather W Weather
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
5 M T W Th I F S S M T W Th F S S M T W Th F S S M T W Th F 5
Activity Description Sub/IMCO Comments/Milestones
IR
4130OXB0W HATCHERY RENOVATON
Hatchery Operations
Intake Window
Incubation Outage X X X X x X X X X x X X X X X X X X X X
Intake Veloclmeter
Delivery of Materials IPC x
Prep for Divers IMCO x
Install Meter With Divers Crux/IMCO III X X
.I.Touch-up&Electrical Hookup Vale/IMCO X X X
Yard Piping/Site Improvements
Installing MH 5 Final Riser IMCO
Install Wall Forms CIP Retaining Wall IMCO X X X
Install CIP Retaining Wall Reber EOI x
Pour Retising Wall IMCO P P
Aeration Tower
Install Metal Siding Nations
Install Stairs&Siding IMCO
Hatchery Facility
Misc.Interior Framing&Build Outs DustyB X X X X X
Rough In Electrical Vale X X X X X X X X X X X X X X X X X X X X
Rough In Plumbing Lacey X X X X X
Install Doors&Windows IMCO X X X X X X X X X X
OH Doors OH Door Co. X X
Install Ice Sheild/Dry In Building Nations Roof X X X X X X X X X X
HVAC Install Fast Glass X X
Install Storefront Door YMC X X X X X X X X X X
Sorting/Spawning
Install Mechanical Piping Below Footings&Encase IMCO X X X X X X X x
Fill to Grade IMCO
Form False Floor&Footing IMCO
Reba,for Footing/False Floor E01
Pour Footing IMCO
Adult Holding
Install Reber Top Mat/Wall Dowels EOI X X X X X
Install Bulkheads/Water Stop IMCO X X X X X X X X X
Foundation Pours IMCO P P P P P P
Install Wall Reber E01 X X X X X X X X X X X X x
Install Wall Forms IMCO X X X X X X X X X x
Setting Slide Gates IMCO
Fish Lift
Form Fish Lift Center Wall&Install Additional Reber IMCO X X
Wall Pour IMCO lip
1pi
P
Center Wall Pour -CO P
LEGEND
Holiday-No Work Meeting I M Ilveating M
Day Activity or P Pour P
Night ARivity N Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather I W JWc.thcr W
Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO ^_I '�.f' ^_I 'rj' b^_I 'a ^�I Comments/Milestones
n b rot o o o g
Sal i
IZ
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window
Incubation Outage x x x X x x x X X X X X x X X x X x x x
Intake Velocimeter
Delivery of Materials !PC X
Prep for Dlvers IMCC, x
Install Meter With Divers Crux IMCO x X
Misc.Touch-up&Electrical Hookup Vale/IMCO X x x
urdgation Tank
Demo Existing Tank IMCO X Work done during powerline outage
Demo Existing Footing a nd Grade For New Footing IMCC, x
Tie Bar&Pour New Footing IMCO x P
Set New Tank IMCC, x Work done during powerline outage
Plumb Took&Wire Floats IMCO ale x x x
Yard Piping/Site Improvements
Install Wall Forms Cl P Retaining Wall IMCO X x X
Pour Retaining Wall IMCO P
Strip&Move Forms IMCO X I X X P
Aeration Tower
Insall Metal Siding Nations
Install Stairs&Grating IMCO
Hatchery Facility
Rough In Electrical Vale X X X X x X X X X X x X x
Rough In Plumbing Lacey X X X X X X X X X X
Insall Doors&Windows IMCO x X X X X X X X X X
Install Ice Shield/Dry In Building Nations Roof X X X
HVAC Install YMC X X X X X X X x
Install Storefront Door F-gima X X
Sorung/Spawning
Install Mechanical Piping Below Footings&Er—o IMCO X X X
Fill to Grade IMCO X X
Form False Floor&Footing IMCO X X
Reber for Footing/False Floor EOI X
Pour Footing IMCO
Adult Holding
Foundation Pours IMCO P P
Install Wall Feb., EOI X X X X X X X X X X X X X
Fab Wall Forms IMCO X X X X X
Install Wall Forms IMCO X X X X X X X X
Wall Pours IMCO P
Fish Lift
Wall Pour IMCO P P
Center Wall Pour IMCO P
LEGEND
Holida-NO Work Meetin M Mee[in M
Da Activi[ Pour P Pour P
Ni ht Activit DeliveryD Deliver,D
Earth Disturbin Actwi[ Com lete C Com lete C
Hold Point Weather W lWeather W
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO Comments/Milestones
41100XBOW HATCHERY BEN OVATION
Hatchery Operations
Intake Window
Incubation Outage X X X X X x X X X x X X X X X X X X X X
Intake Velocimeter
Electrical Hookup Vale IMCO X X
Irrigation Tank
Demo Existing Tank IMCO X Work done during powerllne outage
Demo Existing Footing and Grade For New Footing IMCO X X
Tie Bar&Pour New Footing IMCO x X P
Set New Tank IMCO X Work done during powerline outage
Plumb Tank&Wire Floats IMCO/Vale X X X
Yard Piping/Site Improvements
Strip&Move Forms IMCO X X X
Second Retaining Wall Pour IMCO P
Strip&Move Forms IMCO X X X X
Third Retaining Wall Pour IMCO I P
Aeration Tower
Install Metal Siding Nations
Install Stairs&Grating IMCO
Hatchery Facility
Rough In Electrical Vale X X X X Electrical Inspection Scheduled for Thursday
Rough In Plumbing Lacey X X X X Plumbing Inspection Scheduled for Thursday
Install Doors&Windows IMCO X X X X X X X X
Install Ice Shield/Dry In Building Nations Roof
HVAC Install YMC X
Install Storefront Door Fast glass X X
Insulate Walls Idaho Insulation X X
Begin Exterior Brick Veneer Basin Masonry X X X X X X X X X X X X X
Drywall Install IC Drywall X X X X X X X X X X
Sortingitsti ping
Install Mechanical Piping Below Footings&Encase IMCO X X X X X
Fill to Grade IMCO X X
Form False Floor&Footing IMCO X X
Reber for Footing/False Floor EOI X
Adult Holding
Install Wall Reber EOI X X X X X X X X X X X
Fab Wall Forms IMCO X X X X X
Install Wall Forms IMCO X X X X X X
Wall Pours IMCO P P
Fish Lift
Wall Pour IMCO P P
Center Wall Pour IMCO
LEGEND
Holida-No Work MeetingM Meetin dw
Da ictivit Pour P Pour
Ni ht Activi N Delive D Delive Earth Dist In Activit Com lete C Com lete Hold Point Weather W Weather
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Weeks:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO A A A A A A A A A A A A ^'j ^e] ^„] 1 ^„] ^„] ^„] ^„] ^,� S7 � M r9 r9 r9 M Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Window
Incubation Outage x x x % % X X X X X X X X X X x X X X x
Intake Velocimeter
Electrical Hookup Vale/IMCO x x
Irrigation Tank
Tie Bar&Pour New Footing MCC) x P
Set New Tank IMCO x
Plumb Tank&Wire Floats IMCO/Vale X X X
Yard Piping/Site Improvements
Tie Bar For Third Retaining Wall Pour E01 x
Install Forms For Remaining Retaining Wall Pour IMCO X X x
Third Retaining Wall Pour IMCO P
Move Forms and Pour Fourth Wall Section IMCO X I % I I X P
Install Drain and Backfill Wall IMCO X X X X X X X X X
Aeration Tower
Install Metal Siding Nations
Install Stairs&Grating IMCO
Hatchery Facility
Insulate Plumbing Lacey % X
HVAC Install YMC
Insulate Walls Idaho Insulation X X
Exterior Brick Veneer Basin Masonry X X X X X X X X X X X X X X X
Drywall Install IC Drywall X X X X X X X X X X x X X X x
Interior CMU Veneer Basin Masonry X X X X X X X X X X
Sorting/Spawning
Install Mechanical Piping Below Footings&Encase IMCO X X X X X X X X X X
Fill to Grade IMCO X X
Form False Floor&Footing IMCO X X
Behar for Footing/False Floor E01 X
Adult Holding
Install Wall Behar E01 X X X X X X X X X X X X X
Fab/Move Wall Forms IMCO X P X X X X X X X X X X x X X X X
Wall Pours IMCO p P
Fish HR
Wall Pour IMC0 P
Center Wall Pour IMCC, P P
LEGEND
Holiday-NO Work Meeting M Meeting M
Da Activit Pour P Pour P
Night Activity Delivery I, Delivery D
Earth Disturb in
Activi Corn lete C Cum lete C
Hold Point Weather I W lWeather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO gj ^'j ^'f ^'j ^'f ^'j ^'f ^r,] m A `a `a M M M M Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage x x X X x X X X X x X X X X X x X X X x
Intake Velocimeter
Electrical Hookup Vale/IMCO x x Waiting on IPCsupplied panels.
