Loading...
HomeMy WebLinkAbout20240806IPC to Staff 31(b) Attachment 2 RFB Contruction - Oxbow_Hatchery_Project-Addendums - Combined.pdf ADDENDUM 01 - ATTACHMENT 02 Construction Sequencing IDAW UgNPOMR0 An IDACORP Company OXBOW FISH HATCHERY RENOVATION BID DOCUMENTS NOT FOR CONSTRUCTION FEBRUARY 26, 2021 12 Schnabel ENGINEERING Schnabel Engineering 250 S 5t' Street, Suite 510 Boise,ID 83702 Phone: (208) 3319736 IDAHO POWER COMPANY OXBOW FISH HATCHERY RENOVATION BID OPENING TIME: Remains Unchanged SUBMISSION DATE:Remains Unchanged All other terms of previously issued Bid Documents and Addenda remain unchanged. CONSTRUCTION SEQUENCING: Due to the need of to keep the existing adult holding ponds in service beyond Milestone 1. IPC recognizes there are some interferences for the new underground facilities and the existing holding ponds, particularly the 8 inch well water line between the aeration tower and the incubation building. The following items shall be considered by the bidders for construction sequencing. - Temporary piping for the 8" incubation line from the aeration tower to the new hatchery building. This can be routed south around the existing ponds or potentially straight through/over the existing ponds. - Installation of the new raceways drain manholes and piping will need to be completed after the demolition of the existing head works and ponds. - The existing hatchery surface water supply piping will need to remain in place until May. Once this system is shutdown, the existing supply lines that pass under the hatchery building should be cut and the portion under the building can be abandoned in place after filling them with CDF. The pipe outside of the hatchery building should be fully removed. PINE CREEK 21 0 o 0 15 30 60 90 FT I SCALE:1"=30' a � Q U w �m 6 � O lo K \ � o I i� V y t c a U a / Q \ \ d z O \ a 0zZ \ ZQO o w � L Z \ D a x w w \ r 0 U W a \ \ o = a LU L 1n xO d [Z Q� O \ O 0 \ p m x J — — a �o a 99 N U !� a PROJECT: DA592013.00 PLAN VIEW DATE: 12/23/2020 SHEET a loci ®Schnabel Engineering 2016 All Rights Reservetl 0MR® An IDACORP Company ADDENDUM NO. 02 to the Contract Documents for the Oxbow Hatchery Renovation Construction Project This Addendum, dated March 12,2021,is for all persons preparing bids for the above referenced project and as such, shall be made a part of the Contract Documents. All changes, corrections, deletions, and/or additions to the initial bidding documents enumerated herein shall be included in the Respondent's Proposal. In case of any conflict between the Drawings, Specifications, and this Addendum,this Addendum shall govern. Proposal Due date has been extended to Friday,April 2,2021 The Respondent shall acknowledge the receipt of this Addendum in the appropriate place on the Bid Schedule. Failure to acknowledge the receipt of the Addendum will cause a Bid to be considered non-responsive. See the following documents with upload date of 3/15/2021 that provided additional information/response to submitted questions and pre-bid identification of buried communications line. 1. 3-12-2021 Construction Proj RFB Question Log-Part 1 -Attachment 1 2. Oxbow Hatchery Renovation Project-Addendum 02—Attachment 02—Drawings and Specifications Modifications 3. Oxbow Hatchery Renovation Project—Addendum 02—Attachment 03—Oxbow Fish Hatchery Geotechnical Memo END OF ADDENDUM NO. 02 Idaho Power Company P.O. Box 70 Boise, ID 83707 Oxbow Hatchery Renovation Construction Project Page 1 of 1 OXBOW HATCHERY RENOVATION PROJECT Addendum 02 —Attachment 02 — Drawings and Specifications Modifications DRAWINGS: A2-1. DRAWING GC-2: A. ADD Detail C213 provided on the attached Figure. A2-2. DRAWING 50 M 3: A. REPLACE 50 M 3 with attached 50 M 3 Revision 1. A2-3. DRAWING 50 M 3.1: A. ADD attached 50 M 3.1 to the Bid Documents. SPECIFICATIONS: A2-4. SECTION 02200—EARTHWORK A. ADD the following Paragraph 2.21 I. Riprap: 1. Riprap is along the retaining wall against the Snake River and Pine Creek. 