HomeMy WebLinkAbout20240701CAP to Staff Second Supplemental Responses 24_28.pdf RECEIVED
Monday, July 1, 2024
IDAHO PUBLIC
UTILITIES COMMISSION
ROBERT PRICE
PRESIDENT
CAPITOL WATER CORPORATION
2626 ELDORADO ST.
BOISE, IDAHO 83704-5926
208-375-0931
info(4),capitolwatercorp.com
www.capitolwatercorp.com
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION OF )
CAPITOL WATER CORPORATION )
FOR AUTHORITY TO ) CASE NO. CAP-W-24-01
INCREASE ITS RATES AND CHARGES FOR )
WATER SERVICE IN THE STATE OF IDAHO. ) SECOND
SUPPLEMENTAL
RESPONSE TO THE
SECOND PRODUCTION
REQUEST OF THE
COMMISSION STAFF
Capitol Water Corporation provides the following additional supplemental responses to
the Second Production Request of the Commission Staff to Capitol Water Corporation.
REQUEST NO. 24: Please provide a thorough and complete description of the water
system including the following details regarding the system as applicable:
g. The year, make, model, and capacity for backup generation supporting the well
pumps, and length of time in service. Indicate if the generation has an Automatic
Transfer Switch(ATS) or if it must be manually started; and
COMPANY ORIGINAL RESPONSE: The Company is continuing to compile the
requested information for items a, b, f, g, and h, and will send the requested information when
the research has been completed. As to items c, d, and e, the Company does not have any
storage tanks or booster pumps. The Company recommends an onsite visit with the Water
Operator for a more thorough understanding of the water system.
SECOND PRODUCTION REQUEST
SUPPLEMENTAL RESPONSE OF 1 JUNE 26, 2024
CAPITOL WATER CORPORATION
TO COMMISSION STAFF
COMPANY SUPPLEMENTAL RESPONSE: The Company has already responded to
items c, d, and e; in this response the Company submits the information for items a, b, f, g, and h.
The Company recommends an onsite visit with the Water Operator for a more thorough
understanding of the water system.
g. Back-up Generator: There is a back-up generator at Well#4. It was installed in
August of 2004. It is serviced semi-annually. The generator has an automatic transfer switch.
COMPANY SECOND SUPPPLEMENTAL RESPONSE: The Company did not
include the make and model of the generator in its first supplemental response. It is a Keto Light
generator, Model D300FRJ4, with an engine manufactured by John Deere, Model 6125 HF 070.
REQUEST NO. 28: Please provide the monthly metered amount of water(gallons)
pumped from each well from January 2019 to December 2023. Please provide your responses in
spreadsheet format(such as Microsoft Excel)with formulas intact.
COMPANY ORIGINAL RESPONSE: The monthly metered amount of water
(gallons)pumped from each well from January 2019 through December 2022 has been provided
to Commission Staff in the Company's annual PPCA filings. Please see Case No. CAP-W-20-
01, Case No. CAP-W-21-01, Case No. CAP-W-22-01, and Case No. CAP-W-23-01 for this
information. Copies of the 2023 well logs, which include the daily meter and pressure readings,
are provided as PDFs as "PR 28 Well Logs."
COMPANY SUPPLEMENTAL RESPONSE: After discussions with Commission
Staff, the Company is providing the amount of water pumped from Well#7 into Well#6, the
Aquifer Storage Recharge Well. During 2020/2021 the Company pumped 74,791,900 gallons of
water into Well#6 for the 2021 summer sprinkling season. During 2021/2022 the Company
pumped 85,440,400 gallons of water into Well #6 for the 2022 summer sprinkling season.
During 2022/2023 the Company pumped 66,163,600 gallons of water into Well#6 for the 2023
summer sprinkling season. The amount pumped into Well#6 depends on the weather and
watering patterns of the customers. For example, if there is an early fall, and customers stop
sprinkling their lawns in response,then the Company will begin injecting water into Well#6
sooner than with a late fall. Conversely, if there is an early spring, and customers start sprinkling
their lawns early in the season, then the Company will cease injecting water into Well#6 early as
SECOND PRODUCTION REQUEST
SUPPLEMENTAL RESPONSE OF 2 JUNE 26, 2024
CAPITOL WATER CORPORATION
TO COMMISSION STAFF
well. The Company's goal is to start injecting on November I"and continue injecting until
April 30th, approximately 6 months.