Irrigation Tank
Set New Tank IMCO x
Plumb Tank&Wire Floats IMCO/Vale X X X X X
Yard Piping/Site Improvemerds
Third Retaining Wall Pour IMCO P
Move Forms and Pour Fourth Wall Section IMCO X X X P
Install Drain and Backfill Wall IMCO x X X X X X X X X X X X X X
Aeration Tower
Install Metal Siding Nations
Install Stairs&Grating IMCO
Hatchery Facility
HVAC Install YMC
Exterior Brick Veneer Basin Masonry x x X X x x X X X x
Drywall Install 1C Drywall X X X x X X X x X X X X X x X X X x
Interior CMU Veneer Basin Masonry X X x X X X x
Sorting/Spawning
Install Mechanical Piping Below Footings&Encase IMCO x X X X X X X X X X
Fill to Grade IMCO X X
Form False Floor&Footing IMCO X X
Rebarfor Footing/False Floor E01 X
Adult Holding
Install Wall Rebar E01 X X X X X X X X X X X X X X X
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X x X X X X
Wall Pours IMCO P P P P P P P
Flsh Uft
Center Wall Pours IMCO P P
LEGEND
Holida -No Work Meetin M MeetingM
Day Activity Pour P Paur P
Nigh ActIM N Delivery D D.Ii-ry D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO gj ^'j ^'f ^'j ^'f ^'j ^'f r� ,`� ;3 `a Comments/Milestones
N
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage X X X X x x X X X x X X X X x x x X x x
Intake Velocimeter
Electrical Hookup Vale/IMCO X X
Yard Piping/Site Improvements
Move Forms and Pour Fourth Wall Section IMCO x P
Install Drain and Backfill Wall IMCO X X X X X
Aeration Tower
Install Metal Siding Nations
Install Stairs&Grating IMCO
Hatchery Facility
HVAC Install YMC X X X x X X X X X X X X X
Exterior Brick Veneer Basin Masonry X X X
Drywall Install/Tape&Texture 1C Drywall x X X X X X X X X X X X X X X
Interior CMU Veneer Basin Masonry X X X X
Sorting/Spawning
Install Mechanical Piping Below Footings&Encase IMCO X X X X x X X X X X
Fill to Grade IMCO X X
Form False Floor&Footing IMCO x
Rebarfor Footing/False Floor E01
Adult Holding
Inrta11 Wall Rebar E01 X X X X X X X X X X X X X X X
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X X X x
Wall Pours IMCO P P P P
Fish lift
Center Wall pour IMCO P
LEGEND
Holiday-No Work I I Meeting I M Meeting M
Da ActiAt Pour P Paur P
III Night Activity Delivery D Delivery D
Earth Disturbin ActivityCom let, C Cam Iete C
Hold Point MWeather I W jW.ath.r W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO � A A � � � � � S S Comments/Milestones
49 \ \ R
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage X X X X x X X X X x X X X X x x x x x x
Yard Piping/Site Improvements
Install Misc Yard Pipe Under Sort/Spawn IMCO X X X X
Install Drain and Backfill Wall IMCO X X X X x X X x
Connect 36"Drain from Hold Facto MHI IMCO X X
Aeration Tower
InstallMeta Siding Nations
x x x x x
Install Stairs&Grating IMCO
Hatchery Facility
HVAC Install YMC X X X X x X X X X X X X
Electrical Install Vale Electric X X X X X X X X X X X X % X X X %
Mechanical Pipe Install(Chiller&Incubation) IMCO x X X X X X X X X X X x
Sorting/Spawning
Install Mechanical Piping Below Footings&Encase IMCO % X X X X X X X X X X
Fill to Grade IMCO X X X
Form False Floor&Footing IMCO % X %
Rebarfor Footing/False Floor E01 x x
Adult Holding
Install Wall Reber E01 x X X X X
Fab/Move Wall Forms IMCO % X X X X X X % X X X % X X X %
Wall Pours IMCO P P P P
Fish tik JL
Center Wall Pour IMCO P Smith&Root EA Inspection on the 9th
EA Tank Inspection By Supplier Smith&RootLf
X
LEGEND
Holiday-No Work Meeting M Meeting M
Da Adi'it Pour P Pour P
N fight Activity Delivery D Delivery D
Earth Disturbin ActivityCom let, C Cam let, C
Hold Point MW.ath.r I W jW.ath.r W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Wee1,4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO S S S S S S S S S S S S S S S S S S Comments/Milestones
e
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage X X X X x X X X x X X X X x x X X X x
Yard Piping/Site Improvements
Backfill Retaining Wall IMCO
Dig Conduit From Pine Creek Power Pole IMCO X X x
Install Secondary Conduit Out of Transformer Pad IMCO/Vale X X
Install Conduit from Pine Creek to Transformer IPC
Encase&Backfill Conduit IMCO X X X
Form&Pour Transformer Pad IMCO X X P
Transformer Install IPC I I I I I X X Tentatively Scheduled for end of month
Install Well Pumps IMCo z.s.to call on Nick Sarich and X X t
Aeration Tower crew being onsite
Install Metal Siding Nations The wrong siding showed up so this is on hold now.
Install Stairs&Grating IMCO
Hatchery Facility
HVAC Install YMC X X X X x X X X X Waiting on Equipment Showing up end of month
Electrical Install Vale Electric X X X X X X X x X X X X X X X X X x
Mechanical Pipe Install(Chiller&Incubation) IMCO X X X X X X X X X X X X X X
Install Roof/Soffit/Gutters Nations Roofing X X X X X X X X X X X X
Sorting/Spawning
Install Mechanical Piping Below Footings&Encase IMCO X X X X X X
Form False Floor&Footing IMCO X X x
Reber for Footing/False Floor EOI X
Pour Footing IMCO X
Strip Footing and E.Mil up to top of footing IMCO X
Begin Installing Mechanical Pipe Below Slab IMCO X X X X x
Adult Holding
Install Wall Behar EOI
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X x X X X X
Wall Pours IMCO P P P P P P
Fish Lift
EA Tank Inspection By Supplier Smith&Root X
LEG END
Holida -No Work Mc-mg M Meeting M
Day Activity Pour P Pour P
Night Activit N Delivery D Delive D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W IWeather W
NOTES AS 01/09 IN THE
WEEKLY MEETING ON 01/04
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week I Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W ThAllM T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO S S S S S S S S S S S S S S S S S Comments/Milestones
.� Z n \
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage SHIFTING DUE TO IPC % X X X X X X X X X X X X X X X X X X X
Yard Piping/Site lmprovemerHs RESCHEDULE
Dig Conduit From Pine Creek Power Pole IMCO X W/CHRIS ON WHAT THIS IS, RIGHT MH?
Install Incubation Drain to MH 4 IMCO X
Install New Pine Creek Pole&Conduit IPC X
Encase Conduit&Backfill IMCO % X
Form&Pour Transformer Pad IMCO X X X P
Transformer Install IPC % X
Instal GW Vault&Pipe to Wells IMCO X X X X X X X
Aeration Tower MATERIAL ARRIVING
Install Metal Siding abons X X X
Install Stairs&Gr,tira X X X X X X X X X X
Hatchery Facility REFER LINE RFI DUE
HVAC Install VMC X X X X X X X X % %
Electrical Install Vale Electric X X X X X X X X X X X X X X % X X X %
Mechanical Pipe Install(Chiller&Incubation) IMCO % X X X X X X X X % X X X X X X X X X %
Install Roof/Soffit/Gutters Nations Roofing X X X X X X X X % X X X %
Interior Coating Sandy River Painting X X X X X X X X X X
Sorting/Spawning
Install Mechanical Piping Below Footings&Encase IMCO X X X X X X X
Form False Floor&Footing IMCO X X
Reber for Footing/False Floor E01 X X
Pour Footing IMCO X P
Strip Footing and backfill up to top of footing IMCO X X
Begin Installing Mechanical Pipe Below Slab IMCC, START REVIEWING THIS WORK X X X X X
Adult Holding
Install Exterior Wall Rebar E01 X X X X X X X X
