Loading...
HomeMy WebLinkAbout20240716CAP to Staff Wells Journal Entry 14687.50.pdf CAPITOL WATER CORPORATION DATE J. V. NO. � 'y-�� JOURNAL VOUCHER CHECK NO. POST PLANT ACCOUNT POST GENERAL LEDGER ACCOUNT NO. ACCOUNT TITLE REF ACCT. NO AMOUNT REF. DEBIT CREDIT O 7 O D `fir/ 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Explanation: TOTAL �;�C Prepared b,%': Approved McLeran Well Drilling, LLC INVOICE 1204 Center Ave. DATE: March 24, 2020 Payette, Id. 83661 INVOICE# 1374 David McLeran 208-941-2587 Office 208-405-5808 dmcleran@q.com BILL TO: Capitol Water Corporation 2626 N. Eldorado St. Boise, Id 83704 Lubkin Well Chemical Treatment Activity QTY Column1 AMOUNT 0 Mobilzation 1.00 $2,500.00 $ 2,500.00 Please refer to time log attached. $ Lubkin Well Chemical Treatment 37.50 hrs 37.50 S325.00 $ 12,187.50 TOTAL $ 14,687.50 Make all checks payable to McLeran Well Drilling, LLC. THANK YOU FOR YOUR BUSINESS! McLeran Well Drilling LLC 1204 Center Ave. Payette,Id.83661 Capitol Water Corporation 2626 N.Eldorado St Boise,Id.83704 Lublin Well Chemical Treatment 3/4/2020 10:00 AM On site setting up rig 11:00AM-4:30 PM Scraping upper casing and started brushing upper casing 5.50 Hours 3/6/2020 10:00 AM On Site 10:00 AM-12:30PM Finished brushing upper casing 12:30 PM-2:00 PM Bailing out 13'of infill mostly casing crust little natural sand black 2:00 PM-4:00 PM Brushing screens 20 passes 4:00 PM-5:00 PM Running in pump for development 5:00 PM Off Site 7.00 Hours 3/9/2020 12:00 PM On Site 12:OOPM-12:30PM Getting pump running,Static 57. 2:38 PM Draw Down 92' 1:00 PM Draw Down,98' Off Site Carborator issues 1:00 Hour 3/11/2020 2:30 PM On Site 2:30 PM-5:00 PM Swabbing well moved lots of color and mineral deposits not much natural sand draw, 2.5 hours down 94'. 3/12/2020 9:30 AM On Site 9:30 AM -3:00 PM Finished swabbing screens,drawdown at 92'. 5.5 hours 3/13/2020 12:30 AM-1:00 PM Pump test 276 gpm,static draw down 84'. 1:00 PM-3:30 PM Tripping in Tremie lines for Pumping Acid. 3 Hours 3/16/2020 9:30 AM On Site 9:30 AM -3:00 PM Pumping Acid Tremie fell off,Tripping out Tremie 6 hours 3/17/2020 11:00 AM-1:00 PM Fishing out Tremie and swabbing through screens. 2 hours 3/18/2020 9:30 AM On Site 9:30 AM- 2:30 PM Setting in pump then pumping for water,clearing,then pulling pump. Draw down 92,after 4 hours 275 gpm 2:30 PM Tearing Down Rig 5 hours Total 12.50 Hours Scraping and Brushing 9.00 Hours Development 16.00 Hours Acid and Pumping to Waste Total 37.50 Hours McLeran Well Drilling, LLC INVOICE 1204 Center Ave. DATE: March 24, 2020 Payette, Id. 83661 INVOICE# 1374 David McLeran 208-941-2587 Office 208-405-5808 dmcieran@q.com BILL TO: Capitol Water Corporation 2626 N. Eldorado St. Boise, Id 83704 Lubkin Well Chemical Treatment Activity CITY Column1 AMOUNT Please refer to time log attached. $ Lubkin Well Chemical Treatment 37.50 hrs 3T50 $325.00 $ 12,187.50 TOTAL $ 12,187.50 Make all checks payable to McLeran Well Drilling, LLC. THANK YOU FOR YOUR BUSINESS! McLeran Well Drilling LLC 1204 Center Ave. Payette,Id.83661 Capitol Water Corporation 2626 N.Eldorado St Boise,Id.83704 Lubkin Well Chemical Treatment 3/4/2020 10:00 AM On site setting up rig 11:OOAM-4.30 PM Scraping upper casing and started brushing upper casing 5.50 Hours 3/6/2020 10:00 AM On Site 10:00 AM-12:30PM Finished brushing upper casing 12:30 PM-2:00 PM Bailing out 13'of infill mostly casing crust little natural sand black 2:00 PM-4:00 PM Brushing screens 20 passes 4:00 PM-5:00 PM Running in pump for development 5:00 PM Off Site 7.00 Hours 3/9/2020 12:00 PM On Site 12:00PM-12:30PM Getting pump running Static 57. 2:38 PM Draw Down 92' 1:00 PM Draw Down,98' Off Site Carborator issues 1:00 Hour 3/11/2020 230 PM On Site 2.30 PM-5:00 PM Swabbing well moved lots of color and mineral deposits not much natural sand draw, 2.5 hours down 94'. 3/12/2020 9:30 AM On Site 9:30 AM -3:00 PM Finished swabbing screens,drawdown at 92'. 5.5 hours 3/13/2020 12:30 AM-1:00 PM Pump test 276 gpm,static draw down 84'. 1:00 PM-3:30 PM Tripping in Tremie lines for Pumping Acid. 3 Hours 3/16/2020 9:30 AM On Site 9:30 AM -3:00 PM Pumping Acid Tremie fell off,Tripping out Tremie 6 hours 3/17/2020 11:00 AM-1:00 PM Fishing out Tremie and swabbing through screens. 2 hours 3/18/2020 9:30 AM On Site 9:30 AM- 2:30 PM Setting in pump then pumping for water,clearing,then pulling pump. Draw down 92,after 4 hours 275 gpm 2:30 PM Tearing Down Rig 5 hours Total 1250 Hours Scraping and Brushing 9.00 Hours Development 16.00 Hours Acid and Pumping to Waste Total 37.50 Hours