DATED at Boise, Idaho, this 26th day of June, 2024.
H. Robert Price
President, Capitol Water Corporation
SECOND PRODUCTION REQUEST
SUPPLEMENTAL RESPONSE OF 3 JUNE 26, 2024
CAPITOL WATER CORPORATION
TO COMMISSION STAFF
ROBERT PRICE
PRESIDENT
CAPITOL WATER CORPORATION
2626 ELDORADO ST.
BOISE, IDAHO 83704-5926
208-375-0931
info a,capitolwatercorp.com
www.capitolwatercorp.com
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION OF )
CAPITOL WATER CORPORATION )
FOR AUTHORITY TO ) CASE NO. CAP-W-24-01
INCREASE ITS RATES AND CHARGES FOR )
WATER SERVICE IN THE STATE OF IDAHO. ) SECOND
SUPPLEMENTAL
RESPONSE TO THE
SECOND PRODUCTION
REQUEST OF THE
COMMISSION STAFF
Capitol Water Corporation provides the following additional supplemental responses to
the Second Production Request of the Commission Staff to Capitol Water Corporation.
REQUEST NO. 24: Please provide a thorough and complete description of the water
system including the following details regarding the system as applicable:
g. The year, make, model, and capacity for backup generation supporting the well
pumps, and length of time in service. Indicate if the generation has an Automatic
Transfer Switch (ATS) or if it must be manually started; and
COMPANY ORIGINAL RESPONSE: The Company is continuing to compile the
requested information for items a,b, f, g, and h, and will send the requested information when
the research has been completed. As to items c, d, and e, the Company does not have any
storage tanks or booster pumps. The Company recommends an onsite visit with the Water
Operator for a more thorough understanding of the water system.
SECOND PRODUCTION REQUEST
SUPPLEMENTAL RESPONSE OF 1 JUNE 26, 2024
CAPITOL WATER CORPORATION
TO COMMISSION STAFF
COMPANY SUPPLEMENTAL RESPONSE: The Company has already responded to
items c, d, and e; in this response the Company submits the information for items a,b, f, g, and h.
The Company recommends an onsite visit with the Water Operator for a more thorough
understanding of the water system.
g. Back-up Generator: There is a back-up generator at Well #4. It was installed in
August of 2004. It is serviced semi-annually. The generator has an automatic transfer switch.
COMPANY SECOND SUPPPLEMENTAL RESPONSE: The Company did not
include the make and model of the generator in its first supplemental response. It is a Keto Light
generator, Model D300FRJ4, with an engine manufactured by John Deere, Model 6125 HF 070.
REQUEST NO. 28: Please provide the monthly metered amount of water(gallons)
pumped from each well from January 2019 to December 2023. Please provide your responses in
spreadsheet format(such as Microsoft Excel) with formulas intact.
COMPANY ORIGINAL RESPONSE: The monthly metered amount of water
(gallons)pumped from each well from January 2019 through December 2022 has been provided
to Commission Staff in the Company's annual PPCA filings. Please see Case No. CAP-W-20-
01, Case No. CAP-W-21-01, Case No. CAP-W-22-01, and Case No. CAP-W-23-01 for this
information. Copies of the 2023 well logs, which include the daily meter and pressure readings,
are provided as PDFs as "PR 28 Well Logs."
COMPANY SUPPLEMENTAL RESPONSE: After discussions with Commission
Staff, the Company is providing the amount of water pumped from Well#7 into Well #6, the
Aquifer Storage Recharge Well. During 2020/2021 the Company pumped 74,791,900 gallons of
water into Well#6 for the 202-1 summer sprinkling season. During 2021/2022 the Company
pumped 85,440,400 gallons of water into Well #6 for the 2022 summer sprinkling season.
During 2022/2023 the Company pumped 66,163,600 gallons of water into Well #6 for the 2023
summer sprinkling season. The amount pumped into Well#6 depends on the weather and
watering patterns of the customers. For example, if there is an early fall, and customers stop
sprinkling their lawns in response, then the Company will begin injecting water into Well#6
sooner than with a late fall. Conversely, if there is an early spring, and customers start sprinkling
their lawns early in the season, then the Company will cease injecting water into Well#6 early as
SECOND PRODUCTION REQUEST
SUPPLEMENTAL RESPONSE OF 2 JUNE 26, 2024
CAPITOL WATER CORPORATION
TO COMMISSION STAFF
well. The Company's goal is to start injecting on November 1st and continue injecting until
April 30t', approximately 6 months.