2. The stones shall be graded in size to produce a reasonably dense mass. Riprap shall consist of dense, natural rock fragments. Stone shall be resistant to weathering and to water action; free from overburden, spoil, shale and organic material; and shall meet the gradation requirements specified. Shale and stone with shale seams are not acceptable. 3. Stones shall consist of durable, sound, hard, angular rock meeting the following requirements for durability absorption ratio, soundness test, and abrasion test: Page 1 of 3 Durability Absorption Ratio Acceptability Greater than 23 Passes 10 to 23 Passes only if Durability Index is 52 or greater Less than 10 Fails Durability Absorption Ratio Durability Index (Coarse) /o absorption + 1 4. The durability index and percent absorption shall be determined by AASHTO T 210 and AASHTO T 85, respectively. The minimum apparent specific gravity of the stones shall be 2.5 as determined by AASHTO T 85. 5. Stones shall have less than 10 percent loss of weight after five cycles, when tested per ASTM C 88. 6. Stones shall have a wear not greater than 40 percent, when tested per ASTM C 535. 7. Neither the breadth nor thickness of any piece of riprap shall be less than one- third its length. Material shall be of shapes which will form a stable protection structure of required depth. Rounded boulders or cobbles shall not be used. 8. Riprap stone shall have a minimum specific gravity of 2.6. 9. Riprap shall conform to the H size as follows: Diameter Percentage Passing 30-inch 70 - 100 24-inch 50 - 70 18-inch 35 - 50 6-inch 2- 10 10. Control of gradation shall be by visual inspection. The Contractor shall furnish a sample of the proposed gradation of at least 5 tons or 10 percent of the total riprap weight, whichever is less. If approved, the sample may be incorporated into the finished riprap at a location where it can be used as a frequent reference for judging the gradation of the remainder of riprap. Any difference of opinion between the Engineer and the Contractor shall be resolved by dumping and checking the gradation of two random truckloads of stones. Arranging for and the costs of mechanical equipment, a sorting site, and labor needed in checking gradation shall be the Contractor's responsibility. 11. The acceptability of the stones will be determined by the Engineer prior to placement. 12. Placement of riprap shall begin at the toe of the slope and proceed up the slope. The stones shall be machine placed, dumping will not be allowed. Stones shall be placed so as to provide a minimum of voids. Smaller stones shall be uniformly distributed throughout the mass. Sufficient machine or hand work shall be done to produce a neat and uniform surface, true to the lines, grades, and sections indicated. 13. After placement, fill the interstitial space between placed stones with native material free of cobbles larger than 6 inches. 2'-10" MIN SQUARE CAST IRON FRAME AND COVER PAVEMENT (V 00 A-d ��• C� CONCRET w %2" CAST IRON CAP WITH FINGER Z J HOLE IN CENTER g 1/8 BEND z O F- U) w _ 6» —� WYE BRANCH o MIN m CONCRETE z ` • w PLUG •a. NOTE: INVERT ELEVATION 0 1. IF IN UNIMPROVED AREA TOP SEWER MAIN STATION o SHALL BE 6"ABOVE GRADE. SEWER MAI 0 2. SEE PLAN FOR STATION AND INVERT z ELEVATION. PIPE AND FITTINGS SHALL BE OF o THE SAME MATERIAL AS THE MAIN LINE SEWER. z Lu CLEANOUT TO GRADE COTG C Q z1213 cf) U z O U 0 0 rn Lu 2 U Q 2 2 U LL O m X O w 3: 0 0- OXBOW FISH HATCHERY RENNOVATION