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X X X X X X
Wall Pours IMCO P P P P
POUR NEXT TUESDAY
LEGEND
Holiday-No Work M—in M Meeting M
DaYAc[wity Pour P Pour P
Ni ht Activit N Delivery D Delive D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week I Week 2:Look Ahead Week 3:Look Ahead Week4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO S S Comments/Milestones
S -Z
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage x x X X x X X X X x X X X X x x X X X x
Yard Piping/Site Improvements
Install Conduit from Pine Creek to Transformer IPC X
Backfill Conduit IMCO x x
Form&Pour Transformer Pad IMCO X X P
Install Rebar for Transformer Pad E01 x
Transformer Install IPC
Set GW Vault&Install Pipe IMCO x X X X x
Aeration Tower
Install Metal Siding Nations X X X
Install Stairs&Grating IMCO X X X X X x X X X x
Hatchery Facility
I Install YMC X X X X X X X X X
Electrical Install Vale Electric X X X X X X X X X X X X X X X x X X X x
Mechanical Pipe Install(Chiller&Incubation) IMCO X X X X X X X X X X
Install Roof/Soffit/Gutters Nations Roofing X X X X X X X X X X X X X X X x X X X x
Soning/Spawning
Form False Floor&Footing IMCO X X X X X
Reber for Footing/False Floor E01 X X
Pour Footing IMCO P
Strip Footing and backRll up to top of footing IMCO X x
Begin Installing Mechanical Pipe Below Slab IMCO I X X X X X X X X X X
Adult Holding
Install Wall Rebar E01
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X X X X X X
Wall Pours IMCO P P P P
LEGEND
Holiday-No Work Meeting M Meeting M
Da,
a Actlait Pour P Pour P
Night Activity Delivery D Delivery D
Earth DisturbingActivityCom let. C Cam let. C
Hold Point MWaath.r I W jW.ath.r W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S 5 M T W Th F S S M T W Th F 5
Activity Description Sub/IMCO S AS S 1 A S A S A S A A S S x S x Comments/Milestones
Z- r ry r
4210 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage x x x X x x x X x x x X x x x x X % X x
Yard Piping/Site Improvements
Form&Pour Transformer Pad IMCO x P
Install Rebar for Transformer Pad Lou X
Transformer Install IPC x
Install Incubation Drain to MH 4 IMCO x
Install Sort/Spawn Drain to MH 1 IMCO x
Found.drain&Waterproofing Behind Hatch.&Backfill IMCO x x X x
Install Hydrant Line West of Aeration Tower IMCO x x
Backfill Around Aeration Tower IMCO x x
Layout&Set Equipment Pads Behind Hatch Bid IMCO % x P
Install Sewer Pump Station&Lines from Hatch&Sort IMCO % X X X x % X
Set GW Vault&Install Pipe IMCO % X x
Aeration Tower
Install Metal Siding Nations X % X X x
Install Stairs&Grating IMCO X X X X x % X X X x
Hatchery Facility
HVAC Install YMC % X X X % X X X %
Electrical Install Vale Electric X % X X X % X X X % % X X X % % X X X %
Mechanical Pipe Install(Chiller&Incubation) IMCO X % X X X % X X X %
Install Roof/Soffit/Gutters Nations Roofing X % X X X % X X X % % X X X % % X X X %
Sorting/Spawning
Reber for Footing/False Floor EOI X X
Pour Footing IMCO P
Strip Footing IMCO X
Install Stem Wall&Pipe Penetrations Through Wall IMCO X X X X X X X
Pour Stem Wall IMCO P
Strip Stem Wall&Sack IMCO X X
Begin Backfilling In Layers for Pipe&Plumbing IMCO X
Begin Installing Mechanical Pipe Below Slab IMCO X X
Adult Holding
Install Wall Reber EOI
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X X X X X X
Wall Pours IMCO P P P P
LEGEND
Holiday-No Work I Meeting M Meeting M
Day Activity Pour P Paur P
Night Activity N Delivery D Delivery D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO XlS S S S S S S Comments/Milestones
9 R
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage x x x x x x x x x x x x x x x X X X x x
Yard Piping/Site Improvemerds
Transformer Install IPC x
Install Roof Drain&Backfilled Behind Hatch Bid IMCO x
Install Hydrant Line West of Aeration Tower to Grade IMCO x
Install Drain From Sort Spawn to MH2 IMCO x
Install Hydrant Line West of Aeration Tower IMCO
Backfill Around Aeration Tower IMCO x x
layout&Set Equipment Pads Behind Hatch Bid IMCO X X P
Install Sewer Pump Station&Lines from Hatch&Sort IMCO x x x x x X x
Set GW Vault&Install Pipe IMCO X X x
Aeration Tower
Install Stairs&Grating IMCO x X X X X X X X X X
Hatchery Facility
HVAC Install YMC X X X x x X X X x
Electrical Install Vale Electric X X X X X X X X X X X X X x x X X X X X
Mechanical Pipe Install(Chiller&Incubation) IMCO x X X X x x X X X x
Install Roof/Soffit/Gutters Nations Roofing X X X X X X X X X X
Sorting/Spawning
Strip Footing IMCO x
Install Stem Wall&Pipe Penetrations Block outs IMCO X X X X X x X x
Pour Stem Wall IMCO P
Strip Stem Wall&Sack IMCO X x
Install Perimeter Drain around footing&Backfill IMCO X X
Mech.Pipe&Plumbing Install in Layers IMCO X X X X X X X
Installing Electrical Pipe Below Slab IMCO X X X X x
Adult Holding
Install Wall Rebar EOI X X X X x
Fab/Move Wall Forms IMCO X X X X X X X X X x x X X X x X X X X x
Wall Pours IMCO P P P P
11
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity Pour P Pour P
Night Activi N Delive D Delive D
Earth Disturbing Activity I Icomplete C Complete C
How Point Weather W lWeather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO ,$ S S ,$ s,$ ,$s S S ry n
4 s s s s Comments/Milestones
` n b� \
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage X X X X X X X X X X X X X X X X X X X X
Provide Access m East Door of Hatchery IMCO X X
Infill East Area of Existing Sort Building IMCO X X
Test Alarms IPC/IDFG X
Yard Piping/Site Improvements
Catch Basin Install lnfront of Hatchery Building&Sort/Spawn IMCO X X X X
Install g"GW from Hatch m Aeration Tower IMCO X X
Install Drain From Sort Spawn to MH2 IMCO X
Install Sewer Pump Station&Lines from Hatch&Scut IMCO X X X X X X X X X
Layout&Set Equipment Pads Behind Hatch Bld IMCO X X P
Set GW Vault&Install Pipe IMCO X X X X x
Aeration Tower
Install Stairs IMCO X X X X X
Hatchery Facility
HVAC Install YMC X X X X X X X X X X X X X X X
Electrical Install Vale Electric X X X X X X X X X X X X X X X X X X X X
Mechanical Pipe Install(Chiller&Incubation) IMCO X X X X X X X X X X
Install Roof/Soffit/Gutters Nations Roofing X X X X X X X X X X X X X X X
Replace Drywall in Elec.Chiller&Generator Rooms 1C Drywall X X X X X X X X X X
Paint Sandy River Painting X X X X X Starting in Electrical room first so equipment can be re installed
So ting/Spawning
Install Stem Wall&Pipe Penetrations Block ou6 IMCO X X X
Pour Stem Wall IMCO P
Strip Stem Wall&Patch Holes IMCO X X
Install Perimeter Drain around footing&Backfill IMCO X X
Install Mechanical Pipe Below Slab IMCO X X X X X X X
Tie Rebar for Pipe Encasements&Form EOI/IMCO X X X
Pour Pipe Encasements IMCO P
Installing Electrical&Pluming Below Slab Vale/Lacey X X X X X X X X X X
AduHHolding
Install Wall Rebar EOI
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X X X X X X
Wall Pours IMCO P P P P
LEGEND
Holiday-No Work m"u's M meeting M
Dan,Amivi Pour P Pour P
Ni ht Amivi Deliver D Delwa D
Earth Disturb
in Activi C.
