BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF ROCKY MOUNTAIN ) CASE NO. PAC-E-24-06
POWER'S APPLICATION FOR APPROVAL )
OF THE TRANSFER OF PORTIONS OF THE ) NOTICE OF APPLICATION
NORTH TEMPLE PROPERTY AND )
ACCOUNTING ORDER ) NOTICE OF MODIFIED
PROCEDURE
ORDER NO. 36191
On April 15, 2024, PacifiCorp dba Rocky Mountain Power ("Company") applied for
approval of a Property Transfer Agreement("Transfer Agreement") it entered with LHM DEV E,
LLC and a determination that the disposition of the property is in the public interest. The Company
also requests an accounting order authorizing it to record any net proceeds from the transfer as a
regulatory liability. The Company requests its Application be processed by Modified Procedure
and the Commission issue a final order by October 1, 2024.
We now issue this Notice of Application and Notice of Modified Procedure setting dates
for public comments and the Company's reply.
NOTICE OF APPLICATION
YOU ARE HEREBY NOTIFIED that the Company represents the North Temple property
it seeks authority to sell contains facilities that support several of the Company's operational
functions in the six states it operates. These functions include engineering, IT, HR, renewable
development, health and safety, legal, finance, customer service, grid operations, regulatory,
thermal generation,environmental,and facilities/property management. The grid operations center
located on the property supports the mountain west service territories. The Company represents
the facilities housing these above-mentioned functions and associated personnel no longer meet
disaster recovery requirements and have exceeded their useful lives. The Company lists a myriad
of issues present at the existing facilities to support its position.
YOU ARE FURTHER NOTIFIED that the Company commissioned a third-party
assessment that explored renovating the existing facilities on the North Temple property or new
construction. According to the study the new construction would cost at least ten percent less than
renovation of existing facilities.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 36191 1
YOU ARE FURTHER NOTIFIED that the Company's plans for the initial phase consist
of anew headquarters and the possibility of a new energy services building.' The new energy
services building would be built to critical infrastructure resilience risk category IV standards that
will ensure this critical infrastructure will remain operational during and after extreme incidents.
The Company plans to develop 4-10 acres of the North Temple property and would retain about
35 acres for the Gadsby power plant and substation.
YOU ARE FURTHER NOTIFIED that the North Temple property contains several
"Blocks" that will be available to LHM DEV E, LLC after relevant conditions have been met.
LHM DEV E,LLC is not required to exercise its entire option at once and the Transfer Agreement
contains a timeline for mandatory purchases. The Transfer Agreement also contains the agreed
upon price for the Blocks and price escalators to account for time.
YOU ARE FURTHER NOTIFIED that the Company is not seeking a prudence
determination in this case. If authorized, the Company will credit Federal Energy Regulatory
Commission("FERC")Account 254-Other Regulatory Liabilities and debit FERC Account 421.1-
Gain on disposition of property.
YOU ARE FURTHER NOTIFIED that the Application and exhibits are available for
public inspection during regular business hours at the Commission's office. The Application is
also available on the Commission's website at www.puc.idaho.gov. Click on the "ELECTRIC"
icon, select"Open Cases," and click on the case number as shown on the front of this document.
YOU ARE FURTHER NOTIFIED that all proceedings in this case will be held pursuant
to the Commission's jurisdiction under Title 61 of the Idaho Code, and that all proceedings in this
matter will be conducted pursuant to the Commission's Rules of Procedure, IDAPA 31.01.01.000
et seq.
NOTICE OF MODIFIED PROCEDURE
YOU ARE FURTHER NOTIFIED that the Commission has determined that the public
interest may not require a formal hearing in this matter, and that it will proceed under Modified
Procedure pursuant to the Commission's Rules of Procedure 201-204, IDAPA 31.01.01.201-.204.
1 Exhibit 1 of the Company's Application shows that the remodel would include about 234,000 sq ft and the new
headquarters construction would include 150,000 sq ft.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 36191 2
The Commission notes that Modified Procedure and written comments have proven to be an
effective means for obtaining public input and participation.
YOU ARE FURTHER NOTIFIED that persons desiring to state a position on this
Application may file a written comment explaining why the person supports or opposes the
Application. Persons who would like a hearing must specifically request a hearing in their written
comments and explain why written comments alone are insufficient. Persons interested in filing
written comments must do so by August 1, 2024. Comments must be filed through the
Commission's website or by e-mail unless computer access is unavailable. To comment
electronically, please access the Commission's website at http://www.puc.idaho.gov/. Click the
"Case Comment Form" and complete the form using the case number as it appears on the front of
this document.
To file by e-mail, persons must e-mail the comments to the Commission Secretary and all
parties at the e-mail addresses listed below. Persons submitting a comment by e-mail must provide
their name, address, and the Case Number under which they are commenting. Persons submitting
a comment by e-mail also acknowledge that submitting a comment in an open case constitutes a
public record under Idaho Code § 74-101(13), and all information provided by such person is
available for public and media inspection.
If computer access is unavailable, then comments may be mailed to the Commission and
the parties at the addresses below.Persons submitting a comment by mail must provide their name,
address, and the Case Number under which they are commenting. Persons submitting a comment
by mail also acknowledge that submitting a comment in an open case constitutes a public record
under Idaho Code§74-101(13),and all information provided by such person is available for public
and media inspection.
For the Idaho Public Utilities Commission: For Rocky Mountain Power:
Commission Secretary Mark Alder
Idaho Public Utilities Commission Rocky Mountain Power
P.O. Box 83720 1407 West North Temple, Suite 330
Boise, ID 83720-0074 Salt Lake City, UT 84116
secretarykpuc.idaho.gov mark.aldergpacificorp.com
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 36191 3
Street Address for Express Mail: Joe Dallas
Rocky Mountain Power
11331 W. Chinden Blvd. 825 NE Multnomah, Suite 2000
Building 8, Suite 201-A Portland, OR 97232
Boise, ID 83714 joseph.dallas(&pacificorp.com
Data Request Response Center
PacifiCorp
825 NE Multnomah, Suite 2000
Portland, OR 97232
datarequest(kpacificorp.com
YOU ARE FURTHER NOTIFIED that the Company must file any reply comments by
August 15, 2024.
YOU ARE FURTHER NOTIFIED that if no written comments or protests are received
within the time limit set, the Commission will consider this matter on its merits and enter its final
order without a formal hearing. If written comments are received within the time limit set, the
Commission will consider them and, in its discretion, may set the same for formal hearing.
ORDER
IT IS HEREBY ORDERED that the Application be processed by Modified Procedure,
Rules 201-204. Persons interested in filing written comments must do so by August 1, 2024. The
Company must file any reply comments by August 15, 2024.
IT IS FURTHER ORDERED that parties comply with Order No. 35375, issued April 21,
2022. Generally, all pleadings should be filed with the Commission electronically and will be
deemed timely filed when received by the Commission Secretary.See Rule 14.02. Service between
parties should continue to be accomplished electronically when possible. However, voluminous
discovery-related documents may be filed and served on CD-ROM or a USB flash drive.
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 36191 4
DONE by Order of the Idaho Public Utilities Commission at Boise, Idaho this 24th day of
May 2024.
ERI A DER ON, PRESIDENT
J N R. HAMMOND JR., COMMISSIONER
G o
EDWARD LODGE, CO&AUSSIONER
ATTEST:
Mo a a ios
Commission Secretary
I:\Legal\ELECTRIC\PAC-E-24-06_N Temple\orders\PACE2406_me app mod_dh.docx
NOTICE OF APPLICATION
NOTICE OF MODIFIED PROCEDURE
ORDER NO. 36191 5