Schnabel IDAHO POWER COMPANY FIGURE 1 p E N G I N E E R I N G COPPERFIELD, OREGON m ©Schnabel Engineering 2021 All Rights Reserved A II - II z 0 z" 11 - 22.5° --_1p " a w B 45° i � FF EL 1724.00' 12"DIA LAY FLAT _ HOSE WITH 5' 5_13�8, 2'-0" `� I - LENGTH (TYP) ��---_-_-- T z TOC EL 1,713.10' w z L______________i n IL_____________I \vl z -- -� FF EL 1710.00' > z ------- m w o NOTE 1 i z FLEXIBLE HOSE TO SPAWNING BELOW TO RACEWAYS DD 0'-2"(TYP) SECTION SEE 50 M 4 Die„ w CAST TRANSFER TUBE o PIPING THROUGH a 4 RACEWAY WALLS w �U F o SECTION rA i� � SCALE: 3/16"=1'-0" �L N ROTATING PIPE SUPPORT 1-6 i N z cyi N r AND SHEAVE BLOCK TOC EL 1,713.10' ' 0 �d`Dye vi o PIPE L mfs rn 0e rr TRANSFER TUBE PIPING PLAN THROUOGH CATIO WALL 3 1' ® 81�11 NP (TYP) U' SCALE:/s'= -0" I -2-3�q'-- O t •'` -t •-l 9Y4" FF EL 1724.00' 1'-6"(TYP EA WAY w '• o F---------------- E 77 w r. SEE DETAIL 1 - Z _ SEE DETAIL 2 V0 _ T Z �..m �w mod= 11'-434" 12-10/,13 5'-0" cL) 6" rn Y2"PLATE BOTH SIDES OF MASONRY(SEE S�1)AD T,HRU _ RACEWAY e 2'-0" WALL SEE DETAIL 3 + + + 0 7y4- c a j + FF EL 1710.00' PL FOR T— V-6 P) FLANGE BOLTS 2'-4" � 4x4x3/6"HSS (n o II 25° ; (TYP OF 3) SECTION s SECTION C Z O SCALE: 3/16"=1'-0" SCALE: 3/8"=1'-0" Z C4x7.25 O C) RACEWAY (TYP) Q W WALL i 8x8x%"PLATE W/(4) 4'-10" 114 } Z U) w BRACKET INCLUDES 3/n"DIA MASONRY g Z Q O J o5 ANCHOR(TYP) _.__ .__................... ...___...._.._.__._.._ ___._.._.__._.._.__._..uuui. LU 0_ CO o 2'-2" VERTICAL MEMBER AT 12"DIAxYz''U-BOLTS Q g LU Q Z ? SWIVEL 30°ANGLE TO BUILDING (TYP OF 6) >- O 0 C_) Q 3 ATTACHMENT 0' U o Bx6xY4'HSS(TYP) WALL 12"DIA 12"CIA 1'-6" LU p Z J i; FLEXIBLE HOSE LTRANSFER TUBE TRANSFER TUBE a U W W Q 3 12"DIA TRANSFER — = L1J WI/8" C6z13 z 1'-6" 3'-5„ ._ _._..._._..._._..U.. .._._...._._._..._ .._..._._..._._... TUBES(TYP) = a (� m C6z13 z 1'-6" Q O i SWIVEL f (TYP OF 3) (TYP OF 3) 45° 2 O ii LL, D U � i SWIVEL SHEAVE BLOCK 12"U-BOLT,Yz"CIA x 1 22.5° 12"U-BOLT,Y"DIA _ 10"x10"xYz"PL W/4 Yz" LL Q O SEE 50 M 3.1 WI/a'NEOPRENE U w SLEEVE W/Ye NE SLEEVE a CIA NELSON STUDS O — W TYP. (TYP OF 2) DETAIL 4 SECTION 5 12"x3/e'z10'-2"PL '/4 0'6" �0'-6" o SCALE: 3/4"=1'-0" SCALE: 3/4"=1'-0" 12"3/a"DIA x 10'-2"PL r'cRouT PAD Z Q SS Ya"GUSSET PL (TYP) a MASONRYANCHOR 6 0'-1" a o TYR (TYP OF 12) /a DIA SS • NOTES: 114 MASONRYANCHOR a #5a@12"O.C.E.W. 1 a (TYP OF 12) 1Yz TYP. 1. SLOPE PIPES PER ENGINEERS DIRECTIVE. Ya"GUSSET PIL 1/4 2. RESTRAIN ALL BELL 8r SPIGOT JOINTS WITH 2 PVC ROMAGRIPS AND GALVANIZED RESTRAINT RODS. a 3. GALVANIZE ALL PIPE SUPPORTS AFTER FABRICATION. DETAIL 1 DETAIL 2 DETAIL 3 PROJECT: DA592013.00 c 4. INSULATE ALL EXTERIOR TRANSFER TUBES W/2"OF TRYMER 2,000XP&POLYGUARD ALUMAGUARD JACKET OR AS SPECIFIED.PIPING SHALL ALSO BE HEAT _ _ _ _ _ _ DATE: 12/23/2020 TRACED IN ACCORDANCE W/50 E 1. _ SCALE: 3/4"=1'-0" 5. ALL SURFACES THAT FISH WILL BE IN CONTACT WITH,INCLUDING PIPE INTERIOR SPIGOT JOINT EDGES,CORNERS,PROTRUSIONS OR MISC.BURRS SHALL BE SHEET ROUNDED/GROUND SMOOTH TO AVOID INJURY TO FISH.ANY FUSED PIPE JOINTS SHALL BE GROUND SMOOTH IN THE FIELD AFTER CONSTRUCTION. 50 M 3 5 Schnal el Engineering 2016 All Rights Reserved Q O BLOCKOUT IN CMU y GALVANIZED PIPE SLEEVE,MIN Y4"THICK GROUT Y4"MIN GALVANIZED ADJUSTABLE LINKED PIPE SLEEVE WITH RUBBER SEAL SEEP RING 0'-4" MIN CUR 4 m � " SHEAVE BLOCK � 50 M 3 SUPPORT BRACKET U u z IT 0 1"EYEBOLT W/SHOULDER o LOCKWASHER/NUT 1. HOT-DIPPED GALVANIZED o a SWIVEL BLOCK w 18"DIA SHEAVE z BLOCKOUT - q DETAIL FLANGED BASE PLATE W/ 36"CENTER EXPANSION JOINT SCALE: 1-1/2"=V-0" _ FOUR%"DIA SS RADIUS SWEEP SEE NOTE 8 Y2"DIA 6X19 WRC MASONRY ANCHORS ELBOW(NOTE 3) GALVANIZED (TYP) 2'-0" 6'-97 „ 1'-„ 10'-0"� LONG RADIUS �¢-N z OjdU I n - - - - ELBOW00 c rn � FLANGE CONNECTION (TYP) 12"TT 7 S OPE T 1 2 GUIDE 5'LAY FLAT HOSE W BRACKET v - w E w `n 8 Z Is p x 4"WIDE SS PIPE STRAP UNDER INSULATION aL T-0" N 12'-16' SEE NOTE 6 UHMW WEAR MARINE GRADE,SS, SURFACE ATTACHED WORM GEAR HAND WINCH TO GUIDE BRACKET GEBUWIN WW3000/MR OR EQUIVALENT. SEE NOTE 9 u 3 0 o Z 07 p z a 3-6" > } 0 p Z Z HSS 4x4x1 fi'FRAME L 9 (D Q Lu z 0_ 3 KOU0 U W ° DETAIL 2 0 SCALE: 1-1/2"=1'-0" = o () ~ NOTES: x o a � w mxa LL. i 1. ALL METALLIC PIPING INCLUDING FLANGES SHALL BE T 304 SS. p OU cf) 2. INSULATE AND JACKET EXTERIOR STAINLESS STEEL SECTIONS OF TRANSFER TUBE W/2"OF TRYMER 2,000XP&POLYGUARD ALUMAGUARD p Z m JACKET OR AS SPECIFIED. X 3. CUSTOM SWEEP ELBOW BY APPLETON STAINLESS INC.12"ID/90°SWEEP x 36"CLR/MILL FINISH OR EQUAL. p rc 4. MAXIMUM FORCE TO LIFT PIPE SHALL BE NO MORE THAN 30 LBS ON THE HAND WINCH. a 5. PERFORM HANG TEST ONSITE TO VERIFY TRANSFER TUBE IS LEVEL TO WITHIN 6"WHEN SUPPORTED ONLY BY THE WIRE ROPE.ADD o COUNTER WEIGHT AS NECESSARY TO OUTSIDE OF PIPE,UNDER INSULATION. a - 6. LOCATE GUIDE BRACKET AT THE APPROPRIATE HEIGHT TO ALLOW SPECIFIED RANGE OF PIPE ADJUSTMENT HEIGHT. WEST ELEVATION 7. ALL WELDS ON SUPPORT BRACKETS SHALL BE FULL PENETRATION. 0 8. FLANGED EXPANSION JOINT SHALL HAVE 12"ID WITH FILLED INTERIOR ARCHES FOR SMOOTH BORE AND NO RAISED INTERIOR EDGES. o ? SCALE:3/8"=V-0„ JOINT SHALL BE DESIGNED TO ALLOW 15°OF ANGULAR DEFLECTION. PROJECT: DA592013.00 9. CUT OUT STONE VENEER BEHIND WINCH AND INSTALL GROUT BEHIND WINCH TO BRING BACK OF WINCH FLUSH TO OUTSIDE OF VENEER. DATE: 2/16/2021 _ ATTACH WINCH TO WALL WITH%4"X 12"L ADHESIVE ANCHORS. SHEET 10. INSTALL SECONDARY SAFETY CHAIN BETWEEN SHEAVE SUPPORT BRACKET AND ROTATING PIPE. CHAIN SHALL BE RATED FOR 3,000 LBS. 50 M 3.1 5 SchnaW Engineering 2016 All Rights Reserved DEERE & AULT CONSUL'17AN'FS,INC. DRAFT MEMORANDUM TO: Bryant Charlo, P.E., Ray Eldridge, P.E. FROM: Victor deWolfe, P.E., P.G. DATE: February 18, 2020 RE: Oxbow Fish Hatchery Geotechnical Investigation; D&A Job No. SF-0592.013.00 INTRODUCTION This memorandum presents the results of the geotechnical investigation performed by Deere & Ault Consultants (D&A) at the Oxbow Fish Hatchery. The facility is owned by Idaho Power and operated by the Oregon Department of Fish and Wildlife. The site is located just downstream of the Oxbow Hydroelectric Project in Hells Canyon along the Snake River in Baker County, eastern Oregon(Figure 1). The facility was originally built in the 1960s and has operated ever since. The geotechnical investigation was conducted on January 271h and 28a', 2020 to provide a characterization of the foundation conditions for the design of a new hatchery facility. For the investigation, we excavated seven test pits and performed a cursory geologic reconnaissance of the site. We excavated three of the test pits to locate existing underground utilities. During the field work, a detailed topographic and utilities survey was also performed. However, only the results of the survey pertaining to the geotechnical investigation will be included herein. GEOLOGIC RECONNAISSANCE We performed a brief geologic reconnaissance of the site to assess any geologic conditions that could affect the design of the new hatchery facility. Our observations indicate the site is composed of imported fill. We understand this fill was primarily borrowed from the excavation of the Oxbow Powerhouse site located just up-river; as well as from other cuts in the area. Therefore, the fill appears to represent alluvial and colluvial soils in the area. The alluvial deposits in Hells Canyon are generally composed of sand and gravel with abundant rounded cobbles and boulders composed of basalt. The mountains surrounding the site are also composed