lete C Com le[e C
Hold Point Weather W Weather W
'Schedule Subject to Change Page 1 of 1
Week l:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
5 M I T W Th F 5 5 M T W Th F 5 S M T W Th F S S M T W Th F 5
Activity Description Sub/IMCO 19 go go go go go
Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage % % X X X X X X X X X J
X X X X X X X X
Test Alarms IPGIDFG x
Yard Piping/Site Improvements
Catch Bas In s in tall lnfront of Hatchery Building&Sort/Spawn IMCO Waiting for better weather to backfill catch basins
Install Drain From Sort Spawn to MH2 IMCO x
" f
MESA Retain Wall Install Along Snake River CO X X X X X X n X X X X X X X x
g
Layout&Set Equipment Pads Behind Hatch Bld MCO X X P
Set GW Vault&Install Pipe IMOO Z.S.TO LOOK INTO PLANS ON
THIS UPCOMING WORK
Aeration Tower
Install Stairs IMCO X X X X X X X X X X
Hatchery FaciBty
HVAC Install VMC X X X X X X X X X X X X X X X
Electrical Install Vale Electric % X X X X X X X X X X X X X X X X X X X
Mechanical Pipe Install(Chiller&Incubations IMCO Waiting on Globe Valve Delivery
Install Roof/Soffit/Gutters Nations Roofing % X X X X X X X X X X X X X X
Replace Drywall in Elec.Chiller&Generator Rooms JC Drywall X X X X X X X X X X
Paint Sandy River Painting X X X X X Starting in Electrical room firsts,equipment can be to installed
Sorting/Spawning
Strip Stem Wall&Patch Holes IMCO X
Install Perimeter Drain around footing&Backfill IMCO X X X
Install Mechanical Pipe Below Slab IMCO % X X X X X
Te Rebar for Pipe Encasemen6&Form EOI/IMCO X
Pour Pipe Encasements IMCO P
Installing Electrical&Minoring Below Slab Vale/ucey X X X X X % % % % X
Euckfll IMCO X %
Install Vapor Earlier&Insulation IMCO % %
Install Slab Rebar EOI X X
AduHH,lding
Install Wall Rebar EOI
Fab/Move Wall Forms IMCO % % % % X X % % % X % % % % X X %
Wall Pours IMCO P P P
LEGEND
Holiday-No Work I Meeting I M Meeting M
Da Activit Pour P Pour P
Nigh[Activity N Delivery O Delivery D
Earth Dit.r og Actwit Complete I C 1cm,plate C
Hold Point Weather I W Weather W
'Schedule Subject to Change Page 1 of 1
Week l:Current Weak Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
5 M T W Th F 5 5 M T W Th F 5 S M T W Th F S S M T W Th F 5
Activity Description Sub/IMCO Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage % X % % X X % % % X
Yard Piping/Site Improve—ft
Catch Basin Install lnfrout of Hatchery Building&Sort/Spawn IMCO X
Install G"Conduit Aeration To Formalin %
Install 6"Lines From Aeration TO Sort/Spawn X X X
Install B"GW from Hatch to Aeration Tower IMCO X X
MESA Retaining Wall Install Along Snake River MCO X X X X X X X X X X X X X X X
MESA Retaingin Wall Along Shop IMCO X X X X X
Install Sewer Pump Station&Lines from Hatch&Sort(Sorting building first IMCO X X X X X X X X X X
Layout&Set Equipment Pads Behind Hatch Bid IMCO
Set G W Vault&Install Pipe IMCO
Aeration Tower
Install Stairs IMCO
Hatchery Facility
HVAC Install YMC X X X X X X % % % X % % % % X
Paint IMCO X X X X X % % % % X X % % % X
Electrical Install Vale Electric % X X % X % % % X %
Chiller Pipe Install IMCO X X X X X % % % % X Pending Valve Delivery,Expelled This Week
Install Roof/Soffit/Gutters Nations Roofing X X % % X X % %
Replace Drywall in Elec.Chiller&Generator Rooms JC Drywall X % X X X
Sorting/Spawning
Install Mechanical Pipe Below Slab IMCO X % X X
Tie Rebar for Pipe Encasements&Form E01/IMCO X
Pour Pipe Encasements IMCO P P P
Installing Electrical&Pluming Below Slab Vale/lecey X X X X X X X X X
Partial Backfill For Electrical&Plumbing IMCO X
Final Backfill IMCO X
Install Vapor Barrier&Insulation IMCO % %
Install Slab Rebar EOI X %
Pour Slab IMCO P P
AduHHolding
Install Wall Rebar EOI
Fab/Move Wall Forms IMCO % X X X X X X X X X % % % % X % % % X
%
Wall Pours IMCO P p P P
LEGEND
HOlida No Work Meetin M Meetin M
Day Activity Pour P Pour P
Ni ht Activi Delivery D Delive D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W N
F S S M T W Th F S
Activity Description Sub/IMCO S S S 4 4 4 S S S S Comments/Milestones
s
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage X X X X X
Yard Piping/Site Improvements
MESA Retaining Wall Install Along Snake River IMCO X x X X X X X X X X X x
Private Locates IMCO X X X
Install Sewer Pump Station&Lines from Hatch&Sort(Sorting building first) IMCO X X X X X X X X X X
MESA Retaining Wall Along Shop IMCO X X X X X
Layout&Set Equipment Pads Behind Hatch Bld IMCO x
Set G W Vault&Install Pipe IMCO
Aeration Tower
Install Stairs IMCO x X X X X
Hatchery Facility
HVAC Install YMC X X X X X X X X X X
Paint IMCO X X X X X X X X X X X X X X X X X X X
Electrical Install Vale Electric X X X X X X X X X X X X X X X
Chiller Pipe Install IMCO X X X X X X X X X X Pending Valve Delivery,Expected This Week
Install Roof/Soffit/Gutters Nations Roofing X X
Taping and Texturing Generator,Chillerand Electrical Rooms 1C Drywall X X X
Sorting/Spawning
Installing Electrical&Pluming Below Slab Vale/Lacey X X X X X
Partial Backfill For Electrical&Plumbing IMCO X X
Final Backfill IMCO X X X
Install Vapor Banner&Insulation IMCO X X
Install Slab Rebar EOI X X
Pour Slab IMCO P P Ix
CMU Block Masons X X X X X X X
AduNHolding
Install Wall Rebar EOI X X X
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X X X
Wall Pours IM[O PP P
LEGEND
Holiday-NO Work I Meeting M Meeting M
Day Activity Pour P Pour P
NightActWRY Delivery . D Delivery D
Earth Disturbing Activity Complete C Complete C
'Point Weather I W IWathar W
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Laok Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO ,$ S S ,$ ,$ 4 S �ry s s s s Comments/Milestones
m e
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Incubation Outage X X X X X
Yard Piping/Site Improvements
MESA Retaining Wall Install Along Snake River IMCO % X % X X X X X X X X X X % X
CIP WO Eartof Shop Footing Install IMCO X % X
Footing Reba,CIP Wall East of Shop E01 X X
5Footing Pour IMCO P
Wall Eastof Shop-Form Wall IMCO I X % X % X X X %
CIP Wall East of Shop-Pour Walls IMCO P
GWP From Sorting To Hatch/F,uck Fill IMCO % X x
SWP From Sorting to Yard Hydrants/Fruck Fill IMCO X X %
Aeration Tower
IMCO
Hatchery Facility
HVAC Install YMC X % X % X X X % X X
Paint IMCO X % X X X X X X X X
Chiller Pipe Install IMCO X % X % X X X % X X ACV Vavle Delivered Last Friday
Electrical Install Vale Electric X X X X X X X X X % X % X X X % X X
Stucco Incubation Room Stucco Systems X X % X X X % X % X
Grid Ceiling Install 1C Drywall X % X % X
Sorting/Spawning
Installing Electrical&Pluming Below Slab Vale/Lacey X %
Final Backfill IMCO X %
Install Vapo,Barrier&Insulation IMCO X
1-all Slab Reba, EOI X
Pour Slab IMCO P P P
CMU Block Basin Masonry X X X X X % X % X % X % X %
AduHHolding
Install Wall Reba, EOI X X % X X X % X % X
Fab/Move Wall Forms IM[0 X X X % X X X X X % X % X % X % X X X %
Wall Pours CC
P P
LEGEND
Holiday-NO Work I M eeting M ma.irg M
Da Activi Pour P Pour P
Ni ht A`Nl Deliver D Delive D
Earth Disturbin Activi Com lete C C..PI— C
Hold Point Weather I W Weather W
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO ,$ S S ,$ ,$ 4 S ps s s s Comments/Milestones
m e
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Yard Piping/Si[e Improvements
MESA Retaining Wall Install Along Snake River IMCO X X % % X X X %
CIP Footing Pour loft IMCO p p
CIP Footing Pour 2af2 IMCO
CI P Wall East of Shop-Form Wall IMCO X X % X % X % X
CIP Wall East of Shop-Pour Walls IMCO I P
Rip Rap Along Snake River IMCO X X % X
Grade Arou nd Building IMCO X %
GWP From Sorting To Hatch/Truck Fill IMCO
SWP From Sorting to Yard Hydrants/Truck Fill IMCO
Aeration Tower
Insall Handrail IMCO X X
Hatchery Facility
HVAC Install YMC X % X X X X X X X X
Paint IMCO X X
Chiller Pipe Install IMCO X % X X X ACV Vavle Delivered Last Friday
Elcc rical Install Vale Electric X X X % X X X % X X X % X % X % X % X X
Stucco l ncubation Room Stucco Systems X X X X X X X X X % X
Grid Ceiling Install K Drywall X % X % X
Sorting/Spawning
Pour Slab IMCO P P P
CMU Block Basin Masonry X X X X X X % X % X X X % X X
Adult Holding
Install Wall Mbar EOI X X X X X X X X X X X X X
Fab/Move Wall Forms IMCO X X X X X X X % X X X % X % X % X % X %
Wall Pours IMCO P P
ELL
LEGEND
Holiday-No Work I Meeting I M Ime.ing I M
Day Activity Pour p Po ur P
Night Activity Delivery D Delivery D
Earth Disturbing Activity Complete I C Iccunpletc, C
Hold Point Weather I W lWeather W
'Schedule Subject to Change Page 1 of 1
Week l:Current Weak Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
5 M T W Th F 5 5 I M T W Th F 5 S M T W Th F S S M T W Th F 5
Activity Description Sub/IMCO Comments/Milestones
� ; S
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Spawning Fish IDES X X X X X X X X
Yard Pipmg/Site Improvements
MESA Retaining Wall Install Along Snake River IMCC, X X
CIPWaIIEastof Shop-Form Wall IMOO X % X
CIP Wall East of Shop-Pour Wall1(loft) IMCC, p
CIPWaIIEastof Shop-Form Wall IMOO X X X
CIP Wall East of Shop-Pour Wall,(2of2) IMCC, p
Grade Area By Shop for MESA Wall IMCO X X X
GWP From Sorting To Hatch/Truck Fill IMCO X X
Form&Pour Strip Footing For M ESA Wall Near Shop IMOO X X P
MESA Wall Near Shop IMCC, X X X X X X X
SAP From Sorting to yard Hydra-/Truck Fill IMOO X X
GW Vault IMCC, X X X
Aeration Tower
Hatchery Facility
HVAC Install YMC X X X X X X X X X X
Electrical Install-Pulling Wire&Mounting Panels Vale Electric X X X X X X X X X X
Stucco Incubation Room Stucco Systems X
Grid Ceiling Install JC Drywall X X X
Trim-out Ceiling HVAC/Electrical Vdle/VMC X X X X X
Set Ceiling Tiles JC Drywall X X X
Polish Concrete Floor Consorco
Sorting/Spawning
CMU Block Basin Masonry X X X X X X X X X X X X X X X X X X X X
Aduh Holding
Install Wall Rebar EOI X X X X X X X X X X X X X
Fab/Move Wall Forms MOO X X X X X X X X X X X X X X X X X X X X
Wall Pours MOO P P P Will only be three walls on the 4th-piggy backing off retaining wall pour.