DATED at Boise, Idaho, this 26h day of June, 2024.
d/04�w 1-e-
H. Robert Price
President, Capitol Water Corporation
SECOND PRODUCTION REQUEST
SUPPLEMENTAL RESPONSE OF 3 JUNE 26, 2024
CAPITOL WATER CORPORATION
TO COMMISSION STAFF
ROBERT PRICE
PRESIDENT
CAPITOL WATER CORPORATION
2626 ELDORADO ST.
BOISE, IDAHO 83704-5926
208-375-0931
infoAxapitolwatercorp.com
www.capitolwatercorp.com
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION OF )
CAPITOL WATER CORPORATION )
FOR AUTHORITY TO ) CASE NO. CAP-W-24-01
INCREASE ITS RATES AND CHARGES FOR )
WATER SERVICE IN THE STATE OF IDAHO. ) CAPITOL WATER
CORPORATION
SUPPLEMENTAL
RESPONSE TO THE
FOURTH PRODUCTION
REQUEST OF THE
COMMISSION STAFF
Capitol Water Corporation provides the following supplemental responses to the Fourth
Production Request of the Commission Staff to Capitol Water Corporation.
REQUEST NO. 50: Please provide a count of Test Year 2022 non-metered customers
by service size. Please also provide a count of the number of non-metered accounts that are
charged the Sprinkling Rate.
ORIGINAL COMPANY RESPONSE: The Company counted the number of
customers for the month of June 2022 to determine the count of Test Year 2022 non-metered or
flat-rate customers by service size. There are 2,198 3/-Inch Service Lines; 308 1-Inch Service
Lines; and 12 1'/-Inch Service Lines. For the month of June, there were 2,518 flat-rate
residential customers, as compared to the 2,521 flat-rate customers at year-end as reflected in the
2022 Annual Report.
The customer count fluctuates every month due to customers leaving the system either
through selling/buying the residence or moving into or out of a residential rental. Therefore,
FOURTH PRODUCTION REQUEST SUPPLEMENTAL RESPONSE
OF CAPITOL WATER CORPORATION 1 JULY 1, 2024
TO COMMISSION STAFF
there are customer accounts each month that are not in service. The Company updates the year
end customer count by reviewing all new customer move in/move out documentation for the year
and adjusting the total number of customers for the Annual Report.
SUPPLEMENTAL COMPANY RESPONSE: To clarify the original response, for the
month of June, there were 2048 flat-rate 3/-inch line customers paying the summer rate; 266 flat-
rate 1-inch customers paying the summer rate, and 12 1'/-inch line customers paying the-
summer rate, for a total of 2,326 flat-rate customers paying the summer rate during June 2022.
There were 150 3/-inch line customers paying the winter rate; and 42 1-inch line customers
paying the winter rate, for a total of 192 customers paying the winter rate during June 2022.
REQUEST NO. 51: Please provide a customer bill from within the past year for each
meter size for metered customers, with all confidential customer information redacted.
COMPANY RESPONSE: Due to the eccentricities of the customer billing system, the
Company is not able to reproduce customer bills for prior billing periods. Capitol Water
Corporation is going to purchase new billing software, which will enable the Company to reprint
statements and other features.
The Company is in the process of printing and assembling the June 2024 bills and will
provide a customer bill for each meter size for metered customers by July 1, 2024, from the
current statement period.
SUPPLEMENTAL COMPANY RESPONSE: Please see the attached redacted
metered customer bills for each meter size, Attachment"Redacted Meter Bills June 2024
Question 51.pdf'.
DATED at Boise, Idaho, this first day of July 2024.
,�Z 4;�,A �Jec
H. Robert Price
President, Capitol Water Corporation
FOURTH PRODUCTION REQUEST SUPPLEMENTAL RESPONSE
OF CAPITOL WATER CORPORATION 2 JULY 1, 2024
TO COMMISSION STAFF