of basalt, which is an extrusive volcanic rock that was deposited during the historical eruptions of the Yellowstone caldera. Therefore, there are abundant colluvial soils in the canyon. These soils have more silt or clay and contain angular blocks of basalt. Additionally, the alluvial deposits also contain large angular blocks of basalt that were deposited by rockfall or debris flow 600 S.Airport Road,Building A,Suite 205 Longmont,CO 80503 Phone: 303-651-1468 9 Fax: 303-651-1469 events into the canyon. In some places, the larger blocks of rock have been selectively placed along the edges of the fill as rip rap to guard against river erosion. The site is situated along the left bank of the Snake River and the right bank of Pine Creek. The fill has brought the level of the site up to about 15 feet above the level of the rivers at the time of the site visit. Because the site is bounded by two rivers, it at risk of flooding. Based on this proximity to the two rivers, and the 60-year age of the existing facility, the new design should consider the 100-year flood elevation for the site. GEOTECHNICAL CONDITIONS The geotechnical conditions of the Oxbow Fish Hatchery site were investigated by digging 7 test pits. The test pits were located at planned key structure locations and where the depth of certain existing utilities needed to be confirmed. The locations of the test pits are provided on Figure 1. Test pits TP-1 and TP-6 were excavated where the new hatchery ponds will be located. Test pit TP-2 is located on one abutment of a proposed foot bridge across Pine Creek and encountered two unmapped 480-volt electric lines 3 feet deep. Test pit TP-3 is located at the proposed site of a shop building. Test pit TP-4 was at the proposed location of the new hatchery building. Test pit TP-5 was excavated near the existing dorm building to assess foundation conditions there and to locate a buried irrigation line, which was found about 30 inches deep. Test pit TP-7 was excavated to confirm the location of two sanitary sewer lines 30 inches deep. However, it also encountered warning tape 18 inches deep for an unmapped buried electric line. The electric line was not exposed. Summary logs of the test pits, including observed utility locations are provided on Figure 2. Select photographs of the test pits are provided in Appendix A. The subsurface materials encountered in the test pits primarily consist of dense to very dense, well graded sand and gravel with abundant cobbles and boulders. The material is silty, locally clayey and generally moist to very moist. Rounded cobbles and boulders are abundant and were observed up to about 12 inches the largest dimension. The angular rock blocks observed in the fill ranged up to 36 inches in the largest dimension. Based on our visual observations during excavation, we estimate the D50 of the fill to be about 3 inches. We also estimated the amount of fines (clay and silt sized particles)to range between about 5 and 30 percent, averaging about 15 percent. This gradation estimate is provided on Figure 3. In test pit TP-1 we did encounter some highly plastic (fat)red clay. This type of clay is not an acceptable foundation material due to its shrink-swell potential. The clay band was shallow and ranged in thickness from about 4 to 12 inches thick. The presence, depth, thickness and extent of the clay appear to be insignificant. Therefore, the clay is not considered a problem for the planned site development. In test pit TP-4 we also observed a cobble nest in the east wall of the pit from about 1 to 3 feet deep. The nested cobbles were all about 2 to 3 inches in diameter and very little sand was observed in the voids. Nested cobbles can be