LEGEND
Holiday-NOWork Meeting M Meeting M
Day Activity Pour P Pour P
Night Activity Delivery D Delivery D
Earth Disturbing Activity m IC,mpl,t, I C Iccurple. C
Hold Point MWeather I W JWEther W
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO S S S S S Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Spawning Fish IDFG X X X X X X X %
Trapi ng&Ta nsporti ng Steelhead X
Incubation Trays Delivery X
Yard Piping/Site Improvements
Rip-Rap Placement IMCO X X
CIP Wall East of Shop-Pour Walls(2of2) IMCO P
GW Vault Install IMCO X X
Install Hydrant West of Aer.Twr. IMCO X
Form&Pour Rat Slab For MESAWall IMCO X X
Backfill Retaining Wall Near Shop and Grade for Footing IMCO X X
Fill East Side of Hold.Fac. IMCO X X X X
Install MESA Wall Pine Creeek IMCO X X X X X X X X
Hatchery Facility
Polish Concrete Floor Consorco X X X X
Install Window Trim IMCO X X
Trim Out Plumbing Lacey X X X X
Trim-out Ceiling HVAC/Electrical Vale/YMC X X X X X X
Set Ceiling Tiles JC Drywall X X X
Tile in Bathroom Nampa Flooring X X X X
Install Wainscot IMCO X X X X X
Sorting/Spawning
CMU Block Basin Masonry X X X X X X X X
Metal Decking IMCO X X X X X X X X
Interior Stairs IMCO
Adult Holding
Install Wall Rebar E01
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X X X X
Wall Pours IMCO P P
Grating Potentially
LEGEND
Holiday-No Work Meeting M Meeting M
D,yActi,ity Pour P Pour P
Night Activity N Delivery D Delivery D
Earth Disturbing Activity Com lete C complete C
Hold Point Weather W Weather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO S S A S A S A S 5S S S S Comments/Milestones
Z 5 5 5
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Spawning Fish x
Intake Outage x x x X X X x x x X X X X Tentative 3rd Week of May for Chinook
Incubation Outage X X X X X
Move Out of Existing Hatchery Facility IDFG/IMCO x x X X X
Yard Piping/Site Improvements
Backfill&Form For Ratslab Mesa Wall Along Pine Creek IMCO X X P
Truck Fill Lines IMCO X X x
Mesa Wall Install Along Pine Creek IMCO X X X X X
Storm Drains on West Side of Holding Fac IMCO x X X x
Yard Hydrants IMCO X X X X
Install 6"GW Line to Pumps IMCO x X X X x
Backfill River Side of CIP Retaining Wall Near Shop IMCO X X
Hatchery Facility
Trim-out Ceiling HVAC/Electrical Vale/YMC X X X X X
Install Cabinets Westcraft X X
Trim Out Plumbing Lacey X X X X x
Set Ceiling Tiles JC Drywall X X
Tile in Bathroom Nampa Flooring X X X X
Install Wainscot Nampa Flooring X X X X
Generator Initial Start-up/Fill Cummins X
Chiller Initial Start-up/Fill ACS X
Sorting/Spawning
Install Angle Iron Ledger IMCO X X X X X X x X X X X X x X x
Grout Beam Pockets IMCO X
Pan Decking IMCO/MB Welding X X X
Interior Stairs IMCO X X X X x
Install Mechanical Pipe Running Through 2nd Floor IMCO X X X X
2nd Floor Rebar E01 X X
Pour 2nd Floor Deck IMCO P
Install Sill Plate for Roof Truss' IMOO X X X X X
Adult Holding
Install Wall Reber E01 X X
Fab/Move Wall Forms IMCO x X X X X X X X X x X X X X X X X
Wall Pours IMCO P P P
Walkway Pour IMCO P
shop
Form Footing IMOO X X X X
Install Rebar for Footing/Stem Wall E01 X X
Pour Footing IMOO P
LEGEND
Holiday-No Work Meeting M Meeting M
Da Activit Pour P Pour P
Ni ht Activit r'J Delive D Delivery D
Earth Disturbin Activi Com let e C Com lete C
Hold Point Weather W WeaMer W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO S S S S S S S Comments/Milestones
;a �a i S
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Outage x x x x x x x x X x Tentative 3rd Week of May for Chinook
Incubation Outage % X X X % X X X X X
Move Out of Existing Hatchery Facility IDFG/IMCO x x x x x
Begin Demo of Existing Building IMCO X X X X X
Yard Piping/Site Improvements
Build MESA Wall IMCO X X X x
Install Chilled Water Line to Truck Fill IMCO x
Install GW&SW to Truck Fill IMCO X X
Storm Drains on West Side of Holding Fat IMCO X X X X
Yard Hydrants IMCO x X X X x
Install 6"GW Line to Pumps IMCO X X X X X X X %
Pull&Replace Pumps IMCO/CH Spencer
X X X X X
Hatchery Facility
Trim-out Ceiling HVAC/Electrical Vale/YMC X X X X %
Trim Out Plumbing Lacey X X X X X
Set Ceiling Tiles JC Drywall X
Tile in Bathroom Nampa Flooring X X X X
Install Wainscot Nampa Flooring % X X X
Generator Initial Start-up/Fill Cummins X
Chiller Initial Start-up/Fill ACS X
Paint Interior Trim&Door Frames IMCO x X X X x
Install Interior Finishes(Desks,Lockers,Etc.) IMCO X X X X X
Sorting/Spawning 11
Weld Nelson Studs for Decking MB Welding X
Install Mechanical Pipe In Utility Room IMCO X X X X
2nd Floor Rebar EOI X X
Interior Stairs IMCO X X X
Pour 2nd Floor Deck IMCO P
Install Sill Plate for Roof Truss' IMCO % X X X
Fly Sorting Table In Sorting Room IMCO x
CMU/Interior Beam Painting IMCO % X X X
Install Roof Truss' IMCO X X X X
Adult Holding
Install Wall Rebar EOI X X
Fab/Move Wall Forms IMCO X X X X X X X X X X X X X X X X X
Wall Pours IMCO P P P P
Walkway Pour IMCO P
Shop
Form Footing IMCO % X X
Install Rebar for Footing/Stem Wall EOI X X
Pour Footing IMCO P
Form For Stem Wall IMCO X X X X X
Pour Stem Wall IMCO P
LEGEND
holiday-No Work I IMeetingM Meeting M
Day Aivit cty Paur P Pour P
Ni ht Acth Delive D Oelive D
Earth Disturbing Activity Complete C Complete C
Hold Point Weather W Weather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO S S S S S S Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Outage X X X X X X X X X X Tentative 3rd Week of May for Chinook
Incubation Outage x x X X X x x X X X X x X x x
Move Out of Existing Hatchery Facility IDFG/IMCO X X X X
Begin Demo of Existing Building IMCC, X X X X X X X
Yard Piping/Site Improvements
Build MESA Wall IMCO X X
Misc.Pipe Testing IMCC, X X
Install Catch Basins&Strom West of Hid.Fac. IMCO X X X
Install GW Line From Aer.Twr to Wells IMCC, X X X X
Demo Existing Wells&Hook-up new IMCO/CH Spencer X X X X X X X
Bring Site to Grade Around Building, IMCC, X X X X X
Remaining CIP Wall IMCC, X X X X X X
Install Site Electrical Vaults IMCC, X X X
Hatchery Facility
Trim-out Ceiling HVAC/Electrical Vxle/YMC x X X X x
Trim Out Plumbing Lacey X X X X x
Install Desks,Lockers,&Other Misc.Furnishings IMCC, x X X
Tile in Bathroom Nampa Flooring X X X
Install Wainscot Nampa Flooring X X X
Paint Interior Trim&Door Frames IMCC, X X X X X X X
Hook Up Instrumentation to Control Panel Vale/Simtek X X X X X
Sorting/Spawning
Install Mechanical Pipe Through 2nd Floor Deck IMCO X X
Form Trench Drain 2nd Floor IMCC, x X
Pour 2nd Floor Deck IMCC, P
Interior Stairs IMCC, X X
CMU/Interior Beam Painting IMCO X X X X X X X
Install Sill Plate for Roof Truss' IMCO X X X X
Fly Sorting Table In Sorting Roam IMCO X
Install Roof Truss' IMCO X X X
Adult Holding
Fab/Move Wall Forms IMCC, X X X X X
Wall Pours IMCC, P
Form Walkways/Pour IMCC, X X X P
Stairs&Grating on West Side IMCC, X X X X X X X X X
Set Embedded X-Crowder Rail IMCO X X X X X X X X X
Shop
Form Footing IMCC, X X X
Install Rebar for Footing/Stem Wall E01 X
Pour Footing IMCO P
Form For Stem Wall IMCO X X X X X
Pour Stem Wall IMCO P
�$
LEGEND
Holiday-No Work Meeting M Meeting M
Day Actty Pour P Pour P
Night Activity N Delivery D Delivery D
Earth Disturbing Activity I Complete C Complete C
Hold Point Mweather W Weather W
"Schedule Subject to Change Page 1 of 1
Week l:Current Week Week 2:Laak Ahead Week3:Lack Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S 5 M T W Th F 5
Activity Description Sub/IMCO 5 5 5 5 5 5 5 5 5 5 5 5 4 4 4 4 4 4 4 4 S q G G G Comments/Milestones
411O OXBOW HATCHERY RENOVATION
Hatchery Operations John needs to be on site 5/23
Intake Outage % % % Tentative 31d Week of May for Chinook
Incubation Outage % % % % % % % 3 % x % % % % X X X X X
Demo of Existing Building IMCO % % %
Yard PIPing/Slt Improvement
MM.Pipe Terting IMCO X %
Install GW Line From A-TwrW Wells IMCO X x
Install Vaults For GW IMCO X % %
Demo Existing MIN&Hook-up-111 IMCO/CH Spencer % %
Demo Existing WON&Hook-up-112 IMCO/CHSencer % % %
Bring Existing Retaining Walls TO Grade&Rip Rap IMCO % %
Remaining Cl P Wall Footing IMCO 3 % % % % P
Remaining CIPWa11s IMCO X X X P
Install Site Elldh al Vault IMCO X X X X
confirm if IPC tech needs to be
Hatchery Facility
here? Lacey x x x x
Inrtall Wainscot Top Cap IMCO % % % %
Paint Interior Trim&Door Frames IMCO X X X X X
Hook Up Instrumentation to-1.1 Panel Vale/Si.t.k % % %
on lO Checks DC Engineering X X hatchery building paint a ways out
x x x
Fin Chiller With Glycol A. x x
paint to begin Sorting/Spawning
Pour 2nd FlD Deck(2 If 2 IMCO P
CMU/Interior Beam Painting IMCO % % % % x x x x
NZA x x x x
Fly Sorting Table In Sorting Room IMCO
Inrtall Eleariral Raceways Vale X X X X X
Aeration Tower
I nrtall Grating&Handrail IMCO X X
I nrtall Level Sensors,Ught,and Electriral Raceway Vale X X X X % % % %
Adult Holding
Wa11 Pours(Final Pour Near Gate 6) IMCO P
SO Embedded%.Crowder Rail IMCO
Stairs&Grating on Wert Side IMCO X X X I X
X-Channel Crowder Install IMCO X -1 r % % % %
ShaP stairs to begin today
Form Footing IMCO X X
Inrtall Rebar far Footing/Stem Wa11 EOI X
Pour Footing IMCO P
Form For Stem Wa11 IMCO X X
Pour Stem Wa11 IMCO P
Inrtall Underslab El,driwl Vale % %
Exldll,Inrtall Insulation,&vapor Barrier IMCo % % P1-11
Slab Rebar EOIPour5lab IMCO P
Holida-NO Work Meecin M P H Delive D Complete C Weather W W
'Schedule Subj,d to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO 4 ,$ ,$ 4 ,$ s s s s s s ^� Comments/Milestones
N m \
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Outage % x % X X X X
Incubation Outage X X X x % x % x x X x % X X x X x X x
Yard Piping/She Improvements
Mist.Pipe Testing IMCO X X X
Install Vaults For GW IMCO X
Remove Existing Wells&Hook-up Well IMCO/CH Spencer X
Remove Esisting Wells&Hook-up Well IMCO/CH S encer, x
Bring CIP Retaining Walls To Grade&Rip Rap IMCO X X
Dig For Remaining CIP Footing IMCO x IM
Form CIP Wall Footing CO X x
CIP WaII Reba, E01 X P Roughly J yards
Rem IM
Remaining CIP Walls CO % X X X P P Roughly Syards each
stall Site Electrical Vaults IMCO
Hatchery Facility
Final Plumbing Trim Out Lacey x x x X x
Install Wainscot Top Cap IMCO X X X
Paint Interior Trim&Door Frames IMCO x x x x x
Hook Up In o.o em.tic.to Control Panel Vale/Simtek X X
Flush Chiller Lines IMCO X x
Instrumentation lO Checks DC Engineering X X
Joint Sealant IMCO X x X x
Fill Chiller With Glycol ACS X x
Sorting/Spawning
CMU/Interior Beam Painting IMCO X X X
Install Framing&Truss' Kim Braun X X
Fly Sorting Table In Sorting Room IMCO
Install Electrical Raceways Vale x X X X x
Aeration Tower
Install Level Sensors,Lights,and Electrical Raceway Vale X X % X X
Adult Holding
Stairs&G rating on West Side IMCO X x X X X
X-Channel Crowderinstall Frame IMCO X X
rout X-Channel Embedded Track IMCO X X x
rout X-Crowder Drain IMCO X X X
Install X-Crowder On rail IMCO X x % x %
Install PEMB D-yB x X X X x
Shop
Form For Stem Wall IMCO % x % x %
Pour Stem Wall IMCO P Roughly40yards
Install Under slab Electrical Vale 1A..d %
BackRll,Install Insulation,&Vapor Barrier IMCO X x X x
Install Slab Rebar EOI x X
Pour Slab IMCO P Roughly 80 yards
1 --9,
LEGEND
Holida-No Work 10-ting M Meeting M
Day ActivityPour P Pour P
Ni ht Activi N Delive D DeliveryO
Earth Disturbin Activi[ m Co fete C Com lete C
Hold Point Weather I W IW..thar I W
'Schedule Subject to Change Page 1 of 1
Week l:CurraM Week Week 2:Laak Ahead Week3:Lack Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S 5 M T W Th F 5
Activity Description Sub/IMCO 5 5 5 5 5 5 q q q q q q q q q 4 4 4 4 4 S S b 5 b 5 5 b 5 R S Comments/Milestones
b b b b b b b b b b b b b b b\ b b b b k3 Q b
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
ntake Outage % % %
ncubation Outage % % % A I % % %
Yard Piping/Slte lmprovemenb WATERING UP THURSDAY
Mist.Pipe Terting IMco AFTERNOON
Install Vaults—W IMCO
Hook-up Well Piping Well1 IMCO % % x x
Dig for Well IMCO x x x
Remove Existing Wells&Hook-up Well2 IMCO/CHS enter x
Hook-up Well Piping Well2 % % % x
Dig For Remaining CIP Footing IMCO %
Form CIP Wall Footing IMCO % x
Install CIP Wall Reba, EOI x x
Pour CIP Wall Footing IMCO P Roughly T yards
Form&Pour Walls IMCO x x x P P 11-ghlyS ywds Each
Install Site Elemrical Vaults-North Side IMCO x X X
Hatchery Facility
Final Plumbing Trim Out Laeey % x x x % % % x
Install Wainscot Top Cap IMCO
Paint Interior Trim&Doo,Frames IMCO % x x x % % % % % %
Final Hook Up Instrumentation to C 1.1 Panel Vale/Simtek x
Flush Chiller Lines IMCO x x
Instrumentation lO Checks DC Engineering % %
loin[Sealant IMCO x % x
Fill Chiller With Glycol A. x x
S,xting/Spawning
CMU/Interior Beam Painting IMco x x x x T x x x X DWG FLIP/REFRESH
Install Framing&Truss' Kim B,aun % x x % % % X % %
Fly Sorting Table In Sorting Room IMOD %
Inrta11 Electrical Raceways Vale % x % % % x % % % x
Gutter Drains Around Sort/Spawn x % % % %
Aeration Tower
Inrtall L-1eensors,Ughss,and Electrical Raceway Vale % %
Adult Holding
Slairs&Grating on Wert Side IMCO % % % %
X-Channel Crowder Install Frame IMCO
Grout X-Channel Embedded Track IMCO x x START DWG FLIP
Grout X-C—der Drain IMCO x x
Inrtall%-Crowder On rail IMCO % % % % %
Inrtall PEMB DurtyB % % % % % X x x x X
Shop
Form For Stem Wall IMCO x
Pour Stem Wa11 IMCO P Roughly a0 yards
Install Unde,slab El—iw1 Vale x
E.Mll,Inrta111nsulation,&Vapor Barrier IMCO x x x x x
Install Slab Reba, EOI x %
Pou,51a1, IMCO P Roughly.0 ds
EMe,io,Framing Kim Braun X I x X X X
LEGEND
Haliea-NaWark Meetin M DWG FLIP-SHOULD BE
Day Activity Pour P P
NightAdwity N IDIIHII D C STRAIGHT FORWARD
Earth Disturbing Activity Complete C
Hold Point Weather W Weather W
'Schedule Subj,d to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead I Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO I sA As s � Rmimm
�ry CommenK/Milestones
� 5 -aZ j
4110 OXBOW HATCHERY RENOVATION it
Hatchery Operations
Intake Outage X X X % X % X X X % X X X % X % X
Incubation Outage X X X X % X X X X x X X % X X x X X X X
Yard Piping/Site Improvements
Temporarily Test Well l&Run Water to Tower IMCO X
Pou r CIP Wall Footing IMCO P P Roughly 20 yards
Dig for Well IMCO X X
Remove Esisting Well&Hook-up Well 2 IMCO/CH Spcurr, X
Hook-up Well Piping Wall X % X X
Form&Pour Walls IMCO X X X X P Roughly S Yards Each
Backfill Retaining Wall IMCO X X X