problematic for foundations because they can allow fine materials from nearby soils to internally erode into the voids. This phenomenon can cause differential settlement of the foundation material if it occurs below a slab or footing. - 2 - Based on the shallow depth and limited observation of nested cobbles, we do not consider them to be a significant factor impacting the foundation conditions. GROUNDWATER CONDITIONS Groundwater was not encountered in any of the test pits to the depths excavated. The deepest pits were excavated to 10 feet. Therefore, high groundwater does not appear to be an issue for the foundations planned at this site. However, groundwater conditions during high river stage, or flood stage remain unknown. It is possible that the groundwater level could rise to shallow depths at the site during high water events. The new ponds are essentially large underground basins made of concrete. To counteract any buoyancy forces imparted by high or rising groundwater, the basins (or any other deeper foundations) should be designed with footers to carry backfill loads that can counteract buoyant forces. CONCLUSIONS and RECOMMENDATIONS This geotechnical investigation was performed to characterize the subsurface materials and their conditions for generally shallow, small load foundations. We excavated seven test pits to investigate the character and properties of the subsurface material. Based on our observations, we developed the following conclusions. 1) The material is fill at all proposed foundation locations. The fill generally consists of dense to very dense, well graded sand and gravel with cobbles and boulders. 2) The strength of the foundation materials will be sufficient for the small loads imparted by the proposed structures at the site. Differential settlement is considered unlikely. 3) Any significant deposits of fat clay discovered during foundation construction should be avoided or removed. 4) Any pockets of nested cobbles encountered during construction should be avoided or removed. 5) Building slab elevations should be planned at least one foot above the 100-year flood elevation. 6) Seasonal groundwater levels are unknown and may seasonally rise to levels that could influence foundation stability or impart buoyancy effects to the new ponds. Installation of a monitoring well can provide this information. We recommend installing at least one monitoring well and monitoring the groundwater levels at monthly intervals. The monitoring frequency should be increased to weekly during periods of high river stage. 7) Buried foundations should include footers to counteract buoyancy forces imparted by high or rising groundwater. UA0592 Idaho Power\0592.013 Oxbow Fish Hatchery\Geotech Memo\Oxbow FH Geotech.Mmo Docx - 3 - FIGURES N 0 100 200 wE Feet rA. S Aerial Image from Google Earth(2015) _ 4 4 e wee New Shop Bldg. TiP-3 n v •I't 1l .. v TP 4 Proposed New � Footbridge ' 4P TP-1 �- Hatchery L H` F Bldg. << :. New Holding Ponds TP-g' L . TP-5 ❑ \ ~�� Dorm N x Tp-7 ;, � • y rr LL ashin ton plc• .< �, Montana Ln Site Location � v Idaho ` LL Oregon 1`r'�e • '' °' , Oy min , O Pj, 1 1.. •�`.�, i o • Nevada Utah " o T T IDAHO POWER FIGURE N0. �1 LJ Oxbow Fish Hatchery Geotechnical Investigation�j 1 N CONSULrANrS, INC. sc Jos No: 0592.013.00 SCALE: 1 inch=100 feet FOOTBRIDGE NEW SHOP NEW HATCHERY DORM SANITARY NW HOLDING PONDS ABUTMENT BUILDING BUILDING BUILDING OUTLET TP-1 TP-6 TP-2 TP-3 TP-4 TP-5 TP-7 0 0 i 0.5 0.8 0.8 0.8 - 0.8 -1 CH o U o U SW -1 4" SW,GW 1.5 GW 0 0 NO DIG 12" 15" -2 2.0 e ELECTRICAL _2 CH o WARNING TAPE 2.5 � 0 2"SCH 80 PVC e GW IRRIGATION o n -3 3.0 TWO 1"480V 36 LINE 3.0 , TWO 2"SCH 80 -3 DRY ELECTRICAL GW o. 0. DRY PVC SANITARY CONDUITS TO 24" e Q e Q SEWER LINES DOMESTIC WELL o GW -30" 4 O ° GW C) 0 -5 n 24" e Q 5 0 m o m o °.Q. 5.5 O. GW � d6 _1811 d � 6 2 - d - W O Q O O 0 ..