nstall Site Electrical Vaults-North Side IMCO X X X x
Hock upWell 1&2to Drives IMCO ale X X
Hatchery Facility
Final Plumbing Trim Out Lacey X X X X X
Install Wainscot Top Cap IMCO % X %
Paint Interior Turn&Door Frames IMCO X X X X X X X X X X
Final Hook Up Instrumentation to Control Panel Vale/Simtek X % X X
Instrumentation lO Checks DC Engineering X X
Fill Chiller With Glycol&Do Pre-start-up Checklist ACS X X X
Final Clean-up&Punch list IMCO X X X X X
Set Office Side HVAC&Hook-up IMCO/VMC X X X
HVAC Testing&Balancing YMC % X
Sorting/sine—hig
CMU/Interior Beam Painting IMCO X X % X X X % X X X
Fly Sorting Table In Sorting Room IMCO X
Install Electrical Raceways&Lights on 2nd Floor Vale % X % X X
Gutter Drains Around Sort/Spawn IMCO X X X X X X X
Install From ing&Truss' Kim Braun X X X
Begin Hooking Up Sorting Table IMCO % X X X % X % X
Install Truck Fill Ti IMCO % X % X %
Aeration Tower
Fill GW Side Vale X X
Adult Holding
Install Slide Gate Gears&Motors IMCO X X
Grout X-Channel Embedded Track IMCO X X
X-Channel Crowder Install Frame IMCO X
Grout X-Crowder Drain IMCO X X
Install X-C—der On rail IMCO X % X % X
Install PEMB DartyB X X X X X % X % X % X X X X X
Shop
Install Under slab Electrical Vale % X
Backfill,Install Insulation,&Vapor Barrier IMCO X X X X X X X X
Install Slab Rebar EOI X X
Pour slab IMCO P Roughly.yards
EXtericr Framing Kim Braun X X X X X
EGEND
Holiday-No Work mooling M Meeting M
Day Activity Pour P Pour P
Ni htActivit N Oa" D Daiwa D
Earth Disturb in Activit Com lete C lComplete C
Hold Point Weather W IWe.ther W
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead I Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S 5 M T W Th F S 5 M T W Th F S
Activity Description Sub/IMCO S S Comments/Milestones
us
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Outage x X X X X X X X X x X X X X X X X X X X
Incubation Outage x x X X X x X X X x X X X X X x X X X X
Yard Piping/Site Improvements
Remove Existing Wells&Hook-up Well 2 IMCO/CH Spencer x
Hook-up Well Piping Well IMCO X x X x X X
Form&Pour Walls IMCO P
Backfill Retaining Wall to Conduit IMCO X X x X
Install Site Electrical Vaults-North Side IMCO X X x
Hook-up Well 1&2 to Drives IMCO/Vale x X
F/P Sidewalks at Hatchery IMCO x P
Disconnect Dorm Valc/IPC X X X
Raise Dorm Pacific Movers x
Demo Dorm Foundation IMCO X X
New Foundation Dorm IMCO X X X
Hatchery Facility
Final Plumbing Trim Out Lacey X X X X X
PaintInterior/E#erior Trim&Door Frames IMCO x X X X X x X X X x X X X X X
Final Hook Up Instrumentation to Control Panel Vale/Simtek X X
Instrumentation lO Checks DC Engineering x X
Final Clean-up&Punch list IMCO X X X X X X X X X X
Set Office Side HVAC&Hook-up IMCO/YMC X X
HVAC Testing&Balancing(Chiller) IMCO/Blue Sky X
HVAC Testing&Balancing(Air) YMC X
Sorting/SPawning
CMU/Interior Beam Painting IMCO X X
Install Electrical Raceways Vale X X X X X X X X X x
Install Framing&Truss' Kim Braun X X X X X
Core Drill TT A-Core X
Begin Hooking Up Sorting Table&Transfer Tubes IMCO X X X X X X X
Adult Holding
Install PEMB DustyB X X X X X X X X X x X X X X X X X X X X
X-Channel Crowder Install Frame IMCO X X
Install X-Crowder On rail IMCO X X X X
Shop
Backfill,Install Insulation,&Vapor Barrier IMCO X X X X X
Install Slab Rebar E01 X X
Pour Slab IMOO P Roughly 80 yards
Exterior Framing Kim Braun X X X X X
LEGEND
Holiday-No Work Meeting M Meeting M
Day Activity I Pour P Pour P
Night Activity tWeather
Delivery D DeliveryD
Earth Disturbing Activity Complete C Complete CHold Point W 1weather W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T aW Th eF S
Activity Description Sub/IMCO 4 4 ,$ ,$ S C""'ns/Milestones
ixi
ixi
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Outage % X % X X X % X % X X X % X % X X X X %
Incubation Outage X X X X X X X X X x X X X X X
Trial Incubation With Trout Eggs X X X X %
Yard Piping/SRe Improvemer.
Hoak-up Well Piping Wel I2 IMCO X % X
Run Conduit to Wells IMCO/Vale X X
Pull Wire&Terminate Controls For Wells Simtek X X
Pour Exterior Slabs In Front of Hatchery Building IMCO P P P
Backfill Retaining Wall&Install Conduh IMCO/Vale X %
Install Drainage Along North Side of Hatchery Building IMCO X X X % X
Set Final Heat Pump&Hook-up YMC X %
Disconnect Dorm Vale IPC X % X
Raise Dorm&Move Pacific Movers X
Demo Dorm Foundation IMCO X X
New Foundation Dorm IMCO X X x X x X
24"SW Line From Intake to Aeration Tower IMCO X X X X X X X
Hatchery Facility
Final Plumbing TO.Out Lacey X X
Paint Interior/Exterior Trim&Door Frames IMCO X X X X X X X X X I X
Final Hook Up Instrumentation to Control Panel Vale/Simtek % X
Final Clean-up&Punch list IMCO X X X X X X X X X X
HVAC Testing&Balancing(Chlller) IMCO/Blue Sky X
HVAC Terti.g&Balancing(Air) 'MC
Chiller Commissioning Trane X
Generator Commissioning Cummins X
Sordng/Sp...Ing
Install Electrical Raceways Vale X X X X X X X X X X
Install Framing&Truss' Kim Braun % X % X X X %
Hooking Up Sorting Table&Transfer Tubes IMCO X X X X X X X X X X
Ice Shield Install Nations
Install Ceiling Drywall IC Drywall X %
Install Storefront's&Windows IMCO/Fast Glass X X %
Install ON Doors ON Door Company X X
Install Soffit/Sidi.g/Roof Panels Nations X X X X X
Adult Holding
Install PENIS Dusty X X X X X X X X X X
Install Roof Panels Dusty X X % X X X X X
Install X-Crowder On rail IMCO X X X
Install Electrical Raceways&Slide Gate Hook-up Vale X % X % X X X %
Transfer Tub Pipes West End IMCO X X X X X
Shop
Backfill Inner&Outer Stem Wall,Install Insu labor,&Vapor Barrier IMCO X X X % X % X
Install Slab Rebar E01 X X
Pour Slab IMCO P P Roughly gO Yards Each
Exterior Framing Kim Braun X X
LEGEND
Holida-No Work Meeting M Meetin M
Da Activi[ Pour P Pour P
Ni htActivi N Delive D Deliver D
Earth Disturbin Ac[ivi[ Com lete C Com lete D
Hold Point Weather W Weather W
'Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO A A A A. S S S S S S S S S Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Outage x X X X x x X X X X x x x x x X X X X x
Incubation Outage x X X X X X X X X X
Trial Incubation With Trout Eggs x X X X x X X X X x
Yard Piping/Site Improvements
Pull Wire&Terminate Controls For Wells Simtek X X X
Pour EMerior Slabs In Front of Hatchery Building IMCO P
Set Final Heat Pump&Hook-up YMJC X X
Disconnect Dorm Vale/IPC X X X
Raise Dorm&Move Pacific Movers x
Demo Dorm Foundation IMCO x x
New Foundation Dorm IMCO X X X X X X X X
24"SW Line From Intake to Aeration Tower IMCO X X X X X
Backfill Retaining Wall&EA.Stem Walls-Shop IMCC, X X X
Electrical Trenching at Shop IMCO X X X
Hatchery Facility
Paint Interior/Exterior Trim&Doorframes IMCO X X X X
Final Hook Up Instrumentation to Control Panel Vale/Simtek X X
Final Clean-up&Punch list IMCO X X X X X
HVAC Testing&Balancing YMC X
Chiller Commissioning Tram, X
Generator Commissioning Cummins X
Sorting/Spawning
Install Electrical Raceways Vale X X X X X x X X
Install Framing&Truss' Kim Braun X X X X X X
Hooking Up Sorting Table&Transfer Tubes IMCO X X X X X X X X
Ice Shield Install Nations X
Install Ceiling Drywall JC Drywall X X
Install Storefront's&Windows IMCO/Fast Glass X X X X X
Install OH Doors ON Door Company X X
Install Soffit/Siding/Roof Panels Nations X X X X X
Install Stucco Stucco Systems x X X
Adult Holding
Install PEMB Dusty X X X X X
Install Roof Panels Dusty B X X X % X X X %
Install X-Crowder On rail IMCO X X
Install Electrical Raceways&Slide Gate Hook-up Vale X X X
Transfer Tub Pipes West End IMCO X X X X X
Sack Patch IMCO X X X % X X X % X X X Ix
Shop
Backfill Inner&Outer Stem Wall,Install Insulation,&Vapor Barrier IMCO X X X X X
Install Slab Rebar EOI
Pour Slab IMCO P PRoughly 80 Yards Each
EMerior Framing Kim Braun
LEGEND
Holiday-No Work I Wearing M Meeting dD
Day Activity Paur P Pour
i Delive Delive
D
Ni ht ActivEarth Disturbing Activity Complete C Complete Hold Point Weather W Weather
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Activity Description Sub/IMCO S S S S S S S S S S S Comments/Milestones
4110 OXBOW HATCHERY RENOVATION
Hatchery Operations
Intake Outage X X X X X X X X X X X X X X X x x X X x
Incubation Outage X X X X X
Trial Incubation With Trout Eggs X X X X X X X X X x x x x x
Yard Piping/Site Improvements
Disconnect Dorm ,PC
X
Raise Dorm&Move Pacific Movers X
Demo Dorm Foundation&BackRll IMCO X X X X
Form Dorm Foundation IMCO X X X X X
Pour Dorm Foundation IMCO P
24"SW Line From FM Vault to Aeration Tower IMco X X x BACKFILL COMPLETE BY END OF WEEK
Backfill Retaining Wall&Ext.Stem Walls-Shop IMCO X X X X X X X X
Electrical Trenching IMco x x x HATCH BLDG TO AIR BURST
Hatchery Facility
Final Hook Up Instrumentation to Control Panel Vale/Simtek X
HVAC Testing&Balancing YMC X
Chiller Commissioning Trans X
Final Generator Hook-up Cummins
Sorting/Spawning
Install Electrical Raceways Vale X X X
Install Framing&Truss' Kim Braun X X X
Hooking Up Sorting Table&Transfer Tubes IMCO X X X X X X X X
Transfer Tube Install
Ice Shield Install Nations X
Install Ceiling Drywall 1CDrywall X X
Install Storefront's&Windows IMCO/Fast Glass X X X X X
Install OH Doors OH Door Company X X
Install Soffit/Siding/Roof Panels Nations X X X X X X X X X X
Install Stucco Stucco Systems X X X
Adult Holding
Install Raaf Panels Dusty B X X X X X X X X X X XU
IMCO X
Install Electrical Raceways&Slide Gate Hook-up Vale X X X X X X X X
Sack n Patch IMCO X X X X X X X X X X XIMCO X X X x x
Crowder Limt Switch Install IMCO/Sawtooth X X X X X
Shop PUSH ON SHOP TO RE
Backflll Inner&Outer Stem Wan,Install Insulation,&Vapor Barrier IMCO X X X
Install Slab Rebar EOI X X
Pour 5lab IMCO P P
Exterior Framing Kim Braun X
I I , 4 1 1 1
LEGEND
Holiday-No Work Meeting M Meeting M
Da Activit Pour P Pour P
N ight Activity N Delivery D Delivery D
Earth Disturbina Activity Com lets I C 1C..lete C
Hold Point MWonther I W IWenther W
"Schedule Subject to Change Page 1 of 1
Week 1:Current Week Week 2:Look Ahead Week 3:Look Ahead Week 4:Look Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
ACdVity Description Sub/IMCO S 4 o S 4 S S S N $ ry N N s o S S Comments/Milestones
R i 1 i R R R
41100XBOW HATCHERY RENOVATION
Hatchery Operations
Intake Outage % X % X X X % X % X % X % X % X X X X %
Trial Incubation With Trout Eggs X X X X x X X % x X X % X % X X X % x
Yard Piping/She Improvements
Backfill Dorm Foundation IMCO X X X
24"SW Line From FM Vault to Aeration Tower IMCO x X
Form Dorm Foundation IMCO X X X % X
Pour Dorm Foundation IMCO P
Install Dorm On New Footing&Hook-up Utilities IMCO/Pacific Movers X X X
Ele-ical Trenching IMCO X X Ongoing activity
Backfill Retaining Wall&Ext.Stem Walls-Shop IMCO X X X % X
Hatchery Facility
Final HVAC Hook-up YMC x
Testing&Balancing HVAC System YMC X
Sorting/Spawning
Install Electrical Raceways Vale X X X X X
Install lce-Sheild/Dry-in Nations X %
Install Transfer Tubes From Building to Raceways IMCO X X X X X X X X % X
Install Ceiling Drywall 1C Drywall X %
Install Storefront's&Windows IMCO/Fast Glass X X X % X
Install OH Doors OH Door Company X
Install Soffit/Sidiog/Roof Panels Nations X X X % X X X % X X % X X X x
Install Stucco Stucco Systems % X %
Adult Holding
Install Roof Panels Dusty B X X X X X X X X % X
Install Electrical Raceways&Slide Gate Hook-up Vale X X X X X X X X % X
Sack Patch IMCO X X % X X X X X % X
Transfer Tub Pipes West End IMCO X X % X %
Crowder Limit Switch Install IMCO/Sawtooth % X X
Shop
Backfill Inner&Outer Stem Wall,Install Insulation,&Vapor Barrier IMCO X % X % X
Install Slab Reba, EOI % X
Pour Slab IMCO P P
Exterior Framing Kim Braun
Dorm Building
Backfill IMCO X X
Form Footing IMCO X X
Install Rebar EOI
Pour Footing IMCO P
Pour Stem Well IMCO P
Move Building Onto Foundation Pacific Movers %
Hook-up Utilities IMCO/YMC X X %
Pull New Electrical IPC X
Building Repairs IMCO/1C Drywall X X X
9t
LEGEND
Holiday-No Work I IMeefingM Meeting M
Da Activi[ Pour P Pour P
Ni ht Activi Delive D Deliver D
Earth Disturbin Activi[ Com lete C Com lete C
Hold Point Weather W Weather W
'Schedule Subject to Change Page 1 of 1
Week Lturren<Week Week 2:W.k Ahead Week 3:L.ok Ahead Week 4:L.ok Ahead
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th F S
Adiwty Description Sub/IMCO v v a a a a a a a a a Q Comments/Milestones
41100%BOW HATCHERY RENOVATION
Hatchery Operetipns
Intake Outage % % % % % % % % % % % % % % % % % %
Trial Incubation With Trout Eggs x % % x x % % % % x % % % x % x x x %
Yard Pipmg/Site Improve M,
Backfill Retaining Wall&Ext,Stem Walls-Shop IMCO x x x x x x % %
Electrical Trenching Near Shop IMCO x x Ongoing-i ity
nrtall Storm Behind Sorting between Holding Ponds IMCO % x
Bringing Flll In IMCO % % % x %
EleRrical Trenching Hatchery to Intake IMCO x x x x
Hatchery Fadlity
Final HVAC Hook-up VMC x % %
Testing&Balancing HVAC System VMC %
Sorting/Spawning
Install Electrical Raceways Vale % % % % x
Install Transfer Tubes From Building W Raceways (MCC, % %
n JI Storefront`s&Windows IMCO/Fast Glass % % % %
Install Ice-Shield/Dry-in Nations % %
lnrtall Ceiling Drywall JC Drywall % % % %
HVAC Rough In VMC % % % x % %
Plumbing Rough In Lacey x % % % % x % % % x
lnrtall Soft/Siding/Roof Panels Nations x % % % % x % % % x % x x % %
lnrtall stucco St.—Systems x % %
Adult H.Idl.g
lnrtall Roof Panels DustyB % % % % x x % % % %
Install Electrical Raceways&Slide Gate Hook-up Vale % % % % x x % % % %
Sackn Patch (MCC, % % % % % % % % % %
Transfer Tub Pipes Wert End (MCC, % % % % x
Crowder Umit Switch lnrtall IMCO/S.—oth % % x
Shop
Backfll Inner&Outer Stem Wall,I nrtall Insulation,&Vapor Barrier (MCC, x % % % x
lnrtall Slab Reba, E01 x %
Pour Slab (MCC, P P
EMe,io,Framing Kim Braun % % x x %
Dp,m Bmlal.�g
Find Grade Dorm Foundation (MCC, x
Form Footing (MCC, x %
lnrtall Reba, E01 %
Pour Footing IMCO P
Forming S..Wall (MCC, x % x
Pour Stem Wall IMCO p
Backfill N.rth Side&Prep For Building Move IMCO % % % x
Move Building Onto Foundation Pacific Movers x %
Hook-up Utilities IMCO/YMC % % % x
EE
Pull New EleRrical IPC %
Building Repairs IMCO/JCDrywall %
Ready To Move Back In Dorm
LEGEND
Holida N.Work Meetin M Meetin M
Da ARivi Pour P pour p
Ni ht Ac[ivi N Delive O Delive D
Earth Dim-bift ARivit lc—let. C Com let. C
H.ld Point Weather W Weather W
'Schedule SubJed to Change Page 1 of 1