-0 0 Q 6.5 1 b Q � DRY e 0 0 . o -7 °o O ___ o -7 O. S Q i d d W O VY E p dQ eQ DRY C) -9 9.0 -9 DRY O -10 10.0°0 10.0 e Q -10 DRY DRY 0 N LEGEND NOTES: ROADBASE 1. TEST PITS WERE EXCAVATED ON 1/27/20 AND 1/28/20 USING A TIP-1TEST PIT I.D. KUBOTA KX040-4 RUBBER TRACKED EXCAVATOR WITH A TWO OR THREE-FOOT BUCKET.ALL TEST PITS WERE BACKFILLED AND COMPACTED USING A VIBRATORY COMPACTOR. ❑ (FILL)CLAY, FAT,STIFF,VERY MOIST, HIGHLY PLASTIC, 2. SEE FIGURE 1 FOR TEST PIT LOCATIONS. RED-BROWN,4-12"THICK CH 0s APPROXIMATE DEPTH OF ( ) GEOLOGIC CONTACT 3. LINES BETWEEN MATERIALS REPRESENT APPROXIMATE BOUNDARIES BETWEEN TYPES AND TRANSITIONS MAY BE GRADUAL. [FILL]SAND&GRAVEL,COBBLY TO BOULDERY,SILTY, LOCALLY 4. GROUNDWATER WAS NOT ENCOUNTERED TO THE DEPTHS Q ❑ CLAYEY, DENSE TO VERY DENSE, MOIST,WELL-GRADED,WELL GW USCS FIELD CLASSIFICATION& EXPLORED.GROUNDWATER LEVELS ARE EXPECTED TO FLUCTUATE ROUNDED TO ANGULAR, BROWN, DARK BROWN,LIGHT 24" MAXIMUM PARTICLE SIZE(INCHES) SEASONALLY. GREY-BROWN, RED-BROWN, LOCAL TIMBER AND OTHER DEBRIS, LOCAL COBBLE NESTS(SW,GW) JOB NO.0592.013.00 M 10.0 LIMIT OF EXCAVATION(FEET) ? GROUND REFUSAL DRY GROUNDWATER NOT OXBOW FISH HATCHERY ENCOUNTERED DURING 0 1 2 Vertical Scale in feet SUMMARY LOGS FOR TEST PITS GW=WELL GRADED GRAVEL EXCAVATION. SCALE IN FEET FIGURE NO. SW=WELL GRADED SAND DRAFT D E ER E & A U L T 2 • CH=FAT CLAY DATE: FEB.2020 SCALE: AS NOTED Figure 3 - Oxbow Fish Hatchery Fill Gradation Estimate HYDROMETER ANALYSIS SIEVE ANALYSIS TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 24 HR. 7 HR. 60 MIN. #40 #20 #10 1/2" 1" 2" 5" 45 MIN.45 MIN. 19 MIN. 4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8" 3/4" 1 1/2" 3" 6" 9" 15" 24' 36" 100 90 80 / 70 Z C0 so U) 50 Z / W U 00 If 40 W W 30 20 t Estimated Fill Gradation ' —0 Estimated High Range 10 L- —A— Estimated Low Range 0.001 .002 .005 .009 .019 .037 .074 .149 .297 .59 1.19 2.0 4.76 9.52 19.1 38.1 76.2 127 200 500 1000 .42 2.38 12.7 25.4 50.8 152 DIAMETER OF PARTICLE IN MILLIMETERS FINES SAND I GRAVEL COBBLE BOULDERS CLAY SILT FINE MEDIUM I COARSE I FINE I COARSE APPENDIX A TEST PIT PHOTOGRAPHS Appendix A NOTE: The test pits were excavated on February 3rd and 4th,2020. f� Test Pit TP-1:Open to 10 feet deep _ '�' '�"'a.✓d is - '4.T•c Test Pit TP-1: Excavated Material 1 of 7 Appendix A c Test Pit TP-2: Showing exposed 480V electrical lines Test Pit TP-2: Excavated Material 2 of 7 Appendix A y, . Of y u_Y T.+"r t9 3t Test Pit TP-3: Backfilled and excavated material along abandoned raceways 3 of 7 Appendix A ::.. .. K +�� h 4• Y ` .PAX .,.,,^ a Io .f `xr:` Test Pit TP-4: Showing nested cobbles in the wall iA t- s:' t. s � h K � ✓ ` " r Test Pit TP-4: Excavated Material 4 of 7 Appendix A �IB.M •r I Am Test Pit TP-5:Showing the exposed 2-inch schedule 80 PVC irrigation line E hs 1 is T t Test Pit TP-5: Excavated Material 5 of 7 Appendix A �r- . .� . Test Pit TP-6:Open to 10 feet deep 6 of 7 Appendix A if w... x. f •-s" ,�... :.,may,..' � r„ ,� * _ - Test Pit TP-7:Showing"No Dig"electrical warning tape(left)and two 2-inch schedule 80 PVC sanitary sewer lines (right). 7 of 7 0MR® An IDACORP Company ADDENDUM NO. 03 to the Contract Documents for the Oxbow Hatchery Renovation Construction Project This Addendum, dated March 26,2021,is for all persons preparing bids for the above referenced project and as such, shall be made a part of the Contract Documents. All changes, corrections, deletions, and/or additions to the initial bidding documents enumerated herein shall be included in the Respondent's Proposal. In case of any conflict between the Drawings, Specifications, and this Addendum,this Addendum shall govern. Proposal date has been extended to Wednesday,April 7,2021. The Respondent shall acknowledge the receipt of this Addendum in the appropriate place on the Bid Schedule. Failure to acknowledge the receipt of the Addendum will cause a Bid to be considered non-responsive. See the following documents with upload date of 3/15/2021 that provided additional information/response to submitted questions and pre-bid identification of buried communications line. 1. Addendum 03—Attachment 01 — 3-26-2021 Construction Proj RFP Question Log 2. Addendum 03—Attachment 02—Drawing Revisions 3. Addendum 03—Attachment 03—Oxbow Fish Hatchery Raceway As-Builts 4. Addendum 03 -Attachment 04-HEC RAS Model END OF ADDENDUM NO. 03 Idaho Power Company P.O. Box 70 Boise, ID 83707 Oxbow Hatchery Renovation Construction Project Page 1 of 1 PAW R® An IDACORP Company ADDENDUM NO. 04 to the Contract Documents for the Oxbow Hatchery Renovation Construction Project This Addendum,dated March 31,2021,is for all persons preparing bids for the above referenced project and as such, shall be made a part of the Contract Documents. All changes, corrections, deletions, and/or additions to the initial bidding documents enumerated herein shall be included in the Respondent's Proposal. In case of any conflict between the Drawings, Specifications, and this Addendum,this Addendum shall govern. The Respondent shall acknowledge the receipt of this Addendum in the appropriate place on the Bid Schedule. Failure to acknowledge the receipt of the Addendum will cause a Bid to be considered non-responsive. See the following documents with upload date of 3/31/2021. 1. Addendum 04—Attachment 01 —3-31-2021 Construction Project Question Log-Final 2. Addendum 04—Attachment 02—Oxbow Fish Hatchery Facility Asbestos&Lead Survey Report Reminder: If there are areas of the RFB that you are proposing a variance for,or items that are specified that cannot be attained or achieved,please provide an alternative and clearly note these variances in the proposal. END OF ADDENDUM NO. 04 Idaho Power Company P.O. Box 70 Boise, ID 83707 Oxbow Hatchery Renovation Construction Project Page 1 of 1 PAW R® An IDACORP Company ADDENDUM NO. 05 to the Contract Documents for the Oxbow Hatchery Renovation Construction Project This Addendum,dated April 28,2021,is for all persons preparing bids for the above referenced project and as such, shall be made a part of the Contract Documents. All changes,corrections,deletions, and/or additions to the initial bidding documents enumerated herein shall be included in the Respondent's Proposal. In case of any conflict between the Drawings, Specifications, and this Addendum,this Addendum shall govern. The Respondent shall acknowledge the receipt of this Addendum in the appropriate place on the Bid Schedule. Failure to acknowledge the receipt of the Addendum will cause a Bid to be considered non-responsive. This project start date has been delayed due to an unforeseen circumstance that IPC is working through with FERC. Please provide proposal revisions based on the following attachment and items that can be worked through in the second half of 2021. See the following documents with upload date of 04/28/2021. 1. Oxbow Hatchery Renovation Project-Addendum 05—Attachment 01 —Anticipated Project Schedule March 2022 start date. Additionally,In your revised proposal,please identify suggested design modifications or value engineering that we can be negotiated in 2021,and long lead items that can be procured in 2021. END OF ADDENDUM NO. 04 Idaho Power Company P.O. Box 70 Boise, ID 83707 Oxbow Hatchery Renovation Construction Project